{{#Wiki_filter:Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Surveyunit:
{{#Wiki_filter:Generic ALARA Evaluation Comparison Worksheet Survey Area:     NOL-05                     Surveyunit:       01 Reference Generic ALARA Evaluation No.:         YA-REPT-00-003-05 Applicable Generic ALARA AL:         165 Radionuclide       Average Concentration     DCGL             fraction DCGL Co-60               0.04                     1.4                 0.03 CS-137               0.11               - 3 .O-                  0.04 0.016                 2 -5                   0.00b 4.
01 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 ---- - Radionuclide Average Concentration DCGL fraction DCGL Co-60 0.04 1.4 0.03 CS-137 0.11 -- 3 .O 0.04 0.016 2 -5 0.00 b 4. X(fraction DCGL) = 0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
X(fraction DCGL) =         0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
X Generic ALARA AL I$ satisfied. Generic ALARA AL IS NOT satisfied.
Check one:
I Reviewed by:% & 0 , / Date: d-LkhA -I ' ~ PSS krojectdGlanager DPF-8867.1 Rev. 2 Page 1 of 1 Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit:
X   Generic ALARA AL I$ satisfied.
02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL
Generic ALARA AL IS NOT satisfied.
: 3. 4. C(fraction DCGL) = _-0.19 ___ If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit. Check one:
I Reviewed by:%         &       0,   /
X Generic ALARA AL IS satisfied. Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/ \ Reviewed by: &fiC h,~mm Date: 1. ,/!!;/OJ/
Date: d-LkhA
DPF-8867.
~                PSS krojectdGlanager                                -I   '
I Rev. 2 Page 1 of 1 ALARA Analysis Worksheet 1 1. Decision Criteria: If the sum of the DCGL fractions  
DPF-8867.1 Rev. 2 Page 1 of 1
< AL, then additional remediation is not cost beneficial.
 
If the sum of the fractions  
Generic ALARA Evaluation Comparison Worksheet Survey Area:     NOL-05                     Survey Unit:     02 Reference Generic ALARA Evaluation No.:         YA-REPT-00-003-05 Applicable Generic ALARA AL:         165 Radionuclide       Average Concentration     DCGL                   fraction DCGL 3.
> AL, then additional remediation is cost beneficial. Check one: Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial - Prepared by:  
4.
.( - Date: !Ah-- FSS Radiological Engineer
C(fraction DCGL) = _-0.19             ___
+OK b. 3h-L LYFf u - Independent Review by:
If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
r&LC&2L Date: ,&/;A, 5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3}}
Check one:
X Generic ALARA AL IS satisfied.
Generic ALARA AL IS NOT satisfied, Prepared by:                                           Date:     /!.A/
                \
Reviewed by:                         &fiC   h,~mm     Date:   1O
                                                                  /J;!!./,
DPF-8867. I Rev. 2 Page 1 of 1
 
ALARA Analysis Worksheet
: 11. Decision Criteria:         If the sum of the DCGL fractions < AL, then additional remediation is not cost beneficial. If the sum of the fractions > AL, then additional remediation is cost beneficial.
Check one:     Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial -
Prepared by: .( -
FSS Radiological Engineer Date:   !Ah--
                                      +OK   b.         LYFf r&LC&2L-                              ,&/;A, 3 h - L u
Independent Review by:                                                Date:          5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3}}

Latest revision as of 00:23, 14 March 2020

Yankee Nuclear Power Station - Generic ALARA Evaluation Comparison Worksheet
ML062970060
Person / Time
Site: Yankee Rowe
Issue date: 05/18/2006
From: Danni Smith
Yankee Atomic Electric Co
To:
NRC/FSME
References
YA-REPT-00-003-05
Download: ML062970060 (3)


Text

Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Surveyunit: 01 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL Co-60 0.04 1.4 0.03 CS-137 0.11 - 3 .O- 0.04 0.016 2 -5 0.00b 4.

X(fraction DCGL) = 0.076 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

X Generic ALARA AL I$ satisfied.

Generic ALARA AL IS NOT satisfied.

I Reviewed by:% & 0, /

Date: d-LkhA

~ PSS krojectdGlanager -I '

DPF-8867.1 Rev. 2 Page 1 of 1

Generic ALARA Evaluation Comparison Worksheet Survey Area: NOL-05 Survey Unit: 02 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL 3.

4.

C(fraction DCGL) = _-0.19 ___

If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

X Generic ALARA AL IS satisfied.

Generic ALARA AL IS NOT satisfied, Prepared by: Date: /!.A/

\

Reviewed by: &fiC h,~mm Date: 1O

/J;!!./,

DPF-8867. I Rev. 2 Page 1 of 1

ALARA Analysis Worksheet

11. Decision Criteria: If the sum of the DCGL fractions < AL, then additional remediation is not cost beneficial. If the sum of the fractions > AL, then additional remediation is cost beneficial.

Check one: Additional remediation IS NOT cost beneficial Additional remediation IS cost beneficial -

Prepared by: .( -

FSS Radiological Engineer Date: !Ah--

+OK b. LYFf r&LC&2L- ,&/;A, 3 h - L u

Independent Review by: Date: 5y FSS Project Man&er/ Radiat'on Protection Manager DPF-8867.2 Rev. 2 Page 3 of 3