05000528/FIN-2008004-01: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
| CCA = N/A for ROP | | CCA = N/A for ROP | ||
| INPO aspect = | | INPO aspect = | ||
| description = The inspectors identified a noncited violation of Technical Specification 5.5.2.b, "Primary Coolant Sources Outside Containment," for the failure of engineering and maintenance personnel to implement a program to verify integrated leak test requirements for abandoned valves still connected to an active system. Specifically, between January 8, 1993, and September 30, 2008, engineering personnel failed to ensure portions of the containment spray system, which could be in contact with radioactive fluids outside containment, were included in the integrated leak test requirements. This issue was entered into the licensee's corrective action program as Condition Report/Disposition Request 3170965. The performance deficiency associated with this finding was the failure of engineering and maintenance personnel to implement a program to verify integrated leak test requirements for abandoned valves still connected to an active system. The finding is greater than minor because it is associated with the design control and procedural quality attribute associated with maintaining radiological barrier functionality for the auxiliary building of the barrier integrity cornerstone and affects the cornerstone objective to provide reasonable assurance that the physical design barriers protect the public from radio nuclide releases caused by accidents or events. Using Manual Chapter 0609.04, "Phase 1 Initial Screening and Characterization of Findings," the finding is determined to have very low safety significance because it only represented a degradation of the radiological barrier function of the auxiliary building. This finding was evaluated as not having a crosscutting aspect because the performance deficiency is not indicative of current performance (Section 1R04). | | description = The inspectors identified a noncited violation of Technical Specification 5.5.2.b, \"Primary Coolant Sources Outside Containment,\" for the failure of engineering and maintenance personnel to implement a program to verify integrated leak test requirements for abandoned valves still connected to an active system. Specifically, between January 8, 1993, and September 30, 2008, engineering personnel failed to ensure portions of the containment spray system, which could be in contact with radioactive fluids outside containment, were included in the integrated leak test requirements. This issue was entered into the licensee\'s corrective action program as Condition Report/Disposition Request 3170965. The performance deficiency associated with this finding was the failure of engineering and maintenance personnel to implement a program to verify integrated leak test requirements for abandoned valves still connected to an active system. The finding is greater than minor because it is associated with the design control and procedural quality attribute associated with maintaining radiological barrier functionality for the auxiliary building of the barrier integrity cornerstone and affects the cornerstone objective to provide reasonable assurance that the physical design barriers protect the public from radio nuclide releases caused by accidents or events. Using Manual Chapter 0609.04, \"Phase 1 Initial Screening and Characterization of Findings,\" the finding is determined to have very low safety significance because it only represented a degradation of the radiological barrier function of the auxiliary building. This finding was evaluated as not having a crosscutting aspect because the performance deficiency is not indicative of current performance (Section 1R04). | ||
}} | }} |
Latest revision as of 19:35, 20 February 2018
Site: | Palo Verde |
---|---|
Report | IR 05000528/2008004 Section 1R04 |
Date counted | Sep 30, 2008 (2008Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.04 |
Inspectors (proximate) | P Goldberg R Treadway B Henderson T Mckernon J Melfi D Proulx G Apger A Fairbanks J Bashore M Bloodgood M Catts T Buchanan |
INPO aspect | |
' | |