| title = Review Adequacy Of Suppression Pool Temperature Monitoring System Calibration Relative To Technical Specification Sr 3.3.3.1.3 Channel Calibration
| title = Review Adequacy of Suppression Pool Temperature Monitoring System Calibration Relative to Technical Specification SR 3.3.3.1.3 Channel Calibration
 
| docket = 05000324, 05000325
| docket = 05000324, 05000325
| inspection report = IR 05000324/2008002
| inspection report = IR 05000324/2008002
Line 13: Line 12:
| identified by = NRC
| identified by = NRC
| Inspection procedure = IP 71111.15
| Inspection procedure = IP 71111.15
| Inspector = J Austin, R Moore, R Musser, R Lewis, C Even, M Coursey, G Kolcum, B Collins, J Eargler, Musser G, Kolcum J, Fuller H, Gepford J, Austi
| Inspector = J Austin, R Moore, R Musser, R Lewis, C Even, M Coursey, G Kolcum, B Collins, J Eargler, Musserg Kolcum, J Fuller, H Gepford, J Austin
| CCA = N/A for ROP
| CCA = N/A for ROP
| INPO aspect =  
| INPO aspect =  

Latest revision as of 22:04, 29 May 2018

01
Site: Brunswick Duke Energy icon.png
Report IR 05000324/2008002 Section 1R15
Date counted Mar 31, 2008 (2008Q1)
Type: URI:
cornerstone No Cornerstone
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) J Austin