{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 5, 2018 Mr. Dealis W. Gwyn Licensing Manager CB&I AREVA MOX Services P.O. Box 7097 Aiken, SC 29804-7097
 
February 5, 2018  
 
Mr. Dealis W. Gwyn
 
Licensing Manager CB&I AREVA MOX Services  
 
P.O. Box 7097  
 
Aiken, SC 29804-7097  


==SUBJECT:==
==SUBJECT:==
U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE "PHYSICAL PROTECTION PLAN", "SAFEGUARDS CONTINGENCY  
U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY
 
RESPONSE PLAN", AND THE "TRAINING AND QUALIFICATION PLAN" FOR THE MIXED OXIDE FUEL FABRICATION FACILITY


==Dear Mr. Gwyn:==
==Dear Mr. Gwyn:==


On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the "Physical Protection Plan (PPP)", "Safeguards Contingency Response Plan (SCRP)", and  
On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the Physical Protection Plan (PPP), Safeguards Contingency Response Plan (SCRP), and the Training and Qualification Plan (T&QP) for the Mixed Oxide Fuel Fabrication Facility for review and approval (Agencywide Documents Access and Management System [ADAMS]
 
Accession Numbers ML17222A201, ML17096A721, and ML17096A771).
the "Training and Qualification Plan (T&QP)" for the Mixed Oxide Fuel Fabrication Facility for  
As stated in the enclosed Safeguards Evaluation Reports (SER), the U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the changes requested by MOX Services in the revision of the PPP, SCRP and T&QP.
The methods and procedures outlined in MOX Services February 2017, Revisions of the PPP, T&QP, and SCRP satisfy the performance objectives, systems capabilities, and reporting requirements specified in Title10 of the Code of Federal Regulations (10 CFR) Sections 73.45 and 73.46, and Appendices B, C and H of Part 73. Therefore, NRC staff finds the MOX Services February 2017, Revisions to the PPP, T&QP, and SCRP are acceptable and provide high assurance that activities involving Special Nuclear Material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.
We are basing our conclusions and findings in the SER on the information provided by MOX Services. The PPP SER (Secret // Restricted Data) is provided under a separate cover. The T&QP, and SCRP SERs are attached as enclosures and are Official Use Only - Security Related information.
In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Document transmitted contains Security-Related Information.
When separated from the enclosures, this letter is decontrolled.


review and approval (Agencywide Document s Access and Management System [ADAMS]
D. Gwyn                                      If you have any questions concerning the above, please contact me at (301) 415-8740, or via e-mail at David.Tiktinsky@nrc.gov.
Accession Numbers ML17222A201, ML17096A721, and ML17096A771). 
Sincerely,
 
                                                          \RA\
As stated in the enclosed Safeguards Evaluation Reports (SER), the U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the changes requested by MOX Services in the revision
David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-3098                                         Document transmitted contains Security-Related Information.
 
of the PPP, SCRP and T&QP. 
 
The methods and procedures outlined in MOX Services' February 2017, Revisions of the PPP, T&QP, and SCRP satisfy the performance objectives, systems capabilities, and reporting
 
requirements specified in Title10 of the Code of Federal Regulations (10 CFR) Sections 73.45 and 73.46, and Appendices B, C and H of Part 73. Therefore, NRC staff finds the MOX
 
Services' February 2017, Revisions to the PPP, T&QP, and SCRP are acceptable and provide
 
high assurance that activities involving Special Nuclear Material are not inimical to the common
 
defense and security and do not constitute an unreasonable risk to the public health and safety.
 
We are basing our conclusions and findings in the SER on the information provided by MOX
 
Services. The PPP SER (Secret // Restricted Data) is provided under a separate cover.
The T&QP, and SCRP SERs are attached as enclosures and are Official Use Only - Security
 
Related information.
 
In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure," a
 
copy of this letter will be available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Avail able Records component of NRC's ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.Document transmitted contains  Security-Related Information.
When separated from the
 
enclosures, this letter is
 
decontrolled. 
 
If you have any questions concerning the above, please contact me at (301) 415-8740, or via
 
e-mail at David.Tiktinsky@nrc.gov. Sincerely,     \RA\
David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards  
 
Docket No. 70-3098  


==Enclosures:==
==Enclosures:==
When separated from the enclosure, this letter is decontrolled.
: 1. Training and Qualification Plan
: 1. Training and Qualification Plan
: 2. Safeguards Contingency Response Plan  
: 2. Safeguards Contingency Response Plan cc: See next page


cc:  See next page
D. Gwyn                                    cc w/o  
 
Document transmitted contains  Security-Related Information.
When separated from the
 
enclosure, this letter is decontrolled. 
 
cc w/o  


==Enclosure:==
==Enclosure:==


Mr. Scott Cannon Federal Project Director  
Ms. Glenn Carroll Mr. Scott Cannon                               Nuclear Watch South Federal Project Director                       P.O. Box 8574 NA-262.1                                      Atlanta, GA 30306 P.O. Box A Aiken, SC 29802                                Mr. Lewis Zeller Blue Ridge Environmental Defense League Ms. Joyce Connery, Chairman                    P.O. Box 88 Defense Nuclear Facilities Safety Board        Glendale Springs, NC 28629 625 Indiana Ave., NW, Suite 700 Washington, DC 20004 Ms. Susan Jenkins Division of Radioactive Waste Management Bureau of Health and Environmental Control 2600 Bull St.
Columbia, SC 292011 Ms. Kathryn M. Sutton Morgan, Lewis, & Bockius 1111 Penn. Ave., NW Washington, DC 20004 Ms. Diane Curran Harmon, Curran, Spielburg & Eisenberg, LLP 1726 M St., NW Suite 600 Washington, DC 20036


NA-262.1 P.O. Box A
D. Gwyn                               
 
Aiken, SC  29802
 
Ms. Joyce Connery, Chairman 
 
Defense Nuclear Facilities Safety Board 
 
625 Indiana Ave., NW, Suite 700 Washington, DC  20004
 
Ms. Susan Jenkins
 
Division of Radioactive Waste Management
 
Bureau of Health and Environmental Control
 
2600 Bull St. 
 
Columbia, SC  292011
 
Ms. Kathryn M. Sutton
 
Morgan, Lewis, & Bockius
 
1111 Penn. Ave., NW
 
Washington, DC  20004
 
Ms. Diane Curran
 
Harmon, Curran, Spielburg & Eisenberg, LLP
 
1726 M St., NW
 
Suite 600
 
Washington, DC  20036
 
Ms. Glenn Carroll
 
Nuclear Watch South
 
P.O. Box 8574
 
Atlanta, GA  30306
 
Mr. Lewis Zeller
 
Blue Ridge Environmental Defense League
 
P.O. Box 88 Glendale Springs, NC  28629


==SUBJECT:==
==SUBJECT:==
UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE "PHYSICAL PROTECTION PLAN", "SAFEGUARDS  
UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY DATE: January 25, 2018 ADAMS ACCESSION No. ML17361A363 OFC     FCSE/FMB       NSIR           NSIR       FCSE/ERB   FCSE/FMB NAME     DTiktinsky   THarris*       RStone*     TBrockington RJohnson DATE     1/17/2018   1/17/2018     1/17/2018     1/25/2018   1/25/2018 OFFICIAL RECORD COPY}}
 
CONTINGENCY RESPONSE PLAN", AND THE "TRAINING AND QUALIFICATION PLAN" FOR THE MIXED OXIDE FUEL FABRICATION  
 
FACILITY
 
DATE: January 25, 2018  
 
ADAMS ACCESSION No. ML17361A363 OFC FCSE/FMB NSIR NSIR FCSE/ERB FCSE/FMB NAME DTiktinsky THarris* RStone* TBrockington RJohnson DATE 1/17/2018 1/17/2018 1/17/2018 1/25/2018 1/25/2018 OFFICIAL RECORD COPY}}

Latest revision as of 07:45, 22 October 2019

U.S. Nuclear Regulatory Commission Evaluation of Revision to the Physical Protection Plan, Safeguards Contingency Response Plan, and the Training and Qualification Plan for the Mixed Oxide Fuel Fabrication Facility
ML17361A364
Person / Time
Site: 07003098
Issue date: 02/05/2018
From: David Tiktinsky
Fuel Manufacturing Branch
To: Gwyn D
CB&I AREVA MOX Services
Tiktinsky D
Shared Package
ML17361A363 List:
References
Download: ML17361A364 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 5, 2018 Mr. Dealis W. Gwyn Licensing Manager CB&I AREVA MOX Services P.O. Box 7097 Aiken, SC 29804-7097

SUBJECT:

U.S. NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY

Dear Mr. Gwyn:

On March 1, 2017, CB&I AREVA Mixed MOX Services (MOX Services) submitted revisions to the Physical Protection Plan (PPP), Safeguards Contingency Response Plan (SCRP), and the Training and Qualification Plan (T&QP) for the Mixed Oxide Fuel Fabrication Facility for review and approval (Agencywide Documents Access and Management System [ADAMS]

Accession Numbers ML17222A201, ML17096A721, and ML17096A771).

As stated in the enclosed Safeguards Evaluation Reports (SER), the U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the changes requested by MOX Services in the revision of the PPP, SCRP and T&QP.

The methods and procedures outlined in MOX Services February 2017, Revisions of the PPP, T&QP, and SCRP satisfy the performance objectives, systems capabilities, and reporting requirements specified in Title10 of the Code of Federal Regulations (10 CFR) Sections 73.45 and 73.46, and Appendices B, C and H of Part 73. Therefore, NRC staff finds the MOX Services February 2017, Revisions to the PPP, T&QP, and SCRP are acceptable and provide high assurance that activities involving Special Nuclear Material are not inimical to the common defense and security and do not constitute an unreasonable risk to the public health and safety.

We are basing our conclusions and findings in the SER on the information provided by MOX Services. The PPP SER (Secret // Restricted Data) is provided under a separate cover. The T&QP, and SCRP SERs are attached as enclosures and are Official Use Only - Security Related information.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Document transmitted contains Security-Related Information.

When separated from the enclosures, this letter is decontrolled.

D. Gwyn If you have any questions concerning the above, please contact me at (301) 415-8740, or via e-mail at David.Tiktinsky@nrc.gov.

Sincerely,

\RA\

David Tiktinsky, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-3098 Document transmitted contains Security-Related Information.

Enclosures:

When separated from the enclosure, this letter is decontrolled.

1. Training and Qualification Plan
2. Safeguards Contingency Response Plan cc: See next page

D. Gwyn cc w/o

Enclosure:

Ms. Glenn Carroll Mr. Scott Cannon Nuclear Watch South Federal Project Director P.O. Box 8574 NA-262.1 Atlanta, GA 30306 P.O. Box A Aiken, SC 29802 Mr. Lewis Zeller Blue Ridge Environmental Defense League Ms. Joyce Connery, Chairman P.O. Box 88 Defense Nuclear Facilities Safety Board Glendale Springs, NC 28629 625 Indiana Ave., NW, Suite 700 Washington, DC 20004 Ms. Susan Jenkins Division of Radioactive Waste Management Bureau of Health and Environmental Control 2600 Bull St.

Columbia, SC 292011 Ms. Kathryn M. Sutton Morgan, Lewis, & Bockius 1111 Penn. Ave., NW Washington, DC 20004 Ms. Diane Curran Harmon, Curran, Spielburg & Eisenberg, LLP 1726 M St., NW Suite 600 Washington, DC 20036

D. Gwyn

SUBJECT:

UNITED STATES NUCLEAR REGULATORY COMMISSION EVALUATION OF REVISION TO THE PHYSICAL PROTECTION PLAN, SAFEGUARDS CONTINGENCY RESPONSE PLAN, AND THE TRAINING AND QUALIFICATION PLAN FOR THE MIXED OXIDE FUEL FABRICATION FACILITY DATE: January 25, 2018 ADAMS ACCESSION No. ML17361A363 OFC FCSE/FMB NSIR NSIR FCSE/ERB FCSE/FMB NAME DTiktinsky THarris* RStone* TBrockington RJohnson DATE 1/17/2018 1/17/2018 1/17/2018 1/25/2018 1/25/2018 OFFICIAL RECORD COPY