PLA-6883, Response to Request for Additional Information Associated with Changes to Cyber Security Implementation Schedule Milestones 3 and 6: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 08/15/2012
| issue date = 08/15/2012
| title = Response to Request for Additional Information Associated with Changes to Cyber Security Implementation Schedule Milestones 3 and 6
| title = Response to Request for Additional Information Associated with Changes to Cyber Security Implementation Schedule Milestones 3 and 6
| author name = Helsel J M
| author name = Helsel J
| author affiliation = PPL Susquehanna, LLC
| author affiliation = PPL Susquehanna, LLC
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Jeffrey M. Helsel Nuclear Plant Manager U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3510 Fax 570.542.1504 jmhelsel@pplweb
{{#Wiki_filter:Jeffrey M. Helsel                 PPL Susquehanna, LLC Nuclear Plant Manager                      769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3510 Fax 570.542.1504 jmhelsel@pplweb.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH CHANGES TO CYBER SECURITY IMPLEMENTATION SCHEDULE MILESTONES 3 AND 6                                                                       Docket Nos. 50-387 PLA-6883                                                                                        and 50-388
.com SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH CHANGES TO CYBER SECURITY IMPLEMENTATION SCHEDULE MILESTONES 3 AND 6 Docket Nos. 50-387 and 50-388 PLA-6883


==Reference:==
==Reference:==
(1) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Proposed Amendment No. 306 to License NPF-14 and Proposed Amendment No. 277 to License NPF-22: Withdrawal and Resubmittal of Request for Approval of the PPL Susquehanna, LLC Cyber Security Plan," dated July 22, 2010 (ML102150151).
(1) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Proposed Amendment No. 306 to License NPF-14 and Proposed Amendment No. 277 to License NPF-22: Withdrawal and Resubmittal of Request for Approval of the PPL Susquehanna, LLC Cyber Security Plan," dated July 22, 2010 (ML102150151).
(2) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Response to Cyber Security Request for Additional Information, " dated April 4, 2011 (ML111 020217). (3) Letter from NRC (B. K. Vaidya) to PPL (T. S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2-Issuance of Amendment RE: Approval of PPL Susquehanna, LLC Cyber Security Plan (TAC Nos. ME4420 and ME4421), "dated July 21, 2011 (ML11152A009).
(2) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Response to Cyber Security Request for Additional Information, "
(4) Letter from PPL (J M Helsel) to NRC Document Control Desk, "Proposed Amendment No. 311 to License NPF-14 and Proposed Amendment No. 283 to License NPF-22: Changes to Cyber Security Implementation Schedule Milestones 3 and 6, " dated April 30, 2012 (ML12122A011).
dated April 4, 2011 (ML111020217).
(3) Letter from NRC (B. K. Vaidya) to PPL (T. S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2- Issuance ofAmendment RE: Approval ofPPL Susquehanna, LLC Cyber Security Plan (TAC Nos. ME4420 and ME4421), "dated July 21, 2011 (ML11152A009).
(4) Letter from PPL (J M Helsel) to NRC Document Control Desk, "Proposed Amendment No. 311 to License NPF-14 and Proposed Amendment No. 283 to License NPF-22:
Changes to Cyber Security Implementation Schedule Milestones 3 and 6, "
dated April 30, 2012 (ML12122A011).
(5) Letter from NRC (Carleen J Sanders) to PPL (Mr. Timothy S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2 -Request for Additional Information regarding Request for Changes to Cyber Security Implementation Schedule Milestones 3 and 6 (TAC Nos. ME8521 and ME8522), "dated August 6, 2012 (ML121840016)
(5) Letter from NRC (Carleen J Sanders) to PPL (Mr. Timothy S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2 -Request for Additional Information regarding Request for Changes to Cyber Security Implementation Schedule Milestones 3 and 6 (TAC Nos. ME8521 and ME8522), "dated August 6, 2012 (ML121840016)
PPL Susquehanna, LLC (PPL) submitted a request for an amendment to the Facility Operating Licenses (FOL) for Susquehanna Steam Electric Station, Units 1 and 2 in Reference (4). The proposed amendments requested NRC approval of the revised PPL Cyber Security Plan, revised Implementation Schedule and revised FOL Physical Protection license condition.
PPL Susquehanna, LLC (PPL) submitted a request for an amendment to the Facility Operating Licenses (FOL) for Susquehanna Steam Electric Station, Units 1 and 2 in Reference (4). The proposed amendments requested NRC approval of the revised PPL Cyber Security Plan, revised Implementation Schedule and revised FOL Physical Protection license condition. In Reference ( 5), the NRC requested additional information. The requested information is provided in the attachment to this letter. PPL requests that the attachment, which contains security-related sensitive information, be withheld from pubic disclosure in accordance with 10 CFR 2.390.
In Reference ( 5), the NRC requested additional information.
 
The requested information is provided in the attachment to this letter. PPL requests that the attachment, which contains security-related sensitive information, be withheld from pubic disclosure in accordance with 10 CFR 2.390. Document Control Desk PLA-6883 The additional information does not impact the conclusions of the significant hazards evaluation.
Document Control Desk PLA-6883 The additional information does not impact the conclusions of the significant hazards evaluation.
There are no new regulatory commitments contained in this letter. If you should have any questions regarding this submittal, please contact Mr. John L. Tripoli at (570) 542-3100.
There are no new regulatory commitments contained in this letter.
I declare under penalty of perjury that the foregoing is true and correct. Executed on: J. M. Helsel  
If you should have any questions regarding this submittal, please contact Mr. John L. Tripoli at (570) 542-3100.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on:
~r J. M. Helsel


==Attachment:==
==Attachment:==
 
Response to Request for Additional Information cc:   NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. C. J. Sanders, NRC Project Manager Mr. L. J. Winker, DEP/BRP}}
Response to Request for Additional Information cc: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. C. J. Sanders, NRC Project Manager Mr. L. J. Winker, DEP/BRP}}

Latest revision as of 00:43, 12 November 2019

Response to Request for Additional Information Associated with Changes to Cyber Security Implementation Schedule Milestones 3 and 6
ML12228A602
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/15/2012
From: Helsel J
Susquehanna
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML122280642 List:
References
PLA-6883, TAC ME4420, TAC ME4421, TAC ME8521, TAC ME8522
Download: ML12228A602 (2)


Text

Jeffrey M. Helsel PPL Susquehanna, LLC Nuclear Plant Manager 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3510 Fax 570.542.1504 jmhelsel@pplweb.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ASSOCIATED WITH CHANGES TO CYBER SECURITY IMPLEMENTATION SCHEDULE MILESTONES 3 AND 6 Docket Nos. 50-387 PLA-6883 and 50-388

Reference:

(1) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Proposed Amendment No. 306 to License NPF-14 and Proposed Amendment No. 277 to License NPF-22: Withdrawal and Resubmittal of Request for Approval of the PPL Susquehanna, LLC Cyber Security Plan," dated July 22, 2010 (ML102150151).

(2) Letter from PPL (T. S. Rausch) to NRC Document Control Desk, "Susquehanna Steam Electric Station Response to Cyber Security Request for Additional Information, "

dated April 4, 2011 (ML111020217).

(3) Letter from NRC (B. K. Vaidya) to PPL (T. S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2- Issuance ofAmendment RE: Approval ofPPL Susquehanna, LLC Cyber Security Plan (TAC Nos. ME4420 and ME4421), "dated July 21, 2011 (ML11152A009).

(4) Letter from PPL (J M Helsel) to NRC Document Control Desk, "Proposed Amendment No. 311 to License NPF-14 and Proposed Amendment No. 283 to License NPF-22:

Changes to Cyber Security Implementation Schedule Milestones 3 and 6, "

dated April 30, 2012 (ML12122A011).

(5) Letter from NRC (Carleen J Sanders) to PPL (Mr. Timothy S. Rausch), "Susquehanna Steam Electric Station, Unit Nos. 1 and 2 -Request for Additional Information regarding Request for Changes to Cyber Security Implementation Schedule Milestones 3 and 6 (TAC Nos. ME8521 and ME8522), "dated August 6, 2012 (ML121840016)

PPL Susquehanna, LLC (PPL) submitted a request for an amendment to the Facility Operating Licenses (FOL) for Susquehanna Steam Electric Station, Units 1 and 2 in Reference (4). The proposed amendments requested NRC approval of the revised PPL Cyber Security Plan, revised Implementation Schedule and revised FOL Physical Protection license condition. In Reference ( 5), the NRC requested additional information. The requested information is provided in the attachment to this letter. PPL requests that the attachment, which contains security-related sensitive information, be withheld from pubic disclosure in accordance with 10 CFR 2.390.

Document Control Desk PLA-6883 The additional information does not impact the conclusions of the significant hazards evaluation.

There are no new regulatory commitments contained in this letter.

If you should have any questions regarding this submittal, please contact Mr. John L. Tripoli at (570) 542-3100.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on:

~r J. M. Helsel

Attachment:

Response to Request for Additional Information cc: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. C. J. Sanders, NRC Project Manager Mr. L. J. Winker, DEP/BRP