PLA-6704, Response to Cyber Security Request for Additional Information
ML111020217 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 04/04/2011 |
From: | Rausch T Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
PLA-6704 | |
Download: ML111020217 (11) | |
Text
Timothy S. Rausch PPL Susquehanna, LLC j Sr. Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3445 Fax 570.542.1504 tsrausch@pplweb.com APR 04 20ff \T U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP 1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO CYBER SECURITY REQUEST FOR ADDITIONAL INFORMATION Docket Nos. 50-387 PLA-6704 and 50-388
References:
- 1) Letter from PPL (T S. Rausch) to NRC Document ControlDesk, "SusquehannaSteam Electric Station ProposedAmendment No. 306 to License NPF-14 and ProposedAmendment No. 277 to License NPF-22:
Withdrawal and Resubmittal ofRequestfor Approval of the PPL Susquehanna, LLC Cyber Security Plan," dated July 22, 2010.
- 2) Letterfrom NRC (BhalchandraK. Vaidya) to PPL (Mr. Timothy S. Rausch),
"SusquehannaSteam Electric Station, Units 1 and 2 - Requestfor Additional Infbrmation RegardingAmendment Applicationfor Approval of the SusquehannaSteam Electric Station, Units 1 And 2 Cyber Security Plan (TAC Nos. ME4420 and ME4421), dated March 3, 2011.
In Reference 1, PPL Susquehanna, LLC (PPL) submitted requests for amendments to the Facility Operating Licenses (FOL) for the Susquehanna Steam Electric Station, Units 1 and 2. The proposed amendments requested NRC approval of the PPL Cyber Security Plan, revisions to the existing FOL Physical Protection license condition, and the Cyber Security Plan implementation schedule.
In Reference 2, the NRC requested additional information regarding the PPL Cyber Security Plan and the associated implementation schedule.
Enclosure 1 to this letter provides the PPL response to the NRC request for additional information. A revised implementation schedule is included in Enclosure 2.
Enclosure 3 provides a revised copy of the PPL Susquehanna, LLC Cyber Security Plan, which incorporates changes based on the RAI response. PPL requests that Enclosure 3, which contains security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390.
The enclosed implementation schedule and Cyber Security Plan replace, in their entirety, the schedule and plan previously submitted in Reference 1.
Document Control Desk PLA-6704 The changes do not affect the conclusions of the no significant hazards consideration determination previously provided in Reference 1.
The implementation schedule includes actions that are considered regulatory commitments. These commitments supersede and replace the commitments made in Reference 1.
If you should have any questions regarding this submittal, please contact Mr. John Petrilla at (570) 542-3796.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: _'_-__ t___ _
T. S. Rausch
Enclosures:
- 1. Response to NRC Request for Additional Information Regarding the PPL Cyber Security Plan
- 2. Revised Implementation Schedule Associated with the PPL Cyber Security Plan
- 3. PPL Susquehanna, LLC Cyber Security Plan [Security-Related Information -
Withhold Under 10 CFR 2.390]
cc: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Mr. R. R Janati, DEP/BRP Mr. B. K. Vaidya, NRC Project Manager
Enclosure 1 to PLA-6704 Response to NRC Request for Additional Information Regarding the PPL Cyber Security Plan
Enclosure 1 to PLA-6704 Page 1 of 4 Response to NRC Request for Additional Information On March 3, 2011, the NRC issued a request for additional information (RAI) to PPL Susquehanna, LLC (PPL) regarding the PPL Cyber Security Plan and associated implementation schedule. PPL's response to the RAI is provided below.
RAI 1: Records Retention NRC Ouestion:
"Title 10 of the Code of Federal Regulations (10 CFR) Paragraph 73.54(c)(2) requires licensees to design a cyber security program to ensure the capability to detect, respond to, and recover from cyber attacks. Furthermore, 10 CFR 73.54(e)(2)(i) requires licensees to maintain a cyber security plan that describes how the licensee will maintain the capability for timely detection and response to cyber attacks. The ability for a licensee to detect and respond to cyber attacks requires accurate and complete records and is further supported by 10 CFR 73.54(h), which states that the licensee shall retain all records and supporting technical documentation required to satisfy the requirements of 10 CFR Section 73.54 as a record until the Commission terminates the license for which the records were developed, and shall maintain superseded portions of these records for at least 3 years after the record is superseded, unless otherwise specified by the Commission.
The licensee's Cyber Security Plan (CSP) in Section [4.13] states that Critical Digital Asset (CDA) audit records and audit data (e.g., operating system logs, network device logs) are retained for a period of time that is less than what is required by 10 CFR 73.54(h).
Explain the deviation from the 10 CFR 73.54(h) requirement to retain records and supporting technical documentation until the Commission terminates the license (or to maintain superseded portions of these records for at least 3 years) and how that meets the requirements of 10 CFR 73.54."
PPL Response:
The PPL Cyber Security plan has been updated to require that records be retained until the Commission terminates the license and that superseded portions of these records be retained for at least 3 years after the record is superseded. This update is consistent with the wording provided in a letter from Christopher E. Earls (NEI) to Mr. Richard P.
Correia (NRC) dated February 28, 2011 and accepted by the NRC in a letter from Richard P. Correia to Mr. Christopher E. Earls dated March 1, 2011. The revised PPL Cyber Security Plan is included as Enclosure 3.
Enclosure 1 to PLA-6704 Page 2 of 4 RAI 2: Implementation Schedule NRC Ouestion:
"The regulation at 10 CFR 73.54, "Protection of digital computer and communication systems and networks," requires licensees to submit a CSP that satisfies the requirements of this section for Commission review and approval. Furthermore, each submittal must include a proposed implementation schedule and the implementation of the licensee's cyber security program must be consistent with the approved schedule. Paragraph 73.54(a) of 10 CFR requires licensees to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks, up to and including the design basis threat.
The completion of several key intermediate milestones (Items (a) through (g) below) would demonstrate progress toward meeting the requirements of 10 CFR 73.54. The Nuclear Regulatory Commission (NRC) staff's expectation is that the key intermediate milestones will be completed in a timely manner, but no later than December 31, 2012.
The key CSP implementation milestones are as follows:
(a) Establish, train and qualify Cyber Security Assessment Team, as described in Section 3.1.2, "Cyber Security Assessment Team," of the CSP.
(b) Identify Critical Systems and CDAs, as described in Section 3.1.3, "Identification of Critical Digital Assets," of the CSP.
(c) Implement cyber security defense-in-depth architecture by installation of
[deterministic one-way] devices, as described in Section 4.3, "Defense-In-Depth Protective Strategies" of the CSP.
(d) Implement the management, operational and technical cyber security controls that address attacks promulgated by use of portable media, portable devices, and portable equipment as described in Appendix D Section 1.19 "Access Control for Portable and Mobile Devices," of Nuclear Energy Institute (NEI) 08-09, Revision 6.
(e) Implement observation and identification of obvious cyber related tampering to existing insider mitigation rounds as described in Appendix E Section 4.3, "Personnel Performing Maintenance and Testing Activities," and Appendix E Section 10.3, "Baseline Configuration" of NEI 08-09, Revision 6.
(f) Identify, document, and implement cyber security controls to physical security target set CDAs in accordance with Section 3.1.6, "Mitigation of Vulnerabilities and Application of Cyber Security Controls," of the CSP.
(g) Ongoing monitoring and assessment activities will commence for those target set CDAs whose security controls have been implemented, as described in Section 4.4, "Ongoing Monitoring and Assessment," of the CSP
Enclosure 1 to PLA-6704 Page 3 of 4 (h) Full implementation of the CSP for all safety, security, and emergency preparedness functions.
Provide a revised CSP implementation schedule that identifies the appropriate milestones, completion dates, supporting rationale, and level of detail to allow the NRC to evaluate the licensee's proposed schedule and associated milestone dates, which include the final completion date. It is the NRC's intention to develop a license condition incorporating your revised CSP implementation schedule containing the key milestone dates."
PPL Response:
PPL's revised implementation schedule is included as Enclosure 2 to this submittal. The revised schedule includes the key milestones and indicates that Milestones 1 - 7 will be completed no later than 12/31/2011 and that full implementation will be completed by 12/1/2015. The schedule is consistent with the template provided in a letter from Christopher E. Earls (NEI) to Mr. Richard P. Correia (NRC) dated February 28, 2011 and accepted by the NRC in a letter from Richard P. Correia to Mr. Christopher E. Earls dated March 1, 2011 except for a minor change to the black text for Milestone 3. The second sentence of the template for Milestone 3 states the following:
"Lower security level devices ([level 0, 1, 2 devices]) that bypass the deterministic device and connect to level 3 or 4 will be modified to prevent the digital connectivity to the higher level or will be modified to meet cyber security requirements commensurate with the level [3 or 4] devices to which they connect."
The change involves deletion of the "3 or". The proposed PPL wording is as follows:
Lower security level devices (level 0, 1, 2, 3 devices) that bypass the deterministic device and connect to level 4 will be modified to prevent the digital connectivity to the higher level or will be modified to meet cyber security requirements commensurate with the level 4 devices to which they connect.
This change is intended to align the wording in the implementation schedule with the defensive strategy described in the PPL Cyber Security Plan.
RAI 3: Scope of Systems NRC Question:
"Paragraph 73.54(a) of 10 CFR requires licensees to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks, up to and including the design basis threat as described in 10 CFR 73.1. In addition, 10 CFR 73.54(a)(1) states that the licensee shall protect digital computer and communication systems and networks associated with:
Enclosure 1 to PLA-6704 Page 4 of 4 (i) Safety-related and important-to-safety functions; (ii) Security functions; (iii) Emergency preparedness functions, including offsite communications; and (iv) Support systems and equipment, which, if compromised, would adversely impact safety, security, or emergency preparedness functions.
Subsequent to the issuance of the cyber security rule, the NRC stated that 10 CFR 73.54 should be interpreted to include structures, systems, and components (SSCs) in the balance of plant (BOP) that have a nexus to radiological health and safety (Agencywide Documents Access and Management System (ADAMS) Accession No. ML103490344, dated November 19, 2010). The SSCs in the BOP are those that could directly or indirectly affect reactivity of a nuclear power plant and could result in an unplanned reactor shutdown or transient and are therefore, within the scope of important-to-safety functions described in 10 CFR 73.54(a)(1). Furthermore, the NRC issued a letter to NEI dated January 5,2011 (ADAMS Accession No. ML103550480) that provided licensees with additional guidance on one acceptable approach to comply with the Commission's policy determination.
Explain how the scoping of systems provided by [site/licensee]'s CSP meets the requirements of 10 CFR 73.54 and the additional guidance provided by the NRC."
PPL Response:
Wording consistent with the January 5, 2011 letter has been added to PPL's Cyber Security Plan under Section 2.1. The revised PPL Cyber Security Plan is included as .
Enclosure 2 to PLA-6704 Revised Implementation Schedule Associated with the PPL Cyber Security Plan
Enclosure 2 to PLA-6704 Guidance on Cyber Security Plan Implementation Schedule Cyber Security Plan Implementation Schedule Full implementation of the cyber security program involves many supporting tasks. Major activities include: program and procedure development; performing of individual critical digital asset (CDA) assessments; and identification, scheduling, and implementing individual asset security control design remediation actions through the site configuration management program. These design modifications may be performed on-line or could require a refueling outage for installation.
The extensive workload associated with full implementation of the Cyber Security Plan (CSP) requires prioritization to assure those activities that provide higher degrees of protection against radiological sabotage are performed first. Therefore the CSP implementation schedule will be implemented with two major milestone dates. The first milestone date of no later than December 31, 2012, includes the activities listed inthe table below. The second milestone date, December 1, 2015, includes the completion of all remaining actions that result inthe full implementation of the cyber security plan for all applicable Safety, Security, and Emergency Preparedness (SSEP) functions. This date also bounds the completion of all individual asset security control design remediation actions.
Cyber security controls are not applied ifthe control adversely impacts safety and important to safety, security or emergency preparedness functions.
- Im lm ntto Mietn CompletionSBasis Date 1 Establish Cyber Security Assessment Team (CSAT) as No later than The CSAT, collectively, will need to have digital plant systems described in Section 3.1.2 "Cyber Security Assessment December 31, 2012 knowledge as well as nuclear power plant operations, engineering and Team" of the Cyber Security Plan (CSP). nuclear safety experience and technical expertise. The personnel selected for this team may require additional training in these areas help to ensure adequate capabilities to perform cyber security assessments as well as others duties.
2 Identify Critical Systems (CSs) and Critical Digital No later than The scope of 10 CFR 73.54 includes digital computer and Assets (CDAs) as described in Section 3.1.3 December 31, 2012 communication systems and networks associated with: safety-related "Identification of Critical Digital Assets" of the CSP. and important-to safety functions; security functions; emergency preparedness functions, including offsite communications; and support systems and equipment which, ifcompromised, would adversely impact safety, security, or emergency preparedness functions. The scope of 10 CFR 73.54 includes structures, systems, and components (SSCs) that have a nexus to radiological health and safety and therefore can directly or indirectly affect reactivity of a nuclear power plant and could Page 1 of 3
Guidance on Cyber Security Plan Implementation Schedule result in an unplanned reactor shutdown or transient.
3 Implement Installation of a deterministic one-way No later than The implementation of communication barriers protects the most critical device between lower level devices (level 0 1,2,3) and December 31, 2012 SSEP functions from remote attacks on plant systems. Isolating the the higher level devices (level 4 Safety and Security) plant systems from the internet as well as from the corporate business as described in Section 4.3, "Defense-In-Depth systems is an important milestone in defending against external threats.
Protective Strategies" of the CSP. While the deployment of the barriers is critical to protection from external cyber threats, italso prevents remote access to core Lower security level devices (level 0, 1,2,3 devices) monitoring and plant data systems for reactor engineers, plant that bypass the deterministic device and connect to operations, and other plant staff. This elimination of remote access to level 4 will be modified to prevent the digital reactor core monitoring systems may require the development and connectivity to the higher level or will be modified to execution of a detailed change management plan to ensure continued meet cyber security requirements commensurate with safe operation of the plants. Vendors may be required to develop the level 4 devices to which they connect. software revisions to support the model. The modification will be developed, prioritized and scheduled.
The design modifications that are not finished by the completion date will be documented in the site configuration management and/or change control program to assure completion of the design modification as soon as possible, but no later than the final implementation date.
4 The security control "Access Control For Portable And No later than Portable media devices are used to transfer electronic information (e.g.,
Mobile Devices" described in Appendix D 1.19 of NEI December 31, 2012 data, software, firmware, virus engine updates and configuration 08-09, Revision 6, will be implemented. information) to and from plant process equipment. Careful use of this class of media is required to minimize the spread of malicious software to plant process equipment. The effective implementation of this control may require the coordinated implementation of other complimentary controls to ensure adequate mitigation.
5 Implement observation and identification of obvious No later than Insider mitigation rounds by trained staff look for obvious signs of cyber cyber related tampering to existing insider mitigation December 31, 2012 related tampering and would provide mitigation of observable cyber Page 2 of 3
Guidance on Cyber Security Plan Implementation Schedule
- Imlmntto Mietn Completion Bsi
- p. U UU Date rounds by incorporating the appropriate elements in related insider actions. Implementing steps to add signs of cyber Appendix E Section 4.3 "Personnel Performing security-related tampering to insider mitigation rounds will be performed Maintenance And Testing Activities." by the completion date.
4 .4 I 6 Identify, document, and implement cyber security No later than The site physical protection program provides high assurance that these controls in accordance with the Cyber Security Plan December 31, 2012 elements are protected from physical harm by an adversary. The cyber Section 3.1.6 "Mitigation of Vulnerabilities and security program will enhance the defense-in-depth nature of the Application of Cyber Security Controls" for CDAs that protection of CDAs associated with target sets. Implementing Cyber could adversely impact the design function of physical Security Plan security controls to target set CDAs provides a high security target set equipment. degree of protection against a cyber related attacks that could lead to radiological sabotage. Security controls will be addressed in The implementation of controls that require a design accordance with Cyber Security Plan Section 3.1.6 with the exception of modification that are not finished by the completion those that require a design modification.
date will be documented in the site configuration management and/or change control program to assure completion of the design modification as soon as possible, but no later than the final implementation date.
7 Ongoing monitoring and assessment activities No later than The ongoing monitoring and assessment activities as described in commence, as described in Section 4.4, "Ongoing December 31, 2012 Section 4.4, "Ongoing Monitoring and Assessment" of the Cyber Monitoring and Assessment" of the CSP, for those Security Plan will be implemented for the controls applied to target set target set CDAs whose security controls have been CDAs. This action results in the commencement of the cyber security implemented. program for target set related CDAs.
Full implementafion of the PPL Susquehanna, LLC December 1, 2015 By the completion date, the PPL Susquehanna, LLC Cyber Security Cyber Security Plan for all SSEP functions will be Plan will be fully implemented for all SSEP functions in accordance with achieved. 10 CFR 73.54. This date also bounds the completion of all individual asset security control design remediation actions including those that require a refuel outage for implementation.