| issue date = 06/03/2014
| issue date = 06/03/2014
| title = Request for Withholding Information from Public Disclosure for Hope Creek Generating Station
| title = Request for Withholding Information from Public Disclosure for Hope Creek Generating Station
| author name = Lamb J G
| author name = Lamb J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Joyce T
| addressee name = Joyce T
Line 9: Line 9:
| docket = 05000354
| docket = 05000354
| license number = NPF-057
| license number = NPF-057
| contact person = Lamb J G, NRR/DORL/LPLI-2, 415-3100
| contact person = Lamb J, NRR/DORL/LPLI-2, 415-3100
| case reference number = TAC MF2816
| case reference number = TAC MF2816
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Mr. Thomas Joyce UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 3, 2014 President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236, N09 Hancocks Bridge, NJ 08038  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 3, 2014 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236, N09 Hancocks Bridge, NJ 08038


==SUBJECT:==
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MF2816)  
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MF2816)


==Dear Mr. Joyce:==
==Dear Mr. Joyce:==
By PSEG Nuclear LLC (PSEG) letter LR-N13-0222 dated September 19, 2013, and Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated November 29, 2011, executed by Mr. Lukas Trosman, PSEG requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390: Appendix B of the Core Operating Limits Report for Hope Creek Generating Station, Unit 1, titled "Exposure-Dependent Linear Heat Generation Rate Limits." A non-proprietary version of the document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
 
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended.
By PSEG Nuclear LLC (PSEG) letter LR-N13-0222 dated September 19, 2013, and Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated November 29, 2011, executed by Mr. Lukas Trosman, PSEG requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390:
T. Joyce Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
Appendix B of the Core Operating Limits Report for Hope Creek Generating Station, Unit 1, titled "Exposure-Dependent Linear Heat Generation Rate Limits."
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
A non-proprietary version of the document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
If you have any questions regarding this matter, I may be reached at 301-415-3100.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Mr. Lukas Trosman Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv T. Joyce Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document.
 
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
T. Joyce                                         Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-3100.
If you have any questions regarding this matter, I may be reached at 301-415-3100.
Docket No. 50-354 cc: Mr. Lukas Trosman Sincerely, /RAJ John G. Lamb, Senior Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv DISTRIBUTION:
G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc:      Mr. Lukas Trosman Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv
PUBLIC LPL 1-2 R/F RidsNrrDoriLpl1-2 Resource RidsNrrLAABaxter Resource ADAMS Accession No* ML 14126A830
* ML14126A830 OFFICE LPL 1-2/PM                  LPL3-1/LA              LPL 1-2/BC            LPL 1-2/PM NAME         JLamb                 MHenderson             MKhanna              JLamb DATE         06/2/2014             05/30/2014             06/3/2014             06/3/2014}}
.. OFFICE LPL 1-2/PM LPL3-1/LA NAME JLamb MHenderson DATE 06/2/2014 05/30/2014 RidsNrrPMHopeCreek Resource RidsAcrsAcnw_MaiiCTR Resource RidsRgn1 MaiiCenter Resource LPL 1-2/BC LPL 1-2/PM MKhanna JLamb 06/3/2014 06/3/2014 OFFICIAL RECORD COPY}}

Latest revision as of 05:58, 4 November 2019

Request for Withholding Information from Public Disclosure for Hope Creek Generating Station
ML14126A830
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/03/2014
From: John Lamb
Plant Licensing Branch 1
To: Joyce T
Public Service Enterprise Group
Lamb J, NRR/DORL/LPLI-2, 415-3100
References
TAC MF2816
Download: ML14126A830 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 3, 2014 Mr. Thomas Joyce President and Chief Nuclear Officer PSEG Nuclear LLC P.O. Box 236, N09 Hancocks Bridge, NJ 08038

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR HOPE CREEK GENERATING STATION (TAC NO. MF2816)

Dear Mr. Joyce:

By PSEG Nuclear LLC (PSEG) letter LR-N13-0222 dated September 19, 2013, and Global Nuclear Fuel -Americas, LLC (GNF-A) affidavit dated November 29, 2011, executed by Mr. Lukas Trosman, PSEG requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (1 0 CFR) Section 2.390:

Appendix B of the Core Operating Limits Report for Hope Creek Generating Station, Unit 1, titled "Exposure-Dependent Linear Heat Generation Rate Limits."

A non-proprietary version of the document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(4)a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GNF-A's competitors without license from GNF-A constitutes a competitive economic advantage over other companies; and (4)b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

T. Joyce Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the document. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-3100.

G. Lamb, Senior Project Manager t Licensing Branch 1-2 ision of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 cc: Mr. Lukas Trosman Manager, Reload Design and Analysis Global Nuclear Fuel -Americas, LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional Distribution via Listserv

  • ML14126A830 OFFICE LPL 1-2/PM LPL3-1/LA LPL 1-2/BC LPL 1-2/PM NAME JLamb MHenderson MKhanna JLamb DATE 06/2/2014 05/30/2014 06/3/2014 06/3/2014