ML18058B725: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
#REDIRECT [[IR 05000255/2017007]]
{{Adams
| number = ML18058B725
| issue date = 02/27/2018
| title = Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
| author name = Jeffers M
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Arnone C
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000255
| license number = DPR-020
| contact person =
| case reference number = EA-18-013
| document report number = IR 2017007
| document type = Letter
| page count = 2
}}
See also: [[see also::IR 05000255/2017007]]
 
=Text=
{{#Wiki_filter:UNITED STATES
                          NUCLEAR REGULATORY COMMISSION
                                                REGION III
                                    2443 WARRENVILLE RD. SUITE 210
                                      LISLE, ILLINOIS 60532-4352
                                        February 27, 2018
EA-18-013
Mr. Charles Arnone
Vice President, Operations
Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant
27780 Blue Star Memorial Highway
Covert, MI 49043-9530
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION
            OF NRC INSPECTION REPORT 05000255/2017007
Dear Mr. Arnone:
This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),
dated January 29, 2018, that provided a response to our Inspection Report issued on
December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The
letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection
Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency
Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads.
We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be
thorough and timely in the review of licensee responses. Accordingly, we will inform you as
soon as we complete our evaluation.
This letter will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                                Sincerely,
                                                /RA/
                                                Mark Jeffers, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket No. 50-255
License No. DPR-20
cc: Distribution via LISTSERV
 
Letter to Charles Arnone from Mark Jeffers dated February 27, 2018
SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION
            OF NRC INSPECTION REPORT 05000255/2017007
DISTRIBUTION:
Jeremy Bowen
RidsNrrPMPalisades Resource
RidsNrrDorlLpl3
RidsNrrDirsIrib Resource
Steven West
Darrell Roberts
Richard Skokowski
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number ML: 18058B725
OFFICE      RIII                RIII                RIII          RIII
NAME        JGilliam:cl        RSkosowski          MJeffers
DATE        02/26/18            02/26/18            02/27/18
                                OFFICIAL RECORD COPY
}}

Latest revision as of 23:14, 15 November 2019

Acknowledgement of Disputed Violation of NRC Inspection Report 05000255/2017007 (DRS-J. Gilliam)
ML18058B725
Person / Time
Site: Palisades Entergy icon.png
Issue date: 02/27/2018
From: Jeffers M
NRC/RGN-III/DRS/EB2
To: Arnone C
Entergy Nuclear Operations
References
EA-18-013 IR 2017007
Download: ML18058B725 (2)


See also: IR 05000255/2017007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

February 27, 2018

EA-18-013

Mr. Charles Arnone

Vice President, Operations

Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant

27780 Blue Star Memorial Highway

Covert, MI 49043-9530

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

Dear Mr. Arnone:

This letter acknowledges your letter sent to the U.S. Nuclear Regulatory Commission (NRC),

dated January 29, 2018, that provided a response to our Inspection Report issued on

December 29, 2017, concerning activities conducted at your Palisades Nuclear Plant. The

letter we received contested a Non-Cited Violation (NCV) documented in Palisades Inspection

Report 05000255/2017007. The contested NCV is Failure to Periodically Test the Emergency

Diesel Generators Capacity to Start and Accelerate Design Basis Sequenced Loads.

We are currently reviewing your basis for contesting the above NCV. The NRC seeks to be

thorough and timely in the review of licensee responses. Accordingly, we will inform you as

soon as we complete our evaluation.

This letter will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark Jeffers, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-255

License No. DPR-20

cc: Distribution via LISTSERV

Letter to Charles Arnone from Mark Jeffers dated February 27, 2018

SUBJECT: PALISADES NUCLEAR PLANT ACKNOWLEDGMENT OF DISPUTED VIOLATION

OF NRC INSPECTION REPORT 05000255/2017007

DISTRIBUTION:

Jeremy Bowen

RidsNrrPMPalisades Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18058B725

OFFICE RIII RIII RIII RIII

NAME JGilliam:cl RSkosowski MJeffers

DATE 02/26/18 02/26/18 02/27/18

OFFICIAL RECORD COPY