|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:-3-(4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3458 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.(3) Fire Protection (Section 9.5, SSER-2, -4)*Exelon Generation Company shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report for the faaility, and as approved in the NRC Safety Evaluation Report dated August 1983 through Supplement 9, dated August 1989, and Safety Evaluation dated November 20, 1995, subject to the following provision: | | {{#Wiki_filter: (4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station. |
| The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.*The parenthetical notation following the title of license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. | | C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: |
| Amendment No. 4, 27, 68, G2,108 CONTAINMENT SYSTEMS DRYWELL AVERAGE AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.7 Drywell average air temperature shall not exceed 145OF**.APPLICABILITY: | | (1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3458 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. |
| OPERATIONAL CONDITIONS 1, 2, and 3.ACTION: With the drywell average air temperature greater than 145 0 F**, reduce the average air temperature to within the limit within 8 hours or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.I I SURVEILLANCE REQUIREMENTS 4.6.1.7 The drywell average air temperature shall be the volumetric average of the temperatures at the following locations and shall be determined to be within the limit at least once per 24 hours: Approximate Elevation Number of Installed Sensors*a. 330'b. 320'c. 260'd. 248'3 3 3 6*At least one reading from each elevation is required for a volumetric average calculation. | | (2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. |
| **Operation may continue with drywell average air temperature no greater than 148°F for the remainder of the current operating cycle (Cycle 9), or until the next shutdown of sufficient duration to allow for unit cooler fan repairs, whichever comes first.LIMERICK -L114IT 2 314 6-10 Amendment No. 145}} | | (3) Fire Protection (Section 9.5, SSER-2, -4)* |
| | Exelon Generation Company shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report for the faaility, and as approved in the NRC Safety Evaluation Report dated August 1983 through Supplement 9, dated August 1989, and Safety Evaluation dated November 20, 1995, subject to the following provision: |
| | The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire. |
| | *The parenthetical notation following the title of license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed. |
| | Amendment No. 4, 27, *4, 68, G2,108 |
| | |
| | CONTAINMENT SYSTEMS DRYWELL AVERAGE AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.7 Drywell average air temperature shall not exceed 145OF**. I APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3. |
| | ACTION: |
| | With the drywell average air temperature greater than 145 0 F**, reduce the I average air temperature to within the limit within 8 hours or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. |
| | SURVEILLANCE REQUIREMENTS 4.6.1.7 The drywell average air temperature shall be the volumetric average of the temperatures at the following locations and shall be determined to be within the limit at least once per 24 hours: |
| | Approximate Number of Elevation Installed Sensors* |
| | : a. 330' 3 |
| | : b. 320' 3 |
| | : c. 260' 3 |
| | : d. 248' 6 |
| | *At least one reading from each elevation is required for a volumetric average calculation. |
| | **Operation may continue with drywell average air temperature no greater than 148°F for the remainder of the current operating cycle (Cycle 9), |
| | or until the next shutdown of sufficient duration to allow for unit cooler fan repairs, whichever comes first. |
| | LIMERICK - L114IT 2 314 6-10 Amendment No. *a-2, 145}} |
Letter Sequence Other |
---|
|
|
MONTHYEARML0616300292006-06-0909 June 2006 Exigent License Amendment Request Proposed One - Time Change to the Drywell Average Air Temperature Limit - Technical Specification 3.6.1.7 Project stage: Request ML0616402772006-06-14014 June 2006 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity of a Hearing Project stage: Other ML0617402372006-06-23023 June 2006 Tolerances for the Limerick Drywell Temperature Elements Project stage: Request ML0618804952006-07-0707 July 2006 Issuance of Amendment One-Time Change to the Drywell Average Air Temperature Limit (Tac No. MD2315) Project stage: Approval ML0619202582006-07-0707 July 2006 Tech Spec Pages for Amendment 145 One-Time Change to the Drywell Average Air Temperature Limit Project stage: Other 2006-06-23
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML22272A0372023-01-0303 January 2023 Issuance of Amendment Nos. 258 and 220 Regarding Technical Specifications 3/4.8.1, AC Sources-Operating and 3/4.5.1, ECCS-Operating ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21181A0442021-09-28028 September 2021 Issuance of Amendment Nos. 253 and 215 Technical Specification Changes Related to Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21032A2702021-02-22022 February 2021 Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20239A7252020-11-30030 November 2020 Issuance of Amendment Nos. 249 and 211 Adopt TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML20178A5142020-06-26026 June 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing - Response to Request for Additional Information ML20034F6372020-02-28028 February 2020 Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML19207A0062019-10-0303 October 2019 Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19029B2492019-02-12012 February 2019 Correction to Amendment No. 195 Revising Technical Specifications to Lower the Minimum Standby Liquid Control System Pump Flowrate ML19030A1472019-01-30030 January 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action to Adopt Risk-Informed Completion Times in Accordance with TSTF-505, Revision 2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18017A2012018-02-27027 February 2018 Issuance of Amendment Nos. 227 and 190 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9967 and MF9968; EPID L-2017-LLA-0260) ML17200D0962017-07-19019 July 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Rev. 2. ML17103A0812017-05-16016 May 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML16335A0382016-12-29029 December 2016 Issuance of Amendments to Revise Technical Specification Snubber Requirements ML16041A0212016-03-15015 March 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15356A1402016-01-28028 January 2016 Issuance of Amendments Secondary Containment Access Openings ML15218A5012015-09-15015 September 2015 Issuance of Amendment Nos. 219 and 181 Proposed Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15083A4032015-05-11011 May 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML14344A6812015-01-0707 January 2015 Issuance of Amendments - Main Steam Line Flow-High Isolation Response Time ML14324A8082014-12-29029 December 2014 Issuance of Amendments - Leak Detection System Setpoint and Allowable Value Changes ML14308A1442014-11-0303 November 2014 License Amendment Request Proposed Change to Add New Limiting Conditions for Operations 3.0.5 and 3.0.6 ML0527800342014-10-20020 October 2014 Current Facility Operating License NPF-39, Technical Specifications, Revised 08/15/2018 ML14191B1802014-07-10010 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML13214A0922014-03-26026 March 2014 Issuance of Amendments Elimination of Certain Technical Specifications Reporting Requirements ML13100A0202013-04-0909 April 2013 License Amendment Request to Eliminate Certain Technical Specifications Reporting Requirements ML1131802382011-11-10010 November 2011 Response to Request for Additional Information Concerning the License, Amendment Request Associated with the Reactivity Anomalies Surveillance ML1128700802011-10-12012 October 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1117100072011-06-14014 June 2011 License Amendment Request to Include an Alternate Method of Verifying Drywell Unidentified Leakage ML1115401202011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML1109700662011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1035001802010-12-15015 December 2010 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1030603792010-10-29029 October 2010 Response to Request for Additional Information, License Amendment Request, Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water Maintenance ML1024304662010-08-31031 August 2010 License Amendment Request, Proposed Administrative Changes to Technical Specifications ML1018104342010-06-30030 June 2010 License Amendment Request - Table 3.3.2-2, Item 4e, HPCI Equipment Room Delta Temperature High Isolation Trip Setpoint and Allowable Value Changes ML1008503952010-03-25025 March 2010 Markup of Proposed Operating License, Technical Specifications & Updated Final Safety Analysis Report Pages ML0912800592009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0821207302008-08-27027 August 2008 Tech Spec Pages for Amendment 154 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume ML0817802542008-08-0505 August 2008 Technical Specifications, Limerick Unit 1, Amendment 192, License NPF-39 2024-08-12
[Table view] |
Text
(4) Pursuant to the Act and 10 CFR Parts 30, 40, 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) Pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility, and to receive and possess, but not separate, such source, byproduct, and special nuclear materials as contained in the fuel assemblies and fuel channels from the Shoreham Nuclear Power Station.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I (except as exempted from compliance in Section 2.D. below) and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level Exelon Generation Company is authorized to operate the facility at reactor core power levels of 3458 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 145, are hereby incorporated into this license. Exelon Generation Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) Fire Protection (Section 9.5, SSER-2, -4)*
Exelon Generation Company shall implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report for the faaility, and as approved in the NRC Safety Evaluation Report dated August 1983 through Supplement 9, dated August 1989, and Safety Evaluation dated November 20, 1995, subject to the following provision:
The licensee may make changes to the approved fire protection program without prior approval of the Commission only if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.
- The parenthetical notation following the title of license conditions denotes the section of the Safety Evaluation Report and/or its supplements wherein the license condition is discussed.
Amendment No. 4, 27, *4, 68, G2,108
CONTAINMENT SYSTEMS DRYWELL AVERAGE AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.7 Drywell average air temperature shall not exceed 145OF**. I APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
With the drywell average air temperature greater than 145 0 F**, reduce the I average air temperature to within the limit within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.1.7 The drywell average air temperature shall be the volumetric average of the temperatures at the following locations and shall be determined to be within the limit at least once per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:
Approximate Number of Elevation Installed Sensors*
- a. 330' 3
- b. 320' 3
- c. 260' 3
- d. 248' 6
- At least one reading from each elevation is required for a volumetric average calculation.
- Operation may continue with drywell average air temperature no greater than 148°F for the remainder of the current operating cycle (Cycle 9),
or until the next shutdown of sufficient duration to allow for unit cooler fan repairs, whichever comes first.
LIMERICK - L114IT 2 314 6-10 Amendment No. *a-2, 145