ML062050006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 5: | Line 5: | ||
| author name = Nerses V | | author name = Nerses V | ||
| author affiliation = NRC/NRR/ADRO/DORL/LPLB | | author affiliation = NRC/NRR/ADRO/DORL/LPLB | ||
| addressee name = Christian D | | addressee name = Christian D | ||
| addressee affiliation = Dominion Nuclear Connecticut, Inc | | addressee affiliation = Dominion Nuclear Connecticut, Inc | ||
| docket = 05000336 | | docket = 05000336 | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 7, | {{#Wiki_filter:November 7, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. | ||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA | Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | ||
==SUBJECT:== | ==SUBJECT:== | ||
MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF | MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS TO MODIFY THE DESCRIPTION OF PRESSURIZER POWER OPERATED RELIEF VALVES AND PRESSURIZER SAFETY VALVES POSITION INDICATORS (TAC NO. | ||
MC9463) | MC9463) | ||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
The Commission has issued the enclosed Amendment No. 294 to Facility Operating | The Commission has issued the enclosed Amendment No. 294 to Facility Operating License No. DPR-65 for Millstone Power Station, Unit No. 2, in response to your application dated January 4, 2006. | ||
The amendment revises Technical Specification 3/4.3.3.8, Instrumentation, Accident Monitoring. The revisions modify the description of pressurizer power operated relief valves and pressurizer safety valves position indicators A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice. | |||
Sincerely, | |||
/RA/ | |||
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Amendment No. 294 to DPR-65 | : 1. Amendment No. 294 to DPR-65 | ||
: 2. Safety | : 2. Safety Evaluation cc w/encls: See next page | ||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA | |||
November 7, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc. | |||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 | |||
==SUBJECT:== | ==SUBJECT:== | ||
MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF | MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS TO MODIFY THE DESCRIPTION OF PRESSURIZER POWER OPERATED RELIEF VALVES AND PRESSURIZER SAFETY VALVES POSITION INDICATORS (TAC NO. | ||
MC9463) | MC9463) | ||
==Dear Mr. Christian:== | ==Dear Mr. Christian:== | ||
The Commission has issued the enclosed Amendment No. 294 to Facility Operating | The Commission has issued the enclosed Amendment No. 294 to Facility Operating License No. DPR-65 for Millstone Power Station, Unit No. 2, in response to your application dated January 4, 2006. | ||
The amendment revises Technical Specification 3/4.3.3.8, Instrumentation, Accident Monitoring. The revisions modify the description of pressurizer power operated relief valves and pressurizer safety valves position indicators A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice. | |||
Sincerely, | |||
/RA/ | |||
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Amendment No. 294 to DPR-65 | : 1. Amendment No. 294 to DPR-65 | ||
: 2. Safety | : 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION: | ||
PUBLIC RidsNrrPMVNerses RidsRgn1MailCenter RidsNrrDorlLplb LPL1-2 R/F RidsNrrLACRaynor RidsNrrDirsItsb RidsNrrDssSpwb RidsOgcMailCenter GHill(2) RidsAcrsAcnwMailCenter RidsNrrDciCvib Package Accession Number: ML062050005 Amendment Accession Number: ML062050006 TS Accession Number: ML063110313 OFFICE LPL1-2/PM LPL1-2/LA EICB/SC ITSB/BC OGC/NLO LPL1-2/BC NAME VNerses:osr CRaynor AHowe TKobetz MZobler HChernoff DATE 10/31/06 10/31/06 9/28/06 9/29/06 10/3/06 11/6/06 OFFICIAL RECORD COPY | |||
Millstone Power Station, Unit No. 2 cc: | |||
Building 475, | Lillian M. Cuoco, Esquire Mr. John Markowicz Senior Counsel Co-Chair Dominion Resources Services, Inc. Nuclear Energy Advisory Council Building 475, 5th Floor 9 Susan Terrace Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. Evan W. Woollacott Edward L. Wilds, Jr., Ph.D. Co-Chair Director, Division of Radiation Nuclear Energy Advisory Council Department of Environmental Protection 128 Terrys Plain Road 79 Elm Street Simsbury, CT 06070 Hartford, CT 06106-5127 Ms. Nancy Burton Regional Administrator, Region I 147 Cross Highway U.S. Nuclear Regulatory Commission Redding Ridge, CT 00870 475 Allendale Road King of Prussia, PA 19406 Mr. Chris L. Funderburk Director, Nuclear Licensing and First Selectmen Operations Support Town of Waterford Dominion Resources Services, Inc. | ||
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA | 15 Rope Ferry Road Innsbrook Technical Center Waterford, CT 06385 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Charles Brinkman, Director Washington Operations Nuclear Services Mr. David W. Dodson Westinghouse Electric Company Licensing Supervisor 12300 Twinbrook Pkwy, Suite 330 Dominion Nuclear Connecticut, Inc. | ||
Building 475, | Rockville, MD 20852 Building 475, 5th Floor Rope Ferry Road Senior Resident Inspector Waterford, CT 06385 Millstone Power Station c/o U.S. Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc. | ||
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385 | |||
DOMINION NUCLEAR CONNECTICUT, INC. | |||
DOCKET NO. 50-336 MILLSTONE POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 294 License No. DPR-65 | |||
: 1. The Nuclear Regulatory Commission (the Commission) has found that: | |||
A. The application for amendment by Dominion Nuclear Connecticut, Inc., the licensee, dated January 4, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied. | |||
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows: | |||
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 294, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications. | |||
: 3. This license amendment is effective as of the date of issuance, and shall be implemented within 60 days of issuance. | |||
FOR THE NUCLEAR REGULATORY COMMISSION | |||
/RA/ | |||
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | |||
==Attachment:== | ==Attachment:== | ||
Changes to the Technical | Changes to the Technical Specifications Date of Issuance: November 7, 2006 | ||
ATTACHMENT TO LICENSE AMENDMENT NO. 294 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. | |||
Remove Insert 3/4 3-32 3/4 3-32 3/4 3-35 3/4 3-35 | |||
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 294 TO FACILITY OPERATING LICENSE NO. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC. | |||
MILLSTONE POWER STATION, UNIT NO. 2 DOCKET NO. 50-336 | |||
==1.0 INTRODUCTION== | |||
By application dated January 4, 2006, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) requested Nuclear Regulatory Commission (NRC or the Commission) approval of changes to the Millstone Power Station, Unit No. 2 (MPS2) Technical Specifications (TSs). The changes would modify the description of pressurizer power-operated relief valve (PORV) and pressurizer safety/relief valve (SRV) position indicators by eliminating the phrase Acoustic Monitor. | |||
==2.0 REGULATORY EVALUATION== | |||
The NRC staffs evaluation of the acceptability of the proposed TS changes is based upon the following regulations and regulatory guides: | |||
General Design Criterion (GDC) 13, Instrumentation and Control, which states, in part: | |||
Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems. | |||
Regulatory Guide (RG) 1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident, Revision 2 (December 1980). | |||
==3.0 TECHNICAL EVALUATION== | |||
In its application, the licensee stated that the phrase Acoustic Monitor is contained in MPS2's current TS Limiting Condition of Operation (LCO) items 4 and 6 of TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7. The licensee is requesting approval to delete the phrase Acoustic Monitor from the TSs because it is information that is not necessary to meet the TS requirements. | |||
Without the phrase, the TS requirement for the total and minimum number of channels required to be operable and to verify channel operability at the designated frequencies remains the same. The licensee stated that this would also be the case should the design of the position indication system be changed. Furthermore, the licensee stated that to delete a functional unit from the TS LCO, it must be demonstrated that the four criteria set forth in Section 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations (10 CFR) no longer apply to the functional unit to be deleted. | |||
The NRC staff notes that using 10 CFR 50.36 as a basis would be appropriate if DNC were justifying deletion of the instruments identified in items 4 and 6 in Table 3.3-11 and Table 4.3-7. | |||
This basis, however, is not appropriate for only a change in the names (Acoustic Monitor) of the instruments. | |||
In the MPS2 Updated Final Safety Analysis Report (UFSAR), the licensee stated that the MPS2 valve monitoring system conforms with NUREG-0578, TMI-2 [Three Mile Island Nuclear Station, Unit 2] Lessons Learned Task Force Status Report and Short-Term Recommendations July 1979. In particular, in NUREG-0578, Section 2.1.3, Information to Aid Operations in Accident Diagnosis and Control, a recommendation was made to have direct indication of power-operated relief valve and safety valve position for pressurized water reactors. This recommendation was incorporated (as TMI Related Action Plan Task II.D.3) in an Action Plan issued by the NRC, NUREG-0660, NRC Action Plan Developed as a Result of the TMI-2 Accident, Vol. I, May 1980. A clarification of TMI-related items approved for implementation by the Commission at that time was issued in NUREG-0737, Clarification of TMI Action Requirements, November 1980. | |||
NUREG-0660 also specified the issuance of RG 1.97 and that the NRC will issue requirements for licensees to meet appropriated portions of the RG and will review the licensees designs for conformance to the RG. In the MPS2 UFSAR, the licensee committed to conforming to RG 1.97 (as noted in docketed letters as described below) and the items the licensee committed to were identified in Table 7.5-3 in the UFSAR. Table 7.5-3 summarizes the RG 1.91 information on file that documents which instruments are credited with monitoring the associated variables. | |||
RG 1.97, Revision 2, recommends that Category 2 primary system SRV (including PORV and code valves) position instrumentation or flow-through or pressure-measuring (in relief valve lines) instrumentation be provided to monitor the operation status and to monitor for loss of coolant in the primary coolant system. RG 1.97 also recommends that Category 2 SRV position or main steam flow instrumentation be provided to monitor the operation of the secondary system (steam generator). | |||
In a letter dated February 29, 1984, the licensee committed to provide Category 2 instrumentation for variable D-10, primary system SRV, to monitor the primary coolant system with a note that stated: The Acoustic Valve Monitoring System (AVMS) has been upgraded during the 1983 refueling outage. In the same letter, the licensee also committed to provide Category 2 instrumentation for variable D-18, SRV position, to monitor the secondary system (steam generator). The information provided on variable D-18 did not mention the type of technology that would be used to monitor SRV position. Variables D-10 and D-18 (as identified in the February 29, 1984 letter) are included in TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7, as Instruments 4 and 6, respectively. | |||
In letters dated April 9, 1984, and August 7, 1986, the licensee repeated the information that was provided in the February 29, 1984, letter concerning variables D-10 and D-18. In letters dated November 22, 1989, and February 5, 1991, the NRC staff issued safety evaluations on the licensees conformance to RG 1.97, Revision 2 for MPS2. | |||
In a letter dated March 2, 1992, the licensee provided updated information concerning the MPS2 RG 1.97 instrumentation. The updated information did not include the earlier note concerning the use of the AVMS for variable D-10, thereby removing the commitment to use acoustic monitoring technology to monitor PORV position. | |||
Since the licensee revised the commitment on variable D-10 to not state the technology that would be used to monitor PORV position, and has not made a commitment in this application on the technology that would be used to monitor SRV position, the NRC staff considers that no commitment exists on what technology would be used to monitor PORV or SRV position. | |||
Therefore, the licensee established that the phrase Acoustic Monitor can be deleted from the names of Instrument 4, PORV Position Indicator Acoustic Monitor, and Instrument 6, Safety Valve Position Indicator Acoustic Monitor, in TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7. | |||
Furthermore, the NRC staff considers that the identification of the type of technology (such as Acoustic Monitor) to use for monitoring is not safety significant. | |||
From the information provided above, the NRC staff determined that even with the phrase Acoustic Monitor deleted, GDC 13 continues to be met. Further, the NRC staff notes that the licensee is committed to providing Category 2 primary system SRV position instrumentation or flow-through or pressure-measuring instrumentation to monitor the operation status and to monitor for loss of coolant in the primary coolant system. Therefore, the NRC staff finds that deleting the phrase Acoustic Monitor is acceptable. | |||
== | ==4.0 STATE CONSULTATION== | ||
In accordance with the Commission's regulations, the Connecticut State official was notified of the proposed issuance of the amendment. The Connecticut State official agreed with the NRC staffs conclusion as stated in Section 6 of this Safety Evaluation. | |||
== | ==5.0 ENVIRONMENTAL CONSIDERATION== | ||
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 10073). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment. | |||
== | ==6.0 CONCLUSION== | ||
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. | |||
The Commission has concluded, based on the considerations discussed above, that: | Principal Contributor: Barry Marcus Victor Nerses Date: November 7, 2006}} |
Latest revision as of 16:04, 23 November 2019
ML062050006 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 11/07/2006 |
From: | Nerses V NRC/NRR/ADRO/DORL/LPLB |
To: | Christian D Dominion Nuclear Connecticut |
Nerses V, NRR//DLPM, 415-1484 | |
Shared Package | |
ML062050005 | List: |
References | |
TAC MC9463 | |
Download: ML062050006 (10) | |
Text
November 7, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS TO MODIFY THE DESCRIPTION OF PRESSURIZER POWER OPERATED RELIEF VALVES AND PRESSURIZER SAFETY VALVES POSITION INDICATORS (TAC NO.
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 294 to Facility Operating License No. DPR-65 for Millstone Power Station, Unit No. 2, in response to your application dated January 4, 2006.
The amendment revises Technical Specification 3/4.3.3.8, Instrumentation, Accident Monitoring. The revisions modify the description of pressurizer power operated relief valves and pressurizer safety valves position indicators A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336
Enclosures:
- 1. Amendment No. 294 to DPR-65
- 2. Safety Evaluation cc w/encls: See next page
November 7, 2006 Mr. David A. Christian Sr. Vice President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711
SUBJECT:
MILLSTONE POWER STATION, UNIT NO. 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS TO MODIFY THE DESCRIPTION OF PRESSURIZER POWER OPERATED RELIEF VALVES AND PRESSURIZER SAFETY VALVES POSITION INDICATORS (TAC NO.
Dear Mr. Christian:
The Commission has issued the enclosed Amendment No. 294 to Facility Operating License No. DPR-65 for Millstone Power Station, Unit No. 2, in response to your application dated January 4, 2006.
The amendment revises Technical Specification 3/4.3.3.8, Instrumentation, Accident Monitoring. The revisions modify the description of pressurizer power operated relief valves and pressurizer safety valves position indicators A copy of the related Safety Evaluation is also enclosed. Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Victor Nerses, Senior Project Manager Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-336
Enclosures:
- 1. Amendment No. 294 to DPR-65
- 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC RidsNrrPMVNerses RidsRgn1MailCenter RidsNrrDorlLplb LPL1-2 R/F RidsNrrLACRaynor RidsNrrDirsItsb RidsNrrDssSpwb RidsOgcMailCenter GHill(2) RidsAcrsAcnwMailCenter RidsNrrDciCvib Package Accession Number: ML062050005 Amendment Accession Number: ML062050006 TS Accession Number: ML063110313 OFFICE LPL1-2/PM LPL1-2/LA EICB/SC ITSB/BC OGC/NLO LPL1-2/BC NAME VNerses:osr CRaynor AHowe TKobetz MZobler HChernoff DATE 10/31/06 10/31/06 9/28/06 9/29/06 10/3/06 11/6/06 OFFICIAL RECORD COPY
Millstone Power Station, Unit No. 2 cc:
Lillian M. Cuoco, Esquire Mr. John Markowicz Senior Counsel Co-Chair Dominion Resources Services, Inc. Nuclear Energy Advisory Council Building 475, 5th Floor 9 Susan Terrace Rope Ferry Road Waterford, CT 06385 Waterford, CT 06385 Mr. Evan W. Woollacott Edward L. Wilds, Jr., Ph.D. Co-Chair Director, Division of Radiation Nuclear Energy Advisory Council Department of Environmental Protection 128 Terrys Plain Road 79 Elm Street Simsbury, CT 06070 Hartford, CT 06106-5127 Ms. Nancy Burton Regional Administrator, Region I 147 Cross Highway U.S. Nuclear Regulatory Commission Redding Ridge, CT 00870 475 Allendale Road King of Prussia, PA 19406 Mr. Chris L. Funderburk Director, Nuclear Licensing and First Selectmen Operations Support Town of Waterford Dominion Resources Services, Inc.
15 Rope Ferry Road Innsbrook Technical Center Waterford, CT 06385 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Charles Brinkman, Director Washington Operations Nuclear Services Mr. David W. Dodson Westinghouse Electric Company Licensing Supervisor 12300 Twinbrook Pkwy, Suite 330 Dominion Nuclear Connecticut, Inc.
Rockville, MD 20852 Building 475, 5th Floor Rope Ferry Road Senior Resident Inspector Waterford, CT 06385 Millstone Power Station c/o U.S. Nuclear Regulatory Commission P.O. Box 513 Niantic, CT 06357 Mr. J. Alan Price Site Vice President Dominion Nuclear Connecticut, Inc.
Building 475, 5th Floor Rope Ferry Road Waterford, CT 06385
DOMINION NUCLEAR CONNECTICUT, INC.
DOCKET NO. 50-336 MILLSTONE POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 294 License No. DPR-65
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Dominion Nuclear Connecticut, Inc., the licensee, dated January 4, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 294, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of the date of issuance, and shall be implemented within 60 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Harold Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: November 7, 2006
ATTACHMENT TO LICENSE AMENDMENT NO. 294 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of Appendix A, Technical Specifications, with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 3/4 3-32 3/4 3-32 3/4 3-35 3/4 3-35
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 294 TO FACILITY OPERATING LICENSE NO. DPR-65 DOMINION NUCLEAR CONNECTICUT, INC.
MILLSTONE POWER STATION, UNIT NO. 2 DOCKET NO. 50-336
1.0 INTRODUCTION
By application dated January 4, 2006, Dominion Nuclear Connecticut, Inc. (DNC or the licensee) requested Nuclear Regulatory Commission (NRC or the Commission) approval of changes to the Millstone Power Station, Unit No. 2 (MPS2) Technical Specifications (TSs). The changes would modify the description of pressurizer power-operated relief valve (PORV) and pressurizer safety/relief valve (SRV) position indicators by eliminating the phrase Acoustic Monitor.
2.0 REGULATORY EVALUATION
The NRC staffs evaluation of the acceptability of the proposed TS changes is based upon the following regulations and regulatory guides:
General Design Criterion (GDC) 13, Instrumentation and Control, which states, in part:
Instrumentation shall be provided to monitor variables and systems over their anticipated ranges for normal operation, for anticipated operational occurrences, and for accident conditions as appropriate to assure adequate safety, including those variables and systems that can affect the fission process, the integrity of the reactor core, the reactor coolant pressure boundary, and the containment and its associated systems.
Regulatory Guide (RG) 1.97, Instrumentation for Light-Water-Cooled Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident, Revision 2 (December 1980).
3.0 TECHNICAL EVALUATION
In its application, the licensee stated that the phrase Acoustic Monitor is contained in MPS2's current TS Limiting Condition of Operation (LCO) items 4 and 6 of TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7. The licensee is requesting approval to delete the phrase Acoustic Monitor from the TSs because it is information that is not necessary to meet the TS requirements.
Without the phrase, the TS requirement for the total and minimum number of channels required to be operable and to verify channel operability at the designated frequencies remains the same. The licensee stated that this would also be the case should the design of the position indication system be changed. Furthermore, the licensee stated that to delete a functional unit from the TS LCO, it must be demonstrated that the four criteria set forth in Section 50.36(c)(2)(ii) of Title 10 of the Code of Federal Regulations (10 CFR) no longer apply to the functional unit to be deleted.
The NRC staff notes that using 10 CFR 50.36 as a basis would be appropriate if DNC were justifying deletion of the instruments identified in items 4 and 6 in Table 3.3-11 and Table 4.3-7.
This basis, however, is not appropriate for only a change in the names (Acoustic Monitor) of the instruments.
In the MPS2 Updated Final Safety Analysis Report (UFSAR), the licensee stated that the MPS2 valve monitoring system conforms with NUREG-0578, TMI-2 [Three Mile Island Nuclear Station, Unit 2] Lessons Learned Task Force Status Report and Short-Term Recommendations July 1979. In particular, in NUREG-0578, Section 2.1.3, Information to Aid Operations in Accident Diagnosis and Control, a recommendation was made to have direct indication of power-operated relief valve and safety valve position for pressurized water reactors. This recommendation was incorporated (as TMI Related Action Plan Task II.D.3) in an Action Plan issued by the NRC, NUREG-0660, NRC Action Plan Developed as a Result of the TMI-2 Accident, Vol. I, May 1980. A clarification of TMI-related items approved for implementation by the Commission at that time was issued in NUREG-0737, Clarification of TMI Action Requirements, November 1980.
NUREG-0660 also specified the issuance of RG 1.97 and that the NRC will issue requirements for licensees to meet appropriated portions of the RG and will review the licensees designs for conformance to the RG. In the MPS2 UFSAR, the licensee committed to conforming to RG 1.97 (as noted in docketed letters as described below) and the items the licensee committed to were identified in Table 7.5-3 in the UFSAR. Table 7.5-3 summarizes the RG 1.91 information on file that documents which instruments are credited with monitoring the associated variables.
RG 1.97, Revision 2, recommends that Category 2 primary system SRV (including PORV and code valves) position instrumentation or flow-through or pressure-measuring (in relief valve lines) instrumentation be provided to monitor the operation status and to monitor for loss of coolant in the primary coolant system. RG 1.97 also recommends that Category 2 SRV position or main steam flow instrumentation be provided to monitor the operation of the secondary system (steam generator).
In a letter dated February 29, 1984, the licensee committed to provide Category 2 instrumentation for variable D-10, primary system SRV, to monitor the primary coolant system with a note that stated: The Acoustic Valve Monitoring System (AVMS) has been upgraded during the 1983 refueling outage. In the same letter, the licensee also committed to provide Category 2 instrumentation for variable D-18, SRV position, to monitor the secondary system (steam generator). The information provided on variable D-18 did not mention the type of technology that would be used to monitor SRV position. Variables D-10 and D-18 (as identified in the February 29, 1984 letter) are included in TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7, as Instruments 4 and 6, respectively.
In letters dated April 9, 1984, and August 7, 1986, the licensee repeated the information that was provided in the February 29, 1984, letter concerning variables D-10 and D-18. In letters dated November 22, 1989, and February 5, 1991, the NRC staff issued safety evaluations on the licensees conformance to RG 1.97, Revision 2 for MPS2.
In a letter dated March 2, 1992, the licensee provided updated information concerning the MPS2 RG 1.97 instrumentation. The updated information did not include the earlier note concerning the use of the AVMS for variable D-10, thereby removing the commitment to use acoustic monitoring technology to monitor PORV position.
Since the licensee revised the commitment on variable D-10 to not state the technology that would be used to monitor PORV position, and has not made a commitment in this application on the technology that would be used to monitor SRV position, the NRC staff considers that no commitment exists on what technology would be used to monitor PORV or SRV position.
Therefore, the licensee established that the phrase Acoustic Monitor can be deleted from the names of Instrument 4, PORV Position Indicator Acoustic Monitor, and Instrument 6, Safety Valve Position Indicator Acoustic Monitor, in TS 3/4.3.3.8, Tables 3.3-11 and 4.3-7.
Furthermore, the NRC staff considers that the identification of the type of technology (such as Acoustic Monitor) to use for monitoring is not safety significant.
From the information provided above, the NRC staff determined that even with the phrase Acoustic Monitor deleted, GDC 13 continues to be met. Further, the NRC staff notes that the licensee is committed to providing Category 2 primary system SRV position instrumentation or flow-through or pressure-measuring instrumentation to monitor the operation status and to monitor for loss of coolant in the primary coolant system. Therefore, the NRC staff finds that deleting the phrase Acoustic Monitor is acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Connecticut State official was notified of the proposed issuance of the amendment. The Connecticut State official agreed with the NRC staffs conclusion as stated in Section 6 of this Safety Evaluation.
5.0 ENVIRONMENTAL CONSIDERATION
The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (71 FR 10073). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Barry Marcus Victor Nerses Date: November 7, 2006