ML080460694: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter: .(4) F P Energy Seabrook, LLC,_pursuant to the Act and 10QCF 0.,40 nd 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; and (7) DELETED C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject.to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; is subject to the additional conditions specified or incorporated below: | ||
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS TOTAL ALLOWANCE (TA) | (1) Maximum Power Level FPL Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3648 megawatts thermal (100% of rated power). | ||
: a. Intermediate Range Neutron Flux, P-6 b. Low Power Reactor Trips Block, P-7 1) P-10 input | (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 117*, and the Environmental Protection Plan contained in Appendix B are, incorporated into the Facility License No. NPF-86. | ||
FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. | |||
(3) License Transfer to FPL Energy Seabrook, LLC | |||
: a. On the closing date(s) of the transfer of any ownership interests in Seabrook Station covered by the Order approving the transfer, FPL Energy Seabrook, LLC, shall obtain from each respective transferring owner all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds and additional funds, if necessary, into a decommissioning trust or trusts for Seabrook Station established by FPL Energy Seabrook, LLC, such that the amount of such funds deposited meets or exceeds the amount required under 10 CFR 50.75 with respect to the interest in Seabrook Station FPL Energy Seabrook, LLC, acquires on such dates(s). | |||
* Implemented AMENDMENT NO. 117 | |||
TABLE 2.2-1 (continued) | |||
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS SENSOR TOTAL ERROR FUNCTIONAL UNIT ALLOWANCE (TA) z TRIP SETPOINT ALLOWABLE VAL!.IE | |||
: 18. Reactor Trip System Interlocks | |||
: a. Intermediate Range N.A. N.A. N.A. Ž1 x 10-10 amp x 10-11 amp | |||
___6 Neutron Flux, P-6 | |||
: b. Low Power Reactor Trips Block, P-7 | |||
: 1) P-10 input N.A. N.A. N.A. *10% of RTP* *12.1% of RTP* | |||
: 2) P-13 input N.A. N.A. N.A. *10% RTP* Turbine *12.3% of RTP* Turbine Impulse Pressure Impulse Pressure Equivalent Equivalent | |||
: c. Power Range Neutron N.A. N.A. N.A. *50% of RTP* *52.1% of RTP* | |||
Flux, P-8 | |||
: d. Power Range Neutron N.A. N.A. N.A. *45% of RTP* <45.3% of RTP* | |||
Flux, P-9 I | |||
: e. Power Range Neutron N.A. N.A. N.A. >_10% of'RTP* >7.9% of RTP* | |||
Flux, P-10 | |||
: f. Turbine Impulse Chamber N.A. N.A. N.A. <10% RTP* Turbine *12.3% RTP* Turb ne Pressure, P-13 Impulse Pressure Impulse Pressure Equivalent Equivalent | |||
: 19. Reactor Trip Breakers N.A. N.A. N.A. N.A. N.A. | |||
: 20. Automatic Trip and Interlock N.A. N.A. N.A. N.A. N.A. | |||
I Logic | |||
*RTP = RATED THERMAL POWER SEABROOK - UNIT 1 2-6 Amendment No. 117}} |
Latest revision as of 19:26, 14 November 2019
ML080460694 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 03/27/2008 |
From: | NRC/NRR/ADRO/DORL/LPLI-2 |
To: | |
Miller G, NRR/DORL, 415-2481 | |
Shared Package | |
ML080460674 | List: |
References | |
TAC MD5110 | |
Download: ML080460694 (2) | |
Text
.(4) F P Energy Seabrook, LLC,_pursuant to the Act and 10QCF 0.,40 nd 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; and (7) DELETED C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject.to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level FPL Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3648 megawatts thermal (100% of rated power).
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 117*, and the Environmental Protection Plan contained in Appendix B are, incorporated into the Facility License No. NPF-86.
FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
(3) License Transfer to FPL Energy Seabrook, LLC
- a. On the closing date(s) of the transfer of any ownership interests in Seabrook Station covered by the Order approving the transfer, FPL Energy Seabrook, LLC, shall obtain from each respective transferring owner all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds and additional funds, if necessary, into a decommissioning trust or trusts for Seabrook Station established by FPL Energy Seabrook, LLC, such that the amount of such funds deposited meets or exceeds the amount required under 10 CFR 50.75 with respect to the interest in Seabrook Station FPL Energy Seabrook, LLC, acquires on such dates(s).
- Implemented AMENDMENT NO. 117
TABLE 2.2-1 (continued)
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS SENSOR TOTAL ERROR FUNCTIONAL UNIT ALLOWANCE (TA) z TRIP SETPOINT ALLOWABLE VAL!.IE
- 18. Reactor Trip System Interlocks
- a. Intermediate Range N.A. N.A. N.A. Ž1 x 10-10 amp x 10-11 amp
___6 Neutron Flux, P-6
- b. Low Power Reactor Trips Block, P-7
- 1) P-10 input N.A. N.A. N.A. *10% of RTP* *12.1% of RTP*
- 2) P-13 input N.A. N.A. N.A. *10% RTP* Turbine *12.3% of RTP* Turbine Impulse Pressure Impulse Pressure Equivalent Equivalent
- c. Power Range Neutron N.A. N.A. N.A. *50% of RTP* *52.1% of RTP*
Flux, P-8
- d. Power Range Neutron N.A. N.A. N.A. *45% of RTP* <45.3% of RTP*
Flux, P-9 I
- e. Power Range Neutron N.A. N.A. N.A. >_10% of'RTP* >7.9% of RTP*
Flux, P-10
- f. Turbine Impulse Chamber N.A. N.A. N.A. <10% RTP* Turbine *12.3% RTP* Turb ne Pressure, P-13 Impulse Pressure Impulse Pressure Equivalent Equivalent
- 19. Reactor Trip Breakers N.A. N.A. N.A. N.A. N.A.
- 20. Automatic Trip and Interlock N.A. N.A. N.A. N.A. N.A.
I Logic
- RTP = RATED THERMAL POWER SEABROOK - UNIT 1 2-6 Amendment No. 117