ML060090476
Jump to navigation
Jump to search
| ML060090476 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 01/06/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| References | |
| TAC MC5779 | |
| Download: ML060090476 (1) | |
Text
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT CONTAINMENT AIR-LOCKS SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:
- a.
With the leakage rate In accordance with the Containment Leakage Rate Testing Program.
- b.
At least once per 24 months by verifying that only one door in each air lock can be opened at a time.
SEABROOK - UNIT I 3/4 6-8 Amendment No. 49,106