ML060090476

From kanterella
Jump to navigation Jump to search

Tech Spec Page for Amendment 106 Extension of Containment Air Lock Interlock Surveillance Requirement Interval
ML060090476
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/06/2006
From:
Plant Licensing Branch III-2
To:
References
TAC MC5779
Download: ML060090476 (1)


Text

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT CONTAINMENT AIR-LOCKS SURVEILLANCE REQUIREMENTS 4.6.1.3 Each containment air lock shall be demonstrated OPERABLE:

a. With the leakage rate In accordance with the Containment Leakage Rate Testing Program.
b. At least once per 24 months by verifying that only one door in each air lock can be opened at a time.

SEABROOK - UNIT I 3/4 6-8 Amendment No. 49,106