| {{#Wiki_filter:No. 07-IV-044 Contact: Victor Dricks | | {{#Wiki_filter:NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 611 Ryan Plaza Drive - Suite 400 Arlington, Texas 76011-4005 No. 07-IV-044 December 10, 2007 |
|
| |
|
| Phone: (817) 860-8128 December 10, 2007 E-Mail: opa4@nrc.gov NRC FINALIZES "WHITE" FINDING FOR FORT CALHOUN NUCLEAR PLANT The Fort Calhoun nuclear plant will receive additional oversight from the Nuclear Regulatory Commission based on a violation that adversely affected the reliability of one of the plant's emergency diesel generators. The plant, located near Omaha, Neb., is operated by the Omaha Public Power District. The NRC uses a color-coded system to categorize inspection findings. They range from "green," for an issue of very low safety significance, to "red," for a highly significant issue. In this case, the violation has been determined to be "white," indicating it is of low to moderate safety significance. The finding is based on an NRC inspection completed on Sept. 17 that identified multiple performance deficiencies. The violations involve improper electrical maintenance of an emergency diesel generator which resulted in failures on Feb. 14 and Feb. 16. The diesel generators supply power to plant safety systems during emergencies in the event of a loss of off-site power. The licensee has taken corrective action to prevent recurrence, but the failures are significant. "Our inspection determined there were multiple performance deficiencies involved in this incident," said Region IV Administrator Elmo E. Collins. "Workers applied an unapproved lubricant to a sliding mechanism on the diesel generator that interfered with its operation, causing the Feb. 14 failure. Maintenance on the diesel generator following the Feb. 14 failure contributed to a subsequent failure on Feb. 16. " At the request of Omaha Public Power District officials, a regulatory conference was held on Nov. 8 in the NRC's Region IV office in Arlington, Texas, during which additional information was provided to NRC staff used in making the final determination. The licensee has 30 days to appeal that finding. NRC officials will meet with representatives of the Omaha Public Power District on Dec. 20 to discuss a comprehensive inspection to be conducted at the site next year. The meeting, which will be open to public observation, will begin at 12:30 p.m. in the NRC's Region IV office. The public will have an opportunity to observe and ask questions of NRC staff before the meeting is adjourned. Members of the public can listen to the meeting via a special telephone line by calling 1-800-952-9677 and asking to be transferred to the meeting.
| | ==Contact:== |
| ###
| | Victor Dricks E-Mail: opa4@nrc.gov Phone: (817) 860-8128 NRC FINALIZES WHITE FINDING FOR FORT CALHOUN NUCLEAR PLANT The Fort Calhoun nuclear plant will receive additional oversight from the Nuclear Regulatory Commission based on a violation that adversely affected the reliability of one of the plants emergency diesel generators. The plant, located near Omaha, Neb., is operated by the Omaha Public Power District. |
| NRC news releases are available through a free list serve subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site. | | The NRC uses a color-coded system to categorize inspection findings. They range from green, for an issue of very low safety significance, to red, for a highly significant issue. In this case, the violation has been determined to be white, indicating it is of low to moderate safety significance. |
| NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 611 Ryan Plaza Drive - Suite 400 Arlington, Texas 76011-4005}}
| | The finding is based on an NRC inspection completed on Sept. 17 that identified multiple performance deficiencies. The violations involve improper electrical maintenance of an emergency diesel generator which resulted in failures on Feb. 14 and Feb. 16. The diesel generators supply power to plant safety systems during emergencies in the event of a loss of off-site power. The licensee has taken corrective action to prevent recurrence, but the failures are significant. |
| | Our inspection determined there were multiple performance deficiencies involved in this incident, said Region IV Administrator Elmo E. Collins. Workers applied an unapproved lubricant to a sliding mechanism on the diesel generator that interfered with its operation, causing the Feb. 14 failure. Maintenance on the diesel generator following the Feb. 14 failure contributed to a subsequent failure on Feb. 16. |
| | At the request of Omaha Public Power District officials, a regulatory conference was held on Nov. 8 in the NRCs Region IV office in Arlington, Texas, during which additional information was provided to NRC staff used in making the final determination. The licensee has 30 days to appeal that finding. |
| | NRC officials will meet with representatives of the Omaha Public Power District on Dec. 20 to discuss a comprehensive inspection to be conducted at the site next year. |
| | The meeting, which will be open to public observation, will begin at 12:30 p.m. in the NRCs Region IV office. The public will have an opportunity to observe and ask questions of NRC staff before the meeting is adjourned. Members of the public can listen to the meeting via a special telephone line by calling 1-800-952-9677 and asking to be transferred to the meeting. |
| | NRC news releases are available through a free list serve subscription at the following Web address: |
| | http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.}} |
|
---|
Category:Press Release
MONTHYEARPress Release-17-051, NRC Approves Changes to Fort Calhoun Nuclear Plant'S Emergency Planning Requirements2017-12-14014 December 2017 Press Release-17-051: NRC Approves Changes to Fort Calhoun Nuclear Plant'S Emergency Planning Requirements Press Release-IV-17-010, NRC to Hold Public Meeting May 31 on Decommissioning Process for Fort Calhoun2017-05-0202 May 2017 Press Release-IV-17-010: NRC to Hold Public Meeting May 31 on Decommissioning Process for Fort Calhoun Press Release-16-045, NRC Terminates License for Omaha Va'S Decommissioned Research Reactor2016-08-0101 August 2016 Press Release-16-045: NRC Terminates License for Omaha Va'S Decommissioned Research Reactor Press Release-IV-16-003, NRC to Hold Open House on March 16 for Fort Calhoun Station2016-03-0404 March 2016 Press Release-IV-16-003: NRC to Hold Open House on March 16 for Fort Calhoun Station Press Release-IV-15-019, NRC to Begin Special Inspection at Fort Calhoun Nuclear Station2015-06-29029 June 2015 Press Release-IV-15-019: NRC to Begin Special Inspection at Fort Calhoun Nuclear Station Press Release-IV-15-007, NRC Returns Fort Calhoun to Normal Reactor Oversight Program; Public Meeting Scheduled for April 92015-03-30030 March 2015 Press Release-IV-15-007: NRC Returns Fort Calhoun to Normal Reactor Oversight Program; Public Meeting Scheduled for April 9 Press Release-IV-15-001, NRC Names New Resident Inspector at Fort Calhoun Station2015-01-0505 January 2015 Press Release-IV-15-001: NRC Names New Resident Inspector at Fort Calhoun Station Press Release-IV-14-022, NRC to Hold Meeting to Discuss Status of Fort Calhoun Nuclear Station2014-09-19019 September 2014 Press Release-IV-14-022: NRC to Hold Meeting to Discuss Status of Fort Calhoun Nuclear Station Press Release-14-058, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2014-09-0404 September 2014 Press Release-14-058: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-IV-14-012, NRC Names New Senior Resident Inspector at Fort Calhoun Station2014-06-18018 June 2014 Press Release-IV-14-012: NRC Names New Senior Resident Inspector at Fort Calhoun Station Press Release-IV-14-010, NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station2014-04-30030 April 2014 Press Release-IV-14-010: NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station Press Release-14-016, NRC Issues Annual Assessments for Nation'S Nuclear Plants2014-03-0606 March 2014 Press Release-14-016: NRC Issues Annual Assessments for Nation'S Nuclear Plants Press Release-IV-14-003, NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station2014-02-19019 February 2014 Press Release-IV-14-003: NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station Press Release-IV-13-039, NRC Says Fort Calhoun Plant Is Ready to Restart2013-12-17017 December 2013 Press Release-IV-13-039: NRC Says Fort Calhoun Plant Is Ready to Restart Press Release-IV-13-036, NRC to Hold Public Meeting Nov. 21 to Discuss Status of Fort Calhoun Nuclear Station2013-11-13013 November 2013 Press Release-IV-13-036: NRC to Hold Public Meeting Nov. 21 to Discuss Status of Fort Calhoun Nuclear Station Press Release-IV-13-030, NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station2013-09-12012 September 2013 Press Release-IV-13-030: NRC to Hold Public Meeting to Discuss Status of Fort Calhoun Nuclear Station Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants2013-09-0606 September 2013 Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants Press Release-13-071, NRC Issues Annual Report on Abnormal Occurrences for FY20122013-09-0404 September 2013 Press Release-13-071: NRC Issues Annual Report on Abnormal Occurrences for FY2012 Press Release-IV-13-025, NRC, Omaha Public Power District to Meet on Fort Calhoun Nuclear Station2013-08-16016 August 2013 Press Release-IV-13-025: NRC, Omaha Public Power District to Meet on Fort Calhoun Nuclear Station Press Release-IV-13-018, NRC Will Hold Meeting to Discuss Status of the Fort Calhoun Nuclear Plant2013-07-11011 July 2013 Press Release-IV-13-018: NRC Will Hold Meeting to Discuss Status of the Fort Calhoun Nuclear Plant Press Release-IV-13-013, NRC to Hold Public Meeting to Discuss Results of Inspection at Fort Calhoun Nuclear Plant2013-05-0606 May 2013 Press Release-IV-13-013: NRC to Hold Public Meeting to Discuss Results of Inspection at Fort Calhoun Nuclear Plant Press Release-13-030, NRC, OPPD Officials to Discuss Potential License Amendments for Fort Calhoun Plant April 22 in Rockville, Md2013-04-17017 April 2013 Press Release-13-030: NRC, OPPD Officials to Discuss Potential License Amendments for Fort Calhoun Plant April 22 in Rockville, Md Press Release-IV-13-007, NRC to Hold Public Meeting to Discuss Fort Calhoun Nuclear Plant2013-03-0808 March 2013 Press Release-IV-13-007: NRC to Hold Public Meeting to Discuss Fort Calhoun Nuclear Plant Press Release-IV-13-006, NRC Issues Updated Confirmatory Action Letter to Fort Calhoun Nuclear Plant Operator2013-02-26026 February 2013 Press Release-IV-13-006: NRC Issues Updated Confirmatory Action Letter to Fort Calhoun Nuclear Plant Operator Press Release-IV-13-004, NRC Inspection Teams Arrive at Fort Calhoun Nuclear Plant2013-01-28028 January 2013 Press Release-IV-13-004: NRC Inspection Teams Arrive at Fort Calhoun Nuclear Plant Press Release-IV-12-046, NRC to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant2012-10-26026 October 2012 Press Release-IV-12-046: NRC to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-IV-12-032, NRC to Meet with Omaha Power District Officials to Discuss Fort Calhoun Nuclear Plant2012-08-24024 August 2012 Press Release-IV-12-032: NRC to Meet with Omaha Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-IV-12-023, NRC to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant2012-06-29029 June 2012 Press Release-IV-12-023: NRC to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-12-072, NRC Issues Annual Report on Abnormal Occurrences for Fy 20112012-06-12012 June 2012 Press Release-12-072: NRC Issues Annual Report on Abnormal Occurrences for Fy 2011 Press Release-IV-12-016, NRC Schedules Open House to Discuss Fort Calhoun Nuclear Plant2012-05-0404 May 2012 Press Release-IV-12-016: NRC Schedules Open House to Discuss Fort Calhoun Nuclear Plant Press Release-IV-12-012, NRC Issues Fort Calhoun Station Inspection Finding of High Safety Significance2012-04-10010 April 2012 Press Release-IV-12-012: NRC Issues Fort Calhoun Station Inspection Finding of High Safety Significance Press Release-IV-12-009, NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant2012-03-20020 March 2012 Press Release-IV-12-009: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant ML1200502302012-01-0505 January 2012 Press Release-IV-12-001: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-IV-12-001, NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant2012-01-0505 January 2012 Press Release-IV-12-001: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-IV-11-040, NRC Sends Special Inspection Team to Fort Calhoun Nuclear Plant2011-09-12012 September 2011 Press Release-IV-11-040: NRC Sends Special Inspection Team to Fort Calhoun Nuclear Plant Press Release-IV-11-039, NRC Issues Confirmatory Action Letter for Fort Calhoun Restart Preparations2011-09-0202 September 2011 Press Release-IV-11-039: NRC Issues Confirmatory Action Letter for Fort Calhoun Restart Preparations Press Release-IV-11-035, NRC Cites Fort Calhoun Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance2011-07-19019 July 2011 Press Release-IV-11-035: NRC Cites Fort Calhoun Nuclear Plant for Inspection Finding of Low to Moderate Safety Significance Press Release-IV-11-034, NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant2011-07-14014 July 2011 Press Release-IV-11-034: NRC Staff to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant Press Release-IV-11-031, NRC Activates Incident Response Center for Tracking Events at the Fort Calhoun Nuclear Power Plant2011-06-26026 June 2011 Press Release-IV-11-031: NRC Activates Incident Response Center for Tracking Events at the Fort Calhoun Nuclear Power Plant Press Release-IV-11-030, NRC Tracking Flooding at Two Nebraska Nuclear Power Plants2011-06-22022 June 2011 Press Release-IV-11-030: NRC Tracking Flooding at Two Nebraska Nuclear Power Plants Press Release-IV-11-025, NRC Monitored Alert, Flooding at Fort Calhoun Nuclear Station2011-06-0707 June 2011 Press Release-IV-11-025: NRC Monitored Alert, Flooding at Fort Calhoun Nuclear Station Press Release-IV-11-024, NRC to Hold Regulatory Conference with Omaha Public Power District on Fort Calhoun Nuclear Power Plant on June 22011-05-19019 May 2011 Press Release-IV-11-024: NRC to Hold Regulatory Conference with Omaha Public Power District on Fort Calhoun Nuclear Power Plant on June 2 Press Release-IV-11-008, NRC to Discuss 2010 Performance Assessment for Fort Calhoun Nuclear Plant2011-03-23023 March 2011 Press Release-IV-11-008: NRC to Discuss 2010 Performance Assessment for Fort Calhoun Nuclear Plant Press Release-IV-10-034, NRC Finds Problems with the Fort Calhoun Nuclear Plants Flood Protection Strategy Had Substantial Safety Significance2010-10-0707 October 2010 Press Release-IV-10-034: NRC Finds Problems with the Fort Calhoun Nuclear Plants Flood Protection Strategy Had Substantial Safety Significance Press Release-IV-10-029, NRC to Hold Regulatory Conference with Omaha Public Power District on Ft. Calhoun Nuclear Plant2010-08-10010 August 2010 Press Release-IV-10-029: NRC to Hold Regulatory Conference with Omaha Public Power District on Ft. Calhoun Nuclear Plant Press Release-IV-10-013, NRC to Discuss 2009 Performance Assessment for Fort Calhoun Nuclear Power Plant2010-04-14014 April 2010 Press Release-IV-10-013: NRC to Discuss 2009 Performance Assessment for Fort Calhoun Nuclear Power Plant Press Release-IV-10-009, NRC Sends Special Inspection Team to Fort Calhoun Nuclear Plant2010-03-22022 March 2010 Press Release-IV-10-009: NRC Sends Special Inspection Team to Fort Calhoun Nuclear Plant Press Release-IV-09-025, NRC Names New Resident Inspector at Fort Calhoun Nuclear Plant2009-06-29029 June 2009 Press Release-IV-09-025: NRC Names New Resident Inspector at Fort Calhoun Nuclear Plant Press Release-IV-09-012, NRC to Discuss 2008 Performance Assessment for Fort Calhoun Nuclear Plant2009-04-0808 April 2009 Press Release-IV-09-012: NRC to Discuss 2008 Performance Assessment for Fort Calhoun Nuclear Plant Press Release-IV-08-010, NRC to Discuss 2007 Performance Assessment for Fort Calhoun Station Nuclear Plant April 102008-04-0202 April 2008 Press Release-IV-08-010: NRC to Discuss 2007 Performance Assessment for Fort Calhoun Station Nuclear Plant April 10 2017-05-02
[Table view] |
Text
NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 611 Ryan Plaza Drive - Suite 400 Arlington, Texas 76011-4005 No. 07-IV-044 December 10, 2007
Contact:
Victor Dricks E-Mail: opa4@nrc.gov Phone: (817) 860-8128 NRC FINALIZES WHITE FINDING FOR FORT CALHOUN NUCLEAR PLANT The Fort Calhoun nuclear plant will receive additional oversight from the Nuclear Regulatory Commission based on a violation that adversely affected the reliability of one of the plants emergency diesel generators. The plant, located near Omaha, Neb., is operated by the Omaha Public Power District.
The NRC uses a color-coded system to categorize inspection findings. They range from green, for an issue of very low safety significance, to red, for a highly significant issue. In this case, the violation has been determined to be white, indicating it is of low to moderate safety significance.
The finding is based on an NRC inspection completed on Sept. 17 that identified multiple performance deficiencies. The violations involve improper electrical maintenance of an emergency diesel generator which resulted in failures on Feb. 14 and Feb. 16. The diesel generators supply power to plant safety systems during emergencies in the event of a loss of off-site power. The licensee has taken corrective action to prevent recurrence, but the failures are significant.
Our inspection determined there were multiple performance deficiencies involved in this incident, said Region IV Administrator Elmo E. Collins. Workers applied an unapproved lubricant to a sliding mechanism on the diesel generator that interfered with its operation, causing the Feb. 14 failure. Maintenance on the diesel generator following the Feb. 14 failure contributed to a subsequent failure on Feb. 16.
At the request of Omaha Public Power District officials, a regulatory conference was held on Nov. 8 in the NRCs Region IV office in Arlington, Texas, during which additional information was provided to NRC staff used in making the final determination. The licensee has 30 days to appeal that finding.
NRC officials will meet with representatives of the Omaha Public Power District on Dec. 20 to discuss a comprehensive inspection to be conducted at the site next year.
The meeting, which will be open to public observation, will begin at 12:30 p.m. in the NRCs Region IV office. The public will have an opportunity to observe and ask questions of NRC staff before the meeting is adjourned. Members of the public can listen to the meeting via a special telephone line by calling 1-800-952-9677 and asking to be transferred to the meeting.
NRC news releases are available through a free list serve subscription at the following Web address:
http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.