ML080800149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML080800149
| number = ML080800149
| issue date = 03/19/2008
| issue date = 03/19/2008
| title = 05/13/2008 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar Year
| title = Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar Year
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE
{{#Wiki_filter:March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:                    FirstEnergy Nuclear Operating Company Name of Facility:                    Davis-Besse Nuclear Power Station Docket No:                          50-346 Date and Time of Meeting:            Tuesday May 13, 2008, 3:00 p.m. (EDT)
Location of Meeting:                Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting:                  Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year.
Category 1:                          This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned


Name of Licensee:   FirstEnergy Nuclear Operating Company
Notice of Significant                              Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
Meeting


Name of Facility:   Davis-Besse Nuclear Power Station
==Contact:==
 
Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By:           /RA/
Docket No:    50-346
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects DISTRIBUTION:
 
T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1)
Date and Time of Meeting:  Tuesday May 13, 2008, 3:00 p.m. (EDT)
 
Location of Meeting:  Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH
 
Purpose of Meeting:  Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year.
 
Category 1:    This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
 
NRC Attendees
 
J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned
 
Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned
 
Notice of Significant  Licensee Meeting
 
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008.
The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC
=s meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
 
Meeting Contact: Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov  
 
Approved By:   /RA/   Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects  
 
DISTRIBUTION:
 
T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of R eactor Proj ects, RIII G. Shear, Deputy Director, Division of R eactor Proj ects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1)
T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}}
T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}}

Latest revision as of 07:43, 7 December 2019

Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar Year
ML080800149
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/19/2008
From:
NRC/RGN-III
To:
References
Download: ML080800149 (2)


Text

March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Tuesday May 13, 2008, 3:00 p.m. (EDT)

Location of Meeting: Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting: Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year.

Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.

Meeting

Contact:

Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By: /RA/

Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects DISTRIBUTION:

T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP