|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML080800149 | | | number = ML080800149 |
| | issue date = 03/19/2008 | | | issue date = 03/19/2008 |
| | title = 05/13/2008 Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar Year | | | title = Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar Year |
| | author name = | | | author name = |
| | author affiliation = NRC/RGN-III | | | author affiliation = NRC/RGN-III |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE | | {{#Wiki_filter:March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Tuesday May 13, 2008, 3:00 p.m. (EDT) |
| | Location of Meeting: Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting: Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year. |
| | Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned. |
| | NRC Attendees J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned |
|
| |
|
| Name of Licensee: FirstEnergy Nuclear Operating Company
| | Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008. |
| | The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator. |
| | Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact. |
| | Meeting |
|
| |
|
| Name of Facility: Davis-Besse Nuclear Power Station
| | ==Contact:== |
| | | Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By: /RA/ |
| Docket No: 50-346
| | Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects DISTRIBUTION: |
| | | T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1) |
| Date and Time of Meeting: Tuesday May 13, 2008, 3:00 p.m. (EDT)
| |
| | |
| Location of Meeting: Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH
| |
| | |
| Purpose of Meeting: Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year.
| |
| | |
| Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
| |
| | |
| NRC Attendees
| |
| | |
| J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned
| |
| | |
| Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned
| |
| | |
| Notice of Significant Licensee Meeting
| |
| | |
| Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008.
| |
| The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC
| |
| =s meeting coordinator. | |
| Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
| |
| | |
| Meeting Contact: Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov
| |
| | |
| Approved By: /RA/ Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects | |
| | |
| DISTRIBUTION: | |
| | |
| T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of R eactor Proj ects, RIII G. Shear, Deputy Director, Division of R eactor Proj ects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1) | |
| R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1) | | R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1) |
| T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}} | | T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP}} |
Notice of Meeting with Firstenergy Nuclear Operating Company to Discuss NRC End-of-Cycle Assessment of Davis-Besse Performance for the 2007 Calendar YearML080800149 |
Person / Time |
---|
Site: |
Davis Besse |
---|
Issue date: |
03/19/2008 |
---|
From: |
NRC/RGN-III |
---|
To: |
|
---|
References |
---|
Download: ML080800149 (2) |
|
|
---|
Category:Meeting Notice
MONTHYEARPMNS20241221, Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant2024-09-25025 September 2024 Vistra Operations Company, LLC, (Vistra) Meeting to Discuss Changes to the Quality Assurance Program Manual (QAPM) for Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, and Perry Nuclear Power Plant ML24225A2672024-08-13013 August 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis-Besse Plant for Performance for 2023 Calendar Year ML23111A2692023-04-24024 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis-Besse Nuclear Plant for Performance for 2022 Calendar Year ML22159A3352022-06-0909 June 2022 Notice of Significant Public Meeting to Discuss End-of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station for 2021 Calendar Year ML22031A2302022-01-31031 January 2022 Public Meeting Notice Amendment for Field Flash Selector Switch Preventative Maintenance Regulatory Conference ML22020A4062022-01-21021 January 2022 Public Meeting Notice for Field Flash Selector Switch Preventative Maintenance Regulatory Conference ML22021B6442022-01-21021 January 2022 Notice of Regulatory Conference ML21326A2582021-11-23023 November 2021 Public Meeting Notice (Closed) for Cyber Security Inspection Regulatory Conference PMNS20211401, Meeting with Energy Harbor Nuclear Corp. (Ehnc) Regarding a Proposed Alternative to Certain Steam Generator Inspection Requirements at Davis-Besse Nuclear Power Station, Unit No. 12021-10-27027 October 2021 Meeting with Energy Harbor Nuclear Corp. (Ehnc) Regarding a Proposed Alternative to Certain Steam Generator Inspection Requirements at Davis-Besse Nuclear Power Station, Unit No. 1 ML21158A1752021-06-0404 June 2021 6/22/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Davis Besse Nuclear Power Station and Perry Nuclear Power Plant for Performance for 2020 Calendar Year ML20192A0072020-07-0909 July 2020 7/23/2020 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Davis-Besse Nuclear Power Station and Perry Nuclear Power Plant Performance for the 2019 Calendar Year ML19177A0582019-06-25025 June 2019 7/18/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance for the 2018 Calendar Year ML18157A1332018-06-0606 June 2018 6/26/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-Of-Cycle Assessment of the Davis Besse Nuclear Power Station Performance for the 2017 Calendar Year ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17174B1962017-06-23023 June 2017 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance of the 2016 Calendar Year ML17069A1372017-03-10010 March 2017 Notice of Forthcoming Closed Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Security Plan Changes at Davis-Besse Nuclear Power Station Unit 1 ML16193A2462016-07-0707 July 2016 Alternative Dispute Resolution Meeting Notice (Jls) ML16152A8372016-05-31031 May 2016 6/21/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Davis-Besse Nuclear Power Station Performance for the 2015 Calendar Year ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15141A3632015-05-21021 May 2015 Notice of Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2014 End-Of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station ML15141A3802015-05-21021 May 2015 Notice of Meeting with Public to NRC Activities, Nuclear Power Issues, Davis-Besse Station Performance for the 2014 Calendar Year as Well as Activities Related to the NRC Review of Shield Building Issues ML14177A6882014-06-26026 June 2014 Notice of Meeting to Discuss NRC Activities, Nuclear Power Issues and Davis-Besse, for the 2013 Calendar Year with Public ML14177A6732014-06-26026 June 2014 Public Meeting/Open House to Discuss NRC Activities, Nuclear Power Issues, and 2013 End-Of-Cycle Performance Assessment of Davis-Besse Nuclear Power Station ML14169A4772014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14077A1052014-03-18018 March 2014 March 25, 2014, Notice of Category 3 Forthcoming Meetings to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Davis-Besse, Unit 1 ML14066A0442014-02-20020 February 2014 2014-02-20 Davis-Besse Steam Generator Public Meeting Audio ML14030A5532014-01-30030 January 2014 2/20/2014 - Notice of Public Webinar Meeting with Firstenergy Nuclear Operating Company to Discuss NRC Activities to Inspect Davis-Besse's Installation of Two New Steam Generators ML13280A9062013-10-21021 October 2013 Forthcoming Meeting with Firstenergy Nuclear Operating Company (FENOC) to Discuss Voluntary Risk Informed Fire Protection Amendment for Davis-Besse ML13252A1712013-09-0909 September 2013 9/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse) ML13151A2512013-05-31031 May 2013 Notice of Significant Licensee Meeting ML13144A7902013-05-24024 May 2013 Notice of Meeting with Firstenergy Nuclear Generation, LLC to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Davis-Besse Nuclear Power Station ML13123A3672013-05-0202 May 2013 Ltr 5/2/13 Davis-Besse Operator Licensing Workshop ML13056A2262013-02-22022 February 2013 2/20/2013 - Notice of Significant Licensee Public Meeting with First Energy Nuclear Operating Company to Discuss Davis Besse Nuclear Power Station Planned Steam Generator Replacement Activities ML12256A7922012-09-12012 September 2012 Notice of All-FENOC Public Meeting to Discuss Fleet Wide Performance ML12237A1572012-08-28028 August 2012 Federal Register Notice Regarding the ACRS Plant License Renewal (Davis Besse)Subcommittee Meeting, September 19, 2012 ML12194A7262012-07-12012 July 2012 8/9/2012 Notice of Meeting with Firstenergy Nuclear Operating Company Regarding the Davis-Besse Nuclear Power Station ML12158A4002012-06-0808 June 2012 6/26/2012 Forthcoming Meeting Firstenergy Nuclear Operating Company (FENOC) ML12138A3312012-05-17017 May 2012 05/31/2012, Notice of Significant Licensee Meeting (non-public) Regarding Operator Licensing Workshop and Meeting ML1135601642011-12-22022 December 2011 Meeting Notice with Davis-Besse to Discuss Present the Results of Its Evaluation of Shield Building Cracking and for the NRC to Present the Results of Its Independent Assessment of That Evaluation ML1133604162011-12-0202 December 2011 Notice of Public Meeting with First Energy Nuclear Operating Company to Discuss Their Technical Analysis Regarding Cracking Identified in the Davis-Besse Shield Building ML1115401312011-06-0202 June 2011 Notice of Significant Licensee Meeting, Beaver Valley, Perry, & Davis-Besse Nuclear Generating Stations to Discuss Firstenergy Nuclear Operating Company Fleet Wide Performance with FENOC Management ML1114504162011-05-24024 May 2011 Notice of Meeting with Davis-Besse Meeting Notice to Discuss the NRC End of Cycle Assessment of Davis-Besse Unit 1 Performance for the 2010 Calendar Year 2024-09-25
[Table view] |
Text
March 19, 2008 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: FirstEnergy Nuclear Operating Company Name of Facility: Davis-Besse Nuclear Power Station Docket No: 50-346 Date and Time of Meeting: Tuesday May 13, 2008, 3:00 p.m. (EDT)
Location of Meeting: Davis-Besse Site Energy Education Center 5501 North State Route 2 Oak Harbor, OH Purpose of Meeting: Discuss NRC end-of-cycle assessment of Davis-Besse performance for the 2007 calendar year.
Category 1: This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees J. Cameron, Chief, DRP Branch 6 J. Rutkowski, Senior Resident Inspector Others as assigned Licensee Attendees J. Lash, Vice President Operation, FENOC D. Pace, Vice President Engineering, FENOC B. Allen, Site Vice President Others as assigned
Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Jamnes Cameron at (630) 829-9833 by Friday May 9, 2008.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC=s meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.
Meeting
Contact:
Jamnes L. Cameron Chief, Branch 6 (630) 829-9833 Jamnes.Cameron@nrc.gov Approved By: /RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects DISTRIBUTION:
T. Bloomer (TEB), Region III Coordinator, OEDO T. McGinty (TJM1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR J. Lubinski (JWL), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins (DXC1), DORL, NRR T. Wengert (Thomas.Wengert), Project Manager, DORL, NRR C. Pederson (CDP1), Director, Division of Reactor Projects, RIII G. Shear, Deputy Director, Division of Reactor Projects, RIII S. West (KSW), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII J. Cameron, DRP Branch Chief J. Rutkowski, SRI, Davis-Besse DRS Branch Chiefs (JFL, DEH, ERD, AMS1, SKO, HXP1)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (VTM; PSC1)
T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP