ML121010557: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:}} | ||
}} |
Revision as of 04:42, 29 July 2018
Letter Sequence Other | |
---|---|
TAC:ME8319, (Open) | |
Initiation
Administration Results
Other: ML121010538, ML121010552, ML121010557, ML121010560, ML121010569, ML121150247, ML12258A045 | |
MONTHYEARULNRC-05844, Facility Operating License NPF-30 10 CFR50.55a Request: Proposed Alternative Regarding ASME OM Code Replacement Interval for Main Steam Isolation Value Actuator Rupture Disks2012-03-30030 March 2012
[Table View]Facility Operating License NPF-30 10 CFR50.55a Request: Proposed Alternative Regarding ASME OM Code Replacement Interval for Main Steam Isolation Value Actuator Rupture Disks Project stage: Request ML1210105772012-04-0505 April 2012 Request for Additional Information Re E-mail, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks Project stage: RAI ML1210105692012-04-0909 April 2012 Attachment 5 Project stage: Other ML1210105602012-04-0909 April 2012 Attachment 4 Project stage: Other ML1210105572012-04-0909 April 2012 Attachment 3 Project stage: Other ML1210105522012-04-0909 April 2012 Attachment 2 Project stage: Other ML1210105382012-04-0909 April 2012 Attachment 1 Project stage: Other ML1210105182012-04-0909 April 2012 Email Licensee Responses to Request for Additional Information Regarding Relief Request, Main Steam Isolation Valve Actuator Rupture Disks Replacement Interval Project stage: Response to RAI ML1210104882012-04-10010 April 2012 Request for Additional Information Email to the Licensee, Relief Request Main Steam Isolation Valve Actuator Rupture Disks Replacement Interval Project stage: RAI ML1211502472012-05-0303 May 2012 Memo to File, Verbal Authorization, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks Project stage: Other ML12220A2322012-08-0909 August 2012 Request for Additional Information, Verbal Authorization of Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of MSIV Actuator Rupture Disks Project stage: RAI ULNRC-05905, Response to NRC Request for Additional Information Regarding 10 CFR 50.55a Request: Proposed Alternative to ASME OM Code Replacement Interval for Main Steam Isolation Valve Actuator Rupture Disks2012-09-10010 September 2012 Response to NRC Request for Additional Information Regarding 10 CFR 50.55a Request: Proposed Alternative to ASME OM Code Replacement Interval for Main Steam Isolation Valve Actuator Rupture Disks Project stage: Response to RAI ML12258A0452012-09-18018 September 2012 Relief Request VR-01 from Requirements of ASME OM Code, Mandatory Appendix I, One-time Extension for 5-Year Replacement Interval, from 4/11/12 to 6/2013, Main Steam Isolation Valve Actuator Rupture Disks Project stage: Other 2012-04-09 |
ML121010557 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 04/09/2012 |
From: | Elwood T B Union Electric Co |
To: | Singal B K, Thadani M C Plant Licensing Branch IV |
Singal, B K, NRR/DORL, 301-415-301 | |
Shared Package | |
ML121010479 | List: |
References | |
TAC ME8319 | |
Download: ML121010557 (1) | |
Similar Documents at Callaway | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML23062A6162022-12-29029 December 2022
[Table view]Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23067A1202022-12-29029 December 2022 Site Addendum, Chapter 9, Figures ULNRC-06628, Annual Radiological Environmental Operating Report Errata2021-01-0707 January 2021 Annual Radiological Environmental Operating Report Errata ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ULNRC-05963, Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table2013-02-28028 February 2013 Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table ULNRC-05928, Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates2012-11-0808 November 2012 Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates ULNRC-05918, Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses2012-10-15015 October 2012 Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses ML12271A4742012-08-13013 August 2012 Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ULNRC-05893, Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March2012-08-13013 August 2012 Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12096A3692012-04-20020 April 2012 Request for Concurrence with List of Federally Protected Species and Habitats for the Proposed Callaway Plant License Renewal ML1210105572012-04-0909 April 2012 Attachment 3 ML1035103132010-12-16016 December 2010 Draft TS Mark-up Provided by Licensee as Clarification of Mutual Understanding Following NRC-Licensee TS Modification Discussions at 11/18/10 Public Mtg Re CT Extensions for TS 3.3.2 License Amendment Request ML1019004182010-06-28028 June 2010 Quick View Chart ML1016200532010-06-0909 June 2010 Borehole Identification Tables, Callaway Power Plant, Terracon Project No. 09067011T ML12271A4792009-12-31031 December 2009 Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ULNRC-05893, Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway 2 Water District Pwss Report 30240852009-12-31031 December 2009 Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0630502032006-10-25025 October 2006 Callaway, Requests for Relief from ASME Section Xi Code Inservice Examination Requirements ML0426101132004-09-13013 September 2004 Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) 2022-12-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML121010557&oldid=919382"