|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Ap'V/INuclear Operating CompanySouth Texas Pro/ed Electric Geneating Station P.O Box 289 Wadsworth, Texas 77483 -January 14, 2013NOC-AE-1 300294910 CFR 50.80STI: 33645647U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D.C. 20555-0001South Texas ProjectUnits I and 2Docket Nos. STN 50-498 and STN 50-499Notice Regarding Completion of Merger(TAC NOS. ME9166 and ME9167)Reference(s): (1) Letter from M.P. Murray to NRC Document Control Desk, "Request forThreshold Determination Under 10 CFR 50.80," dated August 1, 2012(NOC-AE-12002895) (ML12228A380)(2) Letter from Balwant Singal to D.L. Koehl, "South Texas Project, Units 1and 2 -Request for Threshold Determination Under 10 CFR 50.80 (TACNOS. ME9166 and ME9167)," dated November 1, 2012 (ML12297A134)STP Nuclear Operating Company ("STPNOC"), acting on behalf of NRG South Texas LP,hereby provides Notice that on December 14, 2012 NRG Energy, Inc. has completed themerger with GenOn Energy, Inc. described in Reference 1. The NRC staff previously evaluatedthe information provided in Reference 1, as supplemented by letters dated August 28 andOctober 3, 2012 (ADAMS Accession Nos. ML12261A334 and ML12292A387, respectively) andconcluded in Reference 2 that the proposed merger would not involve a direct or indirecttransfer of control of NRG South Texas LP's licenses for South Texas Project, Units 1 and 2.This letter contains no commitments.If NRC requires additional information concerning this request, please contact Jamie Paul at(361) 972-7344 or me at (361) 972-8164.Michael P. urriiayManager, Regulatory Affairs1201 NOC-AE-13002949Page 2 of 2cc:(paper copy)(electronic copy)Regional Administrator, Region IVU. S. Nuclear Regulatory Commission1600 East Lamar BoulevardArlington, TX 76011-4511Balwant K. SingalSenior Project ManagerU.S. Nuclear Regulatory CommissionOne White Flint North (MS 8 B1)11555 Rockville PikeRockville, MD 20852NRC Resident InspectorU. S. Nuclear Regulatory CommissionP. O. Box 289, Mail Code: MN116Wadsworth, TX 77483C. M. CanadyCity of AustinElectric Utility Department721 Barton Springs RoadAustin, TX 78704A. H. Gutterman, EsquireMorgan, Lewis & Bockius LLPBalwant K. SingalU. S. Nuclear Regulatory CommissionJohn RaganChris O'HaraJim von SuskilNRG South Texas LPKevin PolioRichard PenaCity Public ServicePeter NemethCrain Caton & James, P.C.C. MeleCity of AustinRichard A. RatliffTexas Department of State HealthServicesAlice RogersTexas Department of State HealthServices | | {{#Wiki_filter:Ap'V/I Nuclear Operating Company South Texas Pro/ed Electric Geneating Station P.O Box 289 Wadsworth, Texas 77483 -January 14, 2013 NOC-AE-1 3002949 10 CFR 50.80 STI: 33645647 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 South Texas Project Units I and 2 Docket Nos. STN 50-498 and STN 50-499 Notice Regarding Completion of Merger (TAC NOS. ME9166 and ME9167)Reference(s): |
| }} | | (1) Letter from M.P. Murray to NRC Document Control Desk, "Request for Threshold Determination Under 10 CFR 50.80," dated August 1, 2012 (NOC-AE-12002895) (ML12228A380) |
| | (2) Letter from Balwant Singal to D.L. Koehl, "South Texas Project, Units 1 and 2 -Request for Threshold Determination Under 10 CFR 50.80 (TAC NOS. ME9166 and ME9167)," dated November 1, 2012 (ML12297A134) |
| | STP Nuclear Operating Company ("STPNOC"), acting on behalf of NRG South Texas LP, hereby provides Notice that on December 14, 2012 NRG Energy, Inc. has completed the merger with GenOn Energy, Inc. described in Reference |
| | : 1. The NRC staff previously evaluated the information provided in Reference 1, as supplemented by letters dated August 28 and October 3, 2012 (ADAMS Accession Nos. ML12261A334 and ML12292A387, respectively) and concluded in Reference 2 that the proposed merger would not involve a direct or indirect transfer of control of NRG South Texas LP's licenses for South Texas Project, Units 1 and 2.This letter contains no commitments. |
| | If NRC requires additional information concerning this request, please contact Jamie Paul at (361) 972-7344 or me at (361) 972-8164.Michael P. urriiay Manager, Regulatory Affairs 1201 NOC-AE-13002949 Page 2 of 2 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Balwant K. Singal U. S. Nuclear Regulatory Commission John Ragan Chris O'Hara Jim von Suskil NRG South Texas LP Kevin Polio Richard Pena City Public Service Peter Nemeth Crain Caton & James, P.C.C. Mele City of Austin Richard A. Ratliff Texas Department of State Health Services Alice Rogers Texas Department of State Health Services}} |
Letter Sequence Other |
---|
|
|
MONTHYEARNOC-AE-12002895, Request for Threshold Determination Under 10 CFR 50.802012-08-0101 August 2012 Request for Threshold Determination Under 10 CFR 50.80 Project stage: Request NOC-AE-12002899, Supplemental Information Regarding Request for Threshold Determination Under 10 CFR 50.802012-08-28028 August 2012 Supplemental Information Regarding Request for Threshold Determination Under 10 CFR 50.80 Project stage: Supplement ML12258A1282012-09-28028 September 2012 Request for Additional Information Regarding Threshold Determination Under 10 CFR 50.80 Related to the Proposed Merger Between Nrg Energy, Inc. and Genon Energy, Inc. Project stage: RAI NOC-AE-12002905, Response to Request for Additional Information Regarding Threshold Determination Under 10 CFR 50.802012-10-0303 October 2012 Response to Request for Additional Information Regarding Threshold Determination Under 10 CFR 50.80 Project stage: Response to RAI ML12297A1342012-11-0101 November 2012 Request Threshold Determination Under 10 CFR 50.80 Regarding the Proposed Merger Between Nrg Energy, Inc. and Genon Energy. Inc. Project stage: Other ML14029A3462012-11-0101 November 2012 Official Exhibit - STP000067-00-BD01 - Letter from B. Singal, NRC, to D. Koehhl, STPNOC, South Texas Project, Units 1 and 2 - Request for Threshold Determination Under 10 CFR 50.80 Project stage: Other ML13182A6902012-11-0101 November 2012 Applicant Pre-Filed Hearing Exhibit STP000067, Request for Threshold Determination Under 10 CFR 50.80 Project stage: Other NOC-AE-13002949, Notice Regarding Completion of Merger2013-01-14014 January 2013 Notice Regarding Completion of Merger Project stage: Other 2012-08-01
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 the Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-04
[Table view] |
Text
Ap'V/I Nuclear Operating Company South Texas Pro/ed Electric Geneating Station P.O Box 289 Wadsworth, Texas 77483 -January 14, 2013 NOC-AE-1 3002949 10 CFR 50.80 STI: 33645647 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 South Texas Project Units I and 2 Docket Nos. STN 50-498 and STN 50-499 Notice Regarding Completion of Merger (TAC NOS. ME9166 and ME9167)Reference(s):
(1) Letter from M.P. Murray to NRC Document Control Desk, "Request for Threshold Determination Under 10 CFR 50.80," dated August 1, 2012 (NOC-AE-12002895) (ML12228A380)
(2) Letter from Balwant Singal to D.L. Koehl, "South Texas Project, Units 1 and 2 -Request for Threshold Determination Under 10 CFR 50.80 (TAC NOS. ME9166 and ME9167)," dated November 1, 2012 (ML12297A134)
STP Nuclear Operating Company ("STPNOC"), acting on behalf of NRG South Texas LP, hereby provides Notice that on December 14, 2012 NRG Energy, Inc. has completed the merger with GenOn Energy, Inc. described in Reference
- 1. The NRC staff previously evaluated the information provided in Reference 1, as supplemented by letters dated August 28 and October 3, 2012 (ADAMS Accession Nos. ML12261A334 and ML12292A387, respectively) and concluded in Reference 2 that the proposed merger would not involve a direct or indirect transfer of control of NRG South Texas LP's licenses for South Texas Project, Units 1 and 2.This letter contains no commitments.
If NRC requires additional information concerning this request, please contact Jamie Paul at (361) 972-7344 or me at (361) 972-8164.Michael P. urriiay Manager, Regulatory Affairs 1201 NOC-AE-13002949 Page 2 of 2 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Balwant K. Singal Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 B1)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP Balwant K. Singal U. S. Nuclear Regulatory Commission John Ragan Chris O'Hara Jim von Suskil NRG South Texas LP Kevin Polio Richard Pena City Public Service Peter Nemeth Crain Caton & James, P.C.C. Mele City of Austin Richard A. Ratliff Texas Department of State Health Services Alice Rogers Texas Department of State Health Services