Initial Conditions:  100% power Turnover:  A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power. Event No. Malf. No.
Initial Conditions:  100% power Turnover:  A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power. Event No. Malf. No. Event Type* Event Description 1 U1_RCR16 C(ATC) TS Pressurizer Safety Valve Leak (SV45B 2gpm) 2  R Power Reduction 3  N Turbine Power Reduction 4 U1_ECP Stator Short C(ATC) TS East CCP fails on overcurrent 5 U1_RX33B I(BOP) Feedwater flow controller fails 6 U1_QTC302 175 over 5 Minutes I(ATC) Charging Letdown Header Temperature QTC
Event Type* Event Description 1 U1_RCR16 C(ATC) TS Pressurizer Safety Valve Leak (SV45B 2gpm) 2  R Power Reduction 3  N Turbine Power Reduction 4 U1_ECP Stator Short C(ATC) TS East CCP fails on overcurrent 5 U1_RX33B I(BOP) Feedwater flow controller fails 6 U1_QTC302 175 over 5 Minutes I(ATC) Charging Letdown Header Temperature QTC
-302 fails high 7 U1_RC01A 60% M(ALL) Large break LOCA 8 U1_ED05E (Trg 1) M(ALL) Vital bus T11A Fails (On RX Trip) 9 U1_RP10A U1_RP11A U1_RP11C C(ATC) Auto/Manual SI Train A does not occur
-302 fails high 7 U1_RC01A 60% M(ALL) Large break LOCA 8 U1_ED05E (Trg 1) M(ALL) Vital bus T11A Fails (On RX Trip) 9 U1_RP10A U1_RP11A U1_RP11C C(ATC) Auto/Manual SI Train A does not occur
                     * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
                     * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor
Line 39: Line 38:
EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.
EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.
Turnover:
Turnover:
1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 92% power following turbine valve testing.
1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 9 2% power following turbine valve testing.
Event No. Malf. No.
Event No. Malf. No. Event Type* Event Description 1  N Secure the CD D/G 2 U1_NI10B 200 over 1 min I(ATC) TS Power range detector (NI
Event Type* Event Description 1  N Secure the CD D/G 2 U1_NI10B 200 over 1 min I(ATC) TS Power range detector (NI
-42) fails high 3  R Power increase to restore power 4 U1_FW40A 100 C(BOP) Condenser Level Control failure (100%)
-42) fails high 3  R Power increase to restore power 4 U1_FW40A 100 C(BOP) Condenser Level Control failure (100%)
5 U1_BLP131 0 over 30sec I(ATC) TS Steam generator #3 BLP131 controlling level channel fails low 6 U1_MS02C 50% Major Steam line #3 break inside containment 7 U1_RP01A U1_RP01B C(ATC) Reactor trip failure (ATWS), Rods Drop when MG sets de
5 U1_BLP131 0 over 30sec I(ATC) TS Steam generator #3 BLP131 controlling level channel fails low 6 U1_MS02C 50% Major Steam line #3 break inside containment 7 U1_RP01A U1_RP01B C(ATC) Reactor trip failure (ATWS), Rods Drop when MG sets de
Line 59: Line 57:
-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. Procedure 1
-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. Procedure 1
-OHP-4021-001-006, Power Escalation is complete up to step 4.2
-OHP-4021-001-006, Power Escalation is complete up to step 4.2
: 8. Raise Power at 10%/hour to ~29%. Event No. Malf. No.
: 8. Raise Power at 10%/hour to ~29%. Event No. Malf. No. Event Type* Event Description 1  N Control Feed Flow In Manual 2  R Raise Power 3 U1_MPC253 to 740 I(ATC) Turbine impulse pressure instrument (MPC
Event Type* Event Description 1  N Control Feed Flow In Manual 2  R Raise Power 3 U1_MPC253 to 740 I(ATC) Turbine impulse pressure instrument (MPC
-253) fails HIGH 4 U1_MPP222 1500 C(BOP) MPP 222 SG #2 PORV Pressure Channel 5 U1_FPC_250 A to 1 over 2 min I(BOP) Main Feedwater discharge pressure (FPC
-253) fails HIGH 4 U1_MPP222 1500 C(BOP) MPP 222 SG #2 PORV Pressure Channel 5 U1_FPC_250 A to 1 over 2 min I(BOP) Main Feedwater discharge pressure (FPC
-250A) fails Low 6 U1_RC10D 10% over 5 Min Major Small break LOCA in containment (150 gpm with a 5 min ramp) 7 U1_RP10A U1_RP10B I(ATC) Auto SI fails 8 U1_TC02 U1_TC03 C(BOP) Main turbine fails to trip 9 U1_RD0435 U1_RD0441 C(ATC) Two rods fail to Drop (H4 & H6) 10 U1_ECP Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip  * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor Appendix D Scenario Outline Form ES-D-1    Page 1 of 1  Facility: __D C Cook______  Scenario No.: ___
-250A) fails Low 6 U1_RC10D 10% over 5 Min Major Small break LOCA in containment (150 gpm with a 5 min ramp) 7 U1_RP10A U1_RP10B I(ATC) Auto SI fails 8 U1_TC02 U1_TC03 C(BOP) Main turbine fails to trip 9 U1_RD0435 U1_RD0441 C(ATC) Two rods fail to Drop (H4 & H6) 10 U1_ECP Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip  * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor Appendix D Scenario Outline Form ES-D-1    Page 1 of 1  Facility: __D C Cook______  Scenario No.: ___
Line 74: Line 71:
-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service  
-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service  
- was run for engineering data collection.
- was run for engineering data collection.
Event No. Malf. No.
Event No. Malf. No. Event Type* Event Description 1  N Remove North Condensate Booster from service 2 U1_QLC451 To 0% I(ATC) TS VCT level instrument (QLC
Event Type* Event Description 1  N Remove North Condensate Booster from service 2 U1_QLC451 To 0% I(ATC) TS VCT level instrument (QLC
-451) fails low 3  R Power reduction 4 U1_MFC140 to 0 I(BOP) TS Steam flow channel (MFC
-451) fails low 3  R Power reduction 4 U1_MFC140 to 0 I(BOP) TS Steam flow channel (MFC
-140) fails low (Controlling) 5 U1_RCR20 to 5 C(ATC) Pressurizer PORV (NRC
-140) fails low (Controlling) 5 U1_RCR20 to 5 C(ATC) Pressurizer PORV (NRC
Line 83: Line 79:
  #4 tube rupture (600 gpm (60%) ramp to 30% over 10 minutes  
  #4 tube rupture (600 gpm (60%) ramp to 30% over 10 minutes  
- raise to 60% on trip
- raise to 60% on trip
) 7 U1_MS06D to 80% C(BOP) Steam generator safety valve (SV 3-4) opens  
) 7 U1_MS06D to 80% C(BOP) Steam generator safety valve (SV 3-4) opens - 80%            * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor}}
- 80%            * (N)ormal,    (R)eactivity,    (I)nstrument,    (C)omponent,    (M)ajor}}

Revision as of 11:12, 9 July 2018

2014 DC Cook Initial License Examination Proposed Scenario D-1 Sheets
ML14274A256
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/01/2014
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Indiana Michigan Power Co
Shared Package
ML14218A305 List:
References
Download: ML14274A256 (4)


Text

Appendix D Required Operator Actions Form ES-D-2 Facility: __D C Cook______ Scenario No.: ____

1____ Op-Test No.: 2014301 Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: 100% power Turnover: A 200 MW power decrease has been requested by the System Dispatcher. Both units are at 100% power. Event No. Malf. No. Event Type* Event Description 1 U1_RCR16 C(ATC) TS Pressurizer Safety Valve Leak (SV45B 2gpm) 2 R Power Reduction 3 N Turbine Power Reduction 4 U1_ECP Stator Short C(ATC) TS East CCP fails on overcurrent 5 U1_RX33B I(BOP) Feedwater flow controller fails 6 U1_QTC302 175 over 5 Minutes I(ATC) Charging Letdown Header Temperature QTC

-302 fails high 7 U1_RC01A 60% M(ALL) Large break LOCA 8 U1_ED05E (Trg 1) M(ALL) Vital bus T11A Fails (On RX Trip) 9 U1_RP10A U1_RP11A U1_RP11C C(ATC) Auto/Manual SI Train A does not occur

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Page 1 of 1 Facility: __D C Cook______ Scenario No.: ____

3____ Op-Test No.: 2014301 Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: ___

EDG CD has been run following mechanical maintenance. The run is complete and the EDG is ready to be shutdown and placed in standby.

Turnover:

1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through preparation for Restoring for OPERABILITY. U1 is at 9 2% power following turbine valve testing.

Event No. Malf. No. Event Type* Event Description 1 N Secure the CD D/G 2 U1_NI10B 200 over 1 min I(ATC) TS Power range detector (NI

-42) fails high 3 R Power increase to restore power 4 U1_FW40A 100 C(BOP) Condenser Level Control failure (100%)

5 U1_BLP131 0 over 30sec I(ATC) TS Steam generator #3 BLP131 controlling level channel fails low 6 U1_MS02C 50% Major Steam line #3 break inside containment 7 U1_RP01A U1_RP01B C(ATC) Reactor trip failure (ATWS), Rods Drop when MG sets de

-energized 8 U1_RP09A U1_RP09B C(BOP) Feedwater isolation does not occur in automatic 9 U1_FW48C C(BOP) TDAFW pump does not start in auto

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor

Appendix D Scenario Outline Form ES-D-1 Page 1 of 1 Facility: __D C Cook______ Scenario No.: ___

4_____ Op-Test No.:

2014301 Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: 12% power, main generator has just been paralleled.

Turnover: The unit is at 12% power with the generator has just been paralleled to the grid. The unit was down powered to fix leak on the weld for FTR

-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. Procedure 1

-OHP-4021-001-006, Power Escalation is complete up to step 4.2

8. Raise Power at 10%/hour to ~29%. Event No. Malf. No. Event Type* Event Description 1 N Control Feed Flow In Manual 2 R Raise Power 3 U1_MPC253 to 740 I(ATC) Turbine impulse pressure instrument (MPC

-253) fails HIGH 4 U1_MPP222 1500 C(BOP) MPP 222 SG #2 PORV Pressure Channel 5 U1_FPC_250 A to 1 over 2 min I(BOP) Main Feedwater discharge pressure (FPC

-250A) fails Low 6 U1_RC10D 10% over 5 Min Major Small break LOCA in containment (150 gpm with a 5 min ramp) 7 U1_RP10A U1_RP10B I(ATC) Auto SI fails 8 U1_TC02 U1_TC03 C(BOP) Main turbine fails to trip 9 U1_RD0435 U1_RD0441 C(ATC) Two rods fail to Drop (H4 & H6) 10 U1_ECP Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RXtrip * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D Scenario Outline Form ES-D-1 Page 1 of 1 Facility: __D C Cook______ Scenario No.: ___

5_____ Op-Test No.:

2014301 Examiners: ____________________________ Operators:

_____________________________

____________________________

_____________________________

____________________________

_____________________________

Initial Conditions: 79% power, Power reduction in progress.

Turnover: Unit is stable at 79% power and continuing a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02

-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service

- was run for engineering data collection.

Event No. Malf. No. Event Type* Event Description 1 N Remove North Condensate Booster from service 2 U1_QLC451 To 0% I(ATC) TS VCT level instrument (QLC

-451) fails low 3 R Power reduction 4 U1_MFC140 to 0 I(BOP) TS Steam flow channel (MFC

-140) fails low (Controlling) 5 U1_RCR20 to 5 C(ATC) Pressurizer PORV (NRC

-153) leaking (requires isolation)

- 5% open NOTE: Time compression may be used as the procedure requires a 15 minute wait time after unisolating each PORV.

6 U1_RC23D to 30 over 10 min Major Reactor Trip with S/G

  1. 4 tube rupture (600 gpm (60%) ramp to 30% over 10 minutes

- raise to 60% on trip

) 7 U1_MS06D to 80% C(BOP) Steam generator safety valve (SV 3-4) opens - 80% * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor