ML15092A341: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


==1.1INTRODUCTION==
==1.1INTRODUCTION==
.....................................................................................................1-11.2SUMMARY AND CONCLUSIONS ON PRINCIPAL SAFETYCONSIDERATIONS.................................................................................................1-21.3GENERAL DESCRIPTION OF THE FACILITY.......................................................1-81.4SHARED FACILITIES AND EQUIPMENT...............................................................1-131.5COMPARISON WITH SIMILAR FACILITIES...........................................................1-141.6SUMMARY OF OPERATIONS................................................................................1-18 1.7COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982.................1-191.8FACILITY MODIFICATIONS AND HISTORY..........................................................1-2
.....................................................................................................1-11.2
 
==SUMMARY==
AND CONCLUSIONS ON PRINCIPAL SAFETYCONSIDERATIONS.................................................................................................1-21.3GENERAL DESCRIPTION OF THE FACILITY.......................................................1-81.4SHARED FACILITIES AND EQUIPMENT...............................................................1-131.5COMPARISON WITH SIMILAR FACILITIES...........................................................1-141.6
 
==SUMMARY==
OF OPERATIONS................................................................................1-18 1.7COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982.................1-191.8FACILITY MODIFICATIONS AND HISTORY..........................................................1-2


==01.9REFERENCES==
==01.9REFERENCES==
Line 28: Line 34:


==43.6REFERENCES==
==43.6REFERENCES==
........................................................................................................3-107 CHAPTER 4IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION4a1HETEROGENEOUS REACTOR DESCRIPTION..............................................4a1-14a2IRRADIATION FACILITY DESCRIPTION.........................................................4a2-14a2.1SUMMARY DESCRIPTION............................................................................4a2-24a2.2SUBCRITICAL ASSEMBLY..........................................................................4a2-6 SectionTitlePage Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiRev. 14a2.3NEUTRON DRIVER.....................................................................................4a2-204a2.4TARGET SOLUTION VESSEL AND LIGHT WATER POOL...............................
........................................................................................................3-107 CHAPTER 4IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION4a1HETEROGENEOUS REACTOR DESCRIPTION..............................................4a1-14a2IRRADIATION FACILITY DESCRIPTION.........................................................4a2-14a2.1
 
==SUMMARY==
DESCRIPTION............................................................................4a2-24a2.2SUBCRITICAL ASSEMBLY..........................................................................4a2-6 SectionTitle Page Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiRev. 14a2.3NEUTRON DRIVER.....................................................................................4a2-204a2.4TARGET SOLUTION VESSEL AND LIGHT WATER POOL...............................
4a2-264a2.5IRRADIATION FACILITY BIOLOGICAL SHIELD....................................................4a2-324a2.6NUCLEAR DESIGN.................................................................................................4a2-374a2.7THERMAL HYDRAULIC DESIGN...........................................................................4a2-514a2.8GAS MANAGEMENT SYSTEM...............................................................................4a2-564a
4a2-264a2.5IRRADIATION FACILITY BIOLOGICAL SHIELD....................................................4a2-324a2.6NUCLEAR DESIGN.................................................................................................4a2-374a2.7THERMAL HYDRAULIC DESIGN...........................................................................4a2-514a2.8GAS MANAGEMENT SYSTEM...............................................................................4a2-564a


==2.9REFERENCES==
==2.9REFERENCES==
........................................................................................................4a2-62 4bRADIOISOTOPE PRODUCTION FACILITY DESCRIPTION..................................4b-14b.1FACILITY AND PROCESS DESCRIPTION............................................................4b-24b.2RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD.......................4b-134b.3RADIOISOTOPE EXTRACTION SYSTEM.............................................................4b-184b.4SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE........................4b-27 4b.5REFERENCES........................................................................................................4b-56 CHAPTER 5 COOLING SYSTEMS5a1HETEROGENEOUS REACTOR COOLING SYSTEMS..........................................5a1-15a2IRRADIATION UNIT COOLING SYSTEMS.............................................................5a2-15a2.1SUMMARY DESCRIPTION.....................................................................................5a2-25a2.2PRIMARY COOLING SYSTEM...............................................................................5a2-45a2.3SECONDARY COOLING SYSTEM.........................................................................5a2-135a2.4PRIMARY COOLANT CLEANUP............................................................................5a2-20 5a2.5PRIMARY COOLANT MAKEUP WATER SYSTEM................................................5a2-225a2.6NITROGEN-16 CONTROL......................................................................................5a2-255a2.7AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................5a2-265a
........................................................................................................4a2-62 4bRADIOISOTOPE PRODUCTION FACILITY DESCRIPTION..................................4b-14b.1FACILITY AND PROCESS DESCRIPTION............................................................4b-24b.2RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD.......................4b-134b.3RADIOISOTOPE EXTRACTION SYSTEM.............................................................4b-184b.4SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE........................4b-27 4b.5REFERENCES........................................................................................................4b-56 CHAPTER 5 COOLING SYSTEMS5a1HETEROGENEOUS REACTOR COOLING SYSTEMS..........................................5a1-15a2IRRADIATION UNIT COOLING SYSTEMS.............................................................5a2-15a2.1
 
==SUMMARY==
DESCRIPTION.....................................................................................5a2-25a2.2PRIMARY COOLING SYSTEM...............................................................................5a2-45a2.3SECONDARY COOLING SYSTEM.........................................................................5a2-135a2.4PRIMARY COOLANT CLEANUP............................................................................5a2-20 5a2.5PRIMARY COOLANT MAKEUP WATER SYSTEM................................................5a2-225a2.6NITROGEN-16 CONTROL......................................................................................5a2-255a2.7AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................5a2-265a


==2.8REFERENCES==
==2.8REFERENCES==
........................................................................................................5a2-275bRADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................5b-1 CHAPTER 6ENGINEERED SAFETY FEATURES6a1HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................6a1-16a2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES..........................6a2-16a2.1SUMMARY DESCRIPTION............................................................................6a2-26a2.2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-46a2.3EMERGENCY COOLING SYSTEM........................................................................6a2-106a2.4IRRADIATION FACILITY ENGINEERED SAFETY FEATURESTECHNICAL SPECIFICATIONS..............................................................................6a2-116a
........................................................................................................5a2-275bRADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................5b-1 CHAPTER 6ENGINEERED SAFETY FEATURES6a1HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................6a1-16a2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES..........................6a2-16a2.1
 
==SUMMARY==
DESCRIPTION............................................................................6a2-26a2.2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-46a2.3EMERGENCY COOLING SYSTEM........................................................................6a2-106a2.4IRRADIATION FACILITY ENGINEERED SAFETY FEATURESTECHNICAL SPECIFICATIONS..............................................................................6a2-116a


==2.5REFERENCES==
==2.5REFERENCES==
........................................................................................................6a2-126bRADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-16b.1SUMMARY DESCRIPTION ENGINEERED SAFETY FEATURES.........................6b-16b.2RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-36b.3NUCLEAR CRITICALITY CONTROL......................................................................6b-116b.4REFERENCES.............................................................................................6b-23 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiiRev. 0 CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS7a1HETEROGENEOUS REACTOR INSTRUMENT & CONTROLSYSTEMS................................................................................................................7a1-17a2IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS........................7a2-17a2.1SUMMARY DESCRIPTION.....................................................................................7a2-17a2.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7a2-37a2.3TSV PROCESS CONTROL DESCRIPTION...........................................................7a2-31 7a2.4TSV REACTIVITY PROTECTION SYSTEM...........................................................7a2-337a2.5ENGINEERED SAFETY FEATURES ACTUATION SYSTEM................................7a2-377a2.6CONTROL CONSOLE AND DISPLAY INFORMATION...............
........................................................................................................6a2-126bRADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-16b.1
 
==SUMMARY==
DESCRIPTION ENGINEERED SAFETY FEATURES.........................6b-16b.2RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-36b.3NUCLEAR CRITICALITY CONTROL......................................................................6b-116b.4REFERENCES.............................................................................................6b-23 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiiRev. 0 CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS7a1HETEROGENEOUS REACTOR INSTRUMENT & CONTROLSYSTEMS................................................................................................................7a1-17a2IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS........................7a2-17a2.1
 
==SUMMARY==
DESCRIPTION.....................................................................................7a2-17a2.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7a2-37a2.3TSV PROCESS CONTROL DESCRIPTION...........................................................7a2-31 7a2.4TSV REACTIVITY PROTECTION SYSTEM...........................................................7a2-337a2.5ENGINEERED SAFETY FEATURES ACTUATION SYSTEM................................7a2-377a2.6CONTROL CONSOLE AND DISPLAY INFORMATION...............
...........................7a2-407a2.7RADIATION MONITORING SYSTEMS...................................................................7a2-437a
...........................7a2-407a2.7RADIATION MONITORING SYSTEMS...................................................................7a2-437a


==2.8REFERENCES==
==2.8REFERENCES==
........................................................................................................7a2-47 7bRADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &CONTROL SYSTEM...............................................................................................7b-17b.1SUMMARY DESCRIPTION.....................................................................................7b-17b.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7b-27b.3PRODUCTION FACILITY PROCESS CONTROL SYSTEMS................................7b-297b.4ENGINEERED SAFETY FEATURE AND ALARMING............................................7b-317b.5CONTROL CONSOLE AND DISPLAY INSTRUMENTATION................................7b-35 7b.6RADIATION MONITORING SYSTEMS...................................................................7b-377b.7REFERENCES........................................................................................................7b-38 CHAPTER 8ELECTRIC POWER SYSTEMS8a1HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS.....................8a1-18a2IRRADIATION UNIT ELECTRICAL POWER SYSTEMS........................................8a2-18a2.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8a2-18a2.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8a2-98a2.3IRRADIATION FACILITY ELECTRICAL POWER SYSTEMSTECHNICAL SPECIFICATIONS.............................................................................8a2-158a
........................................................................................................7a2-47 7bRADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &CONTROL SYSTEM...............................................................................................7b-17b.1
 
==SUMMARY==
DESCRIPTION.....................................................................................7b-17b.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7b-27b.3PRODUCTION FACILITY PROCESS CONTROL SYSTEMS................................7b-297b.4ENGINEERED SAFETY FEATURE AND ALARMING............................................7b-317b.5CONTROL CONSOLE AND DISPLAY INSTRUMENTATION................................7b-35 7b.6RADIATION MONITORING SYSTEMS...................................................................7b-377b.7REFERENCES........................................................................................................7b-38 CHAPTER 8ELECTRIC POWER SYSTEMS8a1HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS.....................8a1-18a2IRRADIATION UNIT ELECTRICAL POWER SYSTEMS........................................8a2-18a2.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8a2-18a2.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8a2-98a2.3IRRADIATION FACILITY ELECTRICAL POWER SYSTEMSTECHNICAL SPECIFICATIONS.............................................................................8a2-158a


==2.4REFERENCES==
==2.4REFERENCES==
Line 48: Line 72:


==2.9REFERENCES==
==2.9REFERENCES==
........................................................................................................9a2-619bRADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS.....................9b-19b.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9b-19b.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9b-29b.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9b-69b.4COMMUNICATION SYSTEMS...............................................................................9b-79b.5POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9b-89b.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9b-159b.7OTHER AUXILIARY SYSTEMS..............................................................................9b-259b.8RADIOISOTOPE PRODUCTION FACILITY AUXILIARYSYSTEMS TECHNICAL SPECIFICATIONS...........................................................9b-539b.6REFERENCES........................................................................................................9b-54CHAPTER 10 EXPERIMENTAL FACILITIES10.1SUMMARY DESCRIPTION.....................................................................................10-1CHAPTER 11RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT11.1RADIATION PROTECTION.....................................................................................11-111.2RADIOACTIVE WASTE MANAGEMENT................................................................11-4211.3RESPIRATORY PROTECTION PROGRAM...........................................................11-5711.4RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENTTECHNICAL SPECIFICATIONS.............................................................................11-59
........................................................................................................9a2-619bRADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS.....................9b-19b.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9b-19b.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9b-29b.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9b-69b.4COMMUNICATION SYSTEMS...............................................................................9b-79b.5POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9b-89b.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9b-159b.7OTHER AUXILIARY SYSTEMS..............................................................................9b-259b.8RADIOISOTOPE PRODUCTION FACILITY AUXILIARYSYSTEMS TECHNICAL SPECIFICATIONS...........................................................9b-539b.6REFERENCES........................................................................................................9b-54CHAPTER 10 EXPERIMENTAL FACILITIES10.1
 
==SUMMARY==
DESCRIPTION.....................................................................................10-1CHAPTER 11RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT11.1RADIATION PROTECTION.....................................................................................11-111.2RADIOACTIVE WASTE MANAGEMENT................................................................11-4211.3RESPIRATORY PROTECTION PROGRAM...........................................................11-5711.4RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENTTECHNICAL SPECIFICATIONS.............................................................................11-59


==11.5REFERENCES==
==11.5REFERENCES==
........................................................................................................11-60CHAPTER 12CONDUCT OF OPERATIONS12.1ORGANIZATION.....................................................................................................12-112.2REVIEW AND AUDIT ACTIVITIES..........................................................................12-5 12.3PROCEDURES.......................................................................................................12-712.4REQUIRED ACTIONS.............................................................................................12-812.5REPORTS...............................................................................................................12-912.6RECORDS...............................................................................................................12-1012.7EMERGENCY PLANNING......................................................................................12-11 12.8SECURITY PLANNING...........................................................................................12-1212.9QUALITY ASSURANCE..........................................................................................12-1312.10OPERATOR TRAINING AND REQUALIFICATION................................................12-14 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesvRev. 112.10aREACTOR OPERATOR TRAINING AND REQUALIFICATION..........
........................................................................................................11-60CHAPTER 12CONDUCT OF OPERATIONS12.1ORGANIZATION.....................................................................................................12-112.2REVIEW AND AUDIT ACTIVITIES..........................................................................12-5 12.3PROCEDURES.......................................................................................................12-712.4REQUIRED ACTIONS.............................................................................................12-812.5REPORTS...............................................................................................................12-912.6RECORDS...............................................................................................................12-1012.7EMERGENCY PLANNING......................................................................................12-11 12.8SECURITY PLANNING...........................................................................................12-1212.9QUALITY ASSURANCE..........................................................................................12-1312.10OPERATOR TRAINING AND REQUALIFICATION................................................12-14 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesvRev. 112.10aREACTOR OPERATOR TRAINING AND REQUALIFICATION..........
....................12-1412.10bPRODUCTION FACILITY OPERATOR TRAINING ANDREQUALIFICATION................................................................................................12-1512.11STARTUP PLAN......................................................................................................12-1612.12VACATED................................................................................................................12-1712.13MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM................................12-1812.14REFERENCES........................................................................................................12-19 APPENDIX 12AEMERGENCY PLAN......................................................................................12A-1APPENDIX 12BSECURITY PLAN...........................................................................................12B-1APPENDIX 12CQUALITY ASSURANCE PROGRAM DESCRIPTION...................................12C-1APPENDIX 12DCONDUCT OF OPERATIONS PROGRAM DESCRIPTION.........................12D-1CHAPTER 13ACCIDENT ANALYSIS13a1HETEROGENEOUS REACTOR ACCIDENT ANALYSIS.......................................13a1-113a2IRRADIATION FACILITY ACCIDENT ANALYSIS...................................................13a2-113a2.1ACCIDENT-INITIATING EVENTS AND SCENARIOS............................................13a2-1 13a2.2ACCIDENT ANALYSIS AND DETERMINATION OFCONSEQUENCES..................................................................................................13a2-3613a3SUMMARY AND CONCLUSIONS..........................................................................13a3-113a4REFERENCES........................................................................................................13a4-113bRADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES....................13b-1 13b.1RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSISMETHODOLOGY....................................................................................................13b-113b.2ANALYSES OF ACCIDENTS WITH RADIOLOGICALCONSEQUENCES..................................................................................................13b-413b.3ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALSPRODUCED FROM LICENSED MATERIAL...........................................................13b-3713b.4REFERENCES........................................................................................................13b-51CHAPTER 14TECHNICAL SPECIFICATIONS14a1HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS.........................14a1-114a2IRRADIATION FACILITY TECHNICAL SPECIFICATIONS....................................14a2-114a
....................12-1412.10bPRODUCTION FACILITY OPERATOR TRAINING ANDREQUALIFICATION................................................................................................12-1512.11STARTUP PLAN......................................................................................................12-1612.12VACATED................................................................................................................12-1712.13MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM................................12-1812.14REFERENCES........................................................................................................12-19 APPENDIX 12AEMERGENCY PLAN......................................................................................12A-1APPENDIX 12BSECURITY PLAN...........................................................................................12B-1APPENDIX 12CQUALITY ASSURANCE PROGRAM DESCRIPTION...................................12C-1APPENDIX 12DCONDUCT OF OPERATIONS PROGRAM DESCRIPTION.........................12D-1CHAPTER 13ACCIDENT ANALYSIS13a1HETEROGENEOUS REACTOR ACCIDENT ANALYSIS.......................................13a1-113a2IRRADIATION FACILITY ACCIDENT ANALYSIS...................................................13a2-113a2.1ACCIDENT-INITIATING EVENTS AND SCENARIOS............................................13a2-1 13a2.2ACCIDENT ANALYSIS AND DETERMINATION OFCONSEQUENCES..................................................................................................13a2-3613a3
 
==SUMMARY==
AND CONCLUSIONS..........................................................................13a3-113a4REFERENCES........................................................................................................13a4-113bRADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES....................13b-1 13b.1RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSISMETHODOLOGY....................................................................................................13b-113b.2ANALYSES OF ACCIDENTS WITH RADIOLOGICALCONSEQUENCES..................................................................................................13b-413b.3ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALSPRODUCED FROM LICENSED MATERIAL...........................................................13b-3713b.4REFERENCES........................................................................................................13b-51CHAPTER 14TECHNICAL SPECIFICATIONS14a1HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS.........................14a1-114a2IRRADIATION FACILITY TECHNICAL SPECIFICATIONS....................................14a2-114a


==2.1INTRODUCTION==
==2.1INTRODUCTION==

Revision as of 05:18, 9 July 2018

Shine Medical Technologies V. 0 - PSAR Master Table of Contents
ML15092A341
Person / Time
Site: SHINE Medical Technologies
Issue date: 03/23/2015
From: Bynum R V
Shine Medical Technologies
To:
Office of Nuclear Reactor Regulation
Lynch S
References
SHINE, SHINE.SUBMISSION.10, SHN.PSAR.P, SHN.PSAR.P.4
Download: ML15092A341 (6)


Text

Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiRev. 0Master Table of Contents CHAPTER 1THE FACILITY

1.1INTRODUCTION

.....................................................................................................1-11.2

SUMMARY

AND CONCLUSIONS ON PRINCIPAL SAFETYCONSIDERATIONS.................................................................................................1-21.3GENERAL DESCRIPTION OF THE FACILITY.......................................................1-81.4SHARED FACILITIES AND EQUIPMENT...............................................................1-131.5COMPARISON WITH SIMILAR FACILITIES...........................................................1-141.6

SUMMARY

OF OPERATIONS................................................................................1-18 1.7COMPLIANCE WITH THE NUCLEAR WASTE POLICY ACT OF 1982.................1-191.8FACILITY MODIFICATIONS AND HISTORY..........................................................1-2

01.9REFERENCES

........................................................................................................1-21 CHAPTER 2 SITE CHARACTERISTICS2.1GEOGRAPHY AND DEMOGRAPHY......................................................................2.1-12.2NEARBY INDUSTRIAL, TRANSPORTATION, AND MILITARY FACILITIES..............................................................................................................2.2-12.3METEOROLOGY.....................................................................................................2.3-1 2.4HYDROLOGY..........................................................................................................2.4-12.5GEOLOGY, SEISMOLOGY, AND GEOTECHNICAL ENGINEERING....................2.5-

12.6REFERENCES

........................................................................................................2.6-1 CHAPTER 3DESIGN OF STRUCTURES, SYSTEMS, AND COMPONENTS3.1DESIGN CRITERIA.................................................................................................3-13.2METEOROLOGICAL DAMAGE..............................................................................3-193.3WATER DAMAGE...................................................................................................3-223.4SEISMIC DAMAGE.................................................................................................3-25 3.5SYSTEMS AND COMPONMENTS.........................................................................3-453.5aIRRADIATION FACILITY.........................................................................................3-573.5bRADIOISOTPE PRODUCTION FACILITY..............................................................3-9

43.6REFERENCES

........................................................................................................3-107 CHAPTER 4IRRADIATION UNIT AND RADIOISOTOPE PRODUCTION FACILITY DESCRIPTION4a1HETEROGENEOUS REACTOR DESCRIPTION..............................................4a1-14a2IRRADIATION FACILITY DESCRIPTION.........................................................4a2-14a2.1

SUMMARY

DESCRIPTION............................................................................4a2-24a2.2SUBCRITICAL ASSEMBLY..........................................................................4a2-6 SectionTitle Page Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiRev. 14a2.3NEUTRON DRIVER.....................................................................................4a2-204a2.4TARGET SOLUTION VESSEL AND LIGHT WATER POOL...............................

4a2-264a2.5IRRADIATION FACILITY BIOLOGICAL SHIELD....................................................4a2-324a2.6NUCLEAR DESIGN.................................................................................................4a2-374a2.7THERMAL HYDRAULIC DESIGN...........................................................................4a2-514a2.8GAS MANAGEMENT SYSTEM...............................................................................4a2-564a

2.9REFERENCES

........................................................................................................4a2-62 4bRADIOISOTOPE PRODUCTION FACILITY DESCRIPTION..................................4b-14b.1FACILITY AND PROCESS DESCRIPTION............................................................4b-24b.2RADIOISOTOPE PRODUCTION FACILITY BIOLOGICAL SHIELD.......................4b-134b.3RADIOISOTOPE EXTRACTION SYSTEM.............................................................4b-184b.4SPECIAL NUCLEAR MATERIAL PROCESSING AND STORAGE........................4b-27 4b.5REFERENCES........................................................................................................4b-56 CHAPTER 5 COOLING SYSTEMS5a1HETEROGENEOUS REACTOR COOLING SYSTEMS..........................................5a1-15a2IRRADIATION UNIT COOLING SYSTEMS.............................................................5a2-15a2.1

SUMMARY

DESCRIPTION.....................................................................................5a2-25a2.2PRIMARY COOLING SYSTEM...............................................................................5a2-45a2.3SECONDARY COOLING SYSTEM.........................................................................5a2-135a2.4PRIMARY COOLANT CLEANUP............................................................................5a2-20 5a2.5PRIMARY COOLANT MAKEUP WATER SYSTEM................................................5a2-225a2.6NITROGEN-16 CONTROL......................................................................................5a2-255a2.7AUXILIARY SYSTEMS USING PRIMARY COOLANT............................................5a2-265a

2.8REFERENCES

........................................................................................................5a2-275bRADIOISOTOPE PRODUCTION FACILITY COOLING SYSTEMS........................5b-1 CHAPTER 6ENGINEERED SAFETY FEATURES6a1HETEROGENEOUS REACTOR ENGINEERED SAFETY FEATURES................6a1-16a2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES..........................6a2-16a2.1

SUMMARY

DESCRIPTION............................................................................6a2-26a2.2IRRADIATION FACILITY ENGINEERED SAFETY FEATURES DETAILED DESCRIPTION6a2-46a2.3EMERGENCY COOLING SYSTEM........................................................................6a2-106a2.4IRRADIATION FACILITY ENGINEERED SAFETY FEATURESTECHNICAL SPECIFICATIONS..............................................................................6a2-116a

2.5REFERENCES

........................................................................................................6a2-126bRADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-16b.1

SUMMARY

DESCRIPTION ENGINEERED SAFETY FEATURES.........................6b-16b.2RADIOISOTOPE PRODUCTION FACILITY ENGINEERED SAFETYFEATURES..............................................................................................................6b-36b.3NUCLEAR CRITICALITY CONTROL......................................................................6b-116b.4REFERENCES.............................................................................................6b-23 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesiiiRev. 0 CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS7a1HETEROGENEOUS REACTOR INSTRUMENT & CONTROLSYSTEMS................................................................................................................7a1-17a2IRRADIATION FACILITY INSTRUMENT & CONTROL SYSTEMS........................7a2-17a2.1

SUMMARY

DESCRIPTION.....................................................................................7a2-17a2.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7a2-37a2.3TSV PROCESS CONTROL DESCRIPTION...........................................................7a2-31 7a2.4TSV REACTIVITY PROTECTION SYSTEM...........................................................7a2-337a2.5ENGINEERED SAFETY FEATURES ACTUATION SYSTEM................................7a2-377a2.6CONTROL CONSOLE AND DISPLAY INFORMATION...............

...........................7a2-407a2.7RADIATION MONITORING SYSTEMS...................................................................7a2-437a

2.8REFERENCES

........................................................................................................7a2-47 7bRADIOISOTOPE PRODUCTION FACILITY INSTRUMENT &CONTROL SYSTEM...............................................................................................7b-17b.1

SUMMARY

DESCRIPTION.....................................................................................7b-17b.2DESIGN OF INSTRUMENTATION AND CONTROL SYSTEMS............................7b-27b.3PRODUCTION FACILITY PROCESS CONTROL SYSTEMS................................7b-297b.4ENGINEERED SAFETY FEATURE AND ALARMING............................................7b-317b.5CONTROL CONSOLE AND DISPLAY INSTRUMENTATION................................7b-35 7b.6RADIATION MONITORING SYSTEMS...................................................................7b-377b.7REFERENCES........................................................................................................7b-38 CHAPTER 8ELECTRIC POWER SYSTEMS8a1HETEROGENEOUS REACTOR ELECTRICAL POWER SYSTEMS.....................8a1-18a2IRRADIATION UNIT ELECTRICAL POWER SYSTEMS........................................8a2-18a2.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8a2-18a2.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8a2-98a2.3IRRADIATION FACILITY ELECTRICAL POWER SYSTEMSTECHNICAL SPECIFICATIONS.............................................................................8a2-158a

2.4REFERENCES

........................................................................................................8a2-168bRADIOISOTOPE PRODUCTION FACILITY ELECTRICALPOWER SYSTEMS.................................................................................................8b-18b.1NORMAL ELECTRICAL POWER SYSTEMS.........................................................8b-1 8b.2EMERGENCY ELECTRICAL POWER SYSTEMS..................................................8b-28b.3RADIOISOTOPE PRODUCTION FACILITY ELECTRICALPOWER SYSTEMS TECHNICAL SPECIFICATIONS.............................................8b-3 CHAPTER 9AUXILIARY SYSTEMS9a1HETEROGENEOUS REACTOR AUXILIARY SYSTEMS.......................................9a1-19a2IRRADIATION FACILITY AUXILIARY SYSTEMS...................................................9a2-19a2.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9a2-19a2.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9a2-13 9a2.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9a2-16 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesivRev. 09a2.4COMMUNICATIONS SYSTEMS.............................................................................9a2-469a2.5POSSESSION & USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9a2-489a2.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9a2-509a2.7OTHER AUXILIARY SYSTEMS..............................................................................9a2-519a2.8IRRADIATION FACILITY AUXILIARY SYSTEMS TECHNICALSPECIFICATIONS...................................................................................................9a2-609a

2.9REFERENCES

........................................................................................................9a2-619bRADIOISOTOPE PRODUCTION FACILITY AUXILIARY SYSTEMS.....................9b-19b.1HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.........................9b-19b.2HANDLING & STORAGE OF TARGET SOLUTION...............................................9b-29b.3FIRE PROTECTION SYSTEMS AND PROGRAMS...............................................9b-69b.4COMMUNICATION SYSTEMS...............................................................................9b-79b.5POSSESSION AND USE OF BYPRODUCT, SOURCE AND SPECIALNUCLEAR MATERIAL.............................................................................................9b-89b.6COVER GAS CONTROL IN CLOSED PRIMARY COOLANT SYSTEMS..............9b-159b.7OTHER AUXILIARY SYSTEMS..............................................................................9b-259b.8RADIOISOTOPE PRODUCTION FACILITY AUXILIARYSYSTEMS TECHNICAL SPECIFICATIONS...........................................................9b-539b.6REFERENCES........................................................................................................9b-54CHAPTER 10 EXPERIMENTAL FACILITIES10.1

SUMMARY

DESCRIPTION.....................................................................................10-1CHAPTER 11RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENT11.1RADIATION PROTECTION.....................................................................................11-111.2RADIOACTIVE WASTE MANAGEMENT................................................................11-4211.3RESPIRATORY PROTECTION PROGRAM...........................................................11-5711.4RADIATION PROTECTION PROGRAM AND WASTE MANAGEMENTTECHNICAL SPECIFICATIONS.............................................................................11-59

11.5REFERENCES

........................................................................................................11-60CHAPTER 12CONDUCT OF OPERATIONS12.1ORGANIZATION.....................................................................................................12-112.2REVIEW AND AUDIT ACTIVITIES..........................................................................12-5 12.3PROCEDURES.......................................................................................................12-712.4REQUIRED ACTIONS.............................................................................................12-812.5REPORTS...............................................................................................................12-912.6RECORDS...............................................................................................................12-1012.7EMERGENCY PLANNING......................................................................................12-11 12.8SECURITY PLANNING...........................................................................................12-1212.9QUALITY ASSURANCE..........................................................................................12-1312.10OPERATOR TRAINING AND REQUALIFICATION................................................12-14 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesvRev. 112.10aREACTOR OPERATOR TRAINING AND REQUALIFICATION..........

....................12-1412.10bPRODUCTION FACILITY OPERATOR TRAINING ANDREQUALIFICATION................................................................................................12-1512.11STARTUP PLAN......................................................................................................12-1612.12VACATED................................................................................................................12-1712.13MATERIAL CONTROL AND ACCOUNTABILITY PROGRAM................................12-1812.14REFERENCES........................................................................................................12-19 APPENDIX 12AEMERGENCY PLAN......................................................................................12A-1APPENDIX 12BSECURITY PLAN...........................................................................................12B-1APPENDIX 12CQUALITY ASSURANCE PROGRAM DESCRIPTION...................................12C-1APPENDIX 12DCONDUCT OF OPERATIONS PROGRAM DESCRIPTION.........................12D-1CHAPTER 13ACCIDENT ANALYSIS13a1HETEROGENEOUS REACTOR ACCIDENT ANALYSIS.......................................13a1-113a2IRRADIATION FACILITY ACCIDENT ANALYSIS...................................................13a2-113a2.1ACCIDENT-INITIATING EVENTS AND SCENARIOS............................................13a2-1 13a2.2ACCIDENT ANALYSIS AND DETERMINATION OFCONSEQUENCES..................................................................................................13a2-3613a3

SUMMARY

AND CONCLUSIONS..........................................................................13a3-113a4REFERENCES........................................................................................................13a4-113bRADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSES....................13b-1 13b.1RADIOISOTOPE PRODUCTION FACILITY ACCIDENT ANALYSISMETHODOLOGY....................................................................................................13b-113b.2ANALYSES OF ACCIDENTS WITH RADIOLOGICALCONSEQUENCES..................................................................................................13b-413b.3ANALYSIS OF ACCIDENTS WITH HAZARDOUS CHEMICALSPRODUCED FROM LICENSED MATERIAL...........................................................13b-3713b.4REFERENCES........................................................................................................13b-51CHAPTER 14TECHNICAL SPECIFICATIONS14a1HETEROGENEOUS REACTOR TECHNICAL SPECIFICATIONS.........................14a1-114a2IRRADIATION FACILITY TECHNICAL SPECIFICATIONS....................................14a2-114a

2.1INTRODUCTION

.....................................................................................................14a2-214a2.2SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS...........................14a2-314a2.3LIMITING CONDITIONS FOR OPERATION...........................................................14a2-4 14a2.4SURVEILLANCE REQUIREMENTS.......................................................................14a2-514a2.5DESIGN FEATURES...............................................................................................14a2-614a2.6ADMINISTRATIVE CONTROLS..............................................................................14a2-714a

2.7REFERENCES

........................................................................................................14a2-1814bTECHNICAL SPECIFICATIONS OF PROCESSES OUTSIDE THEIRRADIATION FACILITY.........................................................................................14b-114b.1INTRODUCTION.....................................................................................................14b-1 14b.2SAFETY LIMITS AND LIMITING SAFETY SYSTEM SETTINGS...........................14b-214b.3LIMITING CONDITIONS FOR OPERATION...........................................................14b-314b.4SURVEILLANCE REQUIREMENTS.......................................................................14b-4 Preliminary Safety Analysis Report Master Table of ContentsSHINE Medical TechnologiesviRev. 014b.5DESIGN FEATURES...............................................................................................14b-514b.6ADMINISTRATIVE CONTROLS..............................................................................14b-6 14b.7REFERENCES........................................................................................................14b-7CHAPTER 15FINANCIAL QUALIFICATIONS15.1FINANCIAL ABILITY TO CONSTRUCT THE SHINE FACILITY..........................15-115.2FINANCIAL ABILITY TO OPERATE THE SHINE FACILITY...............................15-315.3FINANCIAL ABILITY TO DECOMMISSION THE SHINE FACILITY.....................15-5 15.4FOREIGN OWNERSHIP, CONTROL, OR DOMINATION..................................15-6

15.5NUCLEAR INSURANCE

AND INDEMNITY............................................................15-7

15.6REFERENCES

.............................................................................................15-8CHAPTER 16 OTHER LICENSE CONSIDERATIONS16.1PRIOR USE OF FACILITY COMPONENTS.....................................................16-116.2MEDICAL USE OF THE FACILITY..................................................................16-2CHAPTER 17 DECOMMISSIONING AND POSSESSION-ONLY LICENSE AMENDMENTS17.1DECOMMISSIONING..............................................................................................17-117.2POSSESSION-ONLY LICENSE AMENDMENTS...................................................17-2CHAPTER 18HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION18.1HIGHLY ENRICHED TO LOW ENRICHED URANIUM CONVERSION

..................18-1CHAPTER 19ENVIRONMENTAL REVIEW

19.1INTRODUCTION

OF THE ENVIRONMENTAL REPORT.......................................19.1-119.2PROPOSED ACTION..............................................................................................19.2-1 19.3DESCRIPTION OF THE AFFECTED ENVIRONMENT..........................................19.3-119.4IMPACTS OF PROPOSED CONSTRUCTION, OPERATIONS, ANDDECOMMISSIONING..............................................................................................19.4-119.5ALTERNATIVES......................................................................................................19.5-1

19.6CONCLUSION

S......................................................................................................19.6-1

19.7REFERENCES

........................................................................................................19.7-1