ML15217A048: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
Operations Representative Date  Approved By:
Operations Representative Date  Approved By:
Training Department Date JPM Number:
Training Department Date JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Line 37: Line 37:
Do NOT allow examinee to shine any type light into a panel.
Do NOT allow examinee to shine any type light into a panel.
All pre-job briefings are completed.
All pre-job briefings are completed.
Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1
Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1 , 8.3.6.2 complete and 8.3.6.3 circled).
, 8.3.6.2 complete and 8.3.6.3 circled).


JPM Number:
JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 7 INITIAL CONDITIONS:
Page 3 of 7 INITIAL CONDITIONS:
Plant is in Mode 1.
Plant is in Mode 1.
Line 58: Line 57:


JPM Number:
JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1  Verify LOSS OF SYNC lamp not illuminated.
PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1  Verify LOSS OF SYNC lamp not illuminated.
Standard:
Standard: At RPS Solenoid Inverter "A" verifies the loss of sync lamp is not illuminated.
At RPS Solenoid Inverter "A" verifies the loss of sync lamp is not illuminated.
Cue: If loss of sync lamp is illuminated, provide cue "Loss of sync lamp is not illuminated
Cue: If loss of sync lamp is illuminated, provide cue "Loss of sync lamp is not illuminated
". Comments  SAT  UNSAT    Comment Number 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13
". Comments  SAT  UNSAT    Comment Number 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13
-P661 and P662.
-P661 and P662.
Standard:
Standard: Verifies MSIV Solenoids are reset.
Verifies MSIV Solenoids are reset.
Cue: If examinee request status of MSIV Solenoids from the B RO, report "MSIV Solenoids are reset
Cue: If examinee request status of MSIV Solenoids from the B RO, report "MSIV Solenoids are reset
". Comments Stated in the initial conditions all solenoids were reset.
". Comments Stated in the initial conditions all solenoids were reset.
Line 73: Line 70:


JPM Number:
JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 7 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
Page 5 of 7 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
Standard:
Standard: Ensures all control rods A and B solenoids are energized.
Ensures all control rods A and B solenoids are energized.
Cue:  Comments Stated in the initial conditions all solenoids were energized.
Cue:  Comments Stated in the initial conditions all solenoids were energized.
SAT  UNSAT    Comment Number   
SAT  UNSAT    Comment Number   
   *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
   *8.3.4.4 Place TRANSFER SWITCH to INVERTER.
Standard:
Standard: At RPS Solenoid Inverter "A", rotates Transfer Switch t o INVERTER position. Cue: Component is in the position you've described
At RPS Solenoid Inverter "A", rotates Transfer Switch to INVERTER position. Cue: Component is in the position you've described
. Comments  SAT  UNSAT    Comment Number 8.3.4.5 Push and then release Power Monitor RESET push
. Comments  SAT  UNSAT    Comment Number 8.3.4.5 Push and then release Power Monitor RESET push
-button. Standard:
-button. Standard: At RPS Solenoid Inverter "A", pushes then releases Power Monitor Reset push button. Cue: Component is in the position you've described
At RPS Solenoid Inverter "A", pushes then releases Power Monitor Reset push button. Cue: Component is in the position you've described
. Comments  SAT  UNSAT    Comment Number   
. Comments  SAT  UNSAT    Comment Number   


JPM Number:
JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 7 8.3.4.6 Verify power monitor alarms are out.
Page 6 of 7 8.3.4.6 Verify power monitor alarms are out.
Standard:
Standard: At RPS Solenoid Inverter "A" power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights)
At RPS Solenoid Inverter "A" power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights)
. Cue: If power monitor lights are illuminated, provide cue "Over/Under Freq
. Cue: If power monitor lights are illuminated, provide cue "Over/Under Freq
" and/or "Over/Under Voltage lights are not illuminated".
" and/or "Over/Under Voltage lights are not illuminated".
Comments  SAT  UNSAT    Comment Number   
Comments  SAT  UNSAT    Comment Number   
   *8.3.4.7 Place 120 VAC OUTPUT BKR, CB
   *8.3.4.7 Place 120 VAC OUTPUT BKR, CB
-3 to ON. Standard:
-3 to ON. Standard: At RPS Solenoid Inverter "A", places 120 vac Output Bkr, CB
At RPS Solenoid Inverter "A", places 120 vac Output Bkr, CB
-3, to ON. Cue: Component is in the position you've described
-3, to ON.
Cue: Component is in the position you've described
. Comments  SAT  UNSAT    Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
. Comments  SAT  UNSAT    Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
Place AC INPUT (POWER) Bkr to OFF (down). Standard:
Place AC INPUT (POWER) Bkr to OFF (down). Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Cue: If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby.
Cue: If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby.
DO NOT turn the AC Input Bkr to OFF.
DO NOT turn the AC Input Bkr to OFF.
Line 108: Line 98:


JPM Number:
JPM Number:
IP JPM i - rev 03 Clinton Power Station Job Performance Measure (JPM)
IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)
Page 7 of 7 TERMINATING CUES:
Page 7 of 7 TERMINATING CUES:
CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.
CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.
Line 154: Line 144:
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 4003.01C0 11, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium. Cue the examinee that required items are in the examinee's possession.
PERFORMANCE STEPS CPS 4003.01C0 11, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium. Cue the examinee that required items are in the examinee's possession.
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Open 1E12
STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Open 1E12-F004B, RHR PUMP 1B SUCT VLV.
-F004B, RHR PUMP 1B SUCT VLV.
  *4.1 At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781' West, Examinee moves the key operated switch for 1E12
  *4.1 At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781' West, Examinee moves the key operated switch for 1E12
-F004B, RHR PUMP 1B SUCT VLV to "OPEN". 2 Start RHR PUMP 1B, 1E12-C002B. *4.2 At 4160V Bus 1B1 Cub D (1AP09ED), AB 781' West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to "CLOSE". EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707'.
-F004B, RHR PUMP 1B SUCT VLV to "OPEN". 2 Start RHR PUMP 1B, 1E12-C002B. *4.2 At 4160V Bus 1B1 Cub D (1AP09ED), AB 781' West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to "CLOSE". EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707'.
Line 166: Line 155:
Cue: 1VY06C is running
Cue: 1VY06C is running
. 4 Monitor pump/system parameters.
. 4 Monitor pump/system parameters.
4.4.1 Examinee contacts the Operator in AB 707' and requests RHR B pump P. Cue: RHR pump P is 374 psid. 4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF)
4.4.1 Examinee contacts the Operator in AB 707' and requests RHR B pump P. Cue: RHR pump P is 3 74 psid. 4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF)
. Cue: If requested, red light is ON and green light is OFF
. Cue: If requested, red light is ON and green light is OFF
. EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.
. EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.
Line 180: Line 169:
. STOP TIME:   
. STOP TIME:   


JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number:  JPM428 Revision Number: 0 1 Date:  06/23/2015 Developed By:
CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number:  JPM428 Revision Number: 0 1 Date:  06/23/2015 Developed By:
W. D. Kiser 06/23/15  Instructor Date  Validated By:
W. D. Kiser 06/23/15  Instructor Date  Validated By:
  /s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
  /s Mike Antonelli 7/17/15  SME or Instructor Date  Reviewed By:
Operations Representative Date  Approved By:
Operations Representative Date  Approved By:
Training Department Date JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
Training Department Date JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Line 202: Line 191:
All pre-job briefings are completed.
All pre-job briefings are completed.


JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
Page 3 of 6 INITIAL CONDITIONS:
Page 3 of 6 INITIAL CONDITIONS:
You are an extra Operator.
You are an extra Operator.
Line 213: Line 202:
START TIME:   
START TIME:   


JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5 Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30) *8.2.1.5.1 Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.
PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5 Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30) *8.2.1.5.1 Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.
Standard:
Standard: Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position. Cue: Pressure indicator 1PI
Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position.
Cue: Pressure indicator 1PI
-IA055 shows an increasing pressure (1PI
-IA055 shows an increasing pressure (1PI
-IA055 is on left hand side if facing the Aux Bldg).
-IA055 is on left hand side if facing the Aux Bldg).
Comments 1IA024 and 1IA022 are just west of the CCW Expansion Tank.
Comments 1IA024 and 1IA022 are just west of the CCW Expansion Tank.
SAT  UNSAT    Comment Number 8.2.1.5.2 Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.
SAT  UNSAT    Comment Number 8.2.1.5.2 Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.
Standard:
Standard: Operator locates pressure gage s and verifies pressure ha s equalized.
Operator locates pressure gage s and verifies pressure ha s equalized.
Cue:  After several seconds  
Cue:  After several seconds  
- 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054. If requested, flow noise has died off to near nothing.
- 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054. If requested, flow noise has died off to near nothing.
If requested, Low Pressure Control Building IA Ring Header annunciator has cleared. Comments  SAT    UNSAT Comment Number   
If requested, Low Pressure Control B ui ld ing IA Ring Header annunciator has cleared. Comments  SAT    UNSAT Comment Number   


JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
Page 5 of 6 *8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.
Page 5 of 6 *8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.
Standard:
Standard: Operator locates and simulates moving the lever to the latch position for 1IA022.
Operator locates and simulates moving the lever to the latch position for 1IA022.
Cue: Lever arm is latched and holding.
Cue: Lever arm is latched and holding.
Comments  SAT  UNSAT    Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.
Comments  SAT  UNSAT    Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.
Standard:
Standard: Operator locates 1IA022 and observes valve position indication to verify open
Operator locates 1IA022 and observes valve position indication to verify open
. Cue: Component is in the position described.
. Cue: Component is in the position described.
Comments  SAT  UNSAT    Comment Number   
Comments  SAT  UNSAT    Comment Number   
   *8.2.1.5.5 Close or check closed the auto isolation valve bypasses.
   *8.2.1.5.5 Close or check closed the auto isolation valve bypasses.
Standard:
Standard: Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning. Cue: 1IA024 handwheel stops moving.
Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning. Cue: 1IA024 handwheel stops moving.
Comments  SAT  UNSAT    Comment Number   
Comments  SAT  UNSAT    Comment Number   


JPM Number:  IP JPM k - rev 01 Clinton Power Station Job Performance Measure (JPM)
JPM Number:  IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)
Page 6 of 6 8.2.1.5.6 Restore air loads as necessary.
Page 6 of 6 8.2.1.5.6 Restore air loads as necessary.
Standard:
Standard: Operator inquires if there are any loads that need to be restored at this time.
Operator inquires if there are any loads that need to be restored at this time.
Cue: No further loads are required to be placed in service.
Cue: No further loads are required to be placed in service.
Comments  SAT  UNSAT    Comment Number TERMINATING CUES:
Comments  SAT  UNSAT    Comment Number TERMINATING CUES:
The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header. STOP TIME:}}
The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header. STOP TIME:}}

Revision as of 01:03, 9 July 2018

2015 Clinton Power Station Initial License Examination Re-Take Proposed In-Plant JPMs
ML15217A048
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/19/2015
From: McNeil D R
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML15216A595 List:
References
Download: ML15217A048 (20)


Text

CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 0 3 Date: 06/23/2015 Developed By:

W. D. Kiser 06/23/15 Instructor Date Validated By:

/s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS

Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 02 1, INSTRUMENT POWER SYSTEM (IP).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS 3509.01, Rev 02 1, INSTRUMENT POWER SYSTEM (IP)

EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

Provide examinee the procedure.

Do NOT allow examinee to shine any type light into a panel.

All pre-job briefings are completed.

Provide examinee with a marked up copy of CPS 3509.01 INSTRUMENT POWER SYSTEM (IP) showing step 8.3.6 in progress (step 8.3.6.1 , 8.3.6.2 complete and 8.3.6.3 circled).

JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 3 of 7 INITIAL CONDITIONS:

Plant is in Mode 1.

RPS Solenoid Inverter "A" has just been restored from a short maintenance period.

The RPS Solenoid Inverter "A" has been energized per Section 8.3.6 steps 1 and 2.

It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.

MSIV solenoid currents have been verified normal (solenoids are reset).

The A and B solenoids for each Control Rod have been verified energized.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus "A" FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.

START TIME:

JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.

Standard: At RPS Solenoid Inverter "A" verifies the loss of sync lamp is not illuminated.

Cue: If loss of sync lamp is illuminated, provide cue "Loss of sync lamp is not illuminated

". Comments SAT UNSAT Comment Number 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13

-P661 and P662.

Standard: Verifies MSIV Solenoids are reset.

Cue: If examinee request status of MSIV Solenoids from the B RO, report "MSIV Solenoids are reset

". Comments Stated in the initial conditions all solenoids were reset.

SAT UNSAT Comment Number

JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 5 of 7 8.3.4.3 Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).

Standard: Ensures all control rods A and B solenoids are energized.

Cue: Comments Stated in the initial conditions all solenoids were energized.

SAT UNSAT Comment Number

  • 8.3.4.4 Place TRANSFER SWITCH to INVERTER.

Standard: At RPS Solenoid Inverter "A", rotates Transfer Switch t o INVERTER position. Cue: Component is in the position you've described

. Comments SAT UNSAT Comment Number 8.3.4.5 Push and then release Power Monitor RESET push

-button. Standard: At RPS Solenoid Inverter "A", pushes then releases Power Monitor Reset push button. Cue: Component is in the position you've described

. Comments SAT UNSAT Comment Number

JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 6 of 7 8.3.4.6 Verify power monitor alarms are out.

Standard: At RPS Solenoid Inverter "A" power monitor, verifies alarms are out (Over/Under Freq and Over/Under Voltage lights)

. Cue: If power monitor lights are illuminated, provide cue "Over/Under Freq

" and/or "Over/Under Voltage lights are not illuminated".

Comments SAT UNSAT Comment Number

  • 8.3.4.7 Place 120 VAC OUTPUT BKR, CB

-3 to ON. Standard: At RPS Solenoid Inverter "A", places 120 vac Output Bkr, CB

-3, to ON. Cue: Component is in the position you've described

. Comments SAT UNSAT Comment Number 8.3.4.8 IF SMngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:

Place AC INPUT (POWER) Bkr to OFF (down). Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.

Cue: If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby.

DO NOT turn the AC Input Bkr to OFF.

Comments SAT UNSAT Comment Number

JPM Number:

IP JPM i - rev 0 3 Clinton Power Station Job Performance Measure (JPM)

Page 7 of 7 TERMINATING CUES:

CPS 3509.01, Instrument Power System (IP), Section 8.3.4 complete.

STOP TIME:

CLINTON POWER STATION Job Performance Measure RSP - Div 2 LPCI Operation JPM Number: JPM533 Revision Number: 0 0 Date: 06/23/2015 Developed By:

W. D. Kiser 06/23/15 Instructor Date Validated By:

/s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 2 of 7 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS

Div 2 LPCI is injecting to the RPV.

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS No. 4003.01C011, Rev 1a RSP

- Div 2 LPCI Operation EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

Provide examinee the procedure.

Do NOT allow examinee to shine any type light into a panel.

All pre-job briefings are completed.

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 3 of 7 INITIAL CONDITIONS:

A plant transient has occurred.

The plant is shutdown with High Pressure Core Spray and Reactor Core Isolation Cooling inoperable. 4160V Bus 1A1 has de

-energized due to a fault. Automatic Depressurization System was activated due to Reactor Coolant leak into the Secondary Containment.

The Main Control Room had to be abandon ed due to a major fire.

You are an Extra Operator

. INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Do NOT shine any type light into a panel.

Inject into the RPV using CPS 4003.01C011, RSP

- Div 2 LPCI Operation Section 4.0, DIV 2 LPCI STARTUP. The Remote Shutdown Panel (RSP) is manned and an additional Operator has been dispatched to AB 707' to support you as required.

Report to the CRS when Div 2 LPCI is injecting to the RPV.

START TIME:

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 4 of 7 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 4003.01C0 11, Rev 1a RSP - Div 2 LPCI Operation EVALUATOR NOTE: Do NOT allow the Examinee to remove items from the RSP supply podium. Cue the examinee that required items are in the examinee's possession.

STEP ELEMENT STANDARD SAT UNSAT Comment Number 1 Open 1E12-F004B, RHR PUMP 1B SUCT VLV.

  • 4.1 At AB MCC 1B2 Cub 5C (1AP76E5C), AB 781' West, Examinee moves the key operated switch for 1E12

-F004B, RHR PUMP 1B SUCT VLV to "OPEN". 2 Start RHR PUMP 1B, 1E12-C002B. *4.2 At 4160V Bus 1B1 Cub D (1AP09ED), AB 781' West, Examinee moves the REMOTE SHUTDOWN CIRCUIT BREAKER CONTROL handswitch to "CLOSE". EVALUATOR NOTE: For the following steps, cues will be provided when requested from the Operator who was dispatched to AB 707'.

Steps 4.4.1 and 4.4.2 may be performed more than once.

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 5 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 3 Verify RHR PUMP ROOM 1B SUPPLY FAN, 1VY06C starts.

4.3 Examinee contacts the Operator in AB 707' and requests status of 1VY06C.

Cue: 1VY06C is running

. 4 Monitor pump/system parameters.

4.4.1 Examinee contacts the Operator in AB 707' and requests RHR B pump P. Cue: RHR pump P is 3 74 psid. 4.4.2 Examinee determines proper operation of 1E12-F064B, RHR PUMP 1B MIN FLOW VLV indication (red light ON, green light OFF)

. Cue: If requested, red light is ON and green light is OFF

. EVALUATOR NOTE: For the following step, cue for RPV pressure will be provided when requested from the Operator at the RSP.

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 6 of 7 STEP ELEMENT STANDARD SAT UNSAT Comment Number 5 WHEN RPV pressure < 472 psig, THEN Open 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV.

  • 4.5 Examinee contacts the Operator at the RSP and requests RPV pressure

. Cue: RPV pressure is 250 psig and lowering. At AB MCC 1B3 Cub 8C (1AP77E8C), AB 781' West, Examinee moves the switch for 1E12-F042B, RHR PUMP 1B LPCI CNMT VLV to "OPEN".

Cue: Red light is ON and green light is OFF.

JPM Number: IP JPM j - rev 00 Clinton Power Station Job Performance Measure (JPM)

Page 7 of 7 TERMINATING CUES:

Div 2 LPCI is injecting to the RPV IAW CPS No. 4003.01C011 RSP - Div 2 LPCI Operation

. STOP TIME:

JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

CLINTON POWER STATION Job Performance Measure Place an IA Ring Header Automatic Isolation Valve Into Service JPM Number: JPM428 Revision Number: 0 1 Date: 06/23/2015 Developed By:

W. D. Kiser 06/23/15 Instructor Date Validated By:

/s Mike Antonelli 7/17/15 SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

Page 2 of 6 READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

TASK STANDARDS

Place an IA Ring Header Automatic Isolation Valve Into Service IAW CPS No. 3214.01 rev.

26d, PLANT AIR (IA & SA).

TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:

None PROCEDURAL/

REFERENCES:

CPS No. 3214.01 rev. 26d, PLANT AIR (IA & SA).

EVALUATOR INSTRUCTIONS:

Amplifying cues are provided within the JPM steps.

Provide examinee the procedure.

All pre-job briefings are completed.

JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

Page 3 of 6 INITIAL CONDITIONS:

You are an extra Operator.

The Control Building IA ring header has automatically isolated due to a leak on the Radwaste Building ring header. The leak has been subsequently repaired.

INITIATING CUE:

CAUTION All pre-job briefings are completed.

No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.

Restore the Control Building IA ring header to service in accordance with CPS No. 3214.01, PLANT AIR (IA & SA), section 8.2.1.5, by supplying air from the Aux/Fuel Building IA Ring Header.

Inform the MCR when the task is complete.

START TIME:

JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

Page 4 of 6 PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.

PERFORMANCE STEPS CPS 3214.01, PLANT AIR (IA & SA) 8.2.1.5 Repressurizing the Isolated Ring Header (Refer to Table 2, pg 29 and Figure 1, pg 30) *8.2.1.5.1 Slowly open one or both of the auto isolation valve bypasses as necessary, and slowly repressurize the ring header.

Standard: Locates and simulates operating (slowly per caution) 1IA024, Auto Isolation Bypass. Turns handwheel in the CCW direction until resistance is felt in the open position. Cue: Pressure indicator 1PI

-IA055 shows an increasing pressure (1PI

-IA055 is on left hand side if facing the Aux Bldg).

Comments 1IA024 and 1IA022 are just west of the CCW Expansion Tank.

SAT UNSAT Comment Number 8.2.1.5.2 Wait until the isolated ring header pressure is 70 psig or above and equalized across the auto isolation valves.

Standard: Operator locates pressure gage s and verifies pressure ha s equalized.

Cue: After several seconds

- 1PI-IA055 reads nearly the same pressure as indicated on 1PI-IA054. If requested, flow noise has died off to near nothing.

If requested, Low Pressure Control B ui ld ing IA Ring Header annunciator has cleared. Comments SAT UNSAT Comment Number

JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

Page 5 of 6 *8.2.1.5.3 Return the Latch/Unlatch lever arm to the Latch Position.

Standard: Operator locates and simulates moving the lever to the latch position for 1IA022.

Cue: Lever arm is latched and holding.

Comments SAT UNSAT Comment Number 8.2.1.5.4 Verify the auto isolation valve opens.

Standard: Operator locates 1IA022 and observes valve position indication to verify open

. Cue: Component is in the position described.

Comments SAT UNSAT Comment Number

  • 8.2.1.5.5 Close or check closed the auto isolation valve bypasses.

Standard: Operator locates and simulates turning 1IA024 handwheel clockwise until it stops turning. Cue: 1IA024 handwheel stops moving.

Comments SAT UNSAT Comment Number

JPM Number: IP JPM k - rev 0 1 Clinton Power Station Job Performance Measure (JPM)

Page 6 of 6 8.2.1.5.6 Restore air loads as necessary.

Standard: Operator inquires if there are any loads that need to be restored at this time.

Cue: No further loads are required to be placed in service.

Comments SAT UNSAT Comment Number TERMINATING CUES:

The Control Building IA ring header is being supplied by air from the Aux/Fuel Building IA Ring Header. STOP TIME: