|
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Nuclear Operating CompanySouth Texas Pro/ect Elecric Genera~oh Station PCO. Box 289 Wadsworth, Texas 77483 -November 11, 2015NOC-AE-1 500330710 CFR 50.90File No. G25U. S. Nuclear Regulatory Commission Attention: | | {{#Wiki_filter:Nuclear Operating Company South Texas Pro/ect Elecric Genera~oh Station PCO. Box 289 Wadsworth, Texas 77483 -November 11, 2015 NOC-AE-1 5003307 10 CFR 50.90 File No. G25 U. S. Nuclear Regulatory Commission Attention: |
| Document Control DeskWashington, DC 20555-0001 South Texas ProjectUnits 1 and 2Docket Nos. STN 50-498, STN 50-499Supplement | | Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Supplement |
| -Error Correction | | -Error Correction |
| -License Amendment RequestFor Extension of Containment Leakage Rate Testing ProgramSouth Texas Proiect Units 1 and 2 TAC NOS MF6176 and MF6177 | | -License Amendment Request For Extension of Containment Leakage Rate Testing Program South Texas Proiect Units 1 and 2 TAC NOS MF6176 and MF6177 |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2License Amendment Request for Extending the 10 year ILRT to 15 years", datedApril 29, 2015 (NOC-AE-1 5003227) | | : 1. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years", dated April 29, 2015 (NOC-AE-1 5003227) (ML1 51 28A352)2. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years PRA Supplement", dated June 29, 2015 (NOC-AE-15003266) (ML15198A147) |
| (ML1 51 28A352)2. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2License Amendment Request for Extending the 10 year ILRT to 15 years PRASupplement", | | By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Amendment Request (LAR) to extend the 10 year Integrated Leak Rate Test (ILRT) to 15 years. Reference 2 is a supplement to the original submittal that added additional information regarding Probabilistic Risk Assessment topics. This Supplement is to correct errors contained in the initial LAR submittal. |
| dated June 29, 2015 (NOC-AE-15003266) | | The initial submittal was reviewed in its entirety to verify no other errors exist. The corrections are provided in the Enclosure to this letter.There are no commitments in this letter.If there are any questions regarding the submittal, please contact Rafael Gonzales at (361) 972-4779 or me at (361 )-972-7566. |
| (ML15198A147) | | I declare under penalty of perjury that the foregoing is true and correct.Executed on //. 26/5- .'.J , Date G.T. Powell Site Vice President rjg |
| By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Amendment Request (LAR) to extend the 10 year Integrated Leak Rate Test (ILRT) to 15 years. Reference 2 is a supplement to the original submittal that added additional information regarding Probabilistic Risk Assessment topics. This Supplement is to correct errors contained in theinitial LAR submittal. | |
| The initial submittal was reviewed in its entirety to verify no other errorsexist. The corrections are provided in the Enclosure to this letter.There are no commitments in this letter.If there are any questions regarding the submittal, please contact Rafael Gonzales at (361) 972-4779 or me at (361 )-972-7566. | |
| I declare under penalty of perjury that the foregoing is true and correct.Executed on | |
| //. 26/5- .'.J ,DateG.T. PowellSite Vice President rjg | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10year ILRT to 15 years / 'STI: 34238375 NOC-AE-1 5003307Page 2 of 2cc:(paper copy)(electronic copy)Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. RegnerSenior Project ManagerU.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A)11555 Rockville PikeRockville, MD 20852NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNl16Wadsworth, TX 77483Morcqan. | | Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years / 'STI: 34238375 NOC-AE-1 5003307 Page 2 of 2 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNl16 Wadsworth, TX 77483 Morcqan. Lewis & Bockius LLP Steve Frantz U.S. Nuclear Recqulatory Commission Lisa M. Regner NRG South Texas LP John Ragan Chris O'Hara Jim von Suskil CPS Enermy Kevin Polio Cris Eugster L. D. Blaylock Crain Caton & James, P.C.Peter Nemeth City of Austin Cheryl Mele John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free NOC-AE-1 5003307 Enclosure Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years NOC-AE-1 5003307 Enclosure Page 1 of 1 Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years The following paragraph from Attachment 1, NOC-AE-1 5003227, Page 27 of 50, second paragraph, is corrected as indicated in bold: A review of the Type B and Type C test results from 2005 through 2014 for STP Unit 1 I and 2004 through 2013 for STP Unit 2 has shown an exceptional amount of margin I between the actual As-Found (AF) and As-left (AL) outage summations and the regulatory requirements as described below:* The As-Found minimum pathway leak rate average for STP Unit 1 shows an average of 4.49% of 0.6 La with a high of 4.89% of 0.6 La or 0.029 La.* The As-Left maximum pathway leak rate average for STP Unit 1 shows an average of 19.67% of 0.6 La with a high of 20.64% of 0.6 La or 0.124 La.* The As-Found minimum pathway leak rate average for STP Unit 2 shows an average of 7.54% of 0.6 La with a high of 8.82% of 0.6 La or 0.053 La.* The As-Left maximum pathway leak rate average for STP Unit 2 shows an average of 20.54% of 0.6 La with a high of 21.69% of 0.6 La or 0.130 La}} |
| Lewis & Bockius LLPSteve FrantzU.S. Nuclear Recqulatory Commission Lisa M. RegnerNRG South Texas LPJohn RaganChris O'HaraJim von SuskilCPS EnermyKevin PolioCris EugsterL. D. BlaylockCrain Caton & James, P.C.Peter NemethCity of AustinCheryl MeleJohn WesterTexas Dept. of State Health ServicesRichard A. RatliffRobert Free NOC-AE-1 5003307Enclosure Corrections to STP Units 1 and 2 License Amendment Request for Extending the10 year ILRT to 15 years NOC-AE-1 5003307Enclosure Page 1 of 1Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 yearILRT to 15 yearsThe following paragraph from Attachment 1, NOC-AE-1 | |
| : 5003227, Page 27 of 50, secondparagraph, is corrected as indicated in bold:A review of the Type B and Type C test results from 2005 through 2014 for STP Unit 1 Iand 2004 through 2013 for STP Unit 2 has shown an exceptional amount of margin Ibetween the actual As-Found (AF) and As-left (AL) outage summations and theregulatory requirements as described below:* The As-Found minimum pathway leak rate average for STP Unit 1 shows anaverage of 4.49% of 0.6 La with a high of 4.89% of 0.6 La or 0.029 La.* The As-Left maximum pathway leak rate average for STP Unit 1 shows anaverage of 19.67% of 0.6 La with a high of 20.64% of 0.6 La or 0.124 La.* The As-Found minimum pathway leak rate average for STP Unit 2 shows anaverage of 7.54% of 0.6 La with a high of 8.82% of 0.6 La or 0.053 La.* The As-Left maximum pathway leak rate average for STP Unit 2 shows anaverage of 20.54% of 0.6 La with a high of 21.69% of 0.6 La or 0.130 La}}
| |
Letter Sequence Supplement |
---|
|
|
MONTHYEARNOC-AE-15003227, License Amendment Request for Extending the 10 Year ILRT to 15 Years2015-04-29029 April 2015 License Amendment Request for Extending the 10 Year ILRT to 15 Years Project stage: Request ML15156A3832015-06-0101 June 2015 NRR E-mail Capture - Email to South Texas Project, Unit 1 and 2 Amendment to Extend ILRT, Unacceptable with Opportunity to Supplement Project stage: Other ML15163A0172015-06-18018 June 2015 Supplemental Information Needed for Acceptance of Requested Licensing Action, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval Project stage: Acceptance Review NOC-AE-15003266, License Amendment Request for Extending the 10 Year ILRT to 15 Years PRA Supplement2015-06-29029 June 2015 License Amendment Request for Extending the 10 Year ILRT to 15 Years PRA Supplement Project stage: Supplement ML15191A0082015-07-17017 July 2015 Acceptance of Application Following Supplement, Revise Technical Specification 6.8.3.j, Containment Leakage Rate Testing Program, to Extend Integrated Leak Rate Test Interval from 10 to 15 Years (TAC MF6176-MF6177) Project stage: Acceptance Review ML15251A2162015-09-0303 September 2015 NRR E-mail Capture - STP ILRT RAI (MF6176 and MF6177) Project stage: RAI NOC-AE-15003296, Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-10-0808 October 2015 Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program Project stage: Request NOC-AE-15003307, Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-11-11011 November 2015 Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program Project stage: Supplement NOC-AE-16003347, Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program2016-03-17017 March 2016 Response to Request for Additional Information Regarding the License Amendment Request for Extension of Containment Leakage Rate Testing Program Project stage: Response to RAI 2015-06-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24213A0842024-07-31031 July 2024 Application for Order Consenting to Direct Transfer of Licenses ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 ML23089A2042023-03-30030 March 2023 License Amendment Request to Revise Alternative Source Term Dose Calculation ML22221A2122022-08-0909 August 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21252A7582021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21222A2272021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications ML20253A0462020-09-29029 September 2020 Issuance of Amendment Nos. 220 and 205 to Revise Technical Specifications to Adopt TSTF-490, Deletion of E-Bar Definition and Revision to RCS Specific Activity Tech Spec ML20266H8192020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen ML20134K7582020-05-13013 May 2020 License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures NOC-AE-20003734, License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures2020-05-13013 May 2020 License Amendment Request Under Exigent Circumstances for One-Time Revision to Technical Specification 3.5.1 to Reduce Minimum Allowed Accumulator Pressures ML20090B7452020-03-30030 March 2020 License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-20003712, License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan2020-03-30030 March 2020 License Amendment Request for Revise South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-19003677, License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec.2019-09-26026 September 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-490, Revision 0, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec. NOC-AE-18003604, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process2019-05-0101 May 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Using the Consolidated Line Item Improvement Process NOC-AE-18003583, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item ...2018-09-27027 September 2018 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item ... NOC-AE-17003529, License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating)2018-03-27027 March 2018 License Amendment Request to Revise Technical Specification 3.8.1.1 (A.C. Sources, Operating) NOC-AE-17003510, License Amendment Request to Revise Technical Specifications for Administrative Changes and to Relocate Fxy Exclusion Zones to the Core Operating Limits Reports (Colrs)2017-09-18018 September 2017 License Amendment Request to Revise Technical Specifications for Administrative Changes and to Relocate Fxy Exclusion Zones to the Core Operating Limits Reports (Colrs) NOC-AE-16003406, License Amendment Request for Revision to Staffing and Staff Augmentation Times in the South Texas Project Electric Generating Station Emergency Plan2017-07-31031 July 2017 License Amendment Request for Revision to Staffing and Staff Augmentation Times in the South Texas Project Electric Generating Station Emergency Plan NOC-AE-17003459, Supplement to the License Renewal Application Re Aging Management Programs2017-04-19019 April 2017 Supplement to the License Renewal Application Re Aging Management Programs NOC-AE-16003403, Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937)2016-09-28028 September 2016 Supplemental Information for the Review of the South Texas Project, Units 1 and 2, License Renewal - (TAC Nos. ME4936 and ME4937) NOC-AE-16003385, 2016 Annual Update to the License Renewal Application2016-06-28028 June 2016 2016 Annual Update to the License Renewal Application NOC-AE-16003378, Additional Information for the Review of the License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937)2016-05-31031 May 2016 Additional Information for the Review of the License Renewal Application - Aluminum Bronze AMP (TAC Nos. ME4936 and ME4937) NOC-AE-16003351, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies2016-04-0707 April 2016 License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies NOC-AE-16003330, Transmittal of Information of Foreign Ownership, Control, or Influence (FOCI)2016-01-27027 January 2016 Transmittal of Information of Foreign Ownership, Control, or Influence (FOCI) NOC-AE-15003318, Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0909 December 2015 Response to Request for Additional Information and Supplement to Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003315, Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 202015-12-0303 December 2015 Emergency License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Cycle 20 NOC-AE-15003307, Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program2015-11-11011 November 2015 Supplement - Error Correction - License Amendment Request for Extension of Containment Leakage Rate Testing Program NOC-AE-15003227, License Amendment Request for Extending the 10 Year ILRT to 15 Years2015-04-29029 April 2015 License Amendment Request for Extending the 10 Year ILRT to 15 Years NOC-AE-15003223, License Amendment Request: Proposed Revision to Updated Final Safety Analysis Report Table 15.6-172015-04-29029 April 2015 License Amendment Request: Proposed Revision to Updated Final Safety Analysis Report Table 15.6-17 NOC-AE-14003116, Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, Using the Consolidated Line Item Improvement Process2015-04-23023 April 2015 Application to Revise Technical Specifications to Adopt TSTF-510-A, Revision 2, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, Using the Consolidated Line Item Improvement Process NOC-AE-15003214, Response to Request for Additional Information Regarding License Amendment Request for Emergency Action Level Scheme Change2015-02-11011 February 2015 Response to Request for Additional Information Regarding License Amendment Request for Emergency Action Level Scheme Change ML14260A4372014-08-14014 August 2014 Project Units 1 & 2, License Amendment Request - Proposed Administrative Controls Technical Specification 6.9.1.6, Core Operating Limits Report ML14164A3002014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 1 of 7 NOC-AE-14003087, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 7 of 72014-05-15015 May 2014 Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 7 of 7 ML14164A3182014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 6 of 7 ML14164A3032014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 2 of 7 ML14164A3082014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 5 of 7 ML14164A3112014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 3 of 7 ML14164A3142014-05-15015 May 2014 Project, Revision to Unit 1 and Unit 2 Emergency Action Levels, Evaluation of the Proposed Changes License Amendment Request (LAR) for Revision of EAL Scheme to NEI 99-01 Revision 6. Part 4 of 7 NOC-AE-13003031, License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers.2014-01-0606 January 2014 License Amendment Request, Proposed Revision to Technical Specification 3.3. 1, Functional Unit 20, Reactor Trip Breakers. ML13323A1852013-11-13013 November 2013 Enclosure 3 - License Amendment Request for STP Piloted Risk-Informed Approach to Closure for GSI-191 NOC-AE-13002962, License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability2013-07-23023 July 2013 License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability ML13175A2112013-06-19019 June 2013 Project, Units 1 and 2, Revised STP Pilot Submittal and Requests for Exemptions and License Amendment for a Risk-Informed Approach to Resolving Generic Safety Issue (GSI)-191 NOC-AE-12002915, Annual Update to the South Texas Project License Renewal Application2012-10-29029 October 2012 Annual Update to the South Texas Project License Renewal Application NOC-AE-12002877, Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation.2012-08-0101 August 2012 Proposed Revision to Technical Specification 3.3.3.6, Accident Monitoring Instrumentation. ML11335A1402011-11-30030 November 2011 Annual Update to the South Texas Project License Renewal Application (TAC Nos. ME4936 and ME4937) NOC-AE-11002643, License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability2011-06-0202 June 2011 License Amendment Request for Approval of a Revision to the South Texas Project Fire Protection Program Related to the Alternative Shutdown Capability 2024-09-25
[Table view] |
Text
Nuclear Operating Company South Texas Pro/ect Elecric Genera~oh Station PCO. Box 289 Wadsworth, Texas 77483 -November 11, 2015 NOC-AE-1 5003307 10 CFR 50.90 File No. G25 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Supplement
-Error Correction
-License Amendment Request For Extension of Containment Leakage Rate Testing Program South Texas Proiect Units 1 and 2 TAC NOS MF6176 and MF6177
References:
- 1. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years", dated April 29, 2015 (NOC-AE-1 5003227) (ML1 51 28A352)2. Letter from G. T. Powell, STP, to NRC Document Control Desk, "Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years PRA Supplement", dated June 29, 2015 (NOC-AE-15003266) (ML15198A147)
By Reference 1, STP Nuclear Operating Company (STPNOC) submitted a License Amendment Request (LAR) to extend the 10 year Integrated Leak Rate Test (ILRT) to 15 years. Reference 2 is a supplement to the original submittal that added additional information regarding Probabilistic Risk Assessment topics. This Supplement is to correct errors contained in the initial LAR submittal.
The initial submittal was reviewed in its entirety to verify no other errors exist. The corrections are provided in the Enclosure to this letter.There are no commitments in this letter.If there are any questions regarding the submittal, please contact Rafael Gonzales at (361) 972-4779 or me at (361 )-972-7566.
I declare under penalty of perjury that the foregoing is true and correct.Executed on //. 26/5- .'.J , Date G.T. Powell Site Vice President rjg
Enclosure:
Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years / 'STI: 34238375 NOC-AE-1 5003307 Page 2 of 2 cc: (paper copy)(electronic copy)Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, TX 76011-4511 Lisa M. Regner Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (MS 8 G9A)11555 Rockville Pike Rockville, MD 20852 NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MNl16 Wadsworth, TX 77483 Morcqan. Lewis & Bockius LLP Steve Frantz U.S. Nuclear Recqulatory Commission Lisa M. Regner NRG South Texas LP John Ragan Chris O'Hara Jim von Suskil CPS Enermy Kevin Polio Cris Eugster L. D. Blaylock Crain Caton & James, P.C.Peter Nemeth City of Austin Cheryl Mele John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free NOC-AE-1 5003307 Enclosure Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years NOC-AE-1 5003307 Enclosure Page 1 of 1 Corrections to STP Units 1 and 2 License Amendment Request for Extending the 10 year ILRT to 15 years The following paragraph from Attachment 1, NOC-AE-1 5003227, Page 27 of 50, second paragraph, is corrected as indicated in bold: A review of the Type B and Type C test results from 2005 through 2014 for STP Unit 1 I and 2004 through 2013 for STP Unit 2 has shown an exceptional amount of margin I between the actual As-Found (AF) and As-left (AL) outage summations and the regulatory requirements as described below:* The As-Found minimum pathway leak rate average for STP Unit 1 shows an average of 4.49% of 0.6 La with a high of 4.89% of 0.6 La or 0.029 La.* The As-Left maximum pathway leak rate average for STP Unit 1 shows an average of 19.67% of 0.6 La with a high of 20.64% of 0.6 La or 0.124 La.* The As-Found minimum pathway leak rate average for STP Unit 2 shows an average of 7.54% of 0.6 La with a high of 8.82% of 0.6 La or 0.053 La.* The As-Left maximum pathway leak rate average for STP Unit 2 shows an average of 20.54% of 0.6 La with a high of 21.69% of 0.6 La or 0.130 La