ML16200A085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION  
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION  


La CrossLicense TRevision1.Gen1.1.1.2.1.3.1.3.1.3.
La Cros s License T Revisio n 1.Ge n 1.1.1.2.1.3.1.3.1.3.
1.3.
1.3.
1.3.41.3.
1.3.4 1.3.
1.3.
1.3.
1.3.1.4.1.5.1.5.
1.3.1.4.1.5.1.5.
1.5.
1.5.
1.5.
1.5.
1.5.41.5.
1.5.4 1.5.
1.5.
1.5.
1.5.
1.5.
1.5.1.6.1.7.
1.5.1.6.1.7.
Figure 1-Figure 1-Figure 1-Figure 1-  se Boiling WTermination n 0 neral Inform aPurpose .....DecommissFacility ......
Figure 1-Figure 1-Figure 1-Figure 1-  s e Boiling W Termination n 0 n eral Inform a Purpose .....Decommis s Facility ......
1.Site De2.Current3.Meteor4.Geolog5.Surface6.Ground7.EnvironOperationa lPlan Summ1.Genera2.Site Ch3.Identifi4.Remed5.Final R6.Compli7.Update8.SupplemRegulatory References  
1.Site D e 2.Curren t 3.Meteo r 4.Geolo g 5.Surfac e 6.Groun d 7.Enviro nOperationa l Plan Sum m 1.Gener a 2.Site C h 3.Identif i 4.Reme d 5.Final R 6.Compl i 7.Updat e 8.Supple m Regulatory References  
-1Site Re-2Site Ov-3LACBW-4TopogrWater Reacto rPlan ation ...........
-1Site R e-2Site O v-3LACB W-4Topog r W ater Reacto r Plan a tion ...........
...................
...................
sioning Obj e...................
s ioning Obj e...................
escription ....
e scription ....
t/Future La nrology and Cgy and Seis me Water Hy dd Water Hy dns and Natu rl Backgroun dary .............
t/Future La n r ology and C g y and Seis m e Water Hy d d Water Hy d ns and Natu r l Backgroun dary .............
al Informati oharacterizati oication of R ediation Plans Radiation Su riance with t he of the Site-ment to the ENotificatio n...................
al Informati o haracterizati o i cation of R e diation Plans R adiation Su r i ance with t h e of the Site-m ent to the ENotificatio n...................
egional Loc averview .......
e gional Loc a v erview .......
WR Buildin graphical Ma pr TABLE O...................
W R Buildin g r aphical Ma p r TABLE O...................
....................
....................
.ective ..........
.e ctive ..........
....................
....................
....................
....................
.nd Use ........
.nd Use ........
.Climatology  
.Climatology  
.mology ........
.m ology ........
.drology .......
.d rology .......
.drology .......
.d rology .......
.ral Resourc ed ................
.r al Resourc e d ................
....................
....................
.on ................
.o n ................
.on ...............
.o n ...............
.emaining Si t..................
.emaining Si t..................
.rvey Plan ...
.rvey Plan ...
.he Radiolog iSpecific De cEnvironmenns of Chang e...................
.h e Radiolog i Specific De c Environme n n s of Chang e...................
.LIST Oation ............
.LIST O a tion ............
....................
....................
.gs ...............
.g s ...............
.p .................
.p .................
.1-i OF CONTE...................
.1-i OF CONT E...................
....................
....................
....................
....................
Line 68: Line 68:
....................
....................
....................
....................
.es ................
.e s ................
....................
....................
....................
....................
Line 75: Line 75:
.te Dismantl e...................
.te Dismantl e...................
....................
....................
.ical Criteria commission ntal Report ..
.i cal Criteria c ommission ntal Report ..
.es ................
.e s ................
....................
....................
.OF FIGURE...................
.O F FIGUR E...................
....................
....................
....................
....................
....................
....................
.ENTS ...................
.E NTS ...................
....................
....................
....................
....................
Line 103: Line 103:
....................
....................
....................
....................
.RES ...................
.R ES ...................
....................
....................
....................
....................
Line 122: Line 122:
....................
....................
....................
....................
.ities ............
.i ties ............
....................
....................
....................
....................
Line 160: Line 160:
....................
....................
....................
....................
.... 1-1... 1-1... 1-1... 1-2... 1-2... 1-3... 1-3... 1-3... 1-4... 1-5... 1-5... 1-6... 1-7... 1-7... 1-7... 1-8... 1-8... 1-9... 1-9... 1-9... 1-9. 1-10. 1-11. 1-13. 1-14. 1-15. 1-16 La CrossLicense TRevisionALARA AMCG AMSL BGS DCGL DQO DSAR FSS FRS GWH ISFSI LACBWLSA LTP MARSSIMYBP NRC ODCM PSDAR RESRADSTS USACE  se Boiling WTermination n 0 As LoAveraAboveBelowDeriv Data QDefueFinal Final GigawIndepWR La CrLow SLicenIM Multi-MillioNucleOff-SPost-SD RESidSourcUS ArWater Reacto rPlan LIST OF ow As Reas oage Member e Mean Sea w Ground S ued Concent rQuality Obj eeled Safety AStatus Surv eRadiation S uwatt-Hours endent Spe nrosse Boilin gSpecific Actse Terminat i-Agency Ra don Years Be fear Regulato rite Dose Ca lShutdown D dual RADio ae Term Sur vrmy Corp o fr ACRONYMonably Achi eof the Criti cLevel urface ration Guide ectives  Analysis Re pey urvey nt Fuel Stor ag Water Rea civity ion Plan diation Sur vfore Present ry Commisslculation M aecommissio active Mate rvey f Engineers 1-ii MS AND ABevable cal Group line Level port age Installati octor vey and Site ion anual ning Activi trials BBREVIATon Investigatio ties Report TIONS n Manual La CrossLicense TRevision1.GThe La Cthat is o wlocated oVillage oLACBWS4601 StGenoa, WThe site ifor LACBLACBWspent nuclicense.
.... 1-1... 1-1... 1-1... 1-2... 1-2... 1-3... 1-3... 1-3... 1-4... 1-5... 1-5... 1-6... 1-7... 1-7... 1-7... 1-8... 1-8... 1-9... 1-9... 1-9... 1-9. 1-10. 1-11. 1-13. 1-14. 1-15. 1-16 La Cros s License T Revisio nALARA AMCG AMSL BGS DCGL DQO DSAR FSS FRS GWH ISFSI LACB W LSA LTP MARSS I MYBP NRC ODCM PSDAR RESRA D STS USACE  s e Boiling W Termination n 0 As L o Aver a Abov e Belo w Deriv Data Q Defu e Final Final Giga w Indep WR La C r Low S Licen I M Multi-Milli o Nucl e Off-S Post-S D RESi d Sour c US A r W ater Reacto r Plan LIST OF o w As Reas o a ge Member e Mean Sea w Ground S u ed Concent r Q uality Obj e eled Safety A Status Surv e Radiation S u watt-Hours endent Spe n r osse Boilin g S pecific Actse Terminat i-Agency Ra d o n Years Be f ear Regulato r i te Dose Ca l S hutdown D d ual RADio a e Term Sur v rmy Corp o f r ACRONY M o nably Achi eof the Criti c Level u rface r ation Guide ectives  A nalysis Re p e y urvey n t Fuel Stor a g Water Rea civity i on Plan diation Sur v f ore Present ry Commis s l culation M aecommissio a ctive Mate r v ey f Engineers 1-ii M S AND A B e vable c al Group line Level p ort age Installati o c to r v ey and Site ion a nual ning Activi t rials B BREVIA T on Investigatio ties Report TIONS n Manu a l La Cros s License T Revisio n 1.G The La C that is o w located o Village o LACB W S4601 S t Genoa, W The site i for LAC B LACB W spent nu clicense. In a let t requeste dmainten afrom Da i Solution s 1.1.P The objepermit t h 50 licen s general l i This Lic e was writ t f or Lice n R eview Paccomp a the LTP r 1.2.D The dec o LACB Wremaini n the requ idocume n that is d Average s e Boiling W Termination n 0 G eneral I n Crosse Boil i w ned by Dai r o n the Dair y o f Genoa, V e W R t ate Road 3 5 W I. 54632-8 8 i s licensed u B WR and 7 2 W R has been c lear fuel st t er dated O d Nuclear R a nce and d e i rylan d to S o s. P urpose ctive of dec o h e release o f s e except fo i cense prov i ense Termi n ten followi n n se Termina Plan for Eva a nied by a p r require NR C Decommissi o ommissioni n W R can sub m n g ISFSI lic e irements of n ts the proc e d istinguisha bMember of W ater Reacto r Plan n formatio n i ng Water R r yland Pow e yland Geno a e rnon Coun t 5 8 46 u nder Posse s 2-046 for th e shut down ored in the L October 8, 2 R egulatory C ecommissio n o lutions. I n ommissioni nthe site for ur the area s u i sions of 10 C n ation Plan (L n g the guida ntion Plans fo luating Nuc l r oposed lice n C prior appr o o nin g Ob j e c n g objectiv e m it a reques t ensed facilit y10 CFR 2 0 e ss that will ble from ba the Critical r  n Reactor (LA C e r Cooperati a site on t h ty, Wisconsi n ssion Only L e Independe n since 1987 LACBWR I 2 015 (1), D Commission n ing authori t n May 2016, n g LACBW R unrestricted u rrounding t C FR 72 Su b LTP) satisfi e n ce in Reg u fo r Nuclear P l ear Power R nse amend m oval. ctive e is to con d t to the NR C y) in accord a 0.1402, R a d be used to dckground r a Group (A M 1-1 C BWR) wa ve (Dairyla n h e east shor e n with an a d License No.
In a lettrequestedmaintenafrom DaiSolutions1.1.PThe objepermit th50 licensgeneral l iThis Licewas writtfor LicenReview Paccompathe LTP r1.2.DThe decoLACBWremaininthe requidocumenthat is dAverage se Boiling WTermination n 0 General InCrosse Boil iwned by Dai ron the Dair yof Genoa, V eWR tate Road 3 5WI. 54632-8 8is licensed uBWR and 72WR has been clear fuel st ter dated Od Nuclear Rance and d eiryland to Sos. Purpose ctive of dec ohe release o f se except fo icense prov iense Termi nten followi nnse Termina Plan for Eva anied by a p rrequire NR CDecommissi oommissioni nWR can sub mng ISFSI lic eirements of nts the proc edistinguisha bMember of Water Reacto rPlan nformationing Water Rryland Pow eyland Geno aernon Coun t5 846 under Posse s2-046 for th eshut down ored in the LOctober 8, 2Regulatory Cecommissio nolutions. I nommissioni nthe site for ur the area s uisions of 10 Cnation Plan (
D nt Spent Fu eand is curr e I SFSI will b D airylan d a n (NRC) co n t ies, under the NRC p r R is to redu c use and all o t he ISFSI.
Lng the guida ntion Plans foluating Nuc lroposed lice nC prior appr ooning Objecng objectiv emit a reques tensed facilit y10 CFR 20ess that will ble from ba the Critical r  n Reactor (LA Cer Cooperati a site on t hty, Wisconsi nssion Only Le Independe nsince 1987 LACBWR I2015 (1),
b part K. es the requi r ulatory Gui d P ower Rea c R eactor Lic e ment that est duct remed i C for unres t a nce with S u diological C r d emonstrate adioactivity MCG) from a a s a 50 Me g nd). This u n e of the M i d dress of:
DCommission ning authori tn May 2016, ng LACBWRunrestricted urrounding tCFR 72 SubLTP) satisfi ence in Reg ufor Nuclear Plear Power Rnse amendmoval. ctive e is to con dt to the NR Cy) in accord a0.1402, Radbe used to dckground r aGroup (AM1-1 CBWR) wave (Dairyla nhe east shor en with an a dLicense No.
DPR-45 wit h el Storage I n e ntly under g be maintain e n d LaCross e n sent to tra n Possession r ovided con s c e the resid u o w for the te r The ISFSI f rement of 1 0 d e 1.179, St a c tors (2) an d e nse Termi nablishes the i ation and s tricted relea s u bpart E of 1 riteria for Uthat the do s does not e all applicabl e g awatt Elect r n it, also kno w i ssissippi R i h Docket N u nstallation (I g oing deco m e d under an e Solutions , n sfer Dairyl a Only Lice n s ent to tran s u al radioacti v rmination o f f acility is li 0 CFR 50.8 2 a ndard For m d in NURE G n ation Plans criteria for s urvey ope r s e of the si t 10 CFR Pa r t Unrestricte d se from resi d e xceed 25 m e pathways o ric (MWe) B wn as Geno a i ver south o umbers of 5 0 SFSI). mmissioningamended P a LLC (Solu t a n d's posse s n se No. DP R sfer the lice n vity to level f the 10 CF R censed und e 2 (a)(9). Thi s m at and Co n G-1700, Sta n (3). This Lwhen chan g rations suc h te (other th a t 20 after m e d Use. The d ual radioa c mrem/year t o o ver a 1,00 0 B WR a 2, is of the 0-409 . The a rt 50 tions) ssion, R-45, nse to s that R Part er the s LTP n tents n dard L TP is ges to h that a n the e eting LTP ctivity o the 0 year La Cros s License T Revisio n period a n Achieva b 1.3.F 1.3.1.LACB W Mississi p south of nearby p LACB Wmile 67 8 approxi m rail road (AMSL) B oiling W The lice n LACB W plant, of f and incl uthe the co aan a (G ean aa p a The site i Mississi pmiles up The site i 35. A B commer cthis rail
Dnt Spent Fu eand is curr eISFSI will bDairyland an(NRC) conties, under the NRC p rR is to redu cuse and all othe ISFSI.
bpart K. es the requi rulatory Gui dPower ReacReactor Lic ement that est duct remed iC for unres tance with S udiological C rdemonstrate adioactivity MCG) from aas a 50 Me gnd). This u ne of the M iddress of:
DPR-45 wit hel Storage I nently under gbe maintain end LaCross ensent to tra nPossession rovided con sce the resid uow for the te rThe ISFSI frement of 1 0de 1.179, Stactors (2) andense Termi nablishes the iation and stricted relea subpart E of 1riteria for Uthat the do sdoes not eall applicabl egawatt Elect rnit, also kno wississippi R ih Docket N unstallation (I going deco med under an eSolutions
, nsfer Dairyl aOnly Lice nsent to tran sual radioacti vrmination o ffacility is li 0 CFR 50.8 2andard For md in NUREGnation Plans criteria for survey ope rse of the si t10 CFR PartUnrestricte dse from resi dexceed 25 me pathways oric (MWe)
Bwn as Geno aiver south oumbers of 5 0SFSI).
mmissioningamended P aLLC (Solu tand's possesnse No. DP Rsfer the lice nvity to level f the 10 CF Rcensed und e2(a)(9). Thi smat and Co nG-1700, Stan(3). This Lwhen chan grations suc hte (other th at 20 after m ed Use. The dual radioa cmrem/year t oover a 1,00 0BWR a 2, is of the 0-409 . The art 50 tions) ssion, R-45, nse to s that R Part er the s LTP ntents ndard LTP is ges to h that an the eeting LTP ctivity o the 0 year La CrossLicense TRevisionperiod anAchievab1.3.F1.3.1.LACBWMississipsouth of nearby pLACBWmile 678approximrail road


(AMSL) Boiling WThe licenLACBWplant, of fand incluthe the coaan a(Gean aa paThe site iMississipmiles upThe site i35. A Bcommercthis rail
National LACB W and stur g LACB W s e Boiling W Termination n 0 nd that resid u ble" (ALA R F acilit y Site Des c W R is locate d ppi River, a b t he city of L prominent f WR are longi t 8.6 on the m ately 300 fe. The react o per NURE W ater R eact o n sed site c o WR comprisi n f of Highw a ude:  LACBWR p land north o al (and later o area directl y e noa Statio n a rea south o arcel of lan d is bordered o ppi River a nstream, ma n is bordered o B urlington N cial freight aline. The sWildlife &WR, is the G e geon. On t h W R plant, is a W ater Reacto r Plan u al radioact i A). c ription d in south w bout 1 mile La Crosse, W features suc h t ude 91 o , 13'Mississippi feet from th e o r stands o n G-0191, E n or (4). omprises a n g only 1.5 a y 35. The p plant, of LACBW R o il) fueled p y south of L A #3) approx i f Genoa #3 w d to the east o o n the nort h nd Highway naged by th e o n the west b N orthern-San t along the ea s s ite is bord e& Fish Refu g enoa Natio n h e southwe s a public boa t r i vity has be e western Wis c south of th e W I. See Fig u h as high w', 53.35" W e River abo v e Mississipp i n filled land n vironmenta ltotal of 16 3 acres. The prominent f e R , including p ower plant (A CBWR wi t imately 175 w here the I S o f Highway h by the Mis s 35. The U
 
.e U.S. Arm y b y the Miss i ta Fe rail li n stern portio n e red to the s g e Pool 9 a n al Fish Hat c stern corner t launching r 1-2 e n reduced t o c onsin, in V e Village of ure 1-1 for a w ays, rivers est and latit u ve the mou t i River and at an eleva t l Statement 3.5 acres (5 site is acc e e atures on t hthe site swi t (removed in t h an operat ifeet from t h SFSI is loca t 35, across fr s issippi Riv e.S. Lock &
National  
D y Corp of E n issippi Rive r ne, located b n of the site
 
;s outh by a s area. Furth e chery whic hof the site
LACBWand sturgLACBWse Boiling WTermination n 0 nd that resid uble" (ALARFacility Site DescWR is locate dppi River, a bthe city of Lprominent fWR are longi t8.6 on the mately 300 fe. The react oper NUREWater Reactonsed site c oWR comprisi nf of Highw aude:  LACBWR pland north oal (and later oarea directl yenoa Statio narea south o arcel of lan dis bordered oppi River a nstream, ma nis bordered oBurlington Ncial freight aline. The sWildlife  
, ramp with a p o levels that V ernon Cou n fGenoa, WI map showi nand lakes.
&WR, is the G egeon. On t hWR plant, is aWater Reacto rPlan ual radioact iA). cription d in south wbout 1 mile La Crosse, Wfeatures suc htude 91o, 13'Mississippi feet from th eor stands o nG-0191, Enor (4). omprises a ng only 1.5 ay 35. The pplant, of LACBWRoil) fueled py south of L A #3) approx if Genoa #3 wd to the east oon the nort hnd Highway naged by th eon the west bNorthern-San talong the ea ssite is bord e& Fish Refu genoa Natio nhe southwe sa public boa tr ivity has be ewestern Wis csouth of th eWI. See Fig uh as highw', 53.35" W eRiver abo ve Mississipp in filled land nvironmenta ltotal of 16 3acres. The prominent f eR, including power plant (ACBWR witimately 175 where the I Sof Highway h by the Mis s35. The U
u de 43 o , 33', t h of the O475 feet we t ion of 639 related to  
.e U.S. Arm yby the Miss ita Fe rail li nstern portio nered to the sge Pool 9 anal Fish Hat cstern corner t launching r1-2 en reduced t oconsin, in Ve Village of ure 1-1 for a ways, rivers est and latit uve the mou ti River and at an eleva tl Statement 3.5 acres (
: 5) which is essed by a r he site are s h t chyard and 1989), i onal 350-M h e LACBW R ted, and from LACB W er and a nar r D am No. 8 ngineers (U S r and is bor d between the  
5site is acc eeatures on t hthe site swi t(removed in th an operat ifeet from t hSFSI is loca t35, across frsissippi Riv e.S. Lock &
; there are n segment of t e r south, a p h raises end a , approxim a parking lot. are "As Lo w n ty, on the e and appro x n g the site l o The map , 36.22" No r O hio River.
Dy Corp of E nissippi Rive rne, located bn of the site
e st of the ca r feet Above Operation o owned by r oad on the h own in Fi gthe site of t h Mwe fossil g e R plant, W R. r ow strip of is located a SACE), Ro c d ered on the site and Hi g n o passenge r the Upper M pproximatel y angered mu s a tely 0.75 m w As Reaso n east shore o ximately 19 m ocation, incl u coordinat e r th. The sit e The reac t rgo-carryin g Mean Sea L of the La C Dairyland, south side o g ures 1-2 an he former G
;south by a sarea. Furth echery whic hof the site
-e nerating sta t land betwe e approximate l c k Island Di seast by Hig h g hway 35 c a r trains whic Mississippi R y 2.4 miles ssels, brook m iles south o n ably of the m iles u ding es for e is at t or is g-only L evel Crosse with of the n d 1-3 -1 t ion e n the ly 0.6 strict. h way a rries h use River from trout of the La Cros s License T Revisio n 1.3.2.The site the Gen o the pres e continue future la n The sp einterim establish 1.3.3.The La C in Geno a weather rdata incl uTemper a the extr e Average summer and 199 5 Monthly spring a n The blu ff shows p r winds f o LACB W average w 1.3.4.LACB W physiogr Pleistoc e early Pa l which h a area. M a Bedrock Wiscons i Present composi tdolomit e b oth sid e s e Boiling W Termination n 0 Current/has been c o oa 3 facility ence of the a as an indu s n d use, othe r e nt nuclear storage fa c ed and read y Meteoro l C rosse Mun i a maintain r elated info r u des: wind s a tures in the emes being temperatur e season. A r 5. The reco rprecipitati o nd summer s ff s of the Mi s revailing so u or the mont h W R Site whe r wind speeds Geolo gy WR is loca taphic prov i e ne Epoch a l eozoic age.
,ramp with a po levels that Vernon Cou nfGenoa, WI map showi nand lakes.
as been mo d aximum reli e in the site r in Dome b y[MYBP]) s t ion. The P s, sandston e es of the M i W ater Reacto r Plan F uture La n o ntinuously u and support ash landfills s trial-use pr o r than perha p fuel is exp e cility, or l i y to receive L l o gy and Cl icipal Airpo r long standi n rmation in t h s peed and di r La Crosse rmore mark e e s range fro m record maxi r d low was -
ude 43o, 33',th of the O475 feet we tion of 639 related to  
4 o n averages easons and o s sissippi Ri v utherly wind h s of Nove r e the river are typicall y and Seism o t ed within i nce. The a nd is chara c Moderate t dified by a m ef in the reg i r egion consi s y early Pal eedimentary Paleozoic ro c e s and shale s i ssissippi ri v r n d Use used for ind u ing operati o, as well as o perty after p s recreatio n ected to re m icensed te m LACBWR f i matolo gy rt located in ng active w he La Cross e rection, tem p r egion are t y e d because m 20 °F in t hmum temp e 4 3 °F in Jan u in the area one to three ver Valley c h s for seven m m ber th r ou g valley runs y 6-10 mph.
: 5) which is essed by a r he site are s htchyard and 1989), ional 350-Mhe LACBWRted, and from LACBWer and a nar rDam No. 8 ngineers (U Sr and is bor dbetween the  
o lo gy the Wisc oWisconsin c terized by t o strong re l mantle of l o i on is about sts of Pre-C a e ozoic (Ca m strata. B a cks are 1,20
; there are n segment of ter south, a ph raises end a, approxim aparking lot. are "As Lo wnty, on the eand appro xng the site l o The map, 36.22" No rOhio River.
: s. About 60 0 v er in the p l 1-3 u strial purp o o ns (e.g. bar g the on-site decommiss n al, can be e m ain at the mporary mo f uel. the town o f w eather stat i e - Genoa r e p erature, an d y pical of th e of the rive r he three mo e rature of 1 0 u ary of 187 3ranges fro minches per m hannel the w months of t h g h March o north-south onsin DriftlDriftless flat lying n lief has bee n o ess and gla c 1,000 feet.
est of the ca rfeet Above Operation o owned by road on the hown in Fi gthe site of t hMwe fossil g eR plant, WR. row strip of is located aSACE), Rocdered on the site and Hi gno passenge r the Upper Mpproximatel yangered mu sately 0.75 m w As Reaso neast shore oximately 19 mocation, incl u coordinat erth. The sit e The reac trgo-carryin gMean Sea Lof the La CDairyland, south side ogures 1-2 an he former G
ambrian cr y m brian and asement ro c 0-1,300 fee t 0 feet of thi s lant vicinit y o ses since 1 g e washing, ISFSI, it is s ioning is c o e nvisioned o ISFSI until o nitored ret r f La Crosse a i ons that m e gion of the d precipitati e extremes o r valley loc a o nths of the w 0 8 °F was r e 3. m three to f m onth for th e w inds at the L h e year with o f the year.are from t h less sectio nsection wa s naturally dis n produced o cial outwas h ystalline roc kOrdovician
-enerating sta tland betwe eapproximate lck Island Di seast by Hig hghway 35 c ar trains whic Mississippi Ry 2.4 miles ssels, brook miles south onably of the miles uding es for e is at tor is g-only Level Crosse with of the nd 1-3 -1 tion en the ly 0.6 strict. hway arries h use River from trout of the La CrossLicense TRevision1.3.2.The site the Genothe presecontinue future la nThe speinterim establish 1.3.3.The La Cin Genoaweather rdata incl uTemperathe extreAverage summer and 1995Monthly spring anThe bluffshows prwinds foLACBWaverage w1.3.4.LACBWphysiogr Pleistoceearly Palwhich haarea. MaBedrock WisconsiPresent compositdolomiteboth sidese Boiling WTermination n 0 Current/has been c ooa 3 facility ence of the aas an indu snd use, othe rent nuclear storage fa ced and read yMeteorolCrosse Mun ia maintain related info rudes: wind satures in the emes being temperatur eseason. A r5. The reco rprecipitati ond summer s ffs of the Mi srevailing so uor the mont hWR Site whe rwind speeds Geology WR is loca taphic prov iene Epoch aleozoic age.
, c ks in the s t thick in th s sequence i s y. Prior to t 941. Due t o switchyar d)anticipated ompleted.
as been mo daximum reli ein the site rin Dome by[MYBP]) s tion. The Ps, sandston ees of the M iWater Reacto rPlan Future Lanontinuously uand support ash landfills strial-use pr or than perha pfuel is exp ecility, or l iy to receive Llogy and Clicipal Airpo rlong standi nrmation in t hspeed and di rLa Crosse rmore mark ees range fro mrecord maxi rd low was -
N o ver the nex t a federal r e rievable st o a nd the US A m onitor and Mississippi on (6) (7).
4on averages easons and ossissippi Ri vutherly wind hs of Nove re the river are typicall yand Seismoted within ince. The and is chara c Moderate tdified by a mef in the reg iregion consi sy early Pal eedimentary Paleozoic ro ces and shale sississippi ri vr nd Use used for ind uing operati o, as well as operty after ps recreatio nected to re micensed te mLACBWR fimatology rt located in ng active whe La Cross erection, tem pregion are t yed because m 20 °F in t hmum tempe43 °F in Jan uin the area one to three ver Valley c hs for seven mmber througvalley runs y 6-10 mph.
of a contine ation of the winter seas o ecorded in J five inches p e rest of the LACBWR S prevailing n Predomin a h e north an d n of the C s not glac i s secte d sedi m o n the ungl a h in the lar g ks exposed a , 572 Milli o site vicinit y he site vicin i s exposed a l t he Pleistoc e o the prese n) on the pro p that the sit e No other cr e t several de c epository, o orage facili t ACE Lock 8 archive sta n River. Col lntal climat e LACBWR o n to 72 °F i J uly of both p er month i year. S ite. Airpor t n orth to nort h a nt winds a d south. M o Central Lo w i ated durin g mentary roc aciated land s ger valleys o a t the crest o on Years B y are of gr a i ty and cons l ong the blu f ene Epoch (nce of perty, e will edible cades. offsite ty is Dam n dard l ecte d e with Site. i n the 1936 i n the t data h west at the o nthly wland g the ks of scape of the of the B efore a nitic sist of f fs on (more La Cros s License T Revisio n than 2 M today. I t The site Region c syncline s Superior formed d Major u pSome m i MYBP). of the Wsedimen t Many fa u capable a geologic mapped i several n found a nseismici tsite" (8). Seismic 2008 o c decomm i 1.3.5.The LA Cthe vicin Prairie d u width. T There is land, isl a sloughs a the upla n channel aThe mai n are oper a of the si tdistance the site.
ology the WiscoWisconsin cterized by to strong re lmantle of l oion is about sts of Pre-C aeozoic (Ca mstrata. B acks are 1,20
Part of t h plant. T one to t h s e Boiling W Termination n 0 M YBP) the r i t was buried is located c onsists of s and arche ssyncline, F o d uring the L a p lift and do w i nor tilting o The site is W isconsin A tary strata i n u lts have b e according t o conditions i i n the site r e n uclear pow e n y evidenc e t y. Therefo r activity (m a c curred ov e i ssioning (9
: s. About 60 0ver in the p l1-3 ustrial purp oons (e.g. bar gthe on-site decommiss nal, can be emain at the mporary mo fuel. the town o f weather stat ie - Genoa r eperature, an dypical of th eof the rive rhe three mo erature of 1 0uary of 187 3ranges fro minches per mhannel the wmonths of t hgh March onorth-south onsin DriftlDriftless flat lying nlief has bee noess and gla c1,000 feet.
)Surface W C BWR site i ity of the si t u Chien, ap p T he valley w a little or no a a nds betwe e and meande r n d where t r a re wooded.
ambrian cr ymbrian and asement ro c0-1,300 fee t0 feet of thi slant vicinit yoses since 1 ge washing, ISFSI, it is sioning is c oenvisioned oISFSI until onitored ret rf La Crosse aions that megion of the d precipitati e extremes or valley loc aonths of the w08 °F was r e3. m three to fmonth for th ewinds at the Lhe year with of the year.are from t hless sectio nsection wa snaturally dis n produced ocial outwas hystalline roc kOrdovician
n channel o f a ted by the U te) the river iof 20 miles, he licensed herefore, d r h e south, so W ater Reacto r Plan i ver had car v by post-gla cwithin the a vast are a s. Major st r orest City b a a te Pre-Cam b w n-warping a o ccurred dur i located on t h Arch, a sou t n the vicinit y een mappe d o the criteri a i n the site v i egion, b ut i n er plant site s e of capabl r e, capable a gnitudes r a er 180 mil e). Water H y d r i s in the Mi t e, the valle y proximatel y alls rise sha r agricultural e n river ch a ring river c h ributary stre The flat u p f the river v a U SACE for n is nearly fo u then gradu a are a (27 a cainage at t h that only p r  v ed a gorge c ial sedime n Central Sta b a of large c ructural fea t asin, Michi g br ian and E a a lso occurr e i ng and foll o h e southwes t hward proj y dip less th a d in the site a in 10 CFR icinity that r n vestigation s s in the regi o e faulting.
,cks in the st thick in th s sequence i sy. Prior to t941. Due t oswitchyar d)anticipated ompleted.
faulting do e anging from es from t h rolo gy ssissippi Ri v y is deeply c y 40 miles s o r ply 500 to 6 use of the r i a nnels and e h annels. N uams interce p pland areas a aries greatly navigational ur miles wi d a lly widens a c res) is on a e site has berecipitation 1-4 as much as n t. b le Region circular upl i tures inclu d g an Basin, a n a rly Paleozo e d during lat o wing the P l t flank of th e ection of t h a n 20 feet pe r region. N o100, Appe n r epresent ha z s of all of th e o n, in additi o Additiona e s not need 3.5 to 5.4) e site and v er valley a n c ut into high l outh, the va l 6 00 feet fro m i ver valley f e xtensions o umerous sho r pt the mai n and some of t in width ab o purposes.
Nover the nex ta federal r erievable st oand the US Amonitor and Mississippi on (6) (7).
A d e. Below t h a s the river a a filled in a r een establis hthat falls o n 150 to 210 tectonic pr o i fts and se d de the Wisc ond Illinois B o ic (more th a te Paleozoic leistocene ge Wisconsi n he Wiscons i r mile to th e o ne of thes e n dix A. Per zard to the f ese faults d u o n to studie s a lly, the ar e to be consi that has b edid not i nd is relati v ly dissected l ley varies b m river level floor which of low lyin g rt, steep-sid e n river vall e t he tributar y o ve and bel o Above Dam he site, the r i approaches D r ea south o f hed. One v n the bluff a feet deeper ovince. T h dimentary b a onsin Dom e Basin. Thes a n 435 MY B(330 MYB P laciations (2 n Dome and in Dome. e southwest.
of a contine ation of the winter seas oecorded in Jfive inches pe rest of the LACBWR Sprevailing n Predomin ahe north an dn of the Cs not glac issected sedimon the ungl ah in the lar gks exposed a, 572 Milli osite vicinit yhe site vicin is exposed a lthe Pleistoc eo the prese n) on the pro pthat the sit eNo other cr et several de cepository, oorage facili tACE Lock 8 archive sta nRiver. Col lntal climat eLACBWR on to 72 °F iJuly of both per month iyear. Site. Airpor tnorth to nort hant winds ad south. M oCentral Lo wiated durin gmentary roc aciated land sger valleys oat the crest oon Years By are of gr aity and cons long the blu fene Epoch (nce of perty, e will edible cades. offsite ty is Dam ndard lected e with Site. in the 1936 in the t data hwest at the onthly wland g the ks of scape of the of the Before anitic sist of ffs on (more La CrossLicense TRevisionthan 2 Mtoday. I tThe site Region csynclinesSuperior formed dMajor upSome miMYBP). of the WsedimentMany faucapable ageologic mapped iseveral nfound anseismicitsite" (8). Seismic 2008 ocdecommi1.3.5.The LACthe vicin
e faults are the US N R f acility. Nu m u ring the co u s for the LA e a is one o dered in th e e en noted b e impact pla n v ely flat (se e uplands. F r b etween 2.5 . consists pri m g flood pla i e d valleys h e y. Both w y valleys are ow the site.
 
No. 8 (abo u iver is relati v Dam No. 9, f the origin a valley drains a djacent to t than can b e he Central S asins, and b e and Arch, e structures B P). P to 240 M Y 2 MYBP to 0 the western For this r econsidered RC, "There a m erous faul t u rse of vali d CBWR, ha v of relativel y e analysis o etween 197 5 nt operatio n e Figure 1-4 rom La Cro sand 4.5 mi l marily of m i n cut by p ave been c u walls of the cultivated.
Prairie d uwidth. TThere is land, isl asloughs athe uplanchannel aThe mainare operaof the si tdistance the site.
A series of ut 0.75 mile vely narrow33 miles so u al Genoa-1 s to the nort h t he site and e seen S table broad Lake were YBP). 0.001 flank eason, to be are no t s are d ating ve not y low f this 5 and ns or 4). In sse to les in arshy onds, ut into main dams north  for a u th of s team h and on a La Cros s License T Revisio nsmall p o presentl y problem s For a dis and tow n publishe d Davenp o purpose smiles do w other kn o Chien, 4 0 1.3.6.Ground w feet Be l commun fill mate r ground w river. B samplin g vertical glikely d u As the s which is b ut not penetrati n of the ri v water q u has been There ar e analyze d Highwa y 1.3.7.The LA C of Geno a west sh o communWiscons i (Populat i The are a includes Agricult u s e Boiling W Termination n 0 rtion of the y channeled s of flash fl o tance of 40 m n s along th e d records, t h o rt, Iowa, a b , excluding t wnstream.
Part of t hplant. T one to thse Boiling WTermination n 0 MYBP) the r it was buried is located consists of s and arche ssyncline, F oduring the L aplift and do winor tilting o The site is Wisconsin Atary strata i nults have b eaccording t oconditions iin the site r enuclear pow eny evidenc ety. Therefo ractivity (m accurred ov eissioning (9
R o wn users o 0 miles dow n Ground W w ater beneat h l ow Groun d i cation wit h rial likely fl o w ater is also ased on a r e g in support gradient. H o e to high ri v ite has vall e underlain byin valleys ng the Mou n v er valley fl o u ality of the no extensiv e onsite pot a d. Regional l y 35 with th e Environ s C BWR Faci l a (populatio n o re is Reno, i ty in Iowa i i n, an uninc o i on data is f r a within a f Houston C ure and for e W ater Reacto r Plan upland are along the h o ods have oc m iles down s e river are o he nearest m b out 195 m i the adjacent River water f river wate nriver. W ater H y d r h the site is d Surface (h the adjace n o ws toward slikely to fl o e view of th e of the Ge n o wever, the r ver stages an e y sand ov e y Mount Si mcharacteriz e nt Simon la y oor. Use o f deep aquif e e withdraw a a ble and gr o ly, there ar e e water table s and Natur lity is 17 mi l n about 260
)Surface WCBWR site iity of the si tu Chien, ap pThe valley w alittle or no aands betwe eand meande rnd where t rare wooded.
)Minnesota , i s New Albi n orporated h a rom 2013 C i five-mile ra d C ounty, Mi n estry are th e r a contribut e highway an d curred at th e stream of th e o btained fro m major city u i les downst rfossil plant
n channel o fated by the Ute) the river iof 20 miles, he licensed herefore, d rhe south, so Water Reacto rPlan iver had car vby post-gla cwithin the a vast are as. Major st rorest City b aate Pre-Cam bwn-warping aoccurred dur ilocated on t hArch, a sou tn the vicinit yeen mappedo the criteri ain the site v iegion, but iner plant site se of capabl re, capable agnitudes r aer 180 mil e). Water Hydris in the Mi te, the valle yproximatel yalls rise sha ragricultural en river ch aring river c hributary stre The flat u pf the river v aUSACE for nis nearly fo uthen gradu aarea (27 acainage at t hthat only p r  ved a gorge cial sedime nCentral Sta ba of large cructural fea tasin, Michi gbrian and E aalso occurr eing and foll ohe southwes thward proj y dip less th ad in the site a in 10 CFR icinity that rnvestigation ss in the regi oe faulting.
,at the Lansi n r for indust r r olo gy first encou n (BGS) and nt Mississip p s the west a n o w towards e groundwa t n oa 3 fossil re are some d flooding.
faulting do eanging from es from thrology ssissippi Ri vy is deeply cy 40 miles s orply 500 to 6use of the r iannels and ehannels. N uams interce ppland areas aaries greatly navigational ur miles wi dally widens acres) is on ae site has berecipitation 1-4 as much as nt. ble Region circular upl itures inclu dgan Basin, a narly Paleozo ed during lat owing the P lt flank of th eection of t han 20 feet pe rregion. N o100, Appe nrepresent ha zs of all of th eon, in additi o Additiona es not need 3.5 to 5.4) e site and ver valley a ncut into high louth, the va l600 feet fro miver valley fextensions oumerous sho rpt the mai nand some of tin width ab opurposes.
erlaying a l a mon sandsto n e d by sub-yer flow to t h fwater from e rs is poorer al of water a n o undwater m e five dom e encountere d al Resourc e l es south of t). The near
Ade. Below t has the river aa filled in a reen establis hthat falls o n150 to 210 tectonic pr oifts and se dde the Wisc ond Illinois Boic (more th ate Paleozoic leistocene ge Wisconsi nhe Wiscons ir mile to th eone of thes endix A. Per zard to the fese faults d uon to studie sally, the ar eto be consi that has b edid not ind is relati vly dissected lley varies bm river level floor which of low lyin grt, steep-sid en river vall ethe tributar yove and bel oAbove Dam he site, the r iapproaches Drea south o fhed. One vn the bluff afeet deeper ovince. T hdimentary b aonsin DomeBasin. Thes an 435 MYB(330 MYBPlaciations (
, an uninco r n (pop. 513
2n Dome and in Dome.
)amlet, is sit u i ty-Data.co m dius is pre d n nesota, a n e predomin a 1-5 es to runoff d railroad t o e site. e site, virtu a m ground w u sing river w r eam. The n , is the stea m n g plant is u rial purpose s n tered at dep tthe water p i River.
e southwest.
G n d discharg ethe west bu t t er elevatio nstation, it a periods wh e a yer of Eau ne, wells ha v layers of M he surface i nthese artesithan that f r n d no signi fi m onitoring w estic wells s d from 20 t o e s the City of Lest commu n r porated ha m), located fi v u ated five m m) (9). dominantly i nd a small a nt land us e directly ac r o prevent i n ally all muni c water. On t h w ater for d nearest use m-power pla n used for con d s between L ths ranging table aqu i G roundwate r es into the M ut then may n measurem e a ppears tha t e re the gra d Claire san d v e been dri v M ount Sim o ndicating an ian aquifers rom shallo w ficant decrea wells which a s outh of th e o 45 feet BG La Crosse a n n ity (three m mlet of abo u ve miles so u m iles south o i n Vernon C portion o f e s in Vern o ross the sit e n terference w c ipal water s he basis of direct huma n of river w a n t in Lansin g denser cool i LACBWR s i from appro x ifer is in r in the shal l M ississippi R turn and fl o e nts collect e t there is a dients are re v d stone of t h v en in areas on sandsto nartesian he a has been li m w aquifers.
e faults are the US NRfacility. Nu muring the co us for the LA ea is one odered in th eeen noted b eimpact pla nvely flat (se euplands. F rbetween 2.5  
Ase in the art e are periodic e LACBWR S. nd a mile so u m iles to the n u t 350 peo p uthwest of t h of the plant o County, Wi s fAllamake e on County a e. This run o with traffic.
. consists pri mg flood pla ied valleys h ey. Both wy valleys are ow the site.
s upplies for readily ava i n consumpt i ater for ind u g , Iowa, ab o ing. There a i te and Prai r ximately 15 strong hyd r low deposit R iver. The d ow parallel t e d during r o slight dow n v ersed and t h e Cambria nclosest to t h n e. Deep ad about the m ited becau s A s a result, esian head. ally sample d R site and e a uth of the V i northwest) o ple. The n e he plant. Vi c o n the east s s consin, bu t e County, I a s well as i n off is  No cities ilable i on is ustrial o ut 15 a re no r ie du to 25 r aulic s and eeper t o the o utine nward t his is n Age h e site wells level se the there d and a st of i llage o n the e arest ctory, s hore. t also I owa. n the La Cros s License T Revisio n neighbo rCounty's and mar s of the co u The pri m years, t hagricult u woodlan d hardwooA mode s through ointensity-commer c and less related t o nonagric u east of L A Land in t within a bottoml a portion o site, occ uto the ea s Refuge b for 2.5 mincludin g 26 and h o Approxi m water ar e The five populati o 1.4.O Key stat iAllis-perf oDair y turbi nAllis-Initi a s e Boiling W Termination n 0 ring countie sgross area i s hlands is c l unty's gross mary agricul t h ere has be e ural land to  
No. 8 (abo uiver is relati vDam No. 9, f the origin avalley drains adjacent to tthan can b ehe Central Sasins, and be and Arch, e structures BP). P to 240 M Y2 MYBP to 0the western For this r econsidered RC, "There amerous faul turse of vali dCBWR, havof relativel ye analysis o etween 197 5nt operatio ne Figure 1-4rom La Cro sand 4.5 mi lmarily of m in cut by p ave been c uwalls of the cultivated.
: d. The fore s ds. s t amount o o ut Vernon C-use catego r ce, public, t r than 0.3%
A series of ut 0.75 mile vely narrow33 miles so ual Genoa-1 s to the nort hthe site and e seen Stable broad Lake were YBP). 0.001 flank eason, to be are no ts are dating ve not y low f this 5 and ns or 4). In sse to les in arshy onds, ut into main dams north  for a uth of steam h and on a La CrossLicense TRevisionsmall popresentlyproblemsFor a dis and townpublishedDavenpopurposesmiles dowother knoChien, 401.3.6.Groundwfeet Belcommun fill mate rgroundwriver. B samplingvertical glikely duAs the s which is but not penetrati nof the ri vwater quhas been There areanalyzedHighway1.3.7.The LACof Genoawest shocommunWisconsi(PopulatiThe areaincludes
o the proc e ultural indu ACBWR. t he vicinity o a five-mile a nds include d of the Villa g upies less th a s t and north e bottomland a m iles. Rou g g vacation h o useboats a r m ately 3.5 s e a and refu g-mile radiu s o n is 522.
 
O perational ion mileston
Agricultuse Boiling WTermination n 0 rtion of the y channeled s of flash fl otance of 40 mns along th ed records, t hort, Iowa, a b, excluding twnstream.
-Chalmers, u ormed startu p y lan d entere d n e-generato r-Chalmers d al Criticality W ater Reacto r Plan s on the w e is agricultu r l assified as uarea (10).
Rown users o 0 miles dow nGround Wwater beneat hlow Groundication wit hrial likely fl owater is also ased on a r eg in support gradient. H oe to high ri vite has vall eunderlain byin valleys ng the Mou nver valley fl ouality of the no extensiv e onsite pot ad. Regional ly 35 with th eEnvironsCBWR Facila (populatio nore is Reno, ity in Iowa iin, an uninc oion data is f ra within a fHouston Cure and for eWater Reacto rPlan upland are along the hoods have oc miles down se river are ohe nearest mbout 195 m ithe adjacent River water f river wate nriver. Water Hydrh the site is d Surface (h the adjace nows toward slikely to fl oeview of th eof the Ge nowever, the rver stages an ey sand ov ey Mount Si mcharacteriz ent Simon la yoor. Use o f deep aquif ee withdraw aable and gr oly, there ar ee water table s and Natur lity is 17 mi ln about 260
tural activit y en a marke woodland.
)Minnesota
s ts yield su b f sandstone C ounty. Fur t ries of resi d ransportatio n of gross a r e ssing of a g stries of th e o f the LAC Bradius, ap p d in the Up p ge of Geno a a n 100 acre s e ast consisti n a nd water s u g hly a third oomes and b o r e moored a tquare miles ge bottomla n s includes a Back g rou nes are prese n u nder contr a p of the LA C d into a con t r for produc t d ockets appl i achieved:
,is New Albi norporated h arom 2013 C ifive-mile ra dCounty, Mi nestry are th er a contribut ehighway an dcurred at th estream of th eobtained fro mmajor city uiles downst rfossil plant
J r e st side of t r e and wood l u ndevelope d y is dairy f a d trend to w About two-bstantial am oand limest o t her, 85% o f dential and p n , and utiliti e r ea. Local gricultural a n e industrial p BWR Site is proximately p er Mississi p a , the only s
,at the Lansi nr for indust rrology first encou n(BGS) and nt Mississip ps the west a now towards e groundwa tnoa 3 fossil re are some d flooding.
: s. The near e ng of small t urface, lying of the area r o athouses, a t several poi n of Iowa are n d, althoug h a portion of n d n ted in Cha p act with the A CBWR fro m tact to purc h t ion of elect r ication for c o J uly 11, 196 7 1-6 t he Mississi l ands. Abo u d. Total de v arming, me a ward the co
erlaying a l amon sandsto ned by sub-yer flow to t hfwater from ers is poorer al of water a noundwater me five dom e encountere dal Resourc eles south of t). The near
-fifths of th e o unts of oa k o ne quarryi n f the develo p p ark land.
, an uninco rn (pop. 513
T e s) account f industry c o n d forest p r park in Vir o overwhelm i one third ppi River Wubstantial c o e st residenc e trailer parks mainly in M remains un d are scattered n ts at times d within the L h there is s o the incorp o pter 2 of this A EC, desig n m 1962 to 19 6 hase steam f r r icity: June 1 o nstruction:
)amlet, is sit uity-Data.co mdius is pre dnnesota, a ne predomin a1-5 es to runoff d railroad t oe site. e site, virtu am ground wusing river wream. The n, is the stea mng plant is urial purpose sntered at dep tthe water pi River.
7 , i ppi River.
Gnd discharg ethe west bu tter elevatio nstation, it aperiods wh eayer of Eau ne, wells ha vlayers of Mhe surface i nthese artesithan that f rnd no signi fimonitoring westic wells sd from 20 t oes the City of Lest commu nrporated ha m), located fi vuated five mm) (9). dominantly ind a small ant land us edirectly ac ro prevent i nally all muni cwater. On t hwater for d nearest use m-power pla nused for con ds between Lths ranging table aqu iGroundwate res into the Mut then may n measurem eappears tha tere the gra dClaire san dve been dri vMount Simondicating an ian aquifers rom shallo wficant decrea wells which asouth of th eo 45 feet BG La Crosse a nnity (three mmlet of abo uve miles so umiles south oin Vernon Cportion o f es in Vern oross the sit enterference wcipal water she basis of direct huma nof river w ant in Lansin gdenser cool iLACBWR sifrom appro xifer is in r in the shal lMississippi Rturn and fl oents collect et there is a dients are re vdstone of t hven in areas on sandsto nartesian he ahas been li mw aquifers.
u t 3.4%, co n veloped lan d at animals, a nversion o f e total land k and lesser q n g also take p ed land in V The more i n for less tha n o nsists alm o r oducts. O oqua, Wisc o i ngly rural a is accoun t Wildlife and F o mmunity i n e s to the LA C and reside n Minnesota, e x der cultivati o d along the s during the y LACBWR f ome agricul t orated town s LTP. The m n ed, fabricat e 6 7, rom the nuc l 1 962, November 5 Nearly 90%nsisting mai d accounts f o a nd crop fa r f Vernon Cin farms i s quantities o f e s place at a V ernon Co u ntensive la n n 15% of tot a o st exclusiv e O ne notable o nsin locate d a nd undevel o t ed for by Fish Refug e n the five m C BWR Site nces on smal l xtend west o o n. A few d s horeline ne a year. five-mile ra d tural use o n of New A l m ajo r miles t e d, construc t lear plant to 5, 1962, % of the V e nly of wate r or less than rming. In rounty's ma r s now devo t f maple and a number o f u nty is in th e n d uses (ind u a l develope d e ly of oper a exception i d 25 miles t o ped. Of th e water are a e. The deve l m ile radius o are within a l acreages.
Ase in the art eare periodic e LACBWR S. nd a mile so umiles to the nut 350 peo puthwest of t hof the plant oCounty, Wi sfAllamakeeon County ae. This run owith traffic.
of the react o d ozen resid e a r State Hig dius. Most o n the botto m l bin, whose t ones are:
supplies for readily ava in consumpt iater for ind ug, Iowa, ab oing. There aite and Prai rximately 15 strong hyd rlow deposit River. The d ow parallel ted during r oslight dow nversed and t he Cambria nclosest to t hne. Deep ad about the mited becau sAs a result, esian head. ally sample dRsite and e auth of the V inorthwest) ople. The n ehe plant. Vi con the east ssconsin, bu te County, Ias well as i noff is  No cities ilable ion is ustrial out 15 are no rie du to 25 raulic s and eeper to the outine nward this is n Age he site wells level se the there d and ast of illage on the earest ctory, shore. t also Iowa. n the La CrossLicense TRevisionneighborCounty's and marsof the co uThe primyears, thagricultuwoodlandhardwooA modesthroughointensity
t ed and operate a ernon r area 6.6% r ecent r ginal ted to other fsites e low-ustry, d land a tions i s the t o the e area a and l oped of the a mile or site ences, hway f it is mland. total La Cros s License T Revisio nLow Prov iProv iLAC BFina lCom p The reac 96,274.6 The unit The LA C Turbine Storage Tare curreand met a Vessel. holds fiv 1.5.P 1.5.1.The LT Plicense a with the Safety Aamendm e The sub s 1.5.2.LTP Ch a and exte nremain asite char adetermi n The LA C Field Wo August 2 b asis for specifie d (MARS S change t h s e Boiling W Termination n 0 power testi n i sional Ope r i sional Ope r BWR perm a l reactor def u p letion of f utor was crit i hours. Th eavailability C BWR unit B uilding, 1 B T ank Vault, ntly underg o allic radioac t The ISFSI, e above-gro u P lan Summ a General I P describes t h and to relea srequire m en t A nalysis Re p e nt that esta b s ections bel o Site Cha r a pter 2 disc u n t of radioa c at the time o acterization, n ed to be im p C BWR Radi o Wo rk (11) a n 2 015 Field W dividing th e d in NURE G S IM) (13) f o he original c W ater Reacto r Plan ng complete d rating autho r rating Licen s a nently shut u eling was c u el loading i n ical for a to t e total gross factor was 6 consists o f B Diesel G e Ventilation o ing decom m t ive equipm e l ocated sou t und Dry St o a r y I nformatio n he process u se the site f o t s in 10 CF R p ort (DSA R blishes the c o w provide a racterizatio u sses the site c tive conta m of license te r Solutions w p acted by th e ological Ch a n d LACBW R W ork (12) p e site into s u G-1575, Mu o r classific a classificatio n r d:  Septemb e r ization issu e s e, DPRA-4 5 down:  Apr i completed o n nto the ISFS t al of 103,2 8 electrical e n 6 2.9%. f major buil enerator Bui lStack, Lo w m issioning (e nt has bee n th of the Ge n o rage Casks w n used to meet or unrestric t R 50.82(a)(9 R). The LT P criteria for w a brief sum m n characteriz a m ination on s i rmination, s o w ill plan re m e operation o aracterizati o R Radiologi c rovided the urvey units.
-commercand less related t ononagricueast of L ALand in twithin abottomlaportion osite, occ uto the ea sRefuge bfor 2.5 mincluding26 and hoApproximwater areThe five populatio1.4.OKey statiAllis-perfoDairyturbinAllis-Initiase Boiling WTermination n 0 ring countie sgross area ishlands is c lunty's gross mary agricul there has be eural land to  
: d. The fore sds. st amount o out Vernon C-use catego rce, public, t rthan 0.3%
o the proc eultural indu ACBWR. the vicinity oa five-mile ands include dof the Villa gupies less th ast and north ebottomland amiles. Rou gg vacation houseboats a rmately 3.5 s ea and refu g-mile radiu son is 522.
Operational ion mileston
-Chalmers, uormed startu pyland enteredne-generato r-Chalmers dal Criticality Water Reacto rPlan s on the w eis agricultu rlassified as uarea (10).
tural activit yen a marke woodland.
sts yield su bf sandstone County. Fur tries of resi dransportatio nof gross a ressing of a gstries of th eof the LAC Bradius, ap pd in the Up pge of Geno aan 100 acre seast consisti nand water s ughly a third oomes and b ore moored a tquare miles ge bottomla ns includes aBackgrounes are prese nunder contr ap of the LA Cd into a con tr for produc tdockets appl iachieved:
Jr est side of tre and wood lundevelope dy is dairy f ad trend to wAbout two
-bstantial am oand limest other, 85% o fdential and pn, and utiliti erea. Local gricultural a ne industrial pBWR Site is proximately per Mississi pa, the only s
: s. The near eng of small turface, lying of the area roathouses, at several poi nof Iowa are nd, althoug ha portion of nd nted in Cha pact with the ACBWR fromtact to purc htion of elect rication for c oJuly 11, 196 71-6 the Mississi lands. Abo ud. Total de varming, me award the co
-fifths of th eounts of oa kone quarryi nf the develo ppark land.
Tes) account findustry c ond forest p rpark in Vir ooverwhelm ione third ppi River Wubstantial c oest residenc etrailer parks mainly in Mremains un dare scattered nts at times d within the Lh there is s othe incorp opter 2 of this AEC, desig nm 1962 to 19 6hase steam f rricity: June 1onstruction:
7, ippi River.
ut 3.4%, co nveloped lan dat animals, anversion o fe total land k and lesser qng also take ped land in VThe more i nfor less tha nonsists alm oroducts.
Ooqua, Wisc oingly rural ais accoun tWildlife and Fommunity i nes to the LA Cand reside nMinnesota, e xder cultivati od along the sduring the yLACBWR fome agricul torated town s LTP. The mned, fabricat e67, rom the nuc l1962, November 5Nearly 90
%nsisting mai d accounts f oand crop fa rf Vernon Cin farms i squantities o fes place at aVernon Countensive la nn 15% of tot aost exclusiv eOne notable onsin locate dand undevel oted for by Fish Refug en the five mCBWR Site nces on smal lxtend west oon. A few dshoreline ne ayear. five-mile ra dtural use o nof New Almajor milested, construc tlear plant to 5, 1962, % of the V enly of wate ror less than rming. In rounty's ma rs now devo tf maple and a number o f unty is in th end uses (ind ual develope dely of oper aexception id 25 miles toped. Of th ewater are ae. The deve lmile radius oare within al acreages.
of the react odozen resid ear State Hig dius. Most o n the botto mlbin, whose tones are:
ted and operate a ernon r area 6.6% recent rginal ted to other fsites e low-ustry, d land ations is the to the e area a and loped of the a mile or site ences, hway f it is mland. total La CrossLicense TRevisionLow ProviProviLACBFinalCompThe reac96,274.6  
 
The unit The LACTurbine Storage Tare curreand metaVessel.
holds fiv 1.5.P1.5.1.The LTPlicense awith the Safety AamendmeThe subs1.5.2.LTP Chaand extenremain asite char adeterminThe LACField WoAugust 2basis for specified(MARSSchange thse Boiling WTermination n 0 power testi nisional Ope risional Ope rBWR permal reactor def upletion of f utor was crit ihours. Th eavailability CBWR unit Building, 1 BTank Vault, ntly underg oallic radioac tThe ISFSI,  
 
e above-gro uPlan SummaGeneral IP describes t hand to relea srequirementAnalysis Re pent that esta bsections bel oSite Charapter 2 disc unt of radioa cat the time oacterization, ned to be im pCBWR RadioWork (11) an2015 Field Wdividing th ed in NUREGSIM) (13) f ohe original cWater Reacto rPlan ng complete drating autho rrating Licen sanently shut ueling was cuel loading i nical for a to te total gross factor was 6consists o fB Diesel G eVentilation oing decom mtive equipm elocated sou tund Dry St oary Informatio nhe process use the site f ots in 10 CF Rport (DSARblishes the cow provide aracterizatio usses the site ctive conta mof license te rSolutions wpacted by th eological Ch and LACBWRWork (12) pe site into s uG-1575, Muor classific aclassificatio nr d:  Septemb erization issu ese, DPRA-4 5down:  Apr icompleted o nnto the ISFS tal of 103,2 8electrical e n62.9%. f major buil enerator Bui lStack, Lo wmissioning (
ent has bee nth of the Ge norage Casks wn used to meet or unrestric tR 50.82(a)(
9R). The LT Pcriteria for wa brief sum mn characteriz amination on s irmination, s owill plan re me operation oaracterizati oR Radiologi crovided the urvey units.
ulti-Agency ation. Data n of an area
ulti-Agency ation. Data n of an area
,1-7 er 1967, ed (DPRA-65 issued:  A uil 30, 1987, n June 11, 1 9I was comp l87.5 hours.
, 1-7 e r 1967, e d (DPRA-6 5 issued:  A u i l 30, 1987, n June 11, 1 9 I was comp l 8 7.5 hours.
nergy gener adings and slding, Wast ew Specific Asee Figure 1n removed si nnoa 3 fossil with 333 sp ethe require mted use. Th
n ergy gener a d ings and s lding, Wast e w Specific A see Figure 1 n removed si n n oa 3 fossil w ith 333 sp e the require m ted use. Th
: 9) and is su bP submittal when change smary of the o tation that h aite prior to r oils, and gr omediation an dof LACBWRon Survey Rcal Charac tfoundation The surve yRadiation from subs e, within the 6): October 3ugust 28, 19 987, and leted on Se p The 50 M Wated was 4.
: 9) and is su b P submittal w hen change s m ary of the o t a tion that h a ite prior to r oils, and gr o m ediation an d of LACBW R o n Survey R c al Charac t foundation The surve y Radiation from subs e , within the 6): October 3 u gust 28, 19 9 87, and l eted on Se p The 50 M W a ted was 4.
0structures s ue Treatmen tActivity (LS A1-3). Inter mnce 2007, i nstation, be cent fuel ass ements for te rhe LTP has bbmitted as ais accomp as to the LT Pther seven c has been cond uremediation, ound water.
0 structures s u e Treatmen t A ctivity (LS A 1-3). Inter m n ce 2007, i n station, be c e nt fuel ass e ments for te r he LTP has b bmitted as ais accomp a s to the LT P t her seven c h a s been cond u remediation, o und water.
d Final Rad iR. Report for Oterization Sufor further y units were Survey an dequent char arequiremen t31, 1969, 73,  ptember 19, 2We generat o047 Gigawa tuch as the Rt Building, UA) building amittent syste mncluding the came operat iemblies. rminating th ebeen prepar a supplemen tanied by a P require pri ohapters of t hducted to det eincluding s t Based on tiation Surve yOctober an d Survey Repo site charac tevaluated a gd Site Inve sacterization ts of this L T2012. or was on li ntt-Hours (G WReactor Bui lUndergroun dand others wms dismantl eReactor Pr eional in 201 2e 10 CFR P aed in accor dt to the De fuproposed li cor NRC app rhe LTP. ermine the ntructures th athe results oys (FRS) in dNovember rt for June terization a ngainst the c rstigation M amay be us TP, up to th ene for WH). lding, d Gas which ement essure 2 and art 50 dance fueled cense roval. nature at will of the areas 2014 thru nd the riteria anual ed to e time La CrossLicense TRevisionof FRS, remediat1.5.3.LTP ChainformatiA desA sumEstimAn esdispoDescrSolutionsin NUREFacilitie saccordanRadioactadministrActivitie than thodecommioperatingThe info sections remainin1.5.4.LTP Chdecommiin 10 CFremediatThe selecof contamsurfaces.
d Final Rad i R. Report for O terization Su for further y units were Survey an d e quent char arequiremen t 31, 1969, 73,  ptember 19, 2 W e generat o 0 47 Gigawa t u ch as the R t Building, U A) b uilding a mittent syste m n cluding the came operat i emblies. rminating th e b een prepar a supplemen t a nied by a P require pri o h apters of t h d ucted to det eincluding s t Based on t i ation Surve y October an d S urvey Repo site charac t evaluated a g d Site Inve s a cterization ts of this L T 2 012. o r was on li n tt-Hours (G W R eactor Bui l U ndergroun d a nd others w m s dismantl e Reactor Pr e i onal in 201 2 e 10 CFR P a ed in accor d t to the De fu proposed li c o r NRC app r h e LTP. ermine the n tructures th a the results o y s (FRS) in d November rt for June terization a n gainst the c r s tigation M amay be us TP, up to th e ne for WH). l ding, d Gas w hich ement essure 2 and a rt 50 d ance fu eled cense roval. n ature a t will of the areas 2014 thru nd the r iteria a nual ed to e time La Cros s License T Revisio n of FRS, remediat 1.5.3.LTP Ch ainformat iA de sA su mEsti mAn e s disp oDesc r Solution s in NUR E Facilitie s accorda n Radioac tadminist r Activitie than th o decomm i operatin g The info sections remaini n 1.5.4.LTP C h decomm i in 10 C Fremediat The sele c of conta m surfaces.at backg rcontami n structura standard other m e Derived s e Boiling W Termination n 0 as long as t i on in the a r Identific a a pter 3 iden t i on provide d scription of t mmary of r a m ates of ass o stimate of t h osal, and r iptions of p s is decom m E G-0586, G s , Suppleme n n ce with th e tive Waste r ative, work s conducte d o se conduc t i ssioning a c g activities t h rmation pro of the LT P ng dismantle m Remedia hapter 4 di s i ssioning to F R 20.1402 ion activitie cted remedi a m ination.
at backgrcontaminstructura
T  Very limit e r ound level s n ation has b l surfaces i and press u e thods. Su rConcentrati W ater Reacto r Plan t he classific a rea. a tion of Re m tifies the re m d in Chapter t he areas an d diological c o ociated occu p h e types and p roposed co n missioning L G eneric Env i nt 1, Volum e e Solution sProgram, control and during dec o t ed during ctivities is b h at occurre d vided in C h P and prov i ment activit i tion Plans scusses the reduce resi
 
: d. This cha p s on the Ra d ation metho d T he princip a e d soil cont a s or a small b een identi f i nclude sca b re washing, r face and s u on Guideli n r a tion reflec t m ainin g Sit e m aining site 3 includes:
standard  
d equipmen t onditions th a p ational rad i quantities o ntrol mecha n LACBWR i n ironmental I e 1, (14).
 
T s Safety a nOff-Site Ddecommiss i ommissioni n plant ope r b ounded b y d during maj o h apter 3 sup p ides suffici e ies. various r e d ual contam i pter also d i diation Prote d s used are d al materials amination is fraction of fied to dat e b bling and wiping, g r u bsurface s o ne Level (D C 1-8 ts the level o e Dismantl edismantle m t that need f u at may be e n i ation dose, f radioactiv e nisms to ens u n accordanc e I mpact Sta t The decom m n d Health P D ose Calc u ioning impl e n g do not p o r ations. T y previousl y or maintena n p o rts the as s e nt detail t o emediation i nation to le v scusses the ction Progr a dependent u p that may b expecte d; a n the drinkin g e. Remedi a shaving, c h r it blasting, o il with acti v C GL) will b of residual a ement Acti v m ent and dec urther reme d n countere d , e material g e u re areas ar e e with the D t ement on D m issioning a c Program, R a u lation M a ementation p o se any grea t T he radiol o y analyzed r n ce and out a sessment o f o identify r techniques vels that co m ALARA e v am. pon the con t be subject t n y noted gr o g water sta n ation techni h ipping, sp omechanical v ity levels i b e removed activity exi s v ities contaminati o d iation, e nerated for e not re-con t D ECON alte r D ecommissi o c tivities wil l a diation Pro t a nual (OD C p rocedures.
other meDerived se Boiling WTermination n 0 as long as tion in the a rIdentific aapter 3 iden tion provide dscription of tmmary of r amates of ass ostimate of t hosal, and riptions of ps is decommEG-0586, Gs, Suppleme nnce with th etive Waste rative, work s conducte d ose conduc tissioning a cg activities t hrmation pro of the LT Png dismantle mRemediahapter 4 di sissioning to FR 20.1402 ion activitie cted remedi amination.
t er radiolog i ogical risk radiological age activitie s fimpacts co n r esources n ethat may m ply with t h v aluation a n taminated m to remediati o undwate r s a n dards; and ques that m o nge and a fracturing i n excess o f and dispos e s ting prior t o o n activities. release and taminated.
T  Very limit eround level snation has bl surfaces iand press uethods. Su rConcentrati Water Reacto rPlan the classific area. ation of Re mtifies the re md in Chapter the areas an ddiological c oociated occu phe types and proposed co nmissioning LGeneric Env int 1, Volum ee SolutionsProgram, control and during dec oted during ctivities is bhat occurre dvided in C hP and prov iment activit ition Plans scusses the reduce resi
r native des c o ning of N u l be conduc t tection Pro g C M), and  i cal or safet yassociated risk for f o s. nsidered in eeded durin gbe used d h e release c r nd the imp a m aterial and e on are stru c amples haveno surface w m ay be use d a brasive bla and cutting f the appro p e d as radio a o any  The cribed uclear t ed in g ram, plant y risk with ormer other g the d uring riteria a ct of e xtent ctural  been w ater d for sting, , and priate active La Cros s License T Revisio n waste. excavat o environ m adequat e 1.5.5.LTP Ch a package s of a Fi nremaini ndemonst r use spec i The FR S Objectiv e assessm e that are i ISFSI, w 1.5.6.LTP C hcomplia n unrestric t scenario sanalysis, exposur e LTP Ch acontami n work to w Argonne code to dlicense t e 1.5.7.LTP Ch areleasin g with the 1.5.8.LTP Ch a significa nterminat i CFR 50.s e Boiling W Termination n 0 Soil remedirs. Reme d mental contr o erosion, se d Final Ra d a pter 5 pres e s , and instru c n al Status S n g building r ate that the i fied in 10 C S Plan desc r e s (DQO), s u e nt and com p identified a s w hich will sti Complia n hapter 6 pr e n ce with th e t ed use. Ch s , exposure DCGLs a n e complianc e a pter 6 use s n ation and r w ards and b eNational L a determine t h ermination.
: d. This cha ps on the Ra dation metho dThe princip aed soil cont as or a small been identi finclude sca bre washing, rface and s uon Guideli nr ation reflec tmaining Sitemaining site 3 includes:
Update o a pter 7 pr o g the site fo rfunds curre n Supplem a pter 8 upd a n t environ m ion activitie s82(a)(9)(ii)(W ater Reacto r Plan ation equip m diation of s o o l procedur e diment, and d iation Sur v e nts the FR S c tions to pe r urvey (FSSbasements.
d equipmen tonditions th apational rad iquantities o ntrol mecha nLACBWR inironmental Ie 1, (14).
LACBWR f C FR 20.1402 ribes the de v urvey meth o p liance. T h s impacted.
Ts Safety anOff-Site Ddecommiss iommissioni nplant ope rbounded byd during maj ohapter 3 sup pides suffici eies. various r edual contam ipter also d idiation Prote ds used are dal materials amination is fraction of fied to dat ebbling and wiping, g rubsurface s one Level (D C1-8 ts the level oe Dismantl edismantle mt that need f uat may be e niation dose, f radioactiv enisms to ens un accordanc eImpact Sta tThe decommnd Health P Dose Calcuioning impl eng do not p orations.
ll remain a l nce with th e e sents the e radiologi c apter 6 disc u pathways, n d Dose Fa c e scenario a n s radiologi c radioactivity e verified b y a boratory R E h e radiologi c o f the Site-S p o vides an u p r unrestricte d n tly availabl e ent to the E a tes the Env i mental imp a s. This sect G). In acco r r m ent will i n o ils will in c e s, as well air emissio n v e y Plan S Plan whic h rform the F R) for open  The FRS f acility and s (e.g. annua l velopment o o ds and inst r h e FRS Plan The adjac eicensed are a e Radiolo g i c radiologica l c al criteria f usses the sit e computati o ctors, the d e n d evaluatio n cal informatconcentrat i y the FSS o r E Sidual R A cal release c pecific Dec o p dated esti m d use. This e in the dec o E nvironmen ironmental R a cts associa t i on of the L r dance with 1-9 nclude, but c lude the u s as appropri a n controls d u h will be us e R S of the L Aland areas Plan desc r site comply l dose limit o of the surve y rumentation
Ty previousl yor maintena nports the as sent detail t oemediation ination to le vscusses the ction Progr adependent u p that may bexpected; anthe drinkin ge. Remedi ashaving, c hrit blasting, oil with acti vCGL) will bof residual aement Acti vment and dec urther reme dncountered,e material g eure areas ar ee with the Dtement on Dmissioning a cProgram, R aulation Maementation pose any grea tThe radiol oy analyzed rnce and out asessment o f o identify rtechniques vels that co mALARA evam. pon the con tbe subject tny noted gr og water sta nation techni hipping, sp omechanical vity levels ibe removed activity exi svities contaminati odiation, enerated for e not re-con tDECON alte rDecommissi octivities wil ladiation Pro tanual (ODCprocedures.
, addresses ont areas th a a , will not b e cal Criteria l informati o f or license e-specific i n onal model s e rivation of n of alternat iion from C i on levels t h r STS discu s ADioactive m criteria for r o mmissioni n m ate of the chapter als o o mmissioni n tal Report R eport for L t ed with t h L TP is prepa r 10 CFR 51 not be li m s e of establ i ate work p a uring soil re m ed to develo A CBWR site and a Sou r ribes the fi nwith radiol o of 25 mrem y plan, sur v , data collec t o nly LACB W at are classi f e subject to F a for Licens e on and metermination n ventory of r s used for area factor i ve exposur e C hapter 2 a n h at Chapter s sed in Cha p m aterials (R E remaining s t ng Costs e remaining o compares t n g trust fun d LACBWR w he site's d e ared pursuan
ter radiolog iogical risk radiological age activitie sfimpacts co nresources n ethat may mply with t hvaluation a ntaminated mto remediati oundwater sandards; and ques that monge and a fracturing in excess o fand dispos esting prior t oon activities. release and taminated.
.53(d), Sol u mited to, ba cished exca v ackage instr u m ediation.
rnative des coning of N ul be conduc ttection Pro gCM), and  ical or safet yassociated risk for f os. nsidered in eeded durin gbe used dhe release c rnd the imp amaterial and eon are stru camples haveno surface wmay be use dabrasive bla and cutting f the appro ped as radio ao any  The cribed uclear ted in gram, plant y risk with ormer other g the during riteria act of extent ctural  been water d for sting, , and priate active La CrossLicense TRevisionwaste. excavatoenvironmadequate1.5.5.LTP Chapackagesof a Finremainindemonstruse speciThe FRSObjectiveassessmethat are iISFSI, w1.5.6.LTP Chcomplianunrestric tscenariosanalysis,  
o p the site p
 
: r. The FRS P rce Term S nal survey o gical criter i to AMCG p v ey design a t ion and pr o WR structur e f ied as non-i F RS. e Terminat i e thods used and releas e radionuclidedose mod e rs, the basis e scenarios.
exposureLTP Chacontaminwork towArgonne code to dlicense t e1.5.7.LTP Chareleasingwith the 1.5.8.LTP Chasignifica nterminatiCFR 50.se Boiling WTermination n 0 Soil remedirs. Reme dmental contr o erosion, se dFinal Radapter 5 pres es, and instru cnal Status S ng building rate that the ified in 10 CS Plan desc res (DQO), s uent and com pidentified a swhich will sti Complianhapter 6 pr ence with th eted use. Ch s, exposure DCGLs ane complianc eapter 6 use snation and rwards and b eNational L adetermine t hermination.
n d establish4 remediat i pter 5. Sol u E SRAD) v7.tructures a ndecommis sthe estimat e d. w ith new inf o ecommissio n nt to 10 CF R u tions consi d c k and trac k vation safet y uctions to e n rocedures, s u P lan is com p S urvey (ST S process us e i a for unrest r p lus ALAR A a nd Data Q u ocessing, an d e s and land impacted a n i on to demon e of the si ts, future la n e ling, sens ifor the se les the allo w ion method s u tions appli e.0 dose mo d n d soils to e n s ioning cos t ed remainin g ormation an d n ing and li c R 51.53(d) a n ders Chapte r k hoe y and nsure u rvey p rised S) for e d to ricted A). uality d data areas n d the strate t e for n d use i tivity lected w able s will e d the d eling n able ts for g cost d any c ense n d 10 r 8 to La Cros s License T Revisio n be a su pimpacts a LTP ChNUREG-referenc e that the adverse e environ m LACB W have res u Environ mNUREG-1.6.R Solution s LACB Wdocume n Decomm R evision LTP in a LTP, wi t 50.82(a)(Solution s conditio n NRC ap pReq uResuDetr a deco mDecr e Clas s notif iIncr emini mIncr e level an in vCha n test, oIncr e s e Boiling W Termination n 0 pplement to associated wapter 8 co m-0586, whic h e nuclear fa cenvironme n e ffects outs i mental imp a W R dated D e u lted in no m ental Ass e-0191 relate d R e g ulator y N s is submitti W R spans a p n tation is u n issioning P l March 201 4 accordance w t hout prior N (6), and 10 C s is also su b n that estab l p roval. Cha n u ires Commi lts in signifi a cts or nega t mmissionin g e ases a surv e s 2 to Class 3 i cation prio rases the DC m um detect aases the rad i(or corresp o vestigation o n ges the stat i or ases the Ty p W ater Reacto r Plan the Enviro n w ith the exec u mpares the h provides a c ility. The ntal effects f i de the bou n a cts was do e cember 19 8significant essment in d to operati o Notification ng the LTP period that i n nique in th a l an and Pos t 4 (15) whic h w ith 10 CF R N RC appro v C FR 50.82(a bmitting a p r lishes the c r nges to the L ssion appro vcant enviro n t es the reaso n g , e y unit area 3; or Class 1 r to impleme GLs (or de c able concent r ioactivity le v o nding sour c occurs), istical test a p p e I decisio n r nmental Re p u tion of the described a generic en venvironme n f or decom m n ds of NU R cumented i n 8 7. LACB Wenvironme n support of o n of LACB W s of Chan ge as a supple m ncludes sev e at the requ i t-Shutdown D h serves as t R 50.71(e).
Update oapter 7 pr og the site fo rfunds curre nSupplemapter 8 upd ant environ mion activitie s82(a)(9)(ii)(
val, in acco a)(7). r oposed am e riteria for d L TP require val pursuant nmental imp a nable assur aclassificati o to Class 3 w nting the ch c reases dose rations (for b vel, relative ce term inve n p plied to on e n erro r. 1-10 p ort addressi described d edecommissi vironmental n tal assess m m issioning L A R EG-0586. n a supple m W R decom m n tal impact the Augus t W R, dated A e s ment to the D eral decom m i red safety a D ecommissi o t he DSAR fo Once appro vrdance wit h endment to tetermining w prior NRC a to 10 CFR 5 a cts not pre v a nce that ad e o n (i.e., imp a w ithout pro v a nge in clas s factors fro m b oth scan a nto the appli c ntory levels e other than t ing the actu a ecommissio n oning attri bassessment f m ent perfor m ACBWR a r Review of m ent to th e missioning a not previo u t 7, 1991, A pril 21, 19 8 D SAR. Be c m issioning r eanalyses ar e o ning Activ i f or LACBW R v ed, Soluti o h the criteri a the LACB W when chan g approval wh 5 0.59, v iously revi e e quate funds a cted to not i viding NRC sification, m the Basem e nd fixed me a c able derive din the Base m t he Sign tes t a l or potent i ning activiti butes to th o f or the deco m m ed by Sol u re minimal a post-operat e Environm and disman t usly evaluat Decommis s 8 0. c ause the li c e gulation ch a e included ities Report R. Solutio n ons may ma k a in 10 CF R WR license t h g es to the L en the chan g e wed,  will be ava i impacted, C la minimum e nt Fill Mo d asurement m d concentra t m ent Fill M o t or Wilcox o ial environ m es. ose identifi e mmissionin g utions deter m and there a r ing license  
Water Reacto rPlan ation equip mdiation of s ool procedur ediment, and diation Sur vents the FR Sctions to pe rurvey (FSSbasements.
LACBWR fCFR 20.1402 ribes the de vurvey meth opliance. T hs impacted.
ll remain a l nce with th eesents the e radiologi capter 6 disc upathways, nd Dose Fa ce scenario a ns radiologi cradioactivity e verified b yaboratory R Ehe radiologi cof the Site-S povides an u pr unrestricte dntly availabl eent to the Eates the Env imental imp as. This sect G). In acco rr ment will i noils will in ces, as well air emissio nvey Plan S Plan whic hrform the F R) for open  The FRS facility and s (e.g. annua lvelopment oods and inst rhe FRS Plan The adjac eicensed are ae Radiologicradiologica lcal criteria fusses the sit ecomputati octors, the d end evaluatio ncal informatconcentrat iy the FSS o rESidual RAcal release cpecific Dec opdated esti md use. This e in the dec oEnvironmen ironmental Racts associa tion of the Lrdance with 1-9 nclude, but clude the u sas appropri an controls d uh will be us eRS of the L Aland areas Plan desc rsite comply l dose limit oof the surve yrumentation
,addresses ont areas th aa, will not b ecal Criteria l informati ofor license e-specific i nonal model serivation of n of alternat iion from Cion levels t hr STS discu sADioactive mcriteria for rommissioni nmate of the chapter als oommissioni ntal Report Report for Lted with t hLTP is prepa r10 CFR 51 not be li mse of establ iate work p auring soil re med to develo ACBWR site and a Sou rribes the fi nwith radiol oof 25 mrem y plan, sur v, data collec tonly LACBWat are classi fe subject to Fa for Licens eon and metermination nventory of rs used for area factor ive exposur eChapter 2 a nhat Chapter ssed in Cha pmaterials (R Eremaining s tng Costs e remaining o compares tng trust fun dLACBWR whe site's d eared pursuan
.53(d), Sol umited to, ba cished exca vackage instr umediation.
op the site p
: r. The FRS Prce Term Snal survey ogical criter ito AMCG pvey design ation and pr oWR structur efied as non-iFRS. e Terminat iethods used and releas eradionuclidedose moders, the basis e scenarios.
nd establish4 remediat ipter 5. Sol uESRAD) v7.tructures a ndecommissthe estimat ed. with new inf oecommissio nnt to 10 CF Rutions consi dck and trac kvation safet yuctions to e nrocedures, s uPlan is com pSurvey (ST Sprocess us eia for unrest rplus ALARAand Data Q uocessing, an des and land impacted a nion to demone of the si ts, future la neling, sens ifor the se les the allo wion method sutions appli e.0 dose mo dnd soils to e nsioning cos ted remainin gormation an dning and li cR 51.53(d) a nders Chapte rk hoe y and nsure urvey prised S) for ed to ricted A). uality d data areas nd the strate te for nd use itivity lected wable s will ed the deling nable ts for g cost d any cense nd 10 r 8 to La CrossLicense TRevisionbe a supimpacts aLTP ChNUREG-referencethat the adverse eenvironmLACBWhave resuEnvironmNUREG-1.6.RSolutionsLACBWdocumenDecommRevision LTP in aLTP, wit50.82(a)(SolutionsconditionNRC appRequResuDetradecomDecreClassnotifiIncreminimIncrelevel an invChantest, oIncrese Boiling WTermination n 0 pplement to associated wapter 8 co m-0586, whic he nuclear fa cenvironme neffects outs imental imp aWR dated D eulted in no mental Ass e-0191 relate dRegulatory Ns is submitti WR spans a pntation is u nissioning P lMarch 201 4accordance wthout prior N(6), and 10 Cs is also su bn that estab lproval. Cha nuires Commi lts in signifi acts or nega tmmissionin geases a surv es 2 to Class 3ication prio rases the DC mum detect aases the rad i(or corresp ovestigation onges the stat ior ases the Ty pWater Reacto rPlan the Enviro nwith the exec umpares the h provides acility. The ntal effects fide the bou nacts was do ecember 19 8significant essment in d to operati oNotification ng the LTP period that i nnique in th alan and Pos t4 (15) whic hwith 10 CF RNRC approvCFR 50.82(
abmitting a p rlishes the c rnges to the Lssion appro vcant enviro ntes the reaso ng, ey unit area 3; or Class 1 r to impleme GLs (or de cable concent rioactivity le vonding sour coccurs),
istical test a ppe I decisio nr nmental Re pution of the described a generic en venvironme nfor decommnds of NURcumented i n87. LACBWenvironme nsupport of on of LACB Ws of Chan geas a supple mncludes sev eat the requ it-Shutdown Dh serves as tR 50.71(e).
val, in acco a)(7). roposed am eriteria for d LTP require val pursuant nmental imp anable assur aclassificati o to Class 3 wnting the ch creases dose rations (for bvel, relative ce term inve npplied to on en error. 1-10 port addressi described d edecommissi vironmental ntal assess mmissioning L AREG-0586.
n a supple mWR decommntal impact the Augus tWR, dated Aes ment to the Deral decom mired safety aDecommissi othe DSAR foOnce appro vrdance wit hendment to tetermining wprior NRC ato 10 CFR 5acts not pre vance that ad eon (i.e., imp awithout pro vange in clas sfactors fro mboth scan a nto the appli cntory levels e other than ting the actu aecommissio noning attri bassessment fment perfor mACBWR arReview of ment to th emissioning anot previo ut 7, 1991, April 21, 19 8DSAR. Becmissioning r eanalyses ar eoning Activ ifor LACBWRved, Soluti oh the criteri athe LACBWwhen changapproval wh 50.59, viously revi eequate funds acted to not ividing NRC sification, m the Basem end fixed me acable derive din the Base mthe Sign tes tal or potent ining activiti butes to th ofor the deco mmed by Sol ure minimal apost-operat e Environm and disman tusly evaluat Decommiss80. cause the li cegulation ch ae included ities Report R. Solutio nons may ma ka in 10 CF RWR license t hges to the Len the chan gewed,  will be ava iimpacted, C la minimum ent Fill Mo dasurement md concentra tment Fill M ot or Wilcox o ial environ mes. ose identifi emmissionin gutions determand there a ring license  


ental Repo rtlement acti ved in the Nsioning Ord censing hist oanges, the Din the LAC(D-Plan/PS Dns will upda tke changes tR 50.59, 10 hat adds a li cLTP require ge:  ilable for lass 1 to Cl a14 day del) and rela tmethods),
ental Repo r tlement acti ved in the N s ioning Ord censing hist o anges, the Din the LA C (D-Plan/PS D n s will upda t k e changes t R 50.59, 10 hat adds a li c L TP require g e:  ilable for lass 1 to Cl a 14 day d el) and rela t m ethods), t ion guideli n o del), at wh i o n Rank Su m m ental e d in g of a m ined r e no stage rt for vities NRC's er or ory of D SAR C BWR D AR) te the to the CFR cense prior a ss 2; t ed n e i ch m La Cros s License T Revisio n The con t Gerard P Vice Pre LaCross e S4601 S t Genoa, W (224) 78 9 gpvanno o 1.7.R 1. L A L 2. U C 2 3. U f o 4. U r e C 5. L P 6. w 7. w 8. D D9. h t10. 2 11. E S 12. E S 13. U R 14. U S N s e Boiling W Termination n 0 act for LTP P. van Noor d sident, Reg u e Solutions, L t ate Road 3 5 W I. 54632-8 8 9-4025  ordennen@e n References Letter from D A pplication f L icense Ame U.S. Nuclear C ontent of L i 011. U.S. Nuclear o r Evaluatin g U.S. Nuclear elated to Op e C ooperative
tion guideli nodel), at wh ion Rank Su mmental ed in g of a mined re no stage rt for vities NRC's er or ory of DSAR CBWR DAR) te the to the CFR cense prior ass 2; ted ne ich m La CrossLicense TRevisionThe contGerard PVice PreLaCrosseS4601 StGenoa, W(224) 789gpvannoo 1.7.R1. LAL2. UC23. Ufo4. UreC5. LP6. w7. w8. DD9. ht10. 211. ES12. ES13. UR14. USNse Boiling WTermination n 0 act for LTP P. van Noor dsident, Reg ueSolutions, Ltate Road 3 5WI. 54632-8 89-4025  ordennen@e nReferences Letter from DApplication fLicense Ame U.S. Nuclear Content of L i011. U.S. Nuclear or Evaluatin gU.S. Nuclear elated to Op eCooperative
-Letter from Dlanning for I w ww.wunde r www.mvp.w c Dairyland Po Decommissi o t tp://www.c i 008 Vernon E nergySoluti urvey Repo r E nergySoluti urvey Repo r U.S. Nuclear Radiation Su r U.S. Nuclear tatement on November 2 0 W ater Reacto r Plan informatio n d ennen ulatory Affa i L LC 5 8 46 n ergysolutio n D airyland P o f or Order A pndments, d aRegulatory i cense Term iRegulatory g Nuclear P oRegulatory e ration of t h- April 1980 D airyland P o I SFSI, LAC r ground.co m c.usace.arm y wer Cooper a o ning Plan, r ity-data.co m County Ta x ons GG-EO-rt for Octob e ons LC-RS-r t for June t hRegulatory r vey and Sit eRegulatory Decommis s 0 02. r  n , including a i rs ns.com o wer Cooper p proving Li c a ted October Commissio n i nation PlanCommissio n o wer React oCommissio n he La Crosse . ower Compa n-14029, Ma r m. y.mil/projec t a tive, LaCr o r evised Nov e m/city/Geno a x Assessme n-313196-R S e r and Nove m PN-164017-h ru August 2Commissio n e Investigat iCommissio n s ioning of N u 1-11 any submitt e ative to the N cense Trans fe 8, 2015.
-Letter from Dlanning for Iwww.wunderwww.mvp.wcDairyland Po Decommissi ottp://www.c i008 Vernon EnergySoluti urvey Repo rEnergySoluti urvey Repo rU.S. Nuclear Radiation Su rU.S. Nuclear tatement on November 2 0Water Reacto rPlan informatio ndennen ulatory Affa iLLC 5 846 nergysolutio nDairyland P ofor Order A pndments, d aRegulatory icense Term iRegulatory g Nuclear P oRegulatory eration of t h- April 1980 Dairyland P oISFSI, LAC rground.co mc.usace.arm ywer Cooper aoning Plan, rity-data.co mCounty Ta xons GG-EO
n , Regulato r s for Nucle a n NUREG-1 or License T e n NUREG-0 Boiling W a n y to the N u r ch 10, 200 8 ts/Lock 8.
-rt for Octob eons LC-RS-rt for June t hRegulatory rvey and Sit eRegulatory Decommiss002. r  n, including airs ns.com ower Cooper pproving Li cated October Commissio nination PlanCommissio nower React oCommissio nhe La Crosse  
. ower Compa n-14029, Ma rm. y.mil/projec tative, LaCr orevised Nov em/city/Geno ax Assessme n-313196-RSer and Nove mPN-164017
-hru August 2Commissio ne Investigat iCommissio nsioning of N u1-11 any submitt eative to the Ncense Trans fe8, 2015.
n, Regulato rs for Nucle an NUREG-1or License T en NUREG-0Boiling W any to the N urch 10, 200 8ts/Lock 8.
osse Boiling ember 2003.
osse Boiling ember 2003.
a-Wisconsin
a-Wisconsin
.nt Rolls.
.n t Rolls.
S-RP-001, L Amber 2014 F-001, LACB2015 Field Wn, NUREG-1ion Manual (n NUREG-0uclear Facil ied changes aNuclear Re gfer and Conf ory Guide 1.1ar Power Re a1700, Revisi oermination P0191, Final Eater Reactor uclear Regul
S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W n, NUREG-1 i on Manual (n NUREG-0 u clear Facil i e d changes a N uclear Re g fe r and Conf o r y Gui d e 1.1 a r Power Re a 1 700, Revisi oermination P 0 191, Final E ater Reactor u clear Regul
: 8. Water Rea
: 8. Water Rea c.  .html. A CBWR R a Field Work  
: c.  .html. ACBWR RaField Work  
-B WR Radiol o W ork - Nov e 1575, Revis i (MARSSI M 0 586, Gener i ities, Suppl e a nd updates, g ulatory Co m forming Ad m 79, Standar d actors, Revi s o n 1, Stand a P lans - Apr i Environmen t by Dairyla n atory Com m c tor (LACB W a diological C- Novembe r o gical Char a ember 2015.
-BWR Radiol oWork - Nov e1575, Revis i(MARSSIM0586, Gener iities, Suppl eand updates, gulatory Co mforming Adm79, Standar dactors, Revi son 1, Stand aPlans - Apr iEnvironmen tby Dairyla natory Com mctor (LACB Wadiological C- Novemberogical Char aember 2015.
i on 1, Multi
ion 1, Multi
-M), August 2 0 i c Environ m ement 1, Vo l is: mmission, ministrative d Format an d s ion 1 - Jun e ard Review P i l 2003. tal Stateme n n d Power m ission, Sub j W R) C haracteriza t r 2015. a cterization
-M), August 2 0ic Environ mement 1, Vo lis: mmission, ministrative d Format an dsion 1 - Jun eard Review Pil 2003.
   -Agency 0 00. mental Impac t lume 1 - d e P lan n t ject: t ion t La Cros s License T Revisio n 15. D D s e Boiling W Termination n 0 Dairyland Po Decommissi o W ater Reacto r Plan wer Cooper a o ning Activi t r a tive, LAC B ties Report (1-12 B WR Deco m (D-Plan/PS D mmissioning D AR), Revi s Plan and P o s ion - Marc h o st-Shutdow n h 2014. n La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r ure 1-1 S 1-13  S ite Re g ion a a l Location
tal Stateme nnd Power mission, Sub jWR) Characteriza tr 2015. acterization
   -Agency 000. mental Impac tlume 1 - d e Plan nt ject: tion t La CrossLicense TRevision15. DDse Boiling WTermination n 0 Dairyland Po Decommissi oWater Reacto rPlan wer Cooper aoning Activi tr ative, LAC Bties Report (1-12 BWR Decom(D-Plan/PS Dmmissioning DAR), Revi sPlan and P osion - Marc host-Shutdow nh 2014. n La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Figr ure 1-1 S1-13  Site Regionaal Location


La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan r  Figure 1-21-14 2 Site Ovverview LLRLa Crosse Boili nLicense Termin Revision 0 ng Water Reac tation Plan or Figure 1-3 1-15 LACBWR Buuildings La CrossLicense TRevisionse Boiling WTermination n 0 Water Reacto rPlan Fir igure 1-41-16 Topographhical Map}}
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r  Figure 1-2 1-14 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 1-3 1-15 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r ig ure 1-4 1-16 Topo g rap h hical Map}}

Revision as of 06:48, 8 July 2018

La Crosse Boiling Water Reactor License Termination Plan - Chapter 1 - General Information, Rev 0
ML16200A085
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A085 (19)


Text

LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION

La Cros s License T Revisio n 1.Ge n 1.1.1.2.1.3.1.3.1.3.

1.3.

1.3.4 1.3.

1.3.

1.3.1.4.1.5.1.5.

1.5.

1.5.

1.5.4 1.5.

1.5.

1.5.

1.5.1.6.1.7.

Figure 1-Figure 1-Figure 1-Figure 1- s e Boiling W Termination n 0 n eral Inform a Purpose .....Decommis s Facility ......

1.Site D e 2.Curren t 3.Meteo r 4.Geolo g 5.Surfac e 6.Groun d 7.Enviro nOperationa l Plan Sum m 1.Gener a 2.Site C h 3.Identif i 4.Reme d 5.Final R 6.Compl i 7.Updat e 8.Supple m Regulatory References

-1Site R e-2Site O v-3LACB W-4Topog r W ater Reacto r Plan a tion ...........

...................

s ioning Obj e...................

e scription ....

t/Future La n r ology and C g y and Seis m e Water Hy d d Water Hy d ns and Natu r l Backgroun dary .............

al Informati o haracterizati o i cation of R e diation Plans R adiation Su r i ance with t h e of the Site-m ent to the ENotificatio n...................

e gional Loc a v erview .......

W R Buildin g r aphical Ma p r TABLE O...................

....................

.e ctive ..........

....................

....................

.nd Use ........

.Climatology

.m ology ........

.d rology .......

.d rology .......

.r al Resourc e d ................

....................

.o n ................

.o n ...............

.emaining Si t..................

.rvey Plan ...

.h e Radiolog i Specific De c Environme n n s of Chang e...................

.LIST O a tion ............

....................

.g s ...............

.p .................

.1-i OF CONT E...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.e s ................

....................

....................

....................

....................

.te Dismantl e...................

....................

.i cal Criteria c ommission ntal Report ..

.e s ................

....................

.O F FIGUR E...................

....................

....................

....................

.E NTS ...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.ement Activ i...................

....................

.for License ning Costs ...

....................

....................

....................

.R ES ...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.i ties ............

....................

....................

.Terminatio n...................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

....................

.n .................

....................

....................

....................

....................

....................

....................

....................

....................

.... 1-1... 1-1... 1-1... 1-2... 1-2... 1-3... 1-3... 1-3... 1-4... 1-5... 1-5... 1-6... 1-7... 1-7... 1-7... 1-8... 1-8... 1-9... 1-9... 1-9... 1-9. 1-10. 1-11. 1-13. 1-14. 1-15. 1-16 La Cros s License T Revisio nALARA AMCG AMSL BGS DCGL DQO DSAR FSS FRS GWH ISFSI LACB W LSA LTP MARSS I MYBP NRC ODCM PSDAR RESRA D STS USACE s e Boiling W Termination n 0 As L o Aver a Abov e Belo w Deriv Data Q Defu e Final Final Giga w Indep WR La C r Low S Licen I M Multi-Milli o Nucl e Off-S Post-S D RESi d Sour c US A r W ater Reacto r Plan LIST OF o w As Reas o a ge Member e Mean Sea w Ground S u ed Concent r Q uality Obj e eled Safety A Status Surv e Radiation S u watt-Hours endent Spe n r osse Boilin g S pecific Actse Terminat i-Agency Ra d o n Years Be f ear Regulato r i te Dose Ca l S hutdown D d ual RADio a e Term Sur v rmy Corp o f r ACRONY M o nably Achi eof the Criti c Level u rface r ation Guide ectives A nalysis Re p e y urvey n t Fuel Stor a g Water Rea civity i on Plan diation Sur v f ore Present ry Commis s l culation M aecommissio a ctive Mate r v ey f Engineers 1-ii M S AND A B e vable c al Group line Level p ort age Installati o c to r v ey and Site ion a nual ning Activi t rials B BREVIA T on Investigatio ties Report TIONS n Manu a l La Cros s License T Revisio n 1.G The La C that is o w located o Village o LACB W S4601 S t Genoa, W The site i for LAC B LACB W spent nu clicense. In a let t requeste dmainten afrom Da i Solution s 1.1.P The objepermit t h 50 licen s general l i This Lic e was writ t f or Lice n R eview Paccomp a the LTP r 1.2.D The dec o LACB Wremaini n the requ idocume n that is d Average s e Boiling W Termination n 0 G eneral I n Crosse Boil i w ned by Dai r o n the Dair y o f Genoa, V e W R t ate Road 3 5 W I. 54632-8 8 i s licensed u B WR and 7 2 W R has been c lear fuel st t er dated O d Nuclear R a nce and d e i rylan d to S o s. P urpose ctive of dec o h e release o f s e except fo i cense prov i ense Termi n ten followi n n se Termina Plan for Eva a nied by a p r require NR C Decommissi o ommissioni n W R can sub m n g ISFSI lic e irements of n ts the proc e d istinguisha bMember of W ater Reacto r Plan n formatio n i ng Water R r yland Pow e yland Geno a e rnon Coun t 5 8 46 u nder Posse s 2-046 for th e shut down ored in the L October 8, 2 R egulatory C ecommissio n o lutions. I n ommissioni nthe site for ur the area s u i sions of 10 C n ation Plan (L n g the guida ntion Plans fo luating Nuc l r oposed lice n C prior appr o o nin g Ob j e c n g objectiv e m it a reques t ensed facilit y10 CFR 2 0 e ss that will ble from ba the Critical r n Reactor (LA C e r Cooperati a site on t h ty, Wisconsi n ssion Only L e Independe n since 1987 LACBWR I 2 015 (1), D Commission n ing authori t n May 2016, n g LACBW R unrestricted u rrounding t C FR 72 Su b LTP) satisfi e n ce in Reg u fo r Nuclear P l ear Power R nse amend m oval. ctive e is to con d t to the NR C y) in accord a 0.1402, R a d be used to dckground r a Group (A M 1-1 C BWR) wa ve (Dairyla n h e east shor e n with an a d License No.

D nt Spent Fu eand is curr e I SFSI will b D airylan d a n (NRC) co n t ies, under the NRC p r R is to redu c use and all o t he ISFSI.

b part K. es the requi r ulatory Gui d P ower Rea c R eactor Lic e ment that est duct remed i C for unres t a nce with S u diological C r d emonstrate adioactivity MCG) from a a s a 50 Me g nd). This u n e of the M i d dress of:

DPR-45 wit h el Storage I n e ntly under g be maintain e n d LaCross e n sent to tra n Possession r ovided con s c e the resid u o w for the te r The ISFSI f rement of 1 0 d e 1.179, St a c tors (2) an d e nse Termi nablishes the i ation and s tricted relea s u bpart E of 1 riteria for Uthat the do s does not e all applicabl e g awatt Elect r n it, also kno w i ssissippi R i h Docket N u nstallation (I g oing deco m e d under an e Solutions , n sfer Dairyl a Only Lice n s ent to tran s u al radioacti v rmination o f f acility is li 0 CFR 50.8 2 a ndard For m d in NURE G n ation Plans criteria for s urvey ope r s e of the si t 10 CFR Pa r t Unrestricte d se from resi d e xceed 25 m e pathways o ric (MWe) B wn as Geno a i ver south o umbers of 5 0 SFSI). mmissioningamended P a LLC (Solu t a n d's posse s n se No. DP R sfer the lice n vity to level f the 10 CF R censed und e 2 (a)(9). Thi s m at and Co n G-1700, Sta n (3). This Lwhen chan g rations suc h te (other th a t 20 after m e d Use. The d ual radioa c mrem/year t o o ver a 1,00 0 B WR a 2, is of the 0-409 . The a rt 50 tions) ssion, R-45, nse to s that R Part er the s LTP n tents n dard L TP is ges to h that a n the e eting LTP ctivity o the 0 year La Cros s License T Revisio n period a n Achieva b 1.3.F 1.3.1.LACB W Mississi p south of nearby p LACB Wmile 67 8 approxi m rail road (AMSL) B oiling W The lice n LACB W plant, of f and incl uthe the co aan a (G ean aa p a The site i Mississi pmiles up The site i 35. A B commer cthis rail

National LACB W and stur g LACB W s e Boiling W Termination n 0 nd that resid u ble" (ALA R F acilit y Site Des c W R is locate d ppi River, a b t he city of L prominent f WR are longi t 8.6 on the m ately 300 fe. The react o per NURE W ater R eact o n sed site c o WR comprisi n f of Highw a ude: LACBWR p land north o al (and later o area directl y e noa Statio n a rea south o arcel of lan d is bordered o ppi River a nstream, ma n is bordered o B urlington N cial freight aline. The sWildlife &WR, is the G e geon. On t h W R plant, is a W ater Reacto r Plan u al radioact i A). c ription d in south w bout 1 mile La Crosse, W features suc h t ude 91 o , 13'Mississippi feet from th e o r stands o n G-0191, E n or (4). omprises a n g only 1.5 a y 35. The p plant, of LACBW R o il) fueled p y south of L A #3) approx i f Genoa #3 w d to the east o o n the nort h nd Highway naged by th e o n the west b N orthern-San t along the ea s s ite is bord e& Fish Refu g enoa Natio n h e southwe s a public boa t r i vity has be e western Wis c south of th e W I. See Fig u h as high w', 53.35" W e River abo v e Mississipp i n filled land n vironmenta ltotal of 16 3 acres. The prominent f e R , including p ower plant (A CBWR wi t imately 175 w here the I S o f Highway h by the Mis s 35. The U

.e U.S. Arm y b y the Miss i ta Fe rail li n stern portio n e red to the s g e Pool 9 a n al Fish Hat c stern corner t launching r 1-2 e n reduced t o c onsin, in V e Village of ure 1-1 for a w ays, rivers est and latit u ve the mou t i River and at an eleva t l Statement 3.5 acres (5 site is acc e e atures on t hthe site swi t (removed in t h an operat ifeet from t h SFSI is loca t 35, across fr s issippi Riv e.S. Lock &

D y Corp of E n issippi Rive r ne, located b n of the site

s outh by a s area. Furth e chery whic hof the site

, ramp with a p o levels that V ernon Cou n fGenoa, WI map showi nand lakes.

u de 43 o , 33', t h of the O475 feet we t ion of 639 related to

5) which is essed by a r he site are s h t chyard and 1989), i onal 350-M h e LACBW R ted, and from LACB W er and a nar r D am No. 8 ngineers (U S r and is bor d between the
there are n segment of t e r south, a p h raises end a , approxim a parking lot. are "As Lo w n ty, on the e and appro x n g the site l o The map , 36.22" No r O hio River.

e st of the ca r feet Above Operation o owned by r oad on the h own in Fi gthe site of t h Mwe fossil g e R plant, W R. r ow strip of is located a SACE), Ro c d ered on the site and Hi g n o passenge r the Upper M pproximatel y angered mu s a tely 0.75 m w As Reaso n east shore o ximately 19 m ocation, incl u coordinat e r th. The sit e The reac t rgo-carryin g Mean Sea L of the La C Dairyland, south side o g ures 1-2 an he former G

-e nerating sta t land betwe e approximate l c k Island Di seast by Hig h g hway 35 c a r trains whic Mississippi R y 2.4 miles ssels, brook m iles south o n ably of the m iles u ding es for e is at t or is g-only L evel Crosse with of the n d 1-3 -1 t ion e n the ly 0.6 strict. h way a rries h use River from trout of the La Cros s License T Revisio n 1.3.2.The site the Gen o the pres e continue future la n The sp einterim establish 1.3.3.The La C in Geno a weather rdata incl uTemper a the extr e Average summer and 199 5 Monthly spring a n The blu ff shows p r winds f o LACB W average w 1.3.4.LACB W physiogr Pleistoc e early Pa l which h a area. M a Bedrock Wiscons i Present composi tdolomit e b oth sid e s e Boiling W Termination n 0 Current/has been c o oa 3 facility ence of the a as an indu s n d use, othe r e nt nuclear storage fa c ed and read y Meteoro l C rosse Mun i a maintain r elated info r u des: wind s a tures in the emes being temperatur e season. A r 5. The reco rprecipitati o nd summer s ff s of the Mi s revailing so u or the mont h W R Site whe r wind speeds Geolo gy WR is loca taphic prov i e ne Epoch a l eozoic age.

as been mo d aximum reli e in the site r in Dome b y[MYBP]) s t ion. The P s, sandston e es of the M i W ater Reacto r Plan F uture La n o ntinuously u and support ash landfills s trial-use pr o r than perha p fuel is exp e cility, or l i y to receive L l o gy and Cl icipal Airpo r long standi n rmation in t h s peed and di r La Crosse rmore mark e e s range fro m record maxi r d low was -

4 o n averages easons and o s sissippi Ri v utherly wind h s of Nove r e the river are typicall y and Seism o t ed within i nce. The a nd is chara c Moderate t dified by a m ef in the reg i r egion consi s y early Pal eedimentary Paleozoic ro c e s and shale s i ssissippi ri v r n d Use used for ind u ing operati o, as well as o perty after p s recreatio n ected to re m icensed te m LACBWR f i matolo gy rt located in ng active w he La Cross e rection, tem p r egion are t y e d because m 20 °F in t hmum temp e 4 3 °F in Jan u in the area one to three ver Valley c h s for seven m m ber th r ou g valley runs y 6-10 mph.

o lo gy the Wisc oWisconsin c terized by t o strong re l mantle of l o i on is about sts of Pre-C a e ozoic (Ca m strata. B a cks are 1,20

s. About 60 0 v er in the p l 1-3 u strial purp o o ns (e.g. bar g the on-site decommiss n al, can be e m ain at the mporary mo f uel. the town o f w eather stat i e - Genoa r e p erature, an d y pical of th e of the rive r he three mo e rature of 1 0 u ary of 187 3ranges fro minches per m hannel the w months of t h g h March o north-south onsin DriftlDriftless flat lying n lief has bee n o ess and gla c 1,000 feet.

ambrian cr y m brian and asement ro c 0-1,300 fee t 0 feet of thi s lant vicinit y o ses since 1 g e washing, ISFSI, it is s ioning is c o e nvisioned o ISFSI until o nitored ret r f La Crosse a i ons that m e gion of the d precipitati e extremes o r valley loc a o nths of the w 0 8 °F was r e 3. m three to f m onth for th e w inds at the L h e year with o f the year.are from t h less sectio nsection wa s naturally dis n produced o cial outwas h ystalline roc kOrdovician

, c ks in the s t thick in th s sequence i s y. Prior to t 941. Due t o switchyar d)anticipated ompleted.

N o ver the nex t a federal r e rievable st o a nd the US A m onitor and Mississippi on (6) (7).

of a contine ation of the winter seas o ecorded in J five inches p e rest of the LACBWR S prevailing n Predomin a h e north an d n of the C s not glac i s secte d sedi m o n the ungl a h in the lar g ks exposed a , 572 Milli o site vicinit y he site vicin i s exposed a l t he Pleistoc e o the prese n) on the pro p that the sit e No other cr e t several de c epository, o orage facili t ACE Lock 8 archive sta n River. Col lntal climat e LACBWR o n to 72 °F i J uly of both p er month i year. S ite. Airpor t n orth to nort h a nt winds a d south. M o Central Lo w i ated durin g mentary roc aciated land s ger valleys o a t the crest o on Years B y are of gr a i ty and cons l ong the blu f ene Epoch (nce of perty, e will edible cades. offsite ty is Dam n dard l ecte d e with Site. i n the 1936 i n the t data h west at the o nthly wland g the ks of scape of the of the B efore a nitic sist of f fs on (more La Cros s License T Revisio n than 2 M today. I t The site Region c syncline s Superior formed d Major u pSome m i MYBP). of the Wsedimen t Many fa u capable a geologic mapped i several n found a nseismici tsite" (8). Seismic 2008 o c decomm i 1.3.5.The LA Cthe vicin Prairie d u width. T There is land, isl a sloughs a the upla n channel aThe mai n are oper a of the si tdistance the site.

Part of t h plant. T one to t h s e Boiling W Termination n 0 M YBP) the r i t was buried is located c onsists of s and arche ssyncline, F o d uring the L a p lift and do w i nor tilting o The site is W isconsin A tary strata i n u lts have b e according t o conditions i i n the site r e n uclear pow e n y evidenc e t y. Therefo r activity (m a c curred ov e i ssioning (9

)Surface W C BWR site i ity of the si t u Chien, ap p T he valley w a little or no a a nds betwe e and meande r n d where t r a re wooded.

n channel o f a ted by the U te) the river iof 20 miles, he licensed herefore, d r h e south, so W ater Reacto r Plan i ver had car v by post-gla cwithin the a vast are a s. Major st r orest City b a a te Pre-Cam b w n-warping a o ccurred dur i located on t h Arch, a sou t n the vicinit y een mappe d o the criteri a i n the site v i egion, b ut i n er plant site s e of capabl r e, capable a gnitudes r a er 180 mil e). Water H y d r i s in the Mi t e, the valle y proximatel y alls rise sha r agricultural e n river ch a ring river c h ributary stre The flat u p f the river v a U SACE for n is nearly fo u then gradu a are a (27 a cainage at t h that only p r v ed a gorge c ial sedime n Central Sta b a of large c ructural fea t asin, Michi g br ian and E a a lso occurr e i ng and foll o h e southwes t hward proj y dip less th a d in the site a in 10 CFR icinity that r n vestigation s s in the regi o e faulting.

faulting do e anging from es from t h rolo gy ssissippi Ri v y is deeply c y 40 miles s o r ply 500 to 6 use of the r i a nnels and e h annels. N uams interce p pland areas a aries greatly navigational ur miles wi d a lly widens a c res) is on a e site has berecipitation 1-4 as much as n t. b le Region circular upl i tures inclu d g an Basin, a n a rly Paleozo e d during lat o wing the P l t flank of th e ection of t h a n 20 feet pe r region. N o100, Appe n r epresent ha z s of all of th e o n, in additi o Additiona e s not need 3.5 to 5.4) e site and v er valley a n c ut into high l outh, the va l 6 00 feet fro m i ver valley f e xtensions o umerous sho r pt the mai n and some of t in width ab o purposes.

A d e. Below t h a s the river a a filled in a r een establis hthat falls o n 150 to 210 tectonic pr o i fts and se d de the Wisc ond Illinois B o ic (more th a te Paleozoic leistocene ge Wisconsi n he Wiscons i r mile to th e o ne of thes e n dix A. Per zard to the f ese faults d u o n to studie s a lly, the ar e to be consi that has b edid not i nd is relati v ly dissected l ley varies b m river level floor which of low lyin g rt, steep-sid e n river vall e t he tributar y o ve and bel o Above Dam he site, the r i approaches D r ea south o f hed. One v n the bluff a feet deeper ovince. T h dimentary b a onsin Dom e Basin. Thes a n 435 MY B(330 MYB P laciations (2 n Dome and in Dome. e southwest.

e faults are the US N R f acility. Nu m u ring the co u s for the LA e a is one o dered in th e e en noted b e impact pla n v ely flat (se e uplands. F r b etween 2.5 . consists pri m g flood pla i e d valleys h e y. Both w y valleys are ow the site.

No. 8 (abo u iver is relati v Dam No. 9, f the origin a valley drains a djacent to t than can b e he Central S asins, and b e and Arch, e structures B P). P to 240 M Y 2 MYBP to 0 the western For this r econsidered RC, "There a m erous faul t u rse of vali d CBWR, ha v of relativel y e analysis o etween 197 5 nt operatio n e Figure 1-4 rom La Cro sand 4.5 mi l marily of m i n cut by p ave been c u walls of the cultivated.

A series of ut 0.75 mile vely narrow33 miles so u al Genoa-1 s to the nort h t he site and e seen S table broad Lake were YBP). 0.001 flank eason, to be are no t s are d ating ve not y low f this 5 and ns or 4). In sse to les in arshy onds, ut into main dams north for a u th of s team h and on a La Cros s License T Revisio nsmall p o presentl y problem s For a dis and tow n publishe d Davenp o purpose smiles do w other kn o Chien, 4 0 1.3.6.Ground w feet Be l commun fill mate r ground w river. B samplin g vertical glikely d u As the s which is b ut not penetrati n of the ri v water q u has been There ar e analyze d Highwa y 1.3.7.The LA C of Geno a west sh o communWiscons i (Populat i The are a includes Agricult u s e Boiling W Termination n 0 rtion of the y channeled s of flash fl o tance of 40 m n s along th e d records, t h o rt, Iowa, a b , excluding t wnstream.

R o wn users o 0 miles dow n Ground W w ater beneat h l ow Groun d i cation wit h rial likely fl o w ater is also ased on a r e g in support gradient. H o e to high ri v ite has vall e underlain byin valleys ng the Mou n v er valley fl o u ality of the no extensiv e onsite pot a d. Regional l y 35 with th e Environ s C BWR Faci l a (populatio n o re is Reno, i ty in Iowa i i n, an uninc o i on data is f r a within a f Houston C ure and for e W ater Reacto r Plan upland are along the h o ods have oc m iles down s e river are o he nearest m b out 195 m i the adjacent River water f river wate nriver. W ater H y d r h the site is d Surface (h the adjace n o ws toward slikely to fl o e view of th e of the Ge n o wever, the r ver stages an e y sand ov e y Mount Si mcharacteriz e nt Simon la y oor. Use o f deep aquif e e withdraw a a ble and gr o ly, there ar e e water table s and Natur lity is 17 mi l n about 260

)Minnesota , i s New Albi n orporated h a rom 2013 C i five-mile ra d C ounty, Mi n estry are th e r a contribut e highway an d curred at th e stream of th e o btained fro m major city u i les downst rfossil plant

,at the Lansi n r for indust r r olo gy first encou n (BGS) and nt Mississip p s the west a n o w towards e groundwa t n oa 3 fossil re are some d flooding.

erlaying a l a mon sandsto n e d by sub-yer flow to t h fwater from e rs is poorer al of water a n o undwater m e five dom e encountere d al Resourc e l es south of t). The near

, an uninco r n (pop. 513

)amlet, is sit u i ty-Data.co m dius is pre d n nesota, a n e predomin a 1-5 es to runoff d railroad t o e site. e site, virtu a m ground w u sing river w r eam. The n , is the stea m n g plant is u rial purpose s n tered at dep tthe water p i River.

G n d discharg ethe west bu t t er elevatio nstation, it a periods wh e a yer of Eau ne, wells ha v layers of M he surface i nthese artesithan that f r n d no signi fi m onitoring w estic wells s d from 20 t o e s the City of Lest commu n r porated ha m), located fi v u ated five m m) (9). dominantly i nd a small a nt land us e directly ac r o prevent i n ally all muni c water. On t h w ater for d nearest use m-power pla n used for con d s between L ths ranging table aqu i G roundwate r es into the M ut then may n measurem e a ppears tha t e re the gra d Claire san d v e been dri v M ount Sim o ndicating an ian aquifers rom shallo w ficant decrea wells which a s outh of th e o 45 feet BG La Crosse a n n ity (three m mlet of abo u ve miles so u m iles south o i n Vernon C portion o f e s in Vern o ross the sit e n terference w c ipal water s he basis of direct huma n of river w a n t in Lansin g denser cool i LACBWR s i from appro x ifer is in r in the shal l M ississippi R turn and fl o e nts collect e t there is a dients are re v d stone of t h v en in areas on sandsto nartesian he a has been li m w aquifers.

Ase in the art e are periodic e LACBWR S. nd a mile so u m iles to the n u t 350 peo p uthwest of t h of the plant o County, Wi s fAllamake e on County a e. This run o with traffic.

s upplies for readily ava i n consumpt i ater for ind u g , Iowa, ab o ing. There a i te and Prai r ximately 15 strong hyd r low deposit R iver. The d ow parallel t e d during r o slight dow n v ersed and t h e Cambria nclosest to t h n e. Deep ad about the m ited becau s A s a result, esian head. ally sample d R site and e a uth of the V i northwest) o ple. The n e he plant. Vi c o n the east s s consin, bu t e County, I a s well as i n off is No cities ilable i on is ustrial o ut 15 a re no r ie du to 25 r aulic s and eeper t o the o utine nward t his is n Age h e site wells level se the there d and a st of i llage o n the e arest ctory, s hore. t also I owa. n the La Cros s License T Revisio n neighbo rCounty's and mar s of the co u The pri m years, t hagricult u woodlan d hardwooA mode s through ointensity-commer c and less related t o nonagric u east of L A Land in t within a bottoml a portion o site, occ uto the ea s Refuge b for 2.5 mincludin g 26 and h o Approxi m water ar e The five populati o 1.4.O Key stat iAllis-perf oDair y turbi nAllis-Initi a s e Boiling W Termination n 0 ring countie sgross area i s hlands is c l unty's gross mary agricul t h ere has be e ural land to

d. The fore s ds. s t amount o o ut Vernon C-use catego r ce, public, t r than 0.3%

o the proc e ultural indu ACBWR. t he vicinity o a five-mile a nds include d of the Villa g upies less th a s t and north e bottomland a m iles. Rou g g vacation h o useboats a r m ately 3.5 s e a and refu g-mile radiu s o n is 522.

O perational ion mileston

-Chalmers, u ormed startu p y lan d entere d n e-generato r-Chalmers d al Criticality W ater Reacto r Plan s on the w e is agricultu r l assified as uarea (10).

tural activit y en a marke woodland.

s ts yield su b f sandstone C ounty. Fur t ries of resi d ransportatio n of gross a r e ssing of a g stries of th e o f the LAC Bradius, ap p d in the Up p ge of Geno a a n 100 acre s e ast consisti n a nd water s u g hly a third oomes and b o r e moored a tquare miles ge bottomla n s includes a Back g rou nes are prese n u nder contr a p of the LA C d into a con t r for produc t d ockets appl i achieved:

J r e st side of t r e and wood l u ndevelope d y is dairy f a d trend to w About two-bstantial am oand limest o t her, 85% o f dential and p n , and utiliti e r ea. Local gricultural a n e industrial p BWR Site is proximately p er Mississi p a , the only s

s. The near e ng of small t urface, lying of the area r o athouses, a t several poi n of Iowa are n d, althoug h a portion of n d n ted in Cha p act with the A CBWR fro m tact to purc h t ion of elect r ication for c o J uly 11, 196 7 1-6 t he Mississi l ands. Abo u d. Total de v arming, me a ward the co

-fifths of th e o unts of oa k o ne quarryi n f the develo p p ark land.

T e s) account f industry c o n d forest p r park in Vir o overwhelm i one third ppi River Wubstantial c o e st residenc e trailer parks mainly in M remains un d are scattered n ts at times d within the L h there is s o the incorp o pter 2 of this A EC, desig n m 1962 to 19 6 hase steam f r r icity: June 1 o nstruction:

7 , i ppi River.

u t 3.4%, co n veloped lan d at animals, a nversion o f e total land k and lesser q n g also take p ed land in V The more i n for less tha n o nsists alm o r oducts. O oqua, Wisc o i ngly rural a is accoun t Wildlife and F o mmunity i n e s to the LA C and reside n Minnesota, e x der cultivati o d along the s during the y LACBWR f ome agricul t orated town s LTP. The m n ed, fabricat e 6 7, rom the nuc l 1 962, November 5 Nearly 90%nsisting mai d accounts f o a nd crop fa r f Vernon Cin farms i s quantities o f e s place at a V ernon Co u ntensive la n n 15% of tot a o st exclusiv e O ne notable o nsin locate d a nd undevel o t ed for by Fish Refug e n the five m C BWR Site nces on smal l xtend west o o n. A few d s horeline ne a year. five-mile ra d tural use o n of New A l m ajo r miles t e d, construc t lear plant to 5, 1962, % of the V e nly of wate r or less than rming. In rounty's ma r s now devo t f maple and a number o f u nty is in th e n d uses (ind u a l develope d e ly of oper a exception i d 25 miles t o ped. Of th e water are a e. The deve l m ile radius o are within a l acreages.

of the react o d ozen resid e a r State Hig dius. Most o n the botto m l bin, whose t ones are:

t ed and operate a ernon r area 6.6% r ecent r ginal ted to other fsites e low-ustry, d land a tions i s the t o the e area a and l oped of the a mile or site ences, hway f it is mland. total La Cros s License T Revisio nLow Prov iProv iLAC BFina lCom p The reac 96,274.6 The unit The LA C Turbine Storage Tare curreand met a Vessel. holds fiv 1.5.P 1.5.1.The LT Plicense a with the Safety Aamendm e The sub s 1.5.2.LTP Ch a and exte nremain asite char adetermi n The LA C Field Wo August 2 b asis for specifie d (MARS S change t h s e Boiling W Termination n 0 power testi n i sional Ope r i sional Ope r BWR perm a l reactor def u p letion of f utor was crit i hours. Th eavailability C BWR unit B uilding, 1 B T ank Vault, ntly underg o allic radioac t The ISFSI, e above-gro u P lan Summ a General I P describes t h and to relea srequire m en t A nalysis Re p e nt that esta b s ections bel o Site Cha r a pter 2 disc u n t of radioa c at the time o acterization, n ed to be im p C BWR Radi o Wo rk (11) a n 2 015 Field W dividing th e d in NURE G S IM) (13) f o he original c W ater Reacto r Plan ng complete d rating autho r rating Licen s a nently shut u eling was c u el loading i n ical for a to t e total gross factor was 6 consists o f B Diesel G e Ventilation o ing decom m t ive equipm e l ocated sou t und Dry St o a r y I nformatio n he process u se the site f o t s in 10 CF R p ort (DSA R blishes the c o w provide a racterizatio u sses the site c tive conta m of license te r Solutions w p acted by th e ological Ch a n d LACBW R W ork (12) p e site into s u G-1575, Mu o r classific a classificatio n r d: Septemb e r ization issu e s e, DPRA-4 5 down: Apr i completed o n nto the ISFS t al of 103,2 8 electrical e n 6 2.9%. f major buil enerator Bui lStack, Lo w m issioning (e nt has bee n th of the Ge n o rage Casks w n used to meet or unrestric t R 50.82(a)(9 R). The LT P criteria for w a brief sum m n characteriz a m ination on s i rmination, s o w ill plan re m e operation o aracterizati o R Radiologi c rovided the urvey units.

ulti-Agency ation. Data n of an area

, 1-7 e r 1967, e d (DPRA-6 5 issued: A u i l 30, 1987, n June 11, 1 9 I was comp l 8 7.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

n ergy gener a d ings and s lding, Wast e w Specific A see Figure 1 n removed si n n oa 3 fossil w ith 333 sp e the require m ted use. Th

9) and is su b P submittal w hen change s m ary of the o t a tion that h a ite prior to r oils, and gr o m ediation an d of LACBW R o n Survey R c al Charac t foundation The surve y Radiation from subs e , within the 6): October 3 u gust 28, 19 9 87, and l eted on Se p The 50 M W a ted was 4.

0 structures s u e Treatmen t A ctivity (LS A 1-3). Inter m n ce 2007, i n station, be c e nt fuel ass e ments for te r he LTP has b bmitted as ais accomp a s to the LT P t her seven c h a s been cond u remediation, o und water.

d Final Rad i R. Report for O terization Su for further y units were Survey an d e quent char arequiremen t 31, 1969, 73, ptember 19, 2 W e generat o 0 47 Gigawa t u ch as the R t Building, U A) b uilding a mittent syste m n cluding the came operat i emblies. rminating th e b een prepar a supplemen t a nied by a P require pri o h apters of t h d ucted to det eincluding s t Based on t i ation Surve y October an d S urvey Repo site charac t evaluated a g d Site Inve s a cterization ts of this L T 2 012. o r was on li n tt-Hours (G W R eactor Bui l U ndergroun d a nd others w m s dismantl e Reactor Pr e i onal in 201 2 e 10 CFR P a ed in accor d t to the De fu proposed li c o r NRC app r h e LTP. ermine the n tructures th a the results o y s (FRS) in d November rt for June terization a n gainst the c r s tigation M amay be us TP, up to th e ne for WH). l ding, d Gas w hich ement essure 2 and a rt 50 d ance fu eled cense roval. n ature a t will of the areas 2014 thru nd the r iteria a nual ed to e time La Cros s License T Revisio n of FRS, remediat 1.5.3.LTP Ch ainformat iA de sA su mEsti mAn e s disp oDesc r Solution s in NUR E Facilitie s accorda n Radioac tadminist r Activitie than th o decomm i operatin g The info sections remaini n 1.5.4.LTP C h decomm i in 10 C Fremediat The sele c of conta m surfaces.at backg rcontami n structura standard other m e Derived s e Boiling W Termination n 0 as long as t i on in the a r Identific a a pter 3 iden t i on provide d scription of t mmary of r a m ates of ass o stimate of t h osal, and r iptions of p s is decom m E G-0586, G s , Suppleme n n ce with th e tive Waste r ative, work s conducte d o se conduc t i ssioning a c g activities t h rmation pro of the LT P ng dismantle m Remedia hapter 4 di s i ssioning to F R 20.1402 ion activitie cted remedi a m ination.

T Very limit e r ound level s n ation has b l surfaces i and press u e thods. Su rConcentrati W ater Reacto r Plan t he classific a rea. a tion of Re m tifies the re m d in Chapter t he areas an d diological c o ociated occu p h e types and p roposed co n missioning L G eneric Env i nt 1, Volum e e Solution sProgram, control and during dec o t ed during ctivities is b h at occurre d vided in C h P and prov i ment activit i tion Plans scusses the reduce resi

d. This cha p s on the Ra d ation metho d T he princip a e d soil cont a s or a small b een identi f i nclude sca b re washing, r face and s u on Guideli n r a tion reflec t m ainin g Sit e m aining site 3 includes:

d equipmen t onditions th a p ational rad i quantities o ntrol mecha n LACBWR i n ironmental I e 1, (14).

T s Safety a nOff-Site Ddecommiss i ommissioni n plant ope r b ounded b y d during maj o h apter 3 sup p ides suffici e ies. various r e d ual contam i pter also d i diation Prote d s used are d al materials amination is fraction of fied to dat e b bling and wiping, g r u bsurface s o ne Level (D C 1-8 ts the level o e Dismantl edismantle m t that need f u at may be e n i ation dose, f radioactiv e nisms to ens u n accordanc e I mpact Sta t The decom m n d Health P D ose Calc u ioning impl e n g do not p o r ations. T y previousl y or maintena n p o rts the as s e nt detail t o emediation i nation to le v scusses the ction Progr a dependent u p that may b expecte d; a n the drinkin g e. Remedi a shaving, c h r it blasting, o il with acti v C GL) will b of residual a ement Acti v m ent and dec urther reme d n countere d , e material g e u re areas ar e e with the D t ement on D m issioning a c Program, R a u lation M a ementation p o se any grea t T he radiol o y analyzed r n ce and out a sessment o f o identify r techniques vels that co m ALARA e v am. pon the con t be subject t n y noted gr o g water sta n ation techni h ipping, sp omechanical v ity levels i b e removed activity exi s v ities contaminati o d iation, e nerated for e not re-con t D ECON alte r D ecommissi o c tivities wil l a diation Pro t a nual (OD C p rocedures.

t er radiolog i ogical risk radiological age activitie s fimpacts co n r esources n ethat may m ply with t h v aluation a n taminated m to remediati o undwate r s a n dards; and ques that m o nge and a fracturing i n excess o f and dispos e s ting prior t o o n activities. release and taminated.

r native des c o ning of N u l be conduc t tection Pro g C M), and i cal or safet yassociated risk for f o s. nsidered in eeded durin gbe used d h e release c r nd the imp a m aterial and e on are stru c amples haveno surface w m ay be use d a brasive bla and cutting f the appro p e d as radio a o any The cribed uclear t ed in g ram, plant y risk with ormer other g the d uring riteria a ct of e xtent ctural been w ater d for sting, , and priate active La Cros s License T Revisio n waste. excavat o environ m adequat e 1.5.5.LTP Ch a package s of a Fi nremaini ndemonst r use spec i The FR S Objectiv e assessm e that are i ISFSI, w 1.5.6.LTP C hcomplia n unrestric t scenario sanalysis, exposur e LTP Ch acontami n work to w Argonne code to dlicense t e 1.5.7.LTP Ch areleasin g with the 1.5.8.LTP Ch a significa nterminat i CFR 50.s e Boiling W Termination n 0 Soil remedirs. Reme d mental contr o erosion, se d Final Ra d a pter 5 pres e s , and instru c n al Status S n g building r ate that the i fied in 10 C S Plan desc r e s (DQO), s u e nt and com p identified a s w hich will sti Complia n hapter 6 pr e n ce with th e t ed use. Ch s , exposure DCGLs a n e complianc e a pter 6 use s n ation and r w ards and b eNational L a determine t h ermination.

Update o a pter 7 pr o g the site fo rfunds curre n Supplem a pter 8 upd a n t environ m ion activitie s82(a)(9)(ii)(W ater Reacto r Plan ation equip m diation of s o o l procedur e diment, and d iation Sur v e nts the FR S c tions to pe r urvey (FSSbasements.

LACBWR f C FR 20.1402 ribes the de v urvey meth o p liance. T h s impacted.

ll remain a l nce with th e e sents the e radiologi c apter 6 disc u pathways, n d Dose Fa c e scenario a n s radiologi c radioactivity e verified b y a boratory R E h e radiologi c o f the Site-S p o vides an u p r unrestricte d n tly availabl e ent to the E a tes the Env i mental imp a s. This sect G). In acco r r m ent will i n o ils will in c e s, as well air emissio n v e y Plan S Plan whic h rform the F R) for open The FRS f acility and s (e.g. annua l velopment o o ds and inst r h e FRS Plan The adjac eicensed are a e Radiolo g i c radiologica l c al criteria f usses the sit e computati o ctors, the d e n d evaluatio n cal informatconcentrat i y the FSS o r E Sidual R A cal release c pecific Dec o p dated esti m d use. This e in the dec o E nvironmen ironmental R a cts associa t i on of the L r dance with 1-9 nclude, but c lude the u s as appropri a n controls d u h will be us e R S of the L Aland areas Plan desc r site comply l dose limit o of the surve y rumentation

, addresses ont areas th a a , will not b e cal Criteria l informati o f or license e-specific i n onal model s e rivation of n of alternat iion from C i on levels t h r STS discu s ADioactive m criteria for r o mmissioni n m ate of the chapter als o o mmissioni n tal Report R eport for L t ed with t h L TP is prepa r 10 CFR 51 not be li m s e of establ i ate work p a uring soil re m ed to develo A CBWR site and a Sou r ribes the fi nwith radiol o of 25 mrem y plan, sur v , data collec t o nly LACB W at are classi f e subject to F a for Licens e on and metermination n ventory of r s used for area factor i ve exposur e C hapter 2 a n h at Chapter s sed in Cha p m aterials (R E remaining s t ng Costs e remaining o compares t n g trust fun d LACBWR w he site's d e ared pursuan

.53(d), Sol u mited to, ba cished exca v ackage instr u m ediation.

o p the site p

r. The FRS P rce Term S nal survey o gical criter i to AMCG p v ey design a t ion and pr o WR structur e f ied as non-i F RS. e Terminat i e thods used and releas e radionuclidedose mod e rs, the basis e scenarios.

n d establish4 remediat i pter 5. Sol u E SRAD) v7.tructures a ndecommis sthe estimat e d. w ith new inf o ecommissio n nt to 10 CF R u tions consi d c k and trac k vation safet y uctions to e n rocedures, s u P lan is com p S urvey (ST S process us e i a for unrest r p lus ALAR A a nd Data Q u ocessing, an d e s and land impacted a n i on to demon e of the si ts, future la n e ling, sens ifor the se les the allo w ion method s u tions appli e.0 dose mo d n d soils to e n s ioning cos t ed remainin g ormation an d n ing and li c R 51.53(d) a n ders Chapte r k hoe y and nsure u rvey p rised S) for e d to ricted A). uality d data areas n d the strate t e for n d use i tivity lected w able s will e d the d eling n able ts for g cost d any c ense n d 10 r 8 to La Cros s License T Revisio n be a su pimpacts a LTP ChNUREG-referenc e that the adverse e environ m LACB W have res u Environ mNUREG-1.6.R Solution s LACB Wdocume n Decomm R evision LTP in a LTP, wi t 50.82(a)(Solution s conditio n NRC ap pReq uResuDetr a deco mDecr e Clas s notif iIncr emini mIncr e level an in vCha n test, oIncr e s e Boiling W Termination n 0 pplement to associated wapter 8 co m-0586, whic h e nuclear fa cenvironme n e ffects outs i mental imp a W R dated D e u lted in no m ental Ass e-0191 relate d R e g ulator y N s is submitti W R spans a p n tation is u n issioning P l March 201 4 accordance w t hout prior N (6), and 10 C s is also su b n that estab l p roval. Cha n u ires Commi lts in signifi a cts or nega t mmissionin g e ases a surv e s 2 to Class 3 i cation prio rases the DC m um detect aases the rad i(or corresp o vestigation o n ges the stat i or ases the Ty p W ater Reacto r Plan the Enviro n w ith the exec u mpares the h provides a c ility. The ntal effects f i de the bou n a cts was do e cember 19 8significant essment in d to operati o Notification ng the LTP period that i n nique in th a l an and Pos t 4 (15) whic h w ith 10 CF R N RC appro v C FR 50.82(a bmitting a p r lishes the c r nges to the L ssion appro vcant enviro n t es the reaso n g , e y unit area 3; or Class 1 r to impleme GLs (or de c able concent r ioactivity le v o nding sour c occurs), istical test a p p e I decisio n r nmental Re p u tion of the described a generic en venvironme n f or decom m n ds of NU R cumented i n 8 7. LACB Wenvironme n support of o n of LACB W s of Chan ge as a supple m ncludes sev e at the requ i t-Shutdown D h serves as t R 50.71(e).

val, in acco a)(7). r oposed am e riteria for d L TP require val pursuant nmental imp a nable assur aclassificati o to Class 3 w nting the ch c reases dose rations (for b vel, relative ce term inve n p plied to on e n erro r. 1-10 p ort addressi described d edecommissi vironmental n tal assess m m issioning L A R EG-0586. n a supple m W R decom m n tal impact the Augus t W R, dated A e s ment to the D eral decom m i red safety a D ecommissi o t he DSAR fo Once appro vrdance wit h endment to tetermining w prior NRC a to 10 CFR 5 a cts not pre v a nce that ad e o n (i.e., imp a w ithout pro v a nge in clas s factors fro m b oth scan a nto the appli c ntory levels e other than t ing the actu a ecommissio n oning attri bassessment f m ent perfor m ACBWR a r Review of m ent to th e missioning a not previo u t 7, 1991, A pril 21, 19 8 D SAR. Be c m issioning r eanalyses ar e o ning Activ i f or LACBW R v ed, Soluti o h the criteri a the LACB W when chan g approval wh 5 0.59, v iously revi e e quate funds a cted to not i viding NRC sification, m the Basem e nd fixed me a c able derive din the Base m t he Sign tes t a l or potent i ning activiti butes to th o f or the deco m m ed by Sol u re minimal a post-operat e Environm and disman t usly evaluat Decommis s 8 0. c ause the li c e gulation ch a e included ities Report R. Solutio n ons may ma k a in 10 CF R WR license t h g es to the L en the chan g e wed, will be ava i impacted, C la minimum e nt Fill Mo d asurement m d concentra t m ent Fill M o t or Wilcox o ial environ m es. ose identifi e mmissionin g utions deter m and there a r ing license

ental Repo r tlement acti ved in the N s ioning Ord censing hist o anges, the Din the LA C (D-Plan/PS D n s will upda t k e changes t R 50.59, 10 hat adds a li c L TP require g e: ilable for lass 1 to Cl a 14 day d el) and rela t m ethods), t ion guideli n o del), at wh i o n Rank Su m m ental e d in g of a m ined r e no stage rt for vities NRC's er or ory of D SAR C BWR D AR) te the to the CFR cense prior a ss 2; t ed n e i ch m La Cros s License T Revisio n The con t Gerard P Vice Pre LaCross e S4601 S t Genoa, W (224) 78 9 gpvanno o 1.7.R 1. L A L 2. U C 2 3. U f o 4. U r e C 5. L P 6. w 7. w 8. D D9. h t10. 2 11. E S 12. E S 13. U R 14. U S N s e Boiling W Termination n 0 act for LTP P. van Noor d sident, Reg u e Solutions, L t ate Road 3 5 W I. 54632-8 8 9-4025 ordennen@e n References Letter from D A pplication f L icense Ame U.S. Nuclear C ontent of L i 011. U.S. Nuclear o r Evaluatin g U.S. Nuclear elated to Op e C ooperative

-Letter from Dlanning for I w ww.wunde r www.mvp.w c Dairyland Po Decommissi o t tp://www.c i 008 Vernon E nergySoluti urvey Repo r E nergySoluti urvey Repo r U.S. Nuclear Radiation Su r U.S. Nuclear tatement on November 2 0 W ater Reacto r Plan informatio n d ennen ulatory Affa i L LC 5 8 46 n ergysolutio n D airyland P o f or Order A pndments, d aRegulatory i cense Term iRegulatory g Nuclear P oRegulatory e ration of t h- April 1980 D airyland P o I SFSI, LAC r ground.co m c.usace.arm y wer Cooper a o ning Plan, r ity-data.co m County Ta x ons GG-EO-rt for Octob e ons LC-RS-r t for June t hRegulatory r vey and Sit eRegulatory Decommis s 0 02. r n , including a i rs ns.com o wer Cooper p proving Li c a ted October Commissio n i nation PlanCommissio n o wer React oCommissio n he La Crosse . ower Compa n-14029, Ma r m. y.mil/projec t a tive, LaCr o r evised Nov e m/city/Geno a x Assessme n-313196-R S e r and Nove m PN-164017-h ru August 2Commissio n e Investigat iCommissio n s ioning of N u 1-11 any submitt e ative to the N cense Trans fe 8, 2015.

n , Regulato r s for Nucle a n NUREG-1 or License T e n NUREG-0 Boiling W a n y to the N u r ch 10, 200 8 ts/Lock 8.

osse Boiling ember 2003.

a-Wisconsin

.n t Rolls.

S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W n, NUREG-1 i on Manual (n NUREG-0 u clear Facil i e d changes a N uclear Re g fe r and Conf o r y Gui d e 1.1 a r Power Re a 1 700, Revisi oermination P 0 191, Final E ater Reactor u clear Regul

8. Water Rea c. .html. A CBWR R a Field Work

-B WR Radiol o W ork - Nov e 1575, Revis i (MARSSI M 0 586, Gener i ities, Suppl e a nd updates, g ulatory Co m forming Ad m 79, Standar d actors, Revi s o n 1, Stand a P lans - Apr i Environmen t by Dairyla n atory Com m c tor (LACB W a diological C- Novembe r o gical Char a ember 2015.

i on 1, Multi

-M), August 2 0 i c Environ m ement 1, Vo l is: mmission, ministrative d Format an d s ion 1 - Jun e ard Review P i l 2003. tal Stateme n n d Power m ission, Sub j W R) C haracteriza t r 2015. a cterization

-Agency 0 00. mental Impac t lume 1 - d e P lan n t ject: t ion t La Cros s License T Revisio n 15. D D s e Boiling W Termination n 0 Dairyland Po Decommissi o W ater Reacto r Plan wer Cooper a o ning Activi t r a tive, LAC B ties Report (1-12 B WR Deco m (D-Plan/PS D mmissioning D AR), Revi s Plan and P o s ion - Marc h o st-Shutdow n h 2014. n La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r ure 1-1 S 1-13 S ite Re g ion a a l Location

La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r Figure 1-2 1-14 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r Figure 1-3 1-15 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r ig ure 1-4 1-16 Topo g rap h hical Map