ML17228B467: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1,REGULATO INFORMATION DISTRIBUTION
{{#Wiki_filter:CATEGORY 1 ,REGULATO INFORMATION DISTRIBUTION
.TEM(RIDS)ACCESS.(ph'BA:9604220398 DOC.DATE:
.TEM (RIDS)ACCESS.(ph'BA:9604220398 DOC.DATE: 96/04/18 NOTARIZED:
96/04/18NOTARIZED:
YES FAC".::50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.
YESFAC".::50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION BOHLKE,W.H.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
ProvidesresponsetoGL96-01,"TestingofSafetyRelatedLogicCircuits,"
Provides response to GL 96-01,"Testing of Safety Related Logic Circuits," for Units 1&2.DISTRIBUTION CODE: B067D COPIES RECEIVED:LTR I ENCL (SIZE: TITLE: GL 96-01 Response-Testing of Safety-Related Logic NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD3-3~EIII YiG INTERNAL: F E CENTER 1 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT-ID CODE/NAME NORRIS I J NRR/DRCH/HICB NRC PDR COPIES.'TTR ENCL'1 1 1'1 NOTE TO ALL"RIDS" RECIPIENTS:
forUnits1&2.DISTRIBUTION CODE:B067DCOPIESRECEIVED:LTR IENCL(SIZE:TITLE:GL96-01Response-Testing ofSafety-Related LogicNOTES:DOCKET0500033505000389RECIPIENT IDCODE/NAME PD3-3~EIIIYiGINTERNAL:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LT'IR 6 ENCL 6 Florida Power tk Light Company, P.O.Box128, Fort Pierce, FL 34954-0128 April 18, 1996 L-96-88 10 CFR 50.4 10 CFR 50 54 (f)U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse This letter provides the Florida Power and Light Company (FPL)initial response to Generic Letter (GL)96-01"Testing of Safety Related Logic Circuits" for St.Lucie Units 1 and 2.The GL initially requested a written response within sixty days of January 10, 1996, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion.
FECENTER1EXTERNAL:
The response date was extended to April-18, 1996, by NRC-letter to Nuclear Energy Institute (NEI)dated February 14, 1996.FPL plans to take credit for reviews of the integrated safeguards surveillance procedures for each unit which were previously completed.
NOACCOPIESLTTRENCL111111RECIPIENT-IDCODE/NAME NORRISIJNRR/DRCH/HICB NRCPDRCOPIES.'TTR ENCL'111'1NOTETOALL"RIDS"RECIPIENTS:
The St.Lucie Units 1 and 2 Operating Procedures, Peri odi c Integrated Test of Engineered Safety Features, were reviewed against control schematic/wiring diagrams for the safeguards equipment and the circuits analyzed to verify that all circuit components necessary for the equipment to perform their safety functions during a loss-of-offsite-power (LOOP), LOOP with a loss-of-coolant-accident (LOCA), and LOCA were tested.These reviews included bus alignments for swing components.
PLEASEHELPUSTOREDUCEWASTEICONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
The Unit 1 procedure revisions were completed in the Fall of 1994 and the Unit 2 procedure revisions were completed in the Fall of 1995.FPL plans to implement the actions requested in accordance with the schedule in the GL.The additional reviews and any necessary procedure changes for St.Lucie Unit 2 will be completed prior to startup from the Spring 1997 refueling outage (SL2-10).The additional reviews and any necessary procedure changes for St.Lucie Unit 1 will be completed prior to startup from the Spring 1998 refueling outage (SL1-15).-
415-2083)
FPL will notify the NRC in writing within 30 days of completing the requested actions for each unit.9604220398 9604i8 PDR ADQCK 05000335 P PDR an FPL Group company
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDITOTALNUMBEROFCOPIESREQUIRED:
'I 1 p'II e St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse This information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54 (f).Please contact us if there are any questions about this submittal.
LT'IR6ENCL6 FloridaPowertkLightCompany,P.O.Box128,FortPierce,FL34954-0128 April18,1996L-96-8810CFR50.410CFR5054(f)U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555RE:St.LucieUnits1and2DocketNos.50-335and50-389GenericLetter96-01-InitialResonseThisletterprovidestheFloridaPowerandLightCompany(FPL)initialresponsetoGenericLetter(GL)96-01"TestingofSafetyRelatedLogicCircuits" forSt.LucieUnits1and2.TheGLinitially requested awrittenresponsewithinsixtydaysofJanuary10,1996,indicating FPL'sintentions toimplement theactionsrequested intheGLandascheduleforcompletion.
Very truly yours, W.H.Bo lke Vice President St.Lucie Plant WHB/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant f1 St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse STATE OF FLORIDA))COUNTY OF PALM BEACH)W.H.Bohlke being first duly sworn,'deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power 6 Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.W..Bohlke STATE OF FLORIDA COUNTY OF St.Lucie The foregoing instrument was acknowledged before me this l94h day of A , 19't(by W.H.Bohlke, who is personally known to me and who did take an oath.A IN+i+Name of Notary Public My Commission expires Commission No.Q.Q 0)lGQ/-I ygglllil///////
TheresponsedatewasextendedtoApril-18,1996,byNRC-lettertoNuclearEnergyInstitute (NEI)datedFebruary14,1996.FPLplanstotakecreditforreviewsoftheintegrated safeguards surveillance procedures foreachunitwhichwerepreviously completed.
YACC 477524///pcinlb4 I II I I C Ill I I V I', I}}
TheSt.LucieUnits1and2Operating Procedures, PeriodicIntegrated TestofEngineered SafetyFeatures, werereviewedagainstcontrolschematic/wiring diagramsforthesafeguards equipment andthecircuitsanalyzedtoverifythatallcircuitcomponents necessary fortheequipment toperformtheirsafetyfunctions duringaloss-of-offsite-power (LOOP),LOOPwithaloss-of-coolant-accident (LOCA),andLOCAweretested.Thesereviewsincludedbusalignments forswingcomponents.
TheUnit1procedure revisions werecompleted intheFallof1994andtheUnit2procedure revisions werecompleted intheFallof1995.FPLplanstoimplement theactionsrequested inaccordance withthescheduleintheGL.Theadditional reviewsandanynecessary procedure changesforSt.LucieUnit2willbecompleted priortostartupfromtheSpring1997refueling outage(SL2-10).
Theadditional reviewsandanynecessary procedure changesforSt.LucieUnit1willbecompleted priortostartupfromtheSpring1998refueling outage(SL1-15).-
FPLwillnotifytheNRCinwritingwithin30daysofcompleting therequested actionsforeachunit.9604220398 9604i8PDRADQCK05000335PPDRanFPLGroupcompany
'I1p'IIe St.LucieUnits1and2DocketNos.50-335and50-389GenericLetter96-01-InitialResonseThisinformation isprovidedpursuanttotherequirements ofSection182aoftheAtomicEnergyActof1954,asamended,and10CFR50.54(f).Pleasecontactusifthereareanyquestions aboutthissubmittal.
Verytrulyyours,W.H.BolkeVicePresident St.LuciePlantWHB/GRMcc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant f1 St.LucieUnits1and2DocketNos.50-335and50-389GenericLetter96-01-InitialResonseSTATEOFFLORIDA))COUNTYOFPALMBEACH)W.H.Bohlkebeingfirstdulysworn,'deposes andsays:ThatheisVicePresident, St.LuciePlantfortheNuclearDivisionofFloridaPower6LightCompany,theLicenseeherein;Thathehasexecutedtheforegoing document; thatthestatements madeinthisdocumentaretrueandcorrecttothebestofhisknowledge, information andbelief,andthatheisauthorized toexecutethedocumentonbehalfofsaidLicensee.
W..BohlkeSTATEOFFLORIDACOUNTYOFSt.LucieTheforegoing instrument wasacknowledged beforemethisl94hdayofA,19't(byW.H.Bohlke,whoispersonally knowntomeandwhodidtakeanoath.AIN+i+NameofNotaryPublicMyCommission expiresCommission No.Q.Q0)lGQ/-Iygglllil///////
YACC477524///pcinlb4 IIIIICIllIIVI',I}}

Revision as of 15:57, 7 July 2018

Provides Response to GL 96-01, Testing of Safety Related Logic Circuits, for Units 1 & 2
ML17228B467
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/18/1996
From: BOHLKE W H
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-96-01, GL-96-1, L-96-88, NUDOCS 9604220398
Download: ML17228B467 (7)


Text

CATEGORY 1 ,REGULATO INFORMATION DISTRIBUTION

.TEM (RIDS)ACCESS.(ph'BA:9604220398 DOC.DATE: 96/04/18 NOTARIZED:

YES FAC".::50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BOHLKE,W.H.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides response to GL 96-01,"Testing of Safety Related Logic Circuits," for Units 1&2.DISTRIBUTION CODE: B067D COPIES RECEIVED:LTR I ENCL (SIZE: TITLE: GL 96-01 Response-Testing of Safety-Related Logic NOTES: DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD3-3~EIII YiG INTERNAL: F E CENTER 1 EXTERNAL: NOAC COPIES LTTR ENCL 1 1 1 1 1 1 RECIPIENT-ID CODE/NAME NORRIS I J NRR/DRCH/HICB NRC PDR COPIES.'TTR ENCL'1 1 1'1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LT'IR 6 ENCL 6 Florida Power tk Light Company, P.O.Box128, Fort Pierce, FL 34954-0128 April 18, 1996 L-96-88 10 CFR 50.4 10 CFR 50 54 (f)U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse This letter provides the Florida Power and Light Company (FPL)initial response to Generic Letter (GL)96-01"Testing of Safety Related Logic Circuits" for St.Lucie Units 1 and 2.The GL initially requested a written response within sixty days of January 10, 1996, indicating FPL's intentions to implement the actions requested in the GL and a schedule for completion.

The response date was extended to April-18, 1996, by NRC-letter to Nuclear Energy Institute (NEI)dated February 14, 1996.FPL plans to take credit for reviews of the integrated safeguards surveillance procedures for each unit which were previously completed.

The St.Lucie Units 1 and 2 Operating Procedures, Peri odi c Integrated Test of Engineered Safety Features, were reviewed against control schematic/wiring diagrams for the safeguards equipment and the circuits analyzed to verify that all circuit components necessary for the equipment to perform their safety functions during a loss-of-offsite-power (LOOP), LOOP with a loss-of-coolant-accident (LOCA), and LOCA were tested.These reviews included bus alignments for swing components.

The Unit 1 procedure revisions were completed in the Fall of 1994 and the Unit 2 procedure revisions were completed in the Fall of 1995.FPL plans to implement the actions requested in accordance with the schedule in the GL.The additional reviews and any necessary procedure changes for St.Lucie Unit 2 will be completed prior to startup from the Spring 1997 refueling outage (SL2-10).The additional reviews and any necessary procedure changes for St.Lucie Unit 1 will be completed prior to startup from the Spring 1998 refueling outage (SL1-15).-

FPL will notify the NRC in writing within 30 days of completing the requested actions for each unit.9604220398 9604i8 PDR ADQCK 05000335 P PDR an FPL Group company

'I 1 p'II e St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse This information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54 (f).Please contact us if there are any questions about this submittal.

Very truly yours, W.H.Bo lke Vice President St.Lucie Plant WHB/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant f1 St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Generic Letter 96-01-Initial Res onse STATE OF FLORIDA))COUNTY OF PALM BEACH)W.H.Bohlke being first duly sworn,'deposes and says: That he is Vice President, St.Lucie Plant for the Nuclear Division of Florida Power 6 Light Company, the Licensee herein;That he has executed the foregoing document;that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.W..Bohlke STATE OF FLORIDA COUNTY OF St.Lucie The foregoing instrument was acknowledged before me this l94h day of A , 19't(by W.H.Bohlke, who is personally known to me and who did take an oath.A IN+i+Name of Notary Public My Commission expires Commission No.Q.Q 0)lGQ/-I ygglllil///////

YACC 477524///pcinlb4 I II I I C Ill I I V I', I