{{#Wiki_filter:.} '. ... ,,_ . :\ Mr. James G. Keppler,  
{{#Wiki_filter:.} '. ... ,,_ . :\ Mr. James G. Keppler, Director Directorate  
Director  
Directorate  
*of Inspection  
*of Inspection  
and Enforcement  
and Enforcement  
-Region III U.S. F!uclear  
-Region III U.S. F!uclear Regulatory  
Regulatory  
Conunission  
Conunission  
799 Roosevelt  
799 Roosevelt  
Road Glen Ellyn, Illinois  
Road Glen Ellyn, Illinois 60137 November 8, 1976 Su1.:>j0ct:  
60137 November  
Dresde.n Station Unit 3 Dear Mr. Keppler: Response to IE.Inspection  
8, 1976 Su1.:>j0ct:  
Dresde.n  
Station Unit 3 Dear Mr. Keppler:  
Response  
to IE.Inspection  
Report No. 50-249/76-20  
Report No. 50-249/76-20  
NRC *Docket No. SO-i49 Attached  
NRC *Docket No. SO-i49 Attached is Commonwealth  
is Commonwealth  
Edison's response to the item noted under Enforcement  
Edison's  
response  
to the item noted under Enforcement  
Action in the subject  
Action in the subject  
report. Neither this response  
report. Neither this response nor the subject inspection  
nor the subject inspection  
report contain proprietary  
report contain proprietary  
information.  
information.  
Please address any questions  
Please address any questions  
on the *matter to this office. Very truly yours,  
on the *matter to this office. Very truly yours,  
U, f/001-;/  
U, f/001-;/ R. L. . Assistant  
R. L.  
. Assistant  
Vice President  
Vice President  
Attachment  
Attachment  
Line 57: Line 43:
Attc:oi_chment  
Attc:oi_chment  
Infraction:  
Infraction:  
Failu:ce  
Failu:ce to verify fuel grapple "Hoist Loaded" light . . Discussion:  
to verify fuel grapple "Hoist Loaded" light . . Discussion:  
Dm:ing unloading  
Dm:ing unloading  
the fuel from the Dresden Unit 3 reactor,  
the fuel from the Dresden Unit 3 reactor, Procedure  
Procedure  
DFP 800-10 step F.l.h was not followed completely.  
DFP 800-10 step F.l.h was not followed  
Step F.l.h reads as follows: "Slov1ly raise the grapple, using the grapple lever and the load fl9at switch, and verify that the fuel assembly is moving up as follov1s:  
completely.  
Step F.l.h reads as follows:  
"Slov1ly  
raise the grapple,  
using the grapple lever and the load fl9at switch, and verify that the fuel assembly  
is moving up as follov1s:  
1) The *slack cable indicator  
1) The *slack cable indicator  
light should go out. . 2) The hoist loaded indicator  
light should go out. . 2) The hoist loaded indicator  
ligb.ts".  
ligb.ts".  
During this particular  
During this particular  
operation,  
operation, the **Hoist Loaded" indicator  
the **Hoist Loaded" indicator  
"1:1as not  
"1:1as not  
during the .t"irst few feet of lifting the  
during the .t"irst few feet of lifting the  
Line 80: Line 58:
with sfirveillance  
with sfirveillance  
Procedure  
Procedure  
DOS 800-1 steps j-1. The internal  
DOS 800-1 steps j-1. The internal grapple. friction loads are apparently  
grapple.  
changed slightly under  
friction  
loads are apparently  
changed slightly  
under  
conditions  
conditions  
different  
different  
from DOS 800-1. If inrproper  
from DOS 800-1. If inrproper  
hoist loaded light operation  
hoist loaded light operation  
is observed  
is observed under certain operating  
under certain operating  
conditions  
conditions  
different  
different  
than DOS 800-1 condifions,  
than DOS 800-1 condifions, it will be necessary  
it will be necessary  
to reset the load cell for the actual conditions  
to reset the load cell for the actual conditions  
to obtain proper operation.  
to obtain proper operation.  
Corrective  
Corrective  
Action: .. The fuel grapple load cell was reset to actuate the hoist loacl.ed  
Action: .. The fuel grapple load cell was reset to actuate the hoist loacl.ed light lifting a fuel assembly in the reactor core. Corrective  
light lifting a fuel assembly  
in the reactor core. Corrective  
Action to Prevent Recurrence:  
Action to Prevent Recurrence:  
Procedure  
Procedure  
DI"P 800-7 "Fuel Handling'  
DI"P 800-7 "Fuel Handling'  
Inside the F.eactor"  
Inside the F.eactor" step F.*1.1, DFP 800-8 ''Control  
step F.*1.1, DFP 800-8 ''Control  
Rod Blade Guide Movements  
Rod Blade Guide Movements  
Between and in the Spent .Fuel Storage Pool and the Reactor"  
Between and in the Spent .Fuel Storage Pool and the Reactor" step F.6.j, and DFP 800-10 "Fuel Eovements  
step F.6.j, and DFP 800-10 "Fuel Eovements  
from the Reactor to the Storage Pool" step F.l.h i;vill be revised. These revisions  
from the Reactor to the Storage Pool" step F.l.h i;vill be revised.  
These revisions  
'dill allO\*J verification  
'dill allO\*J verification  
that the :Cuel assembly  
that the :Cuel assembly is moving up as the grapple is raised by visual observation  
is moving up as the grapple is raised by visual observation  
of the :fuel assembly or by servation  
of the :fuel assembly  
or by servation  
of the. hoist loaded light. An  
of the. hoist loaded light. An  
note will be added to these 9rocedure  
note will be added to these 9rocedure  

Revision as of 14:24, 7 July 2018

Letter Regarding Response to the Item Noted Under Enforcement Action in Inspection Report 05000249/1976020 - Dresden Unit 3
ML17252B138
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/08/1976
From: Bolger R L
Commonwealth Edison Co
To: Keppler J G
NRC/RGN-III
References
IR 1976020
Download: ML17252B138 (2)


See also: IR 05000249/1976020

Text

.} '. ... ,,_ . :\ Mr. James G. Keppler, Director Directorate

  • of Inspection

and Enforcement

-Region III U.S. F!uclear Regulatory

Conunission

799 Roosevelt

Road Glen Ellyn, Illinois 60137 November 8, 1976 Su1.:>j0ct:

Dresde.n Station Unit 3 Dear Mr. Keppler: Response to IE.Inspection

Report No. 50-249/76-20

NRC *Docket No. SO-i49 Attached is Commonwealth

Edison's response to the item noted under Enforcement

Action in the subject

report. Neither this response nor the subject inspection

report contain proprietary

information.

Please address any questions

on the *matter to this office. Very truly yours,

U, f/001-;/ R. L. . Assistant

Vice President

Attachment

NOV 10 i976 \

Commonwealth

Edison Company

Dkt.

Attc:oi_chment

Infraction:

Failu:ce to verify fuel grapple "Hoist Loaded" light . . Discussion:

Dm:ing unloading

the fuel from the Dresden Unit 3 reactor, Procedure

DFP 800-10 step F.l.h was not followed completely.

Step F.l.h reads as follows: "Slov1ly raise the grapple, using the grapple lever and the load fl9at switch, and verify that the fuel assembly is moving up as follov1s:

1) The *slack cable indicator

light should go out. . 2) The hoist loaded indicator

ligb.ts".

During this particular

operation, the **Hoist Loaded" indicator

"1:1as not

during the .t"irst few feet of lifting the

from the reactor core. The load cell had been checked using the 400 pound grapple test weight in accordance

with sfirveillance

Procedure

DOS 800-1 steps j-1. The internal grapple. friction loads are apparently

changed slightly under

conditions

different

from DOS 800-1. If inrproper

hoist loaded light operation

is observed under certain operating

conditions

different

than DOS 800-1 condifions, it will be necessary

to reset the load cell for the actual conditions

to obtain proper operation.

Corrective

Action: .. The fuel grapple load cell was reset to actuate the hoist loacl.ed light lifting a fuel assembly in the reactor core. Corrective

Action to Prevent Recurrence:

Procedure

DI"P 800-7 "Fuel Handling'

Inside the F.eactor" step F.*1.1, DFP 800-8 Control

Rod Blade Guide Movements

Between and in the Spent .Fuel Storage Pool and the Reactor" step F.6.j, and DFP 800-10 "Fuel Eovements

from the Reactor to the Storage Pool" step F.l.h i;vill be revised. These revisions

'dill allO\*J verification

that the :Cuel assembly is moving up as the grapple is raised by visual observation

of the :fuel assembly or by servation

of the. hoist loaded light. An

note will be added to these 9rocedure

steps to point out the relationship

of the hoist loaded light sensitivity

to grapple position.

These procedures

will be. revised prior to next refueling

activities

on Dresden Units 2 or 3. l l