ML17309A869: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:REGULATINFORMATION DISTRIBUTION STEM(RIDE)~44ACCESSIOM-NBR:9702040321 DOC.DATE:
{{#Wiki_filter:REGULAT INFORMATION DISTRIBUTION STEM (RIDE)~4 4 ACCESSIOM-NBR:9702040321 DOC.DATE: 97/01/31 NOTARIZED:
97/01/31NOTARIZED:
NO DOCKET FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.05000335 50'-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.05000389 AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
NODOCKETFACIL:50-335 St.LuciePlant,Unit1,FloridaPower6LightCo.0500033550'-389St.LuciePlant,Unit2,FloridaPower&LightCo.05000389AUTH.NAMEAUTHORAFFILIATION STALL,J.A.
Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
FloridaPoweraLightCo.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)


==SUBJECT:==
==SUBJECT:==
ForwardsRev32to"Radiological Emergency Plan."NotesthatCrevdoesnotdecreaseeffectiveness ofplan.ADISTRIBUTION CODE:A045DCOPIESRECEIVED:LTR jENCL!SIZE:2.0'2f6TITLE:ORSubmittal:
Forwards Rev 32 to"Radiological Emergency Plan." Notes that C rev does not decrease effectiveness of plan.A DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR j ENCL!SIZE: 2.0'2 f6 TITLE: OR Submittal:
Emergency Preparedness Plans,Implement'g Procedures, CTNOTES:ERECIPIENT IDCODE/NAME PD2-3PD'COPIESLTTRENCL1.1RECIPIENT
Emergency Preparedness Plans, Implement'g Procedures, C T NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD'COPIES LTTR ENCL 1.1 RECIPIENT'OPIES ID CODE/NAME LTTR ENCL WIENS,L.1 1 1 NUDOCS-ABSTRACT EXTERNAL: NOAC 2 2 1 1 1 1 NRR/DRPM/PERB NRC PDR 1 1 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:
'OPIESIDCODE/NAME LTTRENCLWIENS,L.111NUDOCS-ABSTRACT EXTERNAL:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL' Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 January 31, 1997, L-97-25 10 CFR 50.'54(q)10 CFR 50 Appendix E U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 In accordance with 10 CFR 50.54(q), enclosed is one copy of the St.Lucie Plant Radiological Emergency Plan revision.Florida Power and Light Company has determined that this revision does not decrease the effectiveness of the plan.In addition, the plan as revised continues to meet the standards of 10 CFR 50.47(b)and the requirements of 10 CFR 50 Appendix E.Attachment 1 of this letter provides a summary of the changes incorporated by this revision.Should there be any questions on this revision, please contact us.Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC (2 copies)Senior Resident Inspector, USNRC, St.Lucie Plant'O,g P Q 6 4'702040321 970i3i PDR ADQCK 05000335 PDR Q an FPL Group company f St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 L-97-25 ATTACHMENT
NOAC221111NRR/DRPM/PERB NRCPDR1111DUNNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFNSD-5(EXT.
415-2083)
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
LTTR8ENCL' FloridaPower5LightCompany,P.O.Box128,FortPierce,FL34954-0128 January31,1997,L-97-2510CFR50.'54(q) 10CFR50AppendixEU.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Re:St.LucieUnits1and2DocketNos.50-335and50-389Inaccordance with10CFR50.54(q),
enclosedisonecopyoftheSt.LuciePlantRadiological Emergency Planrevision.
FloridaPowerandLightCompanyhasdetermined thatthisrevisiondoesnotdecreasetheeffectiveness oftheplan.Inaddition, theplanasrevisedcontinues tomeetthestandards of10CFR50.47(b)andtherequirements of10CFR50AppendixE.Attachment 1ofthisletterprovidesasummaryofthechangesincorporated bythisrevision.
Shouldtherebeanyquestions onthisrevision, pleasecontactus.Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/sptAttachments cc:RegionalAdministrator, RegionII,USNRC(2copies)SeniorResidentInspector, USNRC,St.LuciePlant'O,gPQ64'702040321 970i3iPDRADQCK05000335PDRQanFPLGroupcompany fSt.LucieUnits1and2DocketNos.50-335and50-389L-97-25ATTACHMENT
: j.
: j.
ATTACHMENT 1CHANGEDOCUMENTFORREVISION32Thisdocumentprovidesareviewofthechangesincorporated intorevision32oftheSt.LuciePlantRadiological Emergency Plan.ThesechangesresultedRomtheannualreviewoftheEmergency Plan.Themajorityofthechangeswereeditorial innatureandaresoindicated.
ATTACHMENT 1 CHANGE DOCUMENT FOR REVISION 32 This document provides a review of the changes incorporated into revision 32 of the St.Lucie Plant Radiological Emergency Plan.These changes resulted Rom the annual review of the Emergency Plan.The majority of the changes were editorial in nature and are so indicated.
Anexplanation/evaluation ofsignificant changesisprovided.
An explanation/evaluation of significant changes is provided.There were no areas of reduced effectiveness identified in this revision.Note: All page and Section references apply to revision 31.A.it u ti 1.Page (4), Figure 2-4, changed"On-Shift Response Organization" to"On-Shift Emergency Response Organization", editorial change.e e (1.0)1.Page 1-1, Section 1.2-"Annual" changed to bold and inserted the word"Occurring" in the definition; editorial change.2.Page 1-2, Section 1.2, Emergency Coordinator definition, changed"E" in"Emergency" and"R" in"Responders" to lower case;editorial change.3.Page 1-2, Section 1.2, Emergency News Center definition, changed"L" in"Local" and"F" in"Federal" to lower case;editorial change.4.Page 1-3, Section 1.2, Emergency Response definition, changed"...the Radiological Emergency Plan for the St.Lucie Plant." to"...St.Lucie Plant Radiological Emergency Plan.";editorial change.5.Page 1-4, Section 1.2, Governmental Affairs Manager (GAM)definition, inserted"Recovery Manager/";
Therewerenoareasofreducedeffectiveness identified inthisrevision.
change makes the definition more correct because the GAM will interface with both the Recovery Manager and the Emergency Control Officer at the Emergency Operations Facility (EOF), this correction does not decrease the effectiveness of the Emergency Plan.6 Page 1-4, Section 1.2, Ingestion Pathway Emergency Planning Zone definition, inserted"Exposure" between Ingestion and Pathway;editorial change.Page 1-4, Section 1.2, Quarterly definition, changed Rom"Once per calendar quarter year (March 31, June 30, September 30, and December 31)" to"Occurring once per calendar quarter, with quarters ending on March 31, June 30, September 30, and December 31 in a year";editorial change.a:hplanr32 f
Note:AllpageandSectionreferences applytorevision31.A.ituti1.Page(4),Figure2-4,changed"On-Shift ResponseOrganization" to"On-Shift Emergency ResponseOrganization",
Page 1-9, Section 1.4, paragraph four, sentence one, changed&om"The company's response to an emergency condition consists of an immediate response (on-shift) and an expanded response (Emergency Response Organization) which can readily adapt to an emergency condition as it develops." to"The company's response to an emergency condition consists of an on-shift (immediate) response and an expanded (augmented) response Emergency Response Organization (ERO)which can readily adapt to an emergency condition as it develops.";
editorial change.ee(1.0)1.Page1-1,Section1.2-"Annual"changedtoboldandinsertedtheword"Occurring" inthedefinition; editorial change.2.Page1-2,Section1.2,Emergency Coordinator definition, changed"E"in"Emergency" and"R"in"Responders" tolowercase;editorial change.3.Page1-2,Section1.2,Emergency NewsCenterdefinition, changed"L"in"Local"and"F"in"Federal" tolowercase;editorial change.4.Page1-3,Section1.2,Emergency Responsedefinition, changed"...theRadiological Emergency PlanfortheSt.LuciePlant."to"...St.LuciePlantRadiological Emergency Plan.";editorial change.5.Page1-4,Section1.2,Governmental AffairsManager(GAM)definition, inserted"Recovery Manager/";
this change clariQes that portions of the ERO are always on-shift, but will be augmented, as necessary, this change does not decrease the effectiveness of the Emergency Plan.Page 1-10, Section 1.4, paragraph six, second sentence, inserted the word"public" between"for" and"protection";
changemakesthedefinition morecorrectbecausetheGAMwillinterface withboththeRecoveryManagerandtheEmergency ControlOfficerattheEmergency Operations Facility(EOF),thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.6Page1-4,Section1.2,Ingestion PathwayEmergency PlanningZonedefinition, inserted"Exposure" betweenIngestion andPathway;editorial change.Page1-4,Section1.2,Quarterly definition, changedRom"Oncepercalendarquarteryear(March31,June30,September 30,andDecember31)"to"Occurring oncepercalendarquarter,withquartersendingonMarch31,June30,September 30,andDecember31inayear";editorial change.a:hplanr32 f
change corrects the quote from the State Plan, this change does not decrease the effectiveness of the Emergency Plan.Page 1-11, Section 1.5, added number 10"UFSAR-Unit 1, Section 13.3, Emergency Planning" and number 11"UFSAR-Unit 2, Emergency Planning", this change is a cross reference to the UFSAR and does not decrease the effectiveness of the Emergency Plan.Page 1-14, Figure 1-2, changed"ON-SHIFT EMERGENCY RESPONDERS" to"ON-SHIFT EMERGENCY RESPONSE ORGANIZATION";
Page1-9,Section1.4,paragraph four,sentenceone,changed&om"Thecompany's responsetoanemergency condition consistsofanimmediate response(on-shift) andanexpandedresponse(Emergency ResponseOrganization) whichcanreadilyadapttoanemergency condition asitdevelops."
editorial change.a izat n F cil''c (2.0)Page 2-1, Section 2.1.1, paragraph two, added"(ERO)" following"Emergency Response Organization";
to"Thecompany's responsetoanemergency condition consistsofanon-shift(immediate) responseandanexpanded(augmented) responseEmergency ResponseOrganization (ERO)whichcanreadilyadapttoanemergency condition asitdevelops.";
editorial change.Page 2-1, Section 2.1.2, deleted"and Rehabilitative Services" from the title of the Florida Department of Health, two locations; change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-1, Section 2.1.2, paragraph four, changed the abbreviation
thischangeclariQesthatportionsoftheEROarealwayson-shift, butwillbeaugmented, asnecessary, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page1-10,Section1.4,paragraph six,secondsentence, insertedtheword"public"between"for"and"protection";
"(DHRS)" to the"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-1, Section 2.1.2, paragraph four, number one, changed the word"Office" to"Bureau", change reflects new title of State office, this correction does not decrease the effectiveness of the Emer'gency Plan.Page 2-4, Figure 2-1, (under ON-SHIFT), changed"As Required From Available Staff" to Other Trained ERO Personnel On-shift";
changecorrectsthequotefromtheStatePlan,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page1-11,Section1.5,addednumber10"UFSAR-Unit1,Section13.3,Emergency Planning" andnumber11"UFSAR-Unit2,Emergency Planning",
this change clarifies the make-up of the on-shift ERO, this change does not decrease the effectiveness of the Emergency Plan.Page 2-4, Figure 2-1, added the following entry: "Chemistry Representative" (under ON-SHIFT),"Off-site Dose Calculations" (under EMERGENCY FUNCTION), and"TSC Chemistry Supervisor Or Alternate" (under PRIMARY);this addition to this figure clarifies an existing condition, that there is a chemist on-shift at all times (as required by NUREG 0737)to perform dose calculations, this is not a change in shift staffing, this addition does not decrease the effectiveness of the Emergency Plan.7.Page 2-5, Figure 2-2A, changed the title of the"Department of Health and Rehabilitative Services" to the"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-6, Figure 2-2B, changed the title of the"Department of Health and Rehabilitative Services" to the"Department of Health";change reflects new title of State agency, this'orrection does not decrease the effectiveness of the Emergency Plan.Page 2-8, Section 2.1.3, paragraph four, last sentence, added"(EOC)" following"Emergency Operations Center";editorial change.10.Page 2-8, Section 2.1.3, paragraph five, thiid sentence, changed the word Office" to"Bureau" and delete the abbreviation
thischangeisacrossreference totheUFSARanddoesnotdecreasetheeffectiveness oftheEmergency Plan.Page1-14,Figure1-2,changed"ON-SHIFT EMERGENCY RESPONDERS" to"ON-SHIFT EMERGENCY RESPONSEORGANIZATION";
"(DHRS)";these changes reflect changes in titles of the State office, this correction does not decxease the effectiveness of the Emergency Plan.Page 2-10, Section 2.1.3, changed"St.Lucie County-Fort Pierce Fire Department" to St.Lucie County-Fort Pierce Fire District";
editorial change.aizatnFcil''c(2.0)Page2-1,Section2.1.1,paragraph two,added"(ERO)"following "Emergency ResponseOrganization";
this is a correction to the organization's title, editorial change.12.Page 2-10, Section 2.1.4, paragraph three, changed"DHRS" to"Department of Health;this change reflects the change in the title of the State office, this correction does not decrease the effectiveness of the Emexgency Plan.13.Page 2-11, Section 2.1.5, paragraph two, last sentence changed".'..xesources as described..." to"...resources as provided for by the Purchase Order listed...";
editorial change.Page2-1,Section2.1.2,deleted"andRehabilitative Services" fromthetitleoftheFloridaDepartment ofHealth,twolocations; changereflectsnewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-1,Section2.1.2,paragraph four,changedtheabbreviation
this change clarifies that a Purchase Order number (which commits to technical services and resources) is listed in the Emergency Plan and not a descriptive document/letter, this change does not decrease the effectiveness of the Emergency Plan.14.Page 2-11, Section 2.2, first paragraph, added"(ERO)" to the title as abbreviation of the Emergency Response Organization; editorial change.15.16.a:Mplanr32 Page 2-11, Section 2.2, first paragraph, sentence four, changed from"The"on-shift" response organization consists of the plant duty shift and other plant personnel as available who are responsible..." to"The on-shift" response consists of shift operators, the plant duty shift and other trained plant personnel as available who are responsible...";
"(DHRS)"tothe"Department ofHealth";changereflectsnewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-1,Section2.1.2,paragraph four,numberone,changedtheword"Office"to"Bureau",
this change clarifies that the on-shift ERO consists of operators, the plant duty shift and other available personnel that are ERO qualified, this change does not decrease the effectiveness of the Emergency Plan.Page 2-11, Section 2.2, first paragraph, sentence five, changed from"Along with the required shift operations personnel, the Emergency Response Organization includes the..." to"Along with the required shift operations personnel, the"expanded" response includes personnel necessary to man the TSC, OSC, and EOF.";this change clarifies the expanded response, this change does not decrease the effectiveness of the Emergency Plan.
changereflectsnewtitleofStateoffice,thiscorrection doesnotdecreasetheeffectiveness oftheEmer'gency Plan.Page2-4,Figure2-1,(underON-SHIFT),
17.Page 2-11, Section 2.2, first paragraph, sentence six, changed from"The"expanded" response organization includes other plant personnel and corporate resources which can be made available, if the emergency..." to"The ERO includes plant and corporate personnel which are available, as the emergency warrants, to...";this change clarifies the makeup of the ERO, but does not reduce the number of persons involved, this change does not decrease the effectiveness of the Emergency Plan.18.Page 2-12, Section 2.2.1, description of Operations Manager, sentence two, changed the word"operation" to"operations";
changed"AsRequiredFromAvailable Staff"toOtherTrainedEROPersonnel On-shift";
editorial change.19.Page 2-13, Section 2.2.1, description of Nuclear Watch Engineer (NWE), last sentence, changed the word"Team" to"Brigade";
thischangeclarifies themake-upoftheon-shiftERO,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-4,Figure2-1,addedthefollowing entry:"Chemistry Representative" (underON-SHIFT),
this change reflects the new title of the Fire Team, editorial change.20.21.Page 2-14, Section 2.2.1, description of System and Component Engineering Manager, changed"System and Component Engineering Manager" to"System Engineering Manager";this change reflects the new title of this position, editorial change.Page 2-15, Section 2.2.2, Organization, paragraph two, sentence two changed"Initially, the operating staff constitutes:
"Off-site DoseCalculations" (underEMERGENCY FUNCTION),
.." to"Initially, shift operators and the plant duty staff constitute
and"TSCChemistry Supervisor OrAlternate" (underPRIMARY);
...";this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.22.Page 2-15 Section 2.2.2, Organization, paragraph two, sentence four, changed"...provided initially by plant staff." to"...provided initially by shift operators and the plant duty staff.";this'hange allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.23.Page 2-15 Section 2.2.2, Organization, paragraph two, sentence five, changed"...the on-shift response organization." to"...the On-shift Emergency Response Organization.", this change allows for consistent wording regarding the description of the ERO which is composed of two components, an On-shift ERO and the Expanded ERO, and is consistent with the description of the company's response to an emergency as stated in Section 1.4, this change does not decrease the effectiveness of the Emergency Plan.24.Page 2-17, Figure 2-4, changed the title&om"ON-SHIFT RESPONSE ORGANIZATION" to"ON-SHIFT EMERGENCY RESPONSE ORGANIZATION";
thisadditiontothisfigureclarifies anexistingcondition, thatthereisachemiston-shiftatalltimes(asrequiredbyNUREG0737)toperform dosecalculations, thisisnotachangeinshiftstaffing, thisadditiondoesnotdecreasetheeffectiveness oftheEmergency Plan.7.Page2-5,Figure2-2A,changedthetitleofthe"Department ofHealthandRehabilitative Services" tothe"Department ofHealth";changereflectsnewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-6,Figure2-2B,changedthetitleofthe"Department ofHealthandRehabilitative Services" tothe"Department ofHealth";changereflectsnewtitleofStateagency,this'orrection doesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-8,Section2.1.3,paragraph four,lastsentence, added"(EOC)"following "Emergency Operations Center";editorial change.10.Page2-8,Section2.1.3,paragraph five,thiidsentence, changedthewordOffice"to"Bureau"anddeletetheabbreviation
this change is consistent with the change in Section 2.2.2, Organization, paragraph two, sentence five, this change does not decrease the effectiveness of the Emergency Plan.25.Page 2-17, Figure 2-4, added"CHEMISTRY REPRESENTATIVE" and"OTHER TRAINED ERO PERSONNEL ON-SHIFT";
"(DHRS)";
these additions are consistent with changes to Figure 2-1 and a:Leplanr32 Section 2.2 first paragraph, respectively, these changes do not decrease the effectiveness of the Emergency Plan.26 Page 2-I9, Section 2.2;2, Plant Staff Emergency Assignments, A, changed"On-shift Emergency Responders" to"On-shift Emergency Response Organization";
thesechangesreflectchangesintitlesoftheStateoffice,thiscorrection doesnotdecxeasetheeffectiveness oftheEmergency Plan.Page2-10,Section2.1.3,changed"St.LucieCounty-Fort PierceFireDepartment" toSt.LucieCounty-Fort PierceFireDistrict";
this change is consistent with the change in Section 2.2.2, Organization, paragraph two, sentence five, this change does not decrease the effectiveness of the Emergency Plan.27.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, A, 1, sentence one, changed"...of members chosen from shift personnel assigned to the plant" to"..~of operators, the plant duty staff and other trained ERO personnel on-shiA.";
thisisacorrection totheorganization's title,editorial change.12.Page2-10,Section2.1.4,paragraph three,changed"DHRS"to"Department ofHealth;thischangereflectsthechangeinthetitleoftheStateoffice,thiscorrection doesnotdecreasetheeffectiveness oftheEmexgency Plan.13.Page2-11,Section2.1.5,paragraph two,lastsentencechanged".'..xesources asdescribed..."
this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.2S.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, A, 1, sentence two, changed"...as designated team members." to"...as ERO members";this is a change in terminology, this change does not decrease the effectiveness of the Emergency Plan.29.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, A, 1, sentence three, changed"The emergency response teams take action until the emergency condition is mitigated." to"The On-shift Emergency Response Organization takes action until the emergency condition is mitigated or until relieved.";
to"...resources asprovidedforbythePurchaseOrderlisted...";
this is a terminology change away from emergency teams and also addresses the need for flexibility if the emergency condition can not be readily mitigated, this change does not decrease the effectiveness of the Emergency Plan.30.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, A, 2, changed"On-shift Emergency Responders may consider themselves relieved gglt.upon the specific instructions of a recognized superior.Merely knowing that a superior is present does not constitute a release form emergency duties and responsibilities." to"Members of the On-shift Emergency Response Organization may consider themselves relieved~nl upon the specific instructions of the EC or appropriate facility supervisor.
thischangeclarifies thataPurchaseOrdernumber(whichcommitstotechnical servicesandresources) islistedintheEmergency Planandnotadescriptive document/letter, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.14.Page2-11,Section2.2,firstparagraph, added"(ERO)"tothetitleasabbreviation oftheEmergency ResponseOrganization; editorial change.15.16.a:Mplanr32 Page2-11,Section2.2,firstparagraph, sentencefour,changedfrom"The"on-shift" responseorganization consistsoftheplantdutyshiftandotherplantpersonnel asavailable whoareresponsible..."
Merely knowing that a replacement is present does not constitute a release from emergency duties and responsibilities";
to"Theon-shift" responseconsistsofshiftoperators, theplantdutyshiftandothertrainedplantpersonnel asavailable whoareresponsible...";
this change reflects the change in terminology away from emergency teams and clarifies that position turnover will be under the direction of the EC or facility supervisor which strengthens the control of this activity, and therefore, this change does not decrease the effectiveness of the Emergency Plan.31.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, B, added the following new paragraph one"The Expanded Emergency Response Organization is composed of operations personnel and ERO personnel to man the TSC, OSC, and EOF, as necessary.";
thischangeclarifies thattheon-shiftEROconsistsofoperators, theplantdutyshiftandotheravailable personnel thatareEROqualified, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-11,Section2.2,firstparagraph, sentencefive,changedfrom"Alongwiththerequiredshiftoperations personnel, theEmergency ResponseOrganization includesthe..."to"Alongwiththerequiredshiftoperations personnel, the"expanded" responseincludespersonnel necessary tomantheTSC,OSC,andEOF.";thischangeclarifies theexpandedresponse, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.
this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.32.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, B, 1, changed to number 2 and changed"...Primary Emergency Response Organization members..." to"...alternate ERO members..." and capitalized"o" in"On-shift";
17.Page2-11,Section2.2,firstparagraph, sentencesix,changedfrom"The"expanded" responseorganization includesotherplantpersonnel andcorporate resources whichcanbemadeavailable, iftheemergency..."
the numbering and case change are editorial, the a:iaplanr32  
to"TheEROincludesplantandcorporate personnel whichareavailable, astheemergency
: warrants, to...";thischangeclarifies themakeupoftheERO,butdoesnotreducethenumberofpersonsinvolved, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.18.Page2-12,Section2.2.1,description ofOperations Manager,sentencetwo,changedtheword"operation" to"operations";
editorial change.19.Page2-13,Section2.2.1,description ofNuclearWatchEngineer(NWE),lastsentence, changedtheword"Team"to"Brigade";
thischangereflectsthenewtitleoftheFireTeam,editorial change.20.21.Page2-14,Section2.2.1,description ofSystemandComponent Engineering Manager,changed"SystemandComponent Engineering Manager"to"SystemEngineering Manager";
thischangereflectsthenewtitleofthisposition, editorial change.Page2-15,Section2.2.2,Organization, paragraph two,sentencetwochanged"Initially, theoperating staffconstitutes:
.."to"Initially, shiftoperators andtheplantdutystaffconstitute
...";thischangeallowsforconsistent wordingregarding thedescription oftheEROwiththeinitialparagraph inthisSection(2.2),thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.22.Page2-15Section2.2.2,Organization, paragraph two,sentencefour,changed"...providedinitially byplantstaff."to"...providedinitially byshiftoperators andtheplantdutystaff.";this'hangeallowsforconsistent wordingregarding thedescription oftheEROwiththeinitialparagraph inthisSection(2.2),thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.23.Page2-15Section2.2.2,Organization, paragraph two,sentencefive,changed"...theon-shiftresponseorganization."
to"...theOn-shiftEmergency ResponseOrganization.",
thischangeallowsforconsistent wordingregarding thedescription oftheEROwhichiscomposedoftwocomponents, anOn-shiftEROandtheExpandedERO,andisconsistent withthedescription ofthecompany's responsetoanemergency asstatedinSection1.4,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.24.Page2-17,Figure2-4,changedthetitle&om"ON-SHIFT RESPONSEORGANIZATION" to"ON-SHIFT EMERGENCY RESPONSEORGANIZATION";
thischangeisconsistent withthechangeinSection2.2.2,Organization, paragraph two,sentencefive,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.25.Page2-17,Figure2-4,added"CHEMISTRY REPRESENTATIVE" and"OTHERTRAINEDEROPERSONNEL ON-SHIFT";
theseadditions areconsistent withchangestoFigure2-1anda:Leplanr32 Section2.2firstparagraph, respectively, thesechangesdonotdecreasetheeffectiveness oftheEmergency Plan.26Page2-I9,Section2.2;2,PlantStaffEmergency Assignments, A,changed"On-shift Emergency Responders" to"On-shift Emergency ResponseOrganization";
thischangeisconsistent withthechangeinSection2.2.2,Organization, paragraph two,sentencefive,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.27.Page2-19,Section2.2.2,PlantStaQ'Emergency Assignments, A,1,sentenceone,changed"...ofmemberschosenfromshiftpersonnel assignedtotheplant"to"..~ofoperators, theplantdutystaffandothertrainedEROpersonnel on-shiA.";
thischangeallowsforconsistent wordingregarding thedescription oftheEROwiththeinitialparagraph inthisSection(2.2),thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.2S.Page2-19,Section2.2.2,PlantStaffEmergency Assignments, A,1,sentencetwo,changed"...asdesignated teammembers."
to"...asEROmembers";
thisisachangeinterminology, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.29.Page2-19,Section2.2.2,PlantStaQ'Emergency Assignments, A,1,sentencethree,changed"Theemergency responseteamstakeactionuntiltheemergency condition ismitigated."
to"TheOn-shiftEmergency ResponseOrganization takesactionuntiltheemergency condition ismitigated oruntilrelieved.";
thisisaterminology changeawayfromemergency teamsandalsoaddresses theneedforflexibility iftheemergency condition cannotbereadilymitigated, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.30.Page2-19,Section2.2.2,PlantStaffEmergency Assignments, A,2,changed"On-shift Emergency Responders mayconsiderthemselves relievedgglt.uponthespecificinstructions ofarecognized superior.
Merelyknowingthatasuperiorispresentdoesnotconstitute areleaseformemergency dutiesandresponsibilities."
to"MembersoftheOn-shiftEmergency ResponseOrganization mayconsiderthemselves relieved~nluponthespecificinstructions oftheECorappropriate facilitysupervisor.
Merelyknowingthatareplacement ispresentdoesnotconstitute areleasefromemergency dutiesandresponsibilities";
thischangereflectsthechangeinterminology awayfromemergency teamsandclarifies thatpositionturnoverwillbeunderthedirection oftheECorfacilitysupervisor whichstrengthens thecontrolofthisactivity, andtherefore, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.31.Page2-19,Section2.2.2,PlantStaffEmergency Assignments, B,addedthefollowing newparagraph one"TheExpandedEmergency ResponseOrganization iscomposedofoperations personnel andEROpersonnel tomantheTSC,OSC,andEOF,asnecessary.";
thischangeallowsforconsistent wordingregarding thedescription oftheEROwiththeinitialparagraph inthisSection(2.2),thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.32.Page2-19,Section2.2.2,PlantStaQ'Emergency Assignments, B,1,changedtonumber2andchanged"...PrimaryEmergency ResponseOrganization members..."
to"...alternate EROmembers..."
andcapitalized "o"in"On-shift";
thenumbering andcasechangeareeditorial, thea:iaplanr32  


change&omprimarytoalternate clarifies thatpositionturnoverisnotrestricted totheprimarypositionholder,butcanoccurwithanyequallyqualified alternate.
change&om primary to alternate clarifies that position turnover is not restricted to the primary position holder, but can occur with any equally qualified alternate.
33.34.Page2-20,Section2.2.2,C.4,paragraph one,sentences threeandfour,changed&om"TheHealthPhysicsrepresentative, on-site,isdesignated astheon-shiftTSCHealthPhysicsSupervisor.
33.34.Page 2-20, Section 2.2.2, C.4, paragraph one, sentences three and four, changed&om"The Health Physics representative, on-site, is designated as the on-shift TSC Health Physics Supervisor.
TheTSCHealthPhysicsSupervisor recommends appropriate protective actionstotheECbaseduponradiological assessments."
The TSC Health Physics Supervisor recommends appropriate protective actions to the EC based upon radiological assessments." to"Prior to the availability to the TSC Health Physics Supervisor, the Health Physics technicians on-site will provide assistance to the EC in recommending protective actions based on radiological assessments.";
to"Priortotheavailability totheTSCHealthPhysicsSupervisor, theHealthPhysicstechnicians on-sitewillprovideassistance totheECinrecommending protective actionsbasedonradiological assessments.";
this change clarifies the role of the HP technicians on-site, one technician will no longer be identified to function as an interim TSC HP Supervisor, but the commitment to assist the EC is unchanged, this change does not decrease the effectiveness of the Emergency Plan.Page 2-21, Section 2.2.2, C.6, last sentence, changed"St.Lucie County-Fort Pierce Fire Department" to St.Lucie County-Fort Pierce Fire District";
thischangeclarifies theroleoftheHPtechnicians on-site,onetechnician willnolongerbeidentified tofunctionasaninterimTSCHPSupervisor, butthecommitment toassisttheECisunchanged, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page2-21,Section2.2.2,C.6,lastsentence, changed"St.LucieCounty-Fort PierceFireDepartment" toSt.LucieCounty-Fort PierceFireDistrict";
this is a correction to the organization's title, editorial change.35.Page 2-22, Section 2.2.2, 3, second paragraph, sentence two, changed" Emergency Operations Facility (EOF)personnel should be notified and placed in a standby status or mobilized as determined by the RM." to"The RM should place the Emergency Operations Facility (EOF)personnel in the facility for an Alert, as conditions warrant.";
thisisacorrection totheorganization's title,editorial change.35.Page2-22,Section2.2.2,3,secondparagraph, sentencetwo,changed"Emergency Operations Facility(EOF)personnel shouldbenotifiedandplacedinastandbystatusormobilized asdetermined bytheRM."to"TheRMshouldplacetheEmergency Operations Facility(EOF)personnel inthefacilityforanAlert,asconditions warrant.";
this change is not a commitment to activate the EOF prior to a Site Area Emergency, but to mobilize and place personnel in the facility to assist the TSC and become operational at the Site Area Emergency or earlier, if deemed appropriate by the RM, this change does not decrease the effectiveness of the Emergency Plan.36.Page 2-24, Table 2-2A, Additional Shift Staffing for all Modes of Operation, changed the Health Physics Technician
thischangeisnotacommitment toactivatetheEOFpriortoaSiteAreaEmergency, buttomobilizeandplacepersonnel inthefacilitytoassisttheTSCandbecomeoperational attheSiteAreaEmergency orearlier,ifdeemedappropriate bytheRM,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.36.Page2-24,Table2-2A,Additional ShiftStaffingforallModesofOperation, changedtheHealthPhysicsTechnician
&om"1" to"1 per unit";this change clarifies that there is one HP Technician on-shift for each unit, this change does not decrease the effectiveness of the Emergency Plan.37.Page 2-25, Table 2-2A, moved the"Note" to the top of the page;editorial change.38.Page 2-25, Table 2-2A, changed asterisk (*)to footnote 1;editorial change.39.Page 2-25, Table 2-2A, added two footnotes (3 Ec 4)to indicate personnel on-shift;this is not a change, but a clarification of on-shift staffing, this change does not decrease the effectiveness of the Emergency Plan.40.Page 2-26, Table 2-2B, under"~n-ljiQ", Emergency Coordinator, added"(assisted by Health Physics Department Representative)";
&om"1"to"1perunit";thischangeclarifies thatthereisoneHPTechnician on-shiftforeachunit,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.37.Page2-25,Table2-2A,movedthe"Note"tothetopofthepage;editorial change.38.Page2-25,Table2-2A,changedasterisk(*)tofootnote1;editorial change.39.Page2-25,Table2-2A,addedtwofootnotes (3Ec4)toindicatepersonnel on-shift; thisisnotachange,butaclarification ofon-shiftstaffing, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.40.Page2-26,Table2-2B,under"~n-ljiQ",Emergency Coordinator, added"(assisted byHealthPhysicsDepartment Representative)";
this change makes this table consistent with Figure 2-1, editorial change.41.Page 2-28, Section 2.2.2, 4, 7, changed"To provide logistic support for emergency personnel (e.g.transportation, communications, temporary quarters, food, water and sanitary facilities in the field, and special equipment and supplies procurement)." to"To provide logistical support for emergency personnel (e.g., transportation, communications, temporary quarters, food, water and a:Wplanr32 sanitary facilities in the field, and procurement of special equipment and supplies)." editorial change.42.Page 2-28, Section 2.2.2, 4, Emergency Information Manager (EIM), first paragraph, sentence two, deleted"During this phase";editorial change.43.Page 2-28, Section 2.2.2, 4, Emergency Technical Manager (ETM), changed"The ETM is a senior management engineer with detailed..." to"The ETM is a manager or senior engineer with detailed...";
thischangemakesthistableconsistent withFigure2-1,editorial change.41.Page2-28,Section2.2.2,4,7,changed"Toprovidelogisticsupportforemergency personnel (e.g.transportation, communications, temporary
this change reflects the move of the engineering group from the corporate office to the plant, senior management was terminology used when this position was staffed&om the corporate office, this change does not decrease the effectiveness of the Emergency Plan.44 Page 2-29, Section 2.2.2, 4, Governmental Affairs Manager (GAM), changed"The GAM is a senior manager experienced..." to"The GAM is a member of the ExternaVGovernmental Affairs staff experienced...";
: quarters, food,waterandsanitaryfacilities inthefield,andspecialequipment andsuppliesprocurement)."
this change clarifies the staffing for this position, this change does not decrease the effectiveness of the Emergency Plan.45.Page 2-29, Section 2.2.3, 2, Radiological Laboratories, sentence three, added"(MERL)";editorial change.46.Page 2-31, Section 2.2.3, 3 Additional Assistance, sentence one, changed"Operation" to"Operations";
to"Toprovidelogistical supportforemergency personnel (e.g.,transportation, communications, temporary
editorial change.47.Page 2-31, Section 2.2.3, 3 Additional Assistance, sentence two, added"Nuclear Steam Supply System" prior to (NSSS)and"ABB" prior to Combustion Engineering; editorial change.48.Page 2-31, Section 2.2.3,4 Support to Federal Assistance Teams, paragraph two, last sentence,.changed"Department of Health and Rehabilitative Services" to"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.49.Page 2-32, Section 2.2.4, 1, Control Room, paragraph one, sentence two changed"he assumes the role..." to"he/she assumes the role...";editorial change.50.Page 2-32, Section 2.2.4, 1, Control Room, paragraph four, sentence two, added"(satellite communications system)" after ESATCOM;editorial change.51.Page 2-33, Section 2.2.4, 2, Technical Support Center (TSC), paragraph four, added"2000" after FTS in two locations; editorial change.52.a:hplanr32 Page 2-33, Section 2.2.4, 3, Operational Support Center (OSC), new paragraph five, added,"A new location for the OSC is being prepared.The new location is in the large conference room on the second floor of the South Services Building, currently an alternate OSC location.The transition to the new location will occur during a 24 hour period with all equipment and supplies being relocated and all revised procedures being issued.The change will be completed by 28 February, 1997.";the new OSC will be comparable to the existing OSC and will, at a minimum, satisfy all requirements for an OSC, training will be provided to all ERO members prior to the transition, this change, when in effect, does not decrease the effectiveness of the Emergency Plan.53.Page 2-34, Section 2.2.4, 4, Alternate Operational Support Center, added"in accordance with procedures" following"...will designate an alternate location.";
: quarters, food,wateranda:Wplanr32 sanitaryfacilities inthefield,andprocurement ofspecialequipment andsupplies)."
this change reflects the addition in the Emergency Plan Implementing Procedures of specific guidance for relocation of the OSC, this improvement does not decrease the effectiveness of the Emergency Plan.54.Page 2-34, Section 2.2.4, 5, Emergency Operations Facility (EOF), paragraph three,'added"(Bell)" between commercial and telephone and added"(satellite communications system)" after ESATCOM;editorial change.55.Page 2-38, Section 2.2.4, 8, St.Lucie County Emergency Operations Center, sentence three, added"(satellite communications system)" after ESATCOM;editorial change.56.Page 2-38, Section 2.2.4, 9, Martin County Emergency Operations Center, sentence three, added"(satellite communications system)" after ESATCOM;editorial change.57.Page 2-38, Section 2.2.4, 10, Florida State Emergency Operations Center (State Warning Point), sentence one, added"Emergency Operations Center" prior to (EOC);editorial change.58.Page 2-38, Section 2.2.4;10, Florida State Emergency Operations Center (State Warning Point), sentence four, added"(satellite communications system)" after ESATCOM and"Local Government Radio" prior to (LGR);editorial change.D.mer nc l te (3.0)Page 3-1, F, sentence two, changed"Unusual Event" to"Notification of Unusual Event";editorial change.Page 3-1, Section 3.1, title, changed"Unusual Event" to"Notification of Unusual Event";editorial change.Page 3-1, Section 3.1, Unusual Event, sentence one, changed"The Unusual Event category..." to"The Notification of Unusual Event (normally shortened to Unusual Event)...";
editorial change.42.Page2-28,Section2.2.2,4,Emergency Information Manager(EIM),firstparagraph, sentencetwo,deleted"Duringthisphase";editorial change.43.Page2-28,Section2.2.2,4,Emergency Technical Manager(ETM),changed"TheETMisaseniormanagement engineerwithdetailed..."
editorial change.a:Opia nr32 Page 3-1, Section 3.2, FPL actions in response to this category will be:, number two, sentence two, changed"The Emergency Operations Facility personnel should be notified, placed in standby status, or mobilized as determined by the RM." to"The RM should place the Emergency Operations Facility personnel on standby in the facility for an Alert, as conditions warrant.";
to"TheETMisamanagerorseniorengineerwithdetailed...";
this change is not a commitment to activate the EOF prior to a Site Area Emergency, but to mobilize and place personnel in the facility to assist the TSC and become operational at the Site Area Emergency or earlier, if deemed appropriate by the RM, this change does not decrease the eQectiveness of the Emergency Plan.5.Pages 3-'5, 7, 8, 10 Table 3-1, GENERAL EMERGENCY, number two, changed"Measured Dose Rates or Off-site Dose Calculation (EPIP 3100033E)worksheet values at one mile in excess of: a.1000 mrem/hr (total dose rate)aa.1000 mrem/hr (total dose-TEDE)b.5000 mrem/hr (thyroid dose rate)bb.5000 mrem/hr (thyroid dose CDE)" to"Performance of EPIP 3100033E (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile)exposure levels have been exceeded as indicated by either A, B, C, or D below: A.1000 mrem/hr (total dose rate)B.1000 mrem/hr (total dose TEDE)C.5000 mrem/hr (thyroid dose rate)D.5000 mrem/hr (thyroid dose CDE)";this is a human factors change and does not revise the initiating condition or alter any decision-making criteria, this change does not decrease the effectiveness of the Emergency Plan.6.9 6 3-9.T Pl 3-1, ilNUEUEE EVENT, 3 6,~.3 6*6'*~a e'e'to" ccu ence e i within the e t ed ea";this is a human factors change and does not revise the initiating condition, but defines what is meant by near or on site, this change does not decrease the effectiveness of the Emergency Plan.7.Page 3-11, Table 3-1, UNUSUAL EVENT, S.A., ed earth uakeha ccu ed, number one, changed"A confirmed earthquake has been experienced on plant site." to"A confirmed earthquake has been experienced within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on plant site, this change does not decrease the effectiveness of the Emergency Plan.a Aeplanr32 s.Page 3-11, Table 3-1, ALERT, 5.B., rri n w'd', number one, changed"Confirmed hurricane warning is in effect with on site winds expected to exceed 175 mph." to"Confirmed hurricane warning is in effect and winds are expected to exceed 175 mph within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.Page 3-11, Table 3-1, SITE AREA EMERGENCY, S.B.,'w't', number two, changed"Confirmed hurricane warning is in effect with on site winds expected to exceed 194 mph.", to"Confirmed hurricane warning is in effect and winds are expected to exceed 194 mph within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.I 10.Page 3-12, Table 3-1, UNUSUAL EVENT, 5.C., i c d i li d"D C ll*dA";Ch'I h g.ted e e Page 3-16, Table 3-1, UNUSUAL EVENT, 9.A., u ra ctivi number one, changed"Aircraft crash on site or unusual..." to"Aircraft crash in the Owner Controlled Area or unusual...";
thischangereflectsthemoveoftheengineering groupfromthecorporate officetotheplant,seniormanagement wasterminology usedwhenthispositionwasstaffed&omthecorporate office,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.44Page2-29,Section2.2.2,4,Governmental AffairsManager(GAM),changed"TheGAMisaseniormanagerexperienced..."
this is a human factors chan'ge and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.12.Page 3-16, Table 3-1, UNUSUAL EVENT, 9.C., changed" n lanne/e e ie ic a a e e c u d..."to" unc t ed a e e ll re a...";this is a human factors change and does not revise the initiating condition, but defines what is meant by near or on site, this change does not decrease the effectiveness of the Emergency Plan.13.Page 3-16, Table 3-1, ALERT, 9.A.,''c number one, changed"Aircraft crash on site damaging plant structures." to"Aircraft crash in the Owner Controlled Area damaging plant structures.";
to"TheGAMisamemberoftheExternaVGovernmental Affairsstaffexperienced...";
this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.14.Page 3-16, Table 3-1, SITE AREA EMERGENCY, 9.A., ama t v't 1 te b*,4gd"Ai ft h i dgigill y"Aircraft crash in the Owner Controlled Area damaging vital plant systems.";
thischangeclarifies thestaffingforthisposition, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.45.Page2-29,Section2.2.3,2,Radiological Laboratories, sentencethree,added"(MERL)";
this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.15.Page 3-17, Table 3-2A, a, under, changed"Close blowdown valves" to"Close S/G blowdown Ec sample valves";editorial change.16.a:Opia nr32 Page 3-17, Table 3-2A, b, under , changed"3.5 x 10 CPM" to"1 x 10 CPM";this change reflects a reduction in the HI-Alarm setting (3X background).
editorial change.46.Page2-31,Section2.2.3,3Additional Assistance, sentenceone,changed"Operation" to"Operations";
based on data collected&om daily surveillances, this change does not decrease the effectiveness of the Emergency Plan.17.Page 3-17, Table 3-2A, c, under , deleted"(4)" next to"P";this monitor is listed in the Technical Specifications, this change does not decrease the effectiveness of the Emergency Plan.18.Page 3-17, Table 3-2A, e, under NT, changed"5 x 10" to"5 x 10";this change is a correction of an apparent typographical error not previously corrected, editorial change.19.Page 3-18, Table 3-2B, a, under T"Close S/G blowdown&sample valves";editorial change.changed"Close blowdown valves" to 20.Page 3-18, Table 3-3B, b, under T A changed"3 x 10 uCi/cc" to"2 x 10 uCi/cc", this change reflects an increase in the HI-Alarm setting, but is set in accordance with the limit established by the Technical Specifications (3X background), based on data collected&om daily surveillances, this change does not decrease the effectiveness of the Emergency Plan.21.Page 3-18, Table 3-3B, c, under, changed"Isolation of FHB exhaust causes auto switch to SBVS" to"NONE";the Process Radiation Monitors have been incorrectly shown to be involved in this switchover, the switchover to the Shield Building Ventilation System occurs based on 2 of 3 Area Radiation Monitors, in one group, going into alarm, this correction does not decrease the effectiveness of the Emergency Plan.22.Page 3-18, Table 3-3B,', under, deleted"(5)" next to"P";this monitor is listed in the Technical Specifications, this change does not decrease the effectiveness of the Emergency Plan.23.Pa~e 3-18, Table 3-3B, c, under T changed"1 x 10" to"1 x 10";this change is a correction of an apparent typographical error, editorial change.24.Page 3-19, Table 3-3, number one, added separate entry for Unit 2"10 to 10 mR/Iir";editorial change.25.Page 3-19, Table 3-3, number one, made separate entries to Unit 1 and Unit 2, changed the alarm setpoint for both Units Rom"7500 mR/hr" to"8000 mR/tir", based on review of recent calibration records;this increase in setpoint may appear as less conservative, but is still within the Technical Specification allowable trip setpoint limit (less than or equal to 10R), therefore, this change does not decrease the effectiveness of the Emergency Plan.26.Page 3-19, Table 3-3, number two, added calibrated alarm setpoints"6.4 R/hr High" and"8.0 R/hr High/High)", clarified that the previously listed (still included)setpoints actually are EAL initiating conditions for declaration of Site Area Emergency (High)and General Emergency a:Qplanr32  
editorial change.47.Page2-31,Section2.2.3,3Additional Assistance, sentencetwo,added"NuclearSteamSupplySystem"priorto(NSSS)and"ABB"priortoCombustion Engineering; editorial change.48.Page2-31,Section2.2.3,4SupporttoFederalAssistance Teams,paragraph two,lastsentence,
.changed"Department ofHealthandRehabilitative Services" to"Department ofHealth";changereflectsnewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.49.Page2-32,Section2.2.4,1,ControlRoom,paragraph one,sentencetwochanged"heassumestherole..."to"he/sheassumestherole...";
editorial change.50.Page2-32,Section2.2.4,1,ControlRoom,paragraph four,sentencetwo,added"(satellite communications system)"afterESATCOM;editorial change.51.Page2-33,Section2.2.4,2,Technical SupportCenter(TSC),paragraph four,added"2000"afterFTSintwolocations; editorial change.52.a:hplanr32 Page2-33,Section2.2.4,3,Operational SupportCenter(OSC),newparagraph five,added,"AnewlocationfortheOSCisbeingprepared.
Thenewlocationisinthelargeconference roomonthesecondflooroftheSouthServicesBuilding, currently analternate OSClocation.
Thetransition tothenewlocationwilloccurduringa24hourperiodwithallequipment andsuppliesbeingrelocated andallrevisedprocedures beingissued.Thechangewillbecompleted by28
: February, 1997.";thenewOSCwillbecomparable totheexistingOSCandwill,ataminimum,satisfyallrequirements foranOSC,trainingwillbeprovidedtoallEROmemberspriortothetransition, thischange,whenineffect,doesnotdecreasetheeffectiveness oftheEmergency Plan.53.Page2-34,Section2.2.4,4,Alternate Operational SupportCenter,added"inaccordance withprocedures" following
"...willdesignate analternate location.";
thischangereflectstheadditionintheEmergency PlanImplementing Procedures ofspecificguidanceforrelocation oftheOSC,thisimprovement doesnotdecreasetheeffectiveness oftheEmergency Plan.54.Page2-34,Section2.2.4,5,Emergency Operations Facility(EOF),paragraph three,'added"(Bell)"betweencommercial andtelephone andadded"(satellite communications system)"afterESATCOM;editorial change.55.Page2-38,Section2.2.4,8,St.LucieCountyEmergency Operations Center,sentencethree,added"(satellite communications system)"afterESATCOM;editorial change.56.Page2-38,Section2.2.4,9,MartinCountyEmergency Operations Center,sentencethree,added"(satellite communications system)"afterESATCOM;editorial change.57.Page2-38,Section2.2.4,10,FloridaStateEmergency Operations Center(StateWarningPoint),sentenceone,added"Emergency Operations Center"priorto(EOC);editorial change.58.Page2-38,Section2.2.4;10,FloridaStateEmergency Operations Center(StateWarningPoint),sentencefour,added"(satellite communications system)"afterESATCOMand"LocalGovernment Radio"priorto(LGR);editorial change.D.mernclte(3.0)Page3-1,F,sentencetwo,changed"UnusualEvent"to"Notification ofUnusualEvent";editorial change.Page3-1,Section3.1,title,changed"UnusualEvent"to"Notification ofUnusualEvent";editorial change.Page3-1,Section3.1,UnusualEvent,sentenceone,changed"TheUnusualEventcategory..."
to"TheNotification ofUnusualEvent(normally shortened toUnusualEvent)...";
editorial change.a:Opianr32Page3-1,Section3.2,FPLactionsinresponsetothiscategorywillbe:,numbertwo,sentencetwo,changed"TheEmergency Operations Facilitypersonnel shouldbenotified, placedinstandbystatus,ormobilized asdetermined bytheRM."to"TheRMshouldplacetheEmergency Operations Facilitypersonnel onstandbyinthefacilityforanAlert,asconditions warrant.";
thischangeisnotacommitment toactivatetheEOFpriortoaSiteAreaEmergency, buttomobilizeandplacepersonnel inthefacilitytoassisttheTSCandbecomeoperational attheSiteArea Emergency orearlier,ifdeemedappropriate bytheRM,thischangedoesnotdecreasetheeQectiveness oftheEmergency Plan.5.Pages3-'5,7,8,10Table3-1,GENERALEMERGENCY, numbertwo,changed"Measured DoseRatesorOff-siteDoseCalculation (EPIP3100033E) worksheet valuesatonemileinexcessof:a.1000mrem/hr(totaldoserate)aa.1000mrem/hr(totaldose-TEDE)b.5000mrem/hr(thyroiddoserate)bb.5000mrem/hr(thyroiddoseCDE)"to"Performance ofEPIP3100033E(Off-site DoseCalculations) ormeasureddoseratesfromoff-sitesurveysindicatesiteboundary(1mile)exposurelevelshavebeenexceededasindicated byeitherA,B,C,orDbelow:A.1000mrem/hr(totaldoserate)B.1000mrem/hr(totaldoseTEDE)C.5000mrem/hr(thyroiddoserate)D.5000mrem/hr(thyroiddoseCDE)";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition oralteranydecision-makingcriteria, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.6.963-9.TPl3-1,ilNUEUEEEVENT,36,~.36*6'*~ae'e'to"ccuenceeiwithintheetedea";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbynearoronsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.7.Page3-11,Table3-1,UNUSUALEVENT,S.A.,edearthuakehaccued,numberone,changed"Aconfirmed earthquake hasbeenexperienced onplantsite."to"Aconfirmed earthquake hasbeenexperienced withintheOwnerControlled Area.";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonplantsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.aAeplanr32 s.Page3-11,Table3-1,ALERT,5.B.,rrinw'd',numberone,changed"Confirmed hurricane warningisineffectwithonsitewindsexpectedtoexceed175mph."to"Confirmed hurricane warningisineffectandwindsareexpectedtoexceed175mphwithintheOwnerControlled Area.";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.Page3-11,Table3-1,SITEAREAEMERGENCY, S.B.,'w't',numbertwo,changed"Confirmed hurricane warningisineffectwithonsitewindsexpectedtoexceed194mph.",to"Confirmed hurricane warningisineffectandwindsareexpectedtoexceed194mphwithintheOwnerControlled Area.";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.I10.Page3-12,Table3-1,UNUSUALEVENT,5.C.,icdilid"DCll*dA";Ch'Ihg.tedeePage3-16,Table3-1,UNUSUALEVENT,9.A.,uractivinumberone,changed"Aircraft crashonsiteorunusual..."
to"Aircraft crashintheOwnerControlled Areaorunusual...";
thisisahumanfactorschan'geanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.12.Page3-16,Table3-1,UNUSUALEVENT,9.C.,changed"nlanne/eeieicaaeecud..."to"unctedaeellrea...";thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbynearoronsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.13.Page3-16,Table3-1,ALERT,9.A.,''cnumberone,changed"Aircraft crashonsitedamagingplantstructures."
to"Aircraft crashintheOwnerControlled Areadamagingplantstructures.";
thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.14.Page3-16,Table3-1,SITEAREAEMERGENCY, 9.A.,amatv't1teb*,4gd"Ai fthidgigilly"Aircraft crashintheOwnerControlled Areadamagingvitalplantsystems.";
thisisahumanfactorschangeanddoesnotrevisetheinitiating condition, butdefineswhatismeantbyonsite,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.15.Page3-17,Table3-2A,a,under,changed"Closeblowdownvalves"to"CloseS/GblowdownEcsamplevalves";editorial change.16.a:Opianr32Page3-17,Table3-2A,b,under,changed"3.5x10CPM"to"1x10CPM";thischangereflectsareduction intheHI-Alarmsetting(3Xbackground).
based ondatacollected
&omdailysurveillances, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.17.Page3-17,Table3-2A,c,under,deleted"(4)"nextto"P";thismonitorislistedintheTechnical Specifications, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.18.Page3-17,Table3-2A,e,underNT,changed"5x10"to"5x10";thischangeisacorrection ofanapparenttypographical errornotpreviously corrected, editorial change.19.Page3-18,Table3-2B,a,underT"CloseS/Gblowdown&samplevalves";editorial change.changed"Closeblowdownvalves"to20.Page3-18,Table3-3B,b,underTAchanged"3x10uCi/cc"to"2x10uCi/cc",thischangereflectsanincreaseintheHI-Alarmsetting,butissetinaccordance withthelimitestablished bytheTechnical Specifications (3Xbackground),
basedondatacollected
&omdailysurveillances, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.21.Page3-18,Table3-3B,c,under,changed"Isolation ofFHBexhaustcausesautoswitchtoSBVS"to"NONE";theProcessRadiation Monitorshavebeenincorrectly showntobeinvolvedinthisswitchover, theswitchover totheShieldBuildingVentilation Systemoccursbasedon2of3AreaRadiation
: Monitors, inonegroup,goingintoalarm,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.22.Page3-18,Table3-3B,',under,deleted"(5)"nextto"P";thismonitorislistedintheTechnical Specifications, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.23.Pa~e3-18,Table3-3B,c,underTchanged"1x10"to"1x10";thischangeisacorrection ofanapparenttypographical error,editorial change.24.Page3-19,Table3-3,numberone,addedseparateentryforUnit2"10to10mR/Iir";editorial change.25.Page3-19,Table3-3,numberone,madeseparateentriestoUnit1andUnit2,changedthealarmsetpointforbothUnitsRom"7500mR/hr"to"8000mR/tir",basedonreviewofrecentcalibration records;thisincreaseinsetpointmayappearaslessconservative, butisstillwithintheTechnical Specification allowable tripsetpointlimit(lessthanorequalto10R),therefore, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.26.Page3-19,Table3-3,numbertwo,addedcalibrated alarmsetpoints "6.4R/hrHigh"and"8.0R/hrHigh/High)",
clarified thatthepreviously listed(stillincluded) setpoints actuallyareEALinitiating conditions fordeclaration ofSiteAreaEmergency (High)andGeneralEmergency a:Qplanr32  


(High/High);
(High/High);
thischangedoesnotalteralarmsetpoints andtherefore doesnotdecreasetheeffectiveness oftheEmergency Plan.27.Page3-19,Table3-3,numberthree,madeseparateentriesforUnit1andUnit2,addedHighAlarmsetpoints forbothUnits;thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.28.Page3-19,Table3-3numberfour,addedHighAlarmsetpoints forbothUnits;thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.29.Page3-20,Table3-4,Subcooled MarginMonitors, added"(QSPDS)"
this change does not alter alarm setpoints and therefore does not decrease the effectiveness of the Emergency Plan.27.Page 3-19, Table 3-3, number three, made separate entries for Unit 1 and Unit 2, added High Alarm setpoints for both Units;this change does not decrease the effectiveness of the Emergency Plan.28.Page 3-19, Table 3-3 number four, added High Alarm setpoints for both Units;this change does not decrease the effectiveness of the Emergency Plan.29.Page 3-20, Table 3-4, Subcooled Margin Monitors, added"(QSPDS)" and replaced the range value for both Units,"50-750 F" and inserted"calculated";
andreplacedtherangevalueforbothUnits,"50-750F"andinserted"calculated";
this change was made to better reflect the manner in which subcooled margin is determined by QSPDS and to eliminate range values which are too limiting, this change does not reduce the effectiveness of the Emergency Plan.30.Page 3-20, Table 3-4, Nuclear Instrumentation Wide Range Power (Log Scale), corrected the range for Unit 1 from"10-100%" to"10-200%";this change is a correction of an apparent typographical error not previously corrected, editorial change.i c'nd Page 4-1, Section 4.1, paragraph one, last sentence, changed"...Section 2.2.1.1..." to"Section 2.2.2.2...";
thischangewasmadetobetterreflectthemannerinwhichsubcooled marginisdetermined byQSPDSandtoeliminate rangevalueswhicharetoolimiting, thischangedoesnotreducetheeffectiveness oftheEmergency Plan.30.Page3-20,Table3-4,NuclearInstrumentation WideRangePower(LogScale),corrected therangeforUnit1from"10-100%"to"10-200%";thischangeisacorrection ofanapparenttypographical errornotpreviously corrected, editorial change.ic'ndPage4-1,Section4.1,paragraph one,lastsentence, changed"...Section2.2.1.1..."
this change is a reference correction, editorial change.Page 4-1, Section 4.1.1,1, sentence two, changed"...the Plant Public Address system..." to"...the plant public address system...";
to"Section2.2.2.2...";
editorial change.Page 4-3, Section 4.1.2, paragraph two, last sentence, changed"...discussed in Table 5-2." to"...discussed in I'igure'5-1.";
thischangeisareference correction, editorial change.Page4-1,Section4.1.1,1,sentencetwo,changed"...thePlantPublicAddresssystem..."
this change is a reference correction, editorial change.Page 4-3, Section 4.2.1, paragraph one, sentence two, changed"The State's Hot Ring Down (commercial telephone and ESATCOM backup)will be..." to"The State's Hot Ring Down (commercial telephone and ESATCOM (satellite communications system)serve as backups)will be...";editorial change.5.Page 4-5, Section 4.2.2, title, changed"Department of Health and Rehabilitative Services" to"Department of Health", change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.a:Rplanr32 Page 4-5, Section 4.2.2, paragraph one, changed"The Division of Emergency Management (DEM)State Warning Point Duty Officer is responsible for notifying the Department of Health land Rehabilitative Services (DHRS).Notification is made to the Public Health Physicist and the Administer, Office of Radiation Control.The Public Health Physicist verifies the existence of a radiological emergency by contacting the Control Room via telephone, then contacts the St.Lucie County EOC to ascertain what, if any, protective actions have been initiated.
to"...theplantpublicaddresssystem...";
If 12 required, the Office of Radiation Control activates the Mobile Emergency Radiological Laboratory (MERL)and/or the Radiological Monitoring Teams." to"The Division of Emergency Management (DEM)State Warning Point Duty Offlcer is responsible for notifying the Department of Health.Notification is made to the Bureau of Radiation Control.A Health Physicist contacts the St.Lucie County EOC to ascertain what, if any, protective actions have been initiated.
editorial change.Page4-3,Section4.1.2,paragraph two,lastsentence, changed"...discussed inTable5-2."to"...discussed inI'igure'5-1.";
If required, the Bureau of Radiation Control activates the Mobile Emergency Radiological Laboratory (MERL)and/or the Radiological Monitoring Teams.";this change reflects the new title of State agency and changes in their standard operating procedures, these changes do not decrease the effectiveness of the Emergency Plan.Page 4-6, Section 4.3, Communications, sentence two, added"(satellite communications system)" after ESATCOM;editorial change.Page 4-7, Section 4.6, paragraph two, sentence one, changed"Communications Network" to"communications network";editorial change.Page 4-9, Section 4.6, paragraph two, last sentence, changed"Commercial telephone or ESATCOM serves as backup." to"Commercial telephone and ESATCOM (satellite communications system)serve as backups.";
thischangeisareference correction, editorial change.Page4-3,Section4.2.1,paragraph one,sentencetwo,changed"TheState'sHotRingDown(commercial telephone andESATCOMbackup)willbe..."to"TheState'sHotRingDown(commercial telephone andESATCOM(satellite communications system)serveasbackups)willbe...";editorial change.5.Page4-5,Section4.2.2,title,changed"Department ofHealthandRehabilitative Services" to"Department ofHealth",changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.a:Rplanr32 Page4-5,Section4.2.2,paragraph one,changed"TheDivisionofEmergency Management (DEM)StateWarningPointDutyOfficerisresponsible fornotifying theDepartment ofHealthlandRehabilitative Services(DHRS).Notification ismadetothePublicHealthPhysicist andtheAdminister, OfficeofRadiation Control.ThePublicHealthPhysicist verifiestheexistence ofaradiological emergency bycontacting theControlRoomviatelephone, thencontactstheSt.LucieCountyEOCtoascertain what,ifany,protective actionshavebeeninitiated.
editorial change.10.Page 4-9, Section 4.6, ESATCOM, sentence one, changed"...an emergency satellite communication system which..." to"...an Emergency Satellite Communications System which...";
If12
editorial change.Page 4-9, Section 4.6, LOCAL GOVERNMENT RADIO (LGR)SYSTEM, sentence two, changed"...Department of Health and Rehabilitative Services (DHRS),..." to"...Department of Health,...";
: required, theOfficeofRadiation Controlactivates theMobileEmergency Radiological Laboratory (MERL)and/ortheRadiological Monitoring Teams."to"TheDivisionofEmergency Management (DEM)StateWarningPointDutyOfflcerisresponsible fornotifying theDepartment ofHealth.Notification ismadetotheBureauofRadiation Control.AHealthPhysicist contactstheSt.LucieCountyEOCtoascertain what,ifany,protective actionshavebeeninitiated.
change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.12.Page 4-10, Section 4.7, sentence one, changed"...communication equipment..." to"...communications equipment...";
Ifrequired, theBureauofRadiation Controlactivates theMobileEmergency Radiological Laboratory (MERL)and/ortheRadiological Monitoring Teams.";thischangereflectsthenewtitleofStateagencyandchangesintheirstandardoperating procedures, thesechangesdonotdecreasetheeffectiveness oftheEmergency Plan.Page4-6,Section4.3,Communications, sentencetwo,added"(satellite communications system)"afterESATCOM;editorial change.Page4-7,Section4.6,paragraph two,sentenceone,changed"Communications Network"to"communications network";
editorial change.13.Page 4-11, Table 4-1, 2, number two, changed"...by Plan and Procedure" to,"...by plan and procedure";
editorial change.Page4-9,Section4.6,paragraph two,lastsentence, changed"Commercial telephone orESATCOMservesasbackup."to"Commercial telephone andESATCOM(satellite communications system)serveasbackups.";
editorial change.14.Page 4-11, Table 4-1, 6, changed"Florida Department of Health and Rehabilitative Services, OQice of Radiation Control..." to"Florida Department of Health, Bureau of Radiation Control...";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.15.Page 4-12, Figure 4-2, abbreviations, added"(NRC)" after HPN-Health Physics Network and inserted"SYSTEM" after ADDRESS in PLT PA-PLANT PUBLIC ADDRESS (PAGE)in the list of abbreviations; editorial change.16.a:heplanr32 Page 4-12, Figure 4-2, added,"ESATCOM" to the communications interfaces available in the TSC and the EOF/ENC and added"ESATCOM-EMERGENCY SATELLITE 13 COMMUNICATIONS SYSTEM" to the list of abbreviations, the system was originally installed in these facilities, but was not reflected in this table, this correction does not decrease the effectiveness of the Emergency Plan.e't'(5.0)I Page 5-1, Section 5.1 paragraph one, last sentence, changed"Post Accident sampling..." to" Post accident sampling...";
editorial change.10.Page4-9,Section4.6,ESATCOM,sentenceone,changed"...anemergency satellite communication systemwhich..."
editorial change.Page 5-1, Section 5.1.1, paragraph three, sentence four, added"Emergency Core Cooling System" prior to (ECCS);editorial change.Page 5-2, Section 5.1.2, paragraph three, sentence one, added"(PASS)" after Post Accident Sampling System;editorial change.Page 5-3, Section 5.1.3, paragraph three, sentence two, changed"(DHRS)" to"the Bureau of Radiation Control";change reflects the new title of State oQice, this correction does not decrease the effectiveness of the Emergency Plan.Page 5-3, Section 5.1.4, paragraph four, sentence two, added"Final Updated Safety Analysis Report" prior to (FUSAR);editorial change.Page 5-6, Section 5.1.5, paragraph two, sentence three, capitalized"State" and"County";editorial change.Page 5-6, Section 5.1.5, sentence four, changed"Table 5-2" to"Figure 5-1";this change is a reference correction, editorial change.-8.Page 5-6, Section 5.1.5, sentence four, added"the Environmental Protection Agency" prior to (EPA)and"Protective Action Guides" prior to (PAGs);editorial change.Page 5-6, Section 5.1.6, paragraph one, sentence one, changed"The Florida Department of Health and Rehabilitative Services maintains..." to"The Florida Department of Health maintains...";
to"...anEmergency Satellite Communications Systemwhich...";
change reflects the new title of State agency, this correction does not decrease the eQectiveness of the Emergency Plan.10.Page 5-6, Section 5.1.6, paragraph one, sentence one, changed"...a system of 35 TLD stations.." to"...a system of about 35 TLD'stations...";
editorial change.Page4-9,Section4.6,LOCALGOVERNMENT RADIO(LGR)SYSTEM,sentencetwo,changed"...Department ofHealthandRehabilitative Services(DHRS),..."
this change is based on feedback from the Department of Health which indicated that the number of TLD locations can vary, but is around 35 so this reference to the TLDs was revised accordingly, this change does not decrease the eQectiveness of the Emergency Plan.a:hplanr32 Page 5-6, Section 5.1.6, paragraph two, sentence five, changed"DHRS" to"Bureau of Radiation Control", also capitalized"State";change reflects the new title of State office, this correction in title nor the editorial change decreases the effectiveness of the Emergency Plan.14 12.Page 5-7, Section 5.1.6, paragraph one, sentence two, capitalized"Plume Exposure" and added"Pathway Emergency Planning Zone" prior to (EPZ);editorial change.13.Page 5-7, Section 5.1.6, paragraph three, changed"...responsibility rests on the DHRS Office of Radiation Control." to"..~responsibility rests with the Bureau of Radiation Control.";
to"...Department ofHealth,...";
change reflects the new title of State office, this correction does not decreases the effectiveness of the Emergency Plan.14.Page 5-8, Section 5.1.6, paragraph one, sentence one, changed"...have been made for State DHRS representatives to be stationed at the EOF." to"..~have been made for representatives from the Bureau of Radiation Control to be stationed at the EOF.";change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.15.Page 5-8, Section 5.1.6, paragraph one, sentence two, changed"Direction and control of field.operations for the Department of Health and Rehabilitative Service will be provided by the Public Health Physicist Supervisor of Surveillance and Laboratories." to"Direction and control of field operations for the Department of Health will be provided by the Health Physics Supervisor.";
changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.12.Page4-10,Section4.7,sentenceone,changed"...communication equipment..."
this change reflects the new title of State agency and changes in their standard operating procedures, these changes do not decrease the effectiveness of the Emergency Plan.16.Page 5-8, Section 5.1.6, paragraph one, sentence four, changed"...have been described in Off-site Emergency Response Organization EPIP 1202,"Activation and Use of the Emergency, Operations Facility (St.Lucie)"." to"...have been described in EPP-15,"Activation and Use of the Emergency Operations Facility".";
to"...communications equipment...";
EPIP 1202 underwent a procedure upgrade process and was renumbered EPP-15, this change should have been reflected in Revision 31, this change does not decrease the effectiveness of the Emergency Plan.17.Page 5-8, Section 5.1.6, paragraph one, sentence five, changed"DHRS" to"the Bureau of Radiation Control.";
editorial change.13.Page4-11,Table4-1,2,numbertwo,changed"...byPlanandProcedure" to,"...byplanandprocedure";
change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.18.Page 5-8, Section 5.1.6, paragraph two, changed"DHRS" to"the Bureau of Radiation Control" in two locations and added"the Department of Energy" prior to (DOE);change reflects the new title of State office and inclusion of the proper title of DOE, neither of these changes decreases the effectiveness of the Emergency Plan.19.Page 5-8, Section 5.'2, paragraph one, capitalized"State" and County";editorial change.20.Page 5-10, Section 5.2.1, paragraph one, sentence one, changed"...
editorial change.14.Page4-11,Table4-1,6,changed"FloridaDepartment ofHealthandRehabilitative
the Department of Health and Rehabilitative Services (DHRS)..." to"...the Department of Health...";
: Services, OQiceofRadiation Control..."
change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.a:ieplanr32 15 21.Page 5-10, Section 5.2.1, paragraph one, last sentence, changed"DHRS" to"Bureau of Radiation Control.";
to"FloridaDepartment ofHealth,BureauofRadiation Control...";changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.15.Page4-12,Figure4-2,abbreviations, added"(NRC)"afterHPN-HealthPhysicsNetworkandinserted"SYSTEM"afterADDRESSinPLTPA-PLANTPUBLICADDRESS(PAGE)inthelistofabbreviations; editorial change.16.a:heplanr32 Page4-12,Figure4-2,added,"ESATCOM" tothecommunications interfaces available intheTSCandtheEOF/ENCandadded"ESATCOM-EMERGENCY SATELLITE 13 COMMUNICATIONS SYSTEM"tothelistofabbreviations, thesystemwasoriginally installed inthesefacilities, butwasnotreflected inthistable,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.e't'(5.0)IPage5-1,Section5.1paragraph one,lastsentence, changed"PostAccidentsampling..."
change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.22.'Page 5-10, Section 5.2.1, paragraph three sentence one, changed"Table 5-2" to"Figure 5-1";this change is a reference correction, editorial change.23.Page 5-14, Section 5.2.2, 2, title, changed"includes Protected Area)" to"(includes the Protected Area)";editorial change.24.P fi fi-lfi,fi i 522,2,~i,*fi, fi fi fi"lifi fi~"'*fiifi 5-2";this change is a reference correction, editorial change.25.Page 5-15, Section 5.2.2, 2, title, changed"includes Protected Area)" to"(includes the Protected Area)";editorial change.26.Page5-15, Section5.2.2,2, vacuati n m lementati n,paragraphone,sentencethree, added"Response Organization" between the words Emergency and personnel; editorial change.27.Page 5-16, Section 5.2.2, 2, title, changed"gncludes Protected Area)" to"(includes the Protected Area)";editorial change.28.Page 5-16, Section 5.2.2,2, er nnel cc unta'li ran rtation and K it Rout paragraph two, changed"Upon declaration of an emergency evacuation, the Security Guard Force will..." to"Upon declaration of an Owner Controlled Area evacuation, the Security Guard Force will...";this change clarifies that the evacuation discussed in this paragraph is associated with the Owner Controlled Area, this change does not decrease the effectiveness of the Emergency Plan.29.Page 5-16, Section 5.2.2,2, er nnel cc unta ili ran rtati n and Exit Routes, paragraph three, sentence one, changed"When an evacuation is declared, all non-essential personnel in the affected area will stop working, leave the affected area and assemble..." to"When an evacuation is declared, all non essential personnel will stop working, leave the area and assemble...";
to"Postaccidentsampling...";
it is not necessary to stipulate the"affected" area because the entire area (Owner Controlled Area)is the area of impact, this change does not decrease the effectiveness of, the Emergency Plan.30.Page 5-16, Section 5.2.2, 2, er.nnel ci unta ili ran at'nd it R ute, paragraph three, sentence two,, changed"Figure 5-1" to"Figure 5-2";this change is a reference correction, editorial change.31.Page5-16,Section5.2.2,2, er.nnel cc unta ili an rtati n a d itR ute, paragraph five, changed"The security force on duty..." to"The Security Guard Force on duty...";editorial change.a hplanr32 16 32.Page 5-16, Section 5.2.3, sentence one, changed"An Off-site Area Evacuation is the..." to"An'ff-site area evacuation is the...";editorial change.33.Page 5-I6, Section 5.2.3, sentence two, changed"...Department of Health and Rehabilitative Services as specified..." to"...Department of Health as specified...";
editorial change.Page5-1,Section5.1.1,paragraph three,sentencefour,added"Emergency CoreCoolingSystem"priorto(ECCS);editorial change.Page5-2,Section5.1.2,paragraph three,sentenceone,added"(PASS)"afterPostAccidentSamplingSystem;editorial change.Page5-3,Section5.1.3,paragraph three,sentencetwo,changed"(DHRS)"to"theBureauofRadiation Control";
change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.34.Page 5-17, Section 5.2.3, paragraph one, sentence one, changed"Table 5-3" to"Table 5-'2";this change is a reference correction, editorial change.35.Page 5-17, Section 5.2.3, paragraph one, sentence two, changed"Figure 5-2" to"Figure 5-3";this change is a reference correction, editorial change.36.Page 5-17, Section 5.'2.3, paragraph two, last sentence, capitalized"State";editorial change.37.Page 5-17, Section 5.2.3, paragraph four, sentence one, changed"...actions for the plume exposure pathway EPZ..." to"...actions for the Plume Exposure Pathway EPZ...";editorial change.38.Page 5-17, Section 5.2.3, paragraph four, changed"DHRS" to"The Bureau of Radiation Control" in two locations; change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.39.Page 5-17, Section 5.2.3, paragraph four, last sentence, changed"...important basis for protective action recommendations." to"...important basis for Protective Action Recommendations (PARs).";editorial change.40.Page 5-18, Section 5.2.4, sentence one, change"(Figures G2-9)" to"(Figures Gl-8)";this change is a reference correction, editorial change.41.Page 5-18, Section 5.2.5, sentence two, changed"DHRS" to"Bureau of Radiation Control";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.42.Page 5-18, Section 5.2.5, sentence two, changed"...the ingestion pathway EPZ." to"...the Ingestion Exposure Pathway EPZ.";editorial change.43.Page 5-18, Section 5.2.7, last sentence, changed"(St.Lucie Site plan)" to"(St.Lucie Site Plan)";editorial change.44.Page 5-24, Table 5-2, changed the revision date of the State of Florida Radiological Emergency Management Plan&om"1/1/95" to"1/1/96", data in the table was unchanged, this change does not decrease the effectiveness of the Emergency Plan.a:hplanr32 17 45.Page 5-27, Section 5.4.1, paragraph two, sentence two, changed"...of an augmented Expanded Response Organization..." to"...of an augmented Expanded Emergency Response Organization...";
changereflectsthenewtitleofStateoQice,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.Page5-3,Section5.1.4,paragraph four,sentencetwo,added"FinalUpdatedSafetyAnalysisReport"priorto(FUSAR);editorial change.Page5-6,Section5.1.5,paragraph two,sentencethree,capitalized "State"and"County";
editorial change.46.Page 5-27, Section 5.4.1, last paragraph, sentence one, changed"...(e.g., federal, state, and local agencies)..." to"...(e.g., Federal, State, and local agencies)...";
editorial change.Page5-6,Section5.1.5,sentencefour,changed"Table5-2"to"Figure5-1";thischangeisareference correction, editorial change.-8.Page5-6,Section5.1.5,sentencefour,added"theEnvironmental Protection Agency"priorto(EPA)and"Protective ActionGuides"priorto(PAGs);editorial change.Page5-6,Section5.1.6,paragraph one,sentenceone,changed"TheFloridaDepartment ofHealthandRehabilitative Servicesmaintains..."
editorial change.47.Page 5-27, Section 5.4.1, last paragraph, sentence two, changed"...the Emergency classification." to"...the emergency classification.";
to"TheFloridaDepartment ofHealthmaintains...";
editorial change.48.Page 5-28,'Section 5.4.1, last paragraph, sentence three, added"Radiation Controlled Area" prior to (RCA);editorial change.49.Page 5-28, Section 5.4.2, sentence three, changed"Annex I" to"Annex K";this change is a reference correction, editorial change.50.51.Page 5-28, Section 5.4.2, sentence three, changed"...and monitoring in the ingestion pathway EPZ." to"...and monitoring in the Ingestion Exposure Pathway EPZ.";editorial change.Page 5-28, Section 5.4.2, last sentence, changed"(Recovery and Re-entry Planning)" to"(Recovery and Re-entry)";
changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeQectiveness oftheEmergency Plan.10.Page5-6,Section5.1.6,paragraph one,sentenceone,changed"...asystemof35TLDstations.."to"...asystemofabout35TLD'stations...";
this change is a chapter title correction from the State of Florida Radiological Emergency Management Plan, this change does not decrease the effectiveness of the Emergency Plan.tLO)1.Page 6-1, Section 6.2, 1, second paragraph, sentence three, capitalized"State";editorial change.2.Page 6-4, Section 6.3, last sentence, added"Exposure Pathway" between Plume and EPZ;editorial change.3.Page 6-10, Table 6-6, in the message text, capitalized"County","State", and"Federal";
thischangeisbasedonfeedbackfromtheDepartment ofHealthwhichindicated thatthenumberofTLDlocations canvary,butisaround35sothisreference totheTLDswasrevisedaccordingly, thischangedoesnotdecreasetheeQectiveness oftheEmergency Plan.a:hplanr32 Page5-6,Section5.1.6,paragraph two,sentencefive,changed"DHRS"to"BureauofRadiation Control",
editorial change.4.Page 6-10, Table 6-6, in the message text, removed phone number;the phone number was mistakenly included in this example news release, this information is provided to the media when the Emergency News Center is operational, this change does not decrease the effectiveness of the Emergency Plan.e enc r (7.0)a:Opia nr32 Page 7-1, Section 7.1.1, paragraph one, sentence two, changed"An exercise includes mobilization of state and..." to"An exercise normally includes mobilization of State and...";this change acknowledges the biennial frequency of exercises and the fact that the degree of oQ'-18 site participation may vary&om year to year, the other change was a capitalization of"State", these changes do not decrease the effectiveness of the Emergency Plan.2.Page 7-I, Section 7.1.2, 3, changed"communication" to"communications";
alsocapitalized "State";changereflectsthenewtitleofStateoffice,thiscorrection intitlenortheeditorial changedecreases theeffectiveness oftheEmergency Plan.14 12.Page5-7,Section5.1.6,paragraph one,sentencetwo,capitalized "PlumeExposure" andadded"PathwayEmergency PlanningZone"priorto(EPZ);editorial change.13.Page5-7,Section5.1.6,paragraph three,changed"...responsibility restsontheDHRSOfficeofRadiation Control."
editorial change.3.Page 7-1, Section 7.1.3, last sentence, removed the word"the" between the words of and plant management; editorial change.4.Page 7-2, Section 7.1.3, 4, capitalized"Federal" and"State";editorial change.5.Page 7-2, Section 7.1.3, mid page, removed the word"the" between the words"conducted," and plant management; editorial change.6.Page 7-5, Section 7.1.4, 1, paragraph one, sentence three, capitalized"Federal" and"State";editorial change.7.Page 7-5, Section 7.1.4, 1, paragraph three, capitalized"Federal" and"State";editorial change.8.Page 7-6, Section 7.1.4, 5, paragraph one, sentence one, capitalized"State","Plume Exposure Pathway";editorial change.9.Page 7-6, Section 7.1.4, 5, paragraph one, sentence three, removed the apostrophe from the word"EOC's";editorial change.10.Page 7-6, Section 7.1.4, 5, paragraph two, changed"These drills include"communications between the nuclear power plants, state, and local Emergency Operations Centers (EOC's)and field assessment teams..."." to"These drills include"communications between the nuclear power plants, State, and local EOCs and field assessment teams...".";
to"..~responsibility restswiththeBureauofRadiation Control.";
this change is a correction of the quote&om the State of Florida Radiological Emergency Management Plan, this change does not decrease the effectiveness of the Emergency Plan.11.Page 7-7, Section 7.1.4, 6, paragraph one, second two, changed"DHRS" to"Department of Health";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.12.Page 7-7, Section 7.1.4, 6, paragraph one, second two, changed"County Disaster Preparedness agencies" to"County Departments of Public Safety";this change reflects consistency to the title of the County agencies as named elsewhere in the Emergency Plan, this change does not decrease the effectiveness of the Emergency Plan.13.Page 7-8, Section 7.2.1, 1, changed"implementing procedures." to"Emergency Plan Implementing Procedures (EPIPs).";
changereflectsthenewtitleofStateoffice,thiscorrection doesnotdecreases theeffectiveness oftheEmergency Plan.14.Page5-8,Section5.1.6,paragraph one,sentenceone,changed"...havebeenmadeforStateDHRSrepresentatives tobestationed attheEOF."to"..~havebeenmadeforrepresentatives fromtheBureauofRadiation Controltobestationed attheEOF.";changereflectsthenewtitleofStateoffice,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.15.Page5-8,Section5.1.6,paragraph one,sentencetwo,changed"Direction andcontroloffield.operations fortheDepartment ofHealthandRehabilitative ServicewillbeprovidedbythePublicHealthPhysicist Supervisor ofSurveillance andLaboratories."
editorial change.14.Page 7-8, Section 7.2.2, title, added"(ERO)" after"Emergency Response Organization";
to"Direction andcontroloffieldoperations fortheDepartment ofHealthwillbeprovidedbytheHealthPhysicsSupervisor.";
thischangereflectsthenewtitleofStateagencyandchangesintheirstandardoperating procedures, thesechangesdonotdecreasetheeffectiveness oftheEmergency Plan.16.Page5-8,Section5.1.6,paragraph one,sentencefour,changed"...havebeendescribed inOff-siteEmergency ResponseOrganization EPIP1202,"Activation andUseoftheEmergency, Operations Facility(St.Lucie)"."
to"...havebeendescribed inEPP-15,"Activation andUseoftheEmergency Operations Facility".";
EPIP1202underwent aprocedure upgradeprocessandwasrenumbered EPP-15,thischangeshouldhavebeenreflected inRevision31,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.17.Page5-8,Section5.1.6,paragraph one,sentencefive,changed"DHRS"to"theBureauofRadiation Control.";
changereflectsthenewtitleofStateoffice,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.18.Page5-8,Section5.1.6,paragraph two,changed"DHRS"to"theBureauofRadiation Control"intwolocations andadded"theDepartment ofEnergy"priorto(DOE);changereflectsthenewtitleofStateofficeandinclusion ofthepropertitleofDOE,neitherofthesechangesdecreases theeffectiveness oftheEmergency Plan.19.Page5-8,Section5.'2,paragraph one,capitalized "State"andCounty";editorial change.20.Page5-10,Section5.2.1,paragraph one,sentenceone,changed"...
theDepartment ofHealthandRehabilitative Services(DHRS)..."
to"...theDepartment ofHealth...";
changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.a:ieplanr32 15 21.Page5-10,Section5.2.1,paragraph one,lastsentence, changed"DHRS"to"BureauofRadiation Control.";
changereflectsthenewtitleofStateoffice,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.22.'Page5-10,Section5.2.1,paragraph threesentenceone,changed"Table5-2"to"Figure5-1";thischangeisareference correction, editorial change.23.Page5-14,Section5.2.2,2,title,changed"includes Protected Area)"to"(includes theProtected Area)";editorial change.24.Pfifi-lfi,fi i522,2,~i,
*fi,fififi"lififi~"'*fiifi5-2";thischangeisareference correction, editorial change.25.Page5-15,Section5.2.2,2,title,changed"includes Protected Area)"to"(includes theProtected Area)";editorial change.26.Page5-15, Section5.2.2,2, vacuatinmlementati n,paragraphone,sentencethree, added"Response Organization" betweenthewordsEmergency andpersonnel; editorial change.27.Page5-16,Section5.2.2,2,title,changed"gncludes Protected Area)"to"(includes theProtected Area)";editorial change.28.Page5-16,Section5.2.2,2,ernnelccunta'liranrtationandKitRoutparagraph two,changed"Upondeclaration ofanemergency evacuation, theSecurityGuardForcewill..."to"Upondeclaration ofanOwnerControlled Areaevacuation, theSecurityGuardForcewill...";
thischangeclarifies thattheevacuation discussed inthisparagraph isassociated withtheOwnerControlled Area,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.29.Page5-16,Section5.2.2,2,ernnelccuntailiranrtatinandExitRoutes,paragraph three,sentenceone,changed"Whenanevacuation isdeclared, allnon-essential personnel intheaffectedareawillstopworking,leavetheaffectedareaandassemble..."
to"Whenanevacuation isdeclared, allnonessential personnel willstopworking,leavetheareaandassemble...";
itisnotnecessary tostipulate the"affected" areabecausetheentirearea(OwnerControlled Area)istheareaofimpact,thischangedoesnotdecreasetheeffectiveness of,theEmergency Plan.30.Page5-16,Section5.2.2,2,er.nnelciuntailiranat'nditRute,paragraph three,sentencetwo,,changed"Figure5-1"to"Figure5-2";thischangeisareference correction, editorial change.31.Page5-16,Section5.2.2,2, er.nnelccuntailianrtatinaditRute,paragraph five,changed"Thesecurityforceonduty..."to"TheSecurityGuardForceonduty...";editorial change.ahplanr3216 32.Page5-16,Section5.2.3,sentenceone,changed"AnOff-siteAreaEvacuation isthe..."to"An'ff-siteareaevacuation isthe...";editorial change.33.Page5-I6,Section5.2.3,sentencetwo,changed"...Department ofHealthandRehabilitative Servicesasspecified..."
to"...Department ofHealthasspecified...";
changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.34.Page5-17,Section5.2.3,paragraph one,sentenceone,changed"Table5-3"to"Table5-'2";thischangeisareference correction, editorial change.35.Page5-17,Section5.2.3,paragraph one,sentencetwo,changed"Figure5-2"to"Figure5-3";thischangeisareference correction, editorial change.36.Page5-17,Section5.'2.3,paragraph two,lastsentence, capitalized "State";editorial change.37.Page5-17,Section5.2.3,paragraph four,sentenceone,changed"...actionsfortheplumeexposurepathwayEPZ..."to"...actionsforthePlumeExposurePathwayEPZ...";editorial change.38.Page5-17,Section5.2.3,paragraph four,changed"DHRS"to"TheBureauofRadiation Control"intwolocations; changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.39.Page5-17,Section5.2.3,paragraph four,lastsentence, changed"...important basisforprotective actionrecommendations."
to"...important basisforProtective ActionRecommendations (PARs).";
editorial change.40.Page5-18,Section5.2.4,sentenceone,change"(Figures G2-9)"to"(Figures Gl-8)";thischangeisareference correction, editorial change.41.Page5-18,Section5.2.5,sentencetwo,changed"DHRS"to"BureauofRadiation Control";
changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.42.Page5-18,Section5.2.5,sentencetwo,changed"...theingestion pathwayEPZ."to"...theIngestion ExposurePathwayEPZ.";editorial change.43.Page5-18,Section5.2.7,lastsentence, changed"(St.LucieSiteplan)"to"(St.LucieSitePlan)";editorial change.44.Page5-24,Table5-2,changedtherevisiondateoftheStateofFloridaRadiological Emergency Management Plan&om"1/1/95"to"1/1/96",
datainthetablewasunchanged, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.a:hplanr32 17 45.Page5-27,Section5.4.1,paragraph two,sentencetwo,changed"...ofanaugmented ExpandedResponseOrganization..."
to"...ofanaugmented ExpandedEmergency ResponseOrganization...";
editorial change.46.Page5-27,Section5.4.1,lastparagraph, sentenceone,changed"...(e.g.,federal,state,andlocalagencies)..."
to"...(e.g.,Federal,State,andlocalagencies)...";
editorial change.47.Page5-27,Section5.4.1,lastparagraph, sentencetwo,changed"...theEmergency classification."
to"...theemergency classification.";
editorial change.48.Page5-28,'Section 5.4.1,lastparagraph, sentencethree,added"Radiation Controlled Area"priorto(RCA);editorial change.49.Page5-28,Section5.4.2,sentencethree,changed"AnnexI"to"AnnexK";thischangeisareference correction, editorial change.50.51.Page5-28,Section5.4.2,sentencethree,changed"...andmonitoring intheingestion pathwayEPZ."to"...andmonitoring intheIngestion ExposurePathwayEPZ.";editorial change.Page5-28,Section5.4.2,lastsentence, changed"(Recovery andRe-entryPlanning)"
to"(Recovery andRe-entry)";
thischangeisachaptertitlecorrection fromtheStateofFloridaRadiological Emergency Management Plan,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.tLO)1.Page6-1,Section6.2,1,secondparagraph, sentencethree,capitalized "State";editorial change.2.Page6-4,Section6.3,lastsentence, added"Exposure Pathway"betweenPlumeandEPZ;editorial change.3.Page6-10,Table6-6,inthemessagetext,capitalized "County",
"State",and"Federal";
editorial change.4.Page6-10,Table6-6,inthemessagetext,removedphonenumber;thephonenumberwasmistakenly includedinthisexamplenewsrelease,thisinformation isprovidedtothemediawhentheEmergency NewsCenterisoperational, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.eencr(7.0)a:Opianr32Page7-1,Section7.1.1,paragraph one,sentencetwo,changed"Anexerciseincludesmobilization ofstateand..."to"Anexercisenormallyincludesmobilization ofStateand...";thischangeacknowledges thebiennialfrequency ofexercises andthefactthatthedegreeofoQ'-18 siteparticipation mayvary&omyeartoyear,theotherchangewasacapitalization of"State",thesechangesdonotdecreasetheeffectiveness oftheEmergency Plan.2.Page7-I,Section7.1.2,3,changed"communication" to"communications";
editorial change.3.Page7-1,Section7.1.3,lastsentence, removedtheword"the"betweenthewordsofandplantmanagement; editorial change.4.Page7-2,Section7.1.3,4,capitalized "Federal" and"State";editorial change.5.Page7-2,Section7.1.3,midpage,removedtheword"the"betweenthewords"conducted,"
andplantmanagement; editorial change.6.Page7-5,Section7.1.4,1,paragraph one,sentencethree,capitalized "Federal" and"State";editorial change.7.Page7-5,Section7.1.4,1,paragraph three,capitalized "Federal" and"State";editorial change.8.Page7-6,Section7.1.4,5,paragraph one,sentenceone,capitalized "State","PlumeExposurePathway";
editorial change.9.Page7-6,Section7.1.4,5,paragraph one,sentencethree,removedtheapostrophe fromtheword"EOC's";editorial change.10.Page7-6,Section7.1.4,5,paragraph two,changed"Thesedrillsinclude"communications betweenthenuclearpowerplants,state,andlocalEmergency Operations Centers(EOC's)andfieldassessment teams..."."
to"Thesedrillsinclude"communications betweenthenuclearpowerplants,State,andlocalEOCsandfieldassessment teams...".";
thischangeisacorrection ofthequote&omtheStateofFloridaRadiological Emergency Management Plan,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.11.Page7-7,Section7.1.4,6,paragraph one,secondtwo,changed"DHRS"to"Department ofHealth";changereflectsthenewtitleofStateagency,thiscorrection doesnotdecreasetheeffectiveness oftheEmergency Plan.12.Page7-7,Section7.1.4,6,paragraph one,secondtwo,changed"CountyDisasterPreparedness agencies" to"CountyDepartments ofPublicSafety";thischangereflectsconsistency tothetitleoftheCountyagenciesasnamedelsewhere intheEmergency Plan,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.13.Page7-8,Section7.2.1,1,changed"implementing procedures."
to"Emergency PlanImplementing Procedures (EPIPs).";
editorial change.14.Page7-8,Section7.2.2,title,added"(ERO)"after"Emergency ResponseOrganization";
editorial change.a:hpIanr32 19  
editorial change.a:hpIanr32 19  
')
')
I~~,415.Page7-8,Section7.2.2,paragraph two,changed&om"Thetrainingprogramformembersoftheon-siteemergency responseorganization willincludepractical drills,asappropriate andparticipation inexercises, inwhicheachindividual demonstrates anabilitytoperformassignedemergen'cy functions."
I~~, 4 15.Page 7-8, Section 7.2.2, paragraph two, changed&om"The training program for members of the on-site emergency response organization will include practical drills, as appropriate and participation in exercises, in which each individual demonstrates an ability to perform assigned emergen'cy functions." to"The training program for members of the on-site ERO will include practical drills in which each individual, participating in the drill, demonstrates an ability to perform assigned emergency functions.";
to"Thetrainingprogramformembersoftheon-siteEROwillincludepractical drillsinwhicheachindividual, participating inthedrill,demonstrates anabilitytoperformassignedemergency functions.";
this change standardizes the wording of this paragraph with the Turkey Point Emergency Plan, the change does not decrease the effectiveness of the Emergency Plan.16.Page 7-8, Section 7.2.2, paragraph two, added two new sentences,"Participation in a drill or exercise is not required for initial qualification in the ERO." and"Training requirements are delineated in EPIP 3100034E,'Maintaining.
thischangestandardizes thewordingofthisparagraph withtheTurkeyPointEmergency Plan,thechangedoesnotdecreasetheeffectiveness oftheEmergency Plan.16.Page7-8,Section7.2.2,paragraph two,addedtwonewsentences, "Participation inadrillorexerciseisnotrequiredforinitialqualification intheERO."and"Training requirements aredelineated inEPIP3100034E,
'Maintaining.
Emergency Preparedness
Emergency Preparedness
-Emergency ResponsePlanTraining'";
-Emergency Response Plan Training'";
thischangeisconsistent withtheFPLpositioninresponsetotheNRCinletterL-96-309inwhichitwasstated"FPLconsiders participation indrillsandexercises assupplemental totheemergency responsetrainingprovidedforinitialqualification.",
this change is consistent with the FPL position in response to the NRC in letter L-96-309 in which it was stated"FPL considers participation in drills and exercises as supplemental to the emergency response training provided for initial qualification.", also reference to the implementing procedure for Emergency Preparedness training is provided, this change does not decrease the effectiveness of the Emergency Plan.17.Page 7-8, Section 7.2.2, paragraph three, sentence five, changed"Procedures" to EPIPs;editorial change.18.Page 7-9, Section 7.2.2, paragraph one, last sentence, changed"Security maintains training records for members of the Security." to"Security Emergency Planning training records are maintained by the Plant Training Manager";this change places all EP training records under the control of the Training Department and the Plant Training Manager, this change does not decrease the effectiveness of the Emergency Plan.19.Page 7-9, Section 7.2.2, 1, a, changed"(i.e.emergency action level determination per Chapter 3)" to"(i.e., Emergency Action Level (EAL)determination per Chapter 3)";editorial change.20.Page 7-13, Section 7.3, paragraph three, changed"(this function may be delegated a to member(s)..." to"(this function may be delegated to a member(s)...";
alsoreference totheimplementing procedure forEmergency Preparedness trainingisprovided, thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.17.Page7-8,Section7.2.2,paragraph three,sentencefive,changed"Procedures" toEPIPs;editorial change.18.Page7-9,Section7.2.2,paragraph one,lastsentence, changed"Security maintains trainingrecordsformembersoftheSecurity."
editorial change.21.Page 7-13, Section 7.3, added new section[1],"Emergency Plan Implementing Procedures (EPIPs)-Written procedures will be established, implemented, and maintained covering the activities associated with Emergency Plan implementation.";
to"Security Emergency Planningtrainingrecordsaremaintained bythePlantTrainingManager";
this change is to ensure that the intent of the previous Technical Specification requirement in 6.8.1.e.has been clearly transferred to the Emergency Plan as was intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.22.Pages 7-14, 15, Sections 7.1 to 7.6, renumbered to"7.2 to 7.7";editorial change.23.a:Opia nr32 Page 7-14, Section 7.1, paragraph two following sentence two, added,"All changes to the Emergency Plan Implementing Procedures shall be approved by the Plant General Manager, prior to implementation.";
thischangeplacesallEPtrainingrecordsunderthecontroloftheTrainingDepartment andthePlantTrainingManager,thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.19.Page7-9,Section7.2.2,1,a,changed"(i.e.emergency actionleveldetermination perChapter3)"to"(i.e.,Emergency ActionLevel(EAL)determination perChapter3)";editorial change.20.Page7-13,Section7.3,paragraph three,changed"(thisfunctionmaybedelegated atomember(s)..."
this change is to ensure that the intent of the previous Technical Specification requirement in 6.8.2 has been clearly transferred to the Emergency Plan as was 20 O fy intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.24.Page 7-14, Section 7.1, paragraph two, sentence four, changed"Recommended changes to the Emergency Plan and Emergency Plan Implementing Procedures will be submitted to the Chairperson of the Company Review Board for review." to"Approved changes to the Emergency Plan and Emergency Plan Implementing Procedures will be submitted to the Chairperson of the Company Review Board (CNRB)for review." and added new sentence,"The Chairperson will review any issues or concerns regarding the Emergency Plan and Emergency Plan Implementing Procedures with the CNRB on an as needed basis.";this change is to ensure that the intent of the previous Technical Specification requirement in 6.5.1.6.j.
to"(thisfunctionmaybedelegated toamember(s)...";
has been clearly transferred to the Emergency Plan as was intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.25.Page 7-14, Section 7.3.1, paragraph three, sentence three, capitalized"State" and"Federal";
editorial change.21.Page7-13,Section7.3,addednewsection[1],"Emergency PlanImplementing Procedures (EPIPs)-Writtenprocedures willbeestablished, implemented, andmaintained coveringtheactivities associated withEmergency Planimplementation.";
editorial change.e e (Appendix C)Page (APP-3), 3100023E, changed the title&om"On-site Emergency Organization and Call Directory" to"Site Emergency Organization";
thischangeistoensurethattheintentofthepreviousTechnical Specification requirement in6.8.1.e.hasbeenclearlytransferred totheEmergency Planaswasintendedintheoriginallicenseeamendment letter(L-95-233, datedAugust16,1995),
thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.22.Pages7-14,15,Sections7.1to7.6,renumbered to"7.2to7.7";editorial change.23.a:Opianr32Page7-14,Section7.1,paragraph twofollowing sentencetwo,added,"AllchangestotheEmergency PlanImplementing Procedures shallbeapprovedbythePlantGeneralManager,priortoimplementation.";
thischangeistoensurethattheintentofthepreviousTechnical Specification requirement in6.8.2hasbeenclearlytransferred totheEmergency Planaswas20 Ofy intendedintheoriginallicenseeamendment letter(L-95-233, datedAugust16,1995),
thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.24.Page7-14,Section7.1,paragraph two,sentencefour,changed"Recommended changestotheEmergency PlanandEmergency PlanImplementing Procedures willbesubmitted totheChairperson oftheCompanyReviewBoardforreview."to"Approved changestotheEmergency PlanandEmergency PlanImplementing Procedures willbesubmitted totheChairperson oftheCompanyReviewBoard(CNRB)forreview."andaddednewsentence, "TheChairperson willreviewanyissuesorconcernsregarding theEmergency PlanandEmergency PlanImplementing Procedures withtheCNRBonanasneededbasis.";thischangeistoensurethattheintentofthepreviousTechnical Specification requirement in6.5.1.6.j.
hasbeenclearlytransferred totheEmergency Planaswasintendedintheoriginallicenseeamendment letter(L-95-233,datedAugust16,1995),
thischangedoesnotdecreasetheeffectiveness oftheEmergency Plan.25.Page7-14,Section7.3.1,paragraph three,sentencethree,capitalized "State"and"Federal";
editorial change.ee(Appendix C)Page(APP-3),3100023E, changedthetitle&om"On-siteEmergency Organization andCallDirectory" to"SiteEmergency Organization";
editorial change.a:Rplanr32 21 4}}
editorial change.a:Rplanr32 21 4}}

Revision as of 10:58, 6 July 2018

Forwards Rev 32 to Radiological Emergency Plan. Notes That Rev Does Not Decrease Effectiveness of Plan
ML17309A869
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/31/1997
From: STALL J A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17309A870 List:
References
L-97-25, NUDOCS 9702040321
Download: ML17309A869 (30)


Text

REGULAT INFORMATION DISTRIBUTION STEM (RIDE)~4 4 ACCESSIOM-NBR:9702040321 DOC.DATE: 97/01/31 NOTARIZED:

NO DOCKET FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power 6 Light Co.05000335 50'-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.05000389 AUTH.NAME AUTHOR AFFILIATION STALL,J.A.

Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 32 to"Radiological Emergency Plan." Notes that C rev does not decrease effectiveness of plan.A DISTRIBUTION CODE: A045D COPIES RECEIVED:LTR j ENCL!SIZE: 2.0'2 f6 TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C T NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD'COPIES LTTR ENCL 1.1 RECIPIENT'OPIES ID CODE/NAME LTTR ENCL WIENS,L.1 1 1 NUDOCS-ABSTRACT EXTERNAL: NOAC 2 2 1 1 1 1 NRR/DRPM/PERB NRC PDR 1 1 1 1 D U N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 ENCL' Florida Power 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 January 31, 1997, L-97-25 10 CFR 50.'54(q)10 CFR 50 Appendix E U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 In accordance with 10 CFR 50.54(q), enclosed is one copy of the St.Lucie Plant Radiological Emergency Plan revision.Florida Power and Light Company has determined that this revision does not decrease the effectiveness of the plan.In addition, the plan as revised continues to meet the standards of 10 CFR 50.47(b)and the requirements of 10 CFR 50 Appendix E.Attachment 1 of this letter provides a summary of the changes incorporated by this revision.Should there be any questions on this revision, please contact us.Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC (2 copies)Senior Resident Inspector, USNRC, St.Lucie Plant'O,g P Q 6 4'702040321 970i3i PDR ADQCK 05000335 PDR Q an FPL Group company f St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 L-97-25 ATTACHMENT

j.

ATTACHMENT 1 CHANGE DOCUMENT FOR REVISION 32 This document provides a review of the changes incorporated into revision 32 of the St.Lucie Plant Radiological Emergency Plan.These changes resulted Rom the annual review of the Emergency Plan.The majority of the changes were editorial in nature and are so indicated.

An explanation/evaluation of significant changes is provided.There were no areas of reduced effectiveness identified in this revision.Note: All page and Section references apply to revision 31.A.it u ti 1.Page (4), Figure 2-4, changed"On-Shift Response Organization" to"On-Shift Emergency Response Organization", editorial change.e e (1.0)1.Page 1-1, Section 1.2-"Annual" changed to bold and inserted the word"Occurring" in the definition; editorial change.2.Page 1-2, Section 1.2, Emergency Coordinator definition, changed"E" in"Emergency" and"R" in"Responders" to lower case;editorial change.3.Page 1-2, Section 1.2, Emergency News Center definition, changed"L" in"Local" and"F" in"Federal" to lower case;editorial change.4.Page 1-3, Section 1.2, Emergency Response definition, changed"...the Radiological Emergency Plan for the St.Lucie Plant." to"...St.Lucie Plant Radiological Emergency Plan.";editorial change.5.Page 1-4, Section 1.2, Governmental Affairs Manager (GAM)definition, inserted"Recovery Manager/";

change makes the definition more correct because the GAM will interface with both the Recovery Manager and the Emergency Control Officer at the Emergency Operations Facility (EOF), this correction does not decrease the effectiveness of the Emergency Plan.6 Page 1-4, Section 1.2, Ingestion Pathway Emergency Planning Zone definition, inserted"Exposure" between Ingestion and Pathway;editorial change.Page 1-4, Section 1.2, Quarterly definition, changed Rom"Once per calendar quarter year (March 31, June 30, September 30, and December 31)" to"Occurring once per calendar quarter, with quarters ending on March 31, June 30, September 30, and December 31 in a year";editorial change.a:hplanr32 f

Page 1-9, Section 1.4, paragraph four, sentence one, changed&om"The company's response to an emergency condition consists of an immediate response (on-shift) and an expanded response (Emergency Response Organization) which can readily adapt to an emergency condition as it develops." to"The company's response to an emergency condition consists of an on-shift (immediate) response and an expanded (augmented) response Emergency Response Organization (ERO)which can readily adapt to an emergency condition as it develops.";

this change clariQes that portions of the ERO are always on-shift, but will be augmented, as necessary, this change does not decrease the effectiveness of the Emergency Plan.Page 1-10, Section 1.4, paragraph six, second sentence, inserted the word"public" between"for" and"protection";

change corrects the quote from the State Plan, this change does not decrease the effectiveness of the Emergency Plan.Page 1-11, Section 1.5, added number 10"UFSAR-Unit 1, Section 13.3, Emergency Planning" and number 11"UFSAR-Unit 2, Emergency Planning", this change is a cross reference to the UFSAR and does not decrease the effectiveness of the Emergency Plan.Page 1-14, Figure 1-2, changed"ON-SHIFT EMERGENCY RESPONDERS" to"ON-SHIFT EMERGENCY RESPONSE ORGANIZATION";

editorial change.a izat n F cilc (2.0)Page 2-1, Section 2.1.1, paragraph two, added"(ERO)" following"Emergency Response Organization";

editorial change.Page 2-1, Section 2.1.2, deleted"and Rehabilitative Services" from the title of the Florida Department of Health, two locations; change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-1, Section 2.1.2, paragraph four, changed the abbreviation

"(DHRS)" to the"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-1, Section 2.1.2, paragraph four, number one, changed the word"Office" to"Bureau", change reflects new title of State office, this correction does not decrease the effectiveness of the Emer'gency Plan.Page 2-4, Figure 2-1, (under ON-SHIFT), changed"As Required From Available Staff" to Other Trained ERO Personnel On-shift";

this change clarifies the make-up of the on-shift ERO, this change does not decrease the effectiveness of the Emergency Plan.Page 2-4, Figure 2-1, added the following entry: "Chemistry Representative" (under ON-SHIFT),"Off-site Dose Calculations" (under EMERGENCY FUNCTION), and"TSC Chemistry Supervisor Or Alternate" (under PRIMARY);this addition to this figure clarifies an existing condition, that there is a chemist on-shift at all times (as required by NUREG 0737)to perform dose calculations, this is not a change in shift staffing, this addition does not decrease the effectiveness of the Emergency Plan.7.Page 2-5, Figure 2-2A, changed the title of the"Department of Health and Rehabilitative Services" to the"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.Page 2-6, Figure 2-2B, changed the title of the"Department of Health and Rehabilitative Services" to the"Department of Health";change reflects new title of State agency, this'orrection does not decrease the effectiveness of the Emergency Plan.Page 2-8, Section 2.1.3, paragraph four, last sentence, added"(EOC)" following"Emergency Operations Center";editorial change.10.Page 2-8, Section 2.1.3, paragraph five, thiid sentence, changed the word Office" to"Bureau" and delete the abbreviation

"(DHRS)";these changes reflect changes in titles of the State office, this correction does not decxease the effectiveness of the Emergency Plan.Page 2-10, Section 2.1.3, changed"St.Lucie County-Fort Pierce Fire Department" to St.Lucie County-Fort Pierce Fire District";

this is a correction to the organization's title, editorial change.12.Page 2-10, Section 2.1.4, paragraph three, changed"DHRS" to"Department of Health;this change reflects the change in the title of the State office, this correction does not decrease the effectiveness of the Emexgency Plan.13.Page 2-11, Section 2.1.5, paragraph two, last sentence changed".'..xesources as described..." to"...resources as provided for by the Purchase Order listed...";

this change clarifies that a Purchase Order number (which commits to technical services and resources) is listed in the Emergency Plan and not a descriptive document/letter, this change does not decrease the effectiveness of the Emergency Plan.14.Page 2-11, Section 2.2, first paragraph, added"(ERO)" to the title as abbreviation of the Emergency Response Organization; editorial change.15.16.a:Mplanr32 Page 2-11, Section 2.2, first paragraph, sentence four, changed from"The"on-shift" response organization consists of the plant duty shift and other plant personnel as available who are responsible..." to"The on-shift" response consists of shift operators, the plant duty shift and other trained plant personnel as available who are responsible...";

this change clarifies that the on-shift ERO consists of operators, the plant duty shift and other available personnel that are ERO qualified, this change does not decrease the effectiveness of the Emergency Plan.Page 2-11, Section 2.2, first paragraph, sentence five, changed from"Along with the required shift operations personnel, the Emergency Response Organization includes the..." to"Along with the required shift operations personnel, the"expanded" response includes personnel necessary to man the TSC, OSC, and EOF.";this change clarifies the expanded response, this change does not decrease the effectiveness of the Emergency Plan.

17.Page 2-11, Section 2.2, first paragraph, sentence six, changed from"The"expanded" response organization includes other plant personnel and corporate resources which can be made available, if the emergency..." to"The ERO includes plant and corporate personnel which are available, as the emergency warrants, to...";this change clarifies the makeup of the ERO, but does not reduce the number of persons involved, this change does not decrease the effectiveness of the Emergency Plan.18.Page 2-12, Section 2.2.1, description of Operations Manager, sentence two, changed the word"operation" to"operations";

editorial change.19.Page 2-13, Section 2.2.1, description of Nuclear Watch Engineer (NWE), last sentence, changed the word"Team" to"Brigade";

this change reflects the new title of the Fire Team, editorial change.20.21.Page 2-14, Section 2.2.1, description of System and Component Engineering Manager, changed"System and Component Engineering Manager" to"System Engineering Manager";this change reflects the new title of this position, editorial change.Page 2-15, Section 2.2.2, Organization, paragraph two, sentence two changed"Initially, the operating staff constitutes:

.." to"Initially, shift operators and the plant duty staff constitute

...";this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.22.Page 2-15 Section 2.2.2, Organization, paragraph two, sentence four, changed"...provided initially by plant staff." to"...provided initially by shift operators and the plant duty staff.";this'hange allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.23.Page 2-15 Section 2.2.2, Organization, paragraph two, sentence five, changed"...the on-shift response organization." to"...the On-shift Emergency Response Organization.", this change allows for consistent wording regarding the description of the ERO which is composed of two components, an On-shift ERO and the Expanded ERO, and is consistent with the description of the company's response to an emergency as stated in Section 1.4, this change does not decrease the effectiveness of the Emergency Plan.24.Page 2-17, Figure 2-4, changed the title&om"ON-SHIFT RESPONSE ORGANIZATION" to"ON-SHIFT EMERGENCY RESPONSE ORGANIZATION";

this change is consistent with the change in Section 2.2.2, Organization, paragraph two, sentence five, this change does not decrease the effectiveness of the Emergency Plan.25.Page 2-17, Figure 2-4, added"CHEMISTRY REPRESENTATIVE" and"OTHER TRAINED ERO PERSONNEL ON-SHIFT";

these additions are consistent with changes to Figure 2-1 and a:Leplanr32 Section 2.2 first paragraph, respectively, these changes do not decrease the effectiveness of the Emergency Plan.26 Page 2-I9, Section 2.2;2, Plant Staff Emergency Assignments, A, changed"On-shift Emergency Responders" to"On-shift Emergency Response Organization";

this change is consistent with the change in Section 2.2.2, Organization, paragraph two, sentence five, this change does not decrease the effectiveness of the Emergency Plan.27.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, A, 1, sentence one, changed"...of members chosen from shift personnel assigned to the plant" to"..~of operators, the plant duty staff and other trained ERO personnel on-shiA.";

this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.2S.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, A, 1, sentence two, changed"...as designated team members." to"...as ERO members";this is a change in terminology, this change does not decrease the effectiveness of the Emergency Plan.29.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, A, 1, sentence three, changed"The emergency response teams take action until the emergency condition is mitigated." to"The On-shift Emergency Response Organization takes action until the emergency condition is mitigated or until relieved.";

this is a terminology change away from emergency teams and also addresses the need for flexibility if the emergency condition can not be readily mitigated, this change does not decrease the effectiveness of the Emergency Plan.30.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, A, 2, changed"On-shift Emergency Responders may consider themselves relieved gglt.upon the specific instructions of a recognized superior.Merely knowing that a superior is present does not constitute a release form emergency duties and responsibilities." to"Members of the On-shift Emergency Response Organization may consider themselves relieved~nl upon the specific instructions of the EC or appropriate facility supervisor.

Merely knowing that a replacement is present does not constitute a release from emergency duties and responsibilities";

this change reflects the change in terminology away from emergency teams and clarifies that position turnover will be under the direction of the EC or facility supervisor which strengthens the control of this activity, and therefore, this change does not decrease the effectiveness of the Emergency Plan.31.Page 2-19, Section 2.2.2, Plant Staff Emergency Assignments, B, added the following new paragraph one"The Expanded Emergency Response Organization is composed of operations personnel and ERO personnel to man the TSC, OSC, and EOF, as necessary.";

this change allows for consistent wording regarding the description of the ERO with the initial paragraph in this Section (2.2), this change does not decrease the effectiveness of the Emergency Plan.32.Page 2-19, Section 2.2.2, Plant StaQ'Emergency Assignments, B, 1, changed to number 2 and changed"...Primary Emergency Response Organization members..." to"...alternate ERO members..." and capitalized"o" in"On-shift";

the numbering and case change are editorial, the a:iaplanr32

change&om primary to alternate clarifies that position turnover is not restricted to the primary position holder, but can occur with any equally qualified alternate.

33.34.Page 2-20, Section 2.2.2, C.4, paragraph one, sentences three and four, changed&om"The Health Physics representative, on-site, is designated as the on-shift TSC Health Physics Supervisor.

The TSC Health Physics Supervisor recommends appropriate protective actions to the EC based upon radiological assessments." to"Prior to the availability to the TSC Health Physics Supervisor, the Health Physics technicians on-site will provide assistance to the EC in recommending protective actions based on radiological assessments.";

this change clarifies the role of the HP technicians on-site, one technician will no longer be identified to function as an interim TSC HP Supervisor, but the commitment to assist the EC is unchanged, this change does not decrease the effectiveness of the Emergency Plan.Page 2-21, Section 2.2.2, C.6, last sentence, changed"St.Lucie County-Fort Pierce Fire Department" to St.Lucie County-Fort Pierce Fire District";

this is a correction to the organization's title, editorial change.35.Page 2-22, Section 2.2.2, 3, second paragraph, sentence two, changed" Emergency Operations Facility (EOF)personnel should be notified and placed in a standby status or mobilized as determined by the RM." to"The RM should place the Emergency Operations Facility (EOF)personnel in the facility for an Alert, as conditions warrant.";

this change is not a commitment to activate the EOF prior to a Site Area Emergency, but to mobilize and place personnel in the facility to assist the TSC and become operational at the Site Area Emergency or earlier, if deemed appropriate by the RM, this change does not decrease the effectiveness of the Emergency Plan.36.Page 2-24, Table 2-2A, Additional Shift Staffing for all Modes of Operation, changed the Health Physics Technician

&om"1" to"1 per unit";this change clarifies that there is one HP Technician on-shift for each unit, this change does not decrease the effectiveness of the Emergency Plan.37.Page 2-25, Table 2-2A, moved the"Note" to the top of the page;editorial change.38.Page 2-25, Table 2-2A, changed asterisk (*)to footnote 1;editorial change.39.Page 2-25, Table 2-2A, added two footnotes (3 Ec 4)to indicate personnel on-shift;this is not a change, but a clarification of on-shift staffing, this change does not decrease the effectiveness of the Emergency Plan.40.Page 2-26, Table 2-2B, under"~n-ljiQ", Emergency Coordinator, added"(assisted by Health Physics Department Representative)";

this change makes this table consistent with Figure 2-1, editorial change.41.Page 2-28, Section 2.2.2, 4, 7, changed"To provide logistic support for emergency personnel (e.g.transportation, communications, temporary quarters, food, water and sanitary facilities in the field, and special equipment and supplies procurement)." to"To provide logistical support for emergency personnel (e.g., transportation, communications, temporary quarters, food, water and a:Wplanr32 sanitary facilities in the field, and procurement of special equipment and supplies)." editorial change.42.Page 2-28, Section 2.2.2, 4, Emergency Information Manager (EIM), first paragraph, sentence two, deleted"During this phase";editorial change.43.Page 2-28, Section 2.2.2, 4, Emergency Technical Manager (ETM), changed"The ETM is a senior management engineer with detailed..." to"The ETM is a manager or senior engineer with detailed...";

this change reflects the move of the engineering group from the corporate office to the plant, senior management was terminology used when this position was staffed&om the corporate office, this change does not decrease the effectiveness of the Emergency Plan.44 Page 2-29, Section 2.2.2, 4, Governmental Affairs Manager (GAM), changed"The GAM is a senior manager experienced..." to"The GAM is a member of the ExternaVGovernmental Affairs staff experienced...";

this change clarifies the staffing for this position, this change does not decrease the effectiveness of the Emergency Plan.45.Page 2-29, Section 2.2.3, 2, Radiological Laboratories, sentence three, added"(MERL)";editorial change.46.Page 2-31, Section 2.2.3, 3 Additional Assistance, sentence one, changed"Operation" to"Operations";

editorial change.47.Page 2-31, Section 2.2.3, 3 Additional Assistance, sentence two, added"Nuclear Steam Supply System" prior to (NSSS)and"ABB" prior to Combustion Engineering; editorial change.48.Page 2-31, Section 2.2.3,4 Support to Federal Assistance Teams, paragraph two, last sentence,.changed"Department of Health and Rehabilitative Services" to"Department of Health";change reflects new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.49.Page 2-32, Section 2.2.4, 1, Control Room, paragraph one, sentence two changed"he assumes the role..." to"he/she assumes the role...";editorial change.50.Page 2-32, Section 2.2.4, 1, Control Room, paragraph four, sentence two, added"(satellite communications system)" after ESATCOM;editorial change.51.Page 2-33, Section 2.2.4, 2, Technical Support Center (TSC), paragraph four, added"2000" after FTS in two locations; editorial change.52.a:hplanr32 Page 2-33, Section 2.2.4, 3, Operational Support Center (OSC), new paragraph five, added,"A new location for the OSC is being prepared.The new location is in the large conference room on the second floor of the South Services Building, currently an alternate OSC location.The transition to the new location will occur during a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period with all equipment and supplies being relocated and all revised procedures being issued.The change will be completed by 28 February, 1997.";the new OSC will be comparable to the existing OSC and will, at a minimum, satisfy all requirements for an OSC, training will be provided to all ERO members prior to the transition, this change, when in effect, does not decrease the effectiveness of the Emergency Plan.53.Page 2-34, Section 2.2.4, 4, Alternate Operational Support Center, added"in accordance with procedures" following"...will designate an alternate location.";

this change reflects the addition in the Emergency Plan Implementing Procedures of specific guidance for relocation of the OSC, this improvement does not decrease the effectiveness of the Emergency Plan.54.Page 2-34, Section 2.2.4, 5, Emergency Operations Facility (EOF), paragraph three,'added"(Bell)" between commercial and telephone and added"(satellite communications system)" after ESATCOM;editorial change.55.Page 2-38, Section 2.2.4, 8, St.Lucie County Emergency Operations Center, sentence three, added"(satellite communications system)" after ESATCOM;editorial change.56.Page 2-38, Section 2.2.4, 9, Martin County Emergency Operations Center, sentence three, added"(satellite communications system)" after ESATCOM;editorial change.57.Page 2-38, Section 2.2.4, 10, Florida State Emergency Operations Center (State Warning Point), sentence one, added"Emergency Operations Center" prior to (EOC);editorial change.58.Page 2-38, Section 2.2.4;10, Florida State Emergency Operations Center (State Warning Point), sentence four, added"(satellite communications system)" after ESATCOM and"Local Government Radio" prior to (LGR);editorial change.D.mer nc l te (3.0)Page 3-1, F, sentence two, changed"Unusual Event" to"Notification of Unusual Event";editorial change.Page 3-1, Section 3.1, title, changed"Unusual Event" to"Notification of Unusual Event";editorial change.Page 3-1, Section 3.1, Unusual Event, sentence one, changed"The Unusual Event category..." to"The Notification of Unusual Event (normally shortened to Unusual Event)...";

editorial change.a:Opia nr32 Page 3-1, Section 3.2, FPL actions in response to this category will be:, number two, sentence two, changed"The Emergency Operations Facility personnel should be notified, placed in standby status, or mobilized as determined by the RM." to"The RM should place the Emergency Operations Facility personnel on standby in the facility for an Alert, as conditions warrant.";

this change is not a commitment to activate the EOF prior to a Site Area Emergency, but to mobilize and place personnel in the facility to assist the TSC and become operational at the Site Area Emergency or earlier, if deemed appropriate by the RM, this change does not decrease the eQectiveness of the Emergency Plan.5.Pages 3-'5, 7, 8, 10 Table 3-1, GENERAL EMERGENCY, number two, changed"Measured Dose Rates or Off-site Dose Calculation (EPIP 3100033E)worksheet values at one mile in excess of: a.1000 mrem/hr (total dose rate)aa.1000 mrem/hr (total dose-TEDE)b.5000 mrem/hr (thyroid dose rate)bb.5000 mrem/hr (thyroid dose CDE)" to"Performance of EPIP 3100033E (Off-site Dose Calculations) or measured dose rates from off-site surveys indicate site boundary (1 mile)exposure levels have been exceeded as indicated by either A, B, C, or D below: A.1000 mrem/hr (total dose rate)B.1000 mrem/hr (total dose TEDE)C.5000 mrem/hr (thyroid dose rate)D.5000 mrem/hr (thyroid dose CDE)";this is a human factors change and does not revise the initiating condition or alter any decision-making criteria, this change does not decrease the effectiveness of the Emergency Plan.6.9 6 3-9.T Pl 3-1, ilNUEUEE EVENT, 3 6,~.3 6*6'*~a e'e'to" ccu ence e i within the e t ed ea";this is a human factors change and does not revise the initiating condition, but defines what is meant by near or on site, this change does not decrease the effectiveness of the Emergency Plan.7.Page 3-11, Table 3-1, UNUSUAL EVENT, S.A., ed earth uakeha ccu ed, number one, changed"A confirmed earthquake has been experienced on plant site." to"A confirmed earthquake has been experienced within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on plant site, this change does not decrease the effectiveness of the Emergency Plan.a Aeplanr32 s.Page 3-11, Table 3-1, ALERT, 5.B., rri n w'd', number one, changed"Confirmed hurricane warning is in effect with on site winds expected to exceed 175 mph." to"Confirmed hurricane warning is in effect and winds are expected to exceed 175 mph within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.Page 3-11, Table 3-1, SITE AREA EMERGENCY, S.B.,'w't', number two, changed"Confirmed hurricane warning is in effect with on site winds expected to exceed 194 mph.", to"Confirmed hurricane warning is in effect and winds are expected to exceed 194 mph within the Owner Controlled Area.";this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.I 10.Page 3-12, Table 3-1, UNUSUAL EVENT, 5.C., i c d i li d"D C ll*dA";Ch'I h g.ted e e Page 3-16, Table 3-1, UNUSUAL EVENT, 9.A., u ra ctivi number one, changed"Aircraft crash on site or unusual..." to"Aircraft crash in the Owner Controlled Area or unusual...";

this is a human factors chan'ge and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.12.Page 3-16, Table 3-1, UNUSUAL EVENT, 9.C., changed" n lanne/e e ie ic a a e e c u d..."to" unc t ed a e e ll re a...";this is a human factors change and does not revise the initiating condition, but defines what is meant by near or on site, this change does not decrease the effectiveness of the Emergency Plan.13.Page 3-16, Table 3-1, ALERT, 9.A.,c number one, changed"Aircraft crash on site damaging plant structures." to"Aircraft crash in the Owner Controlled Area damaging plant structures.";

this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.14.Page 3-16, Table 3-1, SITE AREA EMERGENCY, 9.A., ama t v't 1 te b*,4gd"Ai ft h i dgigill y"Aircraft crash in the Owner Controlled Area damaging vital plant systems.";

this is a human factors change and does not revise the initiating condition, but defines what is meant by on site, this change does not decrease the effectiveness of the Emergency Plan.15.Page 3-17, Table 3-2A, a, under, changed"Close blowdown valves" to"Close S/G blowdown Ec sample valves";editorial change.16.a:Opia nr32 Page 3-17, Table 3-2A, b, under , changed"3.5 x 10 CPM" to"1 x 10 CPM";this change reflects a reduction in the HI-Alarm setting (3X background).

based on data collected&om daily surveillances, this change does not decrease the effectiveness of the Emergency Plan.17.Page 3-17, Table 3-2A, c, under , deleted"(4)" next to"P";this monitor is listed in the Technical Specifications, this change does not decrease the effectiveness of the Emergency Plan.18.Page 3-17, Table 3-2A, e, under NT, changed"5 x 10" to"5 x 10";this change is a correction of an apparent typographical error not previously corrected, editorial change.19.Page 3-18, Table 3-2B, a, under T"Close S/G blowdown&sample valves";editorial change.changed"Close blowdown valves" to 20.Page 3-18, Table 3-3B, b, under T A changed"3 x 10 uCi/cc" to"2 x 10 uCi/cc", this change reflects an increase in the HI-Alarm setting, but is set in accordance with the limit established by the Technical Specifications (3X background), based on data collected&om daily surveillances, this change does not decrease the effectiveness of the Emergency Plan.21.Page 3-18, Table 3-3B, c, under, changed"Isolation of FHB exhaust causes auto switch to SBVS" to"NONE";the Process Radiation Monitors have been incorrectly shown to be involved in this switchover, the switchover to the Shield Building Ventilation System occurs based on 2 of 3 Area Radiation Monitors, in one group, going into alarm, this correction does not decrease the effectiveness of the Emergency Plan.22.Page 3-18, Table 3-3B,', under, deleted"(5)" next to"P";this monitor is listed in the Technical Specifications, this change does not decrease the effectiveness of the Emergency Plan.23.Pa~e 3-18, Table 3-3B, c, under T changed"1 x 10" to"1 x 10";this change is a correction of an apparent typographical error, editorial change.24.Page 3-19, Table 3-3, number one, added separate entry for Unit 2"10 to 10 mR/Iir";editorial change.25.Page 3-19, Table 3-3, number one, made separate entries to Unit 1 and Unit 2, changed the alarm setpoint for both Units Rom"7500 mR/hr" to"8000 mR/tir", based on review of recent calibration records;this increase in setpoint may appear as less conservative, but is still within the Technical Specification allowable trip setpoint limit (less than or equal to 10R), therefore, this change does not decrease the effectiveness of the Emergency Plan.26.Page 3-19, Table 3-3, number two, added calibrated alarm setpoints"6.4 R/hr High" and"8.0 R/hr High/High)", clarified that the previously listed (still included)setpoints actually are EAL initiating conditions for declaration of Site Area Emergency (High)and General Emergency a:Qplanr32

(High/High);

this change does not alter alarm setpoints and therefore does not decrease the effectiveness of the Emergency Plan.27.Page 3-19, Table 3-3, number three, made separate entries for Unit 1 and Unit 2, added High Alarm setpoints for both Units;this change does not decrease the effectiveness of the Emergency Plan.28.Page 3-19, Table 3-3 number four, added High Alarm setpoints for both Units;this change does not decrease the effectiveness of the Emergency Plan.29.Page 3-20, Table 3-4, Subcooled Margin Monitors, added"(QSPDS)" and replaced the range value for both Units,"50-750 F" and inserted"calculated";

this change was made to better reflect the manner in which subcooled margin is determined by QSPDS and to eliminate range values which are too limiting, this change does not reduce the effectiveness of the Emergency Plan.30.Page 3-20, Table 3-4, Nuclear Instrumentation Wide Range Power (Log Scale), corrected the range for Unit 1 from"10-100%" to"10-200%";this change is a correction of an apparent typographical error not previously corrected, editorial change.i c'nd Page 4-1, Section 4.1, paragraph one, last sentence, changed"...Section 2.2.1.1..." to"Section 2.2.2.2...";

this change is a reference correction, editorial change.Page 4-1, Section 4.1.1,1, sentence two, changed"...the Plant Public Address system..." to"...the plant public address system...";

editorial change.Page 4-3, Section 4.1.2, paragraph two, last sentence, changed"...discussed in Table 5-2." to"...discussed in I'igure'5-1.";

this change is a reference correction, editorial change.Page 4-3, Section 4.2.1, paragraph one, sentence two, changed"The State's Hot Ring Down (commercial telephone and ESATCOM backup)will be..." to"The State's Hot Ring Down (commercial telephone and ESATCOM (satellite communications system)serve as backups)will be...";editorial change.5.Page 4-5, Section 4.2.2, title, changed"Department of Health and Rehabilitative Services" to"Department of Health", change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.a:Rplanr32 Page 4-5, Section 4.2.2, paragraph one, changed"The Division of Emergency Management (DEM)State Warning Point Duty Officer is responsible for notifying the Department of Health land Rehabilitative Services (DHRS).Notification is made to the Public Health Physicist and the Administer, Office of Radiation Control.The Public Health Physicist verifies the existence of a radiological emergency by contacting the Control Room via telephone, then contacts the St.Lucie County EOC to ascertain what, if any, protective actions have been initiated.

If 12 required, the Office of Radiation Control activates the Mobile Emergency Radiological Laboratory (MERL)and/or the Radiological Monitoring Teams." to"The Division of Emergency Management (DEM)State Warning Point Duty Offlcer is responsible for notifying the Department of Health.Notification is made to the Bureau of Radiation Control.A Health Physicist contacts the St.Lucie County EOC to ascertain what, if any, protective actions have been initiated.

If required, the Bureau of Radiation Control activates the Mobile Emergency Radiological Laboratory (MERL)and/or the Radiological Monitoring Teams.";this change reflects the new title of State agency and changes in their standard operating procedures, these changes do not decrease the effectiveness of the Emergency Plan.Page 4-6, Section 4.3, Communications, sentence two, added"(satellite communications system)" after ESATCOM;editorial change.Page 4-7, Section 4.6, paragraph two, sentence one, changed"Communications Network" to"communications network";editorial change.Page 4-9, Section 4.6, paragraph two, last sentence, changed"Commercial telephone or ESATCOM serves as backup." to"Commercial telephone and ESATCOM (satellite communications system)serve as backups.";

editorial change.10.Page 4-9, Section 4.6, ESATCOM, sentence one, changed"...an emergency satellite communication system which..." to"...an Emergency Satellite Communications System which...";

editorial change.Page 4-9, Section 4.6, LOCAL GOVERNMENT RADIO (LGR)SYSTEM, sentence two, changed"...Department of Health and Rehabilitative Services (DHRS),..." to"...Department of Health,...";

change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.12.Page 4-10, Section 4.7, sentence one, changed"...communication equipment..." to"...communications equipment...";

editorial change.13.Page 4-11, Table 4-1, 2, number two, changed"...by Plan and Procedure" to,"...by plan and procedure";

editorial change.14.Page 4-11, Table 4-1, 6, changed"Florida Department of Health and Rehabilitative Services, OQice of Radiation Control..." to"Florida Department of Health, Bureau of Radiation Control...";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.15.Page 4-12, Figure 4-2, abbreviations, added"(NRC)" after HPN-Health Physics Network and inserted"SYSTEM" after ADDRESS in PLT PA-PLANT PUBLIC ADDRESS (PAGE)in the list of abbreviations; editorial change.16.a:heplanr32 Page 4-12, Figure 4-2, added,"ESATCOM" to the communications interfaces available in the TSC and the EOF/ENC and added"ESATCOM-EMERGENCY SATELLITE 13 COMMUNICATIONS SYSTEM" to the list of abbreviations, the system was originally installed in these facilities, but was not reflected in this table, this correction does not decrease the effectiveness of the Emergency Plan.e't'(5.0)I Page 5-1, Section 5.1 paragraph one, last sentence, changed"Post Accident sampling..." to" Post accident sampling...";

editorial change.Page 5-1, Section 5.1.1, paragraph three, sentence four, added"Emergency Core Cooling System" prior to (ECCS);editorial change.Page 5-2, Section 5.1.2, paragraph three, sentence one, added"(PASS)" after Post Accident Sampling System;editorial change.Page 5-3, Section 5.1.3, paragraph three, sentence two, changed"(DHRS)" to"the Bureau of Radiation Control";change reflects the new title of State oQice, this correction does not decrease the effectiveness of the Emergency Plan.Page 5-3, Section 5.1.4, paragraph four, sentence two, added"Final Updated Safety Analysis Report" prior to (FUSAR);editorial change.Page 5-6, Section 5.1.5, paragraph two, sentence three, capitalized"State" and"County";editorial change.Page 5-6, Section 5.1.5, sentence four, changed"Table 5-2" to"Figure 5-1";this change is a reference correction, editorial change.-8.Page 5-6, Section 5.1.5, sentence four, added"the Environmental Protection Agency" prior to (EPA)and"Protective Action Guides" prior to (PAGs);editorial change.Page 5-6, Section 5.1.6, paragraph one, sentence one, changed"The Florida Department of Health and Rehabilitative Services maintains..." to"The Florida Department of Health maintains...";

change reflects the new title of State agency, this correction does not decrease the eQectiveness of the Emergency Plan.10.Page 5-6, Section 5.1.6, paragraph one, sentence one, changed"...a system of 35 TLD stations.." to"...a system of about 35 TLD'stations...";

this change is based on feedback from the Department of Health which indicated that the number of TLD locations can vary, but is around 35 so this reference to the TLDs was revised accordingly, this change does not decrease the eQectiveness of the Emergency Plan.a:hplanr32 Page 5-6, Section 5.1.6, paragraph two, sentence five, changed"DHRS" to"Bureau of Radiation Control", also capitalized"State";change reflects the new title of State office, this correction in title nor the editorial change decreases the effectiveness of the Emergency Plan.14 12.Page 5-7, Section 5.1.6, paragraph one, sentence two, capitalized"Plume Exposure" and added"Pathway Emergency Planning Zone" prior to (EPZ);editorial change.13.Page 5-7, Section 5.1.6, paragraph three, changed"...responsibility rests on the DHRS Office of Radiation Control." to"..~responsibility rests with the Bureau of Radiation Control.";

change reflects the new title of State office, this correction does not decreases the effectiveness of the Emergency Plan.14.Page 5-8, Section 5.1.6, paragraph one, sentence one, changed"...have been made for State DHRS representatives to be stationed at the EOF." to"..~have been made for representatives from the Bureau of Radiation Control to be stationed at the EOF.";change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.15.Page 5-8, Section 5.1.6, paragraph one, sentence two, changed"Direction and control of field.operations for the Department of Health and Rehabilitative Service will be provided by the Public Health Physicist Supervisor of Surveillance and Laboratories." to"Direction and control of field operations for the Department of Health will be provided by the Health Physics Supervisor.";

this change reflects the new title of State agency and changes in their standard operating procedures, these changes do not decrease the effectiveness of the Emergency Plan.16.Page 5-8, Section 5.1.6, paragraph one, sentence four, changed"...have been described in Off-site Emergency Response Organization EPIP 1202,"Activation and Use of the Emergency, Operations Facility (St.Lucie)"." to"...have been described in EPP-15,"Activation and Use of the Emergency Operations Facility".";

EPIP 1202 underwent a procedure upgrade process and was renumbered EPP-15, this change should have been reflected in Revision 31, this change does not decrease the effectiveness of the Emergency Plan.17.Page 5-8, Section 5.1.6, paragraph one, sentence five, changed"DHRS" to"the Bureau of Radiation Control.";

change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.18.Page 5-8, Section 5.1.6, paragraph two, changed"DHRS" to"the Bureau of Radiation Control" in two locations and added"the Department of Energy" prior to (DOE);change reflects the new title of State office and inclusion of the proper title of DOE, neither of these changes decreases the effectiveness of the Emergency Plan.19.Page 5-8, Section 5.'2, paragraph one, capitalized"State" and County";editorial change.20.Page 5-10, Section 5.2.1, paragraph one, sentence one, changed"...

the Department of Health and Rehabilitative Services (DHRS)..." to"...the Department of Health...";

change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.a:ieplanr32 15 21.Page 5-10, Section 5.2.1, paragraph one, last sentence, changed"DHRS" to"Bureau of Radiation Control.";

change reflects the new title of State office, this correction does not decrease the effectiveness of the Emergency Plan.22.'Page 5-10, Section 5.2.1, paragraph three sentence one, changed"Table 5-2" to"Figure 5-1";this change is a reference correction, editorial change.23.Page 5-14, Section 5.2.2, 2, title, changed"includes Protected Area)" to"(includes the Protected Area)";editorial change.24.P fi fi-lfi,fi i 522,2,~i,*fi, fi fi fi"lifi fi~"'*fiifi 5-2";this change is a reference correction, editorial change.25.Page 5-15, Section 5.2.2, 2, title, changed"includes Protected Area)" to"(includes the Protected Area)";editorial change.26.Page5-15, Section5.2.2,2, vacuati n m lementati n,paragraphone,sentencethree, added"Response Organization" between the words Emergency and personnel; editorial change.27.Page 5-16, Section 5.2.2, 2, title, changed"gncludes Protected Area)" to"(includes the Protected Area)";editorial change.28.Page 5-16, Section 5.2.2,2, er nnel cc unta'li ran rtation and K it Rout paragraph two, changed"Upon declaration of an emergency evacuation, the Security Guard Force will..." to"Upon declaration of an Owner Controlled Area evacuation, the Security Guard Force will...";this change clarifies that the evacuation discussed in this paragraph is associated with the Owner Controlled Area, this change does not decrease the effectiveness of the Emergency Plan.29.Page 5-16, Section 5.2.2,2, er nnel cc unta ili ran rtati n and Exit Routes, paragraph three, sentence one, changed"When an evacuation is declared, all non-essential personnel in the affected area will stop working, leave the affected area and assemble..." to"When an evacuation is declared, all non essential personnel will stop working, leave the area and assemble...";

it is not necessary to stipulate the"affected" area because the entire area (Owner Controlled Area)is the area of impact, this change does not decrease the effectiveness of, the Emergency Plan.30.Page 5-16, Section 5.2.2, 2, er.nnel ci unta ili ran at'nd it R ute, paragraph three, sentence two,, changed"Figure 5-1" to"Figure 5-2";this change is a reference correction, editorial change.31.Page5-16,Section5.2.2,2, er.nnel cc unta ili an rtati n a d itR ute, paragraph five, changed"The security force on duty..." to"The Security Guard Force on duty...";editorial change.a hplanr32 16 32.Page 5-16, Section 5.2.3, sentence one, changed"An Off-site Area Evacuation is the..." to"An'ff-site area evacuation is the...";editorial change.33.Page 5-I6, Section 5.2.3, sentence two, changed"...Department of Health and Rehabilitative Services as specified..." to"...Department of Health as specified...";

change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.34.Page 5-17, Section 5.2.3, paragraph one, sentence one, changed"Table 5-3" to"Table 5-'2";this change is a reference correction, editorial change.35.Page 5-17, Section 5.2.3, paragraph one, sentence two, changed"Figure 5-2" to"Figure 5-3";this change is a reference correction, editorial change.36.Page 5-17, Section 5.'2.3, paragraph two, last sentence, capitalized"State";editorial change.37.Page 5-17, Section 5.2.3, paragraph four, sentence one, changed"...actions for the plume exposure pathway EPZ..." to"...actions for the Plume Exposure Pathway EPZ...";editorial change.38.Page 5-17, Section 5.2.3, paragraph four, changed"DHRS" to"The Bureau of Radiation Control" in two locations; change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.39.Page 5-17, Section 5.2.3, paragraph four, last sentence, changed"...important basis for protective action recommendations." to"...important basis for Protective Action Recommendations (PARs).";editorial change.40.Page 5-18, Section 5.2.4, sentence one, change"(Figures G2-9)" to"(Figures Gl-8)";this change is a reference correction, editorial change.41.Page 5-18, Section 5.2.5, sentence two, changed"DHRS" to"Bureau of Radiation Control";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.42.Page 5-18, Section 5.2.5, sentence two, changed"...the ingestion pathway EPZ." to"...the Ingestion Exposure Pathway EPZ.";editorial change.43.Page 5-18, Section 5.2.7, last sentence, changed"(St.Lucie Site plan)" to"(St.Lucie Site Plan)";editorial change.44.Page 5-24, Table 5-2, changed the revision date of the State of Florida Radiological Emergency Management Plan&om"1/1/95" to"1/1/96", data in the table was unchanged, this change does not decrease the effectiveness of the Emergency Plan.a:hplanr32 17 45.Page 5-27, Section 5.4.1, paragraph two, sentence two, changed"...of an augmented Expanded Response Organization..." to"...of an augmented Expanded Emergency Response Organization...";

editorial change.46.Page 5-27, Section 5.4.1, last paragraph, sentence one, changed"...(e.g., federal, state, and local agencies)..." to"...(e.g., Federal, State, and local agencies)...";

editorial change.47.Page 5-27, Section 5.4.1, last paragraph, sentence two, changed"...the Emergency classification." to"...the emergency classification.";

editorial change.48.Page 5-28,'Section 5.4.1, last paragraph, sentence three, added"Radiation Controlled Area" prior to (RCA);editorial change.49.Page 5-28, Section 5.4.2, sentence three, changed"Annex I" to"Annex K";this change is a reference correction, editorial change.50.51.Page 5-28, Section 5.4.2, sentence three, changed"...and monitoring in the ingestion pathway EPZ." to"...and monitoring in the Ingestion Exposure Pathway EPZ.";editorial change.Page 5-28, Section 5.4.2, last sentence, changed"(Recovery and Re-entry Planning)" to"(Recovery and Re-entry)";

this change is a chapter title correction from the State of Florida Radiological Emergency Management Plan, this change does not decrease the effectiveness of the Emergency Plan.tLO)1.Page 6-1, Section 6.2, 1, second paragraph, sentence three, capitalized"State";editorial change.2.Page 6-4, Section 6.3, last sentence, added"Exposure Pathway" between Plume and EPZ;editorial change.3.Page 6-10, Table 6-6, in the message text, capitalized"County","State", and"Federal";

editorial change.4.Page 6-10, Table 6-6, in the message text, removed phone number;the phone number was mistakenly included in this example news release, this information is provided to the media when the Emergency News Center is operational, this change does not decrease the effectiveness of the Emergency Plan.e enc r (7.0)a:Opia nr32 Page 7-1, Section 7.1.1, paragraph one, sentence two, changed"An exercise includes mobilization of state and..." to"An exercise normally includes mobilization of State and...";this change acknowledges the biennial frequency of exercises and the fact that the degree of oQ'-18 site participation may vary&om year to year, the other change was a capitalization of"State", these changes do not decrease the effectiveness of the Emergency Plan.2.Page 7-I, Section 7.1.2, 3, changed"communication" to"communications";

editorial change.3.Page 7-1, Section 7.1.3, last sentence, removed the word"the" between the words of and plant management; editorial change.4.Page 7-2, Section 7.1.3, 4, capitalized"Federal" and"State";editorial change.5.Page 7-2, Section 7.1.3, mid page, removed the word"the" between the words"conducted," and plant management; editorial change.6.Page 7-5, Section 7.1.4, 1, paragraph one, sentence three, capitalized"Federal" and"State";editorial change.7.Page 7-5, Section 7.1.4, 1, paragraph three, capitalized"Federal" and"State";editorial change.8.Page 7-6, Section 7.1.4, 5, paragraph one, sentence one, capitalized"State","Plume Exposure Pathway";editorial change.9.Page 7-6, Section 7.1.4, 5, paragraph one, sentence three, removed the apostrophe from the word"EOC's";editorial change.10.Page 7-6, Section 7.1.4, 5, paragraph two, changed"These drills include"communications between the nuclear power plants, state, and local Emergency Operations Centers (EOC's)and field assessment teams..."." to"These drills include"communications between the nuclear power plants, State, and local EOCs and field assessment teams...".";

this change is a correction of the quote&om the State of Florida Radiological Emergency Management Plan, this change does not decrease the effectiveness of the Emergency Plan.11.Page 7-7, Section 7.1.4, 6, paragraph one, second two, changed"DHRS" to"Department of Health";change reflects the new title of State agency, this correction does not decrease the effectiveness of the Emergency Plan.12.Page 7-7, Section 7.1.4, 6, paragraph one, second two, changed"County Disaster Preparedness agencies" to"County Departments of Public Safety";this change reflects consistency to the title of the County agencies as named elsewhere in the Emergency Plan, this change does not decrease the effectiveness of the Emergency Plan.13.Page 7-8, Section 7.2.1, 1, changed"implementing procedures." to"Emergency Plan Implementing Procedures (EPIPs).";

editorial change.14.Page 7-8, Section 7.2.2, title, added"(ERO)" after"Emergency Response Organization";

editorial change.a:hpIanr32 19

')

I~~, 4 15.Page 7-8, Section 7.2.2, paragraph two, changed&om"The training program for members of the on-site emergency response organization will include practical drills, as appropriate and participation in exercises, in which each individual demonstrates an ability to perform assigned emergen'cy functions." to"The training program for members of the on-site ERO will include practical drills in which each individual, participating in the drill, demonstrates an ability to perform assigned emergency functions.";

this change standardizes the wording of this paragraph with the Turkey Point Emergency Plan, the change does not decrease the effectiveness of the Emergency Plan.16.Page 7-8, Section 7.2.2, paragraph two, added two new sentences,"Participation in a drill or exercise is not required for initial qualification in the ERO." and"Training requirements are delineated in EPIP 3100034E,'Maintaining.

Emergency Preparedness

-Emergency Response Plan Training'";

this change is consistent with the FPL position in response to the NRC in letter L-96-309 in which it was stated"FPL considers participation in drills and exercises as supplemental to the emergency response training provided for initial qualification.", also reference to the implementing procedure for Emergency Preparedness training is provided, this change does not decrease the effectiveness of the Emergency Plan.17.Page 7-8, Section 7.2.2, paragraph three, sentence five, changed"Procedures" to EPIPs;editorial change.18.Page 7-9, Section 7.2.2, paragraph one, last sentence, changed"Security maintains training records for members of the Security." to"Security Emergency Planning training records are maintained by the Plant Training Manager";this change places all EP training records under the control of the Training Department and the Plant Training Manager, this change does not decrease the effectiveness of the Emergency Plan.19.Page 7-9, Section 7.2.2, 1, a, changed"(i.e.emergency action level determination per Chapter 3)" to"(i.e., Emergency Action Level (EAL)determination per Chapter 3)";editorial change.20.Page 7-13, Section 7.3, paragraph three, changed"(this function may be delegated a to member(s)..." to"(this function may be delegated to a member(s)...";

editorial change.21.Page 7-13, Section 7.3, added new section[1],"Emergency Plan Implementing Procedures (EPIPs)-Written procedures will be established, implemented, and maintained covering the activities associated with Emergency Plan implementation.";

this change is to ensure that the intent of the previous Technical Specification requirement in 6.8.1.e.has been clearly transferred to the Emergency Plan as was intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.22.Pages 7-14, 15, Sections 7.1 to 7.6, renumbered to"7.2 to 7.7";editorial change.23.a:Opia nr32 Page 7-14, Section 7.1, paragraph two following sentence two, added,"All changes to the Emergency Plan Implementing Procedures shall be approved by the Plant General Manager, prior to implementation.";

this change is to ensure that the intent of the previous Technical Specification requirement in 6.8.2 has been clearly transferred to the Emergency Plan as was 20 O fy intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.24.Page 7-14, Section 7.1, paragraph two, sentence four, changed"Recommended changes to the Emergency Plan and Emergency Plan Implementing Procedures will be submitted to the Chairperson of the Company Review Board for review." to"Approved changes to the Emergency Plan and Emergency Plan Implementing Procedures will be submitted to the Chairperson of the Company Review Board (CNRB)for review." and added new sentence,"The Chairperson will review any issues or concerns regarding the Emergency Plan and Emergency Plan Implementing Procedures with the CNRB on an as needed basis.";this change is to ensure that the intent of the previous Technical Specification requirement in 6.5.1.6.j.

has been clearly transferred to the Emergency Plan as was intended in the original licensee amendment letter (L-95-233, dated August 16,1995), this change does not decrease the effectiveness of the Emergency Plan.25.Page 7-14, Section 7.3.1, paragraph three, sentence three, capitalized"State" and"Federal";

editorial change.e e (Appendix C)Page (APP-3), 3100023E, changed the title&om"On-site Emergency Organization and Call Directory" to"Site Emergency Organization";

editorial change.a:Rplanr32 21 4