| Detailed ActivitiesFollow Up Flag:Follow upFlag Status:FlaggedShawn, Barry, The results of the composite effects of the revisions to the Farley Fire PRA model are significant. Additional refinements are necessary. Additional modifications to plant may be necessary for Unit 2 to lower the risk numbers. The detailed activities that are now required due to the revisions to the Fire PRA model are listed below. The main activities are the refinements to the models and the resulting revisions to the Fire Risk Evaluations (FREs). The results of the Fire PRA model composite effects will be provided by July 3 2014. Currently revisions to 159 FREs will be necessary and will require until August 29, 2014 to complete. This is an aggressive schedule and SNC is pursuing improvements, if possible. The main activities necessary are: | | Detailed Activities Follow Up Flag: |
| | Follow up Flag Status: |
| | FlaggedShawn, Barry, The results of the composite effects of the revisions to the Farley Fire PRA model are significant. Additional refinements are necessary. Additional modifications to plant may be necessary for Unit 2 to lower the risk numbers. The detailed activities that are now required due to the revisions to the Fire PRA model are listed below. The main activities are the refinements to the models and the resulting revisions to the Fire Risk Evaluations (FREs). The results of the Fire PRA model composite effects will be provided by July 3 2014. Currently revisions to 159 FREs will be necessary and will require until August 29, 2014 to complete. This is an a ggressive schedule and SNC is pursuing improvements, if possible. The main activities necessary are: |
| * Fire PRA model updates and refinements | | * Fire PRA model updates and refinements |
| * Fire PRA documentation | | * Fire PRA documentation |
Line 31: |
Line 34: |
| * Revisions to LAR Attachments C and G (note Attachment C is over 2000 pages) As shown above, the revisions to downstream documentation necessitated by the revisions to the Fire PRA model are extensive and necessary. | | * Revisions to LAR Attachments C and G (note Attachment C is over 2000 pages) As shown above, the revisions to downstream documentation necessitated by the revisions to the Fire PRA model are extensive and necessary. |
| If you need any additional information on the schedule change, please let me know. | | If you need any additional information on the schedule change, please let me know. |
| Hearing Identifier: NRR_PMDA Email Number: 1343 Mail Envelope Properties (73ADBEE6BC0EC34D852AEB1AEB8DA1E908C5C9) | | Hearing Identifier: NRR_PMDA Email Number: 1343 Mail Envelope Properties (73ADBEE6BC0EC34D852AEB1AEB8DA1E908C5C9) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Detailed Activities Sent Date: 6/4/2014 3:45:10 PM Received Date: 6/4/2014 3:46:00 PM From: Branum, Jeff K. Created By: JKBRANUM@southernco.com Recipients: "Williams, Shawn" <Shawn.Williams@nrc.gov> Tracking Status: None "Miller, Barry" <Barry.Miller@nrc.gov> | | Detailed Activities Sent Date: 6/4/2014 3:45:10 PM Received Date: 6/4/2014 3:46:00 PM From: Branum, Jeff K. |
| Tracking Status: None Post Office: ALXAPEX42.southernco.com Files Size Date & Time MESSAGE 1508 6/4/2014 3:46:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: Follow up}} | | Created By: JKBRANUM@southernco.com Recipients: "Williams, Shawn" <Sha wn.Williams@nrc.gov> Tracking Status: None "Miller, Barry" <Barry.Miller@nrc.gov> |
| | Tracking Status: None Post Office: ALXAPEX42.southernco.com |
| | |
| | Files Size Date & Time MESSAGE 1508 6/4/2014 3:46:00 PM |
| | |
| | Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: Follow up}} |
|
---|
Category:E-Mail
MONTHYEARML24304A8922024-10-30030 October 2024 Acceptance Review - Farley Units 1 and 2 - RG 1.183 Table 3 Footnote 11 Exception UFSAR Change LAR ML24297A6042024-10-22022 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Admin Oversight ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24276A1132024-10-0202 October 2024 Acceptance Review - License Amendment Request to Revise TS SR 3.4.14.3 and Correct Administrative Oversight ML24271A0052024-09-26026 September 2024 NRR E-mail Capture - for Your Response - RAI - Farley and Vogtle 1 and 2 - Proposed Alternative Request for Steam Generator Welds (L-2024-LLR-0041) ML24227A0512024-08-14014 August 2024 August 14, 2024 - Request for Additional Information - Farley, Units 1 and 2 - Proposed LAR to Revise TS SR 3.6.6.8 Frequency ML24226A1152024-08-12012 August 2024 Tom Sanders Email Updated Trojan Quality Assurance Plan_8-12-2024 ML24212A2232024-07-30030 July 2024 Acceptance Review - License Amendment Request to Adopt TSTF-500, Rev 2 DC Electrical Rewrite (EPID L-2024-LLA-0091) - Email ML24212A3432024-07-25025 July 2024 Email Brian Gutherman, Portland General QA Manager Qualifications Response July 25 2024 ML24205A2142024-07-23023 July 2024 Acceptance Review - License Amendment Request to Change TS 3.6.5, Containment Air Temperature ML24213A2442024-07-22022 July 2024 Portland General Tom Sanders Email to NRC Trojan Quality Assurance Plan Rev. 31 Submittal - Follow-Up July 22, 2024 ML24213A2472024-07-18018 July 2024 Email Trojan Quality Assurance Plan Rev. 31 Submittal - Follow-Up July 18, 2024 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24142A4992024-05-21021 May 2024 NRR E-mail Capture - Acceptance Review - Farley and Hatch - LAR to Revise TS 1.1 and Add Online Monitoring (OLM) Program (L-2024-LLA-0058) ML24114A2452024-04-23023 April 2024 Acceptance Review - Farley, Units 1 and 2-Proposed LAR to Revise TS SR 3.6.6.8 ML24066A0492024-03-0404 March 2024 Trojan Quality Assurance Program Proposed Revision 31 Approval E-Mail ML24037A1352024-02-0505 February 2024 E-mail ML23335A0122023-12-0101 December 2023 FNP - IP95001 Inspection Notification and Request for Information (Email to Farley) ML23243A9952023-08-31031 August 2023 Request for Baseline RP Inspection ML23236A0022023-08-22022 August 2023 NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR ML23223A0142023-08-10010 August 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Exemption to 10 CFR 73.2, Physical Barriers ML23198A1552023-07-17017 July 2023 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 ML23135A0922023-05-11011 May 2023 NRR E-mail Capture - Acceptance Review - SNC Fleet Request to Use Specific Provision of a Later Edition of the ASME BPV Code, Section XI (L-2023-LLR-0016) ML23095A0832023-04-0505 April 2023 NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) ML23086A0232023-03-24024 March 2023 NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) ML23073A0252023-03-13013 March 2023 NRR E-mail Capture - Fyi - Closeout the Evacuation Time Estimate (ETE) Reviews for SNC Fleet ML23045A0782023-02-13013 February 2023 NRR E-mail Capture - Fyi - Revised Estimated Hours - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML23009A0062023-01-0606 January 2023 NRR E-mail Capture - Corrected - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23009A0152023-01-0606 January 2023 NRR E-mail Capture - Acceptance Review - Farley Surveillance Requirement (SR) 3.6.3.5 LAR ML23003A8092023-01-0303 January 2023 NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) ML22354A0112022-12-19019 December 2022 NRR E-mail Capture - Acceptance Review - Requested Licensing Action Regarding TS Revision to Adopt WCAP-17661-P-A, Improved Relaxed Axial Offset Control and Constant Axial Offset Control Fq Surveillance TS (L-2022-LLA-0148 and L-2022-LLA-01 ML22334A1482022-11-30030 November 2022 NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) ML22285A2532022-10-12012 October 2022 NRR E-mail Capture - Acceptance Review - Farley Proposed Inservice Inspection Alternative FNP-ISI-ALT-05-05, Version 1.0 ML22285A0082022-10-11011 October 2022 NRR E-mail Capture - Acceptance Review - Farley TS 4.3 LAR (L-2022-LLA-0138) ML22229A4792022-08-15015 August 2022 HP Baseline Inspection Document Request ML22213A2692022-08-0101 August 2022 NRR E-mail Capture - Joseph M. Farley Nuclear Plant Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specification 3.4.10, Pressurizer Safety Valves ML22123A1802022-05-0303 May 2022 NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22123A1782022-05-0303 May 2022 NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program ML22112A0892022-04-22022 April 2022 NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 ML22104A1312022-04-14014 April 2022 NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22020A0662022-01-13013 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TSTF-269-A LAR (L-2021-LLA-0234) ML22012A0632022-01-11011 January 2022 NRR E-mail Capture - Acceptance Review - Farley and Vogtle TS 5.5.16 LAR (L-2021-LLA-0235) ML22010A2402022-01-10010 January 2022 NRR E-mail Capture - Farley 1 and 2 - Acceptance of Requested Licensing Action Revise TS 5.5.17, Containment Leakage Rate Testing Program to Increase Calculated Peak Containment Pressure ML21321A3772021-11-16016 November 2021 NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal 2024-09-26
[Table view] |
Text
1NRR-PMDAPEm Resource From:Branum, Jeff K. [JKBRANUM@southernco.com]
Sent:Wednesday, June 04, 2014 3:45 PM To:Williams, Shawn; Miller, Barry
Subject:
Detailed Activities Follow Up Flag:
Follow up Flag Status:
FlaggedShawn, Barry, The results of the composite effects of the revisions to the Farley Fire PRA model are significant. Additional refinements are necessary. Additional modifications to plant may be necessary for Unit 2 to lower the risk numbers. The detailed activities that are now required due to the revisions to the Fire PRA model are listed below. The main activities are the refinements to the models and the resulting revisions to the Fire Risk Evaluations (FREs). The results of the Fire PRA model composite effects will be provided by July 3 2014. Currently revisions to 159 FREs will be necessary and will require until August 29, 2014 to complete. This is an a ggressive schedule and SNC is pursuing improvements, if possible. The main activities necessary are:
- Fire PRA model updates and refinements
- Revision to LAR Attachments S,V, and ire Risk Evaluation automation
- Fire Risk Evaluation drafts
- Reviews and comment incorporation
- Revisions to LAR Attachments C and G (note Attachment C is over 2000 pages) As shown above, the revisions to downstream documentation necessitated by the revisions to the Fire PRA model are extensive and necessary.
If you need any additional information on the schedule change, please let me know.
Hearing Identifier: NRR_PMDA Email Number: 1343 Mail Envelope Properties (73ADBEE6BC0EC34D852AEB1AEB8DA1E908C5C9)
Subject:
Detailed Activities Sent Date: 6/4/2014 3:45:10 PM Received Date: 6/4/2014 3:46:00 PM From: Branum, Jeff K.
Created By: JKBRANUM@southernco.com Recipients: "Williams, Shawn" <Sha wn.Williams@nrc.gov> Tracking Status: None "Miller, Barry" <Barry.Miller@nrc.gov>
Tracking Status: None Post Office: ALXAPEX42.southernco.com
Files Size Date & Time MESSAGE 1508 6/4/2014 3:46:00 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: Follow up