| {{#Wiki_filter:Nuclear Operating CompanySouth Tesas Project Electric Generating Station PO. Box 282 Wadsworth. TeUas 77483 -May 29, 2014NOC-AE-1400314010 CFR 50.54(f)U.S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001South Texas ProjectUnits 1 & 2Docket Nos. STN 50-498, STN 50-499Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding the Flooding Aspects of Recommendation 2.3 of theNear-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident | | {{#Wiki_filter:Nuclear Operating CompanySouth Tesas Project Electric Generating Station PO. Box 282 Wadsworth. |
| | TeUas 77483 -May 29, 2014NOC-AE-14003140 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission Attention: |
| | Document Control DeskWashington, DC 20555-0001 South Texas ProjectUnits 1 & 2Docket Nos. STN 50-498, STN 50-499Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding the Flooding Aspects of Recommendation 2.3 of theNear-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter from NRC to All Power Reactor Licensees, "Request for InformationPursuant to Title 10 of the Code of Federal Regulations 50.54(f) RegardingRecommendations 2.1, 2.3 and 9.3, of the Near-Term Task Force Review ofInsights from the Fukushima Dai-ichi Accident," dated March 12, 2012(ML12056A046).2. Letter from D.W. Rencurrel to NRC Document Control Desk, "Final Responseto NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding theFlooding Aspects of Recommendation 2.3 of the Near-Term Task ForceReview of Insights from the Fukushima Dai-Ichi Accident," dated November26, 2012 (NOC-AE-12002932)(ML12340A156).On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders ofconstruction permits in active or deferred status. Enclosure 4 of Reference 1 requested thateach licensee perform flood protection walkdowns and report the results within 180 days ofNRC endorsement of the flooding walkdown procedure (NEI 12-07). STPNOC completed theflood protection walkdowns at South Texas Project Units 1 & 2 and submitted the results inReference 2. Reference 2 contained open items where restricted access prevented walkdownof certain flood protection features. Walkdowns of the restricted access items have beencompleted and this letter provides the results. This submittal closes all the open items inReference 2.STI: 33878631I NOC-AE-14003140Page 2 of 3The attached table (Enclosure 1) provides a list of the restricted access items inspected, theirrespective disposition, and any action planned or taken. As a result of the inspections:* There were 16 deficiencies found (encompassed by two item numbers) and all wereentered into the site Corrective Action Program (CAP).* No temporary measures were required as a result of the completed inspections.* The flood protection features, including all restricted access items, will be included invarious plant maintenance and monitoring programs (see Condition Report (CR)12-11656-24).* One restricted access item has been reclassified as inaccessible.Additionally, this letter also corrects an error in Attachment 2 of Reference 2 -the "List ofRestricted Access Items" table. In the last row of this table, the identifying number of the floodprotection feature was inadvertently copied from the line above. The correct identificationnumber has been provided in this submittal.There are no commitments in this letter.If there are any questions regarding this letter, please contact Wendy Brost at (361) 972-8516 orme at (361) 972-7566.I declare under penalty of perjury that the foregoing is true and correct.Executed on ___ ___q_ ?oilDatedG.T. PowellSite Vice Presidentweb | | : 1. Letter from NRC to All Power Reactor Licensees, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) |
| | Regarding Recommendations 2.1, 2.3 and 9.3, of the Near-Term Task Force Review ofInsights from the Fukushima Dai-ichi Accident," |
| | dated March 12, 2012(ML12056A046). |
| | : 2. Letter from D.W. Rencurrel to NRC Document Control Desk, "Final Responseto NRC Request for Information Pursuant to 10 CFR 50.54(f) |
| | Regarding theFlooding Aspects of Recommendation 2.3 of the Near-Term Task ForceReview of Insights from the Fukushima Dai-Ichi Accident," |
| | dated November26, 2012 (NOC-AE-12002932)(ML12340A156). |
| | On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders ofconstruction permits in active or deferred status. Enclosure 4 of Reference 1 requested thateach licensee perform flood protection walkdowns and report the results within 180 days ofNRC endorsement of the flooding walkdown procedure (NEI 12-07). STPNOC completed theflood protection walkdowns at South Texas Project Units 1 & 2 and submitted the results inReference |
| | : 2. Reference 2 contained open items where restricted access prevented walkdownof certain flood protection features. |
| | Walkdowns of the restricted access items have beencompleted and this letter provides the results. |
| | This submittal closes all the open items inReference 2.STI: 33878631I NOC-AE-14003140 Page 2 of 3The attached table (Enclosure |
| | : 1) provides a list of the restricted access items inspected, theirrespective disposition, and any action planned or taken. As a result of the inspections: |
| | * There were 16 deficiencies found (encompassed by two item numbers) and all wereentered into the site Corrective Action Program (CAP).* No temporary measures were required as a result of the completed inspections. |
| | * The flood protection |
| | : features, including all restricted access items, will be included invarious plant maintenance and monitoring programs (see Condition Report (CR)12-11656-24). |
| | * One restricted access item has been reclassified as inaccessible. |
| | Additionally, this letter also corrects an error in Attachment 2 of Reference 2 -the "List ofRestricted Access Items" table. In the last row of this table, the identifying number of the floodprotection feature was inadvertently copied from the line above. The correct identification number has been provided in this submittal. |
| | There are no commitments in this letter.If there are any questions regarding this letter, please contact Wendy Brost at (361) 972-8516 orme at (361) 972-7566. |
| | I declare under penalty of perjury that the foregoing is true and correct.Executed on ___ ___q_ ?oilDatedG.T. PowellSite Vice President web |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| : 1. Closure of Flooding Walkdown Report Open Items NOC-AE-14003140Page 3 of 3cc:(paper copy)(electronic copy)Regional Administrator, Region IVU. S. Nuclear Regulatory Commission1600 East Lamar BoulevardArlington, Texas 76011-4511Balwant K. SingalSenior Project ManagerU.S. Nuclear Regulatory CommissionOne White Flint North (MS 8 Bi)11555 Rockville PikeRockville, MD 20852NRC Resident InspectorU. S. Nuclear Regulatory CommissionP. O. Box 289, Mail Code: MN116Wadsworth, TX 77483Jim CollinsCity of AustinElectric Utility Department721 Barton Springs RoadAustin, TX 78704A. H. Gutterman, EsquireMorgan, Lewis & Bockius, LLPBalwant K. SingalU.S. Nuclear Regulatory CommissionJohn RaganChris O'HaraJim von SuskilNRG South Texas LPKevin PolioCris EugsterL.D. BlaylockCPS EnergyPeter NemethCrain Caton & James, P.C.C. MeleCity of AustinRichard A. RatliffTexas Department of State Health ServicesRobert FreeTexas Department of State Health Services}} | | : 1. Closure of Flooding Walkdown Report Open Items NOC-AE-14003140 Page 3 of 3cc:(paper copy)(electronic copy)Regional Administrator, Region IVU. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 Balwant K. SingalSenior Project ManagerU.S. Nuclear Regulatory Commission One White Flint North (MS 8 Bi)11555 Rockville PikeRockville, MD 20852NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116Wadsworth, TX 77483Jim CollinsCity of AustinElectric Utility Department 721 Barton Springs RoadAustin, TX 78704A. H. Gutterman, EsquireMorgan, Lewis & Bockius, LLPBalwant K. SingalU.S. Nuclear Regulatory Commission John RaganChris O'HaraJim von SuskilNRG South Texas LPKevin PolioCris EugsterL.D. BlaylockCPS EnergyPeter NemethCrain Caton & James, P.C.C. MeleCity of AustinRichard A. RatliffTexas Department of State Health ServicesRobert FreeTexas Department of State Health Services}} |
|
---|
Category:Letter
MONTHYEARML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function NOC-AE-240040, Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan IR 05000498/20243012024-10-0707 October 2024 NRC Examination Report 05000498/2024301 and 05000499/2024301 ML24255A0322024-09-30030 September 2024 the Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal ML24249A3372024-09-0404 September 2024 Inservice Inspection Summary Report - 2RE23 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24234A0912024-08-27027 August 2024 NRC Initial Operator Licensing Examination Approval 05000498/2024301; 05000499/2024301 IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24184C0832024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators ML24183A1742024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump ML24179A3412024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24171A0112024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function IR 05000498/20244042024-06-0303 June 2024 Cyber Security Inspection Report 05000498/2024404 (Cover Letter) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report ML24116A3172024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 ML24092A1902024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-04
[Table view] |
Text
Nuclear Operating CompanySouth Tesas Project Electric Generating Station PO. Box 282 Wadsworth.
TeUas 77483 -May 29, 2014NOC-AE-14003140 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission Attention:
Document Control DeskWashington, DC 20555-0001 South Texas ProjectUnits 1 & 2Docket Nos. STN 50-498, STN 50-499Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f)Regarding the Flooding Aspects of Recommendation 2.3 of theNear-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident
References:
- 1. Letter from NRC to All Power Reactor Licensees, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3 and 9.3, of the Near-Term Task Force Review ofInsights from the Fukushima Dai-ichi Accident,"
dated March 12, 2012(ML12056A046).
- 2. Letter from D.W. Rencurrel to NRC Document Control Desk, "Final Responseto NRC Request for Information Pursuant to 10 CFR 50.54(f)
Regarding theFlooding Aspects of Recommendation 2.3 of the Near-Term Task ForceReview of Insights from the Fukushima Dai-Ichi Accident,"
dated November26, 2012 (NOC-AE-12002932)(ML12340A156).
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees and holders ofconstruction permits in active or deferred status. Enclosure 4 of Reference 1 requested thateach licensee perform flood protection walkdowns and report the results within 180 days ofNRC endorsement of the flooding walkdown procedure (NEI 12-07). STPNOC completed theflood protection walkdowns at South Texas Project Units 1 & 2 and submitted the results inReference
- 2. Reference 2 contained open items where restricted access prevented walkdownof certain flood protection features.
Walkdowns of the restricted access items have beencompleted and this letter provides the results.
This submittal closes all the open items inReference 2.STI: 33878631I NOC-AE-14003140 Page 2 of 3The attached table (Enclosure
- 1) provides a list of the restricted access items inspected, theirrespective disposition, and any action planned or taken. As a result of the inspections:
- There were 16 deficiencies found (encompassed by two item numbers) and all wereentered into the site Corrective Action Program (CAP).* No temporary measures were required as a result of the completed inspections.
- features, including all restricted access items, will be included invarious plant maintenance and monitoring programs (see Condition Report (CR)12-11656-24).
- One restricted access item has been reclassified as inaccessible.
Additionally, this letter also corrects an error in Attachment 2 of Reference 2 -the "List ofRestricted Access Items" table. In the last row of this table, the identifying number of the floodprotection feature was inadvertently copied from the line above. The correct identification number has been provided in this submittal.
There are no commitments in this letter.If there are any questions regarding this letter, please contact Wendy Brost at (361) 972-8516 orme at (361) 972-7566.
I declare under penalty of perjury that the foregoing is true and correct.Executed on ___ ___q_ ?oilDatedG.T. PowellSite Vice President web
Enclosure:
- 1. Closure of Flooding Walkdown Report Open Items NOC-AE-14003140 Page 3 of 3cc:(paper copy)(electronic copy)Regional Administrator, Region IVU. S. Nuclear Regulatory Commission 1600 East Lamar Boulevard Arlington, Texas 76011-4511 Balwant K. SingalSenior Project ManagerU.S. Nuclear Regulatory Commission One White Flint North (MS 8 Bi)11555 Rockville PikeRockville, MD 20852NRC Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116Wadsworth, TX 77483Jim CollinsCity of AustinElectric Utility Department 721 Barton Springs RoadAustin, TX 78704A. H. Gutterman, EsquireMorgan, Lewis & Bockius, LLPBalwant K. SingalU.S. Nuclear Regulatory Commission John RaganChris O'HaraJim von SuskilNRG South Texas LPKevin PolioCris EugsterL.D. BlaylockCPS EnergyPeter NemethCrain Caton & James, P.C.C. MeleCity of AustinRichard A. RatliffTexas Department of State Health ServicesRobert FreeTexas Department of State Health Services