Line 23: |
Line 23: |
| ==References:== | | ==References:== |
| : 1. Tennessee Valley Authority Letter to NRC, "Watts Bar Nuclear Plant Units 1 and 2 - Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing analysis," dated September 12, 2014 2. Electronic Mail from NRC to TVA, "Watts Bar, Unit 2 - Request for Additional Information (RAIs) on EP Chapter 13.3 and Staffing Analysis," dated October 17, 2014 In Reference 1, the Tennessee Valley Authority submitted Revision 104X to the Radiological Emergency Plan for the Watts Bar Nuclear Plant and a copy of the Emergency Response Organization On-Shift Staffing Analysis Report. In Reference 2, the Nuclear Regulatory Commission (NRC) requested additional information related to the Reference 1 submittal. Enclosure 1 provides responses to address the NRC's requests. Enclosure 2 provides an updated copy of the Emergency Response Organization On-Shift Staffing Analysis Report. There are no new regulatory commitments associated with this letter. If you have any questions or comments, please contact Gordon Arent at (423) 365-2004. | | : 1. Tennessee Valley Authority Letter to NRC, "Watts Bar Nuclear Plant Units 1 and 2 - Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing analysis," dated September 12, 2014 2. Electronic Mail from NRC to TVA, "Watts Bar, Unit 2 - Request for Additional Information (RAIs) on EP Chapter 13.3 and Staffing Analysis," dated October 17, 2014 In Reference 1, the Tennessee Valley Authority submitted Revision 104X to the Radiological Emergency Plan for the Watts Bar Nuclear Plant and a copy of the Emergency Response Organization On-Shift Staffing Analysis Report. In Reference 2, the Nuclear Regulatory Commission (NRC) requested additional information related to the Reference 1 submittal. Enclosure 1 provides responses to address the NRC's requests. Enclosure 2 provides an updated copy of the Emergency Response Organization On-Shift Staffing Analysis Report. There are no new regulatory commitments associated with this letter. If you have any questions or comments, please contact Gordon Arent at (423) 365-2004. |
| U.S. Nuclear Regulatory Commission CNL-14-203 Page 2 December 15, 2014 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of December 2014. Respectfully,J. W. Shea Vice President, Nuclear Licensing | | U.S. Nuclear Regulatory Commission CNL-14-203 |
| | |
| | Page 2 December 15, 2014 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of December 2014. |
| | Respectfully, J. W. Shea Vice President, Nuclear Licensing |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. Responses to Request for Additional Information, Watts Bar Nuclear Plant, Units 1 and 2, Radiological Emergency Plan and On-Shift Staffing Analysis | | : 1. Responses to Request for Additional Information, Watts Bar Nuclear Plant, Units 1 and 2, Radiological Emergency Plan and On-Shift Staffing Analysis |
| : 2. Emergency Response Organization On-Shift Staffing Analysis Report, Revision 3 cc (Enclosure): U. S. Nuclear Regulatory Commission, Region II NRC Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Resident Inspector - Watts Bar Nuclear Plant Unit 2 NRR Project Manager - Watts Bar Nuclear Plant J. W. SheaDigitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley Authority, ou=Nuclear Licensing, email=jwshea@tva.gov, c=US Date: 2014.12.15 21:30:01 -05'00'}} | | : 2. Emergency Response Organization On-Shift Staffing Analysis Report, Revision 3 cc (Enclosure): U. S. Nuclear Regulatory Commission, Region II NRC Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Resident Inspector - Watts Bar Nuclear Plant Unit 2 NRR Project Manager - Watts Bar Nuclear Plant J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley |
| | |
| | Authority, ou=Nuclear Licensing, |
| | |
| | email=jwshea@tva.gov, c=US |
| | |
| | Date: 2014.12.15 21:30:01 -05'00'}} |
Letter Sequence Response to RAI |
---|
|
|
MONTHYEARCNL-14-203, Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis2014-12-15015 December 2014 Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis Project stage: Response to RAI CNL-14-212, Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2014-12-30030 December 2014 Expedited Seismic Evaluation Process Report (CEUS Sites) Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident Project stage: Response to RAI CNL-14-098, Request to Revise the Watts Bar Nuclear Plant Unit 2 Cyber Security Milestone Implementation Schedule and Implementation License Conditions2015-01-0909 January 2015 Request to Revise the Watts Bar Nuclear Plant Unit 2 Cyber Security Milestone Implementation Schedule and Implementation License Conditions Project stage: Request CNL-15-043, Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Acc2015-03-25025 March 2015 Flood Hazard Reevaluation Report for Watts Bar, Response to NRC Request for Information Per Title 10 of CFR 50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid Project stage: Response to RAI CNL-15-046, Submittal of Revision 106X to Appendix C of the Radiological Emergency Plan2015-04-0101 April 2015 Submittal of Revision 106X to Appendix C of the Radiological Emergency Plan Project stage: Request CNL-15-049, Cyber Security Plan Implementation Milestones 1 Through 7 Status and Proposed License Condition2015-04-0101 April 2015 Cyber Security Plan Implementation Milestones 1 Through 7 Status and Proposed License Condition Project stage: Other CNL-15-097, Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2015-06-16016 June 2015 Flood Hazard Reevaluation Report for Watts Bar Plant, Response to NRC Request for Information Per 10CFR50.54(f) Regarding Recommendations 2.1, 2.3 and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Response to RAI ML15229A1952015-08-31031 August 2015 NUREG-0847, Supplement 28 Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Unit 2 Docket Number 50-391 Tennessee Valley Authority Project stage: Request L-11-001, Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies.2015-09-24024 September 2015 Submittal of 30-Day Response to NRC Bulletin 2011-01, Mitigating Strategies. Project stage: Request ML15280A0852015-10-14014 October 2015 Closeout of NRC Bulletin 2011-01, Mitigating Strategies Project stage: Other 2015-03-25
[Table View] |
|
---|
Category:Letter
MONTHYEARCNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-028, Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-14014 March 2024 Response to Request for Additional Information Regarding Watts Bar Nuclear Plant, Units 1 and 2, Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 IR 05000390/20240102024-03-0808 March 2024 Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 CNL-24-012, Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-02-28028 February 2024 Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000390/20230062024-02-28028 February 2024 Annual Assessment Letter for Watts Bar Nuclear Plant Units 1 and 2 - Report 05000390/2023006 and 05000391/2023006 CNL-24-023, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 252024-02-20020 February 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 25 ML24009A1712024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Letter ML24019A0722024-02-14014 February 2024 Request for Withholding Information from Public Disclosure IR 05000390/20230042024-02-13013 February 2024 Integrated Inspection Report 05000390/2023004 and 05000391/2023004 and Apparent Violation 2024-09-05
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402CNL-14-203 December 15, 2014 10 CFR 50.47 10 CFR 50, Appendix E U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License NPF-90 NRC Docket No. 50-390 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
Watts Bar Nuclear Plant Units 1 and 2 - Response to Request for Additional Information on EP Chapter 13.3 and Staffing Analysis
References:
- 1. Tennessee Valley Authority Letter to NRC, "Watts Bar Nuclear Plant Units 1 and 2 - Submittal of Revision to the Radiological Emergency Plan and On-Shift Staffing analysis," dated September 12, 2014 2. Electronic Mail from NRC to TVA, "Watts Bar, Unit 2 - Request for Additional Information (RAIs) on EP Chapter 13.3 and Staffing Analysis," dated October 17, 2014 In Reference 1, the Tennessee Valley Authority submitted Revision 104X to the Radiological Emergency Plan for the Watts Bar Nuclear Plant and a copy of the Emergency Response Organization On-Shift Staffing Analysis Report. In Reference 2, the Nuclear Regulatory Commission (NRC) requested additional information related to the Reference 1 submittal. Enclosure 1 provides responses to address the NRC's requests. Enclosure 2 provides an updated copy of the Emergency Response Organization On-Shift Staffing Analysis Report. There are no new regulatory commitments associated with this letter. If you have any questions or comments, please contact Gordon Arent at (423) 365-2004.
U.S. Nuclear Regulatory Commission CNL-14-203
Page 2 December 15, 2014 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 15th day of December 2014.
Respectfully, J. W. Shea Vice President, Nuclear Licensing
Enclosures:
- 1. Responses to Request for Additional Information, Watts Bar Nuclear Plant, Units 1 and 2, Radiological Emergency Plan and On-Shift Staffing Analysis
- 2. Emergency Response Organization On-Shift Staffing Analysis Report, Revision 3 cc (Enclosure): U. S. Nuclear Regulatory Commission, Region II NRC Resident Inspector - Watts Bar Nuclear Plant Unit 1 NRC Resident Inspector - Watts Bar Nuclear Plant Unit 2 NRR Project Manager - Watts Bar Nuclear Plant J. W. Shea Digitally signed by J. W. Shea DN: cn=J. W. Shea, o=Tennessee Valley