ML16015A327: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Page 1 of 2PUBLIC | {{#Wiki_filter:Page 1 of 2PUBLIC SUBMISSION As of: 1/12/16 3:32 PMReceived: | ||
January 07, 2016Status: Pending_Post Tracking No. lk0-8n96-fbr4 Comments Due: February 29, 2016Submission Type: WebDocket: NRC-20 15-0251Draft Guidance Documents for Subsequent License RenewalComment On: NRC-2015-0251-0004 Guidance: | |||
Subsequent License Renewal,Document: | |||
NRC-20 15-0251 -DRAFT-0005 Comment on FR Doc # 20 15-32368b~ c~&3)Submitter Information.........- | |||
................................ | |||
Name: Jan Boudart ........ | |||
-: .... Address:.... | |||
:1132 W Lunt Ave #D-7 i H' <rChicago, IL, 60626 " ..oEmail: janunaj@hotmail.com General Comment2016-01-07:Docket 2015-0251 This comment regards radiation danger to Lake Michigan, the people of Chicago and the State of Illinois, especially in reference to the Palisades Nuclear Power Plant in Covert Township, Van Buren County,Michigan. | |||
The Palisades NPP achieved it's projected lifespan in 2011. Three or four years before that theNRC changed it's rules to allow an extension of 20 years -- so that Palisades is now scheduled to continueoperations until 2031, at which time it will be 60 years old.Palisades is recognized by the NRC itself as being a plant very susceptible to embrittlement of its steel reactorvessel. But with another relaxation of old rules in favor of new, a coupon sample of its metal has beenpostponed to 2019. The previous test of a the reactor vessel metal, itself, occurred in 2003. This 16-year spanglides through the originally proposed 2011 closing of Palisades. | |||
: However, the NRC has allowed a mathematical formula to supersede actual physical testing of the reactormetal. The formula is based on results from, other NPPs and is obscure in its results. | |||
It creates a distancebetween what the NRC perceives and what activists and the public perceive. | |||
In addition, results from one capsule test,_NumbnrA-_60._from 1~9Rd_ has disappeared along with any data itmay have revealed. | |||
SUNSI Review CompleteTemplate | |||
=ADM -013E-RIDS= ADM -03file :///C 8/NRC-20 15-0251 -DRAFT-0005 | |||
.html 01 /12/2016 Page 2 of 2Both of these problems with testing the reactor metal feel very much like pussyfooting around the truth.But Palisades is just one example, even if the most flagrant, of the NRC changing horses in midstream toobfuscate results and obscure understanding of how they reach conclusions. | |||
The concept of publicresponsibility is the real loss in these situations where the NRC plays loosely with public safety.file :/// C :/Users/ | |||
CA G/Doc um ents/XP Mi gratedF o lders/P RM 28/NR C- 2 015-02 51 -DRAFT-0005 | |||
.html 0 22101/12/2016 Page 1 of 2PUBLIC SUBMISSION As of: 1/12/16 3:32 PMReceived: | |||
January 07, 2016Status: Pending_Post Tracking No. lk0-8n96-fbr4 Comments Due: February 29, 2016Submission Type: WebDocket: NRC-20 15-0251Draft Guidance Documents for Subsequent License RenewalComment On: NRC-2015-0251-0004 Guidance: | |||
Subsequent License Renewal,Document: | |||
NRC-20 15-0251 -DRAFT-0005 Comment on FR Doc # 20 15-32368b~ c~&3)Submitter Information.........- | |||
................................ | |||
Name: Jan Boudart ........ | |||
-: .... Address:.... | |||
:1132 W Lunt Ave #D-7 i H' <rChicago, IL, 60626 " ..oEmail: janunaj@hotmail.com General Comment2016-01-07:Docket 2015-0251 This comment regards radiation danger to Lake Michigan, the people of Chicago and the State of Illinois, especially in reference to the Palisades Nuclear Power Plant in Covert Township, Van Buren County,Michigan. | |||
The Palisades NPP achieved it's projected lifespan in 2011. Three or four years before that theNRC changed it's rules to allow an extension of 20 years -- so that Palisades is now scheduled to continueoperations until 2031, at which time it will be 60 years old.Palisades is recognized by the NRC itself as being a plant very susceptible to embrittlement of its steel reactorvessel. But with another relaxation of old rules in favor of new, a coupon sample of its metal has beenpostponed to 2019. The previous test of a the reactor vessel metal, itself, occurred in 2003. This 16-year spanglides through the originally proposed 2011 closing of Palisades. | |||
: However, the NRC has allowed a mathematical formula to supersede actual physical testing of the reactormetal. The formula is based on results from, other NPPs and is obscure in its results. | |||
It creates a distancebetween what the NRC perceives and what activists and the public perceive. | |||
In addition, results from one capsule test,_NumbnrA-_60._from 1~9Rd_ has disappeared along with any data itmay have revealed. | |||
SUNSI Review CompleteTemplate | |||
=ADM -013E-RIDS= ADM -03file :///C 8/NRC-20 15-0251 -DRAFT-0005 | |||
.html 01 /12/2016 Page 2 of 2Both of these problems with testing the reactor metal feel very much like pussyfooting around the truth.But Palisades is just one example, even if the most flagrant, of the NRC changing horses in midstream toobfuscate results and obscure understanding of how they reach conclusions. | |||
The concept of publicresponsibility is the real loss in these situations where the NRC plays loosely with public safety.file :/// C :/Users/ | |||
CA G/Doc um ents/XP Mi gratedF o lders/P RM 28/NR C- 2 015-02 51 -DRAFT-0005 | |||
.html 0 22101/12/2016}} |
Revision as of 14:00, 30 June 2018
ML16015A327 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 01/07/2016 |
From: | Boudart J - No Known Affiliation |
To: | Rules, Announcements, and Directives Branch |
References | |
80FR79956 00002, NRC-2015-0251 | |
Download: ML16015A327 (2) | |
Text
Page 1 of 2PUBLIC SUBMISSION As of: 1/12/16 3:32 PMReceived:
January 07, 2016Status: Pending_Post Tracking No. lk0-8n96-fbr4 Comments Due: February 29, 2016Submission Type: WebDocket: NRC-20 15-0251Draft Guidance Documents for Subsequent License RenewalComment On: NRC-2015-0251-0004 Guidance:
Subsequent License Renewal,Document:
NRC-20 15-0251 -DRAFT-0005 Comment on FR Doc # 20 15-32368b~ c~&3)Submitter Information.........-
................................
Name: Jan Boudart ........
-: .... Address:....
- 1132 W Lunt Ave #D-7 i H' <rChicago, IL, 60626 " ..oEmail: janunaj@hotmail.com General Comment2016-01-07:Docket 2015-0251 This comment regards radiation danger to Lake Michigan, the people of Chicago and the State of Illinois, especially in reference to the Palisades Nuclear Power Plant in Covert Township, Van Buren County,Michigan.
The Palisades NPP achieved it's projected lifespan in 2011. Three or four years before that theNRC changed it's rules to allow an extension of 20 years -- so that Palisades is now scheduled to continueoperations until 2031, at which time it will be 60 years old.Palisades is recognized by the NRC itself as being a plant very susceptible to embrittlement of its steel reactorvessel. But with another relaxation of old rules in favor of new, a coupon sample of its metal has beenpostponed to 2019. The previous test of a the reactor vessel metal, itself, occurred in 2003. This 16-year spanglides through the originally proposed 2011 closing of Palisades.
- However, the NRC has allowed a mathematical formula to supersede actual physical testing of the reactormetal. The formula is based on results from, other NPPs and is obscure in its results.
It creates a distancebetween what the NRC perceives and what activists and the public perceive.
In addition, results from one capsule test,_NumbnrA-_60._from 1~9Rd_ has disappeared along with any data itmay have revealed.
SUNSI Review CompleteTemplate
=ADM -013E-RIDS= ADM -03file :///C 8/NRC-20 15-0251 -DRAFT-0005
.html 01 /12/2016 Page 2 of 2Both of these problems with testing the reactor metal feel very much like pussyfooting around the truth.But Palisades is just one example, even if the most flagrant, of the NRC changing horses in midstream toobfuscate results and obscure understanding of how they reach conclusions.
The concept of publicresponsibility is the real loss in these situations where the NRC plays loosely with public safety.file :/// C :/Users/
CA G/Doc um ents/XP Mi gratedF o lders/P RM 28/NR C- 2 015-02 51 -DRAFT-0005
.html 0 22101/12/2016 Page 1 of 2PUBLIC SUBMISSION As of: 1/12/16 3:32 PMReceived:
January 07, 2016Status: Pending_Post Tracking No. lk0-8n96-fbr4 Comments Due: February 29, 2016Submission Type: WebDocket: NRC-20 15-0251Draft Guidance Documents for Subsequent License RenewalComment On: NRC-2015-0251-0004 Guidance:
Subsequent License Renewal,Document:
NRC-20 15-0251 -DRAFT-0005 Comment on FR Doc # 20 15-32368b~ c~&3)Submitter Information.........-
................................
Name: Jan Boudart ........
-: .... Address:....
- 1132 W Lunt Ave #D-7 i H' <rChicago, IL, 60626 " ..oEmail: janunaj@hotmail.com General Comment2016-01-07:Docket 2015-0251 This comment regards radiation danger to Lake Michigan, the people of Chicago and the State of Illinois, especially in reference to the Palisades Nuclear Power Plant in Covert Township, Van Buren County,Michigan.
The Palisades NPP achieved it's projected lifespan in 2011. Three or four years before that theNRC changed it's rules to allow an extension of 20 years -- so that Palisades is now scheduled to continueoperations until 2031, at which time it will be 60 years old.Palisades is recognized by the NRC itself as being a plant very susceptible to embrittlement of its steel reactorvessel. But with another relaxation of old rules in favor of new, a coupon sample of its metal has beenpostponed to 2019. The previous test of a the reactor vessel metal, itself, occurred in 2003. This 16-year spanglides through the originally proposed 2011 closing of Palisades.
- However, the NRC has allowed a mathematical formula to supersede actual physical testing of the reactormetal. The formula is based on results from, other NPPs and is obscure in its results.
It creates a distancebetween what the NRC perceives and what activists and the public perceive.
In addition, results from one capsule test,_NumbnrA-_60._from 1~9Rd_ has disappeared along with any data itmay have revealed.
SUNSI Review CompleteTemplate
=ADM -013E-RIDS= ADM -03file :///C 8/NRC-20 15-0251 -DRAFT-0005
.html 01 /12/2016 Page 2 of 2Both of these problems with testing the reactor metal feel very much like pussyfooting around the truth.But Palisades is just one example, even if the most flagrant, of the NRC changing horses in midstream toobfuscate results and obscure understanding of how they reach conclusions.
The concept of publicresponsibility is the real loss in these situations where the NRC plays loosely with public safety.file :/// C :/Users/
CA G/Doc um ents/XP Mi gratedF o lders/P RM 28/NR C- 2 015-02 51 -DRAFT-0005
.html 0 22101/12/2016