ML24212A153
| ML24212A153 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/29/2024 |
| From: | Grigola B - No Known Affiliation |
| To: | Office of Administration |
| References | |
| 89FR53659 00086, NRC-2024-0076 | |
| Download: ML24212A153 (1) | |
Text
PUBLIC SUBMISSION As of: 7/30/24, 9:17 AM Received: July 29, 2024 Status: Pending_Post Tracking No. lz7-kqoj-g6kc Comments Due: July 29, 2024 Submission Type: API Docket: NRC-2024-0076 Notice of Intent to Conduct Scoping Process and Prepare an Environmental Assessment Holtec Decommissioning International, LLC and Holtec Palisades, LLC; Palisades Nuclear Plant, Unit 1 Comment On: NRC-2024-0076-0001 Holtec Decommissioning International, LLC, and Holtec Palisades, LLC; Palisades Nuclear Plant; Notice of Intent To Conduct Scoping Process and Prepare an Environmental Assessment Document: NRC-2024-0076-DRAFT-0086 Comment on FR Doc # 2024-14112 Submitter Information Name: Barbara Grigola Address:
Covert, MI, 49043 Email:bjgrigola@gmail.com Phone:6303908285 General Comment Comment on Holtecs Request to Restart Palisades Nuclear Plant Docket ID NRC-2024-0076 July 29, 2024 My husband and I have great concerns about the safety of the process being utilized to reopen the Palisades Nuclear Plant. It is our understanding that some maintenance had been deferred as the aging plant approached the end of its anticipated lifespan and the 2031 end of its license. To restart the plant without addressing these issues could put the residents of Covert, South Haven and the nearby towns in jeopardy.
Since no nuclear plant has ever reopened after being shut down in the U. S., it is not known what safety hazards might crop up. We respectfully request that the NRC and the EPA develop an official formal protocol to determine the technical criteria that should be met before any nuclear power plant is restarted after shutdown. We neighbors of the Palisades Nuclear Power Plant do not want to be the unwitting guinea pigs to find out too late there should have been a set of standard regulations in place to protect us from any failures in restarting this 50-year-old plant.
We respectfully request that the NRC, DOE and EPA develop a protocol and thorough review before approving Holtecs restarting of the Palisades Power Plant.
Sincerely, Barbara Grigola &
Salvatore Grigola 7/30/24, 9:18 AM blob:https://www.fdms.gov/ea0f1797-2396-4756-b58e-6211cea6125c blob:https://www.fdms.gov/ea0f1797-2396-4756-b58e-6211cea6125c 1/2 SUNSI Review Complete Template=ADM-013 E-RIDS=ADM-03 ADD: Laura Willingham, Mary Richmond, Antoinette Walker-Smith, Marlayna Doell, Mary Neely Comment (86)
Publication Date:6/27/2024 Citation: 89 FR 53659
79882 Ramblewood Drive Covert, MI 49043 (signed pdf version attached)
Attachments Comments on Restarting Palisades Power Plant Grigola 07 29 2024 7/30/24, 9:18 AM blob:https://www.fdms.gov/ea0f1797-2396-4756-b58e-6211cea6125c blob:https://www.fdms.gov/ea0f1797-2396-4756-b58e-6211cea6125c 2/2
Comment on Hottec's Requestto Restart Patisades Nuctear Ptant Docket lD NRC-2024-0076 luly29,2A24 My husband and I have great concerns about the safety of the process being util.ized to reopen the patisades Nuctear ptant. lt is our understanding that some maintenance had been deferred as the aging ptant approached the end of its anticipated tifespan and the 2031 end of its License. To restart the ptant without addressing these issues coutd put the residents of Covert, South Haven and the nearby towns in jeoPardY.
Since no nuclear ptant has ever reopened after being shut down in the U. S., it is not known what safety hazards might crop up. We respectfutty request that the NRC and the EPA develop an officiat format protocot to determine the technicat criteria that Shoutd be met before any nuctear power pl.ant iS restarted after shutdown. We neighbors Of the Patisades Nuctear Power Ptant do not want to be the unwitting guinea pigs to find out too late there shoutd have been a set of standard regulations in ptace to protect us from any faitures in restarting this So-year-otd pl'ant.
We respectfutty request that the NRC, DOE and EPA devetop a protocot and thorough review before approving Hottec's restarting of the Patisades Power Ptant.
Sincerety, Barbara Grigota Grigota
.9"q*JG #^,e+-
79882 Ramblewood Drive Covert, Mt49043
-?&*
Sdtvatore