{{#Wiki_filter:LGS UFSAR CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE TABLE OF CONTENTS   17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.2  QUALITY ASSURANCE DURING THE OPERATIONS PHASE  
{{#Wiki_filter:LGS UFSAR  
 
CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE
 
TABLE OF CONTENTS 17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION  
 
17.2  QUALITY ASSURANCE DURING THE OPERATIONS PHASE  


APPENDIX 17.2B - Deleted.  
APPENDIX 17.2B - Deleted.  
Line 23: Line 29:


APPENDIX 17.2.II - Deleted.
APPENDIX 17.2.II - Deleted.
LGS UFSAR  CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE 


17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the LGS UFSAR.  
LGS UFSAR CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE
 
17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION
 
This section is not applicable to the LGS UFSAR.
 
17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE
 
The licensee is responsible for the operation and maintenance of Limerick Generating Station
 
(LGS). These activities are presently conducted in accordance with the NRC approved Quality
 
Assurance Topical Report (QATR) which descr ibes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.  


17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE The licensee is responsible for the operation and maintenance of Limerick Generating Station (LGS). These activities are presently conducted in accordance with the NRC approved Quality Assurance Topical Report (QATR) which describes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.  
The QATR describes how the Quality Assurance Pr ogram is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality


The QATR describes how the Quality Assurance Program is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality Assurance Program as described by the QATR is incorporated herein by reference.}}
Assurance Program as described by the QA TR is incorporated herein by reference.}}

Revision as of 01:34, 30 June 2018

Limerick Generating Station, Units 1 & 2, Revision 18 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16357A151
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/19/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16357A167 List:
References
Download: ML16357A151 (2)


Text

LGS UFSAR

CHAPTER 17 17-i REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE

TABLE OF CONTENTS 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE

APPENDIX 17.2B - Deleted.

APPENDIX 17.2.I - Deleted.

APPENDIX 17.2.II - Deleted.

LGS UFSAR CHAPTER 17 17.2-1 REV. 13, SEPTEMBER 2006 CHAPTER 17 - QUALITY ASSURANCE

17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION

This section is not applicable to the LGS UFSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATIONS PHASE

The licensee is responsible for the operation and maintenance of Limerick Generating Station

(LGS). These activities are presently conducted in accordance with the NRC approved Quality

Assurance Topical Report (QATR) which descr ibes the formal and comprehensive control methods established to assure compliance with 10CFR50, Appendix B.

The QATR describes how the Quality Assurance Pr ogram is to be functionally implemented with due regard to the safety and health of the public and the personnel on site. The LGS Quality

Assurance Program as described by the QA TR is incorporated herein by reference.