ML14203A427: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 22
| page count = 22
}}
}}
=Text=
{{#Wiki_filter:All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Document TitleAccession NumberDocument DatePilgrim Nuclear Power Station Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO).ML0601004561/3/2006Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with handwritten notes.ML0626803591/3/2006G20060064/LTR-06-0041 - Sen T. Murray, Rep V. DeMacedo, and Rep T. O'Brien Ltr re: Relicensing of Pilgrim and Vermont YankeeML0602300461/12/2006G20060054/LTR-06-0037 - Ltr. Alice Moore Re: Concerns Pilgrim and Vermont Yankee Relicensing.ML0601900391/13/20062006/01/13-Comment (4) submitted by Wedge Bramhall on Proposed Rule PR-73 regarding Design Basis Threat.ML0601801961/13/2006G20060065/LTR-06-0042 - Ltr Mark D. Sylvia re: Concerns Pilgrim and Vermont Yankee Relicensing Applications.ML0602300481/18/2006EA-05-221, Office of Investigations Report No. 1-2004-030.ML0601805481/19/2006EA-05-220, Office of Investigations Report No. 1-2004-030.ML0601805091/19/2006Letter to Debbie Grinnell Regarding Department of Labor (DOL) Occupational Safety & Health Administration (OSHA) Finding of Discrimination of a Contract Worker by Williams Power Corporation.ML0602404641/19/20062006/01/20-Comment (31) submitted by Pilgrim Security Watch, M. Lampert,  et al. E. J. Epstein, N. Cohen, S. J. Goodman, R. Becker, D. Katz and H. Moyer on Proposed Rule PR-73 regarding Design Basis ThreatML0602405871/20/20062006/01/25-Email: (PA) Re: Checking InML0621204911/25/20062006/01/25-Pilgrim Nuclear Power Station Applicant's Environmental Report Operating License Renewal Stage, Appendix E.ML0608306111/25/2006Pilgrim Nuclear Power Station Updated Final Safety Analysis Report Supplement.ML0603000291/25/20062006/01/25-Transmittal of Pilgrim Nuclear Power Station License Renewal Application.ML0603000261/25/20062006/01/25-Pilgrim, License Renewal Application Boundary Drawings.ML0604702481/25/20062006/01/25-Pilgrim Nuclear Power Station License Renewal Application.ML0603000281/25/20062006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and PilgrimML0621204981/27/2006G20050841/LTR-05-0588-Mary Elizabeth Lampert Ltr. re. Pilgrim Nuclear Power Station E-mail Concerns Single Loop Operation Amendment.ML0602600211/27/2006OFFICIAL EXHIBIT - PWA000006-00-BD01 - "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1106009011/31/2006Exhibit PWA 00006, "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1100308991/31/20062006/01/31-Press Release-06-011:  NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.ML0603100431/31/20061 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/01/31-Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station.ML0603105931/31/2006Pilgrim Nuclear Power Station - Seawater System Procedure 2.2.94.ML0613900832/1/2006(3) ENN-NDE-10.03, Rev. 1; "VT-3 Examination," 02/02/2006.ML0706801572/2/2006ENN-NDE-10.03, 02/02/06, VT-3 Examination.ML0707902082/2/20062006/02/03-Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621204992/3/2006E-mail: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205012/3/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205022/3/2006IR 05000293-05-005; 10/01/2005 -12/31/2005; Pilgrim Nuclear Power Station; Flood Protection Measures; Maintenance Effectiveness.ML0603406302/3/20062006/02/03 - Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.ML0603705812/3/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205362/6/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205392/6/2006PNPS Site Plan Monitoring Wells.ML0614203582/13/2006(2) ENN-NDE-10.01, Rev. 2; "VT-1 Examination," 02/13/2006.ML0706801542/13/200603/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process.ML0604405432/13/20062006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.ML0621205432/15/2006Pilgrim Nuclear Power Station Physical Security Plan, Revision 1.ML0605200222/15/2006Pilgrim Nuclear Power Station Relief Request No. PPR-05 (TAC No. MC8288).ML0601201272/17/20062006/02/23-Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts.ML0614302042/23/2006Pilgrim, Withdrawal of Inservice Inspection 10 CFR 50.55a (g)(4)(iv) Request No. PIL-05-R-03.ML0606205082/23/2006G20060065/LTR-06-0042 - Mark Sylvia Ltr. re Concerns Pilgrim and Vermont Yankee relicensing applications.ML0602500682/25/2006G20060054/LTR-06-0037 - Alice Moore Ltr. re. Concerns Pilgrim and Vermont Yankee Relicensing.ML0602400242/25/2006Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report For the Period July 2005 - December 2005.ML0606200582/27/2006G20060064/LTR-06-0041 - Sen. T. Murray Ltr. re. concerns relicensing of Pilgrim and Vermont Yankee.ML0602403092/27/2006G20060064/LTR-06-0041 - Rep. V. DeMacedo and Rep. T. O'Brien Ltr. re. Concerns relicensing of Pilgrim and Vermont Yankee.ML0603402382/27/20062006/02/28-Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont YankeeML0621205492/28/20062 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Press Release-I-06-011:  NRC To Hold March 8th Public Meeting In Plymouth, Mass., On License Renewal Application For Pilgrim Nuclear Plant.ML0606005283/1/2006Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001).ML0606203713/2/2006E-mail from Johnson to Shea, Pilgram ERO Staffing Change Request.ML0626803633/6/200603/07/2006 - RIC 2006 Presentation - T1E - John F. McCann - License Renewal.ML0615901583/7/20062006/03/07- - RIC 2006 Presentation -  T1F - Garry G. Young - License Renewal.ML0615902323/7/200603/07/2006 - RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee).ML0617802713/7/2006CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch.ML0707801973/8/2006E-mail form Johnson to Shea, Phone Call with Pilgrim on ERO Staffing Submittal.ML0626803653/10/200603/11/2006 Annual Town Meeting Summary.ML0610304043/11/2006D. Johnson Calendar, 10:00 - 11:00 a.m. Scheduled Conference Call with Pilgrim.ML0632802503/14/2006Issuance of Orders Requiring Compliance With Updated Adversary Characteristic.ML0605904643/20/2006Pilgrim, Follow-Up Response to NRC Generic Letter 2003-01.ML0608904683/20/2006Pilgrim Nuclear Power Station Relief Request No. PRR-11, (TAC No. MC8294)ML0603400283/21/2006Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing regarding the Application from Entergy Nuclear Operations, Inc., for Renewal of the Operating License for the Pilgrim Nuclear Power.ML0608007453/21/20062006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a HearingML0621206253/21/2006Pilgrim Revision to License Amendment Request Single Recirculation Loop Operation.ML0609004303/22/2006Pilgrim Nuclear Power Station Relief Request No. PRR-9, (TAC No. MC8292).ML0602400553/22/2006Press Release-06-040:  NRC Announces Opportunity to Request a Hearing on Application to Renew Operating License for Pilgrim Nuclear Power Station.ML0608104573/22/2006Pilgrim, Indian Point, James A. Fitzpatrick, and Vermont Yankee Nuclear Power Station, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21).ML0609601373/28/20062006/03/29-Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental).ML0634701763/29/20062006/03/29-E-MAIL: (PD) Pilgrim CZM Notice.ML0634503683/29/2006FitzPatrick, Indian Point Units 1, 2, and 3, Pilgrim, and Vermont Yankee, Sources and Levels of Insurance Required by 10 CFR 50.54(w).ML0609504183/29/20062006/03/29-E-MAIL: (PD) CZM.ML0634703123/29/20062006/03/30-Email: (PA) PNPS Audit Plan.ML0624802913/30/20062006/03/30-E-MAIL: (Intergovernmental) Re: Pilgrim Audit.ML0634703093/30/20063 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Letter dated. 3/31/06 to Multiple Addressees  who did not participate in the March 8, 2006 Generic Fundamentals Exam (GFE).ML0609305393/31/20062006/03/31-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206293/31/20062006/04/03-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during May Site Audit (Intergovernmental).ML0634701804/3/20062006/04/03-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206314/3/2006Pilgrim, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006.ML0609504344/3/20062006/04/04-E-mail: (PA) Pilgrim Audit PlanML0624800854/4/200604/18/2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance.ML0609403704/4/200604/18/2006, NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance.ML0609404084/4/2006Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-002, (TAC MC8300).ML0606601324/5/20062006/04/05-Pilgrim: NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental).ML0634701834/5/20062006/04/05-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May [4/5/06]  (Intergovernmental).ML0634701894/5/20062006/04/06-E-MAIL: (Intergovernmental) Re: Pilgrim Audit [List for Plymouth meeting].ML0634703134/6/20062006/04/06-Email: (PA) Questions counts...ML0621206364/6/20062006/04/07-Email: (PA) AMP, AMR, and TLAA questions for PNPSML0621206424/7/20064/7/06 - Notice Of Intent To Prepare An Environmental Impact Statement And Conduct Scoping Process For License Renewal For The Pilgrim Nuclear Power Station (TAC NO. MC9676)ML0610002614/7/20062006/04/10-Email: (PA) 1999 LR Guidance on DamsML0621300954/10/2006Pilgrim Nuclear Power Station - Technical Specification Pages re Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0611402654/10/20062006/04/10-E-MAIL: (PD) FW: Massachusetts Tribal Information.ML0634702174/10/20062006/04/10-Pilgrim: NRC Contact Report - Arrange Meeting with Planning Council Staff During Site Audit in May (Intergovernmental).ML0907704644/10/2006Press Release-I-06-020:  NRC to Discuss 2005 Performance Assessment for Pilgrim Nuclear Power Plant.ML0610003744/10/2006Pilgrim Nuclear Power Station - Issuance Of Amendment RE:  Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0531404334/10/20062006/04/11-E-MAIL: (PD) CZM Consistency Determination.ML0634605414/11/2006Pilgrim, Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves.ML0610908324/12/20064 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Pilgrim, Issuance of Amendment Re:  Single Recirculation Loop Operation (TAC No. MC4333).ML0601701194/12/20062006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Duxbury meeting].ML0634703264/12/20062006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Carver meeting].ML0634703294/12/20062006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Old Colony meeting].ML0634703194/12/20062006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Kingston Meeting].ML0634703244/12/2006Pilgrim, Tech Spec Pages for Amendment 219 regarding Single Recirculation Loop Operation.ML0610701674/12/2006Pilgrim, License Amendment 221 regarding Revised Rod Worth Minmizer ByPass Allowances.ML0607402144/13/2006Pilgrim Nuclear Power Station-Issuance Of Amendment RE:  Removal Of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement (TAC MC7052).ML0606000404/13/2006Pilgrim, Technical Specification Page, deletes the main steam isolation valve twice per week partial stroke testing surveillance specified in Technical Specification 4.7.A.2.b.1.c.ML0610702154/13/2006Pilgrim Nuclear Power Station, Technical Specification Page re Revised Rod Worth Minimizer Bypass Allowances (TAC MC7055).ML0610702044/13/20062006/04/16-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 16, Seismic: New England Not Immune to Strong Temblors and Specialists Say that a Major Event is Only a Matter of Time, Boston Globe, Bryan Bender, April 16, 2006.ML0810902914/16/20062006/04/18-E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA.ML0634701004/18/20062006/04/18-E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application.ML0634605454/18/2006PNPS Monthly Groundwater Discharge Data.ML0614201834/21/20062006/04/21 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611606134/21/20064/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611702224/21/20064/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611701524/21/20062006/04/21- - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611700854/21/20062006/04/24-E-mail: (PA) PNPS AMP QuestionsML0621204154/24/2006Pilgrim Nuclear Power Station - Request for Additional Information Regarding Unresolved Inspection Item 05000293-05-003-01 From the NRC Integrated Inspection Report 05000293-05-003 (TAC No. MD0178).ML0609703974/24/20065 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/04/25 - Request for a List of Protected Species and Essential Fish Habitat Within the area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.ML0611602834/25/20062006/04/25 - Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611603034/25/20062006/04/25-E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.ML0630703314/25/2006License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293.ML0612206304/26/20062006/04/26-Pilgrim: NRC Contact Report - Follow up from Alicia Williamson's call to Mr. Halkiotis, in regard to meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701744/26/20062006/04/27-Email: (PA) PNPS LRA Appendix C - BWRVIP ActionsML0620905464/27/2006Pilgrim Nuclear Power Station - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.ML0611701104/27/20062006/04/28-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Marshfield meeting].ML0634703334/28/20062006/04/28-Email: (PA) Pilgrim Questions to be Discussed at the AuditML0620904994/28/20062006/04/28-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701704/28/20062006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)ML0611804244/28/20062006/04/30-Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005ML0620104824/30/20062006/05/01-(PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006.ML0634700515/1/200605/02/2006 - Pilgrim Nuclear Power Station License Renewal Application Review.ML0612403355/2/20062006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes.ML0634700725/2/2006Pilgrim - Revision to the Request for Amendment to the Technical Specifications (TS) - Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0613200185/2/2006Press Release-I-06-030:  NRC Seeks Public Input on Environmental Review Associated with License Renewal Proposed for Pilgrim Nuclear Power Plant.ML0612304115/3/2006Indian Point Units 1, 2, and 3, Vermont Yankee, Pilgrim, James A. FitzPatrick; Entergy Operations, Inc., Service List Update.ML0612904245/3/20062006/05/03-E-MAIL: (Intergovernmental) Town of Kingston population figures.ML0634703355/3/20062006/05/03-E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in MetroBoston.ML0634703365/3/20066 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0620904975/4/20062006/05/04-Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0621206475/4/20062006/05/04-Email: (PA) PNPS Template for not consistent with Gall AMRsML0620904965/4/20062006/05/04-Email: (PA) AMP questionsML0620904885/4/2006Photos taken on 05/04/2006 of view looking toward Pilgrim station from junction of Pricilla and White Horse beaches.ML0620104905/4/2006Pilgrim Nuclear Power Station - Correction to Amendment No. 221 Re: Revised Rod Worth Minimizer Bypass Allowances (TAC No. MC7055)ML0611800835/5/20062006/05/05-E-MAIL: (Intergovernmental) Town of Carver, MA GIS layer list.ML0634701115/5/2006Pilgrim Nuclear Power Station - Correction to Amendment No. 221 re: Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications.ML0613000955/5/20062006/05/05-Email: (PA) Re: PNPS Template for not consistent with GALL AMRsML0620904935/5/2006EMAIL: (PA) Re: Bolting Integrity ProgramML0620904905/5/20062006/05/05-Email: (PA) Re: Bolting Integrity ProgramML0620904985/5/20062006/05/05-EMAIL: (PA) AMR Template for Not Consistent with Gall SectionML0620903225/5/20062006/05/06-E-MAIL: (PD) FW: New dwelling units.ML0634702565/6/2006Pilgrim, Main Stack Inspection Report - 05/08/2006.ML0704404815/8/20062006/05/08-Email: (PA) AMR's questionary for PilgrimML0620903245/8/20062006/05/09-E-MAIL: (Intergovernmental) Re: How many housing units built since 2000?.ML0634704015/9/2006EMAIL: (PA-LR) PNPS Documents.ML0630505145/9/20062006/05/09-E-MAIL: (Intergovernmental) Re: New dwelling units.ML0634701915/9/2006(NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics.ML0712901555/9/20062006/05/09-E-mail: (Intergovernmental) Re: Planners Event on Current Trends in MetroBoston.ML0634703385/9/20062006/05/09-EMAIL: (PA) AMR Review of Section 3.3ML0620903285/9/20062006/05/10-Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.ML0624802725/10/2006E-Mail: Guidance How to File Petition for Intervention with NRC - Pilgrim LRA.ML0630701875/10/20062006/05/10-Email: (PA) FWD: Pilgrim AMP Combined QuestionsML0624802835/10/20062006/05/10-E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit - for Pilgrim LRA.ML0630703935/10/20062006/05/11-E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.ML0630704025/11/2006Pilgrim - Annual Radiological Environmental Operating Report for January 1 through December 31, 2005.ML0613705745/11/20062006/05/11-EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.ML0630505185/11/20067 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-10, Fourth 10-Year Inservice Inspection Program Plan (TAC MC8293).ML0612101405/11/2006E-Mail: Revised AMR Initial; from Johnny Eads 5/11/2006 4:01 pm.ML0630703845/11/2006Pilgrim, Annual Radiological Effluent and Waste Disposal Report for January 1 Through December 31, 2005.ML0613806535/11/20062006/05/11-EMAIL: (PA) Table 3.3.1 AMR questionsML0620903335/11/2006LER 06-01-000, Pilgrim re Manual Scram due to High Offgas Recombiner Temperature resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller.ML0613706225/11/20062006/05/11-Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.ML0613805495/11/20062006/05/11- Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)ML0613102345/11/20062006/05/12-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 19, 05/12/2006 Letter from Clifford Anderson (NRC) to Entergy re Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 05000293/2006002.ML0810905535/12/2006IR 05000293-06-002 on 01/01/2006 - 03/31/2006 for Pilgrim Nuclear Power Station. Personnel Performance During Non-routine Plant Evolutions.ML0613205645/12/20062006/05/12-PNPS License Scoping Comment - Tom Belcher.ML0624104065/12/2006E-Mail: Guidance how to file petition for intervention with NRC - Pilgrim LRA.ML0630704055/12/2006Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking.ML0613604655/12/2006Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293.ML0612207165/15/2006Entergy Quality Assurance Program Manual, Revision 13.ML0613705935/15/2006Entergy Operations, Inc., Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401675/16/2006Entergy Operations, Inc., Application to Use Weighting Factors for External Exposure.ML0614303595/16/2006Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan (TAC No. MC8298).ML0610200415/16/20062006/05/17-Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.ML0614201645/17/2006Enclosure 4: Evening Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000505/17/2006Enclosure 3: Afternoon Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000465/17/2006CR-PNP-2006-01914 - Pilgrim.ML0704404795/18/20062006/05/18-E-mail: (Intergovernmental) Townscape Plan for Marshfield.ML0634704055/18/2006Pilgrim, RAI, Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation (TAC No. MC7255).ML0612101725/18/20062006/05/18-(PD) PNPS LR EIS Ecology Meeting May 18, 2006.ML0634700675/18/20068 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/05/19-Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.ML0614100015/19/20062006/05/19-E-MAIL: (PD) Information re: Pilgrim LRA.ML0634605075/19/20062006/05/19-EMAIL: (PA-LR) Information re: Pilgrim LRA.ML0630602965/19/2006Request for the Use of Delta Protection's Self Fed Single Use Mururoa BLU" Suit Systems.ML0614300155/19/20062006/05/22-Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).ML0614400265/22/20062006/05/22-E-MAIL: (PD) Found Extra Color Copy.ML0634604965/22/20062006/05/22-EMAIL: (PA-LR) Pilgrim ETE Comments.ML0630505065/22/20062006/05/23-U.S. Dept. of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding: Formal Consultation on Pilgrim License Renewal Not Required.ML0616500165/23/20062006/05/24-Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.ML0617106015/24/20062006/05/25-Exhibit NRC000003, Pilgrim LR Proceeding - Request for a Hearing and Petition to Intervene.ML1100309755/25/20062006/05/30-Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene.ML0616301255/25/2006Enclosure 1, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants.ML0615304195/25/2006Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203565/25/2006OFFICIAL EXHIBIT - NRC000003-00-BD01 - Request for a Hearing and Petition to Intervene.ML1106009145/25/20062006/05/25-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 18, Attachment 71111.07 (Issue Date 05/25/2006) "Heat Sink Performance"ML0810905375/25/2006James A. Fitzpatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for all Entergy Nuclear Operations, Inc. Plants.ML0615304135/25/20062006/05/25-Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit OrderML0616403295/25/2006Commonwealth of Massachusetts v. USNRC; Nos. 07-1482 and 07-1483; Joint Appendix.ML0725001305/26/2006Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent- Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant.ML12094A1815/26/2006Exhibit 1. Declaration of Dr. Gordon Thompson in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203505/26/2006Risks and Risk-Reducing Options Associated with Pool Storage of Spent Nuclear Fuel at the Pilgrim and Vermont Yankee Nuclear Power Plants.ML12094A1805/26/20069 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/05/26-Pilgrim- Massachusetts Attorney General's Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'s Application for Renewal of the Pilgrim Nuclear Power Plant Operating LicenseML0616300885/26/2006Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Reliable Spent Fuel Pool Instrumentation.ML12094A1825/26/20062006/05/28-Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL ReportML0620903385/28/20062006/05/30-EMAIL: (PA-LR) PNPS License Renewal - Environmental.ML0630602995/30/20062006/05/30-E-MAIL: (PD) PNPS License Renewal - Environmental.ML0634702005/30/2006Entergy Operations, Inc, North and South, Effective Dose Equivalent Weighting Factors for External Exposure.ML0614401105/30/2006Entergy Operations, Inc, North and South, Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401735/30/20062006/05/30-Letter from Diane Curran submitting the originals of several documents for which copies of faxed signature pages were filed on May 26, 2006 in connection with the Massachusetts Attorney General's hearing request and backfit petitionML0616400315/30/20062006/05/31-E-MAIL: (Intergovernmental) FW: No subject [from M. Sylvia to A. Parker].ML0634704085/31/20062006/06/01-E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data [Forecasts].ML0634704126/1/20062006/06/02-E-MAIL: (Intergovernmental) FW: No Subject [6/2/06 from M. Sylvia to A. Parker].ML0634704186/2/20062006/06/02-EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.ML0630505046/2/20062006/06/02-EMAIL: (PA-LR) PNPS - Spotted Turtle.ML0630603226/2/2006Response to NRC Request for Additional Information Regarding Unresolved Inspection Item 05000293/2005003-01 from NRC Integrated Inspection Report 05000293-05-003.ML0616403486/5/20062006/06/05-E-MAIL: (PD) Invasive Nuisances.ML0634701946/5/20062006/06/05-Pilgrim - Notice of Adoption of Contention by Pilgrim Watch.ML0617203846/5/2006Pilgrim Response to NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations."ML0616401326/6/2006Pilgrim, Request for Use of ASME Code Case N-623 and Withdrawal of Pilgrim Relief Request No. PRR-12.ML0617103556/6/20062006/06/06-Hearing Referral Memorandum from A. Vietti-Cook to P. Bollwerk, ASLBP.ML0616002216/6/20062006/06/07-Pilgrim, License Renewal Application, Amendment 2.ML0617104226/7/20062006/06/07-Establishment of Atomic Safety and Licensing BoardML0615905196/7/20062006/06/08-E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).ML0630703306/8/20062006/06/08-Ltr from Mr. Colosi, NOAA to DLR addressing EFH.ML0617106006/8/20062006/06/09-EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.ML0630505126/9/20062006/06/09-E-Mail: The second set of AMR Questions.ML0630703276/9/200610 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/12-Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrim's License Renewal Application.ML0616701016/12/20062006/06/13-Pilgrim - Notice of Appearance of David R. Lewis and Paul A. Gaukler as Counsel on Behalf of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.ML0617201636/13/20062006/06/14-Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.ML0617101046/14/2006Pilgrim - Response to NRC Request for Additional Information Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation.ML0617200846/14/20062006/06/14-LB Order (Regarding Schedule and Guidance for Proceedings)ML0616600476/14/20062006/06/15-Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).ML0617702776/15/20062006/06/15-Pilgrim - NRC Staff Answer to Notice of Adoption of Contentions by Pilgrim WatchML0616700396/15/20062006/06/15- Pilgrim - Notices of Appearance for Susan L. Uttal and Harry E. WedewerML0616700596/15/20062006/06/15-Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Station's License Renewal Application-Federal Register Notice, April 14, 2006.ML0617704076/15/20062006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request.ML0618103956/16/20062006/06/16-Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.ML0617700456/16/20062006/06/16-Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.ML0617700436/16/20062006/06/16-Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c).ML0617403466/16/20062006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, filed by D. Curran, Counsel for Massachusetts Attorney General.ML0617806346/16/20062006/06/16-Pilgrim -  Letter from D. Curran to Judge Young providing recent decision by U.S. Court of Appeals for the Ninth Circuit.ML0617403496/16/20062006/06/26-Pilgrim - Email from S. Hollis to Judge Young re: Participation in Pilgrim Proceeding and Notice of Appearance.ML0617801256/16/20062006/06/19-Exhibit NRC000005, Pilgrim LR Proceeding - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1100309776/19/20062006/06/19-Pilgrim - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim WatchML0617100866/19/200611 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007OFFICIAL EXHIBIT - NRC000005-00-BD01 - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1106009186/19/2006FRN: General Notice, Letter A, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0616000236/20/20062006/06/20- Pilgrim - Official Transcript of Pilgrim Nuclear Power Station Pre-Hearing Conference.ML0617403666/20/2006FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) .ML0616000766/20/2006FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees.ML0616000876/20/20062006/06/20-Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.ML0617703956/20/20062006/06/21-Email: (PA) Additional Missing AMPsML0625103596/21/20062006/06/21-LB Order and Notice (Regarding Oral Argument and Limited Appearance Statement Sessions)ML0617203976/21/2006Pilgrim Nuclear Power Station, Response to NRC request for Additional Information Regarding Pilgrim Relief Request, PRR-10, Risk-informed ISI For Class 1, B-F and B-J Welds (TAC NO. MC8293).ML0618600866/21/20062006/06/22-Email: (PA) Additional missing AMPsML0625102956/22/20062006/06/22-Pilgrim - Entergy's Answer to Massachusetts Attorney General's Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order.ML0617901346/22/20062006/06/22-Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General's Request for Hearing and Petition for Leave to Intervene and Petition for Backfit OrderML0617304826/22/20062006/06/22-Email: (PA) Additional Missing AMPsML0625103616/22/20062006/06/23-Press Release-I-06-038:  Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.ML0617400316/23/20062006/06/25-E-mail: (PA) Additional AMR Question - Section 3.1.1ML0621204106/25/20062006/06/26-Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re: Limited Appearance StatementsML0617801596/26/2006OFFICIAL EXHIBIT - NRC000004-00-BD01 - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1106009166/26/20062006/06/26-Exhibit NRC000004, Pilgrim LR Proceeding - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1100309746/26/20062006/06/26-E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.ML0630703236/26/20062006/06/26-Email: (PA) Audit Report Attachment 5 - List of DocumentsML0621301456/26/20062006/06/26-EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].ML0630602676/26/20062006/06/26-EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006.ML0630505096/26/200612 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/26-Pilgrim - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML0618402166/26/2006E-mail: (PA) ScheduleML0621204086/26/20062006/06/27-E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0621204076/27/20062006/06/27-EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.ML0630503966/27/20062006/06/27-Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0620903886/27/2006Pilgrim - Request for Approval of ASME Code, Section XI, Third Ten-Year Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage.ML0618701636/28/20062006/06/29-Email: (PA) Jim and PeterML0620903096/29/20062006/06/29-EMAIL: (PA-LR) Additional Questions From Bob JacksonML0630506036/29/20062006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903186/29/2006Pilgrim Nuclear Power Station - Relief Request No. PRR-4, (TAC MC8287).ML0614500316/29/20062006/06/29-E-mail: (PA) - None -ML0621204066/29/20062006/06/29-Email: (PA) Additional Question from Bob JacksonML0621300576/29/20062006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0621300586/29/20062006/06/29-EMAIL: (PA-LR) Non-Safety Related SCs.ML0630506106/29/2006IR 05000293-06-006; 04/10/2006 - 05/19/2006; Pilgrim Nuclear Power Station; Component Design Bases Inspection.ML0618002156/29/20062006/06/29-Email: (PA) Non-Safety Related SCsML0621300566/29/2006Email: (PA) Re: QA for Aging Mangement of NSR ComponentsML0620905696/29/2006Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299).ML0614204706/29/2006Pilgrim, Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3.ML0618704926/29/20062006/06/29- Pilgrim - Massachusett's Attorney General's Reply to Entergy's and NRC Staff's Responses to Hearing Request and Petition to Intervene.ML0618702256/29/20062006/06/29-Email: (PA) PNPS ShellML0620903196/29/20062006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0625103646/30/20062006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station.ML0618104246/30/2006Pilgrim - Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems.ML0618704696/30/2006Email: (PA) Response to ARM Questions 482 & 483ML0620905676/30/20062006/06/30-Email: (PA) Response to ARM Questions 482 and 483ML0620903806/30/200613 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/30-Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624803796/30/2006Pilgrim, Procedure No. 3.M.5-2, Revision 10, "Main Stack Inspection Guideline."ML0704404826/30/20062006/06/30-Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624802976/30/20062006/06/30-Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management ReviewsML0621300186/30/20062006/06/30-EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0630506136/30/20062006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0621204236/30/2006Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903077/3/20062006/07/03- Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch.ML0621604497/3/20062006/07/03-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620905657/3/20062006/07/03- Pilgrim - Pilgrim Watch Reply to NRC's and Entergy's Answers to Notice of Adoption of Contention by Pilgrim Watch.ML0621604417/3/20062006/07/05-Pilgrim - License Renewal Application Amendment 3.ML0619401757/5/2006Email: (PA) Re: Draft AMP section of Audit reportML0621300897/5/2006Email: (PA) Re: Quality Assurance for Aging Management of NSR ComponentsML0620902947/5/20062006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300647/5/2006OFFICIAL EXHIBIT - ENT000007-00-BD01 - License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1106008737/5/20062006/07/05-Email: (PA) Re: Draft AMP Section of Audit ReportML0620903037/5/20062006/07/05-Email: (PA) FW: Handing of Generic IssuesML0621300917/5/20062006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300547/5/2006Exhibit ENT000007, Pilgrim LR Proceeding, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1100309987/5/20062006/07/05-Email: (PA) Comments on the AMP writeupML0621300537/5/2006Entergy Nuclear Operations Inc. License Renewal Application Amendment 3.ML0906303957/5/20062006/07/05-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0620902977/5/20062006/07/05-Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.ML0619304187/5/20062006/07/05-Email: (PA) Quality Assurance for Aging Management of NSR ComponentsML0620903047/5/20062006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620903057/5/20062006/07/05-Email: (PA) Quality Asurance for Aging Management of NSR ComponentsML0620905617/5/2006Email: (PA) Re: FW: Handling of Generic IssuesML0620903007/5/200614 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620905637/5/20062006/07/06-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0621300867/6/20062006/07/06- Pilgrim - Official Transcript of Oral Arguments on Contentions for the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619401797/6/20062006/07/06-Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619302187/6/2006Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621301407/6/20062006/07/06-EMAIL: (PA-LR) FW: PNPS ER EJ writeup.ML0630603097/6/20062006/07/06-Email: (PA) Additional AMR questionsML0621300617/6/20062006/07/06-Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.ML0621204777/6/2006Letter dated 7/7/06 to Multiple Addresses who did not participate in the June 7, 2006 Generic Fundamentals Examination (GFE)ML0623604837/7/20062006/07/07-Pilgrim - Limited Appearance Statement by Maurice C. Cion.ML0620700677/7/20062006/07/07- Pilgrim - Official Transcript of Oral Arguments on Contentions in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619303907/7/20062006/07/07-Email: (PA) Comments on Pilgrim AMP documentML0621204807/7/2006Email: (PA) Re: Comments on Pilgrim AMP DocumentML0621301427/7/20062006/07/07-Pilgrim - Limited Appearance Statement by W. BramhallML0620606077/7/20062006/07/07-E-mail: (PA) Re: Comments on Pilgrim AMP documentML0621204127/7/20062006/07/07-Email: (PA) Re: Comments on Pilgrim AMP DocumentML0620902937/7/20062006/07/10-E-Mail: FWD: Response to your question regarding Radwaste Piping.ML0630703197/10/20062006/07/10-Pilgrim - Email from Diane Curran to ASLBP and Parties.ML0620700557/10/20062006/07/11-EMAIL: (PA-LR) FW: Pilgrim Document 83.ML0630603027/11/20062006/07/11-CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.ML0620903627/11/20062006/07/12- Pilgrim - Email from Susan Uttal to ASLBP and Parties.ML0620701317/12/20062006/07/12-E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.ML0630705367/12/20062006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.ML0617000557/13/20062006/07/13-Pilgrim - Letter to the Administrative Judges from Counsel for Entergy following up on one of the two matters raised at last week's prehearing conference.ML0620202357/13/200615 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee.ML0619800287/13/20062006/07/13-Press Release-I-06-040:  NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.ML0619403687/13/20062006/07/13- Pilgrim - Limited Appearance Statement of John R. Glover.ML0620702247/13/2006E-MAIL: NRC to Discuss Pilgrim Audit Findings.ML0630702497/13/2006Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee.ML0619800307/13/20062006/07/14-Pilgrim - Email from Judge Young to the parties.ML0620606147/14/20062006/07/14-LB Order (Regarding Need for Further Briefing on Definition of New and Significant Information As Addressed in Participants' Petitions, Answers and Replies Relating to massachusetts Attorney General contentioin and Pilgrim Watch Contention 4:.ML0619504817/14/2006Response to NRC Request for Additional Information and Revised Pilgrim Relief Request, PRR-15, Rev.1.ML0620102107/14/20062006/07/14-Pilgrim - Email to Judge Young from Molly BartlettML0620606167/14/20062006/07/17- Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) .ML0620700517/17/20062006/07/17-EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson 7/17/06].ML0630602597/17/20062006/07/17-Email: (PA-LR) Additional info for ER.ML0630602397/17/20062006/07/17-E-Mail: Core shroud tie rod upper support cracking- information request.ML0630702527/17/20062006/07/17-EMAIL: (PA-LR) Re: Pilgrim.ML0630602497/17/20062006/07/19-Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.ML0620801427/19/20062006/07/19-Pilgrim - License Renewal Application Amendment 5.ML0620900757/19/2006LER 06-002-00 for Pilgrim Nuclear Power Station re Small Quantities of Unaccountable Licensed Material.ML0620801437/19/20062006/07/20- Pilgrim - Entergy providing follow up information from the prehearing conference on Pilgrim's aging management review to ASLBP.ML0621200187/20/20062006/07/20- Pilgrim - Notice of Withdrawal and Certificate of Service for Harry E. Wedewer for Pilgrim Nuclear Power Station.ML0620105007/20/20062006/07/20-Letter on behalf of more than two dozen organizations and individuals listed on draft Director's Decision dated June 28, 2006, regarding groundwater contamination petition submitted January 25, 2006.ML0621904457/20/20062006/07/21- Pilgrim - Massachusetts Attorney General's Brief Regarding Relevance to this Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0620801717/21/20062006/07/21-Email: (PA) Fwd: Re: RAI for section 3.5ML0620903837/21/200616 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/07/21- Pilgrim - Entergy's Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006.ML0620805897/21/20062006/07/21-Pilgrim - NRC Staff's Response to July 14, 2006 Licensing Board OrderML0620207957/21/20062006/07/23-Pilgrim - Email to Judge Young from Molly BartlettML0620606177/23/20062006/07/24-Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.ML0620903877/24/20062006/07/24-E-Mail: FW: Pilgrim LRA Amendment 5.ML0630703187/24/20062006/07/25- 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.ML0620703057/25/20062006/07/25-Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0620702407/25/20062006/07/25-Summary of Conferences Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676).ML0620702957/25/20062006/07/25-EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.ML0624803627/25/20062006/07/25-Email: (PA) Piligrim AMP/AMR Audit ReportML0625102967/25/20062006/07/26-E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.ML0630702417/26/20062006/07/26- Pilgrim - Letter informing that Entergy has already fully addressed the points raised in the Massachusetts Attorney General's brief regarding new and significant information.ML0621304437/26/20062006/07/26- Pilgrim - Massachusetts Attorney General's Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0621304467/26/20062006/07/26-EMAIL: (PA) Revised AMR 3.4 InputML0624803887/26/20062006/07/26-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0621204647/26/2006IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection.ML0620703967/26/2006CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor.ML0707901747/26/20062006/07/27- Pilgrim - Official Transcript of Entergy Nuclear Generation Company Oral Arguments via Telephone Conference.ML0621300247/27/20062006/07/27-Email: (PA) PNPS Q&QML0625103067/27/2006E-MAIL: Pilgrim Nuclear Power Station Hearing Files Information Request (7/1/06-7/31/06).ML0630702457/27/20062006/07/27-E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.ML0630702467/27/20062006/07/27-Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.ML0630705957/27/20062006/07/27-Pilgrim - Judge Nicholas Trikouros disclosure statement.ML0621207307/27/200617 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Email: (PA) PNPS Q&AML0625103557/27/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621206627/31/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207527/31/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207437/31/20062006/07/31-Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRAML0625103027/31/2006Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0619400157/31/2006Pilgrim Nuclear Power Station - Groundwater Protection - Data Collection Questionnaire.ML0622806027/31/20062006/07/31-E-Mail: Fwd: PNPS Q&A Data Base.ML0630702327/31/20062006/07/31-Email: (PA) Urgent - revised section 3.0.4 input for QA programML0625102997/31/2006Groundwater Protection - Data Collection Questionnaire, Pilgrim.ML0625505187/31/2006IR 05000293-06-003; 04/01-06/30/2006; Pilgrim Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control.ML0621306158/1/20062006/08/02-EMAIL: (PA) AMR Audit Report Section 3.3ML0624803918/2/20062006/08/02-Fax to Brian Ford/Fred Mogolesko from RAMS.ML0625103248/2/20062006/08/02-FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.ML0630703328/2/20062006/08/02-EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)ML0624803618/2/20062006/08/03-EMAIL: (PA) TLAA InputML0624803818/3/20062006/08/03-EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.ML0624803838/3/2006E-Mail: Fwd: Pilgrim ASLB Hearing.ML0630702368/3/20062006/08/03-EMAIL: (PA) Duc's Audit and Review Report InputML0624803858/3/20062006/08/03-EMAIL: (PA) TLAA Section 4.3 InputML0624803958/3/2006E-Mail: Fwd: Pilgrim ASLB Hearing: from Ram Subbaratnam 8/3/06 10:55am.ML0630702348/3/20062006/08/04- Pilgrim - Massachusetts Attorney General's Motion for Disqualification of Judge Nicholas Trikouros.ML0622101008/4/20062006/08/04- Pilgrim - Motion on Behalf of Pilgrim Watch for Disqualification of Judge Nicholas Trikouros.ML0625001388/4/2006Pilgrim - Issuance of License Amendment 222 RE:  Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0618400328/4/2006Pilgrim - Tech Spec Pages for Amendment 222 RE:  Deletion of Requirement Related to NRC Approval of  Engineering Evaluation For Elevated Relief Valve Discharge Pipe Temperature.ML0622301678/4/200618 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/08/07-E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.ML0630702198/7/20062006/08/07-E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.ML0630702398/7/20062006/08/07-E-Mail: FW: RAM.ML0630702208/7/2006Pilgrim, Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0617200688/9/2006Pilgrim, Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0622800138/9/20062006/08/09- Pilgrim - Notice of Appearance for Marian L. Zobler (Pilgrim Nuclear Power Plant) and Certificate of ServiceML0622102508/9/20062006/08/10-E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.ML0630702258/10/2006E-Mail: FW: Requested Pilgrim ISl Information.ML0630702228/10/20062006/08/11-Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRAML0625103438/11/20062006/08/11-E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.ML0630702288/11/20062006/08/14-RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application  (TAC MC9669).ML0622904748/14/20062006/08/14- Pilgrim- Entergy's Response to Motions for Disqualification of Judge Nicholas Trikouros.ML0623400988/14/20062006/08/14-Email: (PA) LRA B.1.1, Boraflex ProgramML0625103508/14/20062006/08/14-Email: (PA) RAIs 3.5.1-1 and 3.5.1-2ML0625103468/14/20062006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station.ML0622802188/15/2006Updated Schedule of Submittal of License Renewal Applications for Entergy Plants.ML0623300088/16/20062006/08/16-EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).ML0630404638/16/20062006/08/16-Pilgrim: NRC Contact Report - To Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental).ML0634701668/16/20062006/08/18-E-MAIL: (Intergovernmental) Rainbow Smelt Data [8/18 from S. Duda].ML0634704248/18/20062006/08/18-E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.ML0630702308/18/2006Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves (TAC No. MD1218).ML0622804348/18/20062006/08/21-E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).ML0630701888/21/20062006/08/21-EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.ML0629904428/21/2006Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack.ML0623700958/21/200619 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/08/21-EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.ML0629902538/21/20062006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0623504408/22/20062006/08/22-Pilgrim - License Renewal Application Amendment 6.ML0624200608/22/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.ML0706602798/22/20062006/08/23-E-Mail: FW: Pilgrim License Renewal Application Amendment 6.ML0630702178/23/20062006/08/23-EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).ML0630502968/23/20062006/08/23-E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.ML0630701908/23/20062006/08/23-Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No.
MC9676).ML0623605148/23/2006OFFICIAL EXHIBIT - PWA000004-00-BD01 - MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I. Chanin.ML1106008868/23/2006Exhibit PWA 00004, MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I. Chanin.ML1100309068/23/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.ML0706700898/24/20062006/08/25-Email: (PA) Pilgrim Audit Report Peer Review AMP SectionsML0625103078/25/2006Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51.ML1112203578/25/20062006/08/25-Petition for Rulemaking PRM 50-10 to Amend 10 C.F.R. Part 51, on behalf of the Massachusetts Attorney General, submitted by Diane Curran.ML0626404098/25/20062006/08/25-Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.ML0624103798/25/20062006/08/25-Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA.ML0629803228/25/2006Order Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0623003048/28/20062006/08/28-E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.ML0630703618/28/20062006/08/28-E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.ML0630703758/28/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706600568/28/2006PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706605488/28/2006Pilgrim, Changes to the Pilgrim Fourth Ten-Year In Service Inspection Program Plan Related to the Snubber Inspection Program.ML0624904218/28/20062006/08/28-E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.ML0630703678/28/200620 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007FitzPatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations - Fitness-for-Duty Program Performance Report For the Period January 2006 - June 2006.ML0624302988/29/20062006/08/30-Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney General's Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).ML0626502218/30/20062006/08/30-LB Notice of Recusal of Judge Nicholas TrikourosML0624204878/30/20062006/08/30-LB Notice of ReconstitutionML0624204698/30/20062006/08/30-E-mail: (PA) SER Input.ML0908300738/30/2006OFFICIAL EXHIBIT - ENT000008-00-BD01 - License Renewal Application Amendment 7.ML1106008748/30/2006Pilgrim Nuclear Power Station, Technical Specification Amendment Request to Relocate Specifications not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, (TAC MC5421).ML0624904898/30/20062006/08/30-Vermont Yankee/Pilgrim - Entergy's Response to Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51 (Aug. 25, 2006).ML0624803668/30/2006Exhibit ENT000008, Pilgrim LR Proceeding, License Renewal Application Amendment 7.ML1100309878/30/20062006/08/30-Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.ML0625001178/30/20062006/08/31-E-MAIL: (Intergovernmental) Pilgrim NPS EIS - info request.ML0634704718/31/2006Mid-cycle Performance  Review and Inspection Plan - Pilgrim Nuclear Power Station.ML0624304438/31/20062006/09/01-E-MAIL: (Intergovernmental) Re: Pilgrim NPS EIS - info request.ML0634704739/1/20062006/09/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 7, Liquid Radioactive Release Lessons Learned Task Force Final Report, September 1, 2006; Executive Summary; Pages 19 and 26; Appendix B Consolidated Recommendations List.ML0810905239/1/20062006/09/05-EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).ML0631102099/5/20062006/09/07-Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0624905019/7/20062006/09/07-E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.ML0630605959/7/20062006/09/08-E-MAIL: (Intergovernmental) Re: Plymouth Population & Buildout Data.ML0634704799/8/20062006/09/08-Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.ML0625004319/8/20062006/09/08-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0625004019/8/20062006/09/08-EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.ML0629904469/8/2006Pilgrim Nuclear Power Station - NRC Material Control and Accounting Program Inspection Report No. 05000293/2006201 and Notice of Violation.ML0622601849/11/200621 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007IR 05000293-06-009, on  07/24/2006 - 08/11/2006, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection.ML0625603579/13/20062006/09/13-Pilgrim - License Renewal Application Amendment 8.ML0626500729/13/20062006/09/13-E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.ML0630704209/13/2006Pilgrim Nuclear Power Station - Issuance of Amendment RE:  Relocation of Technical Specifications (TAC No. MC5421).ML0622803049/14/2006Pilgrim, Core Operating Limits Report, Revision 25.ML0626904719/14/2006Pilgrim, 10 CFR 50.46(a)(3)(ii) Annual Report.ML0626904689/14/2006PD_Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts.ML0706605269/14/2006Pilgrim Nuclear Power Station - Technical Specification Pages re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report.ML0626202409/14/2006Pre-Inspection Cover Sheet and Inspection Plan.ML0626101439/14/2006Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, dated January 25, 2006.ML0625801629/15/200610/02/2006 Commission Meetings - FRN.ML0626102709/18/2006CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall.ML0707901569/19/200622}}

Revision as of 22:55, 27 June 2018

Karen Vale 50-293 ADAMS Docs 2006
ML14203A427
Person / Time
Site: Pilgrim
Issue date: 05/29/2014
From:
NRC/OIS/PMPD/IPB
To:
Armentrout D H
Shared Package
ML14203A422 List:
References
Download: ML14203A427 (22)


Text

All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Document TitleAccession NumberDocument DatePilgrim Nuclear Power Station Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO).ML0601004561/3/2006Letter to NRC from Ford, Entergy, Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization with handwritten notes.ML0626803591/3/2006G20060064/LTR-06-0041 - Sen T. Murray, Rep V. DeMacedo, and Rep T. O'Brien Ltr re: Relicensing of Pilgrim and Vermont YankeeML0602300461/12/2006G20060054/LTR-06-0037 - Ltr. Alice Moore Re: Concerns Pilgrim and Vermont Yankee Relicensing.ML0601900391/13/20062006/01/13-Comment (4) submitted by Wedge Bramhall on Proposed Rule PR-73 regarding Design Basis Threat.ML0601801961/13/2006G20060065/LTR-06-0042 - Ltr Mark D. Sylvia re: Concerns Pilgrim and Vermont Yankee Relicensing Applications.ML0602300481/18/2006EA-05-221, Office of Investigations Report No. 1-2004-030.ML0601805481/19/2006EA-05-220, Office of Investigations Report No. 1-2004-030.ML0601805091/19/2006Letter to Debbie Grinnell Regarding Department of Labor (DOL) Occupational Safety & Health Administration (OSHA) Finding of Discrimination of a Contract Worker by Williams Power Corporation.ML0602404641/19/20062006/01/20-Comment (31) submitted by Pilgrim Security Watch, M. Lampert, et al. E. J. Epstein, N. Cohen, S. J. Goodman, R. Becker, D. Katz and H. Moyer on Proposed Rule PR-73 regarding Design Basis ThreatML0602405871/20/20062006/01/25-Email: (PA) Re: Checking InML0621204911/25/20062006/01/25-Pilgrim Nuclear Power Station Applicant's Environmental Report Operating License Renewal Stage, Appendix E.ML0608306111/25/2006Pilgrim Nuclear Power Station Updated Final Safety Analysis Report Supplement.ML0603000291/25/20062006/01/25-Transmittal of Pilgrim Nuclear Power Station License Renewal Application.ML0603000261/25/20062006/01/25-Pilgrim, License Renewal Application Boundary Drawings.ML0604702481/25/20062006/01/25-Pilgrim Nuclear Power Station License Renewal Application.ML0603000281/25/20062006/01/27-Email: (PA) Receipt of License Renewal Applications for VY and PilgrimML0621204981/27/2006G20050841/LTR-05-0588-Mary Elizabeth Lampert Ltr. re. Pilgrim Nuclear Power Station E-mail Concerns Single Loop Operation Amendment.ML0602600211/27/2006OFFICIAL EXHIBIT - PWA000006-00-BD01 - "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1106009011/31/2006Exhibit PWA 00006, "Modeling of the Coastal Boundary Layer and Pollutant Transport in New England."ML1100308991/31/20062006/01/31-Press Release-06-011: NRC Announces Availability of License Renewal Applications for Vermont Yankee and Pilgrim.ML0603100431/31/20061 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/01/31-Receipt and Availability of the License Renewal Application for the Pilgrim Nuclear Power Station.ML0603105931/31/2006Pilgrim Nuclear Power Station - Seawater System Procedure 2.2.94.ML0613900832/1/2006(3) ENN-NDE-10.03, Rev. 1; "VT-3 Examination," 02/02/2006.ML0706801572/2/2006ENN-NDE-10.03, 02/02/06, VT-3 Examination.ML0707902082/2/20062006/02/03-Email: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621204992/3/2006E-mail: (PA) FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205012/3/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205022/3/2006IR 05000293-05-005; 10/01/2005 -12/31/2005; Pilgrim Nuclear Power Station; Flood Protection Measures; Maintenance Effectiveness.ML0603406302/3/20062006/02/03 - Maintenance of Reference Material at the Plymouth Public Library for the Pilgrim Nuclear Power Station License Renewal Application.ML0603705812/3/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205362/6/2006E-mail: (PA) Re: FWD: Government to Government Meeting for Vermont Yankee License RenewalML0621205392/6/2006PNPS Site Plan Monitoring Wells.ML0614203582/13/2006(2) ENN-NDE-10.01, Rev. 2; "VT-1 Examination," 02/13/2006.ML0706801542/13/200603/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process.ML0604405432/13/20062006/02/15-Email: (PA) License Renewal Tentative Govt to Govt Mtgs around VY.ML0621205432/15/2006Pilgrim Nuclear Power Station Physical Security Plan, Revision 1.ML0605200222/15/2006Pilgrim Nuclear Power Station Relief Request No. PPR-05 (TAC No. MC8288).ML0601201272/17/20062006/02/23-Groundwater Monitoring Well Repairs and Re-Survey Report, Pilgrim Power Station, Plymouth, Massachusetts.ML0614302042/23/2006Pilgrim, Withdrawal of Inservice Inspection 10 CFR 50.55a (g)(4)(iv) Request No. PIL-05-R-03.ML0606205082/23/2006G20060065/LTR-06-0042 - Mark Sylvia Ltr. re Concerns Pilgrim and Vermont Yankee relicensing applications.ML0602500682/25/2006G20060054/LTR-06-0037 - Alice Moore Ltr. re. Concerns Pilgrim and Vermont Yankee Relicensing.ML0602400242/25/2006Entergy Nuclear Northeast - Fitness-for-Duty Program Performance Report For the Period July 2005 - December 2005.ML0606200582/27/2006G20060064/LTR-06-0041 - Sen. T. Murray Ltr. re. concerns relicensing of Pilgrim and Vermont Yankee.ML0602403092/27/2006G20060064/LTR-06-0041 - Rep. V. DeMacedo and Rep. T. O'Brien Ltr. re. Concerns relicensing of Pilgrim and Vermont Yankee.ML0603402382/27/20062006/02/28-Email: (PA) Closeout: G20060065/LTR-06-0042 - Relicensing of Pilgrim and Vermont YankeeML0621205492/28/20062 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Press Release-I-06-011: NRC To Hold March 8th Public Meeting In Plymouth, Mass., On License Renewal Application For Pilgrim Nuclear Plant.ML0606005283/1/2006Annual Assessment Letter - Pilgrim Nuclear Power Station (Report 05000293/2006001).ML0606203713/2/2006E-mail from Johnson to Shea, Pilgram ERO Staffing Change Request.ML0626803633/6/200603/07/2006 - RIC 2006 Presentation - T1E - John F. McCann - License Renewal.ML0615901583/7/20062006/03/07- - RIC 2006 Presentation - T1F - Garry G. Young - License Renewal.ML0615902323/7/200603/07/2006 - RIC 2006 Presentation - T2E - Vincent Coulehan - Use of Operating Experience (Regulator/Operator/Licensee).ML0617802713/7/2006CR-PNP-----------, CR Just Entered, Operability of Refuel Bellows Seal Rupture Drain Leakage Alarm Switch.ML0707801973/8/2006E-mail form Johnson to Shea, Phone Call with Pilgrim on ERO Staffing Submittal.ML0626803653/10/200603/11/2006 Annual Town Meeting Summary.ML0610304043/11/2006D. Johnson Calendar, 10:00 - 11:00 a.m. Scheduled Conference Call with Pilgrim.ML0632802503/14/2006Issuance of Orders Requiring Compliance With Updated Adversary Characteristic.ML0605904643/20/2006Pilgrim, Follow-Up Response to NRC Generic Letter 2003-01.ML0608904683/20/2006Pilgrim Nuclear Power Station Relief Request No. PRR-11, (TAC No. MC8294)ML0603400283/21/2006Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing regarding the Application from Entergy Nuclear Operations, Inc., for Renewal of the Operating License for the Pilgrim Nuclear Power.ML0608007453/21/20062006/03/21-Email: (PA) VY Notice of Acceptablilty and Opportunity to Request a HearingML0621206253/21/2006Pilgrim Revision to License Amendment Request Single Recirculation Loop Operation.ML0609004303/22/2006Pilgrim Nuclear Power Station Relief Request No. PRR-9, (TAC No. MC8292).ML0602400553/22/2006Press Release-06-040: NRC Announces Opportunity to Request a Hearing on Application to Renew Operating License for Pilgrim Nuclear Power Station.ML0608104573/22/2006Pilgrim, Indian Point, James A. Fitzpatrick, and Vermont Yankee Nuclear Power Station, Proof of Financial Protection (10 CFR 140.15) and Guarantee of Payment of Deferred Premiums (10 CFR 140.21).ML0609601373/28/20062006/03/29-Pilgrim: NRC Contact Report - Arrange Meeting with Town Officials During Site Audit (Intergovernmental).ML0634701763/29/20062006/03/29-E-MAIL: (PD) Pilgrim CZM Notice.ML0634503683/29/2006FitzPatrick, Indian Point Units 1, 2, and 3, Pilgrim, and Vermont Yankee, Sources and Levels of Insurance Required by 10 CFR 50.54(w).ML0609504183/29/20062006/03/29-E-MAIL: (PD) CZM.ML0634703123/29/20062006/03/30-Email: (PA) PNPS Audit Plan.ML0624802913/30/20062006/03/30-E-MAIL: (Intergovernmental) Re: Pilgrim Audit.ML0634703093/30/20063 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Letter dated. 3/31/06 to Multiple Addressees who did not participate in the March 8, 2006 Generic Fundamentals Exam (GFE).ML0609305393/31/20062006/03/31-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206293/31/20062006/04/03-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during May Site Audit (Intergovernmental).ML0634701804/3/20062006/04/03-Email: (PA) Re: Request - License Renewal Work for CFEBML0621206314/3/2006Pilgrim, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power, dated February 1, 2006.ML0609504344/3/20062006/04/04-E-mail: (PA) Pilgrim Audit PlanML0624800854/4/200604/18/2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance.ML0609403704/4/200604/18/2006, NRC Slides for Annual Assessment Public Meeting with Entergy (Pilgrim Station) Reference CY2005 Performance.ML0609404084/4/2006Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-002, (TAC MC8300).ML0606601324/5/20062006/04/05-Pilgrim: NRC Contact Report - Follow Up from 4/3/06 Telephone Call (Intergovernmental).ML0634701834/5/20062006/04/05-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May [4/5/06] (Intergovernmental).ML0634701894/5/20062006/04/06-E-MAIL: (Intergovernmental) Re: Pilgrim Audit [List for Plymouth meeting].ML0634703134/6/20062006/04/06-Email: (PA) Questions counts...ML0621206364/6/20062006/04/07-Email: (PA) AMP, AMR, and TLAA questions for PNPSML0621206424/7/20064/7/06 - Notice Of Intent To Prepare An Environmental Impact Statement And Conduct Scoping Process For License Renewal For The Pilgrim Nuclear Power Station (TAC NO. MC9676)ML0610002614/7/20062006/04/10-Email: (PA) 1999 LR Guidance on DamsML0621300954/10/2006Pilgrim Nuclear Power Station - Technical Specification Pages re Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0611402654/10/20062006/04/10-E-MAIL: (PD) FW: Massachusetts Tribal Information.ML0634702174/10/20062006/04/10-Pilgrim: NRC Contact Report - Arrange Meeting with Planning Council Staff During Site Audit in May (Intergovernmental).ML0907704644/10/2006Press Release-I-06-020: NRC to Discuss 2005 Performance Assessment for Pilgrim Nuclear Power Plant.ML0610003744/10/2006Pilgrim Nuclear Power Station - Issuance Of Amendment RE: Revised Applicability For Containment Oxygen And Differential Pressure Limits (TAC MC7056).ML0531404334/10/20062006/04/11-E-MAIL: (PD) CZM Consistency Determination.ML0634605414/11/2006Pilgrim, Proposed License Amendment to Change Technical Specification 3.6.A.2, Pressure-Temperature Limit Curves.ML0610908324/12/20064 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Pilgrim, Issuance of Amendment Re: Single Recirculation Loop Operation (TAC No. MC4333).ML0601701194/12/20062006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Duxbury meeting].ML0634703264/12/20062006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Carver meeting].ML0634703294/12/20062006/04/12-E-MAIL: (Intergovernmental) May 4 meeting - Pilgrim NPS license renewal [List for Old Colony meeting].ML0634703194/12/20062006/04/12-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Kingston Meeting].ML0634703244/12/2006Pilgrim, Tech Spec Pages for Amendment 219 regarding Single Recirculation Loop Operation.ML0610701674/12/2006Pilgrim, License Amendment 221 regarding Revised Rod Worth Minmizer ByPass Allowances.ML0607402144/13/2006Pilgrim Nuclear Power Station-Issuance Of Amendment RE: Removal Of Main Steam Isolation Valve Twice Per Week Testing Surveillance Requirement (TAC MC7052).ML0606000404/13/2006Pilgrim, Technical Specification Page, deletes the main steam isolation valve twice per week partial stroke testing surveillance specified in Technical Specification 4.7.A.2.b.1.c.ML0610702154/13/2006Pilgrim Nuclear Power Station, Technical Specification Page re Revised Rod Worth Minimizer Bypass Allowances (TAC MC7055).ML0610702044/13/20062006/04/16-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 16, Seismic: New England Not Immune to Strong Temblors and Specialists Say that a Major Event is Only a Matter of Time, Boston Globe, Bryan Bender, April 16, 2006.ML0810902914/16/20062006/04/18-E-MAIL: (PA) NRC Issues Notice of Intent to Prepares EIS Pilgrim LRA.ML0634701004/18/20062006/04/18-E-MAIL: (PD) Pilgrim Nuclear Generating Station License Renewal Application.ML0634605454/18/2006PNPS Monthly Groundwater Discharge Data.ML0614201834/21/20062006/04/21 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611606134/21/20064/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611702224/21/20064/21/06 - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611701524/21/20062006/04/21- - Request for Comments Regarding the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611700854/21/20062006/04/24-E-mail: (PA) PNPS AMP QuestionsML0621204154/24/2006Pilgrim Nuclear Power Station - Request for Additional Information Regarding Unresolved Inspection Item 05000293-05-003-01 From the NRC Integrated Inspection Report 05000293-05-003 (TAC No. MD0178).ML0609703974/24/20065 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/04/25 - Request for a List of Protected Species and Essential Fish Habitat Within the area Under Evaluation for the Pilgrim Nuclear Power Station License renewal Application Review.ML0611602834/25/20062006/04/25 - Request for a List of Protected Species Within the Area Under Evaluation for the Pilgrim Nuclear Power Station License Renewal Application Review.ML0611603034/25/20062006/04/25-E-Mail: Re: Teleconference, Needed Information, and Updated Environmental Audit Schedule.ML0630703314/25/2006License Renewal Audit and Review Plan for Plant Aging Management Review and Programs for the Pilgrim Nuclear Power Plant, Docket Number 50-293.ML0612206304/26/20062006/04/26-Pilgrim: NRC Contact Report - Follow up from Alicia Williamson's call to Mr. Halkiotis, in regard to meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701744/26/20062006/04/27-Email: (PA) PNPS LRA Appendix C - BWRVIP ActionsML0620905464/27/2006Pilgrim Nuclear Power Station - Notification of Conduct of a Triennial Fire Protection Baseline Inspection.ML0611701104/27/20062006/04/28-E-MAIL: (Intergovernmental) May 3 meeting - Pilgrim NPS license renewal [List for Marshfield meeting].ML0634703334/28/20062006/04/28-Email: (PA) Pilgrim Questions to be Discussed at the AuditML0620904994/28/20062006/04/28-Pilgrim: NRC Contact Report - Arrange meeting with Town personnel during Site Audit in May (Intergovernmental).ML0634701704/28/20062006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA)ML0611804244/28/20062006/04/30-Marine Ecology Studies Report #67, Appendix B, Geometric Mean Monthly Ichthyoplankton Densities Jan-Dec. 2005ML0620104824/30/20062006/05/01-(PD) Ecology Meeting Notes Pilgrim Nuclear Power Station Site Audit on May 1, 2006.ML0634700515/1/200605/02/2006 - Pilgrim Nuclear Power Station License Renewal Application Review.ML0612403355/2/20062006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes.ML0634700725/2/2006Pilgrim - Revision to the Request for Amendment to the Technical Specifications (TS) - Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0613200185/2/2006Press Release-I-06-030: NRC Seeks Public Input on Environmental Review Associated with License Renewal Proposed for Pilgrim Nuclear Power Plant.ML0612304115/3/2006Indian Point Units 1, 2, and 3, Vermont Yankee, Pilgrim, James A. FitzPatrick; Entergy Operations, Inc., Service List Update.ML0612904245/3/20062006/05/03-E-MAIL: (Intergovernmental) Town of Kingston population figures.ML0634703355/3/20062006/05/03-E-MAIL: (Intergovernmental) FW: Planners Event on Current Trends in MetroBoston.ML0634703365/3/20066 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0620904975/4/20062006/05/04-Email: (PA) Re: Re-assignment of Tables 3.3.2.14-XML0621206475/4/20062006/05/04-Email: (PA) PNPS Template for not consistent with Gall AMRsML0620904965/4/20062006/05/04-Email: (PA) AMP questionsML0620904885/4/2006Photos taken on 05/04/2006 of view looking toward Pilgrim station from junction of Pricilla and White Horse beaches.ML0620104905/4/2006Pilgrim Nuclear Power Station - Correction to Amendment No. 221 Re: Revised Rod Worth Minimizer Bypass Allowances (TAC No. MC7055)ML0611800835/5/20062006/05/05-E-MAIL: (Intergovernmental) Town of Carver, MA GIS layer list.ML0634701115/5/2006Pilgrim Nuclear Power Station - Correction to Amendment No. 221 re: Revised Rod Worth Minimizer Bypass Allowances - Technical Specifications.ML0613000955/5/20062006/05/05-Email: (PA) Re: PNPS Template for not consistent with GALL AMRsML0620904935/5/2006EMAIL: (PA) Re: Bolting Integrity ProgramML0620904905/5/20062006/05/05-Email: (PA) Re: Bolting Integrity ProgramML0620904985/5/20062006/05/05-EMAIL: (PA) AMR Template for Not Consistent with Gall SectionML0620903225/5/20062006/05/06-E-MAIL: (PD) FW: New dwelling units.ML0634702565/6/2006Pilgrim, Main Stack Inspection Report - 05/08/2006.ML0704404815/8/20062006/05/08-Email: (PA) AMR's questionary for PilgrimML0620903245/8/20062006/05/09-E-MAIL: (Intergovernmental) Re: How many housing units built since 2000?.ML0634704015/9/2006EMAIL: (PA-LR) PNPS Documents.ML0630505145/9/20062006/05/09-E-MAIL: (Intergovernmental) Re: New dwelling units.ML0634701915/9/2006(NPA-PD) Letter to Mary Lampert from the Commonwealth of Massachusetts Executive Office of Heath and Human Services, Department of Public Health, Regarding Child Heath Statistics.ML0712901555/9/20062006/05/09-E-mail: (Intergovernmental) Re: Planners Event on Current Trends in MetroBoston.ML0634703385/9/20062006/05/09-EMAIL: (PA) AMR Review of Section 3.3ML0620903285/9/20062006/05/10-Email: (PA) Draft Questions for the Aging Management Program (AMP) Gall Consistency Audit - for Pilgrim.ML0624802725/10/2006E-Mail: Guidance How to File Petition for Intervention with NRC - Pilgrim LRA.ML0630701875/10/20062006/05/10-Email: (PA) FWD: Pilgrim AMP Combined QuestionsML0624802835/10/20062006/05/10-E-Mail: Draft questions for the Aging Management Program (AMP) Gall consistency audit - for Pilgrim LRA.ML0630703935/10/20062006/05/11-E-Mail: Pilgrim Letter 2.06.040 - License Renewal Application, Amendment 1.ML0630704025/11/2006Pilgrim - Annual Radiological Environmental Operating Report for January 1 through December 31, 2005.ML0613705745/11/20062006/05/11-EMAIL: (PA-INT-LR) Document Comparing PNPS Entrained Species to Other MA Stations.ML0630505185/11/20067 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-10, Fourth 10-Year Inservice Inspection Program Plan (TAC MC8293).ML0612101405/11/2006E-Mail: Revised AMR Initial; from Johnny Eads 5/11/2006 4:01 pm.ML0630703845/11/2006Pilgrim, Annual Radiological Effluent and Waste Disposal Report for January 1 Through December 31, 2005.ML0613806535/11/20062006/05/11-EMAIL: (PA) Table 3.3.1 AMR questionsML0620903335/11/2006LER 06-01-000, Pilgrim re Manual Scram due to High Offgas Recombiner Temperature resulting from Inadequate Preventive Recombiner Preheater Pressure Control Valve Controller.ML0613706225/11/20062006/05/11-Pilgrim Nuclear Power Station, License Renewal Application, Amendment 1.ML0613805495/11/20062006/05/11- Pilgrim Nuclear Power Station License Renewal Application Review (SHPO No. RC36661)ML0613102345/11/20062006/05/12-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 19, 05/12/2006 Letter from Clifford Anderson (NRC) to Entergy re Pilgrim Nuclear Power Station - NRC Integrated Inspection Report 05000293/2006002.ML0810905535/12/2006IR 05000293-06-002 on 01/01/2006 - 03/31/2006 for Pilgrim Nuclear Power Station. Personnel Performance During Non-routine Plant Evolutions.ML0613205645/12/20062006/05/12-PNPS License Scoping Comment - Tom Belcher.ML0624104065/12/2006E-Mail: Guidance how to file petition for intervention with NRC - Pilgrim LRA.ML0630704055/12/2006Part 21 60-Day Interim Report Notification: BWR Core Shroud Tie Rod Upper Support Cracking.ML0613604655/12/2006Transmittal Letter for License Renewal Audit and Review Plan for Plant Management Reviews and Programs for the Pilgrim Nuclear Power Plant Docket 50-293.ML0612207165/15/2006Entergy Quality Assurance Program Manual, Revision 13.ML0613705935/15/2006Entergy Operations, Inc., Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401675/16/2006Entergy Operations, Inc., Application to Use Weighting Factors for External Exposure.ML0614303595/16/2006Pilgrim Nuclear Power Station - Request For Additional Information Regarding Relief Request PRR-15, Fourth 10-Year Inservice Inspection Program Plan (TAC No. MC8298).ML0610200415/16/20062006/05/17-Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts.ML0614201645/17/2006Enclosure 4: Evening Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000505/17/2006Enclosure 3: Afternoon Transcript, Public Scoping Meeting for Pilgrim, 05/17/2006.ML0617000465/17/2006CR-PNP-2006-01914 - Pilgrim.ML0704404795/18/20062006/05/18-E-mail: (Intergovernmental) Townscape Plan for Marshfield.ML0634704055/18/2006Pilgrim, RAI, Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation (TAC No. MC7255).ML0612101725/18/20062006/05/18-(PD) PNPS LR EIS Ecology Meeting May 18, 2006.ML0634700675/18/20068 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/05/19-Project Manager Change for the License Renewal Environmental Review for Pilgrim Nuclear Power Station.ML0614100015/19/20062006/05/19-E-MAIL: (PD) Information re: Pilgrim LRA.ML0634605075/19/20062006/05/19-EMAIL: (PA-LR) Information re: Pilgrim LRA.ML0630602965/19/2006Request for the Use of Delta Protection's Self Fed Single Use Mururoa BLU" Suit Systems.ML0614300155/19/20062006/05/22-Request for Additional Information (RAI) Regarding Severe Accident Mitigation Alternatives (SAMA) for Pilgrim Nuclear Power Station (TAC No. MC9676).ML0614400265/22/20062006/05/22-E-MAIL: (PD) Found Extra Color Copy.ML0634604965/22/20062006/05/22-EMAIL: (PA-LR) Pilgrim ETE Comments.ML0630505065/22/20062006/05/23-U.S. Dept. of the Interior Fish and Wildlife Service, Letter Dated May 23, 2006 - Regarding: Formal Consultation on Pilgrim License Renewal Not Required.ML0616500165/23/20062006/05/24-Ltr from Dr. Dean, ACHP to DLR to address license renewal application for Pilgrim.ML0617106015/24/20062006/05/25-Exhibit NRC000003, Pilgrim LR Proceeding - Request for a Hearing and Petition to Intervene.ML1100309755/25/20062006/05/30-Pilgrim - Pilgrim Watch Request for a Hearing and Petition to Intervene.ML0616301255/25/2006Enclosure 1, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for All Entergy Nuclear Operations, Inc. Plants.ML0615304195/25/2006Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203565/25/2006OFFICIAL EXHIBIT - NRC000003-00-BD01 - Request for a Hearing and Petition to Intervene.ML1106009145/25/20062006/05/25-Pilgrim April 2008 Evidentiary Hearing - Staff Exhibit 18, Attachment 71111.07 (Issue Date 05/25/2006) "Heat Sink Performance"ML0810905375/25/2006James A. Fitzpatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations, 2005 Annual Report, and, Securities and Exchange Commission Form 10-K Submittal for all Entergy Nuclear Operations, Inc. Plants.ML0615304135/25/20062006/05/25-Declaration of Dr. Jan Beyea in Support of Massachusetts Attorney General's Contention and Petition for Backfit OrderML0616403295/25/2006Commonwealth of Massachusetts v. USNRC; Nos. 07-1482 and 07-1483; Joint Appendix.ML0725001305/26/2006Report To The Massachusetts Attorney General On The Potential Consequences Of A Spent- Fuel-Pool Fire At The Pilgrim Or Vermont Yankee Nuclear Plant.ML12094A1815/26/2006Exhibit 1. Declaration of Dr. Gordon Thompson in Support of Massachusetts Attorney General's Contention and Petition for Backfit Order.ML1112203505/26/2006Risks and Risk-Reducing Options Associated with Pool Storage of Spent Nuclear Fuel at the Pilgrim and Vermont Yankee Nuclear Power Plants.ML12094A1805/26/20069 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/05/26-Pilgrim- Massachusetts Attorney General's Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.'s Application for Renewal of the Pilgrim Nuclear Power Plant Operating LicenseML0616300885/26/2006Pilgrim Watch Request for Hearing Regarding Insufficiency of Order Modifying Licenses with Regard to Spent Reliable Spent Fuel Pool Instrumentation.ML12094A1825/26/20062006/05/28-Email: (PA) Questions for NRC About the Reactor Head Closure Studs AMP (XI.M3) as described in the GALL ReportML0620903385/28/20062006/05/30-EMAIL: (PA-LR) PNPS License Renewal - Environmental.ML0630602995/30/20062006/05/30-E-MAIL: (PD) PNPS License Renewal - Environmental.ML0634702005/30/2006Entergy Operations, Inc, North and South, Effective Dose Equivalent Weighting Factors for External Exposure.ML0614401105/30/2006Entergy Operations, Inc, North and South, Delta Protection Mururoa V4F1 R Supplied Air Suits.ML0614401735/30/20062006/05/30-Letter from Diane Curran submitting the originals of several documents for which copies of faxed signature pages were filed on May 26, 2006 in connection with the Massachusetts Attorney General's hearing request and backfit petitionML0616400315/30/20062006/05/31-E-MAIL: (Intergovernmental) FW: No subject [from M. Sylvia to A. Parker].ML0634704085/31/20062006/06/01-E-MAIL: (Intergovernmental) Plymouth Population & Buildout Data [Forecasts].ML0634704126/1/20062006/06/02-E-MAIL: (Intergovernmental) FW: No Subject [6/2/06 from M. Sylvia to A. Parker].ML0634704186/2/20062006/06/02-EMAIL: (PA-LR) FW: Word Document of NRC LRA Programs Audit of Pilgrim.ML0630505046/2/20062006/06/02-EMAIL: (PA-LR) PNPS - Spotted Turtle.ML0630603226/2/2006Response to NRC Request for Additional Information Regarding Unresolved Inspection Item 05000293/2005003-01 from NRC Integrated Inspection Report 05000293-05-003.ML0616403486/5/20062006/06/05-E-MAIL: (PD) Invasive Nuisances.ML0634701946/5/20062006/06/05-Pilgrim - Notice of Adoption of Contention by Pilgrim Watch.ML0617203846/5/2006Pilgrim Response to NRC Generic Letter 2006-03, "Potentially Nonconforming Hemyc and MT Fire Barrier Configurations."ML0616401326/6/2006Pilgrim, Request for Use of ASME Code Case N-623 and Withdrawal of Pilgrim Relief Request No. PRR-12.ML0617103556/6/20062006/06/06-Hearing Referral Memorandum from A. Vietti-Cook to P. Bollwerk, ASLBP.ML0616002216/6/20062006/06/07-Pilgrim, License Renewal Application, Amendment 2.ML0617104226/7/20062006/06/07-Establishment of Atomic Safety and Licensing BoardML0615905196/7/20062006/06/08-E-Mail: FWD: LRA Amendment 2 (Updated Drywell Shell Information).ML0630703306/8/20062006/06/08-Ltr from Mr. Colosi, NOAA to DLR addressing EFH.ML0617106006/8/20062006/06/09-EMAIL: (PA-LR) Another Round of AMR Questions and TLAA Questions.ML0630505126/9/20062006/06/09-E-Mail: The second set of AMR Questions.ML0630703276/9/200610 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/12-Comment (1) of Mary Lampert, re Scope of the Environmental Review for Pilgrim's License Renewal Application.ML0616701016/12/20062006/06/13-Pilgrim - Notice of Appearance of David R. Lewis and Paul A. Gaukler as Counsel on Behalf of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.ML0617201636/13/20062006/06/14-Comment (2) of Mary Lampert on Behalf of Pilgrim Watch regarding Scope of the Environmental Review for Pilgrim License Renewal Application - Direct Torus Vent System.ML0617101046/14/2006Pilgrim - Response to NRC Request for Additional Information Regarding Technical Specification Changes to Revise Reactor Coolant Leakage Detection System Instrumentation.ML0617200846/14/20062006/06/14-LB Order (Regarding Schedule and Guidance for Proceedings)ML0616600476/14/20062006/06/15-Comment (3) of Diane Curran, and Matthew Brock, re EIS Scoping Process for Pilgrim Nuclear Plant License Renewal, Proceeding, 71 Fed. Reg. 19,554 (April 14, 2006).ML0617702776/15/20062006/06/15-Pilgrim - NRC Staff Answer to Notice of Adoption of Contentions by Pilgrim WatchML0616700396/15/20062006/06/15- Pilgrim - Notices of Appearance for Susan L. Uttal and Harry E. WedewerML0616700596/15/20062006/06/15-Comment (6) of R. J. Chin, H Chang, M. Lampert, M. Morrison, & B. Pye on Scope of Environmental Review for the Pilgrim Nuclear Power Station's License Renewal Application-Federal Register Notice, April 14, 2006.ML0617704076/15/20062006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request.ML0618103956/16/20062006/06/16-Comment (7) of Elizabeth A. Higgins, re Scoping Comments in Response to Notice of Intent to Prepare Environmental Impact Statement for Pilgrim Nuclear Power Station in Plymouth, Massachusetts.ML0617700456/16/20062006/06/16-Comment (4) of Sheila S. Hollis, re Pilgrim Power Station Regarding Renewal of Facility Operating License DPR-35 for a 20 Year Period.ML0617700436/16/20062006/06/16-Pilgrim- Request of the Town of Plymouth to Participate as of Right Under 2.315(c).ML0617403466/16/20062006/06/16-Pilgrim - Unopposed Motion for Extension of Time to Reply to NRC Staff Response to Hearing Request, filed by D. Curran, Counsel for Massachusetts Attorney General.ML0617806346/16/20062006/06/16-Pilgrim - Letter from D. Curran to Judge Young providing recent decision by U.S. Court of Appeals for the Ninth Circuit.ML0617403496/16/20062006/06/26-Pilgrim - Email from S. Hollis to Judge Young re: Participation in Pilgrim Proceeding and Notice of Appearance.ML0617801256/16/20062006/06/19-Exhibit NRC000005, Pilgrim LR Proceeding - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1100309776/19/20062006/06/19-Pilgrim - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim WatchML0617100866/19/200611 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007OFFICIAL EXHIBIT - NRC000005-00-BD01 - NRC Staff's Response to Request for Hearing and Petition to Intervene Filed by Pilgrim Watch.ML1106009186/19/2006FRN: General Notice, Letter A, Issuance of Order EA-06-137. Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0616000236/20/20062006/06/20- Pilgrim - Official Transcript of Pilgrim Nuclear Power Station Pre-Hearing Conference.ML0617403666/20/2006FRN: General Notice, EA-06-137 Enclosure, Order Modifying Licenses (Effective Immediately) .ML0616000766/20/2006FRN: General Notice, Order EA-06-137, Attachment 1-A List of Licensees.ML0616000876/20/20062006/06/20-Comment (5) of Frank Gorke and Stephanie Abrahams on Scope of Environmental Review for the Pilgrim Nuclear Power Station License Renewal Application - Federal Register Notice, April 14, 2006.ML0617703956/20/20062006/06/21-Email: (PA) Additional Missing AMPsML0625103596/21/20062006/06/21-LB Order and Notice (Regarding Oral Argument and Limited Appearance Statement Sessions)ML0617203976/21/2006Pilgrim Nuclear Power Station, Response to NRC request for Additional Information Regarding Pilgrim Relief Request, PRR-10, Risk-informed ISI For Class 1, B-F and B-J Welds (TAC NO. MC8293).ML0618600866/21/20062006/06/22-Email: (PA) Additional missing AMPsML0625102956/22/20062006/06/22-Pilgrim - Entergy's Answer to Massachusetts Attorney General's Request for a Hearing, Petition for Leave to Intervene, and Petition for Backfit Order.ML0617901346/22/20062006/06/22-Pilgrim - NRC Staff Answer Opposing Massachusetts Attorney General's Request for Hearing and Petition for Leave to Intervene and Petition for Backfit OrderML0617304826/22/20062006/06/22-Email: (PA) Additional Missing AMPsML0625103616/22/20062006/06/23-Press Release-I-06-038: Licensing Board to Hear Oral Arguments and Receive Public Comment in Pilgrim License Renewal Proceeding.ML0617400316/23/20062006/06/25-E-mail: (PA) Additional AMR Question - Section 3.1.1ML0621204106/25/20062006/06/26-Pilgrim - Email from R. Chin, Duxbury Nuclear Advisory Committee to Judge Young re: Limited Appearance StatementsML0617801596/26/2006OFFICIAL EXHIBIT - NRC000004-00-BD01 - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1106009166/26/20062006/06/26-Exhibit NRC000004, Pilgrim LR Proceeding - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML1100309746/26/20062006/06/26-E-MaiI: FWD: Comment (1) of Alex Marion on Behalf of Nuclear Energy Institute (NEI) on Proposed ISG LR-ISG-2006-01.ML0630703236/26/20062006/06/26-Email: (PA) Audit Report Attachment 5 - List of DocumentsML0621301456/26/20062006/06/26-EMAIL: (PA-LR) Pilgrim [regarding: Environmental Scoping].ML0630602676/26/20062006/06/26-EMAIL: (PA-LR) Draft Qs on Section 2.3 on Pilgrim LRA Staff Request a Phone Call on June 27, 2006.ML0630505096/26/200612 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/26-Pilgrim - Entergy's Answer to the Request for Hearing and Petition to Intervene by Pilgrim Watch and Notice of Adoption of Contention.ML0618402166/26/2006E-mail: (PA) ScheduleML0621204086/26/20062006/06/27-E-mail: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0621204076/27/20062006/06/27-EMAIL: (PA-LR) Fwd: PNPS Response for AMR Items 460 and 512 - Potential Conflict in the Responses.ML0630503966/27/20062006/06/27-Email: (PA) PNPS Response for AMR Items 460 and 512 - Potential Conflict in the ResponsesML0620903886/27/2006Pilgrim - Request for Approval of ASME Code,Section XI, Third Ten-Year Relief Request, PRR-42, Examinations of Component Welds with Less Than Essentially 100% Examination Coverage.ML0618701636/28/20062006/06/29-Email: (PA) Jim and PeterML0620903096/29/20062006/06/29-EMAIL: (PA-LR) Additional Questions From Bob JacksonML0630506036/29/20062006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903186/29/2006Pilgrim Nuclear Power Station - Relief Request No. PRR-4, (TAC MC8287).ML0614500316/29/20062006/06/29-E-mail: (PA) - None -ML0621204066/29/20062006/06/29-Email: (PA) Additional Question from Bob JacksonML0621300576/29/20062006/06/29-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0621300586/29/20062006/06/29-EMAIL: (PA-LR) Non-Safety Related SCs.ML0630506106/29/2006IR 05000293-06-006; 04/10/2006 - 05/19/2006; Pilgrim Nuclear Power Station; Component Design Bases Inspection.ML0618002156/29/20062006/06/29-Email: (PA) Non-Safety Related SCsML0621300566/29/2006Email: (PA) Re: QA for Aging Mangement of NSR ComponentsML0620905696/29/2006Pilgrim Nuclear Power Station - Relief Request No. PIL-05-R-001, TAC No. MC8299).ML0614204706/29/2006Pilgrim, Fourth Ten-Year In-Service Testing (IST) Program, IST Relief Request PR-03, Rev. 3.ML0618704926/29/20062006/06/29- Pilgrim - Massachusett's Attorney General's Reply to Entergy's and NRC Staff's Responses to Hearing Request and Petition to Intervene.ML0618702256/29/20062006/06/29-Email: (PA) PNPS ShellML0620903196/29/20062006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0625103646/30/20062006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Power Station.ML0618104246/30/2006Pilgrim - Technical Specifications Amendment Request to Revise the Surveillance Requirements for the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) Systems.ML0618704696/30/2006Email: (PA) Response to ARM Questions 482 & 483ML0620905676/30/20062006/06/30-Email: (PA) Response to ARM Questions 482 and 483ML0620903806/30/200613 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/06/30-Email: (PA) FWD: Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624803796/30/2006Pilgrim, Procedure No. 3.M.5-2, Revision 10, "Main Stack Inspection Guideline."ML0704404826/30/20062006/06/30-Email: (PA) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0624802976/30/20062006/06/30-Email: (PA:) FWD: Questions and Answers of Pilgrim LRA Aging Management ReviewsML0621300186/30/20062006/06/30-EMAIL: (PA-LR) Questions and Answers of Pilgrim LRA Aging Management Reviews.ML0630506136/30/20062006/06/30-Email: (PA) Draft AMP Section of Audit ReportML0621204236/30/2006Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620903077/3/20062006/07/03- Pilgrim - Pilgrim Watch Reply to Entergy Answer to Request for Hearing and Petition to Intervene by Pilgrim Watch.ML0621604497/3/20062006/07/03-Email: (PA) Re: QA for Aging Management of NSR ComponentsML0620905657/3/20062006/07/03- Pilgrim - Pilgrim Watch Reply to NRC's and Entergy's Answers to Notice of Adoption of Contention by Pilgrim Watch.ML0621604417/3/20062006/07/05-Pilgrim - License Renewal Application Amendment 3.ML0619401757/5/2006Email: (PA) Re: Draft AMP section of Audit reportML0621300897/5/2006Email: (PA) Re: Quality Assurance for Aging Management of NSR ComponentsML0620902947/5/20062006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300647/5/2006OFFICIAL EXHIBIT - ENT000007-00-BD01 - License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1106008737/5/20062006/07/05-Email: (PA) Re: Draft AMP Section of Audit ReportML0620903037/5/20062006/07/05-Email: (PA) FW: Handing of Generic IssuesML0621300917/5/20062006/07/05-Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621300547/5/2006Exhibit ENT000007, Pilgrim LR Proceeding, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives for Pilgrim Nuclear Power Station.ML1100309987/5/20062006/07/05-Email: (PA) Comments on the AMP writeupML0621300537/5/2006Entergy Nuclear Operations Inc. License Renewal Application Amendment 3.ML0906303957/5/20062006/07/05-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0620902977/5/20062006/07/05-Pilgrim, License Renewal Application Amendment 4: Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives.ML0619304187/5/20062006/07/05-Email: (PA) Quality Assurance for Aging Management of NSR ComponentsML0620903047/5/20062006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620903057/5/20062006/07/05-Email: (PA) Quality Asurance for Aging Management of NSR ComponentsML0620905617/5/2006Email: (PA) Re: FW: Handling of Generic IssuesML0620903007/5/200614 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/07/05-Email: (PA) PNPS's TLAA Section 4.6ML0620905637/5/20062006/07/06-Email: (PA) FYI: Draft Audit Report Shell TLAA on Metal Fatigue - Audit Report Section 4.3ML0621300867/6/20062006/07/06- Pilgrim - Official Transcript of Oral Arguments on Contentions for the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619401797/6/20062006/07/06-Pilgrim - Official Transcript of Limited Appearance Comment Session in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619302187/6/2006Email: (PA) Re: Quality Assurance for aging management of NSR componentsML0621301407/6/20062006/07/06-EMAIL: (PA-LR) FW: PNPS ER EJ writeup.ML0630603097/6/20062006/07/06-Email: (PA) Additional AMR questionsML0621300617/6/20062006/07/06-Email: (PA) Re: Quality Assurance for Aging Management of NSR Components.ML0621204777/6/2006Letter dated 7/7/06 to Multiple Addresses who did not participate in the June 7, 2006 Generic Fundamentals Examination (GFE)ML0623604837/7/20062006/07/07-Pilgrim - Limited Appearance Statement by Maurice C. Cion.ML0620700677/7/20062006/07/07- Pilgrim - Official Transcript of Oral Arguments on Contentions in the Pilgrim Nuclear Power Station License Renewal Proceeding.ML0619303907/7/20062006/07/07-Email: (PA) Comments on Pilgrim AMP documentML0621204807/7/2006Email: (PA) Re: Comments on Pilgrim AMP DocumentML0621301427/7/20062006/07/07-Pilgrim - Limited Appearance Statement by W. BramhallML0620606077/7/20062006/07/07-E-mail: (PA) Re: Comments on Pilgrim AMP documentML0621204127/7/20062006/07/07-Email: (PA) Re: Comments on Pilgrim AMP DocumentML0620902937/7/20062006/07/10-E-Mail: FWD: Response to your question regarding Radwaste Piping.ML0630703197/10/20062006/07/10-Pilgrim - Email from Diane Curran to ASLBP and Parties.ML0620700557/10/20062006/07/11-EMAIL: (PA-LR) FW: Pilgrim Document 83.ML0630603027/11/20062006/07/11-CZM Federal Consistency Review of the Pilgrim Nuclear Power Station Operating License Renewal; Plymouth.ML0620903627/11/20062006/07/12- Pilgrim - Email from Susan Uttal to ASLBP and Parties.ML0620701317/12/20062006/07/12-E-mail: FWD: Pilgrim License Renewal Application Amendment 3 Cover Letter and Attachment A.ML0630705367/12/20062006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application.ML0617000557/13/20062006/07/13-Pilgrim - Letter to the Administrative Judges from Counsel for Entergy following up on one of the two matters raised at last week's prehearing conference.ML0620202357/13/200615 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Supplement to Request for the Use of Delta Protection's Self Fed Single Use "Mururoa BLU" Suit Systems; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend Pilgrim, Vermont Yankee.ML0619800287/13/20062006/07/13-Press Release-I-06-040: NRC To Meet With Entergy On July 19th To Discuss Pilgrim License Renewal Audit Findings.ML0619403687/13/20062006/07/13- Pilgrim - Limited Appearance Statement of John R. Glover.ML0620702247/13/2006E-MAIL: NRC to Discuss Pilgrim Audit Findings.ML0630702497/13/2006Supplement to Request for Use of Delta Protection Mururoa V4F1 R Supplied Air Suits; Arkansas Nuclear One, Indian Point, Grand Gulf, Waterford, FitzPatrick, River Bend, Pilgrim, Vermont Yankee.ML0619800307/13/20062006/07/14-Pilgrim - Email from Judge Young to the parties.ML0620606147/14/20062006/07/14-LB Order (Regarding Need for Further Briefing on Definition of New and Significant Information As Addressed in Participants' Petitions, Answers and Replies Relating to massachusetts Attorney General contentioin and Pilgrim Watch Contention 4:.ML0619504817/14/2006Response to NRC Request for Additional Information and Revised Pilgrim Relief Request, PRR-15, Rev.1.ML0620102107/14/20062006/07/14-Pilgrim - Email to Judge Young from Molly BartlettML0620606167/14/20062006/07/17- Pilgrim - Limited Appearance Statement on Behalf of Clean Water Action (MASSPIRG) .ML0620700517/17/20062006/07/17-EMAIL: (PA-LR) Re: Pilgrim [from Lampert to A. Williamson 7/17/06].ML0630602597/17/20062006/07/17-Email: (PA-LR) Additional info for ER.ML0630602397/17/20062006/07/17-E-Mail: Core shroud tie rod upper support cracking- information request.ML0630702527/17/20062006/07/17-EMAIL: (PA-LR) Re: Pilgrim.ML0630602497/17/20062006/07/19-Pilgrim Nuclear Power Station - License Renewal Application Amendment 5.ML0620801427/19/20062006/07/19-Pilgrim - License Renewal Application Amendment 5.ML0620900757/19/2006LER 06-002-00 for Pilgrim Nuclear Power Station re Small Quantities of Unaccountable Licensed Material.ML0620801437/19/20062006/07/20- Pilgrim - Entergy providing follow up information from the prehearing conference on Pilgrim's aging management review to ASLBP.ML0621200187/20/20062006/07/20- Pilgrim - Notice of Withdrawal and Certificate of Service for Harry E. Wedewer for Pilgrim Nuclear Power Station.ML0620105007/20/20062006/07/20-Letter on behalf of more than two dozen organizations and individuals listed on draft Director's Decision dated June 28, 2006, regarding groundwater contamination petition submitted January 25, 2006.ML0621904457/20/20062006/07/21- Pilgrim - Massachusetts Attorney General's Brief Regarding Relevance to this Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0620801717/21/20062006/07/21-Email: (PA) Fwd: Re: RAI for section 3.5ML0620903837/21/200616 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/07/21- Pilgrim - Entergy's Brief on New and Significant Information in Response to Licensing Board Order of July 14, 2006.ML0620805897/21/20062006/07/21-Pilgrim - NRC Staff's Response to July 14, 2006 Licensing Board OrderML0620207957/21/20062006/07/23-Pilgrim - Email to Judge Young from Molly BartlettML0620606177/23/20062006/07/24-Email: (PA) Re: Any Correspondences from PNPS on LRA Changes.ML0620903877/24/20062006/07/24-E-Mail: FW: Pilgrim LRA Amendment 5.ML0630703187/24/20062006/07/25- 05/01-05/2006 Meeting Summary of Environmental Site Audit Related to the Review of the License Renewal Application for Pilgrim.ML0620703057/25/20062006/07/25-Pilgrim, Request for Additional Information, Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0620702407/25/20062006/07/25-Summary of Conferences Calls with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC NO. MC9676).ML0620702957/25/20062006/07/25-EMAIL: (PA) Re: FWD: FYI: Forwarding What We Want DCI/FEB to Work at for the Pilgrim Flaw Growth Analysis.ML0624803627/25/20062006/07/25-Email: (PA) Piligrim AMP/AMR Audit ReportML0625102967/25/20062006/07/26-E-Mail: Request for Additional information on LRA section 2.1 Scoping and Screening.ML0630702417/26/20062006/07/26- Pilgrim - Letter informing that Entergy has already fully addressed the points raised in the Massachusetts Attorney General's brief regarding new and significant information.ML0621304437/26/20062006/07/26- Pilgrim - Massachusetts Attorney General's Reply Brief Regarding Relevance to This Proceeding of Regulatory Guide's Definition of "New and Significant Information."ML0621304467/26/20062006/07/26-EMAIL: (PA) Revised AMR 3.4 InputML0624803887/26/20062006/07/26-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0621204647/26/2006IR 05000293-06-008; 06/12/2006-06/16/2006; Pilgrim Nuclear Power Station; Physical Protection.ML0620703967/26/2006CR-PNP-2006-02799, Fair Amount of Water in Torus Room Floor.ML0707901747/26/20062006/07/27- Pilgrim - Official Transcript of Entergy Nuclear Generation Company Oral Arguments via Telephone Conference.ML0621300247/27/20062006/07/27-Email: (PA) PNPS Q&QML0625103067/27/2006E-MAIL: Pilgrim Nuclear Power Station Hearing Files Information Request (7/1/06-7/31/06).ML0630702457/27/20062006/07/27-E-Mail: Fwd: FYI: Attaching File with my Assessment Tracking the Status of Our Metal Fatigue Questions - Jim.ML0630702467/27/20062006/07/27-Email: (NPA-PD-LR) Additional KI info [C. Jacobs] found.ML0630705957/27/20062006/07/27-Pilgrim - Judge Nicholas Trikouros disclosure statement.ML0621207307/27/200617 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007Email: (PA) PNPS Q&AML0625103557/27/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621206627/31/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207527/31/20062006/07/31-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0621207437/31/20062006/07/31-Email: (PA) Updated Section 4.3, Metal Fatigue for PNPS LRAML0625103027/31/2006Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application.ML0619400157/31/2006Pilgrim Nuclear Power Station - Groundwater Protection - Data Collection Questionnaire.ML0622806027/31/20062006/07/31-E-Mail: Fwd: PNPS Q&A Data Base.ML0630702327/31/20062006/07/31-Email: (PA) Urgent - revised section 3.0.4 input for QA programML0625102997/31/2006Groundwater Protection - Data Collection Questionnaire, Pilgrim.ML0625505187/31/2006IR 05000293-06-003; 04/01-06/30/2006; Pilgrim Nuclear Power Station; Maintenance Risk Assessments and Emergent Work Control.ML0621306158/1/20062006/08/02-EMAIL: (PA) AMR Audit Report Section 3.3ML0624803918/2/20062006/08/02-Fax to Brian Ford/Fred Mogolesko from RAMS.ML0625103248/2/20062006/08/02-FAX: From: Ram Subbaratnam To: Brian Ford/ Fred Mogolesko 8/02/2006 RE: Supplement 3.ML0630703328/2/20062006/08/02-EMAIL: (PA) Email to James Davis from Duc Nguyen on 08/02/2006 at 3:50 4:43 pm (No Subject)ML0624803618/2/20062006/08/03-EMAIL: (PA) TLAA InputML0624803818/3/20062006/08/03-EMAIL: (PA) FYI: Forwarding Attachment 1 & Attachments 3-7 on Audit Report TLAA Sections.ML0624803838/3/2006E-Mail: Fwd: Pilgrim ASLB Hearing.ML0630702368/3/20062006/08/03-EMAIL: (PA) Duc's Audit and Review Report InputML0624803858/3/20062006/08/03-EMAIL: (PA) TLAA Section 4.3 InputML0624803958/3/2006E-Mail: Fwd: Pilgrim ASLB Hearing: from Ram Subbaratnam 8/3/06 10:55am.ML0630702348/3/20062006/08/04- Pilgrim - Massachusetts Attorney General's Motion for Disqualification of Judge Nicholas Trikouros.ML0622101008/4/20062006/08/04- Pilgrim - Motion on Behalf of Pilgrim Watch for Disqualification of Judge Nicholas Trikouros.ML0625001388/4/2006Pilgrim - Issuance of License Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation for Elevated Relief Valve Discharge Pipe Temperature.ML0618400328/4/2006Pilgrim - Tech Spec Pages for Amendment 222 RE: Deletion of Requirement Related to NRC Approval of Engineering Evaluation For Elevated Relief Valve Discharge Pipe Temperature.ML0622301678/4/200618 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/08/07-E-Mail Re: RAM: From Fred Mogolesko 8/7/06 12:01pm.ML0630702198/7/20062006/08/07-E-MAIL: Fwd: RAM: from Ram Sabbaratnam 8/7/06 9:13am.ML0630702398/7/20062006/08/07-E-Mail: FW: RAM.ML0630702208/7/2006Pilgrim, Issuance of License Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0617200688/9/2006Pilgrim, Tech Spec Pages for Amendment 223 Regarding Administrative Changes and Relocation of Certain Technical Specification Responsibilities.ML0622800138/9/20062006/08/09- Pilgrim - Notice of Appearance for Marian L. Zobler (Pilgrim Nuclear Power Plant) and Certificate of ServiceML0622102508/9/20062006/08/10-E-Mail: FW: Requested Information from Pilgrim License Renewal Program Document PRPD-06.ML0630702258/10/2006E-Mail: FW: Requested Pilgrim ISl Information.ML0630702228/10/20062006/08/11-Email: (PA) RAI for the Three Flaw Issues for the Pilgrim LRAML0625103438/11/20062006/08/11-E-Mail: Draft RAIs on section 2.4 of Pilgrim LRA.ML0630702288/11/20062006/08/14-RAI For the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0622904748/14/20062006/08/14- Pilgrim- Entergy's Response to Motions for Disqualification of Judge Nicholas Trikouros.ML0623400988/14/20062006/08/14-Email: (PA) LRA B.1.1, Boraflex ProgramML0625103508/14/20062006/08/14-Email: (PA) RAIs 3.5.1-1 and 3.5.1-2ML0625103468/14/20062006/08/15-Summary of Public Audit Status Briefing with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program and the Aging Management Review Audits for the Pilgrim Nuclear Power Station.ML0622802188/15/2006Updated Schedule of Submittal of License Renewal Applications for Entergy Plants.ML0623300088/16/20062006/08/16-EMAIL: (NPA-PD-LR) RAI on Chapter 4.0 TLAAs (from Ram Subbaratnam).ML0630404638/16/20062006/08/16-Pilgrim: NRC Contact Report - To Obtain an Update on the Status of Rainbow Smelt Stocks in the Vicinity of PNPS (Intergovernmental).ML0634701668/16/20062006/08/18-E-MAIL: (Intergovernmental) Rainbow Smelt Data [8/18 from S. Duda].ML0634704248/18/20062006/08/18-E-Mail: Formal RAIs for Pilgrim License Renewal Application on Section 3.5 & 3.6.ML0630702308/18/2006Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves (TAC No. MD1218).ML0622804348/18/20062006/08/21-E-Mail: Additional draft (draft RAIs) the audit team requests (August 21, 2006).ML0630701888/21/20062006/08/21-EMAIL: (NPA-PD-LR) RAIs from Audit by Danhoang & Erach.ML0629904428/21/2006Update to Part 21 Interim Report Notification: Failure Analysis of Core Shroud Repair Tie Rod Upper Support Crack.ML0623700958/21/200619 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/20072006/08/21-EMAIL: (NPA-PD-LR) Requested RAI on Pilgrim LRA.ML0629902538/21/20062006/08/22-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0623504408/22/20062006/08/22-Pilgrim - License Renewal Application Amendment 6.ML0624200608/22/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/22/06 re: Pilgrim AMP Review.ML0706602798/22/20062006/08/23-E-Mail: FW: Pilgrim License Renewal Application Amendment 6.ML0630702178/23/20062006/08/23-EMAIL: (NPA-PD-LR) Fwd: FW: Pilgrim License Renewal Application Amendment 6 (RAI Responses from Entergy on Pilgrim LRA).ML0630502968/23/20062006/08/23-E-Mail: Questions From Fred Mogolesko 8/23/2006 9:29am.ML0630701908/23/20062006/08/23-Summary of Follow Up Conference Call with Entergy Nuclear Operations, Inc., to Discuss the Severe Accident Mitigation Alternatives Requests for Additional Information for Pilgrim Nuclear Power Station (TAC No.

MC9676).ML0623605148/23/2006OFFICIAL EXHIBIT - PWA000004-00-BD01 - MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I. Chanin.ML1106008868/23/2006Exhibit PWA 00004, MACCS2 Support Forum, David I. Chanin; Development of MACCS2: Lessons Learned, David I. Chanin.ML1100309068/23/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/24/06 re: Pilgrim AMP Review.ML0706700898/24/20062006/08/25-Email: (PA) Pilgrim Audit Report Peer Review AMP SectionsML0625103078/25/2006Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51.ML1112203578/25/20062006/08/25-Petition for Rulemaking PRM 50-10 to Amend 10 C.F.R. Part 51, on behalf of the Massachusetts Attorney General, submitted by Diane Curran.ML0626404098/25/20062006/08/25-Summary of Conference Call with Entergy Nuclear Operations, Inc on August 1, 2006.ML0624103798/25/20062006/08/25-Email: (NPA-PD-LR) Final RAI on Section 2.4 - Scoping and Screening Structures for the Pilgrim LRA.ML0629803228/25/2006Order Requiring Compliance with Key Radiological Protection Mitigation Strategies.ML0623003048/28/20062006/08/28-E-Mail: Draft Pilgrim RAIs on Section 4.2.1 - TLAAs on RV Internals, Neutron Fluence.ML0630703618/28/20062006/08/28-E-Mail: Meeting Summary for your information: from Ram Subbaratnam 8/28/06 9:18am.ML0630703758/28/2006PD_Email from Fred Mogolesko, Entergy, dtd 8/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706600568/28/2006PD_Email from Fred Mogolesko, Entergy, dtd 08/28/06 re: Preparation for Region I Inspection at Pilgrim.ML0706605488/28/2006Pilgrim, Changes to the Pilgrim Fourth Ten-Year In Service Inspection Program Plan Related to the Snubber Inspection Program.ML0624904218/28/20062006/08/28-E-Mail: Preparation for Region 1 Inspection at Pilgrim: from: Fred Mogolesko 8/28/06 10:17 am.ML0630703678/28/200620 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007FitzPatrick, Indian Point, Pilgrim, & Vermont Yankee Nuclear Power Stations - Fitness-for-Duty Program Performance Report For the Period January 2006 - June 2006.ML0624302988/29/20062006/08/30-Comment from David R. Lewis of Pillsbury, Winthrop, Shaw and Pittman on Massachusetts Attorney General's Petition for Rulemaking PRM-51-10 to Amend 10 CFR Part 51 (August 25, 2006).ML0626502218/30/20062006/08/30-LB Notice of Recusal of Judge Nicholas TrikourosML0624204878/30/20062006/08/30-LB Notice of ReconstitutionML0624204698/30/20062006/08/30-E-mail: (PA) SER Input.ML0908300738/30/2006OFFICIAL EXHIBIT - ENT000008-00-BD01 - License Renewal Application Amendment 7.ML1106008748/30/2006Pilgrim Nuclear Power Station, Technical Specification Amendment Request to Relocate Specifications not Meeting the Criteria of 10 CFR 50.36(c)(2)(ii), Revision 1, (TAC MC5421).ML0624904898/30/20062006/08/30-Vermont Yankee/Pilgrim - Entergy's Response to Massachusetts Attorney General's Petition for Rulemaking to Amend 10 C.F.R. Part 51 (Aug. 25, 2006).ML0624803668/30/2006Exhibit ENT000008, Pilgrim LR Proceeding, License Renewal Application Amendment 7.ML1100309878/30/20062006/08/30-Pilgrim, Response to Requests for Additional Information re License Renewal Application Amendment 7.ML0625001178/30/20062006/08/31-E-MAIL: (Intergovernmental) Pilgrim NPS EIS - info request.ML0634704718/31/2006Mid-cycle Performance Review and Inspection Plan - Pilgrim Nuclear Power Station.ML0624304438/31/20062006/09/01-E-MAIL: (Intergovernmental) Re: Pilgrim NPS EIS - info request.ML0634704739/1/20062006/09/01-Pilgrim April 2008 Evidentiary Hearing - Intervenor Exhibit 7, Liquid Radioactive Release Lessons Learned Task Force Final Report, September 1, 2006; Executive Summary; Pages 19 and 26; Appendix B Consolidated Recommendations List.ML0810905239/1/20062006/09/05-EMAIL: (NPA-PD-LR) Pilgrim LRA - RAI Responses from Entergy (NRC-03-03-038, Task Order 24).ML0631102099/5/20062006/09/07-Pilgrim, Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC No. MC9669).ML0624905019/7/20062006/09/07-E-mail: Final RAI on Section 4.3.2.1 on Pilgrim LRA.ML0630605959/7/20062006/09/08-E-MAIL: (Intergovernmental) Re: Plymouth Population & Buildout Data.ML0634704799/8/20062006/09/08-Request for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669) Section 3.2.ML0625004319/8/20062006/09/08-Requests for Additional Information for the Review of the Pilgrim Nuclear Power Station License Renewal Application (TAC MC9669).ML0625004019/8/20062006/09/08-EMAIL: (NPA-PD-LR) Fwd: Final RAI on Section 3.2.1 and 4.2.1 on the Pilgrim LRA.ML0629904469/8/2006Pilgrim Nuclear Power Station - NRC Material Control and Accounting Program Inspection Report No. 05000293/2006201 and Notice of Violation.ML0622601849/11/200621 All Documents for Docket 05000293 in ADAMS Public Legacy from 01/01/2006 to 01/01/2007IR 05000293-06-009, on 07/24/2006 - 08/11/2006, Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station; Triennial Fire Protection Team Inspection.ML0625603579/13/20062006/09/13-Pilgrim - License Renewal Application Amendment 8.ML0626500729/13/20062006/09/13-E-Mail: Entergy Memo of 9/13/2006 - Pilgrim.ML0630704209/13/2006Pilgrim Nuclear Power Station - Issuance of Amendment RE: Relocation of Technical Specifications (TAC No. MC5421).ML0622803049/14/2006Pilgrim, Core Operating Limits Report, Revision 25.ML0626904719/14/2006Pilgrim, 10 CFR 50.46(a)(3)(ii) Annual Report.ML0626904689/14/2006PD_Email from Glenn Meyer dtd 9/14/06 re: Planning for Initial Contacts.ML0706605269/14/2006Pilgrim Nuclear Power Station - Technical Specification Pages re Relocation of Technical Specifications Structural Integrity Requirements to Final Safety Analysis Report.ML0626202409/14/2006Pre-Inspection Cover Sheet and Inspection Plan.ML0626101439/14/2006Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, dated January 25, 2006.ML0625801629/15/200610/02/2006 Commission Meetings - FRN.ML0626102709/18/2006CR-PNP-2006-03467, Evidence of Past (Non-Active) Leakage Found on Torus Room Bay 1 Wall.ML0707901569/19/200622