| Q | CCA | Title |
---|
05000382/FIN-2014404-04 | 2014Q3 | | Security |
05000382/FIN-2014404-03 | 2014Q3 | | Security |
05000382/FIN-2014404-02 | 2014Q3 | | Security |
05000382/FIN-2014404-01 | 2014Q3 | | Security |
05000382/FIN-2014005-01 | 2014Q4 | H.2 | Failure to Identify and Control Potential Tornado-Borne Missile Hazards |
05000382/FIN-2014005-05 | 2014Q4 | H.5 | Failure to Adequately Plan and Control Work Activities Related to Alloy 600 Pipe Weld Inspections to Ensure Doses were ALARA |
05000382/FIN-2014005-04 | 2014Q4 | H.11 | Failure to Establish Design Control Measures for the Suitability of Safety-Related Relays |
05000382/FIN-2014005-02 | 2014Q4 | H.13 | Failure to Follow the Operability Determination Process |
05000382/FIN-2014005-06 | 2014Q4 | H.14 | Failure to Correct a Condition Adverse to Quality in a Timely Manner |
05000382/FIN-2014005-03 | 2014Q4 | P.1 | Failure to Establish an Inspection Schedule of the Dry Cooling Towers |
05000382/FIN-2015001-03 | 2015Q1 | H.1 | Failure to Develop the Transportation Security Plan |
05000382/FIN-2014007-04 | 2015Q1 | | Failure to Evaluate Missile Protection Requirements for Emergency Diesel Generator Day and Storage Tank Vents |
05000382/FIN-2014007-03 | 2015Q1 | H.5 | Failure to Initiate a Condition Report for a Condition Adverse to Quality |
05000382/FIN-2014007-02 | 2015Q1 | H.4 | Inadequate Station Procedures for Temporary Emergency Diesel Generator |
05000382/FIN-2014007-01 | 2015Q1 | P.4 | Failure to Identify and Evaluate Elevated Bus Voltages |
05000382/FIN-2014007-06 | 2015Q1 | | Failure to Properly Evaluate Main Feedwater Isolation Valve Required Thrust |
05000382/FIN-2014007-07 | 2015Q1 | | Failure to Properly Evaluate Main Steam Isolation Valve Weak Link |
05000382/FIN-2015405-01 | 2015Q1 | | Security |
05000382/FIN-2015001-04 | 2015Q1 | | Inadequate Procedure for Tightening Thermal Overload Connections for Safety-Related Components |
05000382/FIN-2015001-02 | 2015Q1 | H.12 | Failure to Identify and Correct a Condition Adverse to Fire Protection |
05000382/FIN-2015001-01 | 2015Q1 | | Failure to Identify and Perform Testing of Safety-Related Dry Cooling Tower Tube Bundle Isolation Valves |
05000382/FIN-2014007-05 | 2015Q1 | H.8 | Failure to Identify and Correct Through Wall Corrosion on Emergency Diesel Generator A and B Day Tank Vents |
05000382/FIN-2015011-01 | 2015Q2 | | Failure to Implement Proper Control of Fire Protection Impairments |
05000382/FIN-2015011-02 | 2015Q2 | | Failure to Maintain Complete and Accurate Information for the Fire Protection Program |
05000382/FIN-2015011-03 | 2015Q2 | | Failure to Maintain Complete and Accurate Information for the Access Authorization Program |
05000382/FIN-2015007-05 | 2015Q2 | | Violation of Technical Specification 6.8.1.f for the failure to implement and maintain adequate written procedures covering fire protection program implementation |
05000382/FIN-2015002-02 | 2015Q2 | H.2 | Failure to Follow Instructions in Painting Procedure while Painting on Safety-Related Equipment |
05000382/FIN-2015007-04 | 2015Q2 | P.3 | Failure to Correct Long Standing Deficiencies with the Appendix R Emergency Lighting Units |
05000382/FIN-2015007-03 | 2015Q2 | | Failure to Periodically Test Emergency Lighting Units |
05000382/FIN-2015007-02 | 2015Q2 | P.3 | Failure to Provide a Bounding Calculation for Time Critical Actions |
05000382/FIN-2015007-01 | 2015Q2 | | Inadequate Fire Area Boundary |
05000382/FIN-2015002-01 | 2015Q2 | P.3 | Failure to Identify and Secure Potential Tornado-Borne Missile Hazards |
05000382/FIN-2015201-02 | 2015Q2 | | Security |
05000382/FIN-2015201-01 | 2015Q2 | | Security |