ML18023B320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 27: Line 27:


3 Controlled Unoccupied 50-1,000 mRem/hr 4 Prohibited Unoccupied >1,000 mRem/hr
3 Controlled Unoccupied 50-1,000 mRem/hr 4 Prohibited Unoccupied >1,000 mRem/hr
* Access Dose Rate Range will meet 10 CFR 20 requirements as given in plant procedures.  ** Action Requirements to Enter Zone are given in plant procedures.  
* Access Dose Rate Range will meet 10 CFR 20 requirements as given in plant procedures.  ** Action Requirements to Enter Zone are given in plant procedures.}}
}}

Revision as of 02:34, 18 May 2018

Browns Ferry Nuclear Plant Updated Final Safety Analysis Report (Ufsar), Amendment 27, 12.3 Table - Shielding and Radiation
ML18023B320
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/05/2017
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18018A778 List: ... further results
References
Download: ML18023B320 (1)


Text

BFN-17 Table 12.3-1 PLANT RADIATION ZONE CLASSIFICATIONS

  • ** Shielding Access Access Design Dose Rate Action Requirements Zone Conditions Occupancy Dose Rate Range to Enter Zone

1 Unlimited Continuous <1.0 mRem/hr

2a Regulated Continuous 1.0 mRem/hr

2b Regulated Periodic 15 mRem/hr

3 Controlled Unoccupied 50-1,000 mRem/hr 4 Prohibited Unoccupied >1,000 mRem/hr

  • Access Dose Rate Range will meet 10 CFR 20 requirements as given in plant procedures. ** Action Requirements to Enter Zone are given in plant procedures.