Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2024006 and 05000311/2024006)
ML25069A014
Person / Time
Site: Salem  PSEG icon.png
Issue date: 03/11/2025
From: Nicole Warnek
Division of Operating Reactors
To: Mcfeaters C
Public Service Enterprise Group
References
IR 2024006
Download: ML25069A014 (1)


Text

March 11, 2025

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SALEM NUCLEAR GENERATING STATION, UNITS 1 AND 2 (REPORTS 05000272/2024006 AND 05000311/2024006)

Dear Charles McFeaters:

The U.S Nuclear Regulatory Commission (NRC) has completed its end-of-cycle performance assessment of Salem Nuclear Generating Station (Salem), Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2024 through December 31, 2024. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The baseline inspection program was completed at your facility as defined in Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase.

The NRC determined the performance at Salem, Units 1 and 2, during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all performance indicators (PIs) were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2026.

The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to baseline inspections, the NRC plans to conduct Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 4 at your facility. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (610) 337-6954 with any questions you have regarding this letter.

Sincerely, Nicole S. Warnek, Chief Projects Branch 3 Division of Operating Reactor Safety

Docket Nos. 05000272 and 05000311 License Nos. DPR-70 and DPR-75

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

NICOLE WARNEK Digitally signed by NICOLE WARNEK Date: 2025.03.11 07:20:41 -04'00'

ML25069A014 X

SUNSI Review

X Non-Sensitive Sensitive

X Publicly Available

Non-Publicly Available

OFFICE RI/DORS RI/DORS

NAME RClagg NWarnek

DATE 3/5/2025 3/7/2025

Site Inspection Activity Plan Salem 01/01/2025 - 12/31/2026 Unit Start End Activity CAC Title Staff Count 2025 Salem Initial License Examination

1,2 1/12/2025 1/24/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP Radwaste 71124.08 SAL

1,2 2/17/2025 2/21/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation EP Program Inspection - Salem

1,2 3/17/2025 3/21/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 3/17/2025 3/21/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 3/17/2025 3/21/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 3/17/2025 3/21/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 3/17/2025 3/21/2025 IP 71151 001397 Performance Indicator Verification RP RETS 71124.06 SAL

1,2 3/31/2025 4/4/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment Inservice Inspection - Salem Unit 1

1 4/14/2025 4/25/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Access Control, Protective Strategy, TSR, SPR, PIs - Salem

1,2 6/9/2025 6/13/2025 IP 71130.02 000734 Access Control 1,2 6/9/2025 6/13/2025 IP 71130.05 000737 Protective Strategy Evaluation 1,2 6/9/2025 6/13/2025 IP 71130.09 001656 Security Plan Changes 1,2 6/9/2025 6/13/2025 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 6/9/2025 6/13/2025 IP 71151 001338 Performance Indicator Verification PI&R Biennial Team Inspection - Salem

1,2 6/9/2025 6/13/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 6/23/2025 6/27/2025 IP 71152B 000747 Problem Identification and Resolution RP REMP 71124.07 SAL

1,2 7/14/2025 7/18/2025 IP 71124.07 000731 Radiological Environmental Monitoring Program License Renewal Phase 4 - Salem Units 1 & 2

1,2 8/11/2025 8/15/2025 IP 71003 000687 Post-Approval Site Inspection for License Renewal Salem Requal Inspection with P/F Results

1,2 9/15/2025 9/19/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 9/15/2025 9/19/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance RP Instrumentation 71124.05 SAL

Prepared on 2/13/2025 3:02:16 PM 1 of 2

Site Inspection Activity Plan 1,2 11/10/2025 11/20/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation Age Related Degradation Inspection - Salem

1,2 11/17/2025 11/21/2025 IP 71111.21N.04 001832 Age-Related Degradation 1,2 12/1/2025 12/5/2025 IP 71111.21N.04 001832 Age-Related Degradation RP PI Verification 71151 SAL

1,2 11/17/2025 11/21/2025 IP 71151 000746 Performance Indicator Verification Commercial Grade Dedication - Salem

1,2 1/12/2026 1/16/2026 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 1/26/2026 1/30/2026 IP 71111.21N.03 001808 Commercial Grade Dedication Sec - Access Control, Equipment Testing and Maintenance, Training, SPR, PI Verification - Salem

1,2 3/9/2026 3/13/2026 IP 71130.02 000734 Access Control 1,2 3/9/2026 3/13/2026 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 3/9/2026 3/13/2026 IP 71130.07 000739 Security Training 1,2 3/9/2026 3/13/2026 IP 71130.09 001656 Security Plan Changes 1,2 3/9/2026 3/13/2026 IP 71151 001338 Performance Indicator Verification Inservice Inspection - Salem Unit 2

2 4/13/2026 4/24/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Cyber Security - Salem

1,2 6/8/2026 6/12/2026 IP 71130.10 000741 Cybersecurity 1,2 6/22/2026 6/26/2026 IP 71130.10 000741 Cybersecurity 2026 Salem Initial Operator Licensing Exam

1,2 5/11/2026 5/15/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 7/13/2026 7/17/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - SL/HC

1,2 8/3/2026 8/7/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 8/24/2026 8/28/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing Material Control and Accounting - Salem

1,2 9/14/2026 9/18/2026 IP 71130.11 000742 Material Control and Accounting (MC&A)

Inservice Inspection - Salem Unit 1

1 10/12/2026 10/23/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

EP Exercise Inspection - Salem

1,2 11/16/2026 11/20/2026 IP 71114.01 000716 Exercise Evaluation 1,2 11/16/2026 11/20/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 11/16/2026 11/20/2026 IP 71151 001397 Performance Indicator Verification RP 71151 PI Verification - Salem

1,2 11/16/2026 11/19/2026 IP 71151 000746 Performance Indicator Verification Prepared on 2/13/2025 3:02:16 PM 2 of 2