{{#Wiki_filter: | {{#Wiki_filter:April 18, 2011 | ||
== | ==SUBJECT:== | ||
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000237/2011502(DRS); 05000249/2011502(DRS) | |||
==Dear Mr. Pacilio:== | ==Dear Mr. Pacilio:== | ||
On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the inspection findings, which were discussed on March 25, 2011, with Mr. S. Marik, and other members of your staff. | On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the inspection findings, which were discussed on March 25, 2011, with Mr. S. Marik, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to safety and compliance with the | The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection, there were no findings of significance identified during this inspection | Based on the results of this inspection, there were no findings of significance identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety | |||
DPR-19; DPR-25 | Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 | ||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report 05000237/2011502(DRS); | Inspection Report 05000237/2011502(DRS); | ||
05000249/2011502(DRS) | |||
w/Attachment: Supplemental Information | 05000249/2011502(DRS) | ||
Letter to Michael from Hironori Peterson dated April 18, 2011. SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 | w/Attachment: Supplemental Information | ||
DISTRIBUTION See next page | |||
: | |||
Letter to Michael from Hironori Peterson dated April 18, 2011. | |||
SUBJECT: | |||
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000237/2011502(DRS); 05000249/2011502(DRS) | |||
REGION III== | REGION III== | ||
| Line 50: | Line 59: | ||
50-237; 50-249 License Nos: | 50-237; 50-249 License Nos: | ||
DPR-19; DPR-25 Report No: | DPR-19; DPR-25 Report No: | ||
05000237/ | 05000237/2011502(DRS); 05000249/2011502(DRS) | ||
Licensee: | |||
Robert Jickling, Senior Emergency Preparedness Inspector | Exelon Generation Company Facility: | ||
Dresden Nuclear Power Station, Units 2 and 3 Location: | |||
Morris, IL Dates: | |||
March 21 through 25, 2011 Inspectors: | |||
Robert Jickling, Senior Emergency Preparedness Inspector | |||
Bruce Palagi, Senior Reactor Operations Inspector | |||
Daneira Meléndez-Colón, Resident Inspector Approved by: | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety | |||
Enclosure | |||
=SUMMARY OF FINDINGS= | |||
IR 05000237/2011502, 05000249/2011502; 03/21/2011 - 03/25/2011; Dresden Nuclear Power | |||
Station, Units 2 & 3; Baseline Emergency Preparedness Biennial Exercise Inspection. | |||
The NRC | This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, | ||
-1649, | Reactor Oversight Process, Revision 4, dated December 2006. | ||
A. | A. | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
===NRC-Identified=== | |||
and Self-Revealed Findings | |||
No findings were identified. | |||
B. | |||
No violations were identified. | |||
=== | ===Licensee-Identified Violations=== | ||
Licensee-Identified Violations=== | 1. | ||
REACTOR SAFETY | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
===Cornerstone: | ===Cornerstone: Emergency Preparedness=== | ||
1EP1 Exercise Evaluation | 1EP1 Exercise Evaluation | ||
===.1 === | ===.1=== | ||
{{IP sample|IP=IP 71114.01}} | {{IP sample|IP=IP 71114.01}} | ||
a. Exercise Evaluation The inspectors reviewed the March 23, 2011, biennial emergency preparedness | a. | ||
Exercise Evaluation The inspectors reviewed the March 23, 2011, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2009, 2010, and 2011, to verify that those drills scenarios were sufficiently different from the scenario used in the March 23, 2011, exercise. | |||
Inspection Scope The inspectors evaluated the | Inspection Scope The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: | ||
Control Room Simulator (CRS); | * Control Room Simulator (CRS); | ||
Technical Support Center (TSC); | * Technical Support Center (TSC); and | ||
* Emergency Operations Facility (EOF). | |||
The inspectors also assessed the | The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan. | ||
The inspectors attended post | The inspectors attended post-exercise critiques in the TSC and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. | ||
-exercise critiques in the TSC and EOF to evaluate the | |||
-assessment of its exercise performance. The inspectors later met with the | |||
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05. | |||
b. | |||
No findings were identified. | |||
Findings 1EP5 Correction of Emergency Preparedness Weaknesses | Findings 1EP5 Correction of Emergency Preparedness Weaknesses | ||
===.1 === | ===.1=== | ||
{{IP sample|IP=IP 71114.05}} | {{IP sample|IP=IP 71114.05}} | ||
a | a. | ||
Inspection Scope b. No findings were identified. | Correction of Emergency Preparedness Weaknesses The inspectors reviewed an emergency preparedness related corrective action program item, IR 01031751, concerning a Nuclear Oversight Identified issue for inadequate compensatory measure for degraded public address system equipment, to determine whether the evaluation and corrective actions were timely and effective. Documents reviewed are listed in the Attachment to this report. | ||
Inspection Scope b. | |||
No findings were identified. | |||
Findings | Findings | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone: Emergency Preparedness=== | |||
{{a|4OA1}} | |||
==4OA1 Performance Indicator (PI) Verification== | |||
===.1=== | |||
{{IP sample|IP=IP 71151}} | |||
a. | |||
Drill/Exercise Performance The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report. | |||
Inspection Scope This inspection constituted one drill/exercise performance sample as defined in IP 71151-05. | |||
b. | |||
No findings were identified. | |||
== | |||
Findings | |||
===.2 a.=== | |||
Emergency Response Organization Drill Participation The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. | |||
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2010 drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. | |||
Inspection Scope This inspection constituted one drill | Inspection Scope This inspection constituted one ERO drill participation sample as defined in IP 71151-05. | ||
b. | |||
No findings were identified. | |||
Findings | |||
===.3 a. Alert and Notification System | ===.3 a.=== | ||
Alert and Notification System The inspectors sampled licensee submittals for the Alert and Notification System (ANS) | |||
PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. | |||
Documents reviewed are listed in the Attachment to this report. | |||
Inspection Scope This inspection constituted one alert and notification system sample as defined in IP 71151-05 | Inspection Scope This inspection constituted one alert and notification system sample as defined in IP 71151-05. | ||
b. | |||
No findings were identified. | |||
Findings 4OA6 | |||
===. | ===.1 Management Meetings=== | ||
On March 25, 2011, the inspectors presented the biennial exercise inspection results to Mr. S. Marik and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. | |||
hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Grundy County Building in Morris, Illinois. | ===Exit Meeting Summary=== | ||
===.2 On March 25, 2011, the inspector summarized the NRC's preliminary exercise=== | |||
inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Grundy County Building in Morris, Illinois. | |||
Public and Media Briefing ATTACHMENT: | Public and Media Briefing ATTACHMENT: | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | |||
: [[contact::S. Marik]], Station Plant Manager | : [[contact::S. Marik]], Station Plant Manager | ||
Licensee | Licensee | ||
: [[contact::J. Barowski]], Security | : [[contact::J. Barowski]], Security Supervisor | ||
Supervisor | : [[contact::A. Daniels]], Corporate Emergency Preparedness Manager | ||
: [[contact::A. Daniels]], Corporate Emergency Preparedness Manager | : [[contact::D. Doggett]], Emergency Preparedness Coordinator | ||
: [[contact::D. Doggett]], Emergency Preparedness Coordinator | : [[contact::P. Dohm]], Corporate Emergency Preparedness Coordinator | ||
: [[contact::P. Dohm]], Corporate Emergency Preparedness Coordinator | |||
: [[contact::G. Graff]], Nuclear Oversight Manager | : [[contact::G. Graff]], Nuclear Oversight Manager | ||
: [[contact::L. Jordan]], Training Director | : [[contact::L. Jordan]], Training Director | ||
: [[contact::B. Kapellas]], Work Control Manager | : [[contact::B. Kapellas]], Work Control Manager | ||
: [[contact::D. Leggett]], Regulatory Assurance | : [[contact::D. Leggett]], Regulatory Assurance Manager | ||
Manager | : [[contact::P. Mankoo]], Chemistry Supervisor | ||
: [[contact::P. Mankoo]], Chemistry Supervisor | : [[contact::M. McDonald]], Acting Maintenance Director | ||
: [[contact::M. McDonald]], Acting Maintenance Director | : [[contact::M. Overstreet]], Lead Radiation Protection Supervisor | ||
: [[contact::M. Overstreet]], Lead Radiation Protection Supervisor | : [[contact::P. Quealy]], Emergency Preparedness Manager | ||
: [[contact::P. Quealy]], Emergency Preparedness Manager | : [[contact::R. Ruffin]], Regulatory Assurance | ||
: [[contact::R. Ruffin]], Regulatory Assurance | : [[contact::F. Sadnick]], Nuclear Oversight Assessor | ||
: [[contact::F. Sadnick]], Nuclear Oversight | : [[contact::P. Wojtkiewicz]], Operations Services Manager | ||
Assessor | |||
: [[contact::P. Wojtkiewicz]], Operations | |||
Services Manager | |||
: [[contact::C. Phillips]], Senior Resident Inspector | : [[contact::C. Phillips]], Senior Resident Inspector | ||
Nuclear Regulatory Commission | Nuclear Regulatory Commission | ||
==LIST OF ITEMS== | |||
LIST OF | ===OPENED, CLOSED AND DISCUSSED=== | ||
None Opened, Closed and | |||
===Discussed=== | |||
==LIST OF DOCUMENTS REVIEWED== | |||
LIST OF | |||
}} | }} | ||
Latest revision as of 07:03, 13 January 2025
| ML11110A226 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/18/2011 |
| From: | Hironori Peterson Operations Branch III |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-11-502 | |
| Download: ML11110A226 (14) | |
Text
April 18, 2011
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000237/2011502(DRS); 05000249/2011502(DRS)
Dear Mr. Pacilio:
On March 25, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the inspection findings, which were discussed on March 25, 2011, with Mr. S. Marik, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, there were no findings of significance identified during this inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25
Enclosure:
Inspection Report 05000237/2011502(DRS);
w/Attachment: Supplemental Information
DISTRIBUTION See next page
Letter to Michael from Hironori Peterson dated April 18, 2011.
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000237/2011502(DRS); 05000249/2011502(DRS)
REGION III==
Docket Nos:
50-237; 50-249 License Nos:
05000237/2011502(DRS); 05000249/2011502(DRS)
Licensee:
Exelon Generation Company Facility:
Dresden Nuclear Power Station, Units 2 and 3 Location:
Morris, IL Dates:
March 21 through 25, 2011 Inspectors:
Robert Jickling, Senior Emergency Preparedness Inspector
Bruce Palagi, Senior Reactor Operations Inspector
Daneira Meléndez-Colón, Resident Inspector Approved by:
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Enclosure
SUMMARY OF FINDINGS
IR 05000237/2011502, 05000249/2011502; 03/21/2011 - 03/25/2011; Dresden Nuclear Power
Station, Units 2 & 3; Baseline Emergency Preparedness Biennial Exercise Inspection.
This report covers a one week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649,
Reactor Oversight Process, Revision 4, dated December 2006.
A.
Cornerstone: Emergency Preparedness
NRC-Identified
and Self-Revealed Findings
No findings were identified.
B.
No violations were identified.
Licensee-Identified Violations
1.
REACTOR SAFETY
REPORT DETAILS
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
.1
a.
Exercise Evaluation The inspectors reviewed the March 23, 2011, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2009, 2010, and 2011, to verify that those drills scenarios were sufficiently different from the scenario used in the March 23, 2011, exercise.
Inspection Scope The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator (CRS);
- Technical Support Center (TSC); and
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
The inspectors attended post-exercise critiques in the TSC and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
b.
No findings were identified.
Findings 1EP5 Correction of Emergency Preparedness Weaknesses
.1
a.
Correction of Emergency Preparedness Weaknesses The inspectors reviewed an emergency preparedness related corrective action program item, IR 01031751, concerning a Nuclear Oversight Identified issue for inadequate compensatory measure for degraded public address system equipment, to determine whether the evaluation and corrective actions were timely and effective. Documents reviewed are listed in the Attachment to this report.
Inspection Scope b.
No findings were identified.
Findings
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator (PI) Verification
.1
a.
Drill/Exercise Performance The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report.
Inspection Scope This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.
b.
No findings were identified.
Findings
.2 a.
Emergency Response Organization Drill Participation The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2010 drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report.
Inspection Scope This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
b.
No findings were identified.
Findings
.3 a.
Alert and Notification System The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the first quarter 2010 through fourth quarter 2010. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
Inspection Scope This inspection constituted one alert and notification system sample as defined in IP 71151-05.
b.
No findings were identified.
Findings 4OA6
.1 Management Meetings
On March 25, 2011, the inspectors presented the biennial exercise inspection results to Mr. S. Marik and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
Exit Meeting Summary
.2 On March 25, 2011, the inspector summarized the NRC's preliminary exercise
inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Grundy County Building in Morris, Illinois.
Public and Media Briefing ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
- S. Marik, Station Plant Manager
Licensee
- J. Barowski, Security Supervisor
- A. Daniels, Corporate Emergency Preparedness Manager
- D. Doggett, Emergency Preparedness Coordinator
- P. Dohm, Corporate Emergency Preparedness Coordinator
- G. Graff, Nuclear Oversight Manager
- L. Jordan, Training Director
- B. Kapellas, Work Control Manager
- D. Leggett, Regulatory Assurance Manager
- P. Mankoo, Chemistry Supervisor
- M. McDonald, Acting Maintenance Director
- M. Overstreet, Lead Radiation Protection Supervisor
- P. Quealy, Emergency Preparedness Manager
- R. Ruffin, Regulatory Assurance
- F. Sadnick, Nuclear Oversight Assessor
- P. Wojtkiewicz, Operations Services Manager
- C. Phillips, Senior Resident Inspector
Nuclear Regulatory Commission
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSED
None Opened, Closed and