IR 05000313/2013404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON uly 15, 2013
{{#Wiki_filter:July 15, 2013


==SUBJECT:==
==SUBJECT:==
Line 36: Line 36:
This finding was determined to involve a violation of NRC Requirements.
This finding was determined to involve a violation of NRC Requirements.


If you contest the violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Arkansas Nuclear One facility. One cross-cutting aspect was assigned to the finding in the areas of Problem Identification and Resolution - Corrective Action Program, P.1(c). If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One, Units 1 and 2.
If you contest the violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Arkansas Nuclear One facility.
 
UNITED STATES NUCLEAR REGULATORY COMMI SSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 One cross-cutting aspect was assigned to the finding in the areas of Problem Identification and Resolution - Corrective Action Program, P.1(c). If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One, Units 1 and 2.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Line 45: Line 47:


Sincerely,
Sincerely,
/RA/ Paul J. Elkmann for Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Dockets: 50-313, 50-368 Licenses: DPR-51, NPF-6 Nonpublic Enclosure:
/RA/ Paul J. Elkmann for  
NRC Inspection Report 05000313/2013404, 05000368/2013404 w/Attachment: Supplemental Information cc w/enclosure:
 
Mark S. Haire, Chief  
 
Plant Support Branch 1  
 
Division of Reactor Safety  
 
Dockets: 50-313, 50-368 Licenses: DPR-51, NPF-6  
 
Nonpublic Enclosure:
NRC Inspection Report 05000313/2013404, 05000368/2013404 w/Attachment: Supplemental Information  
 
cc w/enclosure:
Mr. Joshua Toben Manager, Security Entergy Operations, Inc.
Mr. Joshua Toben Manager, Security Entergy Operations, Inc.


1448 S.R. 333 Russellville, AR 72802 cc w/o enclosure:
1448 S.R. 333 Russellville, AR 72802  
Electronic Distribution for Arkansas Nuclear One, Units 1 and 2 ML13197A452 Cover Letter Only Non Sensitive Publicly Available SUNSI Review DAH Sensitive DAH Non-Publicly Available KEYWORD: SUNSI Review Complete Entire Report  Non Sensitive Publicly Available SUNSI Review DAH Sensitive DAH Non-Publicly Available KEYWORD: MD 3.4 Non-Public A.3 PSI:PSB1 SPSI:PSB1 C:PSB1 C:PBE C:PSB1 DHolman JLarsen MHaire DAllen MHaire
 
/RA/ /RA/ /RA/ /RA/ r /RA/ PJE for 7/2/13 7/15/13 7/8/13 7/9/13 7/15/13
cc w/o enclosure:
Electronic Distribution for Arkansas Nuclear One, Units 1 and 2
}}
}}

Latest revision as of 06:50, 11 January 2025

NRC Security Inspection Report 05000313-13-404 and 05000368-13-404. Cover Letter
ML13197A452
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/15/2013
From: Mark Haire
Plant Support Branch-1
To: Jeremy G. Browning
Entergy Operations
References
IR-13-404
Download: ML13197A452 (3)


Text

July 15, 2013

SUBJECT:

ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2013404 AND 05000368/2013404

Dear Mr. Browning:

On July 2, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of Arkansas Nuclear One, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 2, 2013, with Mr. A. James, Senior Manager, Security, and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One NRC-identified violation of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process) was identified during this inspection.

The deficiency was promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the area.

This finding was determined to involve a violation of NRC Requirements.

If you contest the violation or the significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Arkansas Nuclear One facility.

UNITED STATES NUCLEAR REGULATORY COMMI SSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 One cross-cutting aspect was assigned to the finding in the areas of Problem Identification and Resolution - Corrective Action Program, P.1(c). If you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, Region IV; and the NRC Resident Inspector at Arkansas Nuclear One, Units 1 and 2.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agency wide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/ Paul J. Elkmann for

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Dockets: 50-313, 50-368 Licenses: DPR-51, NPF-6

Nonpublic Enclosure:

NRC Inspection Report 05000313/2013404, 05000368/2013404 w/Attachment: Supplemental Information

cc w/enclosure:

Mr. Joshua Toben Manager, Security Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

cc w/o enclosure:

Electronic Distribution for Arkansas Nuclear One, Units 1 and 2