ML14356A583: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14356A583
| number = ML14356A583
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = Salem - NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| title = NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
| author name = Silk D
| author name = Silk D
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
Line 20: Line 20:
=Text=
=Text=
{{#Wiki_filter:Salem Op Test Comments Job Performance Measures:
{{#Wiki_filter:Salem Op Test Comments Job Performance Measures:
Sima: Update cover page-this is not an alternate path JPM. Sim b: No comment. Sim c: Change to put 21 charging pump in service instead of PDP for set up. Sim d: No comment. Sim e: JPM step 12 is not critical.
Sima: Update cover page-this is not an alternate path JPM.
Remove T-hot from initial conditions.
Sim b: No comment.
Add cue to elicit C/D rate and observe applicant response to adjust C/D rate. Sim f: Update cover page-this is not an alternate path JPM. Sim g: Modify simulator set up regarding procedure IOP-3. Sim h: No comment. IP i: At JPM step 5.9.4 clarify droop switch position.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
IP j: Clarify how to remove key from lock. IP k: At step 5.5.4 specify what is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves. RO Admin A 1-1: Conduct in classroom instead of simulator.
Sim d: No comment.
Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes. RO Admin A 1-2: No comment. RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points. RO Admin A4: Add set up info for simulator operator.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions.
Sim f: Update cover page-this is not an alternate path JPM.
Add trend data to support conservative decision on application of table. SRO Admin A 1-2: No comment. SRO Admin A2: Provide optional tagging point in JPM step 2. SRO Admin A3: No comment. SRO Admin A4: No comment.
Sim g: Modify simulator set up regarding procedure IOP-3.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan. ESG-2: Correct 21 B vs 23 BOOS in initial conditions.
Sim h: No comment.
Explain Note on Form ES-D-1 about CTs in parentheses.
IP i: At JPM step 5.9.4 clarify droop switch position.
Make this the spare. ESG-3: No comment. ESG-4: Add TS to event 4. ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.  
 
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.
ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.  
 
Salem Op Test Comments Job Performance Measures:
Salem Op Test Comments Job Performance Measures:
Sima: Update cover page-this is not an alternate path JPM. Sim b: No comment. Sim c: Change to put 21 charging pump in service instead of PDP for set up. Sim d: No comment. Sim e: JPM step 12 is not critical.
Sima: Update cover page-this is not an alternate path JPM.
Remove T-hot from initial conditions.
Sim b: No comment.
Add cue to elicit C/D rate and observe applicant response to adjust C/D rate. Sim f: Update cover page-this is not an alternate path JPM. Sim g: Modify simulator set up regarding procedure IOP-3. Sim h: No comment. IP i: At JPM step 5.9.4 clarify droop switch position.
Sim c: Change to put 21 charging pump in service instead of PDP for set up.
IP j: Clarify how to remove key from lock. IP k: At step 5.5.4 specify what is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves. RO Admin A 1-1: Conduct in classroom instead of simulator.
Sim d: No comment.
Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes. RO Admin A 1-2: No comment. RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points. RO Admin A4: Add set up info for simulator operator.
Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions.
Sim f: Update cover page-this is not an alternate path JPM.
Add trend data to support conservative decision on application of table. SRO Admin A 1-2: No comment. SRO Admin A2: Provide optional tagging point in JPM step 2. SRO Admin A3: No comment. SRO Admin A4: No comment.
Sim g: Modify simulator set up regarding procedure IOP-3.
Scenarios ESG-1: Modify the expected dilution for the reactivity plan. ESG-2: Correct 21 B vs 23 BOOS in initial conditions.
Sim h: No comment.
Explain Note on Form ES-D-1 about CTs in parentheses.
IP i: At JPM step 5.9.4 clarify droop switch position.
Make this the spare. ESG-3: No comment. ESG-4: Add TS to event 4. ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.}}
IP j: Clarify how to remove key from lock.
IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.
RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.
RO Admin A 1-2: No comment.
RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.
RO Admin A4: Add set up info for simulator operator.
SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.
SRO Admin A 1-2: No comment.
SRO Admin A2: Provide optional tagging point in JPM step 2.
SRO Admin A3: No comment.
SRO Admin A4: No comment.  
 
Scenarios ESG-1: Modify the expected dilution for the reactivity plan.
ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.
ESG-3: No comment.
ESG-4: Add TS to event 4.
ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.}}

Latest revision as of 15:18, 10 January 2025

NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2)
ML14356A583
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/24/2014
From: David Silk
Operations Branch I
To:
Public Service Enterprise Group
Shared Package
ML14174B408 List:
References
TAC U01894
Download: ML14356A583 (2)


Text

Salem Op Test Comments Job Performance Measures:

Sima: Update cover page-this is not an alternate path JPM.

Sim b: No comment.

Sim c: Change to put 21 charging pump in service instead of PDP for set up.

Sim d: No comment.

Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.

Sim f: Update cover page-this is not an alternate path JPM.

Sim g: Modify simulator set up regarding procedure IOP-3.

Sim h: No comment.

IP i: At JPM step 5.9.4 clarify droop switch position.

IP j: Clarify how to remove key from lock.

IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.

RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.

RO Admin A 1-2: No comment.

RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.

RO Admin A4: Add set up info for simulator operator.

SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.

SRO Admin A 1-2: No comment.

SRO Admin A2: Provide optional tagging point in JPM step 2.

SRO Admin A3: No comment.

SRO Admin A4: No comment.

Scenarios ESG-1: Modify the expected dilution for the reactivity plan.

ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.

ESG-3: No comment.

ESG-4: Add TS to event 4.

ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.

Salem Op Test Comments Job Performance Measures:

Sima: Update cover page-this is not an alternate path JPM.

Sim b: No comment.

Sim c: Change to put 21 charging pump in service instead of PDP for set up.

Sim d: No comment.

Sim e: JPM step 12 is not critical. Remove T-hot from initial conditions. Add cue to elicit C/D rate and observe applicant response to adjust C/D rate.

Sim f: Update cover page-this is not an alternate path JPM.

Sim g: Modify simulator set up regarding procedure IOP-3.

Sim h: No comment.

IP i: At JPM step 5.9.4 clarify droop switch position.

IP j: Clarify how to remove key from lock.

IP k: At step 5.5.4 specify what ~1auge is being used. At steps 5.5.5 & 5.5.6 specify the location of the valves.

RO Admin A 1-1: Conduct in classroom instead of simulator. Clarify cues to focus applicant actions. Correct number of minutes (1 010 vs 1000) or start time to equal 1000 minutes.

RO Admin A 1-2: No comment.

RO Admin A2: Delete last line of initiating cue. Enhance answer key due to possible multiple isolation points.

RO Admin A4: Add set up info for simulator operator.

SRO Admin A1-1: Fix cue sheet to match cover page initial conditions. Add trend data to support conservative decision on application of table.

SRO Admin A 1-2: No comment.

SRO Admin A2: Provide optional tagging point in JPM step 2.

SRO Admin A3: No comment.

SRO Admin A4: No comment.

Scenarios ESG-1: Modify the expected dilution for the reactivity plan.

ESG-2: Correct 21 B vs 23 BOOS in initial conditions. Explain Note on Form ES-D-1 about CTs in parentheses. Make this the spare.

ESG-3: No comment.

ESG-4: Add TS to event 4.

ESG-5: Replace event 7 (LOOP) with RCP 'C' tripping.