ML16200A085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML16200A085
| number = ML16200A085
| issue date = 06/27/2016
| issue date = 06/27/2016
| title = Boiling Water Reactor License Termination Plan - Chapter 1 - General Information, Rev 0
| title = License Termination Plan - Chapter 1 - General Information, Rev 0
| author name =  
| author name =  
| author affiliation = LaCrosseSolutions, LLC
| author affiliation = LaCrosseSolutions, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION
{{#Wiki_filter:LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION  


La Crossse Boiling Water W          Reactorr License Termination T             Plan Revisionn0 TABLE OF      O CONTE            ENTS
La Cross License T Revision 1.
: 1. Genneral Informaation .................................................................................................................. 1-1 1.1. Purpose ............................................................................................................................... 1-1 1.2. Decommisssioning Objeective .............................................................................................. 1-1 1.3. Facility ................................................................................................................................ 1-2 1.3.1. Site Deescription ........................................................................................................... 1-2 1.3.2. Currentt/Future Lan          nd Use ............................................................................................ 1-3 1.3.3. Meteorrology and ClimatologyC                    ....................
Gen 1.1.
                                                              .                  ............................................................... 1-3 1.3.4
1.2.
: 4. Geolog    gy and Seism      mology ............................................................................................ 1-3 1.3.5. Surfacee Water Hyd          drology ........................................................................................... 1-4 1.3.6. Ground    d Water Hyd        drology ........................................................................................... 1-5 1.3.7. Environ    ns and Naturral Resourcees ................................................................................ 1-5 1.4. Operationall Background          d .................................................................................................... 1-6 1.5. Plan Summary .................................................................................................................... 1-7 1.5.1. Generaal Informatio          on .................................................................................................... 1-7 1.5.2. Site Ch  haracterizatio      on ................................................................................................... 1-7 1.5.3. Identifiication of Reemaining Sitte Dismantleement Activiities .................................... 1-8
1.3.
: 4. Remed 1.5.4          diation Plans ...................................................................................................... 1-8 1.5.5. Final Radiation R                Surrvey Plan ....................................................................................... 1-9 1.5.6. Compliiance with th          he Radiologiical Criteria for License Terminationn ..................... 1-9 1.5.7. Updatee of the Site-Specific Deccommissionning Costs ............................................... 1-9 1.5.8. Supplem    ment to the Environmen E                ntal Report .................................................................. 1-9 1.6. Regulatory Notification          ns of Changees .............................................................................. 1-10 1.7. References ........................................................................................................................ 1-11 LIST OF  O FIGURE          RES Figure 1--1  Site Reegional Locaation .............................................................................................. 1-13 Figure 1--2  Site Ov verview............................................................................................................ 1-14 Figure 1--3  LACBW    WR Building        gs ................................................................................................. 1-15 Figure 1--4  Topogrraphical Map          p ................................................................................................... 1-16 1-i
1.3.
1.3.
1.3.
1.3.4 1.3.
1.3.
1.3.
1.4.
1.5.
1.5.
1.5.
1.5.
1.5.4 1.5.
1.5.
1.5.
1.5.
1.6.
1.7.
Figure 1-Figure 1-Figure 1-Figure 1-se Boiling W Termination n 0 neral Informa Purpose.....
Decommiss Facility......
1.
Site De 2.
Current 3.
Meteor 4.
Geolog 5.
Surface 6.
Ground 7.
Environ Operational Plan Summ 1.
Genera 2.
Site Ch 3.
Identifi 4.
Remed 5.
Final R 6.
Compli 7.
Update 8.
Supplem Regulatory References
-1 Site Re
-2 Site Ov
-3 LACBW
-4 Topogr Water Reactor Plan ation...........
sioning Obje escription....
t/Future Lan rology and C gy and Seism e Water Hyd d Water Hyd ns and Natur l Background ary.............
al Informatio haracterizatio ication of Re diation Plans Radiation Sur iance with th e of the Site-ment to the E Notification egional Loca verview.......
WR Building raphical Map r
TABLE O ective...........
nd Use.........
Climatology.
mology.........
drology........
drology........
ral Resource d.................
on.................
on................
emaining Sit rvey Plan....
he Radiologi Specific Dec Environmen ns of Change LIST O ation.............
gs................
p..................
1-i OF CONTE es.................
te Dismantle ical Criteria commission ntal Report...
es.................
OF FIGURE ENTS ement Activi for License ning Costs....
RES ities.............
Termination n..................
... 1-1
... 1-1
... 1-1
... 1-2
... 1-2
... 1-3
... 1-3
... 1-3
... 1-4
... 1-5
... 1-5
... 1-6
... 1-7
... 1-7
... 1-7
... 1-8
... 1-8
... 1-9
... 1-9
... 1-9
... 1-9
. 1-10
. 1-11
. 1-13
. 1-14
. 1-15
. 1-16


La Crossse Boiling Water W     Reactorr License Termination T            Plan Revision n0 LIST OF ACRONYM      MS AND AB    BBREVIAT  TIONS ALARA          As Loow As Reaso onably Achieevable AMCG          Averaage Member of the Criticcal Group AMSL          Abovee Mean Sea Level BGS            Beloww Ground Su urface DCGL          Derived Concentrration Guideline Level DQO            Data Quality Q      Objeectives DSAR          Defueeled Safety Analysis A         Repport FSS            Final Status Surveey FRS            Final Radiation Suurvey GWH            Gigawwatt-Hours ISFSI          Independent Spen nt Fuel Storaage Installatioon LACBW WR      La Crrosse Boiling g Water Reacctor LSA            Low Specific S        Activity LTP            License Terminatiion Plan MARSSIIM      Multi--Agency Rad diation Survvey and Site Investigation Manual MYBP          Millio on Years Beffore Present NRC            Nucleear Regulatorry Commission ODCM          Off-Site Dose Callculation Maanual PSDAR          Post-S Shutdown Decommissioning Activitties Report RESRAD  D     RESiddual RADioaactive Materrials STS            Source Term Surv vey USACE          US Arrmy Corp off Engineers 1-ii
La Cross License T Revision ALARA AMCG AMSL BGS DCGL DQO DSAR FSS FRS GWH ISFSI LACBW LSA LTP MARSSI MYBP NRC ODCM PSDAR RESRAD STS USACE se Boiling W Termination n 0 As Lo Avera Above Below Deriv Data Q Defue Final Final Gigaw Indep WR La Cr Low S Licen IM Multi-Millio Nucle Off-S Post-S D
RESid Sourc US Ar Water Reactor Plan LIST OF ow As Reaso age Member e Mean Sea w Ground Su ed Concentr Quality Obje eled Safety A Status Surve Radiation Su watt-Hours endent Spen rosse Boiling Specific Act se Terminati
-Agency Rad on Years Bef ear Regulator ite Dose Cal Shutdown D dual RADioa e Term Surv rmy Corp of r
ACRONYM onably Achie of the Critic Level urface ration Guide ectives Analysis Rep ey urvey nt Fuel Stora g Water Reac ivity ion Plan diation Surv fore Present ry Commiss lculation Ma ecommissio active Mater vey f Engineers 1-ii MS AND AB evable cal Group line Level port age Installatio ctor vey and Site ion anual ning Activit rials BBREVIAT on Investigatio ties Report TIONS n Manual


La Crossse Boiling Water W      Reactorr License Termination T             Plan Revision n0
La Cross License T Revision
: 1.       General G         In nformation    n The La Crosse C       Boiliing Water Reactor R        (LAC CBWR) waas a 50 Meggawatt Electrric (MWe) B          BWR that is ow wned by Dairryland Poweer Cooperative (Dairylannd). This unnit, also know      wn as Genoaa 2, is located ono the Dairy yland Genoaa site on th he east shoree of the Miississippi Riiver south oof the Village of o Genoa, Veernon Countty, Wisconsin    n with an adddress of:
: 1.
LACBW  WR S4601 Sttate Road 35 5 Genoa, WI.
G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.
W 54632-88   846 The site is i licensed under u     Possesssion Only License L        No. DDPR-45 withh Docket Nuumbers of 500-409 for LACB  BWR and 72  2-046 for thee Independen  nt Spent Fueel Storage Innstallation (ISFSI).
In a lett requested maintena from Dai Solutions 1.1.
LACBW  WR has been shut down since 1987 and is curreently underggoing decom          mmissioning. The spent nucclear fuel stored in the LACBWR L           ISFSI I      will bbe maintaineed under an amended Paart 50 license.
P The obje permit th 50 licens general li This Lice was writt for Licen Review P accompa the LTP r 1.2.
In a lettter dated October O          8, 2015 2      (1), Dairyland D           annd LaCrosseeSolutions, LLC (Soluttions) requested d Nuclear Regulatory R             Commission C              (NRC) connsent to trannsfer Dairylaands possesssion, maintenaance and deecommission    ning authoritties, under Possession Only Licennse No. DPR          R-45, from Daiiryland to So  olutions. Inn May 2016, the NRC prrovided conssent to transsfer the licennse to Solutionss.
D The deco LACBW remainin the requi documen that is d Average se Boiling W Termination n 0 General In Crosse Boili wned by Dair on the Dairy of Genoa, Ve WR tate Road 35 WI. 54632-88 is licensed u BWR and 72 WR has been clear fuel st ter dated O d Nuclear R ance and de iryland to So
1.1. Purpose P
: s.
The objective of deco  ommissionin  ng LACBWR    R is to reducce the residuual radioactivvity to levels that permit thhe release of the site for unrestricted u            use and alloow for the terrmination off the 10 CFR R Part 50 licensse except for the area su  urrounding the t ISFSI. The ISFSI ffacility is licensed undeer the general liicense proviisions of 10 CFR C 72 Sub  bpart K.
Purpose ctive of deco he release of se except fo icense provi ense Termin ten followin nse Termina Plan for Eva anied by a pr require NRC Decommissio ommissionin WR can subm ng ISFSI lice irements of nts the proce distinguishab Member of Water Reactor Plan nformation ing Water R ryland Powe yland Genoa ernon Count 5
This Liceense Termin nation Plan (L LTP) satisfiees the requirrement of 100 CFR 50.822(a)(9). Thiss LTP was writtten followin ng the guidan nce in Regu ulatory Guidde 1.179, Staandard Form  mat and Conntents for Licennse Termination Plans for fo Nuclear Power P      Reacctors (2) andd in NUREG  G-1700, Stanndard Review Plan P    for Evaluating Nucllear Power Reactor R        Liceense Terminnation Plans (3). This L   LTP is accompaanied by a prroposed licen  nse amendm ment that est ablishes the criteria for when changges to the LTP require r      NRC C prior appro oval.
846 under Posses 2-046 for the shut down ored in the L October 8, 2 Regulatory C ecommission olutions. In ommissionin the site for u r the area su isions of 10 C nation Plan (L ng the guidan tion Plans fo luating Nucl roposed licen C prior appro oning Objec ng objective mit a request ensed facility 10 CFR 20 ess that will ble from ba the Critical r
1.2. Decommissio D            oning Objecctive The deco  ommissionin ng objectivee is to cond  duct remediiation and ssurvey operrations suchh that LACBW  WR can subm  mit a requestt to the NRC  C for unresttricted releasse of the sitte (other thaan the remainin ng ISFSI liceensed facility y) in accordaance with Suubpart E of 110 CFR Partt 20 after meeeting the requiirements of 10 CFR 20    0.1402, Rad diological Crriteria for U  Unrestrictedd Use. The LTP documen  nts the proceess that will be used to demonstrate d              that the dosse from residdual radioacctivity that is distinguishab d            ble from background raadioactivity does not eexceed 25 m        mrem/year too the Average Member of the Critical Group (AM      MCG) from aall applicablee pathways oover a 1,0000 year 1-1
n Reactor (LAC er Cooperati a site on th ty, Wisconsin ssion Only L e Independen since 1987 LACBWR I 2015 (1), D Commission ning authorit n May 2016, ng LACBWR unrestricted urrounding t CFR 72 Sub LTP) satisfie nce in Regu for Nuclear P lear Power R nse amendm oval.
ctive e is to cond t to the NRC y) in accorda 0.1402, Rad be used to d ckground ra Group (AM 1-1 CBWR) wa ve (Dairylan he east shore n with an ad License No. D nt Spent Fue and is curre ISFSI will b Dairyland an (NRC) con ties, under the NRC pr R is to reduc use and allo the ISFSI.
bpart K.
es the requir ulatory Guid Power Reac Reactor Lice ment that est duct remedi C for unrest ance with Su diological Cr demonstrate adioactivity MCG) from a as a 50 Meg nd). This un e of the Mi ddress of:
DPR-45 with el Storage In ently underg be maintaine nd LaCrosse nsent to tran Possession rovided cons ce the residu ow for the ter The ISFSI f rement of 10 de 1.179, Sta ctors (2) and ense Termin ablishes the iation and s tricted releas ubpart E of 1 riteria for U that the dos does not e all applicable gawatt Electr nit, also know ississippi Ri h Docket Nu nstallation (I going decom ed under an eSolutions, nsfer Dairyla Only Licen sent to trans ual radioactiv rmination of facility is li 0 CFR 50.82 andard Form d in NUREG nation Plans criteria for survey oper se of the sit 10 CFR Part Unrestricted se from resid exceed 25 m e pathways o ric (MWe) B wn as Genoa iver south o umbers of 50 SFSI).
mmissioning amended Pa LLC (Solut ands posses nse No. DPR sfer the licen vity to level f the 10 CFR censed unde 2(a)(9). This mat and Con G-1700, Stan (3). This L when chang rations such te (other tha t 20 after me d Use. The dual radioac mrem/year to over a 1,000 BWR a 2, is of the 0-409
. The art 50 tions)
: ssion, R-45, nse to s that R Part er the s LTP ntents ndard LTP is ges to h that an the eeting LTP ctivity o the 0 year  


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revision n0 period an nd that residuual radioactiivity has beeen reduced too levels that are As Low  w As Reasonnably Achievab ble (ALARA).
La Cross License T Revision period an Achievab 1.3.
1.3. Facility F
F 1.3.1.
1.3.1.       Site Desccription LACBW   WR is located  d in southw western Wiscconsin, in V  Vernon Counnty, on the eeast shore oof the Mississip ppi River, ab bout 1 mile south of thee Village off Genoa, WI and approxximately 19 m        miles south of the city of LaL Crosse, WI.W See Figu    ure 1-1 for a map showinng the site loocation, incluuding nearby prominent p           features f          suchh as highw ways, rivers and lakes. The map coordinatees for LACBW  WR are longittude 91o, 13, 53.35 Weest and latituude 43o, 33,, 36.22 Norrth. The sitee is at mile 678  8.6 on the Mississippi River abov        ve the moutth of the O    Ohio River. The reacttor is approxim mately 300 feet fe from thee Mississippii River and 475 feet weest of the carrgo-carryingg-only rail road. The reacto  or stands on n filled land at an elevattion of 639 feet Above Mean Sea L      Level (AMSL) per NUREG-0191, En           nvironmentall Statement related to Operation oof the La C        Crosse Boiling Water W      Reacto or (4).
LACBW Mississip south of nearby p LACBW mile 678 approxim rail road (AMSL)
The licen  nsed site co omprises a total of 163    3.5 acres (55) which is owned by Dairyland, with LACBW  WR comprisin    ng only 1.5 acres. The site is acceessed by a rroad on the south side oof the plant, offf of Highwaay 35. The prominent p           feeatures on thhe site are shhown in Figgures 1-2 annd 1-3 and incluude:
Boiling W The licen LACBW plant, off and inclu the the coa an a (Ge an a a pa The site i Mississip miles up The site i
the LACBWR plant, p the land north ofo LACBWR     R, including the site swittchyard and the site of thhe former G--1 coaal (and later oil) o fueled power p       plant (removed
: 35. A B commerc this rail National LACBW and sturg LACBW se Boiling W Termination n 0 nd that residu ble (ALAR Facility Site Desc WR is located ppi River, ab the city of L prominent f WR are longit 8.6 on the mately 300 fe
(          in 1989),
. The reacto per NURE Water Reacto nsed site co WR comprisin f of Highwa ude:
an area a directly  y south of LA ACBWR witth an operatiional 350-M      Mwe fossil geenerating stattion (Geenoa Station #3) approxiimately 175 feet from thhe LACBWR          R plant, an area a south of Genoa #3 where  w     the ISSFSI is locatted, and a paarcel of land d to the east of o Highway 35, across fr  from LACBW    WR.
LACBWR p land north o al (and later o area directly enoa Station area south o arcel of land is bordered o ppi River an stream, man is bordered o Burlington N cial freight a line. The s Wildlife &
The site isi bordered ono the north h by the Misssissippi Riveer and a narrrow strip of land betweeen the Mississip ppi River an nd Highway 35. The U..S. Lock & D        Dam No. 8 is located aapproximatelly 0.6 miles upstream, man    naged by thee U.S. Army   y Corp of Enngineers (US    SACE), Rocck Island Disstrict.
WR, is the Ge geon. On th WR plant, is a Water Reactor Plan ual radioacti A).
The site isi bordered ono the west by b the Missiissippi Riverr and is borddered on the east by Highhway
cription d in southw bout 1 mile La Crosse, W features such tude 91o, 13 Mississippi feet from the or stands on G-0191, En or (4).
: 35. A Burlington B            Northern-Sant N              ta Fe rail lin ne, located bbetween the site and Higghway 35 caarries commerccial freight along a       the easstern portionn of the site;; there are nno passengerr trains which use this rail line. The site s is bordeered to the south s      by a ssegment of tthe Upper M   Mississippi RRiver National Wildlife & Fish Refug        ge Pool 9 area.
omprises a ng only 1.5 ay 35. The p
a      Furtheer south, appproximatelyy 2.4 miles from LACBW  WR, is the Geenoa Nation    nal Fish Hatcchery whichh raises endaangered musssels, brook trout and sturg geon. On th  he southwesstern corner of the site,, approximaately 0.75 m     miles south oof the LACBW  WR plant, is a public boatt launching ramp r    with a pparking lot.
: plant, of LACBWR oil) fueled p y south of LA
1-2
#3) approxi f Genoa #3 w d to the east o on the north nd Highway naged by the on the west b Northern-Sant along the eas site is borde
& Fish Refug enoa Nation he southwes a public boat r
ivity has bee western Wisc south of the WI. See Figu h as highw
, 53.35 We River abov e Mississippi n filled land nvironmental total of 163 acres. The prominent fe R, including power plant (
ACBWR wit imately 175 where the IS of Highway h by the Miss
: 35. The U.
e U.S. Army by the Missi ta Fe rail lin stern portion ered to the s ge Pool 9 a nal Fish Hatc stern corner t launching r 1-2 en reduced to consin, in V e Village of ure 1-1 for a ways, rivers est and latitu ve the mout i River and at an elevat l Statement 3.5 acres (5 site is acce eatures on th the site swit (removed in th an operati feet from th SFSI is locat 35, across fr sissippi Rive
.S. Lock & D y Corp of En issippi River ne, located b n of the site; south by a s area. Furthe chery which of the site, ramp with a p o levels that Vernon Coun f Genoa, WI map showin and lakes.
ude 43o, 33, th of the O 475 feet we tion of 639 related to
: 5) which is essed by a r he site are sh tchyard and 1989),
ional 350-M he LACBWR ted, and from LACBW er and a narr Dam No. 8 ngineers (US r and is bord between the
; there are n segment of t er south, ap h raises enda
, approxima parking lot.
are As Low nty, on the e and approx ng the site lo The map
, 36.22 Nor Ohio River.
est of the car feet Above Operation o owned by road on the hown in Fig the site of th Mwe fossil ge R plant, WR.
row strip of is located a SACE), Roc dered on the site and Hig no passenger the Upper M pproximately angered mus ately 0.75 m w As Reason east shore o ximately 19 m ocation, inclu coordinate rth. The site The react rgo-carrying Mean Sea L of the La C Dairyland, south side o gures 1-2 an he former G-enerating stat land betwee approximatel ck Island Dis east by High ghway 35 ca r trains whic Mississippi R y 2.4 miles ssels, brook miles south o nably of the miles uding es for e is at tor is g-only Level Crosse with of the nd 1-3
-1 tion en the ly 0.6 strict.
hway arries h use River from trout of the


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revisionn0 1.3.2.     Current/Future Lan    nd Use The site has been co ontinuously used u      for indu ustrial purpooses since 1941. Due too the presennce of the Geno oa 3 facility and supporting operatio  ons (e.g. bargge washing, switchyard)) on the propperty, the preseence of the ash a landfills, as well as the on-site ISFSI, it is anticipated that the sitee will continue as an indusstrial-use pro   operty after decommisssioning is coompleted. N      No other creedible future lan nd use, otherr than perhap ps recreationnal, can be eenvisioned oover the nextt several deccades.
La Cross License T Revision 1.3.2.
The speent nuclear fuel is expeected to rem      main at the ISFSI until a federal reepository, ooffsite interim storage faccility, or liicensed tem      mporary moonitored retrrievable stoorage facilitty is established and ready y to receive LACBWR L           fuel.
The site the Geno the prese continue future lan The spe interim establish 1.3.3.
f 1.3.3.      Meteorollogy and Cliimatology The La Crosse C        Municipal Airporrt located in the town off La Crosse aand the USA      ACE Lock 8 Dam in Genoaa maintain long standin      ng active weather w        statiions that m monitor and archive stanndard weather related r     inforrmation in thhe La Crossee - Genoa reegion of the Mississippi River. Colllected data incluudes: wind speed s      and dirrection, tempperature, andd precipitation (6) (7).
The La C in Genoa weather r data inclu Tempera the extre Average summer and 1995 Monthly spring an The bluff shows pr winds fo LACBW average w 1.3.4.
Temperaatures in the La Crosse regionr      are ty ypical of thee extremes oof a continental climatee with the extreemes being more markeed because of the riverr valley locaation of the LACBWR Site.
LACBW physiogr Pleistoce early Pal which ha area. Ma Bedrock Wisconsi Present composit dolomite both side se Boiling W Termination n 0 Current/
Average temperaturees range from    m 20 °F in th he three moonths of the w  winter seasoon to 72 °F iin the summer season. A recordr        maximum tempeerature of 1008 °F was reecorded in JJuly of both 1936 and 1995 5. The recorrd low was -4  43 °F in Janu uary of 18733.
has been co oa 3 facility ence of the a as an indus nd use, other ent nuclear storage fac ed and ready Meteorol Crosse Muni a maintain related infor udes: wind s atures in the emes being temperature season. A r
Monthly precipitatio  on averages in the area ranges from      m three to ffive inches pper month iin the spring annd summer seasons and one o to three inches per m    month for thee rest of the year.
: 5. The recor precipitatio nd summer s ffs of the Mis revailing sou or the month WR Site wher wind speeds Geology WR is locat aphic provi ene Epoch a leozoic age.
The bluff ffs of the Misssissippi Rivver Valley ch hannel the wwinds at the LLACBWR S    Site. Airportt data shows prrevailing sou utherly winds for seven months m       of thhe year with prevailing nnorth to northhwest winds fo or the month  hs of November throug     gh March oof the year. Predominaant winds aat the LACBW  WR Site wherre the river valley runs north-south are from thhe north andd south. Moonthly average wind w    speeds are typically  y 6-10 mph.
as been mod aximum relie in the site r in Dome by
1.3.4.     Geology and Seismo    ology LACBW  WR is locatted within the Wisco          onsin Driftlless sectionn of the C      Central Low wland physiographic proviince. The Wisconsin Driftless section wass not glaciiated duringg the Pleistoceene Epoch anda is characcterized by flat lying nnaturally disssected sedim      mentary rocks of early Palleozoic age. Moderate to    t strong rellief has beenn produced oon the unglaaciated landsscape which haas been mod  dified by a mantle m        of lo oess and glaccial outwashh in the largger valleys oof the area. Maaximum relieef in the regiion is about 1,000 feet.
[MYBP]) s tion. The P s, sandstone es of the Mi Water Reactor Plan Future Lan ontinuously u and support ash landfills strial-use pro r than perhap fuel is expe cility, or li y to receive L logy and Cli cipal Airpor long standin rmation in th speed and dir La Crosse r more marke es range from record maxi rd low was -4 on averages easons and o ssissippi Riv utherly wind hs of Nove re the river are typically and Seismo ted within ince. The and is charac Moderate t dified by a m ef in the regi region consis y early Pale edimentary Paleozoic roc es and shales ississippi riv r
Bedrock in the site region r       consissts of Pre-Caambrian cryystalline rockks exposed aat the crest oof the Wisconsiin Dome by    y early Paleeozoic (Cam  mbrian and Ordovician,, 572 Millioon Years B      Before Present [MYBP]) sedimentary strata. Baasement roccks in the ssite vicinityy are of graanitic composittion. The Paleozoic P          roccks are 1,200-1,300 feett thick in thhe site viciniity and conssist of dolomites, sandstonees and shaless. About 600    0 feet of thiss sequence iss exposed allong the blufffs on both sidees of the Miississippi riv ver in the pllant vicinityy. Prior to tthe Pleistoceene Epoch ((more 1-3
nd Use used for indu ing operatio
, as well as operty after ps recreation ected to rem icensed tem LACBWR f imatology rt located in ng active w he La Crosse rection, temp region are ty ed because m 20 °F in th mum tempe 43 °F in Janu in the area one to three ver Valley ch s for seven m mber throug valley runs y 6-10 mph.
ology the Wisco Wisconsin cterized by to strong rel mantle of lo ion is about sts of Pre-Ca eozoic (Cam strata. Ba cks are 1,20
: s. About 600 ver in the pl 1-3 ustrial purpo ons (e.g. barg the on-site decommiss nal, can be e main at the mporary mo fuel.
the town of weather stati e - Genoa re perature, and ypical of the of the river he three mo erature of 10 uary of 1873 ranges from inches per m hannel the w months of th gh March o north-south onsin Driftl Driftless flat lying n lief has been oess and glac 1,000 feet.
ambrian cry mbrian and asement roc 0-1,300 feet 0 feet of this lant vicinity oses since 1 ge washing, ISFSI, it is sioning is co envisioned o ISFSI until onitored retr f La Crosse a ions that m egion of the d precipitati e extremes o r valley loca onths of the w 08 °F was re
: 3.
m three to f month for the winds at the L he year with of the year.
are from th less section section was naturally dis n produced o cial outwash ystalline rock Ordovician, cks in the s t thick in th s sequence is
: y. Prior to t 941. Due to switchyard) anticipated ompleted. N over the next a federal re rievable sto and the USA monitor and Mississippi on (6) (7).
of a contine ation of the winter seaso ecorded in J five inches p e rest of the LACBWR S prevailing n Predomina he north and n of the C s not glaci ssected sedim on the ungla h in the larg ks exposed a
, 572 Millio site vicinity he site vicini s exposed al the Pleistoce o the presen
) on the prop that the site No other cre t several dec epository, o orage facilit ACE Lock 8 archive stan River. Coll ntal climate LACBWR on to 72 °F i July of both per month i year.
Site. Airport north to north ant winds a d south. Mo Central Low iated during mentary roc aciated lands ger valleys o at the crest o on Years B y are of gra ity and cons long the bluf ene Epoch (
nce of
: perty, e will edible cades.
offsite ty is Dam ndard lected e with Site.
in the 1936 in the t data hwest at the onthly wland g the ks of scape of the of the Before anitic sist of ffs on (more  


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revision n0 than 2 MYBP)
La Cross License T Revision than 2 M today. It The site Region c synclines Superior formed d Major up Some mi MYBP).
M          the riiver had carvved a gorge as much as 150 to 210 feet deeper than can bee seen today. Itt was buried by post-glaccial sedimen    nt.
of the W sediment Many fau capable a geologic mapped i several n found an seismicit site (8).
The site is located within the Central Stab        ble Region tectonic proovince. Thhe Central S      Stable Region consists c        of a vast areaa of large circular c        upliifts and seddimentary baasins, and bbroad syncliness and archess. Major strructural feattures includde the Wiscoonsin Domee and Arch, Lake Superior syncline, Fo   orest City baasin, Michig gan Basin, annd Illinois BBasin. These structures were formed during d      the Laate Pre-Camb  brian and Eaarly Paleozooic (more thaan 435 MYB    BP).
Seismic 2008 oc decommi 1.3.5.
Major up  plift and dowwn-warping alsoa occurreed during latte Paleozoic (330 MYBP        P to 240 MY YBP).
The LAC the vicin Prairie du width. T There is land, isla sloughs a the uplan channel a The main are opera of the sit distance the site.
Some miinor tilting occurred o          duriing and folloowing the Plleistocene glaciations (22 MYBP to 00.001 MYBP). The site is located on th     he southwest flank of thee Wisconsinn Dome and the western flank of the Wisconsin W            Arch, A      a soutthward projection of thhe Wisconsiin Dome. For this reeason, sedimenttary strata in n the vicinity y dip less thaan 20 feet perr mile to thee southwest.
Part of th plant. T one to th se Boiling W Termination n 0 MYBP) the ri t was buried is located consists of s and arches syncline, Fo during the La plift and dow inor tilting o The site is Wisconsin A tary strata in ults have be according to conditions i in the site re nuclear powe ny evidence ty. Therefor activity (ma ccurred ove issioning (9)
Many fau  ults have beeen mapped   d in the site region. Noone of thesee faults are considered to be capable according a            o the criteriaa in 10 CFR 100, Appenndix A. Per the US NR to                                                                RC, There aare no geologic conditions in   i the site viicinity that represent r         hazzard to the ffacility. Num merous faultts are mapped in  i the site reegion, but in nvestigationss of all of theese faults duuring the couurse of validdating several nuclear n        poweer plant sitess in the regioon, in additioon to studiess for the LACBWR, havve not found an ny evidencee of capable faulting. Additionaally, the areea is one oof relativelyy low seismicitty. Thereforre, capable faulting doees not need to be considered in thee analysis of this site (8).
Surface W CBWR site i ity of the sit u Chien, app The valley wa little or no a ands betwee and meander nd where tr are wooded.
Seismic activity (maagnitudes raanging from 3.5 to 5.4) that has beeen noted beetween 19755 and 2008 occcurred oveer 180 milees from the site and did not iimpact plannt operationns or decommiissioning (9)).
n channel of ated by the U te) the river i of 20 miles, he licensed herefore, dr he south, so Water Reactor Plan iver had carv by post-glac within the a vast area
1.3.5.        Surface Water W      Hydrrology The LAC  CBWR site is  i in the Mississippi Riv  ver valley annd is relativvely flat (seee Figure 1-44). In the vicinity of the sitte, the valleyy is deeply cut c into highlly dissected uplands. Frrom La Crossse to Prairie du u Chien, app  proximatelyy 40 miles so  outh, the vallley varies bbetween 2.5 and 4.5 milles in width. The T valley waalls rise sharrply 500 to 600  6 feet from  m river level.
: s. Major str orest City ba ate Pre-Camb wn-warping a occurred duri located on th Arch, a sout n the vicinity een mapped o the criteria in the site vi egion, but in er plant sites e of capabl re, capable agnitudes ra er 180 mile
There is little or no agricultural a            use of the riiver valley ffloor which consists prim marily of marshy land, islaands betweeen river chaannels and extensions e            oof low lyingg flood plaiin cut by ponds, sloughs and a meanderring river ch    hannels. Nu  umerous shorrt, steep-sideed valleys have been cuut into the uplan  nd where trributary streams intercep    pt the mainn river valleey. Both w  walls of the main a wooded. The flat up channel are                                       a some of tthe tributaryy valleys are cultivated.
).
pland areas and The main  n channel off the river vaaries greatly in width aboove and beloow the site. A series of dams are operaated by the USACE U        for navigational n              purposes. A  Above Dam No. 8 (abouut 0.75 mile north of the sitte) the river is i nearly fouur miles wid de. Below thhe site, the riiver is relativvely narrow for a distance of 20 miles, then graduaally widens as    a the river aapproaches D  Dam No. 9, 33 miles souuth of the site.
Water Hydr is in the Mi te, the valley proximately alls rise shar agricultural en river cha ring river ch ributary stre The flat up f the river va USACE for n is nearly fou then gradua area (27 ac ainage at th that only p r
Part of th he licensed area (27 accres) is on a filled in arrea south off the originaal Genoa-1 ssteam plant. Therefore, drainage at the site has beeen establishhed. One vvalley drains to the northh and one to th he south, so that only precipitation that falls onn the bluff aadjacent to tthe site and on a 1-4
ved a gorge cial sedimen Central Stab a of large c ructural feat asin, Michig brian and Ea also occurre ing and follo he southwes thward proj y dip less tha d in the site a in 10 CFR icinity that r nvestigations s in the regio e faulting.
faulting doe anging from es from th rology ssissippi Riv y is deeply c y 40 miles so rply 500 to 6 use of the ri annels and e hannels. Nu ams intercep pland areas a aries greatly navigational ur miles wid ally widens a cres) is on a e site has be recipitation 1-4 as much as nt.
ble Region circular upli tures includ gan Basin, an arly Paleozo ed during lat owing the Pl t flank of the ection of th an 20 feet per region. No 100, Appen represent haz s of all of the on, in additio Additiona es not need 3.5 to 5.4) e site and ver valley an cut into highl outh, the val 600 feet from iver valley f extensions o umerous shor pt the main and some of t in width abo purposes. A de. Below th as the river a a filled in ar een establish that falls on 150 to 210 tectonic pro ifts and sed de the Wisco nd Illinois B oic (more tha te Paleozoic leistocene g e Wisconsin he Wisconsi r mile to the one of these ndix A. Per zard to the f ese faults du on to studies ally, the are to be consi that has be did not i nd is relativ ly dissected lley varies b m river level floor which of low lying rt, steep-side n river valle the tributary ove and belo Above Dam he site, the ri approaches D rea south of hed. One v n the bluff a feet deeper ovince. Th dimentary ba onsin Dome Basin. Thes an 435 MYB (330 MYBP laciations (2 n Dome and in Dome.
e southwest.
e faults are the US NR facility. Num uring the cou s for the LA ea is one o dered in the een noted be impact plan vely flat (see uplands. Fr between 2.5 consists prim g flood plai ed valleys h ey. Both w y valleys are ow the site.
No. 8 (abou iver is relativ Dam No. 9, f the origina valley drains adjacent to t than can be he Central S asins, and b e and Arch, e structures BP).
P to 240 MY 2 MYBP to 0 the western For this re considered RC, There a merous fault urse of valid CBWR, hav of relatively e analysis o etween 1975 nt operation e Figure 1-4 rom La Cros and 4.5 mil marily of m in cut by p ave been cu walls of the cultivated.
A series of ut 0.75 mile vely narrow 33 miles sou al Genoa-1 s to the north the site and e seen Stable broad Lake were YBP).
0.001 flank
: eason, to be are no ts are dating ve not y low f this 5 and ns or 4). In sse to les in arshy
: onds, ut into main dams north for a uth of steam h and on a  


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revisionn0 small portion of the upland area contributees to runoff directly acrross the sitee. This runooff is presentlyy channeled along the highway h            and d railroad too prevent innterference w  with traffic. No problemss of flash flo oods have occurred at thee site.
La Cross License T Revision small po presently problems For a dis and town published Davenpo purposes miles dow other kno Chien, 40 1.3.6.
For a distance of 40 miles m     downsstream of thee site, virtuaally all municcipal water ssupplies for cities and town ns along thee river are obtained o          from m ground w  water. On thhe basis of readily avaiilable published d records, th he nearest major m        city using u      river w water for ddirect humann consumptiion is Davenpo ort, Iowa, ab bout 195 miiles downstrream. The nnearest use of river waater for induustrial purposes, excluding the t adjacent fossil plant,, is the steam  m-power plannt in Lansingg, Iowa, aboout 15 miles dow wnstream. River R    water at the Lansin    ng plant is uused for conddenser cooliing. There aare no other knoown users of river water for industrrial purposess between L        LACBWR siite and Prairrie du Chien, 400 miles down  nriver.
Groundw feet Bel commun fill mater groundw river. B sampling vertical g likely du As the s which is but not penetratin of the riv water qu has been There are analyzed Highway 1.3.7.
1.3.6.      Ground Water W      Hydrrology Groundw water beneath  h the site is first encoun ntered at deptths ranging from approxximately 15 to 25 feet Bellow Ground    d Surface (BGS)
The LAC of Genoa west sho commun Wisconsi (Populati The area includes Agricultu se Boiling W Termination n 0 rtion of the y channeled s of flash flo tance of 40 m ns along the d records, th ort, Iowa, ab
(        and the water table aquiifer is in strong hydrraulic communication with    h the adjacen nt Mississipp  pi River. G Groundwaterr in the shalllow deposits and fill materrial likely flo ows towardss the west an   nd dischargees into the MMississippi R River. The deeper groundw water is also likely to flo  ow towards the west but    ut then may turn and floow parallel tto the river. Based on a reeview of thee groundwatter elevationn measuremeents collecteed during rooutine sampling g in support of the Gen    noa 3 fossil station, it aappears thatt there is a slight downnward vertical gradient.
, excluding t wnstream. R own users o 0 miles down Ground W water beneath low Ground ication with rial likely flo water is also ased on a re g in support gradient. Ho e to high riv ite has valle underlain by in valleys ng the Moun ver valley flo uality of the no extensiv e onsite pota
g            Hoowever, therre are some periods wheere the graddients are revversed and tthis is likely due to high riv ver stages and flooding.
: d. Regionall y 35 with the Environs CBWR Facil a (population ore is Reno, ity in Iowa i in, an uninco ion data is fr a within a f Houston C ure and fore Water Reactor Plan upland are along the h oods have oc miles downs e river are o he nearest m bout 195 mi the adjacent River water f river wate nriver.
As the site has valleey sand oveerlaying a laayer of Eau Claire sanddstone of thhe Cambriann Age which is underlain by  y Mount Sim  mon sandston   ne, wells havve been drivven in areas closest to thhe site but not in valleys characterizeed by sub-layers of M              Mount Simoon sandstonne. Deep wells penetratinng the Moun  nt Simon lay yer flow to th he surface inndicating an artesian heaad about the level of the riv ver valley flo oor. Use off water from these artesiian aquifers has been lim    mited becausse the water quuality of the deep aquifeers is poorer than that frrom shallow      w aquifers. A  As a result, there has been no extensive withdrawaal of water an       nd no signifificant decrease in the arteesian head.
Water Hydr h the site is d Surface (
There aree onsite potaable and gro  oundwater monitoring m           wells which aare periodically sampledd and w
h the adjacen ows towards likely to flo eview of the of the Gen owever, ther ver stages an ey sand ove y Mount Sim characterize nt Simon lay oor. Use of deep aquife e withdrawa able and gro ly, there are e water table s and Natur lity is 17 mil n about 260)
analyzedd. Regionallly, there aree five domeestic wells ssouth of thee LACBWR            R site and eaast of Highway  y 35 with thee water table encountered     d from 20 too 45 feet BGS.
Minnesota, is New Albin orporated ha rom 2013 Ci five-mile rad County, Min estry are the r
1.3.7.      Environss and Natural Resourcees The LAC  CBWR Facillity is 17 milles south of the    t City of L  La Crosse annd a mile souuth of the Viillage of Genoaa (population  n about 260)). The nearest communnity (three m      miles to the nnorthwest) oon the west sho ore is Reno, Minnesota,, an unincorrporated ham          mlet of abouut 350 peopple. The neearest community in Iowa is    i New Albin  n (pop. 513)), located fivve miles souuthwest of thhe plant. Vicctory, Wisconsiin, an uninco  orporated haamlet, is situ  uated five mmiles south oof the plant oon the east sshore.
a contribute highway and curred at the stream of the obtained from major city u iles downstr fossil plant, at the Lansin r for industr rology first encoun (BGS) and nt Mississipp s the west an ow towards e groundwat noa 3 fossil re are some d flooding.
(Populatiion data is frrom 2013 Ciity-Data.com    m) (9).
erlaying a la mon sandston ed by sub-yer flow to th f water from ers is poorer al of water an oundwater m e five dome encountered al Resource les south of t
The areaa within a five-mile f          rad dius is pred  dominantly iin Vernon C     County, Wissconsin, butt also includes Houston County, C          Min nnesota, an  nd a small portion off Allamakeee County, IIowa.
). The near
Agricultuure and foreestry are thee predominaant land usees in Vernoon County aas well as inn the 1-5
, an unincor n (pop. 513) amlet, is situ ity-Data.com dius is pred nnesota, an e predomina 1-5 es to runoff d railroad to e site.
e site, virtua m ground w using river w ream. The n
, is the steam ng plant is u rial purposes ntered at dept the water pi River. G nd discharge the west but ter elevation station, it a periods whe ayer of Eau ne, wells hav layers of M he surface in these artesi than that fr nd no signifi monitoring w estic wells s d from 20 to es the City of L est commun rporated ham
), located fiv uated five m m) (9).
dominantly i nd a small ant land use directly acr o prevent in ally all munic water. On th water for d nearest use m-power plan used for cond s between L ths ranging table aqui Groundwater es into the M ut then may n measureme appears that ere the grad Claire sand ve been driv Mount Simo ndicating an ian aquifers rom shallow ficant decrea wells which a south of the o 45 feet BG La Crosse an nity (three m mlet of abou ve miles sou miles south o in Vernon C portion of es in Verno ross the site nterference w cipal water s he basis of direct human of river wa nt in Lansing denser cooli LACBWR si from approx ifer is in r in the shall Mississippi R turn and flo ents collecte t there is a dients are rev dstone of th ven in areas on sandston artesian hea has been lim w aquifers. A se in the arte are periodic e LACBWR S.
nd a mile sou miles to the n ut 350 peop uthwest of th of the plant o County, Wis f Allamakee on County a
: e. This runo with traffic.
supplies for readily avai n consumpti ater for indu g, Iowa, abo ing. There a ite and Prair ximately 15 strong hydr low deposit River. The d ow parallel t ed during ro slight down versed and t he Cambrian closest to th ne. Deep ad about the mited becaus As a result, esian head.
ally sampled R site and ea uth of the Vi northwest) o ple. The ne he plant. Vic on the east s sconsin, but e County, I as well as in off is No cities ilable ion is ustrial out 15 are no rie du to 25 raulic s and eeper to the outine nward this is n Age he site wells level se the there d and ast of illage on the earest
: ctory, shore.
t also Iowa.
n the  


La Crossse Boiling Water W      Reactorr License Termination T             Plan Revision n0 neighborring countiess on the weest side of the      t Mississiippi River. Nearly 90%      % of the Veernon County's gross area is  i agriculturre and woodllands. Abouut 3.4%, connsisting mainly of waterr area and marsshlands is cllassified as undeveloped u            d. Total devveloped landd accounts foor less than 6.6%
La Cross License T Revision neighbor County's and mars of the cou The prim years, th agricultu woodland hardwoo A modes througho intensity-commerc and less related to nonagricu east of LA Land in t within a bottomla portion o site, occu to the eas Refuge b for 2.5 m including 26 and ho Approxim water are The five populatio 1.4.
of the cou  unty's gross area (10).
O Key stati Allis-perfo Dairy turbin Allis-Initia se Boiling W Termination n 0 ring counties gross area i shlands is cl unty's gross mary agricult here has bee ural land to
The prim  mary agriculttural activity  y is dairy faarming, meaat animals, aand crop farrming. In rrecent years, th here has beeen a marked trend tow        ward the co nversion off Vernon County's marrginal agricultu ural land to woodland. About two--fifths of thee total land in farms iss now devotted to woodland    d. The foressts yield sub bstantial amo ounts of oakk and lesser qquantities off maple and other hardwoods.
: d. The fores ds.
A modesst amount of sandstone and limesto          one quarryinng also takees place at a number off sites througho  out Vernon County.
st amount o out Vernon C
C        Furtther, 85% off the developped land in V    Vernon Couunty is in thee low-intensity--use categorries of resid  dential and park p      land. T The more inntensive lannd uses (induustry, commercce, public, trransportation    n, and utilitiees) account ffor less thann 15% of totaal developedd land and less than 0.3% of gross arrea. Local industry coonsists almoost exclusiveely of operaations related to  o the proceessing of ag  gricultural an  nd forest prroducts. O  One notable exception iis the nonagricu  ultural industries of thee industrial park p    in Virooqua, Wiscoonsin locatedd 25 miles tto the east of LA  ACBWR.
-use categor ce, public, tr than 0.3%
Land in thet vicinity of o the LACB  BWR Site is overwhelmiingly rural aand undevelooped. Of thee area within a five-mile radius, app       proximately one third is accountted for by water areaa and bottomlaands included    d in the Upp per Mississip  ppi River WWildlife and F  Fish Refugee. The develloped portion of o the Villag  ge of Genoaa, the only substantial coommunity inn the five m      mile radius oof the site, occu upies less thaan 100 acress. The neareest residencees to the LAC    CBWR Site are within a mile to the easst and northeeast consistin  ng of small trailer t       parks and residennces on smalll acreages.
o the proce ultural indu ACBWR.
Refuge bottomland b            and a water su  urface, lying mainly in M  Minnesota, exxtend west oof the reactoor site for 2.5 miles.
the vicinity o a five-mile ands included of the Villag upies less tha st and northe bottomland a miles. Roug g vacation h ouseboats ar mately 3.5 s ea and refug
m        Roug ghly a third ofo the area remains r         undder cultivatioon. A few ddozen resideences, including  g vacation homes and bo    oathouses, are a scatteredd along the sshoreline neaar State Highway 26 and ho  ouseboats arre moored att several poin   nts at times dduring the yyear.
-mile radius on is 522.
Approxim  mately 3.5 square miles of Iowa are within the L        LACBWR ffive-mile raddius. Most of it is water areea and refug    ge bottomlan  nd, although h there is soome agriculttural use onn the bottom  mland.
Operational ion mileston
The five-mile radiuss includes a portion of the incorpoorated town of New Allbin, whose total populatio  on is 522.
-Chalmers, u ormed startup yland entered ne-generator
1.4. Operational O                Backgroun  nd Key statiion milestones are presen    nted in Chap pter 2 of thiss LTP. The m major milesttones are:
-Chalmers d al Criticality Water Reactor Plan s on the we is agricultur lassified as u area (10).
Allis--Chalmers, under u      contraact with the AEC, A      designned, fabricateed, constructted and perfoormed startup  p of the LAC CBWR from  m 1962 to 19667, Dairy yland entered d into a conttact to purchhase steam frrom the nucllear plant to operate a turbin ne-generatorr for producttion of electrricity: June 11962, Allis--Chalmers dockets d        appliication for co onstruction: November 55, 1962, Initiaal Criticality achieved: July J    11, 1967  7, 1-6
tural activity en a marke woodland.
sts yield sub f sandstone County. Furt ries of resid ransportation of gross ar essing of ag stries of the of the LACB radius, app d in the Upp ge of Genoa an 100 acres east consistin and water su ghly a third o omes and bo re moored at quare miles ge bottomlan s includes a Backgroun es are presen under contra p of the LAC d into a cont r for product dockets appli achieved: J r
est side of t re and woodl undeveloped y is dairy fa d trend tow About two-bstantial amo and limesto ther, 85% of dential and p n, and utilitie rea. Local gricultural an e industrial p BWR Site is proximately per Mississip a, the only s
: s. The neare ng of small t urface, lying of the area r oathouses, a t several poin of Iowa are nd, although a portion of nd nted in Chap act with the A CBWR from tact to purch tion of electr ication for co July 11, 1967 1-6 the Mississi lands. Abou
: d. Total dev arming, mea ward the co
-fifths of the ounts of oak one quarryin f the develop park land. T es) account f industry co nd forest pr park in Viro overwhelmi one third ppi River W ubstantial co est residence trailer parks mainly in M remains und are scattered nts at times d within the L h there is so the incorpo pter 2 of this AEC, design m 1962 to 196 hase steam fr ricity: June 1 onstruction:
7, ippi River.
ut 3.4%, con veloped land at animals, a nversion of e total land k and lesser q ng also take ped land in V The more in for less than onsists almo roducts. O oqua, Wisco ingly rural a is account Wildlife and F ommunity in es to the LAC and residen Minnesota, ex der cultivatio d along the s during the y LACBWR f ome agricult orated town s LTP. The m ned, fabricate 67, rom the nucl
: 1962, November 5 Nearly 90%
nsisting mai d accounts fo and crop far f Vernon C in farms is quantities of es place at a Vernon Cou ntensive lan n 15% of tota ost exclusive One notable onsin located and undevelo ted for by Fish Refuge n the five m CBWR Site nces on small xtend west o on. A few d shoreline nea year.
five-mile rad tural use on of New Al major milest ed, construct lear plant to 5, 1962,
% of the Ve nly of water or less than rming. In r ounty's mar s now devot f maple and a number of unty is in the nd uses (indu al developed ely of opera exception i d 25 miles t oped. Of the water area
: e. The devel mile radius o are within a l acreages.
of the reacto dozen reside ar State Hig dius. Most o n the bottom lbin, whose tones are:
ted and operate a ernon r area 6.6%
recent rginal ted to other f sites e low-
: ustry, d land ations is the to the e area a and loped of the a mile or site
: ences, hway f it is mland.
total


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revision n0 Low power testin    ng completed  d: Septembeer 1967, Proviisional Operrating authorrization issueed (DPRA-66): October 331, 1969, Proviisional Operrating Licensse, DPRA-45    5 issued: Auugust 28, 1973, LACB BWR permaanently shut down: Apriil 30, 1987, Finall reactor defuueling was completed c          onn June 11, 19987, and Comp  pletion of fu uel loading innto the ISFSI was complleted on Sepptember 19, 22012.
La Cross License T Revision Low Provi Provi LACB Final Comp The reac 96,274.6 The unit The LAC Turbine Storage T are curre and meta Vessel.
The reactor was critiical for a tottal of 103,28  87.5 hours. The 50 MW    We generatoor was on linne for 96,274.6 hours. Thee total gross electrical en    nergy generaated was 4.0047 Gigawattt-Hours (GW    WH).
holds fiv 1.5.
The unit availability factor was 62.9%.
P 1.5.1.
6 The LAC   CBWR unit consists off major buildings and sstructures suuch as the R        Reactor Buillding, Turbine Building, 1B   B Diesel Geenerator Buillding, Wastee Treatmentt Building, U    Undergroundd Gas Storage Tank T      Vault, Ventilation Stack, Low  w Specific A Activity (LSA A) building aand others wwhich are currently undergo   oing decomm  missioning (see Figure 11-3). Interm  mittent system ms dismantleement and metaallic radioacttive equipmeent has been  n removed sinnce 2007, inncluding the Reactor Preessure Vessel. The ISFSI, located soutth of the Gen      noa 3 fossil station, beccame operatiional in 20122 and holds five above-grou   und Dry Sto orage Casks with w 333 speent fuel asseemblies.
The LTP license a with the Safety A amendme The subs 1.5.2.
1.5. Plan P      Summa ary 1.5.1.        General Information I           n The LTP P describes th he process used u     to meet the requirem ments for terrminating thee 10 CFR Paart 50 license and a to releasse the site fo  or unrestrictted use. Thhe LTP has bbeen prepared in accorddance with the requirementts in 10 CFR    R 50.82(a)(9 9) and is subbmitted as a supplementt to the Defu  fueled Safety Analysis A          Repport (DSAR  R). The LTP   P submittal is accompaanied by a proposed liccense amendmeent that estab  blishes the criteria c        for when w       changess to the LTP P require prioor NRC apprroval.
LTP Cha and exten remain a site chara determin The LAC Field Wo August 2 basis for specified (MARSS change th se Boiling W Termination n 0 power testin isional Oper isional Oper BWR perma l reactor defu pletion of fu tor was criti hours. The availability CBWR unit Building, 1B Tank Vault, ntly undergo allic radioact The ISFSI, e above-grou Plan Summa General I P describes th and to releas requirement Analysis Rep ent that estab sections belo Site Char apter 2 discu nt of radioac at the time o acterization, ned to be imp CBWR Radio Work (11) an 2015 Field W dividing the d in NUREG SIM) (13) fo he original c Water Reactor Plan ng completed rating author rating Licens anently shut ueling was c uel loading in ical for a tot e total gross factor was 6 consists of B Diesel Ge Ventilation oing decomm tive equipme located sout und Dry Sto ary Information he process u se the site fo ts in 10 CFR port (DSAR blishes the c ow provide a racterizatio usses the site ctive contam of license ter Solutions w pacted by the ological Cha nd LACBWR Work (12) p e site into su G-1575, Mu or classifica classification r
The subssections belo  ow provide a brief summ   mary of the otther seven chhapters of thhe LTP.
d: Septembe rization issue se, DPRA-45 down: Apri completed on nto the ISFS tal of 103,28 electrical en 62.9%.
1.5.2.       Site Charracterization LTP Chaapter 2 discu  usses the site characterizaation that haas been condu ducted to deteermine the nnature and exten nt of radioacctive contammination on siite prior to rremediation, including sttructures thaat will remain ata the time of o license terrmination, so  oils, and groound water. Based on tthe results oof the site charaacterization, Solutions will w plan rem  mediation andd Final Radiiation Surveyys (FRS) in areas determin ned to be imp pacted by thee operation ofo LACBWR    R.
f major buil enerator Buil Stack, Low missioning (
The LAC  CBWR Radio    ological Cha  aracterizatio on Survey R  Report for OOctober andd November 2014 Field Work Wo (11) an    nd LACBWR    R Radiologiccal Charactterization Su   Survey Report for June thru August 2015 2       Field Work W      (12) provided the foundation for further site charactterization annd the basis for dividing thee site into su urvey units. The surveyy units were evaluated aggainst the crriteria specifiedd in NUREG    G-1575, Mu  ulti-Agency Radiation Survey andd Site Invesstigation Maanual (MARSS  SIM) (13) fo  or classificaation. Data from subseequent charaacterization may be used to change th he original classification c            n of an area,, within the requirementts of this LT TP, up to thee time 1-7
ent has been th of the Gen orage Casks w n
used to meet or unrestrict R 50.82(a)(9 R). The LTP criteria for w a brief summ n
characteriza mination on si rmination, so will plan rem e operation o aracterizatio R Radiologic rovided the urvey units.
ulti-Agency ation. Data n of an area, 1-7 er 1967, ed (DPRA-6 5 issued: Au il 30, 1987, n June 11, 19 I was compl 87.5 hours.
nergy genera dings and s lding, Waste w Specific A see Figure 1 n removed sin noa 3 fossil with 333 spe the requirem ted use. Th
: 9) and is sub P submittal when changes mary of the ot ation that ha ite prior to r oils, and gro mediation and of LACBWR on Survey R cal Charact foundation The survey Radiation from subse
, within the 6): October 3 ugust 28, 19 987, and leted on Sep The 50 MW ated was 4.0 structures su e Treatment Activity (LSA 1-3). Interm nce 2007, in station, bec ent fuel asse ments for ter he LTP has b bmitted as a is accompa s to the LTP ther seven ch as been condu remediation, ound water.
d Final Radi R.
Report for O terization Su for further y units were Survey and equent chara requirement 31, 1969, 73, ptember 19, 2 We generato 047 Gigawat uch as the R t Building, U A) building a mittent system ncluding the came operati emblies.
rminating the been prepar a supplement anied by a P require prio hapters of th ducted to dete including st Based on t iation Survey October and Survey Repo site charact evaluated ag d Site Inves acterization ts of this LT 2012.
or was on lin tt-Hours (GW Reactor Buil Underground and others w ms dismantle Reactor Pre ional in 2012 e 10 CFR Pa ed in accord t to the Defu proposed lic or NRC appr he LTP.
ermine the n tructures tha the results o ys (FRS) in d November rt for June terization an gainst the cr stigation Ma may be us TP, up to the ne for WH).
: lding, d Gas which ement essure 2 and art 50 dance fueled cense roval.
nature at will of the areas 2014 thru nd the riteria anual ed to e time  


La Crossse Boiling Water W      Reactorr License Termination T               Plan Revisionn0 of FRS, as long as the t classificaation reflectts the level oof residual aactivity exissting prior too any remediation in the arrea.
La Cross License T Revision of FRS, remediat 1.5.3.
1.5.3.       Identificaation of Rem maining Sitee Dismantleement Activvities LTP Chaapter 3 identtifies the rem  maining site dismantlem  ment and deccontaminatioon activities. The informatiion provided d in Chapter 3 includes:
LTP Cha informati A des A sum Estim An es dispo Descr Solutions in NURE Facilities accordan Radioact administr Activitie than tho decommi operating The info sections remainin 1.5.4.
A desscription of the t areas and  d equipmentt that need fuurther remeddiation, A summmary of radiological co    onditions thaat may be enncountered, Estim mates of asso ociated occup  pational radiiation dose, An esstimate of thhe types and quantities of radioactivee material geenerated for release and dispo osal, and Descrriptions of proposed p         conntrol mechan  nisms to ensuure areas aree not re-conttaminated.
LTP Ch decommi in 10 CF remediat The selec of contam surfaces.
Solutionss is decomm missioning LACBWR L            in n accordancee with the D DECON alterrnative desccribed in NURE  EG-0586, Generic G         Enviironmental Impact I      Stattement on D Decommissiooning of Nuuclear Facilitiess, Supplemen nt 1, Volumee 1, (14). The T decomm    missioning acctivities willl be conductted in accordannce with thee Solutionss Safety an        nd Health P Program, Raadiation Prottection Proggram, Radioacttive Waste Program, Off-Site Dose          D      Calcuulation Maanual (ODC    CM), and plant administrrative, work control and decommissiioning impleementation pprocedures.
at backgr contamin structura standard other me Derived se Boiling W Termination n 0 as long as t ion in the ar Identifica apter 3 ident ion provided scription of t mmary of ra mates of asso stimate of th osal, and riptions of p s is decomm EG-0586, G s, Supplemen nce with the tive Waste rative, work s conducted ose conduct issioning ac g activities th rmation pro of the LTP ng dismantlem Remedia hapter 4 dis issioning to FR 20.1402 ion activitie cted remedia mination. T Very limite round levels nation has b l surfaces i and pressu ethods. Sur Concentrati Water Reactor Plan the classifica rea.
Activities conducted during deco     ommissionin  ng do not poose any greatter radiologiical or safetyy risk than tho ose conductted during plant operrations.              T The radioloogical risk associated with decommiissioning acctivities is bounded b         byy previouslyy analyzed rradiological risk for foormer operatingg activities th hat occurredd during majo  or maintenannce and outaage activitiess.
ation of Rem tifies the rem d in Chapter the areas and diological co ociated occup he types and proposed con missioning L Generic Envi nt 1, Volume e Solutions
The information provided in Ch     hapter 3 supp  ports the asssessment off impacts connsidered in other sections of the LTP    P and proviides sufficieent detail too identify rresources neeeded duringg the remaininng dismantlem  ment activitiies.
: Program, control and during deco ted during ctivities is b hat occurred vided in Ch P and provi ment activiti tion Plans scusses the reduce resid
1.5.4.      Remediation Plans LTP Ch  hapter 4 disscusses the various reemediation techniques that may be used dduring decommiissioning to reduce resid   dual contamiination to levvels that com mply with thhe release crriteria in 10 CF FR 20.1402. This chap       pter also discusses the ALARA evvaluation annd the impaact of remediation activities on the Rad   diation Protection Prograam.
. This chap s on the Rad ation method The principa ed soil conta s or a small been identif include scab re washing, rface and su on Guidelin r
The seleccted remediaation method  ds used are dependent d           uppon the conttaminated mmaterial and eextent of contam mination. TheT principaal materials that may bbe subject tto remediation are strucctural surfaces. Very limiteed soil contaamination is expected; anny noted grooundwater saamples have been at backgrround levelss or a small fraction of the drinkingg water stanndards; and no surface w        water contamin nation has been b      identiffied to datee. Remediaation techniques that m      may be usedd for structural surfaces include i        scabbbling and shaving, chhipping, spoonge and aabrasive blasting, standard and pressure washing, wiping, grrit blasting, mechanical fracturing and cutting, and other meethods. Surrface and su    ubsurface so  oil with activvity levels iin excess off the approppriate Derived Concentration Guidelin    ne Level (DC    CGL) will bbe removed and disposeed as radioaactive 1-8
ation reflect maining Site maining site 3 includes:
d equipment onditions tha pational radi quantities o ntrol mechan LACBWR in ironmental I e 1, (14). T s Safety an Off-Site D decommissi ommissionin plant oper bounded by d during majo hapter 3 supp ides sufficie ies.
various re dual contami pter also di diation Prote ds used are d al materials amination is fraction of fied to date bbling and wiping, gr ubsurface so ne Level (DC 1-8 ts the level o e Dismantle dismantlem t that need fu at may be en iation dose, f radioactive nisms to ensu n accordance Impact Stat The decomm nd Health P Dose Calcu ioning imple ng do not po rations. T y previously or maintenan ports the ass ent detail to emediation ination to lev scusses the ction Progra dependent up that may b expected; an the drinking
: e. Remedia shaving, ch rit blasting, oil with activ CGL) will b of residual a ement Activ ment and dec urther remed ncountered, e material ge ure areas are e with the D tement on D missioning ac Program, Ra ulation Ma ementation p ose any great The radiolo y analyzed r nce and outa sessment of o identify r techniques vels that com ALARA ev am.
pon the cont be subject t ny noted gro g water stan ation techni hipping, spo mechanical vity levels i be removed activity exis vities contaminatio
: diation, enerated for e not re-cont DECON alter Decommissio ctivities will adiation Prot anual (ODC procedures.
ter radiologi ogical risk radiological age activities f impacts con resources ne that may mply with th valuation an taminated m to remediati oundwater sa ndards; and ques that m onge and a fracturing in excess of and dispose sting prior to on activities.
release and taminated.
rnative desc oning of Nu l be conduct tection Prog CM), and ical or safety associated risk for fo
: s.
nsidered in eeded during be used d he release cr nd the impa material and e on are struc amples have no surface w may be used abrasive bla and cutting f the approp ed as radioa o any The cribed uclear ted in
: gram, plant y risk with ormer other g the during riteria act of extent ctural been water d for
: sting,
, and priate active


La Crossse Boiling Water W      Reactorr License Termination T             Plan Revisionn0 waste. Soil remediation equipm      ment will in  nclude, but not be lim mited to, bacck and trackk hoe excavators. Remed    diation of so oils will incclude the usse of establiished excavvation safetyy and environmmental contro  ol procedurees, as well as appropriaate work paackage instruuctions to ennsure adequate erosion, sed  diment, and air emission n controls duuring soil remmediation.
La Cross License T Revision waste.
1.5.5.       Final Rad diation Surv vey Plan LTP Chaapter 5 preseents the FRS  S Plan which h will be useed to develoop the site prrocedures, suurvey packagess, and instrucctions to perrform the FRRS of the LA  ACBWR site. The FRS P      Plan is compprised of a Finnal Status Survey (FSS) for open land areas and a Sourrce Term S              Survey (STS  S) for remaininng building basements. The FRS Plan descrribes the finnal survey process useed to demonstrrate that the LACBWR facility f       and site s comply with radioloogical criteriia for unrestrricted use speciified in 10 CFR C 20.1402 (e.g. annuall dose limit oof 25 mrem to AMCG pplus ALARA            A).
excavato environm adequate 1.5.5.
The FRS S Plan descrribes the dev   velopment ofo the surveyy plan, survvey design aand Data Quuality Objectivees (DQO), su  urvey methoods and instrrumentation,, data collecttion and proocessing, andd data assessmeent and comp  pliance. Thhe FRS Plan addresses oonly LACBW        WR structurees and land areas that are identified i          ass impacted. The adjacent areas thaat are classiffied as non-iimpacted annd the ISFSI, which w      will still remain a licensed areaa, will not bee subject to FFRS.
LTP Cha packages of a Fin remainin demonstr use speci The FRS Objective assessme that are i ISFSI, w 1.5.6.
1.5.6.      Complian  nce with thee Radiologiccal Criteriaa for Licensee Terminatiion LTP Ch  hapter 6 preesents the radiologicall informatioon and meethods used to demonstrate complian nce with thee radiologiccal criteria forf license termination and releasee of the sitte for unrestrictted use. Chapter 6 discu usses the sitee-specific innventory of rradionuclides, future lannd use scenarioss, exposure pathways, computatio      onal modelss used for dose modeeling, sensiitivity analysis, DCGLs an    nd Dose Facctors, the deerivation of area factorrs, the basis for the sellected exposuree compliancee scenario an  nd evaluation n of alternatiive exposuree scenarios.
LTP Ch complian unrestrict scenarios
LTP Chaapter 6 usess radiologiccal information from C        Chapter 2 annd establishes the allow    wable contamin nation and radioactivity r              concentratiion levels thhat Chapter 4 remediatiion methodss will work towwards and bee verified by  y the FSS orr STS discusssed in Chappter 5. Soluutions applieed the Argonne National Laaboratory RE    ESidual RA ADioactive m  materials (REESRAD) v7..0 dose moddeling code to determine d          thhe radiologiccal release criteria c       for rremaining sttructures annd soils to ennable license teermination.
: analysis, exposure LTP Cha contamin work tow Argonne code to d license te 1.5.7.
1.5.7.      Update ofo the Site-Sp pecific Deco ommissionin    ng Costs LTP Chaapter 7 pro    ovides an up  pdated estimmate of thee remaining decommisssioning costts for releasing g the site forr unrestricted d use. This chapter alsoo compares tthe estimateed remainingg cost with the funds curren ntly availablee in the deco ommissioninng trust fundd.
LTP Cha releasing with the 1.5.8.
1.5.8.      Supplement to the Environmen E              tal Report LTP Chaapter 8 updaates the Enviironmental Report R        for LLACBWR w    with new infoormation andd any significannt environm mental impaacts associatted with thhe sites deecommissionning and liccense terminatiion activitiess. This section of the LTP L is prepar   ared pursuannt to 10 CFR R 51.53(d) annd 10 CFR 50.82(a)(9)(ii)(G). In accorrdance with 10 CFR 51 .53(d), Soluutions considders Chapterr 8 to 1-9
LTP Cha significan terminati CFR 50.
se Boiling W Termination n 0 Soil remedi rs. Remed mental contro erosion, sed Final Rad apter 5 prese s, and instruc nal Status S ng building rate that the ified in 10 C S Plan descr es (DQO), su ent and comp identified as which will sti Complian hapter 6 pre nce with the ted use. Ch s, exposure DCGLs an e compliance apter 6 uses nation and r wards and be National La determine th ermination.
Update o apter 7 pro g the site for funds curren Supplem apter 8 upda nt environm ion activities 82(a)(9)(ii)(
Water Reactor Plan ation equipm diation of so ol procedure diment, and diation Surv ents the FRS ctions to per urvey (FSS basements.
LACBWR f CFR 20.1402 ribes the dev urvey metho pliance. Th s impacted.
ll remain a l nce with the esents the e radiologic apter 6 discu
: pathways, nd Dose Fac e scenario an s radiologic radioactivity e verified by aboratory RE he radiologic of the Site-Sp ovides an up r unrestricted ntly available ent to the E ates the Envi mental impa
: s. This sect G). In accor r
ment will in oils will inc es, as well air emission vey Plan S Plan which rform the FR
) for open The FRS facility and s (e.g. annual velopment o ods and instr he FRS Plan The adjace icensed area e Radiologic radiological cal criteria f usses the site computatio ctors, the de nd evaluation cal informat concentrati y the FSS or ESidual RA cal release c pecific Deco pdated estim d use. This e in the deco Environmen ironmental R acts associat ion of the L rdance with 1-9 nclude, but clude the us as appropria n controls du h will be use RS of the LA land areas Plan descr site comply l dose limit o of the survey rumentation, addresses o nt areas tha a, will not be cal Criteria l informatio for license e-specific in onal models erivation of n of alternati ion from C ion levels th r STS discus ADioactive m criteria for r ommissionin mate of the chapter also ommissionin tal Report Report for L ted with th LTP is prepar 10 CFR 51 not be lim se of establi ate work pa uring soil rem ed to develo ACBWR site and a Sour ribes the fin with radiolo of 25 mrem y plan, surv
, data collect only LACBW at are classif e subject to F a for License on and me termination nventory of r s used for area factor ive exposure Chapter 2 an hat Chapter ssed in Chap materials (RE remaining st ng Costs e remaining o compares t ng trust fund LACBWR w he sites de ared pursuan
.53(d), Solu mited to, bac ished excav ackage instru mediation.
op the site pr
. The FRS P rce Term S nal survey ogical criteri to AMCG p vey design a tion and pro WR structure fied as non-i FRS.
e Terminati ethods used and release radionuclide dose mode rs, the basis e scenarios.
nd establish 4 remediati pter 5. Solu ESRAD) v7.
tructures an decommiss the estimate
: d.
with new info ecommission nt to 10 CFR utions consid ck and track vation safety uctions to en rocedures, su Plan is comp Survey (STS process use ia for unrestr plus ALARA and Data Qu ocessing, and es and land impacted an ion to demon e of the sit s, future lan eling, sensi for the sel es the allow ion methods utions applie
.0 dose mod nd soils to en sioning cost ed remaining ormation and ning and lic R 51.53(d) an ders Chapter k hoe y and nsure urvey prised S) for ed to ricted A).
uality d data areas nd the strate te for nd use itivity lected wable s will ed the deling nable ts for g cost d any cense nd 10 r 8 to  


La Crossse Boiling Water W      Reactorr License Termination T             Plan Revision n0 be a sup   pplement to the Environ    nmental Rep  port addressiing the actuaal or potentiial environmmental impacts associated a         with w the execu      ution of the described deecommissionning activities.
La Cross License T Revision be a sup impacts a LTP Ch NUREG-reference that the adverse e environm LACBW have resu Environm NUREG-1.6.
LTP Chapter 8 com       mpares the described decommissi oning attribbutes to thoose identifieed in NUREG--0586, which       h provides a generic env  vironmental assessment ffor the decom  mmissioningg of a referencee nuclear faccility. The environmen        ntal assessmment perform med by Soluutions determ  mined that the environmen   ntal effects for f decomm    missioning LA  ACBWR arre minimal aand there arre no adverse effects e      outsiide the boun  nds of NUR  REG-0586. Review of post-operating license stage environm  mental impaacts was documented in          n a supplem  ment to thee Environmental Reporrt for LACBW  WR dated Deecember 198        87. LACBW    WR decomm    missioning aand dismanttlement activvities have resu  ulted in no significant environmen      ntal impact not previouusly evaluated in the N    NRC's Environm  mental Asseessment in support of the Augustt 7, 1991, Decommisssioning Order or NUREG--0191 related     d to operatioon of LACBW    WR, dated A  April 21, 19880.
R Solutions LACBW documen Decomm Revision LTP in a LTP, wit 50.82(a)(
1.6. Regulatory R              Notification N             s of Changees Solutionss is submitting the LTP as a supplem      ment to the D  DSAR. Beccause the liccensing histoory of LACBW  WR spans a period p       that in ncludes seveeral decomm    missioning reegulation chaanges, the D DSAR documen  ntation is un nique in thaat the requiired safety aanalyses aree included in the LAC        CBWR Decommissioning Pllan and Postt-Shutdown DecommissioD              oning Activiities Report (D-Plan/PSD  DAR)
Solutions condition NRC app Requ Resu Detra decom Decre Class notifi Incre minim Incre level an inv Chan test, o Incre se Boiling W Termination n 0 pplement to associated w apter 8 com
Revision March 2014      4 (15) which h serves as the t DSAR fo    for LACBWR    R. Solutionns will updatte the LTP in accordance a            with w 10 CFR     R 50.71(e). Once approvved, Solutioons may makke changes tto the LTP, witthout prior NRC  N      approv val, in accordance withh the criteriaa in 10 CFR    R 50.59, 10 CFR 50.82(a)((6), and 10 CFRC 50.82(aa)(7).
-0586, which e nuclear fac environmen effects outsi mental impa WR dated De ulted in no mental Asse
Solutionss is also sub bmitting a prroposed ameendment to tthe LACBW        WR license thhat adds a liccense condition  n that establlishes the crriteria for determining w    when changges to the L LTP require prior NRC app  proval. Chan  nges to the LTP L require prior NRC aapproval when the changge:
-0191 related Regulatory N s is submitti WR spans a p ntation is un issioning Pl March 2014 accordance w thout prior N (6), and 10 C s is also sub n that establ proval. Chan uires Commi lts in signifi acts or negat mmissioning eases a surve s 2 to Class 3 ication prior ases the DC mum detecta ases the radi (or correspo vestigation o nges the stati or ases the Typ Water Reactor Plan the Environ with the execu mpares the h provides a cility. The ntal effects f ide the boun acts was do ecember 198 significant essment in d to operatio Notification ng the LTP period that in nique in tha lan and Post 4 (15) which with 10 CFR NRC approv CFR 50.82(a bmitting a pr lishes the cr nges to the L ssion approv cant environ tes the reason g,
Requ uires Commission approv    val pursuant to 10 CFR 550.59, Results in significant environ  nmental impaacts not prevviously revieewed, Detraacts or negattes the reason  nable assuraance that adeequate funds will be avaiilable for decom mmissioning  g, Decreeases a surveey unit area classificatio  on (i.e., impaacted to not iimpacted, Cllass 1 to Claass 2; Classs 2 to Class 3; 3 or Class 1 to Class 3 without w        provviding NRC a minimum 14 day notifiication priorr to implementing the change in classsification, Increases the DCGLs (or deccreases dose factors from        m the Basemeent Fill Moddel) and relatted minim mum detectaable concentrrations (for both b    scan annd fixed meaasurement m methods),
ey unit area 3; or Class 1 r to impleme GLs (or dec able concentr ioactivity lev onding sourc occurs),
Increases the radiioactivity lev  vel, relative to the appliccable derivedd concentrattion guidelinne level (or correspo onding sourcce term inven  ntory levels in the Basem ment Fill Moodel), at whiich an invvestigation occurs),
istical test ap pe I decision r
o Chan nges the statiistical test ap pplied to onee other than tthe Sign testt or Wilcoxoon Rank Sum m test, or o
nmental Rep ution of the described a generic env environmen for decomm nds of NUR cumented in
Increases the Typ  pe I decision n error.
: 87. LACBW environmen support of on of LACBW s of Change as a supplem ncludes seve at the requi t-Shutdown D h serves as t R 50.71(e).
1-10
val, in acco a)(7).
roposed ame riteria for d LTP require val pursuant nmental impa nable assura classificatio to Class 3 w nting the ch creases dose rations (for b vel, relative ce term inven pplied to one n error.
1-10 port addressi described de decommissi vironmental ntal assessm missioning LA REG-0586.
n a supplem WR decomm ntal impact the August WR, dated A es ment to the D eral decomm ired safety a Decommissio the DSAR fo Once approv rdance with endment to t etermining w prior NRC a to 10 CFR 5 acts not prev ance that ade on (i.e., impa without prov ange in class factors from both scan an to the applic ntory levels e other than t ing the actua ecommission oning attrib assessment f ment perform ACBWR ar Review of ment to the missioning a not previou t 7, 1991, April 21, 198 DSAR. Bec missioning re analyses are oning Activi for LACBWR ved, Solutio h the criteria the LACBW when chang approval wh 50.59, viously revie equate funds acted to not i viding NRC sification, m the Baseme nd fixed mea cable derived in the Basem the Sign test al or potenti ning activiti butes to tho for the decom med by Solu re minimal a post-operat e Environm and dismant usly evaluat Decommiss
: 80.
cause the lic egulation cha e included ities Report R. Solution ons may mak a in 10 CFR WR license th ges to the L en the chang ewed, will be avai impacted, Cl a minimum ent Fill Mod asurement m d concentrat ment Fill Mo t or Wilcoxo ial environm es.
ose identifie mmissioning utions determ and there ar ing license ental Repor tlement activ ed in the N sioning Ord censing histo anges, the D in the LAC (D-Plan/PSD ns will updat ke changes t R 50.59, 10 hat adds a lic LTP require ge:
ilable for lass 1 to Cla 14 day del) and relat methods),
tion guidelin odel), at whi on Rank Sum mental ed in g of a mined re no stage rt for vities NRC's er or ory of DSAR CBWR DAR) te the to the CFR cense prior ass 2; ted ne ich m


La Crossse Boiling Water W      Reactorr License Termination T             Plan Revisionn0 The contact for LTP information  n, including any a submitteed changes aand updates, is:
La Cross License T Revision The cont Gerard P Vice Pre LaCrosse S4601 St Genoa, W (224) 789 gpvannoo 1.7.
Gerard P.
R
P van Noord  dennen Vice President, Regu ulatory Affaiirs LaCrosseeSolutions, LLC L
: 1.
S4601 Sttate Road 35 5 Genoa, WI.
L A
W 54632-88    846 (224) 789 9-4025 gpvannooordennen@en  nergysolutionns.com 1.7. References R
L
: 1. Letter L       from Dairyland D          Poower Cooperative to the N  Nuclear Reggulatory Com mmission, Application A             for f Order Ap  pproving Liccense Transfe fer and Confo forming Admministrative License L         Amendments, daated October 8, 2015.
: 2.
: 2. U Nuclear Regulatory Commission U.S.                                     n, Regulatorry Guide 1.179, Standardd Format andd Content C        of Liicense Termiination Plans for Nucleaar Power Reaactors, Revission 1 - Junee 2011.
U C
: 3. U.S.
2
U Nuclear Regulatory Commission          n NUREG-11700, Revisioon 1, Standaard Review P    Plan fo or Evaluating  g Nuclear Poower Reactoor License Teermination P    Plans - Apriil 2003.
: 3.
: 4. U.S.
U fo
U Nuclear Regulatory Commission          n NUREG-00191, Final E    Environmenttal Statemennt reelated to Opeeration of th he La Crosse Boiling Waater Reactor by Dairylannd Power Cooperative C              - April 1980.
: 4.
: 5. Letter L      from Dairyland D         Poower Compan  ny to the Nuuclear Regulatory Comm  mission, Subjject:
U re C
Planning for ISFSI, I       LAC-14029, Marrch 10, 20088.
: 5.
: 6. www.wunder w              rground.comm.
L P
: 7. www.mvp.wc w              c.usace.army y.mil/projectts/Lock 8.
: 6.
: 8. Dairyland D          Power Cooperaative, LaCro  osse Boiling Water Reacctor (LACBW      WR)
w
Decommissio D            oning Plan, revised r       Noveember 2003..
: 7.
: 9. htttp://www.ciity-data.com m/city/Genoaa-Wisconsin..html.
w
: 10. 2008 Vernon County Tax    x Assessmen nt Rolls.
: 8.
: 11. EnergySoluti E              ons GG-EO--313196-RS  S-RP-001, LA   ACBWR Raadiological C    Characterizattion Survey Reporrt for Octobeer and Novem    mber 2014 F Field Work - Novemberr 2015.
D D
: 12. EnergySoluti E              ons LC-RS-PN-164017--001, LACB       BWR Radioloogical Charaacterization Survey Reporrt for June th hru August 2015 2      Field W Work - Noveember 2015.
: 9.
: 13. U.S.
ht
U Nuclear Regulatory Commission          n, NUREG-11575, Revisiion 1, Multi--Agency Radiation R          Surrvey and Sitee Investigatiion Manual ((MARSSIM    M), August 20000.
: 10.
: 14. U.S.
2
U Nuclear Regulatory Commission          n NUREG-00586, Generiic Environm    mental Impactt Statement on Decommisssioning of Nu      uclear Faciliities, Suppleement 1, Vollume 1 -
: 11.
November N            20 002.
E S
1-11
: 12.
E S
: 13.
U R
: 14.
U S
N se Boiling W Termination n 0 act for LTP P. van Noord sident, Regu eSolutions, L tate Road 35 WI. 54632-88 9-4025 ordennen@en References Letter from D Application f License Ame U.S. Nuclear Content of Li 011.
U.S. Nuclear or Evaluating U.S. Nuclear elated to Ope Cooperative -
Letter from D lanning for I www.wunder www.mvp.wc Dairyland Po Decommissio ttp://www.ci 008 Vernon EnergySoluti urvey Repor EnergySoluti urvey Repor U.S. Nuclear Radiation Sur U.S. Nuclear tatement on November 20 Water Reactor Plan information dennen ulatory Affai LLC 5
846 nergysolution Dairyland Po for Order Ap ndments, da Regulatory icense Termi Regulatory g Nuclear Po Regulatory eration of th
- April 1980 Dairyland Po ISFSI, LAC rground.com c.usace.army wer Coopera oning Plan, r ity-data.com County Tax ons GG-EO-rt for Octobe ons LC-RS-rt for June th Regulatory rvey and Site Regulatory Decommiss 002.
r n, including a irs ns.com ower Cooper pproving Lic ated October Commission ination Plan Commission ower Reacto Commission he La Crosse ower Compan
-14029, Mar
: m.
y.mil/project ative, LaCro revised Nove m/city/Genoa x Assessmen
-313196-RS er and Novem PN-164017-hru August 2 Commission e Investigati Commission sioning of Nu 1-11 any submitte ative to the N cense Transfe 8, 2015.
n, Regulator s for Nuclea n NUREG-1 or License Te n NUREG-0 Boiling Wa ny to the Nu rch 10, 2008 ts/Lock 8.
osse Boiling ember 2003.
a-Wisconsin.
nt Rolls.
S-RP-001, LA mber 2014 F
-001, LACB 2015 Field W n, NUREG-1 ion Manual (
n NUREG-0 uclear Facili ed changes a Nuclear Reg fer and Confo ry Guide 1.1 ar Power Rea 1700, Revisio ermination P 0191, Final E ater Reactor uclear Regul
: 8.
Water Reac
.html.
ACBWR Ra Field Work -
BWR Radiolo Work - Nove 1575, Revisi (MARSSIM 0586, Generi ities, Supple and updates, gulatory Com forming Adm 79, Standard actors, Revis on 1, Standa Plans - Apri Environment by Dairylan atory Comm ctor (LACBW adiological C
- November ogical Chara ember 2015.
ion 1, Multi-M), August 20 ic Environm ement 1, Vol is:
: mmission, ministrative d Format and sion 1 - June ard Review P il 2003.
tal Statemen nd Power mission, Subj WR)
Characterizat r 2015.
acterization
-Agency 000.
mental Impact lume 1 -
d e
Plan nt ject:
tion t


La Crossse Boiling Water W    Reactorr License Termination T           Plan Revision n0
La Cross License T Revision
: 15. Dairyland D          Power Cooperaative, LACB BWR Decom mmissioning Plan and Poost-Shutdownn Decommissio D          oning Activitties Report (D-Plan/PSD
: 15.
(        DAR), Revission - Marchh 2014.
D D
1-12
se Boiling W Termination n 0 Dairyland Po Decommissio Water Reactor Plan wer Coopera oning Activit r
ative, LACB ties Report (
1-12 BWR Decom (D-Plan/PSD mmissioning DAR), Revis Plan and Po sion - March ost-Shutdown h 2014.
n


La Crossse Boiling Water W     Reactorr License Termination T            Plan Revision n0 Figure 1-1 Site S Regionaal Location 1-13
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r
ure 1-1 S
1-13 Site Regionaal Location


La Crossse Boiling Water W     Reactorr License Termination T            Plan Revision n0 Figure 1-2 2   Site Ovverview 1-14
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r
Figure 1-2 1-14 2
Site Ovverview  


L La Crosse Boilin ng Water Reactor L
L L
License Termination Plan R
R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 1-3 1-15 LACBWR Buildings
Revision 0 Figure 1-3 LACBWR Bu uildings 1-15


La Crossse Boiling Water W     Reactorr License Termination T            Plan Revision n0 Fiigure 1-4 Topograph hical Map 1-16}}
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r
igure 1-4 1-16 Topographhical Map}}

Latest revision as of 21:52, 9 January 2025

License Termination Plan - Chapter 1 - General Information, Rev 0
ML16200A085
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A085 (19)


Text

LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 1 GENERAL INFORMATION

La Cross License T Revision 1.

Gen 1.1.

1.2.

1.3.

1.3.

1.3.

1.3.

1.3.4 1.3.

1.3.

1.3.

1.4.

1.5.

1.5.

1.5.

1.5.

1.5.4 1.5.

1.5.

1.5.

1.5.

1.6.

1.7.

Figure 1-Figure 1-Figure 1-Figure 1-se Boiling W Termination n 0 neral Informa Purpose.....

Decommiss Facility......

1.

Site De 2.

Current 3.

Meteor 4.

Geolog 5.

Surface 6.

Ground 7.

Environ Operational Plan Summ 1.

Genera 2.

Site Ch 3.

Identifi 4.

Remed 5.

Final R 6.

Compli 7.

Update 8.

Supplem Regulatory References

-1 Site Re

-2 Site Ov

-3 LACBW

-4 Topogr Water Reactor Plan ation...........

sioning Obje escription....

t/Future Lan rology and C gy and Seism e Water Hyd d Water Hyd ns and Natur l Background ary.............

al Informatio haracterizatio ication of Re diation Plans Radiation Sur iance with th e of the Site-ment to the E Notification egional Loca verview.......

WR Building raphical Map r

TABLE O ective...........

nd Use.........

Climatology.

mology.........

drology........

drology........

ral Resource d.................

on.................

on................

emaining Sit rvey Plan....

he Radiologi Specific Dec Environmen ns of Change LIST O ation.............

gs................

p..................

1-i OF CONTE es.................

te Dismantle ical Criteria commission ntal Report...

es.................

OF FIGURE ENTS ement Activi for License ning Costs....

RES ities.............

Termination n..................

... 1-1

... 1-1

... 1-1

... 1-2

... 1-2

... 1-3

... 1-3

... 1-3

... 1-4

... 1-5

... 1-5

... 1-6

... 1-7

... 1-7

... 1-7

... 1-8

... 1-8

... 1-9

... 1-9

... 1-9

... 1-9

. 1-10

. 1-11

. 1-13

. 1-14

. 1-15

. 1-16

La Cross License T Revision ALARA AMCG AMSL BGS DCGL DQO DSAR FSS FRS GWH ISFSI LACBW LSA LTP MARSSI MYBP NRC ODCM PSDAR RESRAD STS USACE se Boiling W Termination n 0 As Lo Avera Above Below Deriv Data Q Defue Final Final Gigaw Indep WR La Cr Low S Licen IM Multi-Millio Nucle Off-S Post-S D

RESid Sourc US Ar Water Reactor Plan LIST OF ow As Reaso age Member e Mean Sea w Ground Su ed Concentr Quality Obje eled Safety A Status Surve Radiation Su watt-Hours endent Spen rosse Boiling Specific Act se Terminati

-Agency Rad on Years Bef ear Regulator ite Dose Cal Shutdown D dual RADioa e Term Surv rmy Corp of r

ACRONYM onably Achie of the Critic Level urface ration Guide ectives Analysis Rep ey urvey nt Fuel Stora g Water Reac ivity ion Plan diation Surv fore Present ry Commiss lculation Ma ecommissio active Mater vey f Engineers 1-ii MS AND AB evable cal Group line Level port age Installatio ctor vey and Site ion anual ning Activit rials BBREVIAT on Investigatio ties Report TIONS n Manual

La Cross License T Revision

1.

G The La C that is ow located o Village o LACBW S4601 St Genoa, W The site i for LACB LACBW spent nuc license.

In a lett requested maintena from Dai Solutions 1.1.

P The obje permit th 50 licens general li This Lice was writt for Licen Review P accompa the LTP r 1.2.

D The deco LACBW remainin the requi documen that is d Average se Boiling W Termination n 0 General In Crosse Boili wned by Dair on the Dairy of Genoa, Ve WR tate Road 35 WI. 54632-88 is licensed u BWR and 72 WR has been clear fuel st ter dated O d Nuclear R ance and de iryland to So

s.

Purpose ctive of deco he release of se except fo icense provi ense Termin ten followin nse Termina Plan for Eva anied by a pr require NRC Decommissio ommissionin WR can subm ng ISFSI lice irements of nts the proce distinguishab Member of Water Reactor Plan nformation ing Water R ryland Powe yland Genoa ernon Count 5

846 under Posses 2-046 for the shut down ored in the L October 8, 2 Regulatory C ecommission olutions. In ommissionin the site for u r the area su isions of 10 C nation Plan (L ng the guidan tion Plans fo luating Nucl roposed licen C prior appro oning Objec ng objective mit a request ensed facility 10 CFR 20 ess that will ble from ba the Critical r

n Reactor (LAC er Cooperati a site on th ty, Wisconsin ssion Only L e Independen since 1987 LACBWR I 2015 (1), D Commission ning authorit n May 2016, ng LACBWR unrestricted urrounding t CFR 72 Sub LTP) satisfie nce in Regu for Nuclear P lear Power R nse amendm oval.

ctive e is to cond t to the NRC y) in accorda 0.1402, Rad be used to d ckground ra Group (AM 1-1 CBWR) wa ve (Dairylan he east shore n with an ad License No. D nt Spent Fue and is curre ISFSI will b Dairyland an (NRC) con ties, under the NRC pr R is to reduc use and allo the ISFSI.

bpart K.

es the requir ulatory Guid Power Reac Reactor Lice ment that est duct remedi C for unrest ance with Su diological Cr demonstrate adioactivity MCG) from a as a 50 Meg nd). This un e of the Mi ddress of:

DPR-45 with el Storage In ently underg be maintaine nd LaCrosse nsent to tran Possession rovided cons ce the residu ow for the ter The ISFSI f rement of 10 de 1.179, Sta ctors (2) and ense Termin ablishes the iation and s tricted releas ubpart E of 1 riteria for U that the dos does not e all applicable gawatt Electr nit, also know ississippi Ri h Docket Nu nstallation (I going decom ed under an eSolutions, nsfer Dairyla Only Licen sent to trans ual radioactiv rmination of facility is li 0 CFR 50.82 andard Form d in NUREG nation Plans criteria for survey oper se of the sit 10 CFR Part Unrestricted se from resid exceed 25 m e pathways o ric (MWe) B wn as Genoa iver south o umbers of 50 SFSI).

mmissioning amended Pa LLC (Solut ands posses nse No. DPR sfer the licen vity to level f the 10 CFR censed unde 2(a)(9). This mat and Con G-1700, Stan (3). This L when chang rations such te (other tha t 20 after me d Use. The dual radioac mrem/year to over a 1,000 BWR a 2, is of the 0-409

. The art 50 tions)

ssion, R-45, nse to s that R Part er the s LTP ntents ndard LTP is ges to h that an the eeting LTP ctivity o the 0 year

La Cross License T Revision period an Achievab 1.3.

F 1.3.1.

LACBW Mississip south of nearby p LACBW mile 678 approxim rail road (AMSL)

Boiling W The licen LACBW plant, off and inclu the the coa an a (Ge an a a pa The site i Mississip miles up The site i

35. A B commerc this rail National LACBW and sturg LACBW se Boiling W Termination n 0 nd that residu ble (ALAR Facility Site Desc WR is located ppi River, ab the city of L prominent f WR are longit 8.6 on the mately 300 fe

. The reacto per NURE Water Reacto nsed site co WR comprisin f of Highwa ude:

LACBWR p land north o al (and later o area directly enoa Station area south o arcel of land is bordered o ppi River an stream, man is bordered o Burlington N cial freight a line. The s Wildlife &

WR, is the Ge geon. On th WR plant, is a Water Reactor Plan ual radioacti A).

cription d in southw bout 1 mile La Crosse, W features such tude 91o, 13 Mississippi feet from the or stands on G-0191, En or (4).

omprises a ng only 1.5 ay 35. The p

plant, of LACBWR oil) fueled p y south of LA
  1. 3) approxi f Genoa #3 w d to the east o on the north nd Highway naged by the on the west b Northern-Sant along the eas site is borde

& Fish Refug enoa Nation he southwes a public boat r

ivity has bee western Wisc south of the WI. See Figu h as highw

, 53.35 We River abov e Mississippi n filled land nvironmental total of 163 acres. The prominent fe R, including power plant (

ACBWR wit imately 175 where the IS of Highway h by the Miss

35. The U.

e U.S. Army by the Missi ta Fe rail lin stern portion ered to the s ge Pool 9 a nal Fish Hatc stern corner t launching r 1-2 en reduced to consin, in V e Village of ure 1-1 for a ways, rivers est and latitu ve the mout i River and at an elevat l Statement 3.5 acres (5 site is acce eatures on th the site swit (removed in th an operati feet from th SFSI is locat 35, across fr sissippi Rive

.S. Lock & D y Corp of En issippi River ne, located b n of the site; south by a s area. Furthe chery which of the site, ramp with a p o levels that Vernon Coun f Genoa, WI map showin and lakes.

ude 43o, 33, th of the O 475 feet we tion of 639 related to

5) which is essed by a r he site are sh tchyard and 1989),

ional 350-M he LACBWR ted, and from LACBW er and a narr Dam No. 8 ngineers (US r and is bord between the

there are n segment of t er south, ap h raises enda

, approxima parking lot.

are As Low nty, on the e and approx ng the site lo The map

, 36.22 Nor Ohio River.

est of the car feet Above Operation o owned by road on the hown in Fig the site of th Mwe fossil ge R plant, WR.

row strip of is located a SACE), Roc dered on the site and Hig no passenger the Upper M pproximately angered mus ately 0.75 m w As Reason east shore o ximately 19 m ocation, inclu coordinate rth. The site The react rgo-carrying Mean Sea L of the La C Dairyland, south side o gures 1-2 an he former G-enerating stat land betwee approximatel ck Island Dis east by High ghway 35 ca r trains whic Mississippi R y 2.4 miles ssels, brook miles south o nably of the miles uding es for e is at tor is g-only Level Crosse with of the nd 1-3

-1 tion en the ly 0.6 strict.

hway arries h use River from trout of the

La Cross License T Revision 1.3.2.

The site the Geno the prese continue future lan The spe interim establish 1.3.3.

The La C in Genoa weather r data inclu Tempera the extre Average summer and 1995 Monthly spring an The bluff shows pr winds fo LACBW average w 1.3.4.

LACBW physiogr Pleistoce early Pal which ha area. Ma Bedrock Wisconsi Present composit dolomite both side se Boiling W Termination n 0 Current/

has been co oa 3 facility ence of the a as an indus nd use, other ent nuclear storage fac ed and ready Meteorol Crosse Muni a maintain related infor udes: wind s atures in the emes being temperature season. A r

5. The recor precipitatio nd summer s ffs of the Mis revailing sou or the month WR Site wher wind speeds Geology WR is locat aphic provi ene Epoch a leozoic age.

as been mod aximum relie in the site r in Dome by

[MYBP]) s tion. The P s, sandstone es of the Mi Water Reactor Plan Future Lan ontinuously u and support ash landfills strial-use pro r than perhap fuel is expe cility, or li y to receive L logy and Cli cipal Airpor long standin rmation in th speed and dir La Crosse r more marke es range from record maxi rd low was -4 on averages easons and o ssissippi Riv utherly wind hs of Nove re the river are typically and Seismo ted within ince. The and is charac Moderate t dified by a m ef in the regi region consis y early Pale edimentary Paleozoic roc es and shales ississippi riv r

nd Use used for indu ing operatio

, as well as operty after ps recreation ected to rem icensed tem LACBWR f imatology rt located in ng active w he La Crosse rection, temp region are ty ed because m 20 °F in th mum tempe 43 °F in Janu in the area one to three ver Valley ch s for seven m mber throug valley runs y 6-10 mph.

ology the Wisco Wisconsin cterized by to strong rel mantle of lo ion is about sts of Pre-Ca eozoic (Cam strata. Ba cks are 1,20

s. About 600 ver in the pl 1-3 ustrial purpo ons (e.g. barg the on-site decommiss nal, can be e main at the mporary mo fuel.

the town of weather stati e - Genoa re perature, and ypical of the of the river he three mo erature of 10 uary of 1873 ranges from inches per m hannel the w months of th gh March o north-south onsin Driftl Driftless flat lying n lief has been oess and glac 1,000 feet.

ambrian cry mbrian and asement roc 0-1,300 feet 0 feet of this lant vicinity oses since 1 ge washing, ISFSI, it is sioning is co envisioned o ISFSI until onitored retr f La Crosse a ions that m egion of the d precipitati e extremes o r valley loca onths of the w 08 °F was re

3.

m three to f month for the winds at the L he year with of the year.

are from th less section section was naturally dis n produced o cial outwash ystalline rock Ordovician, cks in the s t thick in th s sequence is

y. Prior to t 941. Due to switchyard) anticipated ompleted. N over the next a federal re rievable sto and the USA monitor and Mississippi on (6) (7).

of a contine ation of the winter seaso ecorded in J five inches p e rest of the LACBWR S prevailing n Predomina he north and n of the C s not glaci ssected sedim on the ungla h in the larg ks exposed a

, 572 Millio site vicinity he site vicini s exposed al the Pleistoce o the presen

) on the prop that the site No other cre t several dec epository, o orage facilit ACE Lock 8 archive stan River. Coll ntal climate LACBWR on to 72 °F i July of both per month i year.

Site. Airport north to north ant winds a d south. Mo Central Low iated during mentary roc aciated lands ger valleys o at the crest o on Years B y are of gra ity and cons long the bluf ene Epoch (

nce of

perty, e will edible cades.

offsite ty is Dam ndard lected e with Site.

in the 1936 in the t data hwest at the onthly wland g the ks of scape of the of the Before anitic sist of ffs on (more

La Cross License T Revision than 2 M today. It The site Region c synclines Superior formed d Major up Some mi MYBP).

of the W sediment Many fau capable a geologic mapped i several n found an seismicit site (8).

Seismic 2008 oc decommi 1.3.5.

The LAC the vicin Prairie du width. T There is land, isla sloughs a the uplan channel a The main are opera of the sit distance the site.

Part of th plant. T one to th se Boiling W Termination n 0 MYBP) the ri t was buried is located consists of s and arches syncline, Fo during the La plift and dow inor tilting o The site is Wisconsin A tary strata in ults have be according to conditions i in the site re nuclear powe ny evidence ty. Therefor activity (ma ccurred ove issioning (9)

Surface W CBWR site i ity of the sit u Chien, app The valley wa little or no a ands betwee and meander nd where tr are wooded.

n channel of ated by the U te) the river i of 20 miles, he licensed herefore, dr he south, so Water Reactor Plan iver had carv by post-glac within the a vast area

s. Major str orest City ba ate Pre-Camb wn-warping a occurred duri located on th Arch, a sout n the vicinity een mapped o the criteria in the site vi egion, but in er plant sites e of capabl re, capable agnitudes ra er 180 mile

).

Water Hydr is in the Mi te, the valley proximately alls rise shar agricultural en river cha ring river ch ributary stre The flat up f the river va USACE for n is nearly fou then gradua area (27 ac ainage at th that only p r

ved a gorge cial sedimen Central Stab a of large c ructural feat asin, Michig brian and Ea also occurre ing and follo he southwes thward proj y dip less tha d in the site a in 10 CFR icinity that r nvestigations s in the regio e faulting.

faulting doe anging from es from th rology ssissippi Riv y is deeply c y 40 miles so rply 500 to 6 use of the ri annels and e hannels. Nu ams intercep pland areas a aries greatly navigational ur miles wid ally widens a cres) is on a e site has be recipitation 1-4 as much as nt.

ble Region circular upli tures includ gan Basin, an arly Paleozo ed during lat owing the Pl t flank of the ection of th an 20 feet per region. No 100, Appen represent haz s of all of the on, in additio Additiona es not need 3.5 to 5.4) e site and ver valley an cut into highl outh, the val 600 feet from iver valley f extensions o umerous shor pt the main and some of t in width abo purposes. A de. Below th as the river a a filled in ar een establish that falls on 150 to 210 tectonic pro ifts and sed de the Wisco nd Illinois B oic (more tha te Paleozoic leistocene g e Wisconsin he Wisconsi r mile to the one of these ndix A. Per zard to the f ese faults du on to studies ally, the are to be consi that has be did not i nd is relativ ly dissected lley varies b m river level floor which of low lying rt, steep-side n river valle the tributary ove and belo Above Dam he site, the ri approaches D rea south of hed. One v n the bluff a feet deeper ovince. Th dimentary ba onsin Dome Basin. Thes an 435 MYB (330 MYBP laciations (2 n Dome and in Dome.

e southwest.

e faults are the US NR facility. Num uring the cou s for the LA ea is one o dered in the een noted be impact plan vely flat (see uplands. Fr between 2.5 consists prim g flood plai ed valleys h ey. Both w y valleys are ow the site.

No. 8 (abou iver is relativ Dam No. 9, f the origina valley drains adjacent to t than can be he Central S asins, and b e and Arch, e structures BP).

P to 240 MY 2 MYBP to 0 the western For this re considered RC, There a merous fault urse of valid CBWR, hav of relatively e analysis o etween 1975 nt operation e Figure 1-4 rom La Cros and 4.5 mil marily of m in cut by p ave been cu walls of the cultivated.

A series of ut 0.75 mile vely narrow 33 miles sou al Genoa-1 s to the north the site and e seen Stable broad Lake were YBP).

0.001 flank

eason, to be are no ts are dating ve not y low f this 5 and ns or 4). In sse to les in arshy
onds, ut into main dams north for a uth of steam h and on a

La Cross License T Revision small po presently problems For a dis and town published Davenpo purposes miles dow other kno Chien, 40 1.3.6.

Groundw feet Bel commun fill mater groundw river. B sampling vertical g likely du As the s which is but not penetratin of the riv water qu has been There are analyzed Highway 1.3.7.

The LAC of Genoa west sho commun Wisconsi (Populati The area includes Agricultu se Boiling W Termination n 0 rtion of the y channeled s of flash flo tance of 40 m ns along the d records, th ort, Iowa, ab

, excluding t wnstream. R own users o 0 miles down Ground W water beneath low Ground ication with rial likely flo water is also ased on a re g in support gradient. Ho e to high riv ite has valle underlain by in valleys ng the Moun ver valley flo uality of the no extensiv e onsite pota

d. Regionall y 35 with the Environs CBWR Facil a (population ore is Reno, ity in Iowa i in, an uninco ion data is fr a within a f Houston C ure and fore Water Reactor Plan upland are along the h oods have oc miles downs e river are o he nearest m bout 195 mi the adjacent River water f river wate nriver.

Water Hydr h the site is d Surface (

h the adjacen ows towards likely to flo eview of the of the Gen owever, ther ver stages an ey sand ove y Mount Sim characterize nt Simon lay oor. Use of deep aquife e withdrawa able and gro ly, there are e water table s and Natur lity is 17 mil n about 260)

Minnesota, is New Albin orporated ha rom 2013 Ci five-mile rad County, Min estry are the r

a contribute highway and curred at the stream of the obtained from major city u iles downstr fossil plant, at the Lansin r for industr rology first encoun (BGS) and nt Mississipp s the west an ow towards e groundwat noa 3 fossil re are some d flooding.

erlaying a la mon sandston ed by sub-yer flow to th f water from ers is poorer al of water an oundwater m e five dome encountered al Resource les south of t

). The near

, an unincor n (pop. 513) amlet, is situ ity-Data.com dius is pred nnesota, an e predomina 1-5 es to runoff d railroad to e site.

e site, virtua m ground w using river w ream. The n

, is the steam ng plant is u rial purposes ntered at dept the water pi River. G nd discharge the west but ter elevation station, it a periods whe ayer of Eau ne, wells hav layers of M he surface in these artesi than that fr nd no signifi monitoring w estic wells s d from 20 to es the City of L est commun rporated ham

), located fiv uated five m m) (9).

dominantly i nd a small ant land use directly acr o prevent in ally all munic water. On th water for d nearest use m-power plan used for cond s between L ths ranging table aqui Groundwater es into the M ut then may n measureme appears that ere the grad Claire sand ve been driv Mount Simo ndicating an ian aquifers rom shallow ficant decrea wells which a south of the o 45 feet BG La Crosse an nity (three m mlet of abou ve miles sou miles south o in Vernon C portion of es in Verno ross the site nterference w cipal water s he basis of direct human of river wa nt in Lansing denser cooli LACBWR si from approx ifer is in r in the shall Mississippi R turn and flo ents collecte t there is a dients are rev dstone of th ven in areas on sandston artesian hea has been lim w aquifers. A se in the arte are periodic e LACBWR S.

nd a mile sou miles to the n ut 350 peop uthwest of th of the plant o County, Wis f Allamakee on County a

e. This runo with traffic.

supplies for readily avai n consumpti ater for indu g, Iowa, abo ing. There a ite and Prair ximately 15 strong hydr low deposit River. The d ow parallel t ed during ro slight down versed and t he Cambrian closest to th ne. Deep ad about the mited becaus As a result, esian head.

ally sampled R site and ea uth of the Vi northwest) o ple. The ne he plant. Vic on the east s sconsin, but e County, I as well as in off is No cities ilable ion is ustrial out 15 are no rie du to 25 raulic s and eeper to the outine nward this is n Age he site wells level se the there d and ast of illage on the earest

ctory, shore.

t also Iowa.

n the

La Cross License T Revision neighbor County's and mars of the cou The prim years, th agricultu woodland hardwoo A modes througho intensity-commerc and less related to nonagricu east of LA Land in t within a bottomla portion o site, occu to the eas Refuge b for 2.5 m including 26 and ho Approxim water are The five populatio 1.4.

O Key stati Allis-perfo Dairy turbin Allis-Initia se Boiling W Termination n 0 ring counties gross area i shlands is cl unty's gross mary agricult here has bee ural land to

d. The fores ds.

st amount o out Vernon C

-use categor ce, public, tr than 0.3%

o the proce ultural indu ACBWR.

the vicinity o a five-mile ands included of the Villag upies less tha st and northe bottomland a miles. Roug g vacation h ouseboats ar mately 3.5 s ea and refug

-mile radius on is 522.

Operational ion mileston

-Chalmers, u ormed startup yland entered ne-generator

-Chalmers d al Criticality Water Reactor Plan s on the we is agricultur lassified as u area (10).

tural activity en a marke woodland.

sts yield sub f sandstone County. Furt ries of resid ransportation of gross ar essing of ag stries of the of the LACB radius, app d in the Upp ge of Genoa an 100 acres east consistin and water su ghly a third o omes and bo re moored at quare miles ge bottomlan s includes a Backgroun es are presen under contra p of the LAC d into a cont r for product dockets appli achieved: J r

est side of t re and woodl undeveloped y is dairy fa d trend tow About two-bstantial amo and limesto ther, 85% of dential and p n, and utilitie rea. Local gricultural an e industrial p BWR Site is proximately per Mississip a, the only s

s. The neare ng of small t urface, lying of the area r oathouses, a t several poin of Iowa are nd, although a portion of nd nted in Chap act with the A CBWR from tact to purch tion of electr ication for co July 11, 1967 1-6 the Mississi lands. Abou
d. Total dev arming, mea ward the co

-fifths of the ounts of oak one quarryin f the develop park land. T es) account f industry co nd forest pr park in Viro overwhelmi one third ppi River W ubstantial co est residence trailer parks mainly in M remains und are scattered nts at times d within the L h there is so the incorpo pter 2 of this AEC, design m 1962 to 196 hase steam fr ricity: June 1 onstruction:

7, ippi River.

ut 3.4%, con veloped land at animals, a nversion of e total land k and lesser q ng also take ped land in V The more in for less than onsists almo roducts. O oqua, Wisco ingly rural a is account Wildlife and F ommunity in es to the LAC and residen Minnesota, ex der cultivatio d along the s during the y LACBWR f ome agricult orated town s LTP. The m ned, fabricate 67, rom the nucl

1962, November 5 Nearly 90%

nsisting mai d accounts fo and crop far f Vernon C in farms is quantities of es place at a Vernon Cou ntensive lan n 15% of tota ost exclusive One notable onsin located and undevelo ted for by Fish Refuge n the five m CBWR Site nces on small xtend west o on. A few d shoreline nea year.

five-mile rad tural use on of New Al major milest ed, construct lear plant to 5, 1962,

% of the Ve nly of water or less than rming. In r ounty's mar s now devot f maple and a number of unty is in the nd uses (indu al developed ely of opera exception i d 25 miles t oped. Of the water area

e. The devel mile radius o are within a l acreages.

of the reacto dozen reside ar State Hig dius. Most o n the bottom lbin, whose tones are:

ted and operate a ernon r area 6.6%

recent rginal ted to other f sites e low-

ustry, d land ations is the to the e area a and loped of the a mile or site
ences, hway f it is mland.

total

La Cross License T Revision Low Provi Provi LACB Final Comp The reac 96,274.6 The unit The LAC Turbine Storage T are curre and meta Vessel.

holds fiv 1.5.

P 1.5.1.

The LTP license a with the Safety A amendme The subs 1.5.2.

LTP Cha and exten remain a site chara determin The LAC Field Wo August 2 basis for specified (MARSS change th se Boiling W Termination n 0 power testin isional Oper isional Oper BWR perma l reactor defu pletion of fu tor was criti hours. The availability CBWR unit Building, 1B Tank Vault, ntly undergo allic radioact The ISFSI, e above-grou Plan Summa General I P describes th and to releas requirement Analysis Rep ent that estab sections belo Site Char apter 2 discu nt of radioac at the time o acterization, ned to be imp CBWR Radio Work (11) an 2015 Field W dividing the d in NUREG SIM) (13) fo he original c Water Reactor Plan ng completed rating author rating Licens anently shut ueling was c uel loading in ical for a tot e total gross factor was 6 consists of B Diesel Ge Ventilation oing decomm tive equipme located sout und Dry Sto ary Information he process u se the site fo ts in 10 CFR port (DSAR blishes the c ow provide a racterizatio usses the site ctive contam of license ter Solutions w pacted by the ological Cha nd LACBWR Work (12) p e site into su G-1575, Mu or classifica classification r

d: Septembe rization issue se, DPRA-45 down: Apri completed on nto the ISFS tal of 103,28 electrical en 62.9%.

f major buil enerator Buil Stack, Low missioning (

ent has been th of the Gen orage Casks w n

used to meet or unrestrict R 50.82(a)(9 R). The LTP criteria for w a brief summ n

characteriza mination on si rmination, so will plan rem e operation o aracterizatio R Radiologic rovided the urvey units.

ulti-Agency ation. Data n of an area, 1-7 er 1967, ed (DPRA-6 5 issued: Au il 30, 1987, n June 11, 19 I was compl 87.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

nergy genera dings and s lding, Waste w Specific A see Figure 1 n removed sin noa 3 fossil with 333 spe the requirem ted use. Th

9) and is sub P submittal when changes mary of the ot ation that ha ite prior to r oils, and gro mediation and of LACBWR on Survey R cal Charact foundation The survey Radiation from subse

, within the 6): October 3 ugust 28, 19 987, and leted on Sep The 50 MW ated was 4.0 structures su e Treatment Activity (LSA 1-3). Interm nce 2007, in station, bec ent fuel asse ments for ter he LTP has b bmitted as a is accompa s to the LTP ther seven ch as been condu remediation, ound water.

d Final Radi R.

Report for O terization Su for further y units were Survey and equent chara requirement 31, 1969, 73, ptember 19, 2 We generato 047 Gigawat uch as the R t Building, U A) building a mittent system ncluding the came operati emblies.

rminating the been prepar a supplement anied by a P require prio hapters of th ducted to dete including st Based on t iation Survey October and Survey Repo site charact evaluated ag d Site Inves acterization ts of this LT 2012.

or was on lin tt-Hours (GW Reactor Buil Underground and others w ms dismantle Reactor Pre ional in 2012 e 10 CFR Pa ed in accord t to the Defu proposed lic or NRC appr he LTP.

ermine the n tructures tha the results o ys (FRS) in d November rt for June terization an gainst the cr stigation Ma may be us TP, up to the ne for WH).

lding, d Gas which ement essure 2 and art 50 dance fueled cense roval.

nature at will of the areas 2014 thru nd the riteria anual ed to e time

La Cross License T Revision of FRS, remediat 1.5.3.

LTP Cha informati A des A sum Estim An es dispo Descr Solutions in NURE Facilities accordan Radioact administr Activitie than tho decommi operating The info sections remainin 1.5.4.

LTP Ch decommi in 10 CF remediat The selec of contam surfaces.

at backgr contamin structura standard other me Derived se Boiling W Termination n 0 as long as t ion in the ar Identifica apter 3 ident ion provided scription of t mmary of ra mates of asso stimate of th osal, and riptions of p s is decomm EG-0586, G s, Supplemen nce with the tive Waste rative, work s conducted ose conduct issioning ac g activities th rmation pro of the LTP ng dismantlem Remedia hapter 4 dis issioning to FR 20.1402 ion activitie cted remedia mination. T Very limite round levels nation has b l surfaces i and pressu ethods. Sur Concentrati Water Reactor Plan the classifica rea.

ation of Rem tifies the rem d in Chapter the areas and diological co ociated occup he types and proposed con missioning L Generic Envi nt 1, Volume e Solutions

Program, control and during deco ted during ctivities is b hat occurred vided in Ch P and provi ment activiti tion Plans scusses the reduce resid

. This chap s on the Rad ation method The principa ed soil conta s or a small been identif include scab re washing, rface and su on Guidelin r

ation reflect maining Site maining site 3 includes:

d equipment onditions tha pational radi quantities o ntrol mechan LACBWR in ironmental I e 1, (14). T s Safety an Off-Site D decommissi ommissionin plant oper bounded by d during majo hapter 3 supp ides sufficie ies.

various re dual contami pter also di diation Prote ds used are d al materials amination is fraction of fied to date bbling and wiping, gr ubsurface so ne Level (DC 1-8 ts the level o e Dismantle dismantlem t that need fu at may be en iation dose, f radioactive nisms to ensu n accordance Impact Stat The decomm nd Health P Dose Calcu ioning imple ng do not po rations. T y previously or maintenan ports the ass ent detail to emediation ination to lev scusses the ction Progra dependent up that may b expected; an the drinking

e. Remedia shaving, ch rit blasting, oil with activ CGL) will b of residual a ement Activ ment and dec urther remed ncountered, e material ge ure areas are e with the D tement on D missioning ac Program, Ra ulation Ma ementation p ose any great The radiolo y analyzed r nce and outa sessment of o identify r techniques vels that com ALARA ev am.

pon the cont be subject t ny noted gro g water stan ation techni hipping, spo mechanical vity levels i be removed activity exis vities contaminatio

diation, enerated for e not re-cont DECON alter Decommissio ctivities will adiation Prot anual (ODC procedures.

ter radiologi ogical risk radiological age activities f impacts con resources ne that may mply with th valuation an taminated m to remediati oundwater sa ndards; and ques that m onge and a fracturing in excess of and dispose sting prior to on activities.

release and taminated.

rnative desc oning of Nu l be conduct tection Prog CM), and ical or safety associated risk for fo

s.

nsidered in eeded during be used d he release cr nd the impa material and e on are struc amples have no surface w may be used abrasive bla and cutting f the approp ed as radioa o any The cribed uclear ted in

gram, plant y risk with ormer other g the during riteria act of extent ctural been water d for
sting,

, and priate active

La Cross License T Revision waste.

excavato environm adequate 1.5.5.

LTP Cha packages of a Fin remainin demonstr use speci The FRS Objective assessme that are i ISFSI, w 1.5.6.

LTP Ch complian unrestrict scenarios

analysis, exposure LTP Cha contamin work tow Argonne code to d license te 1.5.7.

LTP Cha releasing with the 1.5.8.

LTP Cha significan terminati CFR 50.

se Boiling W Termination n 0 Soil remedi rs. Remed mental contro erosion, sed Final Rad apter 5 prese s, and instruc nal Status S ng building rate that the ified in 10 C S Plan descr es (DQO), su ent and comp identified as which will sti Complian hapter 6 pre nce with the ted use. Ch s, exposure DCGLs an e compliance apter 6 uses nation and r wards and be National La determine th ermination.

Update o apter 7 pro g the site for funds curren Supplem apter 8 upda nt environm ion activities 82(a)(9)(ii)(

Water Reactor Plan ation equipm diation of so ol procedure diment, and diation Surv ents the FRS ctions to per urvey (FSS basements.

LACBWR f CFR 20.1402 ribes the dev urvey metho pliance. Th s impacted.

ll remain a l nce with the esents the e radiologic apter 6 discu

pathways, nd Dose Fac e scenario an s radiologic radioactivity e verified by aboratory RE he radiologic of the Site-Sp ovides an up r unrestricted ntly available ent to the E ates the Envi mental impa
s. This sect G). In accor r

ment will in oils will inc es, as well air emission vey Plan S Plan which rform the FR

) for open The FRS facility and s (e.g. annual velopment o ods and instr he FRS Plan The adjace icensed area e Radiologic radiological cal criteria f usses the site computatio ctors, the de nd evaluation cal informat concentrati y the FSS or ESidual RA cal release c pecific Deco pdated estim d use. This e in the deco Environmen ironmental R acts associat ion of the L rdance with 1-9 nclude, but clude the us as appropria n controls du h will be use RS of the LA land areas Plan descr site comply l dose limit o of the survey rumentation, addresses o nt areas tha a, will not be cal Criteria l informatio for license e-specific in onal models erivation of n of alternati ion from C ion levels th r STS discus ADioactive m criteria for r ommissionin mate of the chapter also ommissionin tal Report Report for L ted with th LTP is prepar 10 CFR 51 not be lim se of establi ate work pa uring soil rem ed to develo ACBWR site and a Sour ribes the fin with radiolo of 25 mrem y plan, surv

, data collect only LACBW at are classif e subject to F a for License on and me termination nventory of r s used for area factor ive exposure Chapter 2 an hat Chapter ssed in Chap materials (RE remaining st ng Costs e remaining o compares t ng trust fund LACBWR w he sites de ared pursuan

.53(d), Solu mited to, bac ished excav ackage instru mediation.

op the site pr

. The FRS P rce Term S nal survey ogical criteri to AMCG p vey design a tion and pro WR structure fied as non-i FRS.

e Terminati ethods used and release radionuclide dose mode rs, the basis e scenarios.

nd establish 4 remediati pter 5. Solu ESRAD) v7.

tructures an decommiss the estimate

d.

with new info ecommission nt to 10 CFR utions consid ck and track vation safety uctions to en rocedures, su Plan is comp Survey (STS process use ia for unrestr plus ALARA and Data Qu ocessing, and es and land impacted an ion to demon e of the sit s, future lan eling, sensi for the sel es the allow ion methods utions applie

.0 dose mod nd soils to en sioning cost ed remaining ormation and ning and lic R 51.53(d) an ders Chapter k hoe y and nsure urvey prised S) for ed to ricted A).

uality d data areas nd the strate te for nd use itivity lected wable s will ed the deling nable ts for g cost d any cense nd 10 r 8 to

La Cross License T Revision be a sup impacts a LTP Ch NUREG-reference that the adverse e environm LACBW have resu Environm NUREG-1.6.

R Solutions LACBW documen Decomm Revision LTP in a LTP, wit 50.82(a)(

Solutions condition NRC app Requ Resu Detra decom Decre Class notifi Incre minim Incre level an inv Chan test, o Incre se Boiling W Termination n 0 pplement to associated w apter 8 com

-0586, which e nuclear fac environmen effects outsi mental impa WR dated De ulted in no mental Asse

-0191 related Regulatory N s is submitti WR spans a p ntation is un issioning Pl March 2014 accordance w thout prior N (6), and 10 C s is also sub n that establ proval. Chan uires Commi lts in signifi acts or negat mmissioning eases a surve s 2 to Class 3 ication prior ases the DC mum detecta ases the radi (or correspo vestigation o nges the stati or ases the Typ Water Reactor Plan the Environ with the execu mpares the h provides a cility. The ntal effects f ide the boun acts was do ecember 198 significant essment in d to operatio Notification ng the LTP period that in nique in tha lan and Post 4 (15) which with 10 CFR NRC approv CFR 50.82(a bmitting a pr lishes the cr nges to the L ssion approv cant environ tes the reason g,

ey unit area 3; or Class 1 r to impleme GLs (or dec able concentr ioactivity lev onding sourc occurs),

istical test ap pe I decision r

nmental Rep ution of the described a generic env environmen for decomm nds of NUR cumented in

87. LACBW environmen support of on of LACBW s of Change as a supplem ncludes seve at the requi t-Shutdown D h serves as t R 50.71(e).

val, in acco a)(7).

roposed ame riteria for d LTP require val pursuant nmental impa nable assura classificatio to Class 3 w nting the ch creases dose rations (for b vel, relative ce term inven pplied to one n error.

1-10 port addressi described de decommissi vironmental ntal assessm missioning LA REG-0586.

n a supplem WR decomm ntal impact the August WR, dated A es ment to the D eral decomm ired safety a Decommissio the DSAR fo Once approv rdance with endment to t etermining w prior NRC a to 10 CFR 5 acts not prev ance that ade on (i.e., impa without prov ange in class factors from both scan an to the applic ntory levels e other than t ing the actua ecommission oning attrib assessment f ment perform ACBWR ar Review of ment to the missioning a not previou t 7, 1991, April 21, 198 DSAR. Bec missioning re analyses are oning Activi for LACBWR ved, Solutio h the criteria the LACBW when chang approval wh 50.59, viously revie equate funds acted to not i viding NRC sification, m the Baseme nd fixed mea cable derived in the Basem the Sign test al or potenti ning activiti butes to tho for the decom med by Solu re minimal a post-operat e Environm and dismant usly evaluat Decommiss

80.

cause the lic egulation cha e included ities Report R. Solution ons may mak a in 10 CFR WR license th ges to the L en the chang ewed, will be avai impacted, Cl a minimum ent Fill Mod asurement m d concentrat ment Fill Mo t or Wilcoxo ial environm es.

ose identifie mmissioning utions determ and there ar ing license ental Repor tlement activ ed in the N sioning Ord censing histo anges, the D in the LAC (D-Plan/PSD ns will updat ke changes t R 50.59, 10 hat adds a lic LTP require ge:

ilable for lass 1 to Cla 14 day del) and relat methods),

tion guidelin odel), at whi on Rank Sum mental ed in g of a mined re no stage rt for vities NRC's er or ory of DSAR CBWR DAR) te the to the CFR cense prior ass 2; ted ne ich m

La Cross License T Revision The cont Gerard P Vice Pre LaCrosse S4601 St Genoa, W (224) 789 gpvannoo 1.7.

R

1.

L A

L

2.

U C

2

3.

U fo

4.

U re C

5.

L P

6.

w

7.

w

8.

D D

9.

ht

10.

2

11.

E S

12.

E S

13.

U R

14.

U S

N se Boiling W Termination n 0 act for LTP P. van Noord sident, Regu eSolutions, L tate Road 35 WI. 54632-88 9-4025 ordennen@en References Letter from D Application f License Ame U.S. Nuclear Content of Li 011.

U.S. Nuclear or Evaluating U.S. Nuclear elated to Ope Cooperative -

Letter from D lanning for I www.wunder www.mvp.wc Dairyland Po Decommissio ttp://www.ci 008 Vernon EnergySoluti urvey Repor EnergySoluti urvey Repor U.S. Nuclear Radiation Sur U.S. Nuclear tatement on November 20 Water Reactor Plan information dennen ulatory Affai LLC 5

846 nergysolution Dairyland Po for Order Ap ndments, da Regulatory icense Termi Regulatory g Nuclear Po Regulatory eration of th

- April 1980 Dairyland Po ISFSI, LAC rground.com c.usace.army wer Coopera oning Plan, r ity-data.com County Tax ons GG-EO-rt for Octobe ons LC-RS-rt for June th Regulatory rvey and Site Regulatory Decommiss 002.

r n, including a irs ns.com ower Cooper pproving Lic ated October Commission ination Plan Commission ower Reacto Commission he La Crosse ower Compan

-14029, Mar

m.

y.mil/project ative, LaCro revised Nove m/city/Genoa x Assessmen

-313196-RS er and Novem PN-164017-hru August 2 Commission e Investigati Commission sioning of Nu 1-11 any submitte ative to the N cense Transfe 8, 2015.

n, Regulator s for Nuclea n NUREG-1 or License Te n NUREG-0 Boiling Wa ny to the Nu rch 10, 2008 ts/Lock 8.

osse Boiling ember 2003.

a-Wisconsin.

nt Rolls.

S-RP-001, LA mber 2014 F

-001, LACB 2015 Field W n, NUREG-1 ion Manual (

n NUREG-0 uclear Facili ed changes a Nuclear Reg fer and Confo ry Guide 1.1 ar Power Rea 1700, Revisio ermination P 0191, Final E ater Reactor uclear Regul

8.

Water Reac

.html.

ACBWR Ra Field Work -

BWR Radiolo Work - Nove 1575, Revisi (MARSSIM 0586, Generi ities, Supple and updates, gulatory Com forming Adm 79, Standard actors, Revis on 1, Standa Plans - Apri Environment by Dairylan atory Comm ctor (LACBW adiological C

- November ogical Chara ember 2015.

ion 1, Multi-M), August 20 ic Environm ement 1, Vol is:

mmission, ministrative d Format and sion 1 - June ard Review P il 2003.

tal Statemen nd Power mission, Subj WR)

Characterizat r 2015.

acterization

-Agency 000.

mental Impact lume 1 -

d e

Plan nt ject:

tion t

La Cross License T Revision

15.

D D

se Boiling W Termination n 0 Dairyland Po Decommissio Water Reactor Plan wer Coopera oning Activit r

ative, LACB ties Report (

1-12 BWR Decom (D-Plan/PSD mmissioning DAR), Revis Plan and Po sion - March ost-Shutdown h 2014.

n

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r

ure 1-1 S

1-13 Site Regionaal Location

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r

Figure 1-2 1-14 2

Site Ovverview

L L

R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 1-3 1-15 LACBWR Buildings

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r

igure 1-4 1-16 Topographhical Map