| number = ML17111A844
| number = ML17111A844
| issue date = 04/20/2017
| issue date = 04/20/2017
| title = Catawba Nuclear Station, Units 1 and 2 - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009)
| title = Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009)
| author name = Shaeffer S M
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS/EB2
| author affiliation = NRC/RGN-II/DRS/EB2
| addressee name = Simril R T
| addressee name = Simril R
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  April 20, 2017  Mr. Robert T. Simril  
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION  
REGION II  
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
ATLANTA, GEORGIA  30303-1257  
   
April 20, 2017  
   
Mr. Robert T. Simril  
Site Vice President  
Site Vice President  
Duke Energy Carolinas, LLC  
Duke Energy Carolinas, LLC  
Catawba Nuclear Station  
Catawba Nuclear Station  
4800 Concord Road York, SC  29745   
4800 Concord Road  
York, SC  29745  
   
SUBJECT:  CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF  
SUBJECT:  CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF  
  CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS. 05000413/2017009 AND 05000414/2017009)   Dear Mr. Simril:   The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1 and 2.  The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from the NRC Region II Office.  The team will be composed of personnel from the NRC Region II  
   
Office.  The inspection will be conducted in accordance with IP 71111.05XT, "Fire Protection -  
CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND  
NFPA 805 (Triennial)," the NRC's baseline fire protection inspection procedure, dated   
REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.  
January 31, 2013.  On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements for an information gathering onsite visit and a two-week onsite inspection.  The schedule for the  
05000413/2017009 AND 05000414/2017009)
inspection is as follows:   * Information gathering visit: June 27 - 29, 2017 * Week 1 of onsite inspection: July 24 - 28, 2017 * Week 2 of onsite inspection: August 7 - 11, 2017  The purposes of the information gathering visit are to obtain information and documentation needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for  
Dear Mr. Simril:
unescorted site access.   An initial list of the documents the team will review during the conduct of the inspection is listed  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1  
and 2.  The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from  
the NRC Region II Office.  The team will be composed of personnel from the NRC Region II  
Office.  The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -  
NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated   
January 31, 2013.  
   
On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba  
Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements  
for an information gathering onsite visit and a two-week onsite inspection.  The schedule for the  
inspection is as follows:
*  
Information gathering visit:  
June 27 - 29, 2017  
*  
Week 1 of onsite inspection:  
July 24 - 28, 2017  
*  
Week 2 of onsite inspection:  
August 7 - 11, 2017  
   
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section  
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for  
unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed  
in Enclosures 1 and 2.  The team leader will contact you with any additional specific document  
in Enclosures 1 and 2.  The team leader will contact you with any additional specific document  
requests prior to the information gathering visit.  
requests prior to the information gathering visit.
T. Simril 2  During the information gathering visit, the team will also discuss the following administrative details: office space and location; specific documents requested to be made available to the  
 
team in their office spaces; arrangements for reactor site access (including radiation protection training, security, safety, and fitness for duty requirements); and the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact  
T. Simril  
2  
   
During the information gathering visit, the team will also discuss the following administrative  
details: office space and location; specific documents requested to be made available to the  
team in their office spaces; arrangements for reactor site access (including radiation protection  
training, security, safety, and fitness for duty requirements); and the availability of  
knowledgeable plant staff and licensing organization personnel to serve as points of contact  
during the inspection.   
during the inspection.   
   
   
We request that during the on-site inspection weeks you ensure that copies of analyses,  
We request that during the on-site inspection weeks you ensure that copies of analyses,  
evaluations, or documentation regarding the implementation and maintenance of the station fire protection program, including post-fire safe shutdown capability, be readily accessible to the team for their review.  Of specific interest for the fire protection portion of the inspection, are  
evaluations, or documentation regarding the implementation and maintenance of the station fire  
protection program, including post-fire safe shutdown capability, be readily accessible to the  
team for their review.  Of specific interest for the fire protection portion of the inspection, are  
those documents which establish that your fire protection program satisfies NRC regulatory  
those documents which establish that your fire protection program satisfies NRC regulatory  
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
protection compliance assessment documents).  For the 10 CFR 50.54(hh)(2) portion of the inspection, those documents implementing your mitigating strategies and demonstrating the management of your commitments for the strategies are of specific interest.  Also, personnel  
protection compliance assessment documents).  For the 10 CFR 50.54(hh)(2) portion of the  
inspection, those documents implementing your mitigating strategies and demonstrating the  
management of your commitments for the strategies are of specific interest.  Also, personnel  
should be available at the site during the inspection who are knowledgeable regarding those  
should be available at the site during the inspection who are knowledgeable regarding those  
plant systems required to achieve and maintain safe shutdown conditions from inside and  
plant systems required to achieve and maintain safe shutdown conditions from inside and  
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown analyses, reactor plant fire protection systems and features, and the station fire protection program and its implementation.   
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown  
analyses, reactor plant fire protection systems and features, and the station fire protection  
program and its implementation.   
   
   
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
This letter does not contain new or amended information collection requirements subject to the  
requirements were approved by the Office of Management and Budget, under control number 3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
document displays a currently valid Office of Management and Budget control number.  
requirements were approved by the Office of Management and Budget, under control number  
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
3150 0011.  The NRC may not conduct or sponsor, and a person is not required to respond to,  
T. Simril 3  Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please  
a request for information or an information collection requirement unless the requesting  
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at  404-997-4521.  Sincerely,       /RA: Jonathan Montgomery for/  Scott M. Shaeffer, Chief Engineering Branch 2  
document displays a currently valid Office of Management and Budget control number.
Division of Reactor Safety   
Docket Nos: 50-413; 50-414 License Nos: NPF-35 and NPF-52  Enclosures: 1. Triennial Fire Protection Inspection   
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records System (PARS) component of NRCs document  
system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
 
T. Simril  
3  
   
Your cooperation and support during this inspection will be appreciated.  If you have questions  
concerning this inspection, or the inspection team's information or logistical needs, please  
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at   
404-997-4521.  
   
Sincerely,  
/RA: Jonathan Montgomery for/  
   
Scott M. Shaeffer, Chief  
Engineering Branch 2  
Division of Reactor Safety  
   
Docket Nos: 50-413; 50-414  
License Nos: NPF-35 and NPF-52  
   
Enclosures:  
1. Triennial Fire Protection Inspection   
       Supporting Documentation   
       Supporting Documentation   
2. Mitigating Strategies Supporting      Documentation  
2. Mitigating Strategies Supporting  
       Documentation
cc:  Distribution via Listserv  
cc:  Distribution via Listserv  
   
   
 
T. Simril 4 SUBJECTCATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS. 05000413/2017009 AND 05000414/2017009) 
 
 
_________________________
SUNSI REVIEW COMPLETE
  FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
   
   
SIGNATURE
RJF2 VIA
EMAIL
JMM9 FOR  
SMS
   
   
   
   
   
   
 
   
   
   
   
 
NAME
RFANNER
SSHAEFFER
   
   
   
   
 
   
   
   
   
   
   
    
DATE
4/20/2017
4/20/2017
4/   /2017
4/    /2017
4/    /2017
4/    /2017
4/    /2017
E-MAIL COPY?
    YES
NO      YES
NO   
  YES
NO   
  YES
NO      YES
NO   
  YES
NO   
  YES
NO   
 
   
   
   
   
 
   
   
   
   
Enclosure 1
   
   
 
TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
   
   
  PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS:  Yes ACCESSION NUMBER:_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RJF2 VIA EMAILJMM9 FOR SMS    NAME RFANNER SSHAEFFER      DATE 4/20/2017 4/20/2017 4/    /2017 4/    /2017 4/    /2017 4/    /2017 4/    /2017 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  S:\DRS NEW\ENG BRANCH 2\REPORTS\TFPI REACTOR INSPECTION REPORTS\CATAWBA\NOTIFICATION LETTER\CATAWBA 2017009 TFPI NOTIFICATION LETTER.DOCX   
The documents and information requested below should generally be made available to the  
    Enclosure 1  TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION  The documents and information requested below should generally be made available to the inspection team during the on-site information gathering visit for the team's use both on-site and off-site during the inspection.  Electronic format is the preferred media, except where specifically noted, if readily available.  The preferred file format is readable and searchable PDF files.  If  
inspection team during the on-site information gathering visit for the team's use both on-site and  
off-site during the inspection.  Electronic format is the preferred media, except where specifically  
noted, if readily available.  The preferred file format is readable and searchable PDF files.  If  
electronic media is made available via an internet based remote document management  
electronic media is made available via an internet based remote document management  
system, then the remote document access must allow inspectors to download, save, and print  
system, then the remote document access must allow inspectors to download, save, and print  
the documents in the NRC's regional office.  Electronic media on compact disc or paper records (hard copy) are acceptable.  At the end of the inspection, the documents in the team's possession will not be retained. Approximately three weeks before the on-site information gathering visit, the following documents should be made available to the team leader for review in the regional office: * Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1) * Fire Hazards Analysis (request A.2) * Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If available) * Fire Risk Evaluations (If available) * Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3) * Plant layout drawings that identify:  C-size paper drawings and electronic copy (request B.6). o Plant fire area boundaries; o Combustible control zone drawings; o Areas protected by automatic fire suppression and detection; and o Locations of fire protection equipment.  Based on review of the above documents, the team leader will identify a preliminary list of fire areas being considered for inspection prior to the on-site information gathering visit.  During the information gathering visit, or shortly thereafter, the fire areas selected for inspection will be  
the documents in the NRC's regional office.  Electronic media on compact disc or paper records  
determined. This document request is based on typical documents that a generic plant might have.  As such, this generic document request is not meant to imply that any specific plant is required to have all of the listed documents.  It is recognized that some documents listed below may not be  
(hard copy) are acceptable.  At the end of the inspection, the documents in the team's  
possession will not be retained.  
Approximately three weeks before the on-site information gathering visit, the following  
documents should be made available to the team leader for review in the regional office:  
*  
Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)  
*  
Fire Hazards Analysis (request A.2)  
*  
Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If  
available)  
*  
Fire Risk Evaluations (If available)  
*  
Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)  
*  
Plant layout drawings that identify:  C-size paper drawings and electronic copy (request  
B.6).  
o Plant fire area boundaries;  
o Combustible control zone drawings;  
o Areas protected by automatic fire suppression and detection; and  
o Locations of fire protection equipment.  
   
Based on review of the above documents, the team leader will identify a preliminary list of fire  
areas being considered for inspection prior to the on-site information gathering visit.  During the  
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be  
determined.  
This document request is based on typical documents that a generic plant might have.  As such,  
this generic document request is not meant to imply that any specific plant is required to have all  
of the listed documents.  It is recognized that some documents listed below may not be  
available for your plant.  In addition, the document titles listed below are based on typical  
available for your plant.  In addition, the document titles listed below are based on typical  
industry document names; your plant specific document titles may vary.  A. DESIGN AND LICENSING BASIS DOCUMENTS A.1 Post-fire Safe Shutdown and / or Alternative Shutdown Analysis. A.2 Fire Hazards Analysis.  
industry document names; your plant specific document titles may vary.  
A.3 Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY), including: * Results of any post-IPEEE reviews; and * List of actions taken or plant modifications performed in response to the IPEEE results.  
   
2     A.4 Fire Protection Program and/or Fire Protection Plan. A.5 List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown equipment list). A.6 Fire Protection Systems Design Basis Documents.  
A.  
A.7 Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.  
DESIGN AND LICENSING BASIS DOCUMENTS  
A.8 List of applicable NFPA codes and standards and issuance dates (i.e., codes of record). A.9 List of deviations from NFPA codes of record. A.10 NFPA Compliance Review Report.  A.11 Report or evaluation that compares the fire protection program to the NRC Branch Technical Position (BTP) 9.5-1 Appendix A. A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are specifically listed in the facility operating license for the approved fire protection program. A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe shutdown or alternative shutdown features. A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or alternative shutdown features. A.15 Exemption requests submitted but not yet approved for plant fire protection and post-fire safe shutdown or alternative shutdown features. A.16 Facility Operating License (electronic format only).  
A.1  
Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.  
A.2  
Fire Hazards Analysis.  
A.3  
Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),  
including:  
* Results of any post-IPEEE reviews; and  
* List of actions taken or plant modifications performed in response to the IPEEE  
results.
 
2  
A.4  
Fire Protection Program and/or Fire Protection Plan.  
A.5  
List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown  
equipment list).  
A.6  
Fire Protection Systems Design Basis Documents.  
A.7  
Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.  
A.8  
List of applicable NFPA codes and standards and issuance dates (i.e., codes of  
record).  
A.9  
List of deviations from NFPA codes of record.  
A.10 NFPA Compliance Review Report.   
A.11 Report or evaluation that compares the fire protection program to the NRC Branch  
Technical Position (BTP) 9.5-1 Appendix A.  
A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are  
specifically listed in the facility operating license for the approved fire protection  
program.  
A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe  
shutdown or alternative shutdown features.  
A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or  
alternative shutdown features.  
A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
fire safe shutdown or alternative shutdown features.  
A.16 Facility Operating License (electronic format only).  
A.17 Technical Specifications (electronic format only).  
A.17 Technical Specifications (electronic format only).  
A.18  Technical Requirements Manual (electronic format only).  
A.18  Technical Requirements Manual (electronic format only).  
A.19 Updated Final Safety Analysis Report (electronic format only).  B. GENERAL PLANT DESIGN DOCUMENTS B.1 Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe shutdown or alternative shutdown systems (C-size paper drawings and electronic copy). B.2 P&IDs and legend list for fire protection systems, including fire water supply, water suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings and electronic copy).   
A.19 Updated Final Safety Analysis Report (electronic format only).  
3      B.3 AC and DC electrical system single line diagrams, from off-site power down to the highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and electronic copy). B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire safe shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper drawings and electronic copy ).  B.5 Equipment location drawings which identify the physical plant locations of post-fire safe shutdown or alternative shutdown equipment (C-size paper drawings and electronic copy). B.6 Plant layout drawings which identify:  (C-size paper drawings and electronic copy) * Plant fire area boundaries; * Combustible control zone drawings; * Areas protected by automatic fire suppression and detection; and * Locations of fire protection equipment.  C. CLASSICAL FIRE PROTECTION C.1 Fire protection program implementing procedures (e.g., administrative controls, surveillance testing, fire brigade). C.2 List of calculations and engineering analyses, studies, or evaluations for the fire protection system, including the fire water system. C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire areas. C.4 Last two completed surveillance records of fire protection features in the selected fire areas (detection, suppression, damper inspections, damper tests, penetration inspections, barrier inspections, etc.). C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps, including pump controllers and batteries. C.6 Last two completed annual fire pump pressure and flow tests.  
   
B.  
GENERAL PLANT DESIGN DOCUMENTS  
B.1  
Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe  
shutdown or alternative shutdown systems (C-size paper drawings and electronic  
copy).  
B.2  
P&IDs and legend list for fire protection systems, including fire water supply, water  
suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings  
and electronic copy).  
 
3
 
   
B.3  
AC and DC electrical system single line diagrams, from off-site power down to the  
highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and  
electronic copy).  
B.4  
Single line diagrams for motor control centers (MCCs) that supply post-fire safe  
shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper  
drawings and electronic copy ).   
B.5  
Equipment location drawings which identify the physical plant locations of post-fire  
safe shutdown or alternative shutdown equipment (C-size paper drawings and  
electronic copy).  
B.6  
Plant layout drawings which identify:  (C-size paper drawings and electronic copy)  
*  
Plant fire area boundaries;  
*  
Combustible control zone drawings;  
*  
Areas protected by automatic fire suppression and detection; and  
*  
Locations of fire protection equipment.  
   
C. CLASSICAL FIRE PROTECTION  
C.1 Fire protection program implementing procedures (e.g., administrative controls,  
surveillance testing, fire brigade).  
C.2 List of calculations and engineering analyses, studies, or evaluations for the fire  
protection system, including the fire water system.  
C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire  
areas.  
C.4 Last two completed surveillance records of fire protection features in the selected fire  
areas (detection, suppression, damper inspections, damper tests, penetration  
inspections, barrier inspections, etc.).  
C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,  
including pump controllers and batteries.  
C.6 Last two completed annual fire pump pressure and flow tests.  
C.7 Last two completed monthly and/or quarterly fire pump tests.  
C.7 Last two completed monthly and/or quarterly fire pump tests.  
C.8 Last two completed fire loop flow tests and loop flushes.  
C.8 Last two completed fire loop flow tests and loop flushes.  
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate concentrations and soak or hold times can be achieved (only for selected fire areas). C.10 Last five hot work permits (at power).  
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate  
C.11 Last five transient combustible permits (at power)
concentrations and soak or hold times can be achieved (only for selected fire areas).  
4      C.12 For Fire Brigade Drills, provide the following: * Last drill critique for a drill with off-site fire department support; * Summary of any unsatisfactory drill performance items for last three years; and * Last unannounced drill critique by a qualified individual independent of the licensee's staff.  C.13 For fire brigade equipment, provide the following: * Procedure for inventory and inspection; and * Most recent inspection and inventory results.  C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained breathing apparatus (SCBA) and training lesson plans. C.15 Electronic copy of the mutual aid agreement for the "first-due" local fire department that is currently in effect. C.16 Flooding analysis for selected fire areas, which demonstrates: * a fire water pipe break in the selected fire areas won't affect safe shutdown (SSD) capability for equipment in the selected fire areas; * a fire water pipe break in an adjacent fire area won't affect SSD capability for equipment in the selected fire areas;  * hydrostatic rating of any floor penetration seals installed within the fire areas that are credited with keeping water from leaking into fire areas below.  C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas. C.18 For Emergency Lighting Units (ELU), provide the following: * List of Preventive Maintenance tasks, frequencies, and bases; * Most recently performed monthly or quarterly functional test; * Most recently performed battery discharge performance test, if applicable; * ELU battery loading analysis; * vendor manual(s);  * results of black-out testing (if performed); * Maintenance Rule program information related to the ELU, if applicable; and * Compensatory measures taken when ELU are out of service.  C.19 Impairment Log (for period of 3 months before the start of inspection), for fire protection features that are out of service. C.20 List of Fire Protection screening reviews since the last inspection for recent design changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10 review that screened out). C.21 List of fire protection system design changes completed in the last three years (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations). 
C.10 Last five hot work permits (at power).  
5      C.22 List of penetration seal work, re-work, or installation activities in the last three years. C.23 List of fire wrap work, re-work, or installation activities in the last three years.
C.11 Last five transient combustible permits (at power).  
C.24 Fire protection system health reports for the two most recent years. C.25 Fire protection program health report for the two most recent years.  
 
C.26 Emergency lighting system health reports for the two most recent years. C.27 Licensee evaluation of industry operating experience, related to the Fire Protection Program for the three most recent years. 
4  
D. ELECTRICAL D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or Thermoplastic.  Specifically identify any Thermoplastic cable in the selected fire areas. D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative shutdown equipment (only for selected fire areas). D.3 Administrative or configuration control procedures that govern fuse replacement (e.g., fuse control procedures). D.4 Maintenance procedures that verify breaker over-current trip settings to ensure coordination remains functional, for post-fire safe shutdown or alternative shutdown equipment. D.5 Electrical system health reports for the two most recent years.
   
D.6 Last completed preventive maintenance of those components as tested from the safe shutdown or alternative shutdown panel.  D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by inspector (C-size paper drawings and electronic copy).  D.8 Cable routing for components and equipment credited for post-fire safe shutdown or alternative shutdown (only for selected fire areas). D.9 List of post-fire safe shutdown or alternative shutdown design changes completed, since the last inspection.  E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS E.1 List of identified fire induced circuit failure configurations (only for selected fire areas). E.2 Multiple Spurious Operation (MSO) Expert Panel Report.  
   
6      E.3 Corrective actions for fire-induced circuit failures, both single and multiple spurious actuations for the selected fire areas.  F. OPERATIONS F.1 List of calculations and engineering analyses, studies, or evaluations for the safe shutdown or alternative shutdown methodology. F.2 List of licensed operator Job Performance Measures (JPMs) for operator manual actions required by post-fire safe shutdown or alternative shutdown. F.3 List of non-licensed operator training associated with post-fire safe shutdown or alternative shutdown manual actions that would be performed by a non-licensed operator (including JPMs, in-field training walkdowns, simulations, or initial qualification). F.4 List of lesson plans for post-fire safe shutdown or alternative shutdown training for licensed and non-licensed operators. F.5 For operator manual actions (OMAs) provide the following: * Manual Action Feasibility Study; * Operator Time Critical Action Program; * Time lines for time-critical OMAs; and * Time line validations; * Environmental and habitability evaluations for post-fire operator manual actions (temperature, smoke, humidity, SCBAs, etc.). F.6 Thermal hydraulic calculation or analysis that determines the time requirements for time-critical manual operator actions. F.7 Operating procedures for post-fire safe shutdown from the control room with a postulated fire in the selected fire areas. F.8 Operating procedures for post-fire safe shutdown or alternative shutdown from outside the control room. F.9 For safe shutdown equipment and tools, provide the following: * Procedure for inventory and inspection; and * Most recent inspection and inventory results.  F.10 List of procedures that implement Cold Shutdown Repairs. F.11 For Cold Shutdown Repairs, provide the following: * Procedure for inventory and inspection (i.e., needed tools, material, etc.); and * Most recent inspection and inventory results. 
7      F.12 Calculation or analysis that demonstrates pressurizer level will remain within the indicating range for a PWR, or reactor water level will remain above the top of active fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance with the requirements of 10 CFR 50 Appendix R III.L performance goals. F.13 For Radio communications, provide the following: * Communications Plan for firefighting and post-fire safe shutdown manual actions; * Repeater locations; * Cable routing for repeater power supply cables; * Radio coverage test results; and * Radio Dead Spot locations in the plant.  F.14  NRC approved exemption requests for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas. F.15 Exemption requests submitted but not yet approved, for operator manual actions for 10 CFR 50 Appendix R III.G.2 fire areas.  G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC IN 92-18), both single and multiple spurious actuations (only for selected fire areas). G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown operator manual actions.  G.3 Internal and external self-assessments, peer assessments, and audits of fire protection activities for the last three years. G.4 Internal and external self-assessments, peer assessments, and audits of post-fire safe shutdown or alternative shutdown capabilities for the last three years. G.5 List of condition reports for the fire protection system for the last three years.
G.6 List of condition reports for emergency lighting units for the last three years. G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown (ASD) issues for the last three years.  This includes issues affecting the SSD or ASD
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training, timeline evaluations for operator actions, and supporting engineering evaluations, analysis, or calculations. G.8 List of all Generic Letter 86 - 10 evaluations. G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years. G.10 All fire loading calculations and evaluations performed (only for selected fire areas and their adjacent fire areas).
  Enclosure 2  MITIGATING STRATEGIES SUPPORTING DOCUMENTATION  H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS H.1 List of all changes to regulatory commitments made to meet the requirements of Title 10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2). H.2 List of procedures and guidelines that were revised or generated to implement the mitigating strategies.  These could be extensive damage mitigation guidelines (EDMGs), severe accident management guidelines (SAMGs), emergency operating procedures (EOPs), abnormal operating procedures (AOPs), etc. H.3 A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline," issued December 2006, and the site-specific procedures or guidelines that are used to implement each strategy. H.4 List of engineering evaluations or calculations that were used to verify the engineering bases for the mitigating strategies. H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow diagrams for systems relied upon in the mitigating strategies.  These could be the type used for training (C-size paper drawings and electronic copy). H.6 List of modification packages or summary descriptions of modifications with simplified drawings, for necessary facility changes to implement the mitigating strategies. H.7 List of routine tests, surveillances, and preventive maintenance for equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies. H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies, provide the following: * Procedures for inventory, testing, and inspection; and * Most recent inspection, inventory, and testing results; * Copies of the last two completed performance tests, surveillances, and preventative maintenance performed on the pumps, including the pump controllers and batteries.  H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that differ from that documented in the submittals or the safety evaluation report. H.10 Site general arrangement drawings that show the majority of buildings and areas referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic copy).  H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
2        H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments) required to implement any mitigating strategies.  H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
and associated responses; and other pertinent documents. 
    
    
C.12 For Fire Brigade Drills, provide the following:
*
Last drill critique for a drill with off-site fire department support;
*
Summary of any unsatisfactory drill performance items for last three years; and
*
Last unannounced drill critique by a qualified individual independent of the
licensee's staff.
C.13 For fire brigade equipment, provide the following:
*
Procedure for inventory and inspection; and
*
Most recent inspection and inventory results.
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
breathing apparatus (SCBA) and training lesson plans.
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
that is currently in effect.
C.16 Flooding analysis for selected fire areas, which demonstrates:
* a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)
capability for equipment in the selected fire areas;
* a fire water pipe break in an adjacent fire area wont affect SSD capability for
equipment in the selected fire areas; 
* hydrostatic rating of any floor penetration seals installed within the fire areas that
are credited with keeping water from leaking into fire areas below. 
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
C.18 For Emergency Lighting Units (ELU), provide the following:
*
List of Preventive Maintenance tasks, frequencies, and bases;
*
Most recently performed monthly or quarterly functional test;
*
Most recently performed battery discharge performance test, if applicable;
*
ELU battery loading analysis;
*
vendor manual(s); 
*
results of black-out testing (if performed);
*
Maintenance Rule program information related to the ELU, if applicable; and
*
Compensatory measures taken when ELU are out of service.
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire
protection features that are out of service.
C.20 List of Fire Protection screening reviews since the last inspection for recent design
changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
review that screened out).
C.21 List of fire protection system design changes completed in the last three years
(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).


5
 
C.22 List of penetration seal work, re-work, or installation activities in the last three years.
C.23 List of fire wrap work, re-work, or installation activities in the last three years.
C.24 Fire protection system health reports for the two most recent years.
C.25 Fire protection program health report for the two most recent years.
C.26 Emergency lighting system health reports for the two most recent years.
C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
Program for the three most recent years.
D. ELECTRICAL
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or
Thermoplastic.  Specifically identify any Thermoplastic cable in the selected fire
areas.
D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
shutdown equipment (only for selected fire areas).
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,
fuse control procedures).
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
coordination remains functional, for post-fire safe shutdown or alternative shutdown
equipment.
D.5 Electrical system health reports for the two most recent years.
D.6 Last completed preventive maintenance of those components as tested from the safe
shutdown or alternative shutdown panel. 
D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
inspector (C-size paper drawings and electronic copy). 
D.8 Cable routing for components and equipment credited for post-fire safe shutdown or
alternative shutdown (only for selected fire areas).
D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,
since the last inspection.
E.
SPURIOUS FIRE INDUCED CIRCUIT FAULTS
E.1
List of identified fire induced circuit failure configurations (only for selected fire areas).
E.2
Multiple Spurious Operation (MSO) Expert Panel Report.
6
 
E.3
Corrective actions for fire-induced circuit failures, both single and multiple spurious
actuations for the selected fire areas.
F.
OPERATIONS
F.1
List of calculations and engineering analyses, studies, or evaluations for the safe
shutdown or alternative shutdown methodology.
F.2
List of licensed operator Job Performance Measures (JPMs) for operator manual
actions required by post-fire safe shutdown or alternative shutdown.
F.3
List of non-licensed operator training associated with post-fire safe shutdown or
alternative shutdown manual actions that would be performed by a non-licensed
operator (including JPMs, in-field training walkdowns, simulations, or initial
qualification).
F.4
List of lesson plans for post-fire safe shutdown or alternative shutdown training for
licensed and non-licensed operators.
F.5
For operator manual actions (OMAs) provide the following:
*
Manual Action Feasibility Study;
*
Operator Time Critical Action Program;
*
Time lines for time-critical OMAs; and
*
Time line validations;
*
Environmental and habitability evaluations for post-fire operator manual actions
(temperature, smoke, humidity, SCBAs, etc.).
F.6
Thermal hydraulic calculation or analysis that determines the time requirements for
time-critical manual operator actions.
F.7
Operating procedures for post-fire safe shutdown from the control room with a
postulated fire in the selected fire areas.
F.8
Operating procedures for post-fire safe shutdown or alternative shutdown from
outside the control room.
F.9
For safe shutdown equipment and tools, provide the following:
*
Procedure for inventory and inspection; and
*
Most recent inspection and inventory results.
F.10 List of procedures that implement Cold Shutdown Repairs.
F.11 For Cold Shutdown Repairs, provide the following:
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
*
Most recent inspection and inventory results.
7
 
F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
indicating range for a PWR, or reactor water level will remain above the top of active
fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
with the requirements of 10 CFR 50 Appendix R III.L performance goals.
F.13 For Radio communications, provide the following:
*
Communications Plan for firefighting and post-fire safe shutdown manual actions;
*
Repeater locations;
*
Cable routing for repeater power supply cables;
*
Radio coverage test results; and
*
Radio Dead Spot locations in the plant.
F.14  NRC approved exemption requests for operator manual actions for
10 CFR 50 Appendix R III.G.2 fire areas.
F.15 Exemption requests submitted but not yet approved, for operator manual actions for
10 CFR 50 Appendix R III.G.2 fire areas.
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown
operator manual actions.
G.3 Internal and external self-assessments, peer assessments, and audits of fire
protection activities for the last three years.
G.4 Internal and external self-assessments, peer assessments, and audits of post-fire
safe shutdown or alternative shutdown capabilities for the last three years.
G.5 List of condition reports for the fire protection system for the last three years.
G.6 List of condition reports for emergency lighting units for the last three years.
G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
(ASD) issues for the last three years.  This includes issues affecting the SSD or ASD
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
timeline evaluations for operator actions, and supporting engineering evaluations,
analysis, or calculations.
G.8 List of all Generic Letter 86 - 10 evaluations.
G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
G.10 All fire loading calculations and evaluations performed (only for selected fire areas
and their adjacent fire areas).
Enclosure 2
MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
H.1 List of all changes to regulatory commitments made to meet the requirements of Title
10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
H.2 List of procedures and guidelines that were revised or generated to implement the
mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
H.3 A matrix that shows the correlation between the mitigation strategies identified in
Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
issued December 2006, and the site-specific procedures or guidelines that are used
to implement each strategy.
H.4 List of engineering evaluations or calculations that were used to verify the
engineering bases for the mitigating strategies.
H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training (C-size paper drawings and electronic copy).
H.6 List of modification packages or summary descriptions of modifications with simplified
drawings, for necessary facility changes to implement the mitigating strategies.
H.7 List of routine tests, surveillances, and preventive maintenance for equipment and
tools needed to implement 10 CFR 50.54(hh)(2) strategies.
H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
provide the following:
*
Procedures for inventory, testing, and inspection; and
*
Most recent inspection, inventory, and testing results;
*
Copies of the last two completed performance tests, surveillances, and
preventative maintenance performed on the pumps, including the pump
controllers and batteries.
H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
H.10 Site general arrangement drawings that show the majority of buildings and areas
referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
copy).
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
2
  H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)
required to implement any mitigating strategies.
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment
requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
and associated responses; and other pertinent documents.
}}
}}

Latest revision as of 10:21, 9 January 2025

Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009)
ML17111A844
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/20/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Simril R
Duke Energy Carolinas
References
IR 2017009
Download: ML17111A844 (13)


See also: IR 05000413/2017009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 20, 2017

Mr. Robert T. Simril

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND

REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.

05000413/2017009 AND 05000414/2017009)

Dear Mr. Simril:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1

and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from

the NRC Region II Office. The team will be composed of personnel from the NRC Region II

Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -

NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated

January 31, 2013.

On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba

Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements

for an information gathering onsite visit and a two-week onsite inspection. The schedule for the

inspection is as follows:

Information gathering visit:

June 27 - 29, 2017

Week 1 of onsite inspection:

July 24 - 28, 2017

Week 2 of onsite inspection:

August 7 - 11, 2017

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section

50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for

unescorted site access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

T. Simril

2

During the information gathering visit, the team will also discuss the following administrative

details: office space and location; specific documents requested to be made available to the

team in their office spaces; arrangements for reactor site access (including radiation protection

training, security, safety, and fitness for duty requirements); and the availability of

knowledgeable plant staff and licensing organization personnel to serve as points of contact

during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection, are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, including the electrical aspects of the relevant post-fire safe shutdown

analyses, reactor plant fire protection systems and features, and the station fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

T. Simril

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at

404-997-4521.

Sincerely,

/RA: Jonathan Montgomery for/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos: 50-413; 50-414

License Nos: NPF-35 and NPF-52

Enclosures:

1. Triennial Fire Protection Inspection

Supporting Documentation

2. Mitigating Strategies Supporting

Documentation

cc: Distribution via Listserv

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RJF2 VIA

EMAIL

JMM9 FOR

SMS

NAME

RFANNER

SSHAEFFER

DATE

4/20/2017

4/20/2017

4/ /2017

4/ /2017

4/ /2017

4/ /2017

4/ /2017

E-MAIL COPY?

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

YES

NO

Enclosure 1

TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted, if readily available. The preferred file format is readable and searchable PDF files. If

electronic media is made available via an internet based remote document management

system, then the remote document access must allow inspectors to download, save, and print

the documents in the NRC's regional office. Electronic media on compact disc or paper records

(hard copy) are acceptable. At the end of the inspection, the documents in the team's

possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)

Fire Hazards Analysis (request A.2)

Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If

available)

Fire Risk Evaluations (If available)

Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)

Plant layout drawings that identify: C-size paper drawings and electronic copy (request

B.6).

o Plant fire area boundaries;

o Combustible control zone drawings;

o Areas protected by automatic fire suppression and detection; and

o Locations of fire protection equipment.

Based on review of the above documents, the team leader will identify a preliminary list of fire

areas being considered for inspection prior to the on-site information gathering visit. During the

information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.

A.2

Fire Hazards Analysis.

A.3

Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),

including:

  • Results of any post-IPEEE reviews; and
  • List of actions taken or plant modifications performed in response to the IPEEE

results.

2

A.4

Fire Protection Program and/or Fire Protection Plan.

A.5

List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown

equipment list).

A.6

Fire Protection Systems Design Basis Documents.

A.7

Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.

A.8

List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.9

List of deviations from NFPA codes of record.

A.10 NFPA Compliance Review Report.

A.11 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved fire protection

program.

A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe

shutdown or alternative shutdown features.

A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or

alternative shutdown features.

A.15 Exemption requests submitted but not yet approved for plant fire protection and post-

fire safe shutdown or alternative shutdown features.

A.16 Facility Operating License (electronic format only).

A.17 Technical Specifications (electronic format only).

A.18 Technical Requirements Manual (electronic format only).

A.19 Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe

shutdown or alternative shutdown systems (C-size paper drawings and electronic

copy).

B.2

P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings

and electronic copy).

3

B.3

AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and

electronic copy).

B.4

Single line diagrams for motor control centers (MCCs) that supply post-fire safe

shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper

drawings and electronic copy ).

B.5

Equipment location drawings which identify the physical plant locations of post-fire

safe shutdown or alternative shutdown equipment (C-size paper drawings and

electronic copy).

B.6

Plant layout drawings which identify: (C-size paper drawings and electronic copy)

Plant fire area boundaries;

Combustible control zone drawings;

Areas protected by automatic fire suppression and detection; and

Locations of fire protection equipment.

C. CLASSICAL FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire

areas.

C.4 Last two completed surveillance records of fire protection features in the selected fire

areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

4

C.12 For Fire Brigade Drills, provide the following:

Last drill critique for a drill with off-site fire department support;

Summary of any unsatisfactory drill performance items for last three years; and

Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained

breathing apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 Flooding analysis for selected fire areas, which demonstrates:

  • a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)

capability for equipment in the selected fire areas;

  • a fire water pipe break in an adjacent fire area wont affect SSD capability for

equipment in the selected fire areas;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

List of Preventive Maintenance tasks, frequencies, and bases;

Most recently performed monthly or quarterly functional test;

Most recently performed battery discharge performance test, if applicable;

ELU battery loading analysis;

vendor manual(s);

results of black-out testing (if performed);

Maintenance Rule program information related to the ELU, if applicable; and

Compensatory measures taken when ELU are out of service.

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 List of Fire Protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10

review that screened out).

C.21 List of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).

5

C.22 List of penetration seal work, re-work, or installation activities in the last three years.

C.23 List of fire wrap work, re-work, or installation activities in the last three years.

C.24 Fire protection system health reports for the two most recent years.

C.25 Fire protection program health report for the two most recent years.

C.26 Emergency lighting system health reports for the two most recent years.

C.27 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative

shutdown equipment (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire safe shutdown or alternative shutdown

equipment.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed preventive maintenance of those components as tested from the safe

shutdown or alternative shutdown panel.

D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by

inspector (C-size paper drawings and electronic copy).

D.8 Cable routing for components and equipment credited for post-fire safe shutdown or

alternative shutdown (only for selected fire areas).

D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,

since the last inspection.

E.

SPURIOUS FIRE INDUCED CIRCUIT FAULTS

E.1

List of identified fire induced circuit failure configurations (only for selected fire areas).

E.2

Multiple Spurious Operation (MSO) Expert Panel Report.

6

E.3

Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for the selected fire areas.

F.

OPERATIONS

F.1

List of calculations and engineering analyses, studies, or evaluations for the safe

shutdown or alternative shutdown methodology.

F.2

List of licensed operator Job Performance Measures (JPMs) for operator manual

actions required by post-fire safe shutdown or alternative shutdown.

F.3

List of non-licensed operator training associated with post-fire safe shutdown or

alternative shutdown manual actions that would be performed by a non-licensed

operator (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

F.4

List of lesson plans for post-fire safe shutdown or alternative shutdown training for

licensed and non-licensed operators.

F.5

For operator manual actions (OMAs) provide the following:

Manual Action Feasibility Study;

Operator Time Critical Action Program;

Time lines for time-critical OMAs; and

Time line validations;

Environmental and habitability evaluations for post-fire operator manual actions

(temperature, smoke, humidity, SCBAs, etc.).

F.6

Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

F.7

Operating procedures for post-fire safe shutdown from the control room with a

postulated fire in the selected fire areas.

F.8

Operating procedures for post-fire safe shutdown or alternative shutdown from

outside the control room.

F.9

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

F.10 List of procedures that implement Cold Shutdown Repairs.

F.11 For Cold Shutdown Repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

Most recent inspection and inventory results.

7

F.12 Calculation or analysis that demonstrates pressurizer level will remain within the

indicating range for a PWR, or reactor water level will remain above the top of active

fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance

with the requirements of 10 CFR 50 Appendix R III.L performance goals.

F.13 For Radio communications, provide the following:

Communications Plan for firefighting and post-fire safe shutdown manual actions;

Repeater locations;

Cable routing for repeater power supply cables;

Radio coverage test results; and

Radio Dead Spot locations in the plant.

F.14 NRC approved exemption requests for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

F.15 Exemption requests submitted but not yet approved, for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown

operator manual actions.

G.3 Internal and external self-assessments, peer assessments, and audits of fire

protection activities for the last three years.

G.4 Internal and external self-assessments, peer assessments, and audits of post-fire

safe shutdown or alternative shutdown capabilities for the last three years.

G.5 List of condition reports for the fire protection system for the last three years.

G.6 List of condition reports for emergency lighting units for the last three years.

G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown

(ASD) issues for the last three years. This includes issues affecting the SSD or ASD

analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,

timeline evaluations for operator actions, and supporting engineering evaluations,

analysis, or calculations.

G.8 List of all Generic Letter 86 - 10 evaluations.

G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.

G.10 All fire loading calculations and evaluations performed (only for selected fire areas

and their adjacent fire areas).

Enclosure 2

MITIGATING STRATEGIES SUPPORTING DOCUMENTATION

H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

H.1 List of all changes to regulatory commitments made to meet the requirements of Title

10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

H.2 List of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

H.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

H.4 List of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings and electronic copy).

H.6 List of modification packages or summary descriptions of modifications with simplified

drawings, for necessary facility changes to implement the mitigating strategies.

H.7 List of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

Procedures for inventory, testing, and inspection; and

Most recent inspection, inventory, and testing results;

Copies of the last two completed performance tests, surveillances, and

preventative maintenance performed on the pumps, including the pump

controllers and batteries.

H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

H.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic

copy).

H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

2

H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)

required to implement any mitigating strategies.

H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment

requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)

and associated responses; and other pertinent documents.