{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                                  NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION II
REGION II  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
                                        ATLANTA, GEORGIA 30303-1257
ATLANTA, GEORGIA 30303-1257  
                                              April 20, 2017
Mr. Robert T. Simril
April 20, 2017  
Site Vice President
Duke Energy Carolinas, LLC
Mr. Robert T. Simril  
Catawba Nuclear Station
Site Vice President  
4800 Concord Road
Duke Energy Carolinas, LLC  
York, SC 29745
Catawba Nuclear Station  
SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF
4800 Concord Road  
              CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND
York, SC 29745  
              REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.
              05000413/2017009 AND 05000414/2017009)
SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF  
Dear Mr. Simril:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND  
staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1
REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.  
and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from
05000413/2017009 AND 05000414/2017009)
the NRC Region II Office. The team will be composed of personnel from the NRC Region II
Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -
Dear Mr. Simril:
NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated
January 31, 2013.
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba
staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1  
Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements
and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from  
for an information gathering onsite visit and a two-week onsite inspection. The schedule for the
the NRC Region II Office. The team will be composed of personnel from the NRC Region II  
inspection is as follows:
Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -  
        *   Information gathering visit:       June 27 - 29, 2017
NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated
        *   Week 1 of onsite inspection:       July 24 - 28, 2017
January 31, 2013.  
        *   Week 2 of onsite inspection:       August 7 - 11, 2017
The purposes of the information gathering visit are to obtain information and documentation
On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba  
needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire
Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,
for an information gathering onsite visit and a two-week onsite inspection. The schedule for the  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section
inspection is as follows:
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for
unescorted site access.
*  
An initial list of the documents the team will review during the conduct of the inspection is listed
Information gathering visit:  
in Enclosures 1 and 2. The team leader will contact you with any additional specific document
June 27 - 29, 2017  
*  
Week 1 of onsite inspection:  
July 24 - 28, 2017  
*  
Week 2 of onsite inspection:  
August 7 - 11, 2017  
The purposes of the information gathering visit are to obtain information and documentation  
needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire  
protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,  
mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section  
50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for  
unescorted site access.
An initial list of the documents the team will review during the conduct of the inspection is listed  
in Enclosures 1 and 2. The team leader will contact you with any additional specific document  
requests prior to the information gathering visit.
requests prior to the information gathering visit.


T. Simril                                       2
T. Simril  
During the information gathering visit, the team will also discuss the following administrative
2  
details: office space and location; specific documents requested to be made available to the
team in their office spaces; arrangements for reactor site access (including radiation protection
During the information gathering visit, the team will also discuss the following administrative  
training, security, safety, and fitness for duty requirements); and the availability of
details: office space and location; specific documents requested to be made available to the  
knowledgeable plant staff and licensing organization personnel to serve as points of contact
team in their office spaces; arrangements for reactor site access (including radiation protection  
during the inspection.
training, security, safety, and fitness for duty requirements); and the availability of  
We request that during the on-site inspection weeks you ensure that copies of analyses,
knowledgeable plant staff and licensing organization personnel to serve as points of contact  
evaluations, or documentation regarding the implementation and maintenance of the station fire
during the inspection.
protection program, including post-fire safe shutdown capability, be readily accessible to the
team for their review. Of specific interest for the fire protection portion of the inspection, are
We request that during the on-site inspection weeks you ensure that copies of analyses,  
those documents which establish that your fire protection program satisfies NRC regulatory
evaluations, or documentation regarding the implementation and maintenance of the station fire  
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire
protection program, including post-fire safe shutdown capability, be readily accessible to the  
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the
team for their review. Of specific interest for the fire protection portion of the inspection, are  
inspection, those documents implementing your mitigating strategies and demonstrating the
those documents which establish that your fire protection program satisfies NRC regulatory  
management of your commitments for the strategies are of specific interest. Also, personnel
requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire  
should be available at the site during the inspection who are knowledgeable regarding those
protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the  
plant systems required to achieve and maintain safe shutdown conditions from inside and
inspection, those documents implementing your mitigating strategies and demonstrating the  
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown
management of your commitments for the strategies are of specific interest. Also, personnel  
analyses, reactor plant fire protection systems and features, and the station fire protection
should be available at the site during the inspection who are knowledgeable regarding those  
program and its implementation.
plant systems required to achieve and maintain safe shutdown conditions from inside and  
This letter does not contain new or amended information collection requirements subject to the
outside the control room, including the electrical aspects of the relevant post-fire safe shutdown  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
analyses, reactor plant fire protection systems and features, and the station fire protection  
requirements were approved by the Office of Management and Budget, under control number
program and its implementation.
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
This letter does not contain new or amended information collection requirements subject to the  
document displays a currently valid Office of Management and Budget control number.
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its
requirements were approved by the Office of Management and Budget, under control number  
enclosures will be available electronically for public inspection in the NRC Public Document
3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
Room or from the Publicly Available Records System (PARS) component of NRCs document
a request for information or an information collection requirement unless the requesting  
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records System (PARS) component of NRCs document  
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
rm/adams.html (the Public Electronic Reading Room).


T. Simril                                   3
T. Simril  
Your cooperation and support during this inspection will be appreciated. If you have questions
3  
concerning this inspection, or the inspection team's information or logistical needs, please
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at
Your cooperation and support during this inspection will be appreciated. If you have questions  
404-997-4521.
concerning this inspection, or the inspection team's information or logistical needs, please  
                                              Sincerely,
contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at
                                              /RA: Jonathan Montgomery for/
404-997-4521.  
                                              Scott M. Shaeffer, Chief
                                              Engineering Branch 2
Sincerely,  
                                              Division of Reactor Safety
Docket Nos: 50-413; 50-414
License Nos: NPF-35 and NPF-52
Enclosures:
1. Triennial Fire Protection Inspection
    Supporting Documentation
2. Mitigating Strategies Supporting
    Documentation
/RA: Jonathan Montgomery for/  
cc: Distribution via Listserv
Scott M. Shaeffer, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket Nos: 50-413; 50-414  
License Nos: NPF-35 and NPF-52  
Enclosures:  
1. Triennial Fire Protection Inspection
      Supporting Documentation
2. Mitigating Strategies Supporting  
      Documentation
cc: Distribution via Listserv  




_________________________             SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
_________________________  
OFFICE           RII:DRS       RII:DRS
  SIGNATURE         RJF2 VIA     JMM9 FOR
SUNSI REVIEW COMPLETE  
                  EMAIL        SMS
FORM 665 ATTACHED  
  NAME             RFANNER       SSHAEFFER
OFFICE  
  DATE                 4/20/2017     4/20/2017   4/ /2017     4/ /2017       4/ /2017     4/ /2017     4/ /2017
RII:DRS  
E-MAIL COPY?       YES     NO  YES     NO   YES   NO    YES    NO      YES    NO    YES    NO    YES     NO
RII:DRS  
       
   
      TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
The documents and information requested below should generally be made available to the
inspection team during the on-site information gathering visit for the team's use both on-site and
off-site during the inspection. Electronic format is the preferred media, except where specifically
noted, if readily available. The preferred file format is readable and searchable PDF files. If
SIGNATURE  
electronic media is made available via an internet based remote document management
RJF2 VIA  
system, then the remote document access must allow inspectors to download, save, and print
EMAIL
the documents in the NRC's regional office. Electronic media on compact disc or paper records
JMM9 FOR  
(hard copy) are acceptable. At the end of the inspection, the documents in the team's
SMS
possession will not be retained.
   
Approximately three weeks before the on-site information gathering visit, the following
documents should be made available to the team leader for review in the regional office:
     *    Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)
    *    Fire Hazards Analysis (request A.2)
    *    Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If
NAME  
        available)
RFANNER  
     *    Fire Risk Evaluations (If available)
SSHAEFFER  
    *    Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
   
     *    Plant layout drawings that identify: C-size paper drawings and electronic copy (request
        B.6).
            o Plant fire area boundaries;
            o Combustible control zone drawings;
            o Areas protected by automatic fire suppression and detection; and
DATE  
            o Locations of fire protection equipment.
4/20/2017  
Based on review of the above documents, the team leader will identify a preliminary list of fire
4/20/2017  
areas being considered for inspection prior to the on-site information gathering visit. During the
4/   /2017  
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
4/   /2017  
determined.
4/   /2017  
This document request is based on typical documents that a generic plant might have. As such,
4/   /2017  
this generic document request is not meant to imply that any specific plant is required to have all
4/   /2017  
of the listed documents. It is recognized that some documents listed below may not be
E-MAIL COPY?  
available for your plant. In addition, the document titles listed below are based on typical
     YES  
industry document names; your plant specific document titles may vary.
NO       YES  
A.   DESIGN AND LICENSING BASIS DOCUMENTS
NO     
    A.1    Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.
  YES  
    A.2    Fire Hazards Analysis.
NO     
    A.3    Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
  YES
            including:
NO      YES
            * Results of any post-IPEEE reviews; and
NO      
            * List of actions taken or plant modifications performed in response to the IPEEE
  YES
              results.
NO      
                                                                                          Enclosure 1
   YES
NO   


                                                  2
  A.4 Fire Protection Program and/or Fire Protection Plan.
  A.5 List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
        equipment list).
  A.6  Fire Protection Systems Design Basis Documents.
Enclosure 1
  A.7  Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
  A.8  List of applicable NFPA codes and standards and issuance dates (i.e., codes of
TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION
        record).
  A.9 List of deviations from NFPA codes of record.
The documents and information requested below should generally be made available to the
  A.10 NFPA Compliance Review Report.
inspection team during the on-site information gathering visit for the team's use both on-site and
  A.11 Report or evaluation that compares the fire protection program to the NRC Branch
off-site during the inspection.  Electronic format is the preferred media, except where specifically
        Technical Position (BTP) 9.5-1 Appendix A.
noted, if readily availableThe preferred file format is readable and searchable PDF files. If
  A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
electronic media is made available via an internet based remote document management
        specifically listed in the facility operating license for the approved fire protection
system, then the remote document access must allow inspectors to download, save, and print
        program.
the documents in the NRC's regional officeElectronic media on compact disc or paper records
  A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
(hard copy) are acceptable. At the end of the inspection, the documents in the team's
        shutdown or alternative shutdown features.
possession will not be retained.  
  A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
Approximately three weeks before the on-site information gathering visit, the following
        alternative shutdown features.
documents should be made available to the team leader for review in the regional office:
  A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
*
        fire safe shutdown or alternative shutdown features.
Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)
  A.16 Facility Operating License (electronic format only).
*
  A.17 Technical Specifications (electronic format only).
Fire Hazards Analysis (request A.2)
  A.18 Technical Requirements Manual (electronic format only).
*
  A.19 Updated Final Safety Analysis Report (electronic format only).
Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If
B. GENERAL PLANT DESIGN DOCUMENTS
available)
  B.1  Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
*
        shutdown or alternative shutdown systems (C-size paper drawings and electronic
Fire Risk Evaluations (If available)  
        copy).
*
  B.2  P&IDs and legend list for fire protection systems, including fire water supply, water
Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)
        suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings
*
        and electronic copy).
Plant layout drawings that identify: C-size paper drawings and electronic copy (request
B.6).  
o Plant fire area boundaries;
o Combustible control zone drawings;
o Areas protected by automatic fire suppression and detection; and
o Locations of fire protection equipment.
Based on review of the above documents, the team leader will identify a preliminary list of fire  
areas being considered for inspection prior to the on-site information gathering visit. During the
information gathering visit, or shortly thereafter, the fire areas selected for inspection will be
determined.  
This document request is based on typical documents that a generic plant might have. As such,
this generic document request is not meant to imply that any specific plant is required to have all
of the listed documents. It is recognized that some documents listed below may not be
available for your plant.  In addition, the document titles listed below are based on typical
industry document names; your plant specific document titles may vary.  
A.  
DESIGN AND LICENSING BASIS DOCUMENTS
A.1
Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.  
A.2
Fire Hazards Analysis.  
A.3
Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),
including:
* Results of any post-IPEEE reviews; and  
* List of actions taken or plant modifications performed in response to the IPEEE
results.


                                                3
2
  B.3 AC and DC electrical system single line diagrams, from off-site power down to the
        highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and
        electronic copy).
   
  B.4 Single line diagrams for motor control centers (MCCs) that supply post-fire safe
        shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
        drawings and electronic copy ).
A.4  
  B.5 Equipment location drawings which identify the physical plant locations of post-fire
Fire Protection Program and/or Fire Protection Plan.  
        safe shutdown or alternative shutdown equipment (C-size paper drawings and
A.5  
        electronic copy).
List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown
  B.6 Plant layout drawings which identify: (C-size paper drawings and electronic copy)
equipment list).  
        *  Plant fire area boundaries;
A.6  
        *  Combustible control zone drawings;
Fire Protection Systems Design Basis Documents.
        *  Areas protected by automatic fire suppression and detection; and
A.7
        *  Locations of fire protection equipment.
Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.
C. CLASSICAL FIRE PROTECTION
A.8
  C.1  Fire protection program implementing procedures (e.g., administrative controls,
List of applicable NFPA codes and standards and issuance dates (i.e., codes of
        surveillance testing, fire brigade).
record).
  C.2  List of calculations and engineering analyses, studies, or evaluations for the fire
A.9
        protection system, including the fire water system.
List of deviations from NFPA codes of record.  
  C.3  Hydraulic calculation or analysis for fire protection water system in the selected fire
A.10 NFPA Compliance Review Report.  
        areas.
A.11 Report or evaluation that compares the fire protection program to the NRC Branch
  C.4  Last two completed surveillance records of fire protection features in the selected fire
Technical Position (BTP) 9.5-1 Appendix A.  
        areas (detection, suppression, damper inspections, damper tests, penetration
A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are
        inspections, barrier inspections, etc.).
specifically listed in the facility operating license for the approved fire protection
  C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,
program.
        including pump controllers and batteries.
A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe
  C.6 Last two completed annual fire pump pressure and flow tests.
shutdown or alternative shutdown features.  
  C.7  Last two completed monthly and/or quarterly fire pump tests.
A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or
  C.8  Last two completed fire loop flow tests and loop flushes.
alternative shutdown features.  
  C.9  CO2 and Halon initial discharge testing or calculation that determined appropriate
A.15 Exemption requests submitted but not yet approved for plant fire protection and post-
        concentrations and soak or hold times can be achieved (only for selected fire areas).
fire safe shutdown or alternative shutdown features.
  C.10 Last five hot work permits (at power).
A.16 Facility Operating License (electronic format only).
  C.11 Last five transient combustible permits (at power).
A.17 Technical Specifications (electronic format only).  
A.18 Technical Requirements Manual (electronic format only).
A.19 Updated Final Safety Analysis Report (electronic format only).  
   
B.  
GENERAL PLANT DESIGN DOCUMENTS
B.1
Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe
shutdown or alternative shutdown systems (C-size paper drawings and electronic
copy).  
B.2
P&IDs and legend list for fire protection systems, including fire water supply, water
suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings
and electronic copy).  


                                                4
3
C.12 For Fire Brigade Drills, provide the following:
    *  Last drill critique for a drill with off-site fire department support;
    *  Summary of any unsatisfactory drill performance items for last three years; and
 
    *  Last unannounced drill critique by a qualified individual independent of the
        licensee's staff.
B.3
C.13 For fire brigade equipment, provide the following:
AC and DC electrical system single line diagrams, from off-site power down to the  
    *   Procedure for inventory and inspection; and
highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and
    *   Most recent inspection and inventory results.
electronic copy).
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
B.4
    breathing apparatus (SCBA) and training lesson plans.
Single line diagrams for motor control centers (MCCs) that supply post-fire safe
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper
    that is currently in effect.
drawings and electronic copy ). 
C.16 Flooding analysis for selected fire areas, which demonstrates:
B.5
    * a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)
Equipment location drawings which identify the physical plant locations of post-fire
      capability for equipment in the selected fire areas;
safe shutdown or alternative shutdown equipment (C-size paper drawings and
    * a fire water pipe break in an adjacent fire area wont affect SSD capability for
electronic copy).
      equipment in the selected fire areas;
B.6
    * hydrostatic rating of any floor penetration seals installed within the fire areas that
Plant layout drawings which identify:  (C-size paper drawings and electronic copy)
      are credited with keeping water from leaking into fire areas below.
*
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.
Plant fire area boundaries;
C.18 For Emergency Lighting Units (ELU), provide the following:
*
    *  List of Preventive Maintenance tasks, frequencies, and bases;
Combustible control zone drawings;
    *  Most recently performed monthly or quarterly functional test;
*  
    *  Most recently performed battery discharge performance test, if applicable;
Areas protected by automatic fire suppression and detection; and  
    *  ELU battery loading analysis;
*  
    *  vendor manual(s);
Locations of fire protection equipment.
    *  results of black-out testing (if performed);
    *  Maintenance Rule program information related to the ELU, if applicable; and
C. CLASSICAL FIRE PROTECTION
    *  Compensatory measures taken when ELU are out of service.
C.1 Fire protection program implementing procedures (e.g., administrative controls,  
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire
surveillance testing, fire brigade).  
    protection features that are out of service.
C.2 List of calculations and engineering analyses, studies, or evaluations for the fire  
C.20 List of Fire Protection screening reviews since the last inspection for recent design
protection system, including the fire water system.  
    changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire  
    review that screened out).
areas.
C.21 List of fire protection system design changes completed in the last three years
C.4 Last two completed surveillance records of fire protection features in the selected fire  
    (including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).
areas (detection, suppression, damper inspections, damper tests, penetration
inspections, barrier inspections, etc.).
C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,
including pump controllers and batteries.  
C.6 Last two completed annual fire pump pressure and flow tests.  
C.7 Last two completed monthly and/or quarterly fire pump tests.  
C.8 Last two completed fire loop flow tests and loop flushes.  
C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate
concentrations and soak or hold times can be achieved (only for selected fire areas).  
C.10 Last five hot work permits (at power).  
C.11 Last five transient combustible permits (at power).  


                                                  5
4
  C.22 List of penetration seal work, re-work, or installation activities in the last three years.
  C.23 List of fire wrap work, re-work, or installation activities in the last three years.
  C.24 Fire protection system health reports for the two most recent years.
 
  C.25 Fire protection program health report for the two most recent years.
  C.26 Emergency lighting system health reports for the two most recent years.
C.12 For Fire Brigade Drills, provide the following:
  C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
*
        Program for the three most recent years.
Last drill critique for a drill with off-site fire department support;
D. ELECTRICAL
*
  D.1  Identify whether the cables in the selected fire areas are predominantly Thermoset or
Summary of any unsatisfactory drill performance items for last three years; and
        Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire
*
        areas.
Last unannounced drill critique by a qualified individual independent of the
  D.2  Breaker and fuse coordination calculation for post-fire safe shutdown or alternative
licensee's staff.  
        shutdown equipment (only for selected fire areas).
  D.3  Administrative or configuration control procedures that govern fuse replacement (e.g.,
C.13 For fire brigade equipment, provide the following:
        fuse control procedures).
*
  D.4  Maintenance procedures that verify breaker over-current trip settings to ensure
Procedure for inventory and inspection; and
        coordination remains functional, for post-fire safe shutdown or alternative shutdown
*
        equipment.
Most recent inspection and inventory results.  
  D.5 Electrical system health reports for the two most recent years.
  D.6  Last completed preventive maintenance of those components as tested from the safe
C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained
        shutdown or alternative shutdown panel.
breathing apparatus (SCBA) and training lesson plans.  
  D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
C.15 Electronic copy of the mutual aid agreement for the first-due local fire department
        inspector (C-size paper drawings and electronic copy).
that is currently in effect.  
  D.8  Cable routing for components and equipment credited for post-fire safe shutdown or
C.16 Flooding analysis for selected fire areas, which demonstrates:
        alternative shutdown (only for selected fire areas).
* a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)
  D.List of post-fire safe shutdown or alternative shutdown design changes completed,
capability for equipment in the selected fire areas;
        since the last inspection.
* a fire water pipe break in an adjacent fire area wont affect SSD capability for
E. SPURIOUS FIRE INDUCED CIRCUIT FAULTS
equipment in the selected fire areas
  E.List of identified fire induced circuit failure configurations (only for selected fire areas).
* hydrostatic rating of any floor penetration seals installed within the fire areas that
  E.2  Multiple Spurious Operation (MSO) Expert Panel Report.
are credited with keeping water from leaking into fire areas below.
C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.  
C.18 For Emergency Lighting Units (ELU), provide the following:
*
List of Preventive Maintenance tasks, frequencies, and bases;
*
Most recently performed monthly or quarterly functional test;
*
Most recently performed battery discharge performance test, if applicable;
*
ELU battery loading analysis;
*
vendor manual(s);  
*
results of black-out testing (if performed);
*
Maintenance Rule program information related to the ELU, if applicable; and
*
Compensatory measures taken when ELU are out of service.  
   
C.19 Impairment Log (for period of 3 months before the start of inspection), for fire  
protection features that are out of service.  
C.20 List of Fire Protection screening reviews since the last inspection for recent design
changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10
review that screened out).  
C.21 List of fire protection system design changes completed in the last three years
(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).  


                                                6
5
  E.3  Corrective actions for fire-induced circuit failures, both single and multiple spurious
        actuations for the selected fire areas.
F. OPERATIONS
 
  F.1  List of calculations and engineering analyses, studies, or evaluations for the safe
        shutdown or alternative shutdown methodology.
C.22 List of penetration seal work, re-work, or installation activities in the last three years.
  F.2 List of licensed operator Job Performance Measures (JPMs) for operator manual
C.23 List of fire wrap work, re-work, or installation activities in the last three years.
        actions required by post-fire safe shutdown or alternative shutdown.
C.24 Fire protection system health reports for the two most recent years.
  F.3 List of non-licensed operator training associated with post-fire safe shutdown or
C.25 Fire protection program health report for the two most recent years.  
        alternative shutdown manual actions that would be performed by a non-licensed
C.26 Emergency lighting system health reports for the two most recent years.  
        operator (including JPMs, in-field training walkdowns, simulations, or initial
C.27 Licensee evaluation of industry operating experience, related to the Fire Protection
        qualification).
Program for the three most recent years.
  F.4 List of lesson plans for post-fire safe shutdown or alternative shutdown training for
        licensed and non-licensed operators.
D. ELECTRICAL
  F.5 For operator manual actions (OMAs) provide the following:
D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or  
        *  Manual Action Feasibility Study;
Thermoplastic.  Specifically identify any Thermoplastic cable in the selected fire
        *  Operator Time Critical Action Program;
areas.  
        *  Time lines for time-critical OMAs; and
D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative  
        *  Time line validations;
shutdown equipment (only for selected fire areas).  
        *  Environmental and habitability evaluations for post-fire operator manual actions
D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,  
            (temperature, smoke, humidity, SCBAs, etc.).
fuse control procedures).  
  F.6  Thermal hydraulic calculation or analysis that determines the time requirements for
D.4 Maintenance procedures that verify breaker over-current trip settings to ensure
        time-critical manual operator actions.
coordination remains functional, for post-fire safe shutdown or alternative shutdown  
  F.7  Operating procedures for post-fire safe shutdown from the control room with a
equipment.  
        postulated fire in the selected fire areas.
D.5 Electrical system health reports for the two most recent years.
  F.8  Operating procedures for post-fire safe shutdown or alternative shutdown from
D.6 Last completed preventive maintenance of those components as tested from the safe
        outside the control room.
shutdown or alternative shutdown panel.
  F.9  For safe shutdown equipment and tools, provide the following:
D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by
        *  Procedure for inventory and inspection; and
inspector (C-size paper drawings and electronic copy).
        *  Most recent inspection and inventory results.
D.8 Cable routing for components and equipment credited for post-fire safe shutdown or
  F.10 List of procedures that implement Cold Shutdown Repairs.
alternative shutdown (only for selected fire areas).  
  F.11 For Cold Shutdown Repairs, provide the following:
D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,
        *  Procedure for inventory and inspection (i.e., needed tools, material, etc.); and
since the last inspection.  
        *  Most recent inspection and inventory results.
E.  
SPURIOUS FIRE INDUCED CIRCUIT FAULTS
E.1
List of identified fire induced circuit failure configurations (only for selected fire areas).  
E.2
Multiple Spurious Operation (MSO) Expert Panel Report.  


                                                7
6
  F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
        indicating range for a PWR, or reactor water level will remain above the top of active
        fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
 
        with the requirements of 10 CFR 50 Appendix R III.L performance goals.
  F.13 For Radio communications, provide the following:
E.3
        *    Communications Plan for firefighting and post-fire safe shutdown manual actions;
Corrective actions for fire-induced circuit failures, both single and multiple spurious
        *    Repeater locations;
actuations for the selected fire areas.  
        *    Cable routing for repeater power supply cables;
        *    Radio coverage test results; and
F.  
        *    Radio Dead Spot locations in the plant.
OPERATIONS
  F.14 NRC approved exemption requests for operator manual actions for
F.1
        10 CFR 50 Appendix R III.G.2 fire areas.
List of calculations and engineering analyses, studies, or evaluations for the safe
  F.15 Exemption requests submitted but not yet approved, for operator manual actions for
shutdown or alternative shutdown methodology.  
        10 CFR 50 Appendix R III.G.2 fire areas.
F.2  
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
List of licensed operator Job Performance Measures (JPMs) for operator manual
  G.1  Corrective actions for fire-induced circuit failures (including but not limited to NRC
actions required by post-fire safe shutdown or alternative shutdown.  
        IN 92-18), both single and multiple spurious actuations (only for selected fire areas).
F.3
  G.2  Corrective actions associated with post-fire safe shutdown or alternative shutdown
List of non-licensed operator training associated with post-fire safe shutdown or  
        operator manual actions.
alternative shutdown manual actions that would be performed by a non-licensed
  G.3  Internal and external self-assessments, peer assessments, and audits of fire
operator (including JPMs, in-field training walkdowns, simulations, or initial
        protection activities for the last three years.
qualification).  
  G.4 Internal and external self-assessments, peer assessments, and audits of post-fire
F.4  
        safe shutdown or alternative shutdown capabilities for the last three years.
List of lesson plans for post-fire safe shutdown or alternative shutdown training for  
  G.5 List of condition reports for the fire protection system for the last three years.
licensed and non-licensed operators.  
  G.6 List of condition reports for emergency lighting units for the last three years.
F.5  
  G.7  List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
For operator manual actions (OMAs) provide the following:
        (ASD) issues for the last three years. This includes issues affecting the SSD or ASD
*
        analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
Manual Action Feasibility Study;
        timeline evaluations for operator actions, and supporting engineering evaluations,
*
        analysis, or calculations.
Operator Time Critical Action Program;
  G.List of all Generic Letter 86 - 10 evaluations.
*
  G.9  Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.
Time lines for time-critical OMAs; and
  G.10 All fire loading calculations and evaluations performed (only for selected fire areas
*
        and their adjacent fire areas).
Time line validations;
*
Environmental and habitability evaluations for post-fire operator manual actions
(temperature, smoke, humidity, SCBAs, etc.).  
F.6  
Thermal hydraulic calculation or analysis that determines the time requirements for  
time-critical manual operator actions.
F.7
Operating procedures for post-fire safe shutdown from the control room with a
postulated fire in the selected fire areas.  
F.8
Operating procedures for post-fire safe shutdown or alternative shutdown from
outside the control room.
F.9
For safe shutdown equipment and tools, provide the following:
*
Procedure for inventory and inspection; and  
*
Most recent inspection and inventory results.  
F.10 List of procedures that implement Cold Shutdown Repairs.  
F.11 For Cold Shutdown Repairs, provide the following:
*
Procedure for inventory and inspection (i.e., needed tools, material, etc.); and  
*
Most recent inspection and inventory results.  


              MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
7
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
  H.1  List of all changes to regulatory commitments made to meet the requirements of Title
        10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
 
  H.2  List of procedures and guidelines that were revised or generated to implement the
        mitigating strategies. These could be extensive damage mitigation guidelines
F.12 Calculation or analysis that demonstrates pressurizer level will remain within the
        (EDMGs), severe accident management guidelines (SAMGs), emergency operating
indicating range for a PWR, or reactor water level will remain above the top of active
        procedures (EOPs), abnormal operating procedures (AOPs), etc.
fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance
  H.3 A matrix that shows the correlation between the mitigation strategies identified in
with the requirements of 10 CFR 50 Appendix R III.L performance goals.  
        Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
F.13 For Radio communications, provide the following:
        issued December 2006, and the site-specific procedures or guidelines that are used
*
        to implement each strategy.
Communications Plan for firefighting and post-fire safe shutdown manual actions;
  H.4 List of engineering evaluations or calculations that were used to verify the
*
        engineering bases for the mitigating strategies.
Repeater locations;
  H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
*
        diagrams for systems relied upon in the mitigating strategies. These could be the
Cable routing for repeater power supply cables;
        type used for training (C-size paper drawings and electronic copy).
*
  H.6 List of modification packages or summary descriptions of modifications with simplified
Radio coverage test results; and
        drawings, for necessary facility changes to implement the mitigating strategies.
*
  H.7 List of routine tests, surveillances, and preventive maintenance for equipment and
Radio Dead Spot locations in the plant.
        tools needed to implement 10 CFR 50.54(hh)(2) strategies.
  H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
F.14  NRC approved exemption requests for operator manual actions for
        provide the following:
10 CFR 50 Appendix R III.G.2 fire areas.  
        *    Procedures for inventory, testing, and inspection; and
F.15 Exemption requests submitted but not yet approved, for operator manual actions for
        *    Most recent inspection, inventory, and testing results;
10 CFR 50 Appendix R III.G.2 fire areas.
        *    Copies of the last two completed performance tests, surveillances, and
   
            preventative maintenance performed on the pumps, including the pump
G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS
            controllers and batteries.
G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC
  H.List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
IN 92-18), both single and multiple spurious actuations (only for selected fire areas).  
        differ from that documented in the submittals or the safety evaluation report.
G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown
  H.10 Site general arrangement drawings that show the majority of buildings and areas
operator manual actions.  
        referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
   
        copy).
G.3 Internal and external self-assessments, peer assessments, and audits of fire
  H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
protection activities for the last three years.  
                                                                                    Enclosure 2
G.4 Internal and external self-assessments, peer assessments, and audits of post-fire
safe shutdown or alternative shutdown capabilities for the last three years.  
G.5 List of condition reports for the fire protection system for the last three years.  
G.6 List of condition reports for emergency lighting units for the last three years.  
G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown
(ASD) issues for the last three yearsThis includes issues affecting the SSD or ASD
analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,
timeline evaluations for operator actions, and supporting engineering evaluations,  
analysis, or calculations.  
G.8 List of all Generic Letter 86 - 10 evaluations.  
G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.  
G.10 All fire loading calculations and evaluations performed (only for selected fire areas  
and their adjacent fire areas).


                                          2
H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)
    required to implement any mitigating strategies.
Enclosure 2
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment
    requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)
MITIGATING STRATEGIES SUPPORTING DOCUMENTATION
    and associated responses; and other pertinent documents.
H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS
H.1 List of all changes to regulatory commitments made to meet the requirements of Title
10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).
H.2 List of procedures and guidelines that were revised or generated to implement the
mitigating strategies.  These could be extensive damage mitigation guidelines
(EDMGs), severe accident management guidelines (SAMGs), emergency operating
procedures (EOPs), abnormal operating procedures (AOPs), etc.
H.3 A matrix that shows the correlation between the mitigation strategies identified in
Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"
issued December 2006, and the site-specific procedures or guidelines that are used
to implement each strategy.
H.4 List of engineering evaluations or calculations that were used to verify the
engineering bases for the mitigating strategies.
H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow
diagrams for systems relied upon in the mitigating strategies.  These could be the
type used for training (C-size paper drawings and electronic copy).
H.6 List of modification packages or summary descriptions of modifications with simplified
drawings, for necessary facility changes to implement the mitigating strategies.
H.7 List of routine tests, surveillances, and preventive maintenance for equipment and
tools needed to implement 10 CFR 50.54(hh)(2) strategies.
H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,
provide the following:
*
Procedures for inventory, testing, and inspection; and
*
Most recent inspection, inventory, and testing results;
*
Copies of the last two completed performance tests, surveillances, and
preventative maintenance performed on the pumps, including the pump
controllers and batteries.
H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that
differ from that documented in the submittals or the safety evaluation report.
H.10 Site general arrangement drawings that show the majority of buildings and areas
referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic
copy).
H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).
 
2
  H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)  
required to implement any mitigating strategies.  
H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment  
requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)  
and associated responses; and other pertinent documents.
}}
}}

Latest revision as of 10:21, 9 January 2025

Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (NRC Inspection Report Nos. 05000413/2017009 and 05000414/2017009)
ML17111A844
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/20/2017
From: Scott Shaeffer
NRC/RGN-II/DRS/EB2
To: Simril R
Duke Energy Carolinas
References
IR 2017009
Download: ML17111A844 (13)


See also: IR 05000413/2017009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

April 20, 2017

Mr. Robert T. Simril

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT: CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - NOTIFICATION OF

CONDUCT OF A TRIENNIAL FIRE PROTECTION BASELINE INSPECTION AND

REQUEST FOR INFORMATION (NRC INSPECTION REPORT NOS.

05000413/2017009 AND 05000414/2017009)

Dear Mr. Simril:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct a triennial fire protection baseline inspection at Catawba Nuclear Plant, Units 1

and 2. The inspection team will be led by Mr. Rodney Fanner, a Senior Reactor Inspector from

the NRC Region II Office. The team will be composed of personnel from the NRC Region II

Office. The inspection will be conducted in accordance with IP 71111.05XT, Fire Protection -

NFPA 805 (Triennial), the NRC's baseline fire protection inspection procedure, dated

January 31, 2013.

On April 10, 2017, during a telephone conversation between Ms. Sherry Andrews, Catawba

Licensing, and Mr. Rodney Fanner, USNRC RII, our respective staff confirmed arrangements

for an information gathering onsite visit and a two-week onsite inspection. The schedule for the

inspection is as follows:

Information gathering visit:

June 27 - 29, 2017

Week 1 of onsite inspection:

July 24 - 28, 2017

Week 2 of onsite inspection:

August 7 - 11, 2017

The purposes of the information gathering visit are to obtain information and documentation

needed to support the inspection, to become familiar with the Catawba Nuclear Plant fire

protection program, fire protection features, post-fire safe shutdown capabilities, plant layout,

mitigating strategies to address Title 10 of the Code of Federal Regulations (10 CFR) Section

50.54(hh)(2), and, as necessary, obtain plant specific site access training and badging for

unescorted site access.

An initial list of the documents the team will review during the conduct of the inspection is listed

in Enclosures 1 and 2. The team leader will contact you with any additional specific document

requests prior to the information gathering visit.

T. Simril

2

During the information gathering visit, the team will also discuss the following administrative

details: office space and location; specific documents requested to be made available to the

team in their office spaces; arrangements for reactor site access (including radiation protection

training, security, safety, and fitness for duty requirements); and the availability of

knowledgeable plant staff and licensing organization personnel to serve as points of contact

during the inspection.

We request that during the on-site inspection weeks you ensure that copies of analyses,

evaluations, or documentation regarding the implementation and maintenance of the station fire

protection program, including post-fire safe shutdown capability, be readily accessible to the

team for their review. Of specific interest for the fire protection portion of the inspection, are

those documents which establish that your fire protection program satisfies NRC regulatory

requirements and conforms to applicable NRC and industry fire protection guidance (i.e., fire

protection compliance assessment documents). For the 10 CFR 50.54(hh)(2) portion of the

inspection, those documents implementing your mitigating strategies and demonstrating the

management of your commitments for the strategies are of specific interest. Also, personnel

should be available at the site during the inspection who are knowledgeable regarding those

plant systems required to achieve and maintain safe shutdown conditions from inside and

outside the control room, including the electrical aspects of the relevant post-fire safe shutdown

analyses, reactor plant fire protection systems and features, and the station fire protection

program and its implementation.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, under control number

3150 0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRC Rules and Practices, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records System (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

T. Simril

3

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Rodney Fanner, the team leader in the Region II office at 404-997-4638 or me at

404-997-4521.

Sincerely,

/RA: Jonathan Montgomery for/

Scott M. Shaeffer, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos: 50-413; 50-414

License Nos: NPF-35 and NPF-52

Enclosures:

1. Triennial Fire Protection Inspection

Supporting Documentation

2. Mitigating Strategies Supporting

Documentation

cc: Distribution via Listserv

_________________________

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RJF2 VIA

EMAIL

JMM9 FOR

SMS

NAME

RFANNER

SSHAEFFER

DATE

4/20/2017

4/20/2017

4/ /2017

4/ /2017

4/ /2017

4/ /2017

4/ /2017

E-MAIL COPY?

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

YES

NO

Enclosure 1

TRIENNIAL FIRE PROTECTION INSPECTION SUPPORTING DOCUMENTATION

The documents and information requested below should generally be made available to the

inspection team during the on-site information gathering visit for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media, except where specifically

noted, if readily available. The preferred file format is readable and searchable PDF files. If

electronic media is made available via an internet based remote document management

system, then the remote document access must allow inspectors to download, save, and print

the documents in the NRC's regional office. Electronic media on compact disc or paper records

(hard copy) are acceptable. At the end of the inspection, the documents in the team's

possession will not be retained.

Approximately three weeks before the on-site information gathering visit, the following

documents should be made available to the team leader for review in the regional office:

Post-fire Safe Shutdown and / or Alternative Shutdown Analysis (request A.1)

Fire Hazards Analysis (request A.2)

Fire Probabilistic Risk Assessment Summary Document or full PRA Document (If

available)

Fire Risk Evaluations (If available)

Individual Plant Examination for External Events (Fire Chapter ONLY) (request A.3)

Plant layout drawings that identify: C-size paper drawings and electronic copy (request

B.6).

o Plant fire area boundaries;

o Combustible control zone drawings;

o Areas protected by automatic fire suppression and detection; and

o Locations of fire protection equipment.

Based on review of the above documents, the team leader will identify a preliminary list of fire

areas being considered for inspection prior to the on-site information gathering visit. During the

information gathering visit, or shortly thereafter, the fire areas selected for inspection will be

determined.

This document request is based on typical documents that a generic plant might have. As such,

this generic document request is not meant to imply that any specific plant is required to have all

of the listed documents. It is recognized that some documents listed below may not be

available for your plant. In addition, the document titles listed below are based on typical

industry document names; your plant specific document titles may vary.

A.

DESIGN AND LICENSING BASIS DOCUMENTS

A.1

Post-fire Safe Shutdown and / or Alternative Shutdown Analysis.

A.2

Fire Hazards Analysis.

A.3

Individual Plant Examination for External Events (IPEEE) (Fire Chapter ONLY),

including:

  • Results of any post-IPEEE reviews; and
  • List of actions taken or plant modifications performed in response to the IPEEE

results.

2

A.4

Fire Protection Program and/or Fire Protection Plan.

A.5

List of post-fire safe shutdown or alternative shutdown systems (i.e., safe shutdown

equipment list).

A.6

Fire Protection Systems Design Basis Documents.

A.7

Post-fire Safe Shutdown or Alternative Shutdown Design Basis Document.

A.8

List of applicable NFPA codes and standards and issuance dates (i.e., codes of

record).

A.9

List of deviations from NFPA codes of record.

A.10 NFPA Compliance Review Report.

A.11 Report or evaluation that compares the fire protection program to the NRC Branch

Technical Position (BTP) 9.5-1 Appendix A.

A.12 Electronic copy of licensee submittals and NRC safety evaluation reports that are

specifically listed in the facility operating license for the approved fire protection

program.

A.13 NRC Safety Evaluation Reports for fire protection program and post-fire safe

shutdown or alternative shutdown features.

A.14 NRC approved exemptions for plant fire protection and post-fire safe shutdown or

alternative shutdown features.

A.15 Exemption requests submitted but not yet approved for plant fire protection and post-

fire safe shutdown or alternative shutdown features.

A.16 Facility Operating License (electronic format only).

A.17 Technical Specifications (electronic format only).

A.18 Technical Requirements Manual (electronic format only).

A.19 Updated Final Safety Analysis Report (electronic format only).

B.

GENERAL PLANT DESIGN DOCUMENTS

B.1

Piping and instrumentation diagrams (P&IDs) and legend list for post-fire safe

shutdown or alternative shutdown systems (C-size paper drawings and electronic

copy).

B.2

P&IDs and legend list for fire protection systems, including fire water supply, water

suppression sprinklers & deluge, and CO2 and Halon systems (C-size paper drawings

and electronic copy).

3

B.3

AC and DC electrical system single line diagrams, from off-site power down to the

highest safety-related bus level (typically 4kV, EDG bus), (C-size paper drawings and

electronic copy).

B.4

Single line diagrams for motor control centers (MCCs) that supply post-fire safe

shutdown or alternative shutdown loads (only for selected fire areas) (C-size paper

drawings and electronic copy ).

B.5

Equipment location drawings which identify the physical plant locations of post-fire

safe shutdown or alternative shutdown equipment (C-size paper drawings and

electronic copy).

B.6

Plant layout drawings which identify: (C-size paper drawings and electronic copy)

Plant fire area boundaries;

Combustible control zone drawings;

Areas protected by automatic fire suppression and detection; and

Locations of fire protection equipment.

C. CLASSICAL FIRE PROTECTION

C.1 Fire protection program implementing procedures (e.g., administrative controls,

surveillance testing, fire brigade).

C.2 List of calculations and engineering analyses, studies, or evaluations for the fire

protection system, including the fire water system.

C.3 Hydraulic calculation or analysis for fire protection water system in the selected fire

areas.

C.4 Last two completed surveillance records of fire protection features in the selected fire

areas (detection, suppression, damper inspections, damper tests, penetration

inspections, barrier inspections, etc.).

C.5 List of routine tests, surveillances, and preventive maintenance on fire pumps,

including pump controllers and batteries.

C.6 Last two completed annual fire pump pressure and flow tests.

C.7 Last two completed monthly and/or quarterly fire pump tests.

C.8 Last two completed fire loop flow tests and loop flushes.

C.9 CO2 and Halon initial discharge testing or calculation that determined appropriate

concentrations and soak or hold times can be achieved (only for selected fire areas).

C.10 Last five hot work permits (at power).

C.11 Last five transient combustible permits (at power).

4

C.12 For Fire Brigade Drills, provide the following:

Last drill critique for a drill with off-site fire department support;

Summary of any unsatisfactory drill performance items for last three years; and

Last unannounced drill critique by a qualified individual independent of the

licensee's staff.

C.13 For fire brigade equipment, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

C.14 Fire Brigade Medical Evaluations and Qualifications, including self-contained

breathing apparatus (SCBA) and training lesson plans.

C.15 Electronic copy of the mutual aid agreement for the first-due local fire department

that is currently in effect.

C.16 Flooding analysis for selected fire areas, which demonstrates:

  • a fire water pipe break in the selected fire areas wont affect safe shutdown (SSD)

capability for equipment in the selected fire areas;

  • a fire water pipe break in an adjacent fire area wont affect SSD capability for

equipment in the selected fire areas;

are credited with keeping water from leaking into fire areas below.

C.17 Pre-fire plans for the selected fire areas and their adjacent fire areas.

C.18 For Emergency Lighting Units (ELU), provide the following:

List of Preventive Maintenance tasks, frequencies, and bases;

Most recently performed monthly or quarterly functional test;

Most recently performed battery discharge performance test, if applicable;

ELU battery loading analysis;

vendor manual(s);

results of black-out testing (if performed);

Maintenance Rule program information related to the ELU, if applicable; and

Compensatory measures taken when ELU are out of service.

C.19 Impairment Log (for period of 3 months before the start of inspection), for fire

protection features that are out of service.

C.20 List of Fire Protection screening reviews since the last inspection for recent design

changes, modifications, or temporary modifications (e.g., a Generic Letter 86-10

review that screened out).

C.21 List of fire protection system design changes completed in the last three years

(including their associated 10 CFR 50.59 and Generic Letter 86-10 evaluations).

5

C.22 List of penetration seal work, re-work, or installation activities in the last three years.

C.23 List of fire wrap work, re-work, or installation activities in the last three years.

C.24 Fire protection system health reports for the two most recent years.

C.25 Fire protection program health report for the two most recent years.

C.26 Emergency lighting system health reports for the two most recent years.

C.27 Licensee evaluation of industry operating experience, related to the Fire Protection

Program for the three most recent years.

D. ELECTRICAL

D.1 Identify whether the cables in the selected fire areas are predominantly Thermoset or

Thermoplastic. Specifically identify any Thermoplastic cable in the selected fire

areas.

D.2 Breaker and fuse coordination calculation for post-fire safe shutdown or alternative

shutdown equipment (only for selected fire areas).

D.3 Administrative or configuration control procedures that govern fuse replacement (e.g.,

fuse control procedures).

D.4 Maintenance procedures that verify breaker over-current trip settings to ensure

coordination remains functional, for post-fire safe shutdown or alternative shutdown

equipment.

D.5 Electrical system health reports for the two most recent years.

D.6 Last completed preventive maintenance of those components as tested from the safe

shutdown or alternative shutdown panel.

D.7 Schematic or elementary diagrams for circuits to be reviewed, as requested by

inspector (C-size paper drawings and electronic copy).

D.8 Cable routing for components and equipment credited for post-fire safe shutdown or

alternative shutdown (only for selected fire areas).

D.9 List of post-fire safe shutdown or alternative shutdown design changes completed,

since the last inspection.

E.

SPURIOUS FIRE INDUCED CIRCUIT FAULTS

E.1

List of identified fire induced circuit failure configurations (only for selected fire areas).

E.2

Multiple Spurious Operation (MSO) Expert Panel Report.

6

E.3

Corrective actions for fire-induced circuit failures, both single and multiple spurious

actuations for the selected fire areas.

F.

OPERATIONS

F.1

List of calculations and engineering analyses, studies, or evaluations for the safe

shutdown or alternative shutdown methodology.

F.2

List of licensed operator Job Performance Measures (JPMs) for operator manual

actions required by post-fire safe shutdown or alternative shutdown.

F.3

List of non-licensed operator training associated with post-fire safe shutdown or

alternative shutdown manual actions that would be performed by a non-licensed

operator (including JPMs, in-field training walkdowns, simulations, or initial

qualification).

F.4

List of lesson plans for post-fire safe shutdown or alternative shutdown training for

licensed and non-licensed operators.

F.5

For operator manual actions (OMAs) provide the following:

Manual Action Feasibility Study;

Operator Time Critical Action Program;

Time lines for time-critical OMAs; and

Time line validations;

Environmental and habitability evaluations for post-fire operator manual actions

(temperature, smoke, humidity, SCBAs, etc.).

F.6

Thermal hydraulic calculation or analysis that determines the time requirements for

time-critical manual operator actions.

F.7

Operating procedures for post-fire safe shutdown from the control room with a

postulated fire in the selected fire areas.

F.8

Operating procedures for post-fire safe shutdown or alternative shutdown from

outside the control room.

F.9

For safe shutdown equipment and tools, provide the following:

Procedure for inventory and inspection; and

Most recent inspection and inventory results.

F.10 List of procedures that implement Cold Shutdown Repairs.

F.11 For Cold Shutdown Repairs, provide the following:

Procedure for inventory and inspection (i.e., needed tools, material, etc.); and

Most recent inspection and inventory results.

7

F.12 Calculation or analysis that demonstrates pressurizer level will remain within the

indicating range for a PWR, or reactor water level will remain above the top of active

fuel for a BWR, at the safe shutdown or alternative shutdown panel, in accordance

with the requirements of 10 CFR 50 Appendix R III.L performance goals.

F.13 For Radio communications, provide the following:

Communications Plan for firefighting and post-fire safe shutdown manual actions;

Repeater locations;

Cable routing for repeater power supply cables;

Radio coverage test results; and

Radio Dead Spot locations in the plant.

F.14 NRC approved exemption requests for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

F.15 Exemption requests submitted but not yet approved, for operator manual actions for

10 CFR 50 Appendix R III.G.2 fire areas.

G. ADMINISTRATIVE CONTROL, OVERSIGHT, AND CORRECTIVE ACTION PROGRAMS

G.1 Corrective actions for fire-induced circuit failures (including but not limited to NRC

IN 92-18), both single and multiple spurious actuations (only for selected fire areas).

G.2 Corrective actions associated with post-fire safe shutdown or alternative shutdown

operator manual actions.

G.3 Internal and external self-assessments, peer assessments, and audits of fire

protection activities for the last three years.

G.4 Internal and external self-assessments, peer assessments, and audits of post-fire

safe shutdown or alternative shutdown capabilities for the last three years.

G.5 List of condition reports for the fire protection system for the last three years.

G.6 List of condition reports for emergency lighting units for the last three years.

G.7 List of condition reports for post-fire safe shutdown (SSD) or alternative shutdown

(ASD) issues for the last three years. This includes issues affecting the SSD or ASD

analysis, fire hazards analysis, SSD or ASD operating procedures and/or training,

timeline evaluations for operator actions, and supporting engineering evaluations,

analysis, or calculations.

G.8 List of all Generic Letter 86 - 10 evaluations.

G.9 Copy of all Generic Letter 86 - 10 evaluations performed in the last three years.

G.10 All fire loading calculations and evaluations performed (only for selected fire areas

and their adjacent fire areas).

Enclosure 2

MITIGATING STRATEGIES SUPPORTING DOCUMENTATION

H. 10 CFR 50.54(hh)(2) MITIGATING STRATEGIES DOCUMENTS

H.1 List of all changes to regulatory commitments made to meet the requirements of Title

10 of the Code of Federal Regulations (10 CFR) 50.54(hh)(2).

H.2 List of procedures and guidelines that were revised or generated to implement the

mitigating strategies. These could be extensive damage mitigation guidelines

(EDMGs), severe accident management guidelines (SAMGs), emergency operating

procedures (EOPs), abnormal operating procedures (AOPs), etc.

H.3 A matrix that shows the correlation between the mitigation strategies identified in

Nuclear Energy Institute 06-12, Revision 2, "B.5.b Phase 2 & 3 Submittal Guideline,"

issued December 2006, and the site-specific procedures or guidelines that are used

to implement each strategy.

H.4 List of engineering evaluations or calculations that were used to verify the

engineering bases for the mitigating strategies.

H.5 Piping and instrumentation diagrams (P&ID) and legend list or simplified flow

diagrams for systems relied upon in the mitigating strategies. These could be the

type used for training (C-size paper drawings and electronic copy).

H.6 List of modification packages or summary descriptions of modifications with simplified

drawings, for necessary facility changes to implement the mitigating strategies.

H.7 List of routine tests, surveillances, and preventive maintenance for equipment and

tools needed to implement 10 CFR 50.54(hh)(2) strategies.

H.8 For equipment and tools needed to implement 10 CFR 50.54(hh)(2) strategies,

provide the following:

Procedures for inventory, testing, and inspection; and

Most recent inspection, inventory, and testing results;

Copies of the last two completed performance tests, surveillances, and

preventative maintenance performed on the pumps, including the pump

controllers and batteries.

H.9 List of 10 CFR 50.54(hh)(2) strategies, if any, which have implementing details that

differ from that documented in the submittals or the safety evaluation report.

H.10 Site general arrangement drawings that show the majority of buildings and areas

referenced in 10 CFR 50.54(hh)(2) documents (C-size paper drawings and electronic

copy).

H.11 Training records, training matrix, and lesson plans related to 10 CFR 50.54(hh)(2).

2

H.12 Copies of memoranda of understanding (MOU), (e.g., with local fire departments)

required to implement any mitigating strategies.

H.13 Docketed correspondence for 10 CFR 50.54(hh) to include license amendment

requests (LARS); Safety Evaluation Reports (SER); Request for Information (RFI)

and associated responses; and other pertinent documents.