| title = Responds to NRC | | title = Responds to NRC Re Violation Noted in IE Insp Rept 50-335/79-14.Corrective Actions:Required Valves Are Locked & Prestart Check List Will Be Revised by 790801 | ||
| author name = Uhrig R | | author name = Uhrig R | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 7908200013 | | document report number = NUDOCS 7908200013 | ||
| title reference date = 06-20-1979 | |||
| package number = ML17206A970 | | package number = ML17206A970 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:8 P. BOX 013100. MIAMI. FL 33101 | {{#Wiki_filter:8 P. BOX 013100. MIAMI. FL 33101 pR | ||
~ 3 F LORIDAPOWER 8c LIGHTCOMPANY July ll, 1979 L-79-189 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
Re: | |||
Re: | RII:JAD 50-335/79-14 Florida Power 5 Light Company has reviewed the subject inspection report and a response is attached. | ||
There | There is no proprietary information in the report. | ||
Very | Very truly yours, obert E. Uhrig Vice President Advanced Systems | ||
& Technology REU/MAS/mal Attachment cc: | |||
Harold F. Reis, Esquire O82 OOOi~ | |||
PEOPLE... SERVING PEOPLE | PEOPLE... SERVING PEOPLE | ||
ATTACHMENT Re. | ATTACHMENT Re. | ||
RII:JAB 50-335/79-14 Findinn As required by Technical Specification 6.8.l.a,written procedures are required to be established, implemented and maintained covering the applicable proce-dures recommended in Appendix "A" of Regulatory Guide 1.33, | |||
: November, 1972. | |||
Contrary to the above: | Contrary to the above: | ||
l. | |||
Plant Operating Procedure 0410020 "HPSI/LPSI-Normal Operation", Section 8.1 was not followed in that safeguards pumps minimum flow isolation valve NV-3660, required to be locked open, was found open but unlocked on June 7, 1979. | |||
2. | |||
Plant Operating Procedure 0420020 "Containment Spray-Initial Valve Alignment", | |||
Section 8.1.9 divas not followed in that B header eductor inlet valve 07261, required to be locked open, was found open but unlocked on June 7, 19/9. | Section 8.1.9 divas not followed in that B header eductor inlet valve 07261, required to be locked open, was found open but unlocked on June 7, 19/9. | ||
~Res | ~Res ense The valves required to be locked are now locked.,The individuals responsible for valve locking have been apprised of the importance of the finding. | ||
The | The pre-start check list procedure (Administrative Procedure 0030120) will be revised by August 1, 1979. | ||
The revised procedure will require verification of the locked valve list for a particular mode of operation prior to entry into that mode. | |||
This requirement will be mandatory after any outage involving si gnificant val ve mani pul ation.}} | |||
Latest revision as of 16:30, 8 January 2025
| ML17206A971 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/11/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17206A970 | List: |
| References | |
| NUDOCS 7908200013 | |
| Download: ML17206A971 (4) | |
Text
8 P. BOX 013100. MIAMI. FL 33101 pR
~ 3 F LORIDAPOWER 8c LIGHTCOMPANY July ll, 1979 L-79-189 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Re:
RII:JAD 50-335/79-14 Florida Power 5 Light Company has reviewed the subject inspection report and a response is attached.
There is no proprietary information in the report.
Very truly yours, obert E. Uhrig Vice President Advanced Systems
& Technology REU/MAS/mal Attachment cc:
Harold F. Reis, Esquire O82 OOOi~
PEOPLE... SERVING PEOPLE
ATTACHMENT Re.
RII:JAB 50-335/79-14 Findinn As required by Technical Specification 6.8.l.a,written procedures are required to be established, implemented and maintained covering the applicable proce-dures recommended in Appendix "A" of Regulatory Guide 1.33,
- November, 1972.
Contrary to the above:
l.
Plant Operating Procedure 0410020 "HPSI/LPSI-Normal Operation", Section 8.1 was not followed in that safeguards pumps minimum flow isolation valve NV-3660, required to be locked open, was found open but unlocked on June 7, 1979.
2.
Plant Operating Procedure 0420020 "Containment Spray-Initial Valve Alignment",
Section 8.1.9 divas not followed in that B header eductor inlet valve 07261, required to be locked open, was found open but unlocked on June 7, 19/9.
~Res ense The valves required to be locked are now locked.,The individuals responsible for valve locking have been apprised of the importance of the finding.
The pre-start check list procedure (Administrative Procedure 0030120) will be revised by August 1, 1979.
The revised procedure will require verification of the locked valve list for a particular mode of operation prior to entry into that mode.
This requirement will be mandatory after any outage involving si gnificant val ve mani pul ation.