{{#Wiki_filter:Student Handout Index
{{#Wiki_filter:1 Student Handout Index
: 1. LCO 3.3.1.2 SRM Instrumentation [RO]
: 1.
: 2. LCO 3.6.1.1 Primary Containment [SRO]
LCO 3.3.1.2 SRM Instrumentation [RO]
: 3. LCO 3.4.1 Recirculation Loops Operating [SRO]
: 2.
: 4. LCO 3.4.2 Jet Pumps [SRO]
LCO 3.6.1.1 Primary Containment [SRO]
: 5. LCO 3.7.9 Control Building / Standby Gas Treatment (CB/SBGT) Instrument Air System [SRO]
: 3.
: 6. LCO 3.8.1 AC Sources Operating [SRO]
LCO 3.4.1 Recirculation Loops Operating [SRO]
: 7. EPIP Form EAL-01 Emergency Action Level Matrix [Hot]
: 4.
LCO 3.4.2 Jet Pumps [SRO]
: 5.
LCO 3.7.9 Control Building / Standby Gas Treatment (CB/SBGT) Instrument Air System [SRO]
: 6.
LCO 3.8.1 AC Sources Operating [SRO]
: 7.
EPIP Form EAL-01 Emergency Action Level Matrix [Hot]
[SRO]
[SRO]
: 8. EPIP Form EAL-02 Emergency Action Level Matrix [Cold]
: 8.
EPIP Form EAL-02 Emergency Action Level Matrix [Cold]
[SRO]
[SRO]
: 9. EOP Graph 07 Drywell Spray Initiation Limit [SRO]
: 9.
: 10. LCO 3.2.2 MCPR [SRO]
EOP Graph 07 Drywell Spray Initiation Limit [SRO]
: 11. LCO 3.4.10 Reactor Steam Dome Pressure [SRO]
: 10.
: 12. LCO 3.5.1 ECCS Operating [SRO]
LCO 3.2.2 MCPR [SRO]
: 13. LCO 3.1.3 Control Rod Operability [SRO]
: 11.
: 14. LCO 3.1.6 Rod Pattern Control [SRO]
LCO 3.4.10 Reactor Steam Dome Pressure [SRO]
: 15. EOP Table 6 [RO/SRO]
: 12.
: 16. LCO 3.6.2.2 [SRO]
LCO 3.5.1 ECCS Operating [SRO]
: 17. EOP Graph 04 [RO/SRO]
: 13.
: 18. Table of RPV Pressure versus Saturation Temperature (AOP 915 Attachment 5) [RO]
LCO 3.1.3 Control Rod Operability [SRO]
: 19. Core Spray NPSH Limit [RO]
: 14.
: 20. Core Spray Vortex Limit [RO]
LCO 3.1.6 Rod Pattern Control [SRO]
: 21. AOP 149 Appendix 1 Heatup Rate Curve -RPV Flooded
: 15.
EOP Table 6 [RO/SRO]
: 16.
LCO 3.6.2.2 [SRO]
: 17.
EOP Graph 04 [RO/SRO]
: 18.
Table of RPV Pressure versus Saturation Temperature (AOP 915 Attachment 5) [RO]
: 19.
Core Spray NPSH Limit [RO]
: 20.
Core Spray Vortex Limit [RO]
: 21.
AOP 149 Appendix 1 Heatup Rate Curve -RPV Flooded
[RO]
[RO]
: 22. AOP 149 Appendix 2 Heatup Rate Curve -RPV Level at 200[RO]
: 22.
1
AOP 149 Appendix 2 Heatup Rate Curve -RPV Level at 200[RO]  


SRM Instrumentation 3.3.1.2 3.3 INSTRUMENTATION 3.3.1.2 Source Range Monitor (SRM) Instrumentation LCO 3.3.1.2         The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE.
SRM Instrumentation 3.3.1.2 2
APPLICABILITY:     According to Table 3.3.1.2-1.
3.3 INSTRUMENTATION 3.3.1.2 Source Range Monitor (SRM) Instrumentation LCO 3.3.1.2 The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE.
ACTIONS CONDITION                 REQUIRED ACTION             COMPLETION TIME A. One or more required       A.1    Restore required        4 hours SRMs inoperable in               SRMs to OPERABLE MODE 2 with                       status.
APPLICABILITY: According to Table 3.3.1.2-1.
Intermediate Range Monitors (IRMs) on Range 2 or below.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
B. Three required SRMs       B.1    Suspend control rod    Immediately inoperable in MODE 2             withdrawal.
One or more required SRMs inoperable in MODE 2 with Intermediate Range Monitors (IRMs) on Range 2 or below.
with IRMs on Range 2 or below.
A.1 Restore required SRMs to OPERABLE status.
C. Required Action and       C.1    Be in MODE 3.          12 hours associated Completion Time of Condition A or B not met.
4 hours B.
(continued) 2
Three required SRMs inoperable in MODE 2 with IRMs on Range 2 or below.
B.1 Suspend control rod withdrawal.
Immediately C.
Required Action and associated Completion Time of Condition A or B not met.
C.1 Be in MODE 3.
12 hours (continued)  


SRM Instrumentation 3.3.1.2 ACTIONS (continued)
SRM Instrumentation 3.3.1.2 3
CONDITION               REQUIRED ACTION             COMPLETION TIME D. One or more required D.1   Fully insert all         1 hour SRMs inoperable in        insertable control rods.
ACTIONS (continued)
MODE 3 or 4.
CONDITION REQUIRED ACTION COMPLETION TIME D.
AND D.2   Place reactor mode switch in the shutdown   1 hour position.
One or more required SRMs inoperable in MODE 3 or 4.
E. One or more required E.1   Suspend CORE             Immediately SRMs inoperable in        ALTERATIONS except MODE 5.                    for control rod insertion.
D.1 Fully insert all insertable control rods.
AND E.2 Initiate action to fully   Immediately insert all insertable control rods in core cells containing one or more fuel assemblies.
AND D.2 Place reactor mode switch in the shutdown position.
3
1 hour 1 hour E.
One or more required SRMs inoperable in MODE 5.
E.1 Suspend CORE ALTERATIONS except for control rod insertion.
AND E.2 Initiate action to fully insert all insertable control rods in core cells containing one or more fuel assemblies.
Immediately Immediately


SURVEILLANCE REQUIREMENTS
4 SURVEILLANCE REQUIREMENTS  
----------------------------------------------------NOTE--------------------------------------------------------
----------------------------------------------------NOTE--------------------------------------------------------
Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.
Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.
SURVEILLANCE                                             FREQUENCY SR 3.3.1.2.1 Perform CHANNEL CHECK.                                                     In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.2         --------------------------NOTES--------------------------
SURVEILLANCE FREQUENCY SR 3.3.1.2.1 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.2  
--------------------------NOTES--------------------------
: 1. Only required to be met during CORE ALTERATIONS.
: 1. Only required to be met during CORE ALTERATIONS.
: 2. One SRM may be used to satisfy more than one of the following.
: 2. One SRM may be used to satisfy more than one of the following.
Verify an OPERABLE SRM detector is                               In accordance with located in :                                                     the Surveillance Frequency Control
Verify an OPERABLE SRM detector is located in :
: a. The fueled region;                                         Program
: a.
: b. The core quadrant where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region; and
The fueled region;
: c. A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.
: b.
SR 3.3.1.2.3         Perform CHANNEL CHECK.                                           In accordance with the Surveillance Frequency Control Program SURVEILLANCE REQUIREMENTS (continued) 4
The core quadrant where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region; and
: c.
A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.
In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.3 Perform CHANNEL CHECK.
In accordance with the Surveillance Frequency Control Program SURVEILLANCE REQUIREMENTS (continued)  


SURVEILLANCE                                           FREQUENCY SR 3.3.1.2.4 ------------------------NOTE------------------------------
5 SURVEILLANCE FREQUENCY SR 3.3.1.2.4  
------------------------NOTE------------------------------
Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.
In accordance Verify count rate is 3.0 cps.                               with the Surveillance Frequency Control Program SR 3.3.1.2.5 Perform CHANNEL FUNCTIONAL TEST.                               In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.6 ------------------------NOTE------------------------------
Verify count rate is 3.0 cps.
In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.5 Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.6  
------------------------NOTE------------------------------
Not required to be performed until 12 hours after IRMs on Range 2 or below.
Not required to be performed until 12 hours after IRMs on Range 2 or below.
Perform CHANNEL FUNCTIONAL TEST.                               In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.7 -----------------------NOTES-----------------------------
Perform CHANNEL FUNCTIONAL TEST.
In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.7  
-----------------------NOTES-----------------------------
: 1. Neutron detectors are excluded.
: 1. Neutron detectors are excluded.
: 2. Not required to be performed until 12 hours after IRMs on Range 2 or below.
: 2. Not required to be performed until 12 hours after IRMs on Range 2 or below.
In accordance with Perform CHANNEL CALIBRATION.                                   the Surveillance Frequency Control Program 5
Perform CHANNEL CALIBRATION.
In accordance with the Surveillance Frequency Control Program  


Primary Containment 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1         Primary containment shall be OPERABLE.
Primary Containment 3.6.1.1 6
APPLICABILITY:     MODES 1, 2, and 3.
3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE.
ACTIONS CONDITION                   REQUIRED ACTION     COMPLETION TIME A. Primary containment       A.1   Restore primary   1 hour inoperable.                      containment to OPERABLE status.
APPLICABILITY: MODES 1, 2, and 3.
B. Required Action and       B.1   Be in MODE 3. 12 hours associated Completion Time not met.              AND B.2   Be in MODE 4. 36 hours 6
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Primary containment inoperable.
A.1 Restore primary containment to OPERABLE status.
1 hour B.
Required Action and associated Completion Time not met.
B.1 Be in MODE 3.
AND B.2 Be in MODE 4.
12 hours 36 hours  


Primary Containment 3.6.1.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.6.1.1.1 Perform required visual examinations and leakage   In accordance rate testing except for primary containment   with the Primary air lock testing, in accordance with the     Containment Primary Containment Leakage Rate             Leakage Rate Program.                                      Program.
Primary Containment 3.6.1.1 7
SR 3.6.1.1.2     Verify suppression chamber pressure does     In accordance with not increase at a rate > 0.009 psi per minute the Surveillance tested over a 10 minute period at a           Frequency Control differential pressure of > 1.0 psid.         Program 7
SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.1 Perform required visual examinations and leakage rate testing except for primary containment air lock testing, in accordance with the Primary Containment Leakage Rate Program.
In accordance with the Primary Containment Leakage Rate Program.
SR 3.6.1.1.2 Verify suppression chamber pressure does not increase at a rate > 0.009 psi per minute tested over a 10 minute period at a differential pressure of > 1.0 psid.
In accordance with the Surveillance Frequency Control Program  


Recirculation Loops Operating 3.4.1 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1         Two recirculation loops with matched pump speeds shall be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR.
Recirculation Loops Operating 3.4.1 8
3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1 Two recirculation loops with matched pump speeds shall be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR.
OR One recirculation loop may be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR and with the following limits applied when the associated LCO is applicable:
OR One recirculation loop may be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR and with the following limits applied when the associated LCO is applicable:
: a. LCO 3.2.1, AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR), single loop operation limits specified in the COLR;
: a.
: b. LCO 3.2.2, MINIMUM CRITICAL POWER RATIO (MCPR),
LCO 3.2.1, AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR), single loop operation limits specified in the COLR;
: b.
LCO 3.2.2, MINIMUM CRITICAL POWER RATIO (MCPR),
single loop operation limits specified in the COLR; and
single loop operation limits specified in the COLR; and
: c. LCO 3.3.1.1, Reactor Protection System (RPS)
: c.
LCO 3.3.1.1, Reactor Protection System (RPS)
Instrumentation, Function 2.b (Average Power Range Monitors Flow Biased High Scram), Allowable Value of Table 3.3.1.1-1 is reset for single loop operation.
Instrumentation, Function 2.b (Average Power Range Monitors Flow Biased High Scram), Allowable Value of Table 3.3.1.1-1 is reset for single loop operation.
APPLICABILITY:     MODES 1 and 2.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION                     REQUIRED ACTION               COMPLETION TIME A. No recirculation loops       A.1     Place the reactor     Immediately in operation.                        mode switch in the Shutdown position.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
(continued) 8
No recirculation loops in operation.
A.1 Place the reactor mode switch in the Shutdown position.
Immediately (continued)  


Recirculation Loops Operating 3.4.1 ACTIONS (continued)
Recirculation Loops Operating 3.4.1 9
CONDITION                 REQUIRED ACTION               COMPLETION TIME B. One or two recirculation B.1  Initiate action to exit    Immediately loops in operation in the       the Exclusion Region.
ACTIONS (continued)
Exclusion Region of the power/flow map described in the Core Operating Limits Report.
CONDITION REQUIRED ACTION COMPLETION TIME B.
C. Recirculation pump       C.1   Trip one recirculation     2 hours speed mismatch not              pump.
One or two recirculation loops in operation in the Exclusion Region of the power/flow map described in the Core Operating Limits Report.
within limits.
B.1 Initiate action to exit the Exclusion Region.
D. Requirements of the       D.1  Satisfy requirements      24 hours LCO not met for                 of the LCO.
Immediately C.
reasons other than Conditions A, B or C.
Recirculation pump speed mismatch not within limits.
E. Required Action and       E.1  Be in MODE 3.              12 hours associated Completion Time of Condition C or D not met.
C.1 Trip one recirculation pump.
9
2 hours D.
Requirements of the LCO not met for reasons other than Conditions A, B or C.
D.1 Satisfy requirements of the LCO.
24 hours E.
Required Action and associated Completion Time of Condition C or D not met.
E.1 Be in MODE 3.
12 hours


Recirculation Loops Operating 3.4.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY SR 3.4.1.1 -----------------------------NOTE---------------------------
Recirculation Loops Operating 3.4.1 10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1  
-----------------------------NOTE---------------------------
Not required to be performed until 24 hours after both recirculation loops are in operation.
Not required to be performed until 24 hours after both recirculation loops are in operation.
Verify recirculation pump speed mismatch with                    In accordance with both recirculation pumps at steady state                         the Surveillance operation is as follows:                                         Frequency Control Program
Verify recirculation pump speed mismatch with both recirculation pumps at steady state operation is as follows:
: a. The speed of the faster pump shall be 135%
: a. The speed of the faster pump shall be 135%
of the speed of the slower pump when operating at < 69.4 % RTP.
of the speed of the slower pump when operating at < 69.4 % RTP.
: b. The speed of the faster pump shall be 122% of the speed of the slower pump when operating at 69.4 % RTP.
: b. The speed of the faster pump shall be 122% of the speed of the slower pump when operating at 69.4 % RTP.
SR 3.4.1.2 Verify core flow as a function of core THERMAL                       In accordance with POWER is outside the Exclusion Region shown                       the Surveillance in the COLR.                                                     Frequency Control Program 10
In accordance with the Surveillance Frequency Control Program SR 3.4.1.2 Verify core flow as a function of core THERMAL POWER is outside the Exclusion Region shown in the COLR.
In accordance with the Surveillance Frequency Control Program  


Jet Pumps 3.4.2 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.2 Jet Pumps LCO 3.4.2         All jet pumps shall be OPERABLE.
Jet Pumps 3.4.2 11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.2 Jet Pumps LCO 3.4.2 All jet pumps shall be OPERABLE.
APPLICABILITY:   MODES 1 and 2.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION                 REQUIRED ACTION     COMPLETION TIME A.       One or more jet         A.1   Be in MODE 3. 12 hours pumps inoperable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
11
One or more jet pumps inoperable.
A.1 Be in MODE 3.
12 hours  


Jet Pumps 3.4.2 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                               FREQUENCY SR 3.4.2.1 -----------------------------NOTES-------------------------------
Jet Pumps 3.4.2 12 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1  
: 1.     Not required to be performed until 4 hours after the associated recirculation loop is in operation.
-----------------------------NOTES-------------------------------
: 2.     Not required to be performed until 24 hours after > 21.7% RTP.
: 1.
: 3.     Criterion c is only applicable when pump speed is 60% rated speed.
Not required to be performed until 4 hours after the associated recirculation loop is in operation.
Verify at least one of the following criteria (a, b                   In accordance or c, as applicable) is satisfied for each                           with the operating recirculation loop:                                         Surveillance Frequency
: 2.
: a.     Recirculation pump flow to speed ratio                       Control Program differs by 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by 5% from established patterns.
Not required to be performed until 24 hours after > 21.7% RTP.
: b.     Each jet pump diffuser to lower plenum differential pressure differs by 20% from established patterns.
: 3.
: c.     The recirculation pump flow to speed ratio, jet pump loop flow to recirculation pump speed ratio, and jet pump diffuser to lower plenum differential pressure ratios are evaluated as being acceptable.
Criterion c is only applicable when pump speed is 60% rated speed.
12
Verify at least one of the following criteria (a, b or c, as applicable) is satisfied for each operating recirculation loop:
: a.
Recirculation pump flow to speed ratio differs by 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by 5% from established patterns.
: b.
Each jet pump diffuser to lower plenum differential pressure differs by 20% from established patterns.
: c.
The recirculation pump flow to speed ratio, jet pump loop flow to recirculation pump speed ratio, and jet pump diffuser to lower plenum differential pressure ratios are evaluated as being acceptable.
In accordance with the Surveillance Frequency Control Program


CB/SBGT Instrument Air System 3.7.9 3.7 PLANT SYSTEMS 3.7.9 Control Building/Standby Gas Treatment (CB/SBGT) Instrument Air System LCO 3.7.9           Two CB/SBGT Instrument Air subsystems shall be OPERABLE.
CB/SBGT Instrument Air System 3.7.9 13 3.7 PLANT SYSTEMS 3.7.9 Control Building/Standby Gas Treatment (CB/SBGT) Instrument Air System LCO 3.7.9 Two CB/SBGT Instrument Air subsystems shall be OPERABLE.
APPLICABILITY:     MODES 1, 2, and 3.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION                 REQUIRED ACTION             COMPLETION TIME A. One CB/SBGT           A.1 Declare required         4 hours from Instrument Air                feature(s), supported   discovery of subsystem                    by the inoperable       Condition A inoperable.                  CB/SBGT Instrument Air concurrent with subsystem, inoperable   inoperability of when the redundant      redundant required required feature(s)    feature(s) are inoperable.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
AND A.2 Restore the CB/SBGT     7 days Instrument Air subsystem to OPERABLE status.
One CB/SBGT Instrument Air subsystem inoperable.
B. Required Action and   B.1  Be in MODE 3.            12 hours Associated Completion Time of     AND Condition A not met.                   B.2  Be in MODE 4.            36 hours OR Both CB/SBGT Instrument Air subsystems inoperable.
A.1 Declare required feature(s), supported by the inoperable CB/SBGT Instrument Air subsystem, inoperable when the redundant required feature(s) are inoperable.
13
AND A.2 Restore the CB/SBGT Instrument Air subsystem to OPERABLE status.
4 hours from discovery of Condition A concurrent with inoperability of redundant required feature(s) 7 days B.
Required Action and Associated Completion Time of Condition A not met.
OR Both CB/SBGT Instrument Air subsystems inoperable.
B.1 Be in MODE 3.
AND B.2 Be in MODE 4.
12 hours 36 hours


CB/SBGT Instrument Air System 3.7.9 CONDITION REQUIRED ACTION       COMPLETION TIME 14
CB/SBGT Instrument Air System 3.7.9 14 CONDITION REQUIRED ACTION COMPLETION TIME  


CB/SBGT Instrument Air System 3.7.9 SURVEILLANCE REQUIREMENTS SURVEILLANCE                         FREQUENCY SR 3.7.9.1 Operates each CB/SBGT Instrument Air           In accordance with the compressor for 20 minutes.                 Surveillance Frequency Control Program SR 3.7.9.2 Verify each CB/SBGT Instrument Air             In accordance with the subsystem actuates on an actual or           Surveillance Frequency simulated initiation signal and maintains   Control Program air pressure 75 psig in the receiver.
CB/SBGT Instrument Air System 3.7.9 15 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operates each CB/SBGT Instrument Air compressor for 20 minutes.
15
In accordance with the Surveillance Frequency Control Program SR 3.7.9.2 Verify each CB/SBGT Instrument Air subsystem actuates on an actual or simulated initiation signal and maintains air pressure 75 psig in the receiver.
In accordance with the Surveillance Frequency Control Program


AC Sources Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources Operating LCO 3.8.1                 The following AC electrical power sources shall be OPERABLE:
AC Sources Operating 3.8.1 16 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:
: a. Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
: a.
: b. Two diesel generators (DGs).
Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and
APPLICABILITY:           MODES 1, 2, and 3.
: b.
ACTIONS
Two diesel generators (DGs).
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS  
----------------------------------------------------------NOTE-----------------------------------------------------
----------------------------------------------------------NOTE-----------------------------------------------------
LCO 3.0.4.b is not applicable to DGs.
LCO 3.0.4.b is not applicable to DGs.
CONDITION                             REQUIRED ACTION                       COMPLETION TIME A.       One offsite circuit             A.1     Perform SR 3.8.1.1 for           1 hour inoperable.                              OPERABLE offsite circuit.                         AND Once per 24 hours thereafter AND A.2     Restore offsite circuit           Prior to entering to OPERABLE status.               MODE 2 from MODE 3 or 4 (continued) 16
CONDITION REQUIRED ACTION COMPLETION TIME A.
One offsite circuit inoperable.
A.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit.
AND A.2 Restore offsite circuit to OPERABLE status.
1 hour AND Once per 24 hours thereafter Prior to entering MODE 2 from MODE 3 or 4 (continued)  


AC Sources Operating 3.8.1 ACTIONS (continued)
AC Sources Operating 3.8.1 17 ACTIONS (continued)
CONDITION           REQUIRED ACTION             COMPLETION TIME B. One DG inoperable. B.1 Perform SR 3.8.1.1 for   1 hour OPERABLE offsite circuit(s).             AND Once per 12 hours thereafter AND B.2   Declare required       4 hours from feature(s), supported   discovery of by the inoperable DG,   Condition B inoperable when the     concurrent with redundant required     inoperability of feature(s) are         redundant required inoperable.            feature(s)
CONDITION REQUIRED ACTION COMPLETION TIME B.
AND (continued) 17
One DG inoperable.
B.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit(s).
AND B.2 Declare required feature(s), supported by the inoperable DG, inoperable when the redundant required feature(s) are inoperable.
AND 1 hour AND Once per 12 hours thereafter 4 hours from discovery of Condition B concurrent with inoperability of redundant required feature(s)
(continued)  


AC Sources Operating 3.8.1 ACTIONS CONDITION               REQUIRED ACTION                     COMPLETION TIME B.   (continued)         B.3     Determine OPERABLE             24 hours DG is not inoperable due to common cause failure.
AC Sources Operating 3.8.1 18 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.
AND
(continued)
                          ---------------NOTE----------------
B.3 Determine OPERABLE DG is not inoperable due to common cause failure.
AND  
---------------NOTE----------------
Not required to be performed when the cause of the inoperable DG is pre-planned, preventive maintenance and testing.
Not required to be performed when the cause of the inoperable DG is pre-planned, preventive maintenance and testing.
B.4     Perform SR 3.8.1.2 for OPERABLE DG.                   Once per 72 hours AND B.5     Restore DG to OPERABLE status.               7 days AND 8 days from discovery of failure to meet LCO expect for Condition A C. Two offsite circuits C.1     Declare required               12 hours from inoperable.                  feature(s) inoperable           discovery of Condition when the redundant             C concurrent with required feature(s) are         inoperability of inoperable.                    redundant required feature(s)
B.4 Perform SR 3.8.1.2 for OPERABLE DG.
(continued) 18
AND B.5 Restore DG to OPERABLE status.
24 hours Once per 72 hours 7 days AND 8 days from discovery of failure to meet LCO expect for Condition A C.
Two offsite circuits inoperable.
C.1 Declare required feature(s) inoperable when the redundant required feature(s) are inoperable.
12 hours from discovery of Condition C concurrent with inoperability of redundant required feature(s)
(continued)  


AC Sources Operating 3.8.1 ACTIONS (continued)
AC Sources Operating 3.8.1 19 ACTIONS (continued)
CONDITION               REQUIRED ACTION           COMPLETION TIME AND C.   (continued)         C.2   Restore one offsite 24 hours circuit to OPERABLE status.             AND 8 days from discovery of failure to meet LCO except for Condition A D. Two DGs inoperable. D.1   Restore one DG to   2 hours OPERABLE status.
CONDITION REQUIRED ACTION COMPLETION TIME C.
E. Required Action and   E.1  Be in MODE 3.        12 hours Associated Completion Time of   AND Condition A, B, C, or D not met.           E.2   Be in MODE 4.       36 hours F. Three or more AC     F.1   Enter LCO 3.0.3. Immediately sources inoperable.
(continued)
19
AND C.2 Restore one offsite circuit to OPERABLE status.
24 hours AND 8 days from discovery of failure to meet LCO except for Condition A D.
Two DGs inoperable.
D.1 Restore one DG to OPERABLE status.
2 hours E.
Required Action and Associated Completion Time of Condition A, B, C, or D not met.
E.1 Be in MODE 3.
AND E.2 Be in MODE 4.
12 hours 36 hours F.
Three or more AC sources inoperable.
F.1 Enter LCO 3.0.3.
Immediately  


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                             FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power In accordance with availability for each offsite circuit.                         the Surveillance Frequency Control Program SR 3.8.1.2 ------------------------NOTES-----------------------------
AC Sources Operating 3.8.1 20 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each offsite circuit.
: 1. All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.2  
: 2. A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
------------------------NOTES-----------------------------
: 1.
All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.
: 2.
A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.
: 3. When a DG is placed in an inoperable status solely for the performance of testing required by Required Actions B.3 or B.4, entry into associated Conditions and Required Actions may be delayed for up to 2 hours.
: 3.
Verify each DG starts from standby conditions                   In accordance with and achieves steady state voltage 3744v                       the Surveillance and 4576v and frequency 59.5Hz and                         Frequency Control 60.5Hz.                                                       Program (continued) 20
When a DG is placed in an inoperable status solely for the performance of testing required by Required Actions B.3 or B.4, entry into associated Conditions and Required Actions may be delayed for up to 2 hours.
Verify each DG starts from standby conditions and achieves steady state voltage 3744v and 4576v and frequency 59.5Hz and 60.5Hz.
In accordance with the Surveillance Frequency Control Program (continued)  


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources Operating 3.8.1 21 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                               FREQUENCY SR 3.8.1.3 -------------------------NOTES----------------------------
SURVEILLANCE FREQUENCY SR 3.8.1.3  
: 1. DG loadings may include gradual loading as recommended by the manufacturer.
-------------------------NOTES----------------------------
: 2. Momentary transients outside the load range do not invalidate this test.
: 1.
: 3. This Surveillance shall be conducted on only one DG at a time.
DG loadings may include gradual loading as recommended by the manufacturer.
: 4. This SR shall be preceded by and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
: 2.
Verify each DG is synchronized and loaded                       In accordance with and operates for 60 minutes at a load                         the Surveillance 2750kw and 2950kw.                                           Frequency Control Program SR 3.8.1.4 Verify each tank contains 220 gal of fuel oil.                       In accordance with the Surveillance Frequency Control Program SR 3.8.1.5 Check for the presence of water in the fuel oil in                     In accordance with each day tank and remove water as necessary.                     the Surveillance Frequency Control Program (continued) 21
Momentary transients outside the load range do not invalidate this test.
: 3.
This Surveillance shall be conducted on only one DG at a time.
: 4.
This SR shall be preceded by and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.
Verify each DG is synchronized and loaded and operates for 60 minutes at a load 2750kw and 2950kw.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.4 Verify each tank contains 220 gal of fuel oil.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.5 Check for the presence of water in the fuel oil in each day tank and remove water as necessary.
In accordance with the Surveillance Frequency Control Program (continued)


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources Operating 3.8.1 22 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                               FREQUENCY SR 3.8.1.6 Verify the fuel oil transfer system operates to                         In accordance with transfer fuel oil from storage tank to the day                   the Surveillance tank.                                                            Frequency Control Program SR 3.8.1.7 -------------------------NOTE------------------------------
SURVEILLANCE FREQUENCY SR 3.8.1.6 Verify the fuel oil transfer system operates to transfer fuel oil from storage tank to the day tank.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.7  
-------------------------NOTE------------------------------
All DG starts may be preceded by an engine prelube period.
All DG starts may be preceded by an engine prelube period.
Verify each DG starts from standby condition                     In accordance with and achieves:                                                     the Surveillance Frequency Control
Verify each DG starts from standby condition and achieves:
: a. in 10 seconds, voltage 3744V and                           Program frequency 59.5Hz; and
: a. in 10 seconds, voltage 3744V and frequency 59.5Hz; and
: b. steady state, voltage 3744V and 4576V and frequency 59.5Hz and 60.5Hz.
: b. steady state, voltage 3744V and 4576V and frequency 59.5Hz and 60.5Hz.
SR 3.8.1.8 ----------------------------NOTE----------------------------
In accordance with the Surveillance Frequency Control Program SR 3.8.1.8  
----------------------------NOTE----------------------------
The Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.
The Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.
Verify automatic slow transfer of AC power                       In accordance with supply from the Startup Transformer to the                       the Surveillance Standby Transformer.                                             Frequency Control Program (continued) 22
Verify automatic slow transfer of AC power supply from the Startup Transformer to the Standby Transformer.
In accordance with the Surveillance Frequency Control Program (continued)  


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources Operating 3.8.1 23 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                             FREQUENCY SR 3.8.1.9 ----------------------------NOTE---------------------------This Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.
SURVEILLANCE FREQUENCY SR 3.8.1.9  
Verify each DG rejects a load greater than or                   In accordance equal to its associated single largest post-                   with the accident load, and:                                             Surveillance Frequency
----------------------------NOTE---------------------------This Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.
: a. Following load rejection, the frequency is Control Program 64.5Hz.
Verify each DG rejects a load greater than or equal to its associated single largest post-accident load, and:
: b. Within 1.3 seconds following load rejection, the voltage is 3744V and 4576V.
: a.
: c. Within 3.9 seconds following load rejection, the frequency is 59.5Hz and 60.5Hz.
Following load rejection, the frequency is 64.5Hz.
SR 3.8.1.10 ----------------------------NOTE---------------------------
: b.
Within 1.3 seconds following load rejection, the voltage is 3744V and 4576V.
: c.
Within 3.9 seconds following load rejection, the frequency is 59.5Hz and 60.5Hz.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.10 ----------------------------NOTE---------------------------
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify each DGs automatic trips are bypassed                   In accordance on an actual or simulated Loss of Offsite Power                 with the (LOOP) signal or on an actual or simulated                     Surveillance ECCS initiation signal except:                                 Frequency Control Program
Verify each DGs automatic trips are bypassed on an actual or simulated Loss of Offsite Power (LOOP) signal or on an actual or simulated ECCS initiation signal except:
: a. Engine overspeed; and
: a.
: b. Generator lockout.
Engine overspeed; and
(continued) 23
: b.
Generator lockout.
In accordance with the Surveillance Frequency Control Program (continued)  


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources Operating 3.8.1 24 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                 FREQUENCY SR 3.8.1.11     -----------------------------NOTE--------------------------------
SURVEILLANCE FREQUENCY SR 3.8.1.11  
-----------------------------NOTE--------------------------------
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify under manual control each DG:                               In accordance with the
Verify under manual control each DG:
: a. Synchronizes with offsite power source Surveillance while loaded with emergency loads upon a Frequency simulated restoration of offsite power; Control Program
: a.
: b. Transfers loads to offsite power source; and
Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;
: c. Returns to ready-to-load operation.
: b.
SR 3.8.1.12 -----------------------NOTE-----------------------------------
Transfers loads to offsite power source; and
: c.
Returns to ready-to-load operation.
In accordance with the Surveillance Frequency Control Program SR 3.8.1.12  
-----------------------NOTE-----------------------------------
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.
Verify interval between each sequenced load                         In accordance block is 2 seconds.                                               with the Surveillance Frequency Control Program (continued) 24
Verify interval between each sequenced load block is 2 seconds.
In accordance with the Surveillance Frequency Control Program (continued)  


AC Sources Operating 3.8.1 SURVEILLANCE REQUIREMENTS (continued)
AC Sources Operating 3.8.1 25 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                             FREQUENCY SR 3.8.1.13 -------------------------NOTES---------------------------
SURVEILLANCE FREQUENCY SR 3.8.1.13  
: 1.     All DG starts may be preceded by an engine prelube period.
-------------------------NOTES---------------------------
: 2.     This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
: 1.
Verify, on an actual or simulated loss of offsite               In accordance with power signal in conjunction with an actual or                   the Surveillance simulated ECCS initiation signal:                               Frequency Control Program
All DG starts may be preceded by an engine prelube period.
: a.     De-energization of essential buses;
: 2.
: b.     Load shedding from essential buses; and
This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.
: c.     DG auto-start from standby condition and:
Verify, on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated ECCS initiation signal:
: 1. energizes permanently connected loads in 10 seconds,
: a.
: 2. energizes auto-connected emergency loads in the proper timed sequence,
De-energization of essential buses;
: 3. achieves steady state voltage 3744V and 4576V,
: b.
: 4. achieves steady state frequency 59.5Hz and 60.5Hz, and
Load shedding from essential buses; and
: 5. supplies permanently connected and auto-connected emergency loads for 5 minutes.
: c.
25
DG auto-start from standby condition and:
: 1.
energizes permanently connected loads in 10 seconds,
: 2.
energizes auto-connected emergency loads in the proper timed
: sequence,
: 3.
achieves steady state voltage 3744V and 4576V,
: 4.
achieves steady state frequency 59.5Hz and 60.5Hz, and
: 5.
supplies permanently connected and auto-connected emergency loads for 5 minutes.
In accordance with the Surveillance Frequency Control Program


Graph 7: Drywell Spray Initiation Limit 400 Do not initiate drywell 350 sprays in shaded area Average Drywell Air Temperature (&deg;F) 300 250 200 150 100 50 0
26 0
3.0                            11.4 0       2        4    6      8        10          12  14  16  18  20 Drywell Pressure (psig) 26
50 100 150 200 250 300 350 400 0
2 4
6 8
10 12 14 16 18 20 Average Drywell Air Temperature (&deg;F)
Drywell Pressure (psig)
Graph 7: Drywell Spray Initiation Limit Do not initiate drywell sprays in shaded area 11.4 3.0


MCPR 3.2.2 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)
MCPR 3.2.2 27 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)
LCO 3.2.2         All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.
LCO 3.2.2 All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.
APPLICABILITY:     THERMAL POWER 21.7% RTP.
APPLICABILITY:
ACTIONS CONDITION                   REQUIRED ACTION           COMPLETION TIME A. Any MCPR not within         A.1     Restore MCPR(s) to   2 hours limits.                            within limits.
THERMAL POWER 21.7% RTP.
B. Required Action and         B.1     Reduce THERMAL       4 hours associated Completion              POWER to < 21.7%
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
Time not met.                      RTP.
Any MCPR not within limits.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                               FREQUENCY SR 3.2.2.1     Verify all MCPRs are greater than or equal to   Once within the limits specified in the COLR.               12 hours after 21.7% RTP AND In accordance with the Surveillance Frequency Control Program (continued) 27
A.1 Restore MCPR(s) to within limits.
2 hours B.
Required Action and associated Completion Time not met.
B.1 Reduce THERMAL POWER to < 21.7%
RTP.
4 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify all MCPRs are greater than or equal to the limits specified in the COLR.
Once within 12 hours after 21.7% RTP AND In accordance with the Surveillance Frequency Control Program (continued)  


MCPR 3.2.2 SURVEILLANCE REQUIREMENTS (continued)
MCPR 3.2.2 28 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE         FREQUENCY SR 3.2.2.2   Determine the MCPR limits. Once within 72 hours after each completion of SR 3.1.4.1 AND Once within 72 hours after each completion of SR 3.1.4.2.
SURVEILLANCE FREQUENCY SR 3.2.2.2 Determine the MCPR limits.
28
Once within 72 hours after each completion of SR 3.1.4.1 AND Once within 72 hours after each completion of SR 3.1.4.2.  


Reactor Steam Dome Pressure 3.4.10 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure LCO 3.4.10         The reactor steam dome pressure shall be 1025 psig.
Reactor Steam Dome Pressure 3.4.10 29 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure LCO 3.4.10 The reactor steam dome pressure shall be 1025 psig.
APPLICABILITY:     MODES 1 and 2.
APPLICABILITY: MODES 1 and 2.
ACTIONS CONDITION                   REQUIRED ACTION             COMPLETION TIME A. Reactor steam dome         A.1   Restore reactor steam     15 minutes pressure not within limit.      dome pressure to within limit.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
B. Required Action and       B.1   Be in MODE 3.             12 hours associated Completion Time not met.
Reactor steam dome pressure not within limit.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FREQUENCY SR 3.4.10.1 Verify reactor steam dome pressure is 1025       In accordance with the psig.                                          Surveillance Frequency Control Program 29
A.1 Restore reactor steam dome pressure to within limit.
15 minutes B.
Required Action and associated Completion Time not met.
B.1 Be in MODE 3.
12 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify reactor steam dome pressure is 1025 psig.
In accordance with the Surveillance Frequency Control Program  


ECCS Operating 3.5.1 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS Operating LCO 3.5.1                 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.
ECCS Operating 3.5.1 30 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.
APPLICABILITY:           MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure 100 psig.
APPLICABILITY: MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure 100 psig.
ACTIONS
ACTIONS  
--------------------------------------------------------NOTE----------------------------------------------------
--------------------------------------------------------NOTE----------------------------------------------------
LCO 3.0.4.b is not applicable to HPCI.
LCO 3.0.4.b is not applicable to HPCI.
CONDITION                             REQUIRED ACTION                       COMPLETION TIME A.       One Residual Heat                   A.1     Restore RHR pump to               30 Days Removal (RHR) pump                          OPERABLE status.
CONDITION REQUIRED ACTION COMPLETION TIME A.
inoperable.
One Residual Heat Removal (RHR) pump inoperable.
B.      One low pressure ECCS B.1                   Restore low pressure             7 days subsystem inoperable for                    ECCS subsystem to reasons other than                          OPERABLE status.
A.1 Restore RHR pump to OPERABLE status.
Condition A.
30 Days B.
C.      One Core Spray                       C.1    Restore Core Spray                72 hours subsystem inoperable.                        subsystem to OPERABLE status.
One low pressure ECCS subsystem inoperable for reasons other than Condition A.
AND One or two RHR                       OR pump(s) inoperable.                                                           72 hours C.2     Restore RHR pump(s) to OPERABLE status.
B.1 Restore low pressure ECCS subsystem to OPERABLE status.
D.     Both Core Spray                       D.1     Restore one Core                 72 hours subsystems inoperable.                        Spray subsystem to OPERABLE status.
7 days C.
(continued) 30
One Core Spray subsystem inoperable.
AND One or two RHR pump(s) inoperable.
C.1 Restore Core Spray subsystem to OPERABLE status.
OR C.2 Restore RHR pump(s) to OPERABLE status.
72 hours 72 hours D.
Both Core Spray subsystems inoperable.
D.1 Restore one Core Spray subsystem to OPERABLE status.
72 hours (continued)  


ECCS Operating 3.5.1 ACTIONS (continued)
ECCS Operating 3.5.1 31 ACTIONS (continued)
CONDITION               REQUIRED ACTION         COMPLETION TIME E. Required Action and     E.1  Be in MODE 3.        12 hours associated Completion Time of Condition A, B, AND C, or D not met.       E.2 Be in MODE 4.       36 hours F. HPCI System             F.1 Verify by           Immediately inoperable.                  administrative means RCIC System is OPERABLE.
CONDITION REQUIRED ACTION COMPLETION TIME E.
AND F.2 Restore HPCI         14 days System to OPERABLE status.
Required Action and associated Completion Time of Condition A, B, C, or D not met.
G. HPCI System             G.1 Restore HPCI         7 days inoperable.                  System to OPERABLE status.
E.1 Be in MODE 3.
AND OR One RHR pump inoperable.            G.2 Restore RHR pump to OPERABLE         7 days status.
AND E.2 Be in MODE 4.
H. HPCI System             H.1 Restore HPCI         72 hours inoperable.                  System to AND                          OPERABLE status.
12 hours 36 hours F.
OR One low pressure ECCS subsystem is      H.2 Restore low pressure 72 hours inoperable for reasons      ECCS subsystem to other than Condition A.      OPERABLE status.
HPCI System inoperable.
I. HPCI System             I.1 Restore HPCI         72 hours inoperable.                  System to OPERABLE status.
F.1 Verify by administrative means RCIC System is OPERABLE.
AND OR One ADS valve inoperable.            I.2 Restore ADS valve to 72 hours OPERABLE status.
AND F.2 Restore HPCI System to OPERABLE status.
(continued) 31
Immediately 14 days G.
HPCI System inoperable.
AND One RHR pump inoperable.
G.1 Restore HPCI System to OPERABLE status.
OR G.2 Restore RHR pump to OPERABLE status.
7 days 7 days H.
HPCI System inoperable.
AND One low pressure ECCS subsystem is inoperable for reasons other than Condition A.
H.1 Restore HPCI System to OPERABLE status.
OR H.2 Restore low pressure ECCS subsystem to OPERABLE status.
72 hours 72 hours I.
HPCI System inoperable.
AND One ADS valve inoperable.
I.1 Restore HPCI System to OPERABLE status.
OR I.2 Restore ADS valve to OPERABLE status.
72 hours 72 hours (continued)


ECCS Operating 3.5.1 ACTIONS (continued)
ECCS Operating 3.5.1 32 ACTIONS (continued)
CONDITION                 REQUIRED ACTION       COMPLETION TIME J. Required Action and     J.1        Be in MODE 3. 12 hours associated Completion Time of Condition F, G, AND H, or I not met.         J.2 Reduce reactor steam 36 hours dome pressure to 150 psig.
CONDITION REQUIRED ACTION COMPLETION TIME J.
K. One ADS valve           K.1 Restore ADS valve to 30 days inoperable.                  OPERABLE status.
Required Action and associated Completion Time of Condition F, G, H, or I not met.
L. One ADS valve           L.1 Restore ADS valve to 72 hours inoperable.                  OPERABLE status.
J.1 Be in MODE 3.
AND                      OR One low pressure        L.2 Restore low pressure 72 hours ECCS subsystem                ECCS subsystem to inoperable for reasons        OPERABLE status.
AND J.2 Reduce reactor steam dome pressure to 150 psig.
other than Condition A.
12 hours 36 hours K.
M. Two or more ADS         M.1         Be in MODE 3. 12 hours valves inoperable.      AND OR                      M.2 Reduce reactor steam 36 hours Required Action and          dome pressure to associated Completion          100 psig.
One ADS valve inoperable.
Time of Condition K or L not met.
K.1 Restore ADS valve to OPERABLE status.
(continued) 32
30 days L.
One ADS valve inoperable.
AND One low pressure ECCS subsystem inoperable for reasons other than Condition A.
L.1 Restore ADS valve to OPERABLE status.
OR L.2 Restore low pressure ECCS subsystem to OPERABLE status.
72 hours 72 hours M.
Two or more ADS valves inoperable.
OR Required Action and associated Completion Time of Condition K or L not met.
M.1 Be in MODE 3.
AND M.2 Reduce reactor steam dome pressure to 100 psig.
12 hours 36 hours (continued)  


ECCS Operating 3.5.1 ACTIONS (continued)
ECCS Operating 3.5.1 33 ACTIONS (continued)
CONDITION                       REQUIRED ACTION       COMPLETION TIME N. Two or more low             N.1        Enter LCO 3.0.3. Immediately pressure ECCS subsystems inoperable for reasons other than Condition C or D.
CONDITION REQUIRED ACTION COMPLETION TIME N.
Two or more low pressure ECCS subsystems inoperable for reasons other than Condition C or D.
OR HPCI System and two or more ADS valves inoperable.
OR HPCI System and two or more ADS valves inoperable.
OR HPCI System and two or more low pressure ECCS subsystems inoperable.
OR HPCI System and two or more low pressure ECCS subsystems inoperable.
OR One ADS valve and two or more low pressure ECCS subsystems inoperable.
OR One ADS valve and two or more low pressure ECCS subsystems inoperable.
OR One ADS valve and HPCI System and one low pressure ECCS subsystem inoperable.
OR One ADS valve and HPCI System and one low pressure ECCS subsystem inoperable.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                           FREQUENCY SR 3.5.1.1   Verify, for each ECCS injection/spray subsystem,   In accordance with the locations susceptible to gas accumulation     Surveillance are sufficiently filled with water.           Frequency Control Program (continued) 33
N.1 Enter LCO 3.0.3.
Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, locations susceptible to gas accumulation are sufficiently filled with water.
In accordance with the Surveillance Frequency Control Program (continued)


ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
ECCS Operating 3.5.1 34 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                                     FREQUENCY SR 3.5.1.2 -------------------------------NOTE-------------------------------------
SURVEILLANCE FREQUENCY SR 3.5.1.2  
The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and operation for decay heat removal in MODE 3, if capable of being manually realigned and not otherwise inoperable.
-------------------------------NOTE-------------------------------------
                -------------------------------NOTE-------------------------------------
The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and operation for decay heat removal in MODE 3, if capable of being manually realigned and not otherwise inoperable.  
-------------------------------NOTE-------------------------------------
Not required to be met for system vent flow paths opened under administrative control.
Not required to be met for system vent flow paths opened under administrative control.
Verify each ECCS injection/spray subsystem power                             In accordance operated and automatic valve in the flow path, that is not                   with the locked, sealed, or otherwise secured in position, is in the                   Surveillance correct position.                                                             Frequency Control Program SR 3.5.1.3 Verify a 100 day supply of nitrogen exists for each ADS                           In accordance accumulator.                                                                  with the Surveillance Frequency Control Program SR 3.5.1.4 Verify the following ECCS pumps develop the specified flow                       In accordance rate against a system head corresponding to the                              with the specified reactor pressure.                                                   Inservice Testing Program SYSTEM HEAD NO.         CORRESPONDING OF         TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray           2718 gpm             1           113 psig LPCI           4320 gpm             1           20 psig (continued) 34
Verify each ECCS injection/spray subsystem power operated and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.
In accordance with the Surveillance Frequency Control Program SR 3.5.1.3 Verify a 100 day supply of nitrogen exists for each ADS accumulator.
In accordance with the Surveillance Frequency Control Program SR 3.5.1.4 Verify the following ECCS pumps develop the specified flow rate against a system head corresponding to the specified reactor pressure.
SYSTEM HEAD NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray 2718 gpm 1 113 psig LPCI 4320 gpm 1 20 psig In accordance with the Inservice Testing Program (continued)  


ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
ECCS Operating 3.5.1 35 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                           FREQUENCY SR 3.5.1.5 ----------------------------NOTE----------------------------
SURVEILLANCE FREQUENCY SR 3.5.1.5  
----------------------------NOTE----------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure 1025 and 940                   In accordance psig, the HPCI pump can develop a flow rate                       with the 2700 gpm against a system head                                 Inservice Testing corresponding to reactor pressure.                               Program SR 3.5.1.6 -----------------------------NOTE---------------------------
Verify, with reactor pressure 1025 and 940 psig, the HPCI pump can develop a flow rate 2700 gpm against a system head corresponding to reactor pressure.
In accordance with the Inservice Testing Program SR 3.5.1.6  
-----------------------------NOTE---------------------------
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Not required to be performed until 12 hours after reactor steam pressure and flow are adequate to perform the test.
Verify, with reactor pressure 160 psig, the                     In accordance HPCI pump can develop a flow rate 2700                         with the gpm against a system head corresponding to                       Surveillance reactor pressure.                                                 Frequency Control Program SR 3.5.1.7 ----------------------------NOTES--------------------------
Verify, with reactor pressure 160 psig, the HPCI pump can develop a flow rate 2700 gpm against a system head corresponding to reactor pressure.
: 1.     Vessel injection /spray may be excluded.
In accordance with the Surveillance Frequency Control Program SR 3.5.1.7  
: 2.     For the LPCI System, the Surveillance may be met by any series of sequential and/or overlapping steps, such that the LPCI Loop Select function is tested.
----------------------------NOTES--------------------------
Verify each ECCS injection/spray subsystem                       In accordance actuates on an actual or simulated automatic                     with the initiation signal.                                               Surveillance Frequency Control Program (continued) 35
: 1.
Vessel injection /spray may be excluded.
: 2.
For the LPCI System, the Surveillance may be met by any series of sequential and/or overlapping steps, such that the LPCI Loop Select function is tested.
Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal.
In accordance with the Surveillance Frequency Control Program (continued)


ECCS Operating 3.5.1 SURVEILLANCE REQUIREMENTS (continued)
ECCS Operating 3.5.1 36 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                           FREQUENCY SR 3.5.1.8 -------------------------NOTE-------------------------------
SURVEILLANCE FREQUENCY SR 3.5.1.8  
-------------------------NOTE-------------------------------
Valve actuation may be excluded.
Valve actuation may be excluded.
Verify the ADS actuates on an actual or                           In accordance simulated automatic initiation signal.                           with the Surveillance Frequency Control Program SR 3.5.1.9     Verify each ADS valve actuator strokes when                       In accordance manually actuated.                                               with the Inservice Testing Program 36
Verify the ADS actuates on an actual or simulated automatic initiation signal.
In accordance with the Surveillance Frequency Control Program SR 3.5.1.9 Verify each ADS valve actuator strokes when manually actuated.
In accordance with the Inservice Testing Program  


Rod Pattern Control 3.1.6 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Rod Pattern Control LCO 3.1.6           OPERABLE control rods shall comply with the requirements of the Banked Position Withdrawal Sequence (BPWS).
Rod Pattern Control 3.1.6 37 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Rod Pattern Control LCO 3.1.6 OPERABLE control rods shall comply with the requirements of the Banked Position Withdrawal Sequence (BPWS).
APPLICABILITY:     MODES 1 and 2 with THERMAL POWER 10% RTP.
APPLICABILITY: MODES 1 and 2 with THERMAL POWER 10% RTP.
ACTIONS CONDITION                   REQUIRED ACTION                   COMPLETION TIME A. One or more             A.1     -----------NOTE-------------
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
OPERABLE control                Rod Worth Minimizer rods not in compliance          (RWM) may be with BPWS.                      bypassed as allowed by LCO 3.3.2.1, Control Rod Block Instrumentation.
One or more OPERABLE control rods not in compliance with BPWS.
Move associated                   8 hours control rod(s) to correct position.
A.1  
OR A.2     Declare associated               8 hours control rod(s) inoperable.
-----------NOTE-------------
(continued) 37
Rod Worth Minimizer (RWM) may be bypassed as allowed by LCO 3.3.2.1, Control Rod Block Instrumentation.
Move associated control rod(s) to correct position.
OR A.2 Declare associated control rod(s) inoperable.
8 hours 8 hours (continued)  


Rod Pattern Control 3.1.6 ACTIONS (continued)
Rod Pattern Control 3.1.6 38 ACTIONS (continued)
CONDITION                 REQUIRED ACTION                         COMPLETION TIME B. Nine or more OPERABLE B.1       -------------NOTE-------------
CONDITION REQUIRED ACTION COMPLETION TIME B. Nine or more OPERABLE control rods not in compliance with BPWS.
control rods not in            Rod Worth Minimizer compliance with BPWS.          (RWM) may be bypassed as allowed by LCO 3.3.2.1.
B.1  
Suspend withdrawal of                 Immediately control rods.
-------------NOTE-------------
AND B.2 Place the reactor                     1 hour mode switch in the Shutdown position.
Rod Worth Minimizer (RWM) may be bypassed as allowed by LCO 3.3.2.1.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                       FREQUENCY SR 3.1.6.1       Verify all OPERABLE control rods comply                 In accordance with the with BPWS.                                              Surveillance Frequency Control Program 38
Suspend withdrawal of control rods.
AND B.2 Place the reactor mode switch in the Shutdown position.
Immediately 1 hour SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify all OPERABLE control rods comply with BPWS.
In accordance with the Surveillance Frequency Control Program  


Control Rod OPERABILITY 3.1.3 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Control Rod OPERABILITY LCO 3.1.3                 Each control rod shall be OPERABLE.
Control Rod OPERABILITY 3.1.3 39 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Control Rod OPERABILITY LCO 3.1.3 Each control rod shall be OPERABLE.
APPLICABILITY:           MODES 1 and 2.
APPLICABILITY: MODES 1 and 2.
ACTIONS
ACTIONS  
-------------------------------------------------------NOTE-----------------------------------------------------
-------------------------------------------------------NOTE-----------------------------------------------------
Separate Condition entry is allowed for each control rod.
Separate Condition entry is allowed for each control rod.
CONDITION                           REQUIRED ACTION                       COMPLETION TIME A. One withdrawn control           ----------------NOTE----------------
CONDITION REQUIRED ACTION COMPLETION TIME A.
rod stuck.                      Rod Worth Minimizer (RWM) may be bypassed as allowed by LOC 3.3.2.1, Control Rod Block Instrumentation, if required, to allow continued operation.
One withdrawn control rod stuck.
A.1     Verify stuck control               Immediately rod separation criteria are met.
----------------NOTE----------------
AND 2 hours A.2     Disarm the associated Control Rod Drive (CRD).
Rod Worth Minimizer (RWM) may be bypassed as allowed by LOC 3.3.2.1, Control Rod Block Instrumentation, if required, to allow continued operation.
AND (continued) 39
A.1 Verify stuck control rod separation criteria are met.
AND A.2 Disarm the associated Control Rod Drive (CRD).
AND Immediately 2 hours (continued)  


Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION             REQUIRED ACTION                 COMPLETION TIME A. (continued)           A.3 Perform SR 3.1.3.2 for         24 hours each withdrawn                  from discovery of OPERABLE control                Condition A rod.                            concurrent with THERMAL POWER greater than the Low Power Setpoint (LPSP) of the AND                                  RWM.
Control Rod OPERABILITY 3.1.3 40 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
A.4  Perform SR 3.1.1.1              72 hours B. Two or more           B.1 Be in MODE 3.                   12 hours withdrawn control rods stuck.
(continued)
C. One or more control   C.1 -----------NOTE------------
A.3 Perform SR 3.1.3.2 for each withdrawn OPERABLE control rod.
rods inoperable for        RWM may be reasons other than          bypassed as allowed Condition A or B.          by LCO 3.3.2.1, if required, to allow insertion of inoperable control rod and continued operation.
AND A.4 Perform SR 3.1.1.1 24 hours from discovery of Condition A concurrent with THERMAL POWER greater than the Low Power Setpoint (LPSP) of the RWM.
Fully insert inoperable         3 hours control rod.
72 hours B.
AND (continued) 40
Two or more withdrawn control rods stuck.
B.1 Be in MODE 3.
12 hours C.
One or more control rods inoperable for reasons other than Condition A or B.
C.1  
-----------NOTE------------
RWM may be bypassed as allowed by LCO 3.3.2.1, if required, to allow insertion of inoperable control rod and continued operation.
Fully insert inoperable control rod.
AND 3 hours (continued)  


Control Rod OPERABILITY 3.1.3 ACTIONS CONDITION                     REQUIRED ACTION             COMPLETION TIME C. (continued)                       C.2 Disarm the associated     4 hours CRD.
Control Rod OPERABILITY 3.1.3 41 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.
D. ------------NOTE------------     D.1  Restore compliance with    4 hours Not applicable when                   BPWS.
(continued)
THERMAL POWER
C.2 Disarm the associated CRD.
      > 10% RTP.
4 hours D.  
      -------------------------------- OR Two or more inoperable D.2            Restore control rod        4 hours control rods not in                   to OPERABLE status.
------------NOTE------------
compliance with Banked Position Withdrawal Sequence (BPWS) and not separated by two or more OPERABLE control rods.
Not applicable when THERMAL POWER  
E. Required Action and               E.1  Be in MODE 3.              12 hours associated Completion Time of Condition A, C, or D, not met.
> 10% RTP.
Two or more inoperable control rods not in compliance with Banked Position Withdrawal Sequence (BPWS) and not separated by two or more OPERABLE control rods.
D.1 Restore compliance with BPWS.
OR D.2 Restore control rod to OPERABLE status.
4 hours 4 hours E.
Required Action and associated Completion Time of Condition A, C, or D, not met.
OR Nine or more control rods inoperable.
OR Nine or more control rods inoperable.
41
E.1 Be in MODE 3.
12 hours


Control Rod OPERABILITY 3.1.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                                         FREQUENCY 3.1.3.1               Determine the position of each control rod In accordance with the Surveillance Frequency Control Program SR 3.1.3.2   ---------------------------NOTE----------------------------
Control Rod OPERABILITY 3.1.3 42 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 3.1.3.1 Determine the position of each control rod In accordance with the Surveillance Frequency Control Program SR 3.1.3.2  
---------------------------NOTE----------------------------
Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than 20% RTP.
Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than 20% RTP.
Insert each withdrawn control rod at least one                   In accordance notch.                                                            with the Surveillance Frequency Control Program SR 3.1.3.3   Verify each control rod scram time from fully                   In accordance withdrawn to notch position 04 is                               with SR 3.1.4.1 7 seconds.                                                      and SR 3.1.4.2 SR 3.1.3.4 Verify each withdrawn control rod does not                       Each time the go to the withdrawn overtravel position.                         control rod is withdrawn to full out position AND Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling (continued) 42
Insert each withdrawn control rod at least one notch.
In accordance with the Surveillance Frequency Control Program SR 3.1.3.3 Verify each control rod scram time from fully withdrawn to notch position 04 is 7 seconds.
In accordance with SR 3.1.4.1 and SR 3.1.4.2 SR 3.1.3.4 Verify each withdrawn control rod does not go to the withdrawn overtravel position.
Each time the control rod is withdrawn to full out position AND Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling (continued)  


Table 6                                     Secondary Containment Limits Max Normal   Max Safe Parameter and Areas                              Operating   Operating  Value/Trend Limit      Limit Area/Location                           Indicator           &deg;F         &deg;F A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT               TR/TDR 2000A Ch 1           130          140 RHR SE CORNER ROOM DIFFERENTIAL          TR/TDR 2000A Ch 2             50         N/A B RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT               TR/TDR 2000B Ch 1           130          140 RHR NW CORNER ROOM DIFFERENTIAL          TR/TDR 2000B Ch 2             50         N/A HPCI Room Area HPCI EMER COOLER AMBIENT                 TR/TDR 2225A[B] Ch 1         175          310 HPCI ROOM AMBIENT                        TR/TDR 2225A Ch 2           175          310 HPCI ROOM DIFFERENTIAL                  TR/TDR 2225A[B] Ch 4[3]       50         N/A RCIC Room Area Temperature RCIC EMER COOLER AMBIENT                 TR/TDR 2425A[B] Ch 1         175          300 RCIC ROOM AMBIENT                        TR/TDR 2425A Ch 2           175          300 RCIC ROOM DIFFERENTIAL                  TR/TDR 2425A[B] Ch 4         50         N/A Torus Area TORUS CATWALK NORTH AMBIENT             TR/TDR 2425A Ch 3           150          165 TORUS CATWALK WEST AMBIENT              TR/TDR 2425B Ch 2           150          165 TORUS CATWALK SOUTH AMBIENT              TR/TDR 2225A Ch 3           150          165 TORUS CATWALK EAST AMBIENT              TR/TDR 2225B Ch 2           150          165 TORUS CATWALK EAST DIFF                  TR/TDR 2425A Ch 5             50          N/A TORUS CATWALK WEST DIFF                  TR/TDR 2425B Ch 5             50          N/A TORUS CATWALK SOUTHWEST DIFF            TR/TDR 2225A Ch 5             50          N/A TORUS CATWALK SOUTH DIFF                TR/TDR 2225B Ch 4             50         N/A RB 786 South Area RWCU PUMP ROOM AMBIENT                   TR/TDR 2700A[B] Ch 1         130          212 RWCU HX ROOM AMBIENT                    TR/TDR 2700A[B] Ch 2,3       130         212 RB 757 South Area RWCU ABOVE TIP ROOM AMBIENT             TR/TDR 2700A[B] Ch 4,5       111.5       150 Steam Tunnel Area STEAM TUNNEL AMBIENT                     TR/TDR 2425B Ch 3           160          300 STEAM TUNNEL DIFFERENTIAL                TR/TDR 2225B Ch 5             70         N/A Area/Location                           Indicator         mR/hr       mR/hr RB 757 South Area RB RAILROAD ACCESS AREA                 RI 9167                      10          100 SOUTH CRD MODULE AREA                   RI 9169                       10          100 TIP ROOM                                RI 9176                       60         600 RB 757 North Area NORTH CRD MODULE                         RI 9168                      10          100 CRD REPAIR ROOM                         RI 9170                       15         150 RB 786 North Area Radiation RWCU SPENT RESIN ROOM                   RI 9173                      100          103 RWCU PHASE SEP TANK                     RI 9177                       20         200 RB 786 South Area RWCU PUMP ROOM                           RI 9156                      103        104 RWCU HX ROOM                             RI 9157                       103         104 RB 812 North Area MAIN PLANT EXHAUST FAN ROOM             RI 9171                       60          600 JUNGLE ROOM                              RI 9155                       60         600 Refuel Floor Area NEW FUEL VAULT AREA                     RI 9153                      10          100 NORTH REFUEL FLOOR                     RI 9163                      10          100 SOUTH REFUEL FLOOR                     RI 9164                      10          100 SPENT FUEL POOL AREA                   RI 9178                     100         103 Area/Location                           Indicator         inches     inches Water Level HPCI ROOM                                   LI 3768                       2           6 RCIC ROOM                                   LI 3769                       3           6 A RHR & CS SECR                           LI 3770                       2           10 B RHR & CS NWCR                           LI 3771                       2           10 TORUS AREA                                   LI 3772                       2           12 43
43 Table 6 Secondary Containment Limits Parameter and Areas Max Normal Operating Limit Max Safe Operating Limit Value/Trend Temperature Area/Location Indicator  
&deg;F  
&deg;F A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT RHR SE CORNER ROOM DIFFERENTIAL TR/TDR 2000A Ch 1 TR/TDR 2000A Ch 2 130 50 140 N/A B RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT RHR NW CORNER ROOM DIFFERENTIAL TR/TDR 2000B Ch 1 TR/TDR 2000B Ch 2 130 50 140 N/A HPCI Room Area HPCI EMER COOLER AMBIENT HPCI ROOM AMBIENT HPCI ROOM DIFFERENTIAL TR/TDR 2225A[B] Ch 1 TR/TDR 2225A Ch 2 TR/TDR 2225A[B] Ch 4[3]
175 175 50 310 310 N/A RCIC Room Area RCIC EMER COOLER AMBIENT RCIC ROOM AMBIENT RCIC ROOM DIFFERENTIAL TR/TDR 2425A[B] Ch 1 TR/TDR 2425A Ch 2 TR/TDR 2425A[B] Ch 4 175 175 50 300 300 N/A Torus Area TORUS CATWALK NORTH AMBIENT TORUS CATWALK WEST AMBIENT TORUS CATWALK SOUTH AMBIENT TORUS CATWALK EAST AMBIENT TORUS CATWALK EAST DIFF TORUS CATWALK WEST DIFF TORUS CATWALK SOUTHWEST DIFF TORUS CATWALK SOUTH DIFF TR/TDR 2425A Ch 3 TR/TDR 2425B Ch 2 TR/TDR 2225A Ch 3 TR/TDR 2225B Ch 2 TR/TDR 2425A Ch 5 TR/TDR 2425B Ch 5 TR/TDR 2225A Ch 5 TR/TDR 2225B Ch 4 150 150 150 150 50 50 50 50 165 165 165 165 N/A N/A N/A N/A RB 786 South Area RWCU PUMP ROOM AMBIENT RWCU HX ROOM AMBIENT TR/TDR 2700A[B] Ch 1 TR/TDR 2700A[B] Ch 2,3 130 130 212 212 RB 757 South Area RWCU ABOVE TIP ROOM AMBIENT TR/TDR 2700A[B] Ch 4,5 111.5 150 Steam Tunnel Area STEAM TUNNEL AMBIENT STEAM TUNNEL DIFFERENTIAL TR/TDR 2425B Ch 3 TR/TDR 2225B Ch 5 160 70 300 N/A Radiation Area/Location Indicator mR/hr mR/hr RB 757 South Area RB RAILROAD ACCESS AREA SOUTH CRD MODULE AREA TIP ROOM RI 9167 RI 9169 RI 9176 10 10 60 100 100 600 RB 757 North Area NORTH CRD MODULE CRD REPAIR ROOM RI 9168 RI 9170 10 15 100 150 RB 786 North Area RWCU SPENT RESIN ROOM RWCU PHASE SEP TANK RI 9173 RI 9177 100 20 103 200 RB 786 South Area RWCU PUMP ROOM RWCU HX ROOM RI 9156 RI 9157 103 103 104 104 RB 812 North Area MAIN PLANT EXHAUST FAN ROOM JUNGLE ROOM RI 9171 RI 9155 60 60 600 600 Refuel Floor Area NEW FUEL VAULT AREA NORTH REFUEL FLOOR SOUTH REFUEL FLOOR SPENT FUEL POOL AREA RI 9153 RI 9163 RI 9164 RI 9178 10 10 10 100 100 100 100 103 Water Level Area/Location Indicator inches inches HPCI ROOM LI 3768 2
6 RCIC ROOM LI 3769 3
6 A RHR & CS SECR LI 3770 2
10 B RHR & CS NWCR LI 3771 2
10 TORUS AREA LI 3772 2
12  


Suppression Pool Water Level 3.6.2.2 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2         Suppression pool water level shall be 10.11 ft and 10.43 ft.
Suppression Pool Water Level 3.6.2.2 44 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be 10.11 ft and 10.43 ft.
APPLICABILITY:       MODES 1, 2, and 3.
APPLICABILITY: MODES 1, 2, and 3.
ACTIONS CONDITION                   REQUIRED ACTION             COMPLETION TIME A. Suppression pool water     A.1   Restore suppression     2 hours level not within limits.          pool water level to within limits.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
B. Required Action and         B.1   Be in MODE 3.           12 hours associated Completion Time not met.              AND B.2   Be in MODE 4.           36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE                         FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is within       In accordance with the limits.                                    Surveillance Frequency Control Program 44
Suppression pool water level not within limits.
A.1 Restore suppression pool water level to within limits.
2 hours B.
Required Action and associated Completion Time not met.
B.1 Be in MODE 3.
AND B.2 Be in MODE 4.
12 hours 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is within limits.
In accordance with the Surveillance Frequency Control Program  


Graph 4: Heat Capacity Limit 240 230 220                                              Action is required 210 Torus Water Temperature (&deg;F) 200 190 180 170 160 150                  Bounding curve for torus levels between 8 ft and 13 ft 140 130 120 50 0        100  200  300    400  500    600    700  800  900 1000 1100 RPV Pressure (psig) 45
45 Graph 4: Heat Capacity Limit 0
120 RPV Pressure (psig)
Torus Water Temperature (&deg;F) 100 200 300 400 500 600 700 800 900 1000 1100 130 140 150 160 170 180 190 200 210 220 230 240 50 Action is required Bounding curve for torus levels between 8 ft and 13 ft


Table of RPV Pressure Versus Saturation Temperature psig Temp (&deg;F)       psig       Temp (&deg;F)         psig   Temp (&deg;F) 1100   558           680         502           280     415 1080   556           660         499           260     409 1060   553           640         495           240     402 1040   551           620         492           220     395 1020   549           600         488           200     387 1000   546           580         485           180     380 980   542           560         481           160     371 960   541           540         477           140     361 940   539           520         474           120     350 920   536           500         470           100     338 900   534           480         466             80     324 880   531           460         461             60     307 860   528           440         457             40     287 840   526           420         452             20     259 820   523           400         448             0     212 800   520           380         443 780   517           360         438 760   514           340         431 740   511           320         427 720   508           300         421 700   505 46
46 Table of RPV Pressure Versus Saturation Temperature psig Temp (&deg;F) psig Temp (&deg;F) psig Temp (&deg;F) 1100 558 680 502 280 415 1080 556 660 499 260 409 1060 553 640 495 240 402 1040 551 620 492 220 395 1020 549 600 488 200 387 1000 546 580 485 180 380 980 542 560 481 160 371 960 541 540 477 140 361 940 539 520 474 120 350 920 536 500 470 100 338 900 534 480 466 80 324 880 531 460 461 60 307 860 528 440 457 40 287 840 526 420 452 20 259 820 523 400 448 0
212 800 520 380 443 780 517 360 438 760 514 340 431 740 511 320 427 720 508 300 421 700 505  


260 240
47 Figure 1: Core Spray NPSH Limit 100 120 140 160 180 200 220 240 260 0
* 15 psig 220
1000 2000 3000 4000 5000 CS PUM P FLOWRATE (gpm)
* 10 psig 200
* torus pressue
* 5 psig 180 160
*15 psig
* 0 psig 140  Do NOT operate CS pumps above these curves unless directed by EOPs
*10 psig
* torus pressue 120 100 0       1000           2000         3000   4000           5000 CS PUM P FLOWRATE (gpm)
*5 psig
Figure 1: Core Spray NPSH Limit 47
*0 psig Do NOT operate CS pumps above these curves unless directed by EOPs 100 120 140 160 180 200 220 240 260 0
1000 2000 3000 4000 5000 CS PUM P FLOWRATE (gpm)
* torus pressue
*15 psig
*10 psig
*5 psig
*0 psig Do NOT operate CS pumps above these curves unless directed by EOPs


12 10 8
48 Figure 2: Core Spray Vortex Limit 0
6 4                      Do NOT operate CS pumps in this area unless directed by EOPs 2
2 4
0 0 500 1000   1500 2000     2500     3000     3500 4000 4500 CS LOOP FLOW (gpm)
6 8
Figure 2: Core Spray Vortex Limit 48
10 12 0
500 1000 1500 2000 2500 3000 3500 4000 4500 CS LOOP FLOW (gpm)
Do NOT operate CS pumps in this area unless directed by EOPs 0
2 4
6 8
10 12 0
500 1000 1500 2000 2500 3000 3500 4000 4500 CS LOOP FLOW (gpm)
Do NOT operate CS pumps in this area unless directed by EOPs


APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE RFO-25 Vessel Water Heatup Rate (Floodup Condition) 9.0 8.0 7.0 Heatup Rate (Deg F/hr) 6.0 5.0 4.0 3.0 2.0 1.0 0.0 0   10   20     30     40     50     60     70   80   90   100 Time Since Shutdown (Days)
49 APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE CAUTION 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 0
CAUTION 49
10 20 30 40 50 60 70 80 90 100 Heatup Rate (Deg F/hr)
Time Since Shutdown (Days)
RFO-25 Vessel Water Heatup Rate (Floodup Condition)


APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" RFO-25 Vessel Water Heatup Rate (Water Level = 200'' )
50 APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" CAUTION 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 0
50.0 45.0 40.0 Heatup Rate (Deg F/hr) 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0   10     20   30       40     50     60     70   80   90     100 Time Since Shutdown (Days)
10 20 30 40 50 60 70 80 90 100 Heatup Rate (Deg F/hr)
CAUTION 50}}
Time Since Shutdown (Days)
RFO-25 Vessel Water Heatup Rate (Water Level = 200'' )}}

Latest revision as of 15:24, 8 January 2025

Dua 2017 Ile - Administered Exam Written Examination Handouts
ML17214A350
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 06/14/2017
From: Bielby M
Operations Branch III
To:
NextEra Energy Duane Arnold
Bielby M
Shared Package
ML16308A454 List:
References
Download: ML17214A350 (50)


Text

1 Student Handout Index

1.

LCO 3.3.1.2 SRM Instrumentation [RO]

2.

LCO 3.6.1.1 Primary Containment [SRO]

3.

LCO 3.4.1 Recirculation Loops Operating [SRO]

4.

LCO 3.4.2 Jet Pumps [SRO]

5.

LCO 3.7.9 Control Building / Standby Gas Treatment (CB/SBGT) Instrument Air System [SRO]

6.

LCO 3.8.1 AC Sources Operating [SRO]

7.

EPIP Form EAL-01 Emergency Action Level Matrix [Hot]

[SRO]

8.

EPIP Form EAL-02 Emergency Action Level Matrix [Cold]

[SRO]

9.

EOP Graph 07 Drywell Spray Initiation Limit [SRO]

10.

LCO 3.2.2 MCPR [SRO]

11.

LCO 3.4.10 Reactor Steam Dome Pressure [SRO]

12.

LCO 3.5.1 ECCS Operating [SRO]

13.

LCO 3.1.3 Control Rod Operability [SRO]

14.

LCO 3.1.6 Rod Pattern Control [SRO]

15.

EOP Table 6 [RO/SRO]

16.

LCO 3.6.2.2 [SRO]

17.

EOP Graph 04 [RO/SRO]

18.

Table of RPV Pressure versus Saturation Temperature (AOP 915 Attachment 5) [RO]

19.

Core Spray NPSH Limit [RO]

20.

Core Spray Vortex Limit [RO]

21.

AOP 149 Appendix 1 Heatup Rate Curve -RPV Flooded

[RO]

22.

AOP 149 Appendix 2 Heatup Rate Curve -RPV Level at 200[RO]

SRM Instrumentation 3.3.1.2 2

3.3 INSTRUMENTATION 3.3.1.2 Source Range Monitor (SRM) Instrumentation LCO 3.3.1.2 The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE.

APPLICABILITY: According to Table 3.3.1.2-1.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required SRMs inoperable in MODE 2 with Intermediate Range Monitors (IRMs) on Range 2 or below.

A.1 Restore required SRMs to OPERABLE status.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> B.

Three required SRMs inoperable in MODE 2 with IRMs on Range 2 or below.

B.1 Suspend control rod withdrawal.

Immediately C.

Required Action and associated Completion Time of Condition A or B not met.

C.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (continued)

SRM Instrumentation 3.3.1.2 3

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME D.

One or more required SRMs inoperable in MODE 3 or 4.

D.1 Fully insert all insertable control rods.

AND D.2 Place reactor mode switch in the shutdown position.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> 1 hour E.

One or more required SRMs inoperable in MODE 5.

E.1 Suspend CORE ALTERATIONS except for control rod insertion.

AND E.2 Initiate action to fully insert all insertable control rods in core cells containing one or more fuel assemblies.

Immediately Immediately

4 SURVEILLANCE REQUIREMENTS


NOTE--------------------------------------------------------

Refer to Table 3.3.1.2-1 to determine which SRs apply for each applicable MODE or other specified conditions.

SURVEILLANCE FREQUENCY SR 3.3.1.2.1 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.2


NOTES--------------------------

1. Only required to be met during CORE ALTERATIONS.
2. One SRM may be used to satisfy more than one of the following.

Verify an OPERABLE SRM detector is located in :

a.

The fueled region;

b.

The core quadrant where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region; and

c.

A core quadrant adjacent to where CORE ALTERATIONS are being performed, when the associated SRM is included in the fueled region.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.3 Perform CHANNEL CHECK.

In accordance with the Surveillance Frequency Control Program SURVEILLANCE REQUIREMENTS (continued)

5 SURVEILLANCE FREQUENCY SR 3.3.1.2.4


NOTE------------------------------

Not required to be met with less than or equal to four fuel assemblies adjacent to the SRM and no other fuel assemblies in the associated core quadrant.

Verify count rate is 3.0 cps.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.5 Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.6


NOTE------------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.

Perform CHANNEL FUNCTIONAL TEST.

In accordance with the Surveillance Frequency Control Program SR 3.3.1.2.7


NOTES-----------------------------

1. Neutron detectors are excluded.
2. Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after IRMs on Range 2 or below.

Perform CHANNEL CALIBRATION.

In accordance with the Surveillance Frequency Control Program

Primary Containment 3.6.1.1 6

3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment LCO 3.6.1.1 Primary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Primary containment inoperable.

A.1 Restore primary containment to OPERABLE status.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours

Primary Containment 3.6.1.1 7

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.1.1.1 Perform required visual examinations and leakage rate testing except for primary containment air lock testing, in accordance with the Primary Containment Leakage Rate Program.

In accordance with the Primary Containment Leakage Rate Program.

SR 3.6.1.1.2 Verify suppression chamber pressure does not increase at a rate > 0.009 psi per minute tested over a 10 minute period at a differential pressure of > 1.0 psid.

In accordance with the Surveillance Frequency Control Program

Recirculation Loops Operating 3.4.1 8

3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.1 Recirculation Loops Operating LCO 3.4.1 Two recirculation loops with matched pump speeds shall be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR.

OR One recirculation loop may be in operation with core flow as a function of THERMAL POWER outside the Exclusion Region specified in the COLR and with the following limits applied when the associated LCO is applicable:

a.

LCO 3.2.1, AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR), single loop operation limits specified in the COLR;

b.

LCO 3.2.2, MINIMUM CRITICAL POWER RATIO (MCPR),

single loop operation limits specified in the COLR; and

c.

LCO 3.3.1.1, Reactor Protection System (RPS)

Instrumentation, Function 2.b (Average Power Range Monitors Flow Biased High Scram), Allowable Value of Table 3.3.1.1-1 is reset for single loop operation.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

No recirculation loops in operation.

A.1 Place the reactor mode switch in the Shutdown position.

Immediately (continued)

Recirculation Loops Operating 3.4.1 9

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One or two recirculation loops in operation in the Exclusion Region of the power/flow map described in the Core Operating Limits Report.

B.1 Initiate action to exit the Exclusion Region.

Immediately C.

Recirculation pump speed mismatch not within limits.

C.1 Trip one recirculation pump.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> D.

Requirements of the LCO not met for reasons other than Conditions A, B or C.

D.1 Satisfy requirements of the LCO.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> E.

Required Action and associated Completion Time of Condition C or D not met.

E.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

Recirculation Loops Operating 3.4.1 10 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.1.1


NOTE---------------------------

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after both recirculation loops are in operation.

Verify recirculation pump speed mismatch with both recirculation pumps at steady state operation is as follows:

a. The speed of the faster pump shall be 135%

of the speed of the slower pump when operating at < 69.4 % RTP.

b. The speed of the faster pump shall be 122% of the speed of the slower pump when operating at 69.4 % RTP.

In accordance with the Surveillance Frequency Control Program SR 3.4.1.2 Verify core flow as a function of core THERMAL POWER is outside the Exclusion Region shown in the COLR.

In accordance with the Surveillance Frequency Control Program

Jet Pumps 3.4.2 11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.2 Jet Pumps LCO 3.4.2 All jet pumps shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more jet pumps inoperable.

A.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

Jet Pumps 3.4.2 12 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.2.1


NOTES-------------------------------

1.

Not required to be performed until 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> after the associated recirculation loop is in operation.

2.

Not required to be performed until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after > 21.7% RTP.

3.

Criterion c is only applicable when pump speed is 60% rated speed.

Verify at least one of the following criteria (a, b or c, as applicable) is satisfied for each operating recirculation loop:

a.

Recirculation pump flow to speed ratio differs by 5% from established patterns, and jet pump loop flow to recirculation pump speed ratio differs by 5% from established patterns.

b.

Each jet pump diffuser to lower plenum differential pressure differs by 20% from established patterns.

c.

The recirculation pump flow to speed ratio, jet pump loop flow to recirculation pump speed ratio, and jet pump diffuser to lower plenum differential pressure ratios are evaluated as being acceptable.

In accordance with the Surveillance Frequency Control Program

CB/SBGT Instrument Air System 3.7.9 13 3.7 PLANT SYSTEMS 3.7.9 Control Building/Standby Gas Treatment (CB/SBGT) Instrument Air System LCO 3.7.9 Two CB/SBGT Instrument Air subsystems shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One CB/SBGT Instrument Air subsystem inoperable.

A.1 Declare required feature(s), supported by the inoperable CB/SBGT Instrument Air subsystem, inoperable when the redundant required feature(s) are inoperable.

AND A.2 Restore the CB/SBGT Instrument Air subsystem to OPERABLE status.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition A concurrent with inoperability of redundant required feature(s) 7 days B.

Required Action and Associated Completion Time of Condition A not met.

OR Both CB/SBGT Instrument Air subsystems inoperable.

B.1 Be in MODE 3.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours

CB/SBGT Instrument Air System 3.7.9 14 CONDITION REQUIRED ACTION COMPLETION TIME

CB/SBGT Instrument Air System 3.7.9 15 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.9.1 Operates each CB/SBGT Instrument Air compressor for 20 minutes.

In accordance with the Surveillance Frequency Control Program SR 3.7.9.2 Verify each CB/SBGT Instrument Air subsystem actuates on an actual or simulated initiation signal and maintains air pressure 75 psig in the receiver.

In accordance with the Surveillance Frequency Control Program

AC Sources Operating 3.8.1 16 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources Operating LCO 3.8.1 The following AC electrical power sources shall be OPERABLE:

a.

Two qualified circuits between the offsite transmission network and the onsite Class 1E AC Electrical Power Distribution System; and

b.

Two diesel generators (DGs).

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS


NOTE-----------------------------------------------------

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One offsite circuit inoperable.

A.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit.

AND A.2 Restore offsite circuit to OPERABLE status.

1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter Prior to entering MODE 2 from MODE 3 or 4 (continued)

AC Sources Operating 3.8.1 17 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B.

One DG inoperable.

B.1 Perform SR 3.8.1.1 for OPERABLE offsite circuit(s).

AND B.2 Declare required feature(s), supported by the inoperable DG, inoperable when the redundant required feature(s) are inoperable.

AND 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> from discovery of Condition B concurrent with inoperability of redundant required feature(s)

(continued)

AC Sources Operating 3.8.1 18 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME B.

(continued)

B.3 Determine OPERABLE DG is not inoperable due to common cause failure.

AND


NOTE----------------

Not required to be performed when the cause of the inoperable DG is pre-planned, preventive maintenance and testing.

B.4 Perform SR 3.8.1.2 for OPERABLE DG.

AND B.5 Restore DG to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 7 days AND 8 days from discovery of failure to meet LCO expect for Condition A C.

Two offsite circuits inoperable.

C.1 Declare required feature(s) inoperable when the redundant required feature(s) are inoperable.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> from discovery of Condition C concurrent with inoperability of redundant required feature(s)

(continued)

AC Sources Operating 3.8.1 19 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

AND C.2 Restore one offsite circuit to OPERABLE status.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND 8 days from discovery of failure to meet LCO except for Condition A D.

Two DGs inoperable.

D.1 Restore one DG to OPERABLE status.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> E.

Required Action and Associated Completion Time of Condition A, B, C, or D not met.

E.1 Be in MODE 3.

AND E.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours F.

Three or more AC sources inoperable.

F.1 Enter LCO 3.0.3.

Immediately

AC Sources Operating 3.8.1 20 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.1.1 Verify correct breaker alignment and indicated power availability for each offsite circuit.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.2


NOTES-----------------------------

1.

All DG starts may be preceded by an engine prelube period and followed by a warmup period prior to loading.

2.

A modified DG start involving idling and gradual acceleration to synchronous speed may be used for this SR as recommended by the manufacturer.

When modified start procedures are not used, the time, voltage, and frequency tolerances of SR 3.8.1.7 must be met.

3.

When a DG is placed in an inoperable status solely for the performance of testing required by Required Actions B.3 or B.4, entry into associated Conditions and Required Actions may be delayed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Verify each DG starts from standby conditions and achieves steady state voltage 3744v and 4576v and frequency 59.5Hz and 60.5Hz.

In accordance with the Surveillance Frequency Control Program (continued)

AC Sources Operating 3.8.1 21 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.3


NOTES----------------------------

1.

DG loadings may include gradual loading as recommended by the manufacturer.

2.

Momentary transients outside the load range do not invalidate this test.

3.

This Surveillance shall be conducted on only one DG at a time.

4.

This SR shall be preceded by and immediately follow, without shutdown, a successful performance of SR 3.8.1.2 or SR 3.8.1.7.

Verify each DG is synchronized and loaded and operates for 60 minutes at a load 2750kw and 2950kw.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.4 Verify each tank contains 220 gal of fuel oil.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.5 Check for the presence of water in the fuel oil in each day tank and remove water as necessary.

In accordance with the Surveillance Frequency Control Program (continued)

AC Sources Operating 3.8.1 22 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.6 Verify the fuel oil transfer system operates to transfer fuel oil from storage tank to the day tank.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.7


NOTE------------------------------

All DG starts may be preceded by an engine prelube period.

Verify each DG starts from standby condition and achieves:

a. in 10 seconds, voltage 3744V and frequency 59.5Hz; and
b. steady state, voltage 3744V and 4576V and frequency 59.5Hz and 60.5Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.8


NOTE----------------------------

The Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.

Verify automatic slow transfer of AC power supply from the Startup Transformer to the Standby Transformer.

In accordance with the Surveillance Frequency Control Program (continued)

AC Sources Operating 3.8.1 23 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.9


NOTE---------------------------This Surveillance shall not be performed in MODE 1 or 2. However, credit may be taken for unplanned events that satisfy this SR.

Verify each DG rejects a load greater than or equal to its associated single largest post-accident load, and:

a.

Following load rejection, the frequency is 64.5Hz.

b.

Within 1.3 seconds following load rejection, the voltage is 3744V and 4576V.

c.

Within 3.9 seconds following load rejection, the frequency is 59.5Hz and 60.5Hz.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.10 ----------------------------NOTE---------------------------

This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify each DGs automatic trips are bypassed on an actual or simulated Loss of Offsite Power (LOOP) signal or on an actual or simulated ECCS initiation signal except:

a.

Engine overspeed; and

b.

Generator lockout.

In accordance with the Surveillance Frequency Control Program (continued)

AC Sources Operating 3.8.1 24 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.11


NOTE--------------------------------

This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify under manual control each DG:

a.

Synchronizes with offsite power source while loaded with emergency loads upon a simulated restoration of offsite power;

b.

Transfers loads to offsite power source; and

c.

Returns to ready-to-load operation.

In accordance with the Surveillance Frequency Control Program SR 3.8.1.12


NOTE-----------------------------------

This Surveillance shall not be performed in MODE 1, 2 or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify interval between each sequenced load block is 2 seconds.

In accordance with the Surveillance Frequency Control Program (continued)

AC Sources Operating 3.8.1 25 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.8.1.13


NOTES---------------------------

1.

All DG starts may be preceded by an engine prelube period.

2.

This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.

Verify, on an actual or simulated loss of offsite power signal in conjunction with an actual or simulated ECCS initiation signal:

a.

De-energization of essential buses;

b.

Load shedding from essential buses; and

c.

DG auto-start from standby condition and:

1.

energizes permanently connected loads in 10 seconds,

2.

energizes auto-connected emergency loads in the proper timed

sequence,
3.

achieves steady state voltage 3744V and 4576V,

4.

achieves steady state frequency 59.5Hz and 60.5Hz, and

5.

supplies permanently connected and auto-connected emergency loads for 5 minutes.

In accordance with the Surveillance Frequency Control Program

26 0

50 100 150 200 250 300 350 400 0

2 4

6 8

10 12 14 16 18 20 Average Drywell Air Temperature (°F)

Drywell Pressure (psig)

Graph 7: Drywell Spray Initiation Limit Do not initiate drywell sprays in shaded area 11.4 3.0

MCPR 3.2.2 27 3.2 POWER DISTRIBUTION LIMITS 3.2.2 MINIMUM CRITICAL POWER RATIO (MCPR)

LCO 3.2.2 All MCPRs shall be greater than or equal to the MCPR operating limits specified in the COLR.

APPLICABILITY:

THERMAL POWER 21.7% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Any MCPR not within limits.

A.1 Restore MCPR(s) to within limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Reduce THERMAL POWER to < 21.7%

RTP.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.2.2.1 Verify all MCPRs are greater than or equal to the limits specified in the COLR.

Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 21.7% RTP AND In accordance with the Surveillance Frequency Control Program (continued)

MCPR 3.2.2 28 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.2.2.2 Determine the MCPR limits.

Once within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each completion of SR 3.1.4.1 AND Once within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after each completion of SR 3.1.4.2.

Reactor Steam Dome Pressure 3.4.10 29 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.10 Reactor Steam Dome Pressure LCO 3.4.10 The reactor steam dome pressure shall be 1025 psig.

APPLICABILITY: MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Reactor steam dome pressure not within limit.

A.1 Restore reactor steam dome pressure to within limit.

15 minutes B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.10.1 Verify reactor steam dome pressure is 1025 psig.

In accordance with the Surveillance Frequency Control Program

ECCS Operating 3.5.1 30 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM 3.5.1 ECCS Operating LCO 3.5.1 Each ECCS injection/spray subsystem and the Automatic Depressurization System (ADS) function of four safety/relief valves shall be OPERABLE.

APPLICABILITY: MODE 1, MODES 2 and 3, except High Pressure Coolant Injection (HPCI) is not required to be OPERABLE with reactor steam dome pressure 150 psig and ADS valves are not required to be OPERABLE with reactor steam dome pressure 100 psig.

ACTIONS


NOTE----------------------------------------------------

LCO 3.0.4.b is not applicable to HPCI.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One Residual Heat Removal (RHR) pump inoperable.

A.1 Restore RHR pump to OPERABLE status.

30 Days B.

One low pressure ECCS subsystem inoperable for reasons other than Condition A.

B.1 Restore low pressure ECCS subsystem to OPERABLE status.

7 days C.

One Core Spray subsystem inoperable.

AND One or two RHR pump(s) inoperable.

C.1 Restore Core Spray subsystem to OPERABLE status.

OR C.2 Restore RHR pump(s) to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours D.

Both Core Spray subsystems inoperable.

D.1 Restore one Core Spray subsystem to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (continued)

ECCS Operating 3.5.1 31 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME E.

Required Action and associated Completion Time of Condition A, B, C, or D not met.

E.1 Be in MODE 3.

AND E.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours F.

HPCI System inoperable.

F.1 Verify by administrative means RCIC System is OPERABLE.

AND F.2 Restore HPCI System to OPERABLE status.

Immediately 14 days G.

HPCI System inoperable.

AND One RHR pump inoperable.

G.1 Restore HPCI System to OPERABLE status.

OR G.2 Restore RHR pump to OPERABLE status.

7 days 7 days H.

HPCI System inoperable.

AND One low pressure ECCS subsystem is inoperable for reasons other than Condition A.

H.1 Restore HPCI System to OPERABLE status.

OR H.2 Restore low pressure ECCS subsystem to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours I.

HPCI System inoperable.

AND One ADS valve inoperable.

I.1 Restore HPCI System to OPERABLE status.

OR I.2 Restore ADS valve to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours (continued)

ECCS Operating 3.5.1 32 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME J.

Required Action and associated Completion Time of Condition F, G, H, or I not met.

J.1 Be in MODE 3.

AND J.2 Reduce reactor steam dome pressure to 150 psig.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours K.

One ADS valve inoperable.

K.1 Restore ADS valve to OPERABLE status.

30 days L.

One ADS valve inoperable.

AND One low pressure ECCS subsystem inoperable for reasons other than Condition A.

L.1 Restore ADS valve to OPERABLE status.

OR L.2 Restore low pressure ECCS subsystem to OPERABLE status.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 72 hours M.

Two or more ADS valves inoperable.

OR Required Action and associated Completion Time of Condition K or L not met.

M.1 Be in MODE 3.

AND M.2 Reduce reactor steam dome pressure to 100 psig.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours (continued)

ECCS Operating 3.5.1 33 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME N.

Two or more low pressure ECCS subsystems inoperable for reasons other than Condition C or D.

OR HPCI System and two or more ADS valves inoperable.

OR HPCI System and two or more low pressure ECCS subsystems inoperable.

OR One ADS valve and two or more low pressure ECCS subsystems inoperable.

OR One ADS valve and HPCI System and one low pressure ECCS subsystem inoperable.

N.1 Enter LCO 3.0.3.

Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.5.1.1 Verify, for each ECCS injection/spray subsystem, locations susceptible to gas accumulation are sufficiently filled with water.

In accordance with the Surveillance Frequency Control Program (continued)

ECCS Operating 3.5.1 34 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.2


NOTE-------------------------------------

The low pressure coolant injection (LPCI) system may be considered OPERABLE during alignment and operation for decay heat removal in MODE 3, if capable of being manually realigned and not otherwise inoperable.


NOTE-------------------------------------

Not required to be met for system vent flow paths opened under administrative control.

Verify each ECCS injection/spray subsystem power operated and automatic valve in the flow path, that is not locked, sealed, or otherwise secured in position, is in the correct position.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.3 Verify a 100 day supply of nitrogen exists for each ADS accumulator.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.4 Verify the following ECCS pumps develop the specified flow rate against a system head corresponding to the specified reactor pressure.

SYSTEM HEAD NO. CORRESPONDING OF TO A REACTOR SYSTEM FLOW RATE PUMPS PRESSURE OF Core Spray 2718 gpm 1 113 psig LPCI 4320 gpm 1 20 psig In accordance with the Inservice Testing Program (continued)

ECCS Operating 3.5.1 35 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.5


NOTE----------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure 1025 and 940 psig, the HPCI pump can develop a flow rate 2700 gpm against a system head corresponding to reactor pressure.

In accordance with the Inservice Testing Program SR 3.5.1.6


NOTE---------------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure and flow are adequate to perform the test.

Verify, with reactor pressure 160 psig, the HPCI pump can develop a flow rate 2700 gpm against a system head corresponding to reactor pressure.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.7


NOTES--------------------------

1.

Vessel injection /spray may be excluded.

2.

For the LPCI System, the Surveillance may be met by any series of sequential and/or overlapping steps, such that the LPCI Loop Select function is tested.

Verify each ECCS injection/spray subsystem actuates on an actual or simulated automatic initiation signal.

In accordance with the Surveillance Frequency Control Program (continued)

ECCS Operating 3.5.1 36 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.1.8


NOTE-------------------------------

Valve actuation may be excluded.

Verify the ADS actuates on an actual or simulated automatic initiation signal.

In accordance with the Surveillance Frequency Control Program SR 3.5.1.9 Verify each ADS valve actuator strokes when manually actuated.

In accordance with the Inservice Testing Program

Rod Pattern Control 3.1.6 37 3.1 REACTIVITY CONTROL SYSTEMS 3.1.6 Rod Pattern Control LCO 3.1.6 OPERABLE control rods shall comply with the requirements of the Banked Position Withdrawal Sequence (BPWS).

APPLICABILITY: MODES 1 and 2 with THERMAL POWER 10% RTP.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more OPERABLE control rods not in compliance with BPWS.

A.1


NOTE-------------

Rod Worth Minimizer (RWM) may be bypassed as allowed by LCO 3.3.2.1, Control Rod Block Instrumentation.

Move associated control rod(s) to correct position.

OR A.2 Declare associated control rod(s) inoperable.

8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> 8 hours (continued)

Rod Pattern Control 3.1.6 38 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. Nine or more OPERABLE control rods not in compliance with BPWS.

B.1


NOTE-------------

Rod Worth Minimizer (RWM) may be bypassed as allowed by LCO 3.3.2.1.

Suspend withdrawal of control rods.

AND B.2 Place the reactor mode switch in the Shutdown position.

Immediately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.6.1 Verify all OPERABLE control rods comply with BPWS.

In accordance with the Surveillance Frequency Control Program

Control Rod OPERABILITY 3.1.3 39 3.1 REACTIVITY CONTROL SYSTEMS 3.1.3 Control Rod OPERABILITY LCO 3.1.3 Each control rod shall be OPERABLE.

APPLICABILITY: MODES 1 and 2.

ACTIONS


NOTE-----------------------------------------------------

Separate Condition entry is allowed for each control rod.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One withdrawn control rod stuck.


NOTE----------------

Rod Worth Minimizer (RWM) may be bypassed as allowed by LOC 3.3.2.1, Control Rod Block Instrumentation, if required, to allow continued operation.

A.1 Verify stuck control rod separation criteria are met.

AND A.2 Disarm the associated Control Rod Drive (CRD).

AND Immediately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (continued)

Control Rod OPERABILITY 3.1.3 40 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

(continued)

A.3 Perform SR 3.1.3.2 for each withdrawn OPERABLE control rod.

AND A.4 Perform SR 3.1.1.1 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from discovery of Condition A concurrent with THERMAL POWER greater than the Low Power Setpoint (LPSP) of the RWM.

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> B.

Two or more withdrawn control rods stuck.

B.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> C.

One or more control rods inoperable for reasons other than Condition A or B.

C.1


NOTE------------

RWM may be bypassed as allowed by LCO 3.3.2.1, if required, to allow insertion of inoperable control rod and continued operation.

Fully insert inoperable control rod.

AND 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> (continued)

Control Rod OPERABILITY 3.1.3 41 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.

(continued)

C.2 Disarm the associated CRD.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> D.


NOTE------------

Not applicable when THERMAL POWER

> 10% RTP.

Two or more inoperable control rods not in compliance with Banked Position Withdrawal Sequence (BPWS) and not separated by two or more OPERABLE control rods.

D.1 Restore compliance with BPWS.

OR D.2 Restore control rod to OPERABLE status.

4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> 4 hours E.

Required Action and associated Completion Time of Condition A, C, or D, not met.

OR Nine or more control rods inoperable.

E.1 Be in MODE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />

Control Rod OPERABILITY 3.1.3 42 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY 3.1.3.1 Determine the position of each control rod In accordance with the Surveillance Frequency Control Program SR 3.1.3.2


NOTE----------------------------

Not required to be performed until 31 days after the control rod is withdrawn and THERMAL POWER is greater than 20% RTP.

Insert each withdrawn control rod at least one notch.

In accordance with the Surveillance Frequency Control Program SR 3.1.3.3 Verify each control rod scram time from fully withdrawn to notch position 04 is 7 seconds.

In accordance with SR 3.1.4.1 and SR 3.1.4.2 SR 3.1.3.4 Verify each withdrawn control rod does not go to the withdrawn overtravel position.

Each time the control rod is withdrawn to full out position AND Prior to declaring control rod OPERABLE after work on control rod or CRD System that could affect coupling (continued)

43 Table 6 Secondary Containment Limits Parameter and Areas Max Normal Operating Limit Max Safe Operating Limit Value/Trend Temperature Area/Location Indicator

°F

°F A RHR-SE Corner Room Area RHR SE CORNER ROOM AMBIENT RHR SE CORNER ROOM DIFFERENTIAL TR/TDR 2000A Ch 1 TR/TDR 2000A Ch 2 130 50 140 N/A B RHR-NW Corner Room Area RHR NW CORNER ROOM AMBIENT RHR NW CORNER ROOM DIFFERENTIAL TR/TDR 2000B Ch 1 TR/TDR 2000B Ch 2 130 50 140 N/A HPCI Room Area HPCI EMER COOLER AMBIENT HPCI ROOM AMBIENT HPCI ROOM DIFFERENTIAL TR/TDR 2225A[B] Ch 1 TR/TDR 2225A Ch 2 TR/TDR 2225A[B] Ch 4[3]

175 175 50 310 310 N/A RCIC Room Area RCIC EMER COOLER AMBIENT RCIC ROOM AMBIENT RCIC ROOM DIFFERENTIAL TR/TDR 2425A[B] Ch 1 TR/TDR 2425A Ch 2 TR/TDR 2425A[B] Ch 4 175 175 50 300 300 N/A Torus Area TORUS CATWALK NORTH AMBIENT TORUS CATWALK WEST AMBIENT TORUS CATWALK SOUTH AMBIENT TORUS CATWALK EAST AMBIENT TORUS CATWALK EAST DIFF TORUS CATWALK WEST DIFF TORUS CATWALK SOUTHWEST DIFF TORUS CATWALK SOUTH DIFF TR/TDR 2425A Ch 3 TR/TDR 2425B Ch 2 TR/TDR 2225A Ch 3 TR/TDR 2225B Ch 2 TR/TDR 2425A Ch 5 TR/TDR 2425B Ch 5 TR/TDR 2225A Ch 5 TR/TDR 2225B Ch 4 150 150 150 150 50 50 50 50 165 165 165 165 N/A N/A N/A N/A RB 786 South Area RWCU PUMP ROOM AMBIENT RWCU HX ROOM AMBIENT TR/TDR 2700A[B] Ch 1 TR/TDR 2700A[B] Ch 2,3 130 130 212 212 RB 757 South Area RWCU ABOVE TIP ROOM AMBIENT TR/TDR 2700A[B] Ch 4,5 111.5 150 Steam Tunnel Area STEAM TUNNEL AMBIENT STEAM TUNNEL DIFFERENTIAL TR/TDR 2425B Ch 3 TR/TDR 2225B Ch 5 160 70 300 N/A Radiation Area/Location Indicator mR/hr mR/hr RB 757 South Area RB RAILROAD ACCESS AREA SOUTH CRD MODULE AREA TIP ROOM RI 9167 RI 9169 RI 9176 10 10 60 100 100 600 RB 757 North Area NORTH CRD MODULE CRD REPAIR ROOM RI 9168 RI 9170 10 15 100 150 RB 786 North Area RWCU SPENT RESIN ROOM RWCU PHASE SEP TANK RI 9173 RI 9177 100 20 103 200 RB 786 South Area RWCU PUMP ROOM RWCU HX ROOM RI 9156 RI 9157 103 103 104 104 RB 812 North Area MAIN PLANT EXHAUST FAN ROOM JUNGLE ROOM RI 9171 RI 9155 60 60 600 600 Refuel Floor Area NEW FUEL VAULT AREA NORTH REFUEL FLOOR SOUTH REFUEL FLOOR SPENT FUEL POOL AREA RI 9153 RI 9163 RI 9164 RI 9178 10 10 10 100 100 100 100 103 Water Level Area/Location Indicator inches inches HPCI ROOM LI 3768 2

6 RCIC ROOM LI 3769 3

6 A RHR & CS SECR LI 3770 2

10 B RHR & CS NWCR LI 3771 2

10 TORUS AREA LI 3772 2

12

Suppression Pool Water Level 3.6.2.2 44 3.6 CONTAINMENT SYSTEMS 3.6.2.2 Suppression Pool Water Level LCO 3.6.2.2 Suppression pool water level shall be 10.11 ft and 10.43 ft.

APPLICABILITY: MODES 1, 2, and 3.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

Suppression pool water level not within limits.

A.1 Restore suppression pool water level to within limits.

2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> B.

Required Action and associated Completion Time not met.

B.1 Be in MODE 3.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 36 hours SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.2.2.1 Verify suppression pool water level is within limits.

In accordance with the Surveillance Frequency Control Program

45 Graph 4: Heat Capacity Limit 0

120 RPV Pressure (psig)

Torus Water Temperature (°F) 100 200 300 400 500 600 700 800 900 1000 1100 130 140 150 160 170 180 190 200 210 220 230 240 50 Action is required Bounding curve for torus levels between 8 ft and 13 ft

46 Table of RPV Pressure Versus Saturation Temperature psig Temp (°F) psig Temp (°F) psig Temp (°F) 1100 558 680 502 280 415 1080 556 660 499 260 409 1060 553 640 495 240 402 1040 551 620 492 220 395 1020 549 600 488 200 387 1000 546 580 485 180 380 980 542 560 481 160 371 960 541 540 477 140 361 940 539 520 474 120 350 920 536 500 470 100 338 900 534 480 466 80 324 880 531 460 461 60 307 860 528 440 457 40 287 840 526 420 452 20 259 820 523 400 448 0

212 800 520 380 443 780 517 360 438 760 514 340 431 740 511 320 427 720 508 300 421 700 505

47 Figure 1: Core Spray NPSH Limit 100 120 140 160 180 200 220 240 260 0

1000 2000 3000 4000 5000 CS PUM P FLOWRATE (gpm)

  • torus pressue
  • 15 psig
  • 10 psig
  • 5 psig
  • 0 psig Do NOT operate CS pumps above these curves unless directed by EOPs 100 120 140 160 180 200 220 240 260 0

1000 2000 3000 4000 5000 CS PUM P FLOWRATE (gpm)

  • torus pressue
  • 15 psig
  • 10 psig
  • 5 psig
  • 0 psig Do NOT operate CS pumps above these curves unless directed by EOPs

48 Figure 2: Core Spray Vortex Limit 0

2 4

6 8

10 12 0

500 1000 1500 2000 2500 3000 3500 4000 4500 CS LOOP FLOW (gpm)

Do NOT operate CS pumps in this area unless directed by EOPs 0

2 4

6 8

10 12 0

500 1000 1500 2000 2500 3000 3500 4000 4500 CS LOOP FLOW (gpm)

Do NOT operate CS pumps in this area unless directed by EOPs

49 APPENDIX 1 HEATUP RATE CURVE - RPV FLOODED NOTE CAUTION 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 0

10 20 30 40 50 60 70 80 90 100 Heatup Rate (Deg F/hr)

Time Since Shutdown (Days)

RFO-25 Vessel Water Heatup Rate (Floodup Condition)

50 APPENDIX 2 HEATUP RATE CURVE - RPV LEVEL AT 200" CAUTION 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 0

10 20 30 40 50 60 70 80 90 100 Heatup Rate (Deg F/hr)

Time Since Shutdown (Days)

RFO-25 Vessel Water Heatup Rate (Water Level = 200 )