{{#Wiki_filter:TECHNICAL SPECIFICATIONS TASK FORCE | {{#Wiki_filter:11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVITY TSTF DATE DRAFT TSTF-17-01 REVISION 3 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 | ||
==SUBJECT:== | ==SUBJECT:== | ||
Response to NRC Questions on TSTF-505-A, "Provide Risk-Informed Extended Completion Times" | Response to NRC Questions on TSTF-505-A, "Provide Risk-Informed Extended Completion Times" | ||
==Reference:== | ==Reference:== | ||
| Line 28: | Line 28: | ||
: 1. The industry will pursue development of a companion traveler for TSTF-505-A that addresses the NRC issues with Actions related to inoperability of all trains of a TS required system. Following approval, plants that have adopted TSTF-505-A without these Actions could submit a LAR to adopt the companion traveler. Following NRC approval of the companion traveler, plants that have not adopted TSTF-505-A can adopt TSTF-505-A and the companion traveler in a single LAR. | : 1. The industry will pursue development of a companion traveler for TSTF-505-A that addresses the NRC issues with Actions related to inoperability of all trains of a TS required system. Following approval, plants that have adopted TSTF-505-A without these Actions could submit a LAR to adopt the companion traveler. Following NRC approval of the companion traveler, plants that have not adopted TSTF-505-A can adopt TSTF-505-A and the companion traveler in a single LAR. | ||
: 2. TSTF-505-A allows licensees to choose which Action changes are included in their LAR. | : 2. TSTF-505-A allows licensees to choose which Action changes are included in their LAR. | ||
The TSTF will recommend to the industry that until the companion traveler is approved by the NRC, licensees submitting LARs to adopt TSTF-505 follow the guidance in the attachments to this letter. Actions related to the inoperability of all trains of a TS required system should not be included in LARs submitted prior to approval of the companion traveler. Omitting these Actions and incorporating the other changes recommended in the | The TSTF will recommend to the industry that until the companion traveler is approved by the NRC, licensees submitting LARs to adopt TSTF-505 follow the guidance in the attachments to this letter. Actions related to the inoperability of all trains of a TS required system should not be included in LARs submitted prior to approval of the companion traveler. Omitting these Actions and incorporating the other changes recommended in the | ||
TSTF-17-01 DATE attachments to this letter should allow timely approval of LARs. Attachment 1 contains a list of the Actions revised by TSTF-505-A that should be omitted in LARs submitted prior to approval of the companion traveler. Attachment 1 also includes conforming changes to the TSTF-505-A Section 1.3 TS example and the TS Section 5.5 Administrative Controls program. Attachment 2 contains a list of Actions revised by TSTF-505-A that have conditions on their inclusion in a plant-specific LAR. Attachment 3 contains a revised Mode Application for requesting adoption of TSTF-505-A. | TSTF-17-01 DATE attachments to this letter should allow timely approval of LARs. Attachment 1 contains a list of the Actions revised by TSTF-505-A that should be omitted in LARs submitted prior to approval of the companion traveler. Attachment 1 also includes conforming changes to the TSTF-505-A Section 1.3 TS example and the TS Section 5.5 Administrative Controls program. Attachment 2 contains a list of Actions revised by TSTF-505-A that have conditions on their inclusion in a plant-specific LAR. Attachment 3 contains a revised Mode Application for requesting adoption of TSTF-505-A. | ||
| Line 34: | Line 34: | ||
The TSTF requests that the NRC rescind the suspension of the approval of TSTF-505-A, Revision 1, and accept LARs to adopt TSTF-505-A that follow the recommendations in the attachments to this letter. | The TSTF requests that the NRC rescind the suspension of the approval of TSTF-505-A, Revision 1, and accept LARs to adopt TSTF-505-A that follow the recommendations in the attachments to this letter. | ||
Should you have any questions, please do not hesitate to contact us. | Should you have any questions, please do not hesitate to contact us. | ||
James R. Morris (PWROG/W) | James R. Morris (PWROG/W) | ||
Otto W. Gustafson (PWROG/CE) | Lisa L. Williams (BWROG) | ||
Otto W. Gustafson (PWROG/CE) | |||
Jordan Vaughan (PWROG/B&W) | |||
Jason P. Redd (APOG) | Jason P. Redd (APOG) | ||
Enclosure cc: | Enclosure cc: | ||
Mirella Gavrilas, Director of the Division of Safety Systems Anne T. Boland, Director of the Division of Operating Reactor Licensing Jennifer Whitman, Acting Chief of the Technical Specifications Branch Michelle Honcharik, Technical Specifications Branch Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1430, Babcock and Wilcox STS Page 1 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.1.C RPS Instrumentation Do not include Action 3.3.2.A Reactor Protection System (RPS) Manual Reactor Trip Do not include. | |||
Action 3.3.5.B ESFAS Instrumentation Do not include Action 3.3.6.B ESFAS Manual Initiation Do not include Action 3.3.11.D EFIC System Instrumentation Do not include Action 3.3.13.B EFIC Logic Do not include Action 3.3.14.B EFIC-EFW-Vector Valve Logic Do not include Action 3.4.10.A Pressurizer Safety Valves Do not include. | |||
Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include. | |||
Action 3.4.14.C | Action 3.5.1.A CFTs Do not include Action 3.5.1.B CFTs Do not include Action 3.5.1.C CFTs Do not include Action 3.5.2.C ECCS - Operating Do not include Action 3.5.3.B ECCS - Shutdown Do not include. | ||
Action 3.5.1.A | Action 3.5.4.A BWST Do not include Action 3.5.4.B BWST Do not include Action 3.6.3.B Containment Isolation Valves Do not include Action 3.6.3.D Containment Isolation Valves Do not include Action 3.6.6.F Containment Spray and Cooling Systems Do not include Action 3.7.2.C MSIVs Do not include Action 3.7.4.B AVVs Do not include. | ||
Action 3.5.4.A | Action 3.7.5.C EFW System Do not include Action 3.7.6.A CST Do not include. | ||
Action 3.7.5.C | Action 3.7.8.B SWS Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1430, Babcock and Wilcox STS Page 2 Specification Specification Title Notes Action 3.7.9.C UHS Do not include Action 3.7.11.B CREVS Do not include Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.7.8.B | Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 3 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.1.C RTS Instrumentation Do not include Action 3.3.1.E RTS Instrumentation Do not include Action 3.3.1.G RTS Instrumentation Do not include Action 3.3.1.I RTS Instrumentation Do not include Action 3.3.1.Q RTS Instrumentation Do not include Action 3.3.1.S RTS Instrumentation Do not include Action 3.3.1.T RTS Instrumentation Do not include Action 3.3.1.V RTS Instrumentation Do not include Action 3.3.1.W RTS Instrumentation Do not include Action 3.3.1.Z RTS Instrumentation Do not include Action 3.3.1.CC RTS Instrumentation Do not include Action 3.3.1.EE RTS Instrumentation Do not include Action 3.3.1.JJ RTS Instrumentation Do not include Action 3.3.2.C ESFAS Instrumentation Do not include Action 3.3.2.E ESFAS Instrumentation Do not include Action 3.3.2.G ESFAS Instrumentation Do not include Action 3.3.2.I ESFAS Instrumentation Do not include Action 3.3.2.K ESFAS Instrumentation Do not include Action 3.3.2.M ESFAS Instrumentation Do not include Action 3.3.2.O ESFAS Instrumentation Do not include Action 3.3.2.Q ESFAS Instrumentation Do not include Action 3.3.2.S ESFAS Instrumentation Do not include Action 3.3.2.U ESFAS Instrumentation Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 4 Specification Specification Title Notes Action 3.3.2.V ESFAS Instrumentation Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.3.9.B BDPS Do not include Action 3.4.9.C Pressurizer Do not include. | |||
Action 3.4.10.A Pressurizer Safety Valves Do not include. | |||
Action 3.8.4.D | Action 3.4.11.E Pressurizer Power Operated Relief Valves (PORVs) | ||
Do not include. | |||
Action 3.4.11.F Pressurizer Power Operated Relief Valves (PORVs) | |||
Do not include. | |||
Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include. | |||
Action 3.3.9.B | Action 3.5.1.A Accumulators Do not include. | ||
Action 3.4.10.A | Action 3.5.1.B Accumulators Do not include. | ||
Action 3.4.11.E | Action 3.5.1.C Accumulators Do not include. | ||
Action 3.5.2.B ECCS - Operating Do not include. | |||
Action 3.4.11.F | Action 3.5.3.B ECCS - Shutdown Do not include. | ||
Action 3.5.4.A RWST Do not include. | |||
Action 3.5.4.B RWST Do not include. | |||
Action 3.5.1.A | Action 3.5.6.A Boron Injection Tank Do not include. | ||
Action 3.5.1.B | Action 3.6.3.B Containment Isolation Valves Do not include. | ||
Action 3.5.1.C | Action 3.6.3.C Containment Isolation Valves Do not include. | ||
Action 3.5.2.B | Action 3.6.3.D Containment Isolation Valves Do not include. | ||
Action 3.5.3.B | Action 3.6.3.E Containment Isolation Valves Do not include. | ||
Action 3.5.4.A | Action 3.6.6A.E Containment Spray and Cooling Systems (Atmospheric and Dual) | ||
Action 3.5.4.B | Do not include. | ||
Action 3.5.6.A | Action 3.6.6B.G Containment Spray and Cooling Systems (Atmospheric and Dual) | ||
Action 3.6.3.B | Do not include. | ||
Action 3.6.3.C | Action 3.6.6C.B Containment Spray System (Ice Condenser) | ||
Action 3.6.3.D | Do not include. | ||
Action 3.6.3.E | Action 3.6.6D.B QS System (Subatmospheric) | ||
Action 3.6.6A.E | Do not include. | ||
(Atmospheric and Dual) | Action 3.6.6E.F RS System (Subatmospheric) | ||
Action 3.6.6B.G | Do not include. | ||
(Atmospheric and Dual) | Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 5 Specification Specification Title Notes Action 3.6.9.B Hydrogen Mixing System Do not include. | ||
Action 3.6.6C.B | Action 3.6.10.C HIS (Ice Condenser) | ||
Action 3.6.6D.B | Do not include. | ||
Action 3.6.6E.F | Action 3.6.14.B ARS (Ice Condenser) | ||
Do not include. | |||
Action 3.6.15.A Ice Bed Do not include. | |||
Action 3.6.17.A Divider Barrier Integrity (Ice Condenser) | |||
Action 3.6.10.C | Do not include. | ||
Action 3.6.14.B | Action 3.6.17.B Divider Barrier Integrity (Ice Condenser) | ||
Action 3.6.15.A | Do not include. | ||
Action 3.6.17.A | Action 3.6.18.A Containment Recirculation Drains (Ice Condenser) | ||
Action 3.6.17.B | Do not include. | ||
Action 3.6.18.A | Action 3.6.18.B Containment Recirculation Drains (Ice Condenser) | ||
Action 3.6.18.B | Do not include. | ||
Action 3.7.2.C | Action 3.7.2.C MSIVs Do not include. | ||
Action 3.7.5.C | Action 3.7.5.C AFW System Do not include. | ||
Action 3.7.6.A | Action 3.7.6.A Condensate Storage Tank Do not include. | ||
Action 3.7.7.B | Action 3.7.7.B CCW System Do not include. | ||
Action 3.7.8.B | Action 3.7.8.B SWS Do not include. | ||
Action 3.7.9.C | Action 3.7.9.C UHS Do not include. | ||
Action 3.7.11.B | Action 3.7.11.B CREATCS Do not include. | ||
Action 3.8.1.E | Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.8.4.D | Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached Recommended Changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1432, Combustion Engineering STS Page 6 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.4.B ESFAS Instrumentation (Analog) | ||
Do not include. | |||
Action 3.3.5.B ESFAS Logic and Manual Trip (Analog) | |||
Action 3.3.5.B | Do not include. | ||
Action 3.3.5.E | Action 3.3.5.E ESFAS Logic and Manual Trip (Analog) | ||
Action 3.3.6.A | Do not include. | ||
Action 3.3.6.E | Action 3.3.6.A ESFAS Logic and Manual Trip (Digital) | ||
Action 3.4.9.C | Do not include. | ||
Action 3.4.10.A | Action 3.3.6.E ESFAS Logic and Manual Trip (Digital) | ||
Action 3.4.11.E | Do not include. | ||
Action 3.4.9.C Pressurizer Do not include. | |||
Action 3.4.11.F | Action 3.4.10.A Pressurizer Safety Valves Do not include. | ||
Action 3.4.11.E Pressurizer Power Operated Relief Valves (PORVs) | |||
Action 3.4.14.C | Do not include. | ||
Action 3.5.1.A | Action 3.4.11.F Pressurizer Power Operated Relief Valves (PORVs) | ||
Action 3.5.1.B | Do not include. | ||
Action 3.5.1.C | Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include. | ||
Action 3.5.2.C | Action 3.5.1.A SITs Do not include. | ||
Action 3.5.3.A | Action 3.5.1.B SITs Do not include. | ||
Action 3.5.4.A | Action 3.5.1.C SITs Do not include. | ||
Action 3.5.4.B | Action 3.5.2.C ECCS - Operating Do not include. | ||
Action 3.6.3.C | Action 3.5.3.A ECCS - Shutdown Do not include. | ||
Action 3.6.3.E | Action 3.5.4.A RWT Do not include. | ||
Action 3.6.3.F | Action 3.5.4.B RWT Do not include. | ||
Action 3.6.6A.F | Action 3.6.3.C Containment Isolation Valves Do not include. | ||
(Atmospheric and Dual) | Action 3.6.3.E Containment Isolation Valves Do not include. | ||
Action 3.6.6B.F | Action 3.6.3.F Containment Isolation Valves Do not include. | ||
Action 3.6.6A.F Containment Spray and Cooling Systems (Atmospheric and Dual) | |||
Action 3.6.9.B | Do not include. | ||
Action 3.7.2.C | Action 3.6.6B.F Containment Spray and Cooling Systems (Atmospheric and Dual) | ||
Do not include. | |||
Action 3.6.9.B Hydrogen Mixing System Do not include. | |||
Action 3.7.2.C MSIVs Do not include. | |||
Action 3.7.5.C | Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1432, Combustion Engineering STS Page 7 Specification Specification Title Notes Action 3.7.4.B Atmospheric Dump Valves Do not include. | ||
Action 3.7.6.A | Action 3.7.5.C AFW System Do not include. | ||
Action 3.7.7.B | Action 3.7.6.A Condensate Storage Tank Do not include. | ||
Action 3.7.8.B | Action 3.7.7.B CCW System Do not include. | ||
Action 3.7.9.C | Action 3.7.8.B SWS Do not include. | ||
Action 3.7.10.B | Action 3.7.9.C UHS Do not include. | ||
Action 3.7.12.B | Action 3.7.10.B ECW Do not include. | ||
Action 3.8.1.E | Action 3.7.12.B CREATCS Do not include. | ||
Action 3.8.1.G | Action 3.8.1.E AC Sources - Operating Do not include. | ||
Action 3.8.4.D | Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1433, BWR/4 STS Page 8 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.1.7.A SLC System Do not include. | |||
Action 3.1.7.C SLC System Do not include. | |||
Action 3.1.7.C | Action 3.3.1.1.C Reactor Protection System (RPS) Instrumentation Do not include. | ||
Action 3.3.1.1.C | Action 3.3.4.1.B End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Do not include. | ||
Action 3.3.4.1.B | Action 3.3.4.2.B Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) | ||
Instrumentation Do not include. | |||
Recirculation Pump Trip (ATWS-RPT) | Action 3.3.4.2.C Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) | ||
Instrumentation Action 3.3.4.2.C | Do not include. | ||
Action 3.3.5.2.C Reactor Core Isolation Cooling (RCIC) System Instrumentation Do not include. | |||
Action 3.3.5.2.C | Action 3.3.6.1.B Primary Containment Isolation Instrumentation Do not include. | ||
Action 3.3.6.3.C LLS Instrumentation Do not include. | |||
Action 3.3.6.3.C | Action 3.3.6.3.D LLS Instrumentation Do not include. | ||
Action 3.3.6.3.D | Action 3.4.3.B S/RVs Do not include. | ||
Action 3.4.3.B | Action 3.5.1.G ECCS - Operating Do not include. | ||
Action 3.5.1.G | Action 3.5.1.I ECCS - Operating Do not include. | ||
Action 3.5.1.I | Action 3.6.1.3.B PCIVs Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.6.1.3.B | Action 3.6.1.3.C PCIVs Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.6.1.3.C | Action 3.6.2.3.B Residual Heat Removal (RHR) Suppression Pool Cooling Do not include. | ||
Action 3.6.2.3.B | Action 3.6.2.4.B Residual Heat Removal (RHR) Suppression Pool Spray Do not include. | ||
Action 3.6.3.3.B Containment Atmosphere Dilution (CAD) System Do not include. | |||
Action 3.7.1.D Residual Heat Removal Service Water (RHRSW) | |||
Action 3.7.1.D | System Do not include. | ||
Action 3.7.2.F | |||
Action 3.7.5.B | [PSW] System and [UHS] | ||
Action 3.8.1.E | Do not include. | ||
Action 3.7.5.B | |||
[Control Room AC] System Do not include. | |||
Action 3.8.4.D | Action 3.8.1.E AC Sources - Operating Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1433, BWR/4 STS Page 9 Specification Specification Title Notes Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505. | ||
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.15 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1434, BWR/6 STS Page 10 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.1.7.A SLC System Do not include. | |||
Action 3.1.7.C SLC System Do not include. | |||
Action 3.1.7.C | Action 3.3.1.1.C Reactor Protection System (RPS) Instrumentation Do not include. | ||
Action 3.3.1.1.C | Action 3.3.4.1.B End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Do not include. | ||
Action 3.3.4.1.B | Action 3.3.4.2.B Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) | ||
Instrumentation Do not include. | |||
Recirculation Pump Trip (ATWS-RPT) | Action 3.3.4.2.C Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT) | ||
Instrumentation Action 3.3.4.2.C | Instrumentation Do not include. | ||
Recirculation Pump Trip (ATWS-RPT) | Action 3.3.5.2.C Reactor Core Isolation Cooling (RCIC) System Instrumentation Do not include. | ||
Instrumentation Action 3.3.5.2.C | Action 3.3.6.1.B Primary Containment Isolation Instrumentation Do not include. | ||
Action 3.3.6.4.B Suppression Pool Makeup (SPMU) System Instrumentation Do not include. | |||
Action 3.3.6.4.B | Action 3.3.6.4.C Suppression Pool Makeup (SPMU) System Instrumentation Do not include. | ||
Action 3.3.6.5.B Relief and LLS Instrumentation Do not include. | |||
Action 3.4.4.B S/RVs Do not include. | |||
Action 3.4.4.B | Action 3.5.1.G ECCS - Operating Do not include. | ||
Action 3.5.1.G | Action 3.5.1.I ECCS - Operating Do not include. | ||
Action 3.5.1.I | Action 3.5.1.J ECCS - Operating Do not include. | ||
Action 3.5.1.J | Action 3.5.1.K ECCS - Operating Do not include. | ||
Action 3.5.1.K | Action 3.5.1.L ECCS - Operating Do not include. | ||
Action 3.5.1.L | Action 3.6.1.3.B Primary Containment Isolation Valves (PCIVs) | ||
Action 3.6.1.3.B | Do not include. | ||
Action 3.6.1.3.C | Action 3.6.1.3.C Primary Containment Isolation Valves (PCIVs) | ||
Action 3.6.1.3.D | Do not include. | ||
Action 3.6.1.7.B | Action 3.6.1.3.D Primary Containment Isolation Valves (PCIVs) | ||
Do not include. | |||
Action 3.6.1.7.B Residual Heat Removal (RHR) Containment Spray System Do not include. | |||
Action 3.6.2.3.B Residual Heat Removal (RHR) Suppression Pool Cooling Do not include. | |||
Action 3.6.2.4.A SPMU System Do not include. | |||
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1434, BWR/6 STS Page 11 Specification Specification Title Notes Action 3.6.2.4.B SPMU System Do not include. | |||
Action 3.6.2.4.D | Action 3.6.2.4.D SPMU System Do not include. | ||
Action 3.6.3.1.B | Action 3.6.3.1.B Drywell Cooling System Fans Do not include. | ||
Action 3.6.3.2.B | Action 3.6.3.2.B Drywell Purge System Do not include. | ||
Action 3.6.5.1.A | Action 3.6.5.1.A Drywell Do not include. | ||
Action 3.6.5.3.B | Action 3.6.5.3.B Drywell Isolation Valve[s] | ||
Action 3.6.5.6.D | Do not include. | ||
Action 3.6.5.6.E | Action 3.6.5.6.D Drywell Vacuum Relief System Do not include. | ||
Action 3.6.5.6.F | Action 3.6.5.6.E Drywell Vacuum Relief System Do not include. | ||
Action 3.7.1.D | Action 3.6.5.6.F Drywell Vacuum Relief System Do not include. | ||
Action 3.7.4.B | Action 3.7.1.D | ||
Action 3.8.1.E | [SSW] System and [UHS] | ||
Action 3.8.4.D | Do not include. | ||
Action 3.7.4.B | |||
[Control Room AC] System Do not include. | |||
Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505. | |||
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.15 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Recommended Changes to the Section 1.3 Example Page 12 | |||
----------------------------------------- Reviewer's Note ------------------------------------------ | |||
Example 1.3-8 is only applicable to plants that have adopted the Risk Informed Completion Time Program. | Example 1.3-8 is only applicable to plants that have adopted the Risk Informed Completion Time Program. | ||
[ | |||
EXAMPLE 1.3-8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One subsystem inoperable. | |||
A.1 Restore subsystem to OPERABLE status. | |||
BC.Required | 7 days OR In accordance with the Risk Informed Completion Time Program B. --- NOTE ------ | ||
Not applicable when second subsystem intentionally made inoperable. | |||
Two subsystems inoperable. | |||
B.1 Restore subsystems to OPERABLE status. | |||
1 hour OR In accordance with the Risk Informed Completion Time Program BC.Required Action and associated Completion Time not met. | |||
BC.1 Be in MODE 3. | |||
AND BC.2 Be in MODE 5. | |||
6 hours 36 hours Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Recommended Changes to the Section 1.3 Example Page 13 When a subsystem is declared inoperable, Condition A is entered. The 7 day Completion Time may be applied as discussed in Example 1.3-2. However, the licensee may elect to apply the Risk Informed Completion Time Program which permits calculation of a Risk Informed Completion Time (RICT) that may be used to complete the Required Action beyond the 7 day Completion Time. The RICT cannot exceed 30 days. After the 7 day Completion Time has expired, the subsystem must be restored to OPERABLE status within the RICT or Condition BC must also be entered. | |||
If a second subsystem is declared inoperable, Condition B may also be entered. The Condition is modified by a Note stating it is not applicable if the second subsystem is intentionally made inoperable. The Required Actions of Condition B are not intended for voluntary removal of redundant subsystems from service. The Required Action is only applicable if one subsystem is inoperable for any reason and the second subsystem is found to be inoperable, or if both subsystems are found to be inoperable at the same time. If Condition B is applicable, at least one subsystem must be restored to OPERABLE status within 1 hour or Condition C must also be entered. The licensee may be able to apply a RICT to extend the Completion Time beyond 1 hour if the requirements of the Risk Informed Completion Time Program are met. If two subsystems are inoperable and Condition B is not applicable (i.e., the second subsystem was intentionally made inoperable), LCO 3.0.3 is entered as there is no applicable Condition. | If a second subsystem is declared inoperable, Condition B may also be entered. The Condition is modified by a Note stating it is not applicable if the second subsystem is intentionally made inoperable. The Required Actions of Condition B are not intended for voluntary removal of redundant subsystems from service. The Required Action is only applicable if one subsystem is inoperable for any reason and the second subsystem is found to be inoperable, or if both subsystems are found to be inoperable at the same time. If Condition B is applicable, at least one subsystem must be restored to OPERABLE status within 1 hour or Condition C must also be entered. The licensee may be able to apply a RICT to extend the Completion Time beyond 1 hour if the requirements of the Risk Informed Completion Time Program are met. If two subsystems are inoperable and Condition B is not applicable (i.e., the second subsystem was intentionally made inoperable), LCO 3.0.3 is entered as there is no applicable Condition. | ||
The Risk Informed Completion Time Program requires recalculation of the RICT to reflect changing plant conditions. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours after the plant configuration change, whichever is less. | The Risk Informed Completion Time Program requires recalculation of the RICT to reflect changing plant conditions. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours after the plant configuration change, whichever is less. | ||
If the 7 day Completion Time clock of Condition A or the 1 hour Completion Time clock of Condition B have has expired and subsequent changes in plant condition result in exiting the applicability of the Risk Informed Completion Time Program without restoring the inoperable subsystem to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start. | If the 7 day Completion Time clock of Condition A or the 1 hour Completion Time clock of Condition B have has expired and subsequent changes in plant condition result in exiting the applicability of the Risk Informed Completion Time Program without restoring the inoperable subsystem to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start. | ||
If the RICT expires or is recalculated to be less than the elapsed time since the Condition was entered and the inoperable subsystem has not been restored to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start. If the inoperable subsystems are restored to OPERABLE status after Condition BC is entered, Conditions A, B, and BC are exited, and therefore, the Required Actions of Condition BC may be terminated. ] | If the RICT expires or is recalculated to be less than the elapsed time since the Condition was entered and the inoperable subsystem has not been restored to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start. If the inoperable subsystems are restored to OPERABLE status after Condition BC is entered, Conditions A, B, and BC are exited, and therefore, the Required Actions of Condition BC may be terminated. ] | ||
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 14 | |||
[ 5.5.18 Risk Informed Completion Time Program This program provides controls to calculate a Risk Informed Completion Time (RICT) and must be implemented in accordance with NEI 06-09-A, Revision 0, "Risk-Managed Technical Specifications (RMTS) Guidelines." The program shall include the following: | |||
: a. The RICT may not exceed 30 days; | |||
[ 5.5.18 | --------------------------------- REVIEWER'S NOTE ---------------------------------- | ||
: a. The RICT may not exceed 30 days; | |||
The Risk Informed Completion Time is only applicable in MODES supported by the Licensees PRA. Licensee's applying the RICT Program to MODES other than Modes 1 and 2 must demonstrate that they have the capability to calculate a RICT in those MODES or that the risk indicated by their MODE 1 and 2 PRA model is bounding with respect to the lower MODE conditions. | The Risk Informed Completion Time is only applicable in MODES supported by the Licensees PRA. Licensee's applying the RICT Program to MODES other than Modes 1 and 2 must demonstrate that they have the capability to calculate a RICT in those MODES or that the risk indicated by their MODE 1 and 2 PRA model is bounding with respect to the lower MODE conditions. | ||
: b. | |||
: b. | A RICT may only be utilized in MODE 1, 2 [, and 3, and MODE 4 while relying on steam generators for heat removal]; | ||
: c. | : c. | ||
When a RICT is being used, any change to the plant configuration, as defined in NEI 06-09-A, Appendix A, change within the scope of the Risk Informed Completion Time Program must be considered for the effect on the RICT. | |||
: 1. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration. | : 1. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration. | ||
: 2. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours after the plant configuration change, whichever is less. | : 2. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours after the plant configuration change, whichever is less. | ||
: 3. Revising the RICT is not required If the plant configuration change would lower plant risk and would result in a longer RICT. | : 3. Revising the RICT is not required If the plant configuration change would lower plant risk and would result in a longer RICT. | ||
: d. | : d. | ||
: e. | Use of a RICT is not permitted for voluntary entry into a configuration which represents a loss of a specified safety function or inoperability of all required trains of a system required to be OPERABLE. | ||
: e. | |||
Use of a RICT is permitted for emergent conditions which represent a loss of a specified safety function or inoperability of all required trains of a system required to be OPERABLE if one or more of the trains are considered "PRA functional" as defined in Section 2.3.1 of NEI 06-09.] | |||
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 15 | |||
: d. | : d. | ||
If the extent of condition evaluation for inoperable structures, systems, or components (SSCs) is not complete prior to exceeding the Completion Time, the RICT shall account for the increased possibility of common cause failure (CCF) by either: | |||
: 1. Numerically accounting for the increased possibility of CCF in the RICT calculation; or | : 1. Numerically accounting for the increased possibility of CCF in the RICT calculation; or | ||
: 2. Risk Management Actions (RMAs) not already credited in the RICT calculation shall be implemented that support redundant or diverse SSCs that perform the function(s) of the inoperable SSCs, and, if practicable, reduce the frequency of initiating events that challenge the function(s) performed by the inoperable SSCs. | : 2. Risk Management Actions (RMAs) not already credited in the RICT calculation shall be implemented that support redundant or diverse SSCs that perform the function(s) of the inoperable SSCs, and, if practicable, reduce the frequency of initiating events that challenge the function(s) performed by the inoperable SSCs. | ||
: e. | : e. | ||
[This paragraph will describe when prior NRC approval is needed for changes to the methodology used to calculate a RICT. The wording for this provision is currently under discussion between the NRC and the industry.] | |||
Discussion of Recommended Changes to the Risk Informed Completion Time Program | Discussion of Recommended Changes to the Risk Informed Completion Time Program | ||
: 1. The reference to NEI 06-09 is revised to refer to the approved version, NEI 06-09-A, Revision 0. | : 1. | ||
: 2. Paragraphs d. and e. of TSTF-505 are deleted. These paragraphs discuss determining a RICT when all trains of a system are inoperable and are not applicable to the near-term submittals that are the subject of this letter. | The reference to NEI 06-09 is revised to refer to the approved version, NEI 06-09-A, Revision | ||
: 3. The NRC questioned the difference between the TSTF-505 Risk Informed Completion Time (RICT) Program in paragraph 5.5.c and the NEI 06-09 Configuration Risk Management Program (CRMP). The traveler justification stated that the TS Section 5.5 RICT Program was the same as the NEI 06-09 CRMP; however, users of the TS may not have TSTF-505 available, which may lead to confusion when applying NEI 06-09 in accordance with the TS 5.5 RICT Program. The program was revised to clarify the application of the requirements. | : 0. | ||
: 4. A new paragraph d. is added addressing common cause failure considerations. | : 2. | ||
: 5. A new paragraph e. is added. The NRC's Safety Evaluation for NEI 06-09 stated: | Paragraphs d. and e. of TSTF-505 are deleted. These paragraphs discuss determining a RICT when all trains of a system are inoperable and are not applicable to the near-term submittals that are the subject of this letter. | ||
As part of its review and approval of a licensees application requesting to implement the RMTS, the NRC staff intends to impose a license condition that will explicitly address the scope of the PRA and non-PRA methods approved by the NRC staff for use in the plant-specific RMTS program. If a licensee wishes to change its methods, and the change is outside the bounds of the license condition, the licensee will need NRC approval, via a license amendment, of the implementation of the new method in its RMTS program. The focus of the NRC staffs review and approval will be on the | : 3. | ||
The NRC questioned the difference between the TSTF-505 Risk Informed Completion Time (RICT) Program in paragraph 5.5.c and the NEI 06-09 Configuration Risk Management Program (CRMP). The traveler justification stated that the TS Section 5.5 RICT Program was the same as the NEI 06-09 CRMP; however, users of the TS may not have TSTF-505 available, which may lead to confusion when applying NEI 06-09 in accordance with the TS 5.5 RICT Program. The program was revised to clarify the application of the requirements. | |||
: 4. | |||
A new paragraph d. is added addressing common cause failure considerations. | |||
: 5. | |||
A new paragraph e. is added. The NRC's Safety Evaluation for NEI 06-09 stated: | |||
As part of its review and approval of a licensees application requesting to implement the RMTS, the NRC staff intends to impose a license condition that will explicitly address the scope of the PRA and non-PRA methods approved by the NRC staff for use in the plant-specific RMTS program. If a licensee wishes to change its methods, and the change is outside the bounds of the license condition, the licensee will need NRC approval, via a license amendment, of the implementation of the new method in its RMTS program. The focus of the NRC staffs review and approval will be on the Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 16 technical adequacy of the methodology and analyses relied upon for the RMTS application. | |||
There is no legal difference between a license condition and a Technical Specification and it is less error prone to put all requirements related to calculation of a RICT in the same location. | There is no legal difference between a license condition and a Technical Specification and it is less error prone to put all requirements related to calculation of a RICT in the same location. | ||
Therefore, in lieu of a license condition, the restriction is added as paragraph e. of the program. | Therefore, in lieu of a license condition, the restriction is added as paragraph e. of the program. | ||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 17 Specification LCO Requirements and Condition Condition on Use 3.3.8.B LCO: Three channels of loss of voltage Function and three channels of degraded voltage Function EDG LOPS instrumentation per EDG shall be OPERABLE. | |||
Condition: One or more Functions with two or more channels per EDG inoperable. | |||
Licensee must justify that two or more channels per EDG inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
3.3.12.B | 3.3.12.B LCO: Two manual initiation switches per actuation channel for each of the following emergency feedwater initiation and control (EFIC) | ||
: a. Steam generator (SG) A Main Feedwater (MFW) | Functions shall be OPERABLE: | ||
: b. SG B MFW Isolation, | : a. Steam generator (SG) A Main Feedwater (MFW) | ||
: c. SG A Main Steam Line Isolation, | Isolation, | ||
: d. SG B Main Steam Line Isolation, and | : b. SG B MFW Isolation, | ||
: e. Emergency Feedwater Actuation. | : c. SG A Main Steam Line Isolation, | ||
: d. SG B Main Steam Line Isolation, and | |||
: e. Emergency Feedwater Actuation. | |||
Condition: One or more EFIC Function(s) with one or both manual initiation switches inoperable in both actuation channels. | |||
[capable of being powered by emergency power | Licensee must justify that one or both channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | ||
3.5.2.B | Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 18 Specification LCO Requirements and Condition Condition on Use 3.4.9.C LCO: The pressurizer shall be OPERABLE. | ||
Condition: Capacity of pressurizer heaters | |||
[capable of being powered by emergency power supply] less than limit. | |||
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.6.6 | 3.5.2.B LCO: Two ECCS trains shall be OPERABLE. | ||
[required] containment cooling train inoperable. | Condition: One or more [ECCS] trains inoperable for reasons other than one LPI subsystem inoperable. | ||
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 19 Specification LCO Requirements and Condition Condition on Use 3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism. | |||
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS. | |||
3.3.1.DD | 3.6.6 LCO: Containment Spray and Cooling Systems Condition A: One containment spray train inoperable Condition C: One [required] containment cooling train inoperable. | ||
Condition D: One containment spray train and one | |||
[required] containment cooling train inoperable. | |||
Condition E: Two [required] containment cooling trains inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 20 Specification LCO Requirements and Condition Condition on Use 3.3.1.F LCO: The RTS instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE. | |||
Condition: One Power Range Neutron Flux - High channel inoperable. | |||
Licensee must justify that the condition does not represent the inability to perform the safety function assumed in the FSAR given the loss of spacial distribution of the remaining Power Range detectors. The justification can include that the Actions require periodic monitoring of spacial power distribution and imposition of compensatory limits and reduced power. | |||
3.3.1.DD LCO: The RTS instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE. | |||
Condition: One RTB train inoperable. | |||
The licensee must include information regarding how the TSTF-411 conditions and limitations will be implemented (or similar conditions if TSTF-411 has not been adopted), including discussion of ATWS Mitigation System Actuation (AMSAC), | |||
and why those actions are sufficient, including a discussion of defense in depth. | and why those actions are sufficient, including a discussion of defense in depth. | ||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 21 Specification LCO Requirements and Condition Condition on Use 3.3.5.B LCO: [Three] channels per bus of the loss of voltage Function and [three] channels per bus of the degraded voltage Function shall be OPERABLE. | |||
Condition: One or more Functions with two or more channels per bus inoperable. | |||
Licensee must justify that two or more channels per bus inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
3.3.9.A | 3.3.9.A LCO: Boron Dilution Protection System (BDPS) | ||
MODES [2,] 3, 4, and 5.) | Condition: One train inoperable (applicable to MODES [2,] 3, 4, and 5.) | ||
3.4.9.B | BDPS is typically not modeled in the PRA. | ||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.4.9.B LCO: The pressurizer shall be OPERABLE Condition: One [required] group of pressurizer heaters inoperable. | |||
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.6.2.C | Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 22 Specification LCO Requirements and Condition Condition on Use 3.5.2.A LCO: Two ECCS trains shall be OPERABLE. | ||
3.6.6A | Condition: One or more [ECCS] trains inoperable. | ||
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable. Acceptable justification is TS Condition requiring 100% flow equivalent to a single ECCS train. | |||
3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism. | |||
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS. | |||
[required] containment cooling train inoperable | 3.6.6A LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit taken for iodine removal by the Containment Spray System) | ||
Condition A: One containment spray train inoperable. | |||
Condition C: One [required] containment cooling train inoperable. | |||
Condition D: Two [required] containment cooling trains inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 23 Specification LCO Requirements and Condition Condition on Use 3.6.6B LCO: Containment Spray and Cooling Systems (Atmospheric and Dual (Credit not taken for iodine removal by the Containment Spray System) | |||
Condition A: One containment spray train inoperable. | |||
Condition B: One [required] containment cooling train inoperable. | |||
Condition C: Two containment spray trains inoperable. | |||
Condition D: One containment spray train and one | |||
[required] containment cooling train inoperable. | |||
Condition E: Two [required] containment cooling trains inoperable. | Condition E: Two [required] containment cooling trains inoperable. | ||
3.6.6C.A | Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
3.6.6D.A | 3.6.6C.A LCO: Containment Spray System (Ice Condenser) | ||
Condition: One containment spray train inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.6.6D.A LCO: Quench Spray (QS) System (Subatmospheric) | |||
3.6.16.A | Condition: One QS train inoperable Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
3.7.4.B | Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 24 Specification LCO Requirements and Condition Condition on Use 3.6.6E LCO: Recirculation Spray (RS) System (Subatmospheric) | ||
Condition A: One RS subsystem inoperable. | |||
Condition B: Two RS subsystems inoperable in one train. | |||
Condition C: Two inside RS subsystems inoperable Condition D: Two outside RS subsystems inoperable. | |||
3.4.9.B | Condition E: Casing cooling tank inoperable. | ||
3.5.2.D | Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
3.6.16.A LCO: The ice condenser inlet doors, intermediate deck doors, and top deck [doors] shall be OPERABLE and closed. | |||
Condition: One or more ice condenser doors physically restrained from opening Licensee must justify that one or more inoperable doors is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
3.7.4.B LOC: [Three] Atmospheric Dump Valves (ADV) lines shall be OPERABLE. | |||
3.6.6A | Condition: Two or more required ADV lines inoperable Licensee must justify that two or more inoperable ADVs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | ||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 25 Specification LCO Requirements and Condition Condition on Use 3.3.6.C (analog) | |||
LCO: [Four] channels of Loss of Voltage Function and [four] channels of Degraded Voltage Function auto-initiation instrumentation per DG shall be OPERABLE. | |||
Condition: One or more Functions with more than two channels inoperable. | |||
Licensee must justify that more than two channels per bus inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
3.4.9.B LCO: The pressurizer shall be OPERABLE Condition: One [required] group of pressurizer heaters inoperable. | |||
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.5.2.D LCO: Two ECCS trains shall be OPERABLE. | |||
Condition: Less than 100% of the ECCS flow equivalent to a single OPERABLE train available. | |||
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable. Acceptable justification is TS Condition requiring 100% flow equivalent to a single ECCS train. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 26 Specification LCO Requirements and Condition Condition on Use 3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism. | |||
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS. | |||
3.6.6A LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit taken for iodine removal by the Containment Spray System) | |||
Condition A: One containment spray train inoperable. | |||
Condition C: One containment cooling train inoperable. | |||
Condition D: One containment spray and one containment cooling train inoperable. | |||
Condition E: Two containment cooling trains inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 27 Specification LCO Requirements and Condition Condition on Use 3.6.6B LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit not taken for iodine removal by the Containment Spray System) | |||
Condition A: One containment spray train inoperable. | |||
Condition B: One containment cooling train inoperable. | |||
Condition C: Two containment spray trains inoperable. | |||
Condition D: One containment spray train and one containment cooling train inoperable. | |||
Condition E: Two containment cooling trains inoperable. | Condition E: Two containment cooling trains inoperable. | ||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
3.3.2.2.B | Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 28 Specification LCO Requirements and Condition Condition on Use 3.3.1.2.A LCO: The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE. | ||
Condition: One or more required SRMs inoperable in MODE 2 with intermediate range monitors (IRMs) on Range 2 or below Licensee must justify that one or more inoperable SRMs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.3.2.2.B LCO: [Three] channels of feedwater and main turbine high water level trip instrumentation shall be OPERABLE. | |||
Condition: Two or more feedwater and main turbine high water level trip channels inoperable. | |||
Licensee must justify that two or more inoperable trip channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 29 Specification LCO Requirements and Condition Condition on Use 3.3.4.1.A LCO: End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Condition: One or more required channels inoperable. | |||
Licensee must justify that one or more inoperable EOC-RPT channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
Licensee must justify the ability to calculate a RICT given that EOC-RPT channels are not typically modeled in the PRA. | Licensee must justify the ability to calculate a RICT given that EOC-RPT channels are not typically modeled in the PRA. | ||
3.3.6.3.A | 3.3.6.3.A LCO: Low-Low Set (LLS) Instrumentation Condition: One LLS valve inoperable due to inoperable channel(s). | ||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 30 Specification LCO Requirements and Condition Condition on Use 3.3.8.1.A LCO: The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE. | |||
Condition: One or more channels inoperable. | |||
3.6.1.2.C | Licensee must justify that one or more channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | ||
3.6.1.2.C LCO: The primary containment air lock shall be OPERABLE. Condition: Primary containment air lock inoperable for reasons other than Condition A or B. | |||
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.1.2 requires the condition to be assessed in accordance with TS 3.6.1.1, Primary Containment, and any loss of function would require an immediate plant shutdown under that TS. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 31 Specification LCO Requirements and Condition Condition on Use 3.6.1.3.E LCO: Each PCIV, except reactor building-to-suppression chamber vacuum breakers, shall be OPERABLE. | |||
Condition: One or more penetration flow paths with one or more containment purge valves not within purge valve leakage limits. | |||
Licensee must justify that PCIV leakage in excess of the limits is not a condition in which all required trains or subsystems of a TS required system are inoperable. | |||
Licensee must justify the ability to calculate a RICT for this inoperability. | Licensee must justify the ability to calculate a RICT for this inoperability. | ||
3.6.1.7.D | 3.6.1.7.D LCO: Each reactor building-to-suppression chamber vacuum breaker shall be OPERABLE. | ||
3.7.7.A | Condition: Two or more lines with one or more reactor building -to-suppression chamber vacuum breakers inoperable for opening. | ||
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR | Licensee must justify that one or more inoperable vacuum breakers on two or more lines is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | ||
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER | 3.7.7.A LCO: The Main Turbine Bypass System shall be OPERABLE. | ||
OR The following limits are made applicable: | |||
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," limits for an inoperable Main Turbine Bypass System, as specified in the [COLR]; and ] | |||
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the | |||
[COLR]. ] | [COLR]. ] | ||
Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable]. | Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable]. | ||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 32 Specification LCO Requirements and Condition Condition on Use 3.3.1.2.A LCO: The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE. | |||
Condition: One or more required SRMs inoperable in MODE 2 with intermediate range monitors (IRMs) on Range 2 or below. | |||
Licensee must justify that one or more inoperable SRMs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
Licensee must justify the ability to calculate a RICT given that SRMs are not typically modeled in the PRA. | Licensee must justify the ability to calculate a RICT given that SRMs are not typically modeled in the PRA. | ||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 33 Specification LCO Requirements and Condition Condition on Use 3.3.4.1.A LCO: End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Condition: One or more required channels inoperable. | |||
Licensee must justify that one or more inoperable channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.3.6.5.A LCO: Relief and Low-Low Set (LLS) | |||
Instrumentation Condition: One trip system inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 34 Specification LCO Requirements and Condition Condition on Use 3.3.8.1.A LCO: The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE. | |||
Condition: One or more channels inoperable. | |||
Licensee must justify that one or more channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of. | |||
3.6.1.2.C LCO: The primary containment air lock shall be OPERABLE. Condition: Primary containment air lock inoperable for reasons other than Condition A or B. | |||
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.1.2 requires the condition to be assessed in accordance with TS 3.6.1.1, Primary Containment, and any loss of function would require an immediate plant shutdown under that TS. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 35 Specification LCO Requirements and Condition Condition on Use 3.6.1.3.E LCO: Each PCIV shall be OPERABLE. | |||
Condition: One or more penetration flow paths with one or more containment purge valves not within purge valve leakage limits. | |||
Licensee must justify that PCIV leakage in excess of the limits is not a condition in which all required trains or subsystems of a TS required system are inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
3.6.1.7.A LCO: Residual Heat Removal (RHR) Containment Spray System Condition: One RHR containment spray subsystem inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
3. | 3.7.4.A LCO: Two [control room AC] subsystems shall be OPERABLE. | ||
Condition: One [control room AC] subsystem inoperable. | |||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | ||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 36 Specification LCO Requirements and Condition Condition on Use 3.7.6.A LCO: The Main Turbine Bypass System shall be OPERABLE. | |||
OR The following limits are made applicable: | |||
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," limits for an inoperable Main Turbine Bypass System, as specified in the [COLR] and ] | |||
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the | |||
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR | |||
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER | |||
[COLR]. ] | [COLR]. ] | ||
Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable]. | Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable]. | ||
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative. | |||
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Page 37 Note 1 Some Conditions are applicable when an unspecified number of subsystems or instrument channels are inoperable, typically written as "One or more" or "Two or more". These conditions currently apply when all subsystems or channels required to be operable to perform a function are inoperable, and application of a RICT in this situation is prohibited in the near-term TSTF-505 submittals. | |||
To address this, it is recommended that the following modification to TSTF-505 be made to the Required Actions indicated in the Attachment 2 tables for Completion Times potentially applicable when all required subsystems or channels are inoperable. | To address this, it is recommended that the following modification to TSTF-505 be made to the Required Actions indicated in the Attachment 2 tables for Completion Times potentially applicable when all required subsystems or channels are inoperable. | ||
The typical Completion Time is modified by TSTF-505 to state: | The typical Completion Time is modified by TSTF-505 to state: | ||
| Line 374: | Line 437: | ||
OR In accordance with the Risk Informed Completion Time Program It is recommended that the second Completion Time be modified with a Note, as shown below: | OR In accordance with the Risk Informed Completion Time Program It is recommended that the second Completion Time be modified with a Note, as shown below: | ||
72 hours (i.e., the existing Completion Time) | 72 hours (i.e., the existing Completion Time) | ||
OR | OR | ||
-------------NOTE------------- | |||
Not applicable when | Not applicable when | ||
[all/four/both] required channels are inoperable. | [all/four/both] required channels are inoperable. | ||
In accordance with the Risk Informed Completion Time Program The bracketed number of channels will depend on the specification. This approach retains the existing requirements and limits the use of a RICT to conditions in which the function can still be performed. | In accordance with the Risk Informed Completion Time Program The bracketed number of channels will depend on the specification. This approach retains the existing requirements and limits the use of a RICT to conditions in which the function can still be performed. | ||
The licensee must justify that the required function can still be performed absent an additional failure when a RICT is applied. | The licensee must justify that the required function can still be performed absent an additional failure when a RICT is applied. | ||
Alternatively, the licensee may modify the Condition to only apply when at least one subsystem or channel is operable, but this approach may require creating a new Condition or modifying an existing condition to retain the current requirements, or accepting a more restrictive requirement (such a LCO 3.0.3 entry). | Alternatively, the licensee may modify the Condition to only apply when at least one subsystem or channel is operable, but this approach may require creating a new Condition or modifying an existing condition to retain the current requirements, or accepting a more restrictive requirement (such a LCO 3.0.3 entry). | ||
TSTF-505 Model Application | |||
PROPOSED MODEL APPLICATION FOR PLANT-SPECIFIC ADOPTION OF TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B" U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 | Page PROPOSED MODEL APPLICATION FOR PLANT-SPECIFIC ADOPTION OF TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B" U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 | ||
==SUBJECT:== | ==SUBJECT:== | ||
[PLANT] | [PLANT] | ||
DOCKET NO. 50-[XXX] | DOCKET NO. 50-[XXX] | ||
LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT RISK INFORMED COMPLETION TIMES TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B." | LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT RISK INFORMED COMPLETION TIMES TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B." | ||
==REFERENCE:== | ==REFERENCE:== | ||
| Line 400: | Line 461: | ||
* Attachment 3 provides revised (clean) TS pages. | * Attachment 3 provides revised (clean) TS pages. | ||
* Attachment 4 provides existing TS Bases pages marked up to show the proposed changes. | * Attachment 4 provides existing TS Bases pages marked up to show the proposed changes. | ||
[LICENSEE] requests approval of the proposed license amendment by [DATE], with the amendment being implemented [BY DATE OR WITHIN X DAYS]. | [LICENSEE] requests approval of the proposed license amendment by [DATE], with the amendment being implemented [BY DATE OR WITHIN X DAYS]. | ||
Page In accordance with 10 CFR 50.91(a)(1), "Notice for Public Comment," the analysis about the issue of no significant hazards consideration using the standards in 10 CFR 50.92 is being provided to the Commission. | Page In accordance with 10 CFR 50.91(a)(1), "Notice for Public Comment," the analysis about the issue of no significant hazards consideration using the standards in 10 CFR 50.92 is being provided to the Commission. | ||
In accordance with 10 CFR 50.91(b)(1), "Notice for Public Comment; State Consultation," a copy of this application, with attachments, is being provided to the designated [STATE] Official. | In accordance with 10 CFR 50.91(b)(1), "Notice for Public Comment; State Consultation," a copy of this application, with attachments, is being provided to the designated [STATE] Official. | ||
| Line 411: | Line 473: | ||
: 2. Proposed Technical Specification Changes (Mark-Up) | : 2. Proposed Technical Specification Changes (Mark-Up) | ||
: 3. Revised Technical Specification Pages | : 3. Revised Technical Specification Pages | ||
: 4. Proposed Technical Specification Bases Changes (Mark-Up) | : 4. Proposed Technical Specification Bases Changes (Mark-Up) | ||
==Enclosures:== | ==Enclosures:== | ||
| Line 425: | Line 487: | ||
: 10. Program Implementation | : 10. Program Implementation | ||
: 11. Monitoring Program | : 11. Monitoring Program | ||
: 12. Risk Management Action Examples cc: | : 12. Risk Management Action Examples cc: | ||
NRC Project Manager NRC Regional Office NRC Resident Inspector State Contact | |||
ATTACHMENT 1 DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGE License Amendment Request for Adoption of TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b" | |||
==1.0 DESCRIPTION== | |||
The proposed amendment would modify the Technical Specification (TS) requirements related to Completion Times (CTs) for Required Actions to provide the option to calculate a longer, risk-informed CT (RICT). A new program, the Risk-Informed Completion Time Program, is added to TS Section 5 Administrative Controls. | The proposed amendment would modify the Technical Specification (TS) requirements related to Completion Times (CTs) for Required Actions to provide the option to calculate a longer, risk-informed CT (RICT). A new program, the Risk-Informed Completion Time Program, is added to TS Section 5 Administrative Controls. | ||
The methodology for using the RICT Program is described in NEI 06-09-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) | The methodology for using the RICT Program is described in NEI 06-09-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS) | ||
Guidelines," Revision 0, which was approved by the NRC on May 17, 2007. Adherence to NEI 06-09-A is required by the RICT Program. | Guidelines," Revision 0, which was approved by the NRC on May 17, 2007. Adherence to NEI 06-09-A is required by the RICT Program. | ||
The proposed amendment is consistent with TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b," as modified by the TSTF's [DATE] letter to the NRC, "Response to NRC Questions on TSTF-505, 'Provide Risk-Informed Extended Completion Times'." However, only those Required Actions described in Enclosure 1 are proposed to be changed, [which does not include all of the modified Required Actions in TSTF-505 and which includes some plant-specific Required Actions not included in TSTF-505]. | The proposed amendment is consistent with TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b," as modified by the TSTF's [DATE] letter to the NRC, "Response to NRC Questions on TSTF-505, 'Provide Risk-Informed Extended Completion Times'." However, only those Required Actions described in Enclosure 1 are proposed to be changed, [which does not include all of the modified Required Actions in TSTF-505 and which includes some plant-specific Required Actions not included in TSTF-505]. | ||
2.0 | |||
==2.0 ASSESSMENT== | |||
2.1 Applicability of Published Safety Evaluation | |||
[LICENSEE] has reviewed the model safety evaluation dated [DATE] as part of the Federal Register Notice for Comment. This review included a review of the NRC staffs evaluation, as well as the supporting information provided to support TSTF-505 and the safety evaluation for NEI 06-09, as well as the TSTF's [DATE] letter on TSTF-505. [As described in the subsequent paragraphs,][LICENSEE] has concluded that the technical basis presented in the TSTF-505 proposal, the associated model safety evaluation prepared by the NRC staff, as modified by the TSTF letter on TSTF-505 are applicable to [PLANT, UNIT NOS.] and support incorporation of this amendment in the [PLANT] TS. ] | [LICENSEE] has reviewed the model safety evaluation dated [DATE] as part of the Federal Register Notice for Comment. This review included a review of the NRC staffs evaluation, as well as the supporting information provided to support TSTF-505 and the safety evaluation for NEI 06-09, as well as the TSTF's [DATE] letter on TSTF-505. [As described in the subsequent paragraphs,][LICENSEE] has concluded that the technical basis presented in the TSTF-505 proposal, the associated model safety evaluation prepared by the NRC staff, as modified by the TSTF letter on TSTF-505 are applicable to [PLANT, UNIT NOS.] and support incorporation of this amendment in the [PLANT] TS. ] | ||
2.2 | 2.2 Verifications and Regulatory Commitments In accordance with Section 4.0, Limitations and Conditions, of the safety evaluation for NEI 06-09-A, the following is provided: | ||
Page | |||
: 1. Enclosure 1 identifies each of the TS Required Actions to which the RICT Program will apply, with a comparison of the TS functions to the functions modeled in the probabilistic risk assessment (PRA) of the structures, systems and components (SSCs) subject to those actions. | : 1. Enclosure 1 identifies each of the TS Required Actions to which the RICT Program will apply, with a comparison of the TS functions to the functions modeled in the probabilistic risk assessment (PRA) of the structures, systems and components (SSCs) subject to those actions. | ||
: 2. Enclosure 2 provides a discussion of the results of peer reviews and self-assessments conducted for the plant-specific PRA models which support the RICT Program, as required by Regulatory Guide (RG) 1.200 Section 4.2. | : 2. Enclosure 2 provides a discussion of the results of peer reviews and self-assessments conducted for the plant-specific PRA models which support the RICT Program, as required by Regulatory Guide (RG) 1.200 Section 4.2. | ||
| Line 447: | Line 515: | ||
: 8. Enclosure 8 provides a description of how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP | : 8. Enclosure 8 provides a description of how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP | ||
: 9. Enclosure 9 provides a discussion of how the key assumptions and sources of uncertainty in the PRA models were identified, and how their impact on the RICT Program was assessed and dispositioned. | : 9. Enclosure 9 provides a discussion of how the key assumptions and sources of uncertainty in the PRA models were identified, and how their impact on the RICT Program was assessed and dispositioned. | ||
: 10. Enclosure 10 provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation, including risk management action (RMA) implementation. | : 10. Enclosure 10 provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation, including risk management action (RMA) implementation. | ||
Page | Page | ||
: 11. Enclosure 11 provides a description of the implementation and monitoring program as described in NEI 06-09, Section 2.3.2, Step 7. | : 11. Enclosure 11 provides a description of the implementation and monitoring program as described in NEI 06-09, Section 2.3.2, Step 7. | ||
: 12. Enclosure 12 provides a description of the process to identify and provide RMAs. | : 12. Enclosure 12 provides a description of the process to identify and provide RMAs. | ||
2.3 | 2.3 Optional Changes and Variations | ||
[LICENSEE is not proposing any changes, variations, or deviations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE], except as described in the TSTF letter dated [DATE].] [LICENSEE is proposing the following changes or variations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE]. | [LICENSEE is not proposing any changes, variations, or deviations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE], except as described in the TSTF letter dated [DATE].] [LICENSEE is proposing the following changes or variations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE]. | ||
These options were recognized as acceptable changes or variations in TSTF-505 and the NRC staff's model safety evaluation.] | These options were recognized as acceptable changes or variations in TSTF-505 and the NRC staff's model safety evaluation.] | ||
{NOTE: If a change or variation is not identified in TSTF-505, the NRC staff's model safety evaluation, or NEI 06-09 then provide the description and justification.} | {NOTE: If a change or variation is not identified in TSTF-505, the NRC staff's model safety evaluation, or NEI 06-09 then provide the description and justification.} | ||
[The [PLANT] TS utilize different [numbering][and][titles] than the Standard Technical Specifications on which TSTF-505 was based. Specifically, [describe differences between the plant-specific TS numbering and/or titles (including Required Actions and programs) and the TSTF-505 numbering and titles.] These differences are administrative and do not affect the applicability of TSTF-505 to the [PLANT] TS.] | [The [PLANT] TS utilize different [numbering][and][titles] than the Standard Technical Specifications on which TSTF-505 was based. Specifically, [describe differences between the plant-specific TS numbering and/or titles (including Required Actions and programs) and the TSTF-505 numbering and titles.] These differences are administrative and do not affect the applicability of TSTF-505 to the [PLANT] TS.] | ||
3.0 | 3.0 REGULATORY SAFETY ANALYSIS 3.1 No Significant Hazards Consideration Determination | ||
[LICENSEE] has evaluated the proposed change to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed change does not involve a significant hazards consideration. | [LICENSEE] has evaluated the proposed change to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed change does not involve a significant hazards consideration. | ||
[PLANT, UNIT NOS.] requests adoption of an approved change to the standard technical specifications (STS) and plant-specific technical specifications (TS), to modify the TS requirements related to Completion Times for Required Actions to provide the option to calculate a longer, risk-informed Completion Time. The allowance is described in a new program in Chapter 5, "Administrative Controls," entitled the "Risk-Informed Completion Time Program." | [PLANT, UNIT NOS.] requests adoption of an approved change to the standard technical specifications (STS) and plant-specific technical specifications (TS), to modify the TS requirements related to Completion Times for Required Actions to provide the option to calculate a longer, risk-informed Completion Time. The allowance is described in a new program in Chapter 5, "Administrative Controls," entitled the "Risk-Informed Completion Time Program." | ||
As required by 10 CFR 50.91(a), an analysis of the issue of no significant hazards consideration is presented below: | As required by 10 CFR 50.91(a), an analysis of the issue of no significant hazards consideration is presented below: | ||
: 1. | : 1. | ||
Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated? | |||
Page Response: No. | Page Response: No. | ||
The proposed change permits the extension of Completion Times provided the associated risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change does not involve a significant increase in the probability of an accident previously evaluated because the change involves no change to the plant or its modes of operation. The proposed change does not increase the consequences of an accident because the design-basis mitigation function of the affected systems is not changed and the consequences of an accident during the extended Completion Time are no different from those during the existing Completion Time. | The proposed change permits the extension of Completion Times provided the associated risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change does not involve a significant increase in the probability of an accident previously evaluated because the change involves no change to the plant or its modes of operation. The proposed change does not increase the consequences of an accident because the design-basis mitigation function of the affected systems is not changed and the consequences of an accident during the extended Completion Time are no different from those during the existing Completion Time. | ||
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. | Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. | ||
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? | : 2. | ||
Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated? | |||
Response: No. | Response: No. | ||
The proposed change does not change the design, configuration, or method of operation of the plant. The proposed change does not involve a physical alteration of the plant (no new or different kind of equipment will be installed). | The proposed change does not change the design, configuration, or method of operation of the plant. The proposed change does not involve a physical alteration of the plant (no new or different kind of equipment will be installed). | ||
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated. | Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated. | ||
: 3. Does the proposed change involve a significant reduction in a margin of safety? | : 3. | ||
Does the proposed change involve a significant reduction in a margin of safety? | |||
Response: No. | Response: No. | ||
The proposed change permit the extension of Completion Times provided risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change implements a risk-informed configuration management program to assure that adequate margins of safety are maintained. Application of these new specifications and the configuration management program considers cumulative effects of multiple systems or components being out of service and does so more effectively than the current TS. | The proposed change permit the extension of Completion Times provided risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change implements a risk-informed configuration management program to assure that adequate margins of safety are maintained. Application of these new specifications and the configuration management program considers cumulative effects of multiple systems or components being out of service and does so more effectively than the current TS. | ||
Therefore, the proposed change does not involve a significant reduction in a margin of safety | Therefore, the proposed change does not involve a significant reduction in a margin of safety. | ||
Page Based on the above, [LICENSEE] concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified. | |||
==4.0 ENVIRONMENTAL CONSIDERATION== | |||
[LICENSEE] has reviewed the environmental evaluation included in the model safety evaluation published on [DATE] ([ ] FR [ ]) as part of the Notice of Availability. [LICENSEE] has concluded that the NRC staff findings presented in that evaluation are applicable to [PLANT, NO.]. | [LICENSEE] has reviewed the environmental evaluation included in the model safety evaluation published on [DATE] ([ ] FR [ ]) as part of the Notice of Availability. [LICENSEE] has concluded that the NRC staff findings presented in that evaluation are applicable to [PLANT, NO.]. | ||
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). | The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). | ||
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change. | Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change. | ||
ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP) | |||
{provided by the licensee} | {provided by the licensee} | ||
| Line 486: | Line 560: | ||
ATTACHMENT 4 PROPOSED CHANGES TO TECHNICAL SPECIFICATION BASES CHANGES (MARK-UP) PAGES | ATTACHMENT 4 PROPOSED CHANGES TO TECHNICAL SPECIFICATION BASES CHANGES (MARK-UP) PAGES | ||
{provided by the licensee} | {provided by the licensee} | ||
ENCLOSURE 1 LIST OF REVISED REQUIRED ACTIONS TO CORRESPONDING PRA FUNCTIONS | ENCLOSURE 1 LIST OF REVISED REQUIRED ACTIONS TO CORRESPONDING PRA FUNCTIONS | ||
| Line 492: | Line 566: | ||
TS conditions with insufficient TS operable equipment to meet the specified safety function of the system, are not to be included in the application. | TS conditions with insufficient TS operable equipment to meet the specified safety function of the system, are not to be included in the application. | ||
List each TS Required Action to which the RICT Program may be applied and, for each Required Action, describe the following: | List each TS Required Action to which the RICT Program may be applied and, for each Required Action, describe the following: | ||
The TS Required Action; The corresponding SSC; Each design basis function of the SSC; How each design basis function is modeled in the PRA. If one of the design basis functions of an SSC or the SSC is not modeled in the PRA, describe any proposed surrogates and why the proposed surrogate adequately captures the configuration risk; and The success criteria used in the PRA model compared to the licensing basis criteria. The success criteria should include both train-level and component/parameter level. | |||
Note that the above description should be at the level of the TS condition/TS Required Action (not at the LCO level only). If the TS condition/ TS Required action covers multiple SSCs or multiple design basis functions, such as in the case ESFAS Instrumentation or Containment Sprays, describe each one individually. | Note that the above description should be at the level of the TS condition/TS Required Action (not at the LCO level only). If the TS condition/ TS Required action covers multiple SSCs or multiple design basis functions, such as in the case ESFAS Instrumentation or Containment Sprays, describe each one individually. | ||
The enclosure should also include clear definitions of any used terms, such as train, division, loop, "subsystem," etc. | The enclosure should also include clear definitions of any used terms, such as train, division, loop, "subsystem," etc. | ||
The enclosure should provide a detailed system description of TS 3.8, "Electrical Power Systems," Required Actions if the loading scheme is not uniform (e.g., Train A and B have similar loading, except Train B supplies power to additional SSCs.) Also, provide a description in Enclosure 12 of representative RMAs for non-uniform trains to demonstrate that the systems safety function is maintained with either train or subsystem operable.} | The enclosure should provide a detailed system description of TS 3.8, "Electrical Power Systems," Required Actions if the loading scheme is not uniform (e.g., Train A and B have similar loading, except Train B supplies power to additional SSCs.) Also, provide a description in Enclosure 12 of representative RMAs for non-uniform trains to demonstrate that the systems safety function is maintained with either train or subsystem operable.} | ||
ENCLOSURE 2 INFORMATION SUPPORTING CONSISTENCY WITH REGULATORY GUIDE 1.200, REVISION 2 | ENCLOSURE 2 INFORMATION SUPPORTING CONSISTENCY WITH REGULATORY GUIDE 1.200, REVISION 2 | ||
| Line 505: | Line 575: | ||
Per NEI 06-09 Rev. 0, capability category II of the standards is applicable; therefore, the licensee identifies those parts of the PRAs that conform to capability categories lower than II, and provides a disposition for the RICT Program. Consistent with RG 1.200 Section 4.2, the licensee identifies and provides a discussion of the resolution of any findings and observations from the peer reviews or self-assessments. | Per NEI 06-09 Rev. 0, capability category II of the standards is applicable; therefore, the licensee identifies those parts of the PRAs that conform to capability categories lower than II, and provides a disposition for the RICT Program. Consistent with RG 1.200 Section 4.2, the licensee identifies and provides a discussion of the resolution of any findings and observations from the peer reviews or self-assessments. | ||
The licensee assessment must also address the clarifications and qualifications found in RG 1.200, either by a separate discussion provided by the licensee, or by confirmation that the peer reviews or self-assessments included consideration of the clarifications and qualifications of the current applicable RG 1.200 revision. | The licensee assessment must also address the clarifications and qualifications found in RG 1.200, either by a separate discussion provided by the licensee, or by confirmation that the peer reviews or self-assessments included consideration of the clarifications and qualifications of the current applicable RG 1.200 revision. | ||
Licensees are strongly encouraged to apply the guidance in Appendix X, "Close out of Facts and Observations," of NEI 05-04, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard, Rev 3, November 2009," NEI 07-12, "Fire Probabilistic Risk Assessment Peer Review Process Guidelines, Rev 1, June 2010," and NEI 12-13, "External Hazards PRA Peer Review Process Guidelines, Rev 0, August 2012," to close PRA peer review findings, as this will make more efficient use of the NRC and industry resources needed to develop and review of the application. } | Licensees are strongly encouraged to apply the guidance in Appendix X, "Close out of Facts and Observations," of NEI 05-04, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard, Rev 3, November 2009," NEI 07-12, "Fire Probabilistic Risk Assessment Peer Review Process Guidelines, Rev 1, June 2010," and NEI 12-13, "External Hazards PRA Peer Review Process Guidelines, Rev 0, August 2012," to close PRA peer review findings, as this will make more efficient use of the NRC and industry resources needed to develop and review of the application. } | ||
ENCLOSURE 3 INFORMATION SUPPORTING TECHNICAL ADEQUACY OF PRA MODELS WITHOUT PRA STANDARDS ENDORSED BY REGULATORY GUIDE 1.200, REVISION 2 | ENCLOSURE 3 INFORMATION SUPPORTING TECHNICAL ADEQUACY OF PRA MODELS WITHOUT PRA STANDARDS ENDORSED BY REGULATORY GUIDE 1.200, REVISION 2 | ||
| Line 511: | Line 581: | ||
RG 1.200 Rev. 2 endorses standards for internal and external events including internal floods and fires, seismic events, and other external hazards for full power conditions. | RG 1.200 Rev. 2 endorses standards for internal and external events including internal floods and fires, seismic events, and other external hazards for full power conditions. | ||
This scope includes the relevant hazard groups applicable to a RICT Program unless the program is to apply to lower modes of operation. In this case, shutdown and transition risk PRA models may apply but are not be covered by an endorsed standard. | This scope includes the relevant hazard groups applicable to a RICT Program unless the program is to apply to lower modes of operation. In this case, shutdown and transition risk PRA models may apply but are not be covered by an endorsed standard. | ||
If applicable, the licensee should provide a detailed description of these PRA models and the basis for its determination of their technical adequacy to support the RICT Program.} | If applicable, the licensee should provide a detailed description of these PRA models and the basis for its determination of their technical adequacy to support the RICT Program.} | ||
ENCLOSURE 4 INFORMATION SUPPORTING JUSTIFICATION OF EXCLUDING SOURCES OF RISK NOT ADDRESSED BY THE PRA MODELS | ENCLOSURE 4 INFORMATION SUPPORTING JUSTIFICATION OF EXCLUDING SOURCES OF RISK NOT ADDRESSED BY THE PRA MODELS | ||
| Line 519: | Line 589: | ||
For external hazards that are not screened out from inclusion in RICT calculations, the licensee may propose a bounding approach to address the hazard. If the bounding approach involves assuming a uniform increase in baseline risk to address the hazard, the licensee will need to address potential RICT-specific impacts by doing one of the following: | For external hazards that are not screened out from inclusion in RICT calculations, the licensee may propose a bounding approach to address the hazard. If the bounding approach involves assuming a uniform increase in baseline risk to address the hazard, the licensee will need to address potential RICT-specific impacts by doing one of the following: | ||
* Demonstrate in the LAR that this approach is bounding for all TS actions included in the LAR, or | * Demonstrate in the LAR that this approach is bounding for all TS actions included in the LAR, or | ||
* Establish a procedure to evaluate the validity of the bounding approach when calculating an RICT that is not demonstrated to be bounded in the LAR, or | * Establish a procedure to evaluate the validity of the bounding approach when calculating an RICT that is not demonstrated to be bounded in the LAR, or For RICTs not demonstrated to be bounded in the LAR, establish a procedure to qualitatively evaluate the impact of the specific external hazard for each RICT when calculated and apply risk management actions as appropriate. } | ||
ENCLOSURE 5 BASELINE CDF AND LERF | ENCLOSURE 5 BASELINE CDF AND LERF | ||
{NOTE: This enclosure provides the plant-specific total CDF and total LERF to confirm that these are less than 10-4/year and 10-5/year, respectively. This assures that the potential risk increases allowed under the RICT Program are consistent with RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," Revision 2. | {NOTE: This enclosure provides the plant-specific total CDF and total LERF to confirm that these are less than 10-4/year and 10-5/year, respectively. This assures that the potential risk increases allowed under the RICT Program are consistent with RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," Revision 2. | ||
The licensee should provide the totals and the contributions from each hazard group (internal events, fires, floods, seismic, other external). } | The licensee should provide the totals and the contributions from each hazard group (internal events, fires, floods, seismic, other external). } | ||
ENCLOSURE 6 JUSTIFICATION OF APPLICATION OF AT-POWER PRA MODELS TO SHUTDOWN MODES | ENCLOSURE 6 JUSTIFICATION OF APPLICATION OF AT-POWER PRA MODELS TO SHUTDOWN MODES | ||
| Line 530: | Line 599: | ||
The at-power PRA models may potentially be applied to lower modes of operation (hot standby for PWRs, and hot shutdown for PWRs and BWRs) for some Required Actions. | The at-power PRA models may potentially be applied to lower modes of operation (hot standby for PWRs, and hot shutdown for PWRs and BWRs) for some Required Actions. | ||
If the licensee is not proposing to use the RICT Program in these modes, then this information is not required and this Enclosure should be marked "Not applicable." | If the licensee is not proposing to use the RICT Program in these modes, then this information is not required and this Enclosure should be marked "Not applicable." | ||
Otherwise, the licensee provides a detailed justification for those Required Actions proposed to apply the RICT Program in lower modes of operation using the at-power PRA models.} | Otherwise, the licensee provides a detailed justification for those Required Actions proposed to apply the RICT Program in lower modes of operation using the at-power PRA models.} | ||
ENCLOSURE 7 PRA MODEL UPDATE PROCESS | ENCLOSURE 7 PRA MODEL UPDATE PROCESS | ||
{NOTE: This enclosure describes how the PRA models used in the calculation of completion times is maintained consistent with the as-built, as-operated plant. | {NOTE: This enclosure describes how the PRA models used in the calculation of completion times is maintained consistent with the as-built, as-operated plant. | ||
The licensee provides a discussion of its programs and procedures to assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant. This should include a discussion of the timing of significant PRA model changes as described in NEI 06-09, Section 2.3.4, Step 7.} | The licensee provides a discussion of its programs and procedures to assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant. This should include a discussion of the timing of significant PRA model changes as described in NEI 06-09, Section 2.3.4, Step 7.} | ||
ENCLOSURE 8 ATTRIBUTES OF THE CRMP MODEL | ENCLOSURE 8 ATTRIBUTES OF THE CRMP MODEL | ||
| Line 544: | Line 613: | ||
* The licensee describes how consistency of calculated results from the baseline PRA model and the CRMP are verified to assure the CRMP PRA models are consistent with the baseline model and updated when the baseline PRA model is updated. | * The licensee describes how consistency of calculated results from the baseline PRA model and the CRMP are verified to assure the CRMP PRA models are consistent with the baseline model and updated when the baseline PRA model is updated. | ||
* The licensee describes the quality requirements applied to the CRMP PRA models. | * The licensee describes the quality requirements applied to the CRMP PRA models. | ||
* The licensee describes the training and qualification programs applicable to personnel responsible for development and use of the CRMP.} | * The licensee describes the training and qualification programs applicable to personnel responsible for development and use of the CRMP.} | ||
ENCLOSURE 9 KEY ASSUMPTIONS AND SOURCES OF UNCERTAINTY | ENCLOSURE 9 KEY ASSUMPTIONS AND SOURCES OF UNCERTAINTY | ||
{NOTE: This enclosure describes the key assumptions and sources of uncertainty in the PRA models, and how their impact on the RICT Program was assessed and dispositioned. Sensitivity analyses for various plant configuration cases under different assumptions should be provided to justify conclusions.} | {NOTE: This enclosure describes the key assumptions and sources of uncertainty in the PRA models, and how their impact on the RICT Program was assessed and dispositioned. Sensitivity analyses for various plant configuration cases under different assumptions should be provided to justify conclusions.} | ||
ENCLOSURE 10 PROGRAM IMPLEMENTATION | ENCLOSURE 10 PROGRAM IMPLEMENTATION | ||
{NOTE: This enclosure provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation including training of plant personnel, and specifically discusses the decision process for risk management action (RMA) implementation during extended CTs.} | {NOTE: This enclosure provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation including training of plant personnel, and specifically discusses the decision process for risk management action (RMA) implementation during extended CTs.} | ||
ENCLOSURE 11 MONITORING PROGRAM | ENCLOSURE 11 MONITORING PROGRAM | ||
{NOTE: This enclosure describes the monitoring program for cumulative risk impacts as described in NEI 06-09, Revision 0, Section 2.3.2, Step 7. This should include a description of how the calculations are made and what actions and thresholds are applied when corrective measures are necessary due to excessive risk increases.} | {NOTE: This enclosure describes the monitoring program for cumulative risk impacts as described in NEI 06-09, Revision 0, Section 2.3.2, Step 7. This should include a description of how the calculations are made and what actions and thresholds are applied when corrective measures are necessary due to excessive risk increases.} | ||
ENCLOSURE 12 RISK MANAGEMENT ACTION EXAMPLES | ENCLOSURE 12 RISK MANAGEMENT ACTION EXAMPLES | ||
Latest revision as of 10:54, 8 January 2025
"Draft Meeting" is not in the list (Request, Draft Request, Supplement, Acceptance Review, Meeting, Withholding Request, Withholding Request Acceptance, RAI, Draft RAI, Draft Response to RAI, ...) of allowed values for the "Project stage" property.
| ML17258A127 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 09/12/2017 |
| From: | Technical Specifications Task Force |
| To: | Office of Nuclear Reactor Regulation |
| Honcharik M, 301-415-1774, DSS/STSB | |
| Shared Package | |
| ML17258A124 | List: |
| References | |
| Download: ML17258A127 (62) | |
Text
11921 Rockville Pike, Suite 100, Rockville, MD 20852 Phone: 301-984-4400, Fax: 301-984-7600 Administration by EXCEL Services Corporation TECHNICAL SPECIFICATIONS TASK FORCE A JOINT OWNERS GROUP ACTIVITY TSTF DATE DRAFT TSTF-17-01 REVISION 3 PROJ0753 Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Response to NRC Questions on TSTF-505-A, "Provide Risk-Informed Extended Completion Times"
Reference:
Letter from T. McGinty and A. Boland (NRC) to Technical Specifications Task Force (TSTF), "Issues with Technical Specifications Task Force Traveler TSTF-505, Revision 1, 'Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b'," dated November 15, 2016 In the referenced letter, the NRC raised concerns with approved TSTF traveler, TSTF-505-A, Revision 1, "Provide Risk-Informed Extended Completion Times." The NRC published in the Federal Register a notice of availability for the Model Safety Evaluation (SE) for plant-specific adoption of TSTF traveler TSTF-505, Revision 1, on March 15, 2012. Currently, several licensees have License Amendment Requests (LARs) under NRC review to adopt risk-informed Completion Times.
On December 13, 2016, the TSTF and the Nuclear Energy Institute (NEI) met with the NRC to discuss the NRC's concerns. Most of the NRC concerns were related to proposed Technical Specifications (TS) Actions related to all trains of a TS required system being inoperable. The industry proposed the following short-term and long-term actions to resolve the NRC concerns:
- 1. The industry will pursue development of a companion traveler for TSTF-505-A that addresses the NRC issues with Actions related to inoperability of all trains of a TS required system. Following approval, plants that have adopted TSTF-505-A without these Actions could submit a LAR to adopt the companion traveler. Following NRC approval of the companion traveler, plants that have not adopted TSTF-505-A can adopt TSTF-505-A and the companion traveler in a single LAR.
- 2. TSTF-505-A allows licensees to choose which Action changes are included in their LAR.
The TSTF will recommend to the industry that until the companion traveler is approved by the NRC, licensees submitting LARs to adopt TSTF-505 follow the guidance in the attachments to this letter. Actions related to the inoperability of all trains of a TS required system should not be included in LARs submitted prior to approval of the companion traveler. Omitting these Actions and incorporating the other changes recommended in the
TSTF-17-01 DATE attachments to this letter should allow timely approval of LARs. Attachment 1 contains a list of the Actions revised by TSTF-505-A that should be omitted in LARs submitted prior to approval of the companion traveler. Attachment 1 also includes conforming changes to the TSTF-505-A Section 1.3 TS example and the TS Section 5.5 Administrative Controls program. Attachment 2 contains a list of Actions revised by TSTF-505-A that have conditions on their inclusion in a plant-specific LAR. Attachment 3 contains a revised Mode Application for requesting adoption of TSTF-505-A.
- 3. The proposed actions only apply to future submittals. The licensees with LARs currently under NRC review will decide how to proceed.
The TSTF requests that the NRC rescind the suspension of the approval of TSTF-505-A, Revision 1, and accept LARs to adopt TSTF-505-A that follow the recommendations in the attachments to this letter.
Should you have any questions, please do not hesitate to contact us.
James R. Morris (PWROG/W)
Lisa L. Williams (BWROG)
Otto W. Gustafson (PWROG/CE)
Jordan Vaughan (PWROG/B&W)
Jason P. Redd (APOG)
Enclosure cc:
Mirella Gavrilas, Director of the Division of Safety Systems Anne T. Boland, Director of the Division of Operating Reactor Licensing Jennifer Whitman, Acting Chief of the Technical Specifications Branch Michelle Honcharik, Technical Specifications Branch Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1430, Babcock and Wilcox STS Page 1 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.1.C RPS Instrumentation Do not include Action 3.3.2.A Reactor Protection System (RPS) Manual Reactor Trip Do not include.
Action 3.3.5.B ESFAS Instrumentation Do not include Action 3.3.6.B ESFAS Manual Initiation Do not include Action 3.3.11.D EFIC System Instrumentation Do not include Action 3.3.13.B EFIC Logic Do not include Action 3.3.14.B EFIC-EFW-Vector Valve Logic Do not include Action 3.4.10.A Pressurizer Safety Valves Do not include.
Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include.
Action 3.5.1.A CFTs Do not include Action 3.5.1.B CFTs Do not include Action 3.5.1.C CFTs Do not include Action 3.5.2.C ECCS - Operating Do not include Action 3.5.3.B ECCS - Shutdown Do not include.
Action 3.5.4.A BWST Do not include Action 3.5.4.B BWST Do not include Action 3.6.3.B Containment Isolation Valves Do not include Action 3.6.3.D Containment Isolation Valves Do not include Action 3.6.6.F Containment Spray and Cooling Systems Do not include Action 3.7.2.C MSIVs Do not include Action 3.7.4.B AVVs Do not include.
Action 3.7.5.C EFW System Do not include Action 3.7.6.A CST Do not include.
Action 3.7.8.B SWS Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1430, Babcock and Wilcox STS Page 2 Specification Specification Title Notes Action 3.7.9.C UHS Do not include Action 3.7.11.B CREVS Do not include Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505.
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 3 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.1.C RTS Instrumentation Do not include Action 3.3.1.E RTS Instrumentation Do not include Action 3.3.1.G RTS Instrumentation Do not include Action 3.3.1.I RTS Instrumentation Do not include Action 3.3.1.Q RTS Instrumentation Do not include Action 3.3.1.S RTS Instrumentation Do not include Action 3.3.1.T RTS Instrumentation Do not include Action 3.3.1.V RTS Instrumentation Do not include Action 3.3.1.W RTS Instrumentation Do not include Action 3.3.1.Z RTS Instrumentation Do not include Action 3.3.1.CC RTS Instrumentation Do not include Action 3.3.1.EE RTS Instrumentation Do not include Action 3.3.1.JJ RTS Instrumentation Do not include Action 3.3.2.C ESFAS Instrumentation Do not include Action 3.3.2.E ESFAS Instrumentation Do not include Action 3.3.2.G ESFAS Instrumentation Do not include Action 3.3.2.I ESFAS Instrumentation Do not include Action 3.3.2.K ESFAS Instrumentation Do not include Action 3.3.2.M ESFAS Instrumentation Do not include Action 3.3.2.O ESFAS Instrumentation Do not include Action 3.3.2.Q ESFAS Instrumentation Do not include Action 3.3.2.S ESFAS Instrumentation Do not include Action 3.3.2.U ESFAS Instrumentation Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 4 Specification Specification Title Notes Action 3.3.2.V ESFAS Instrumentation Do not include. Required Action outside the scope of TSTF-505.
Action 3.3.9.B BDPS Do not include Action 3.4.9.C Pressurizer Do not include.
Action 3.4.10.A Pressurizer Safety Valves Do not include.
Action 3.4.11.E Pressurizer Power Operated Relief Valves (PORVs)
Do not include.
Action 3.4.11.F Pressurizer Power Operated Relief Valves (PORVs)
Do not include.
Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include.
Action 3.5.1.A Accumulators Do not include.
Action 3.5.1.B Accumulators Do not include.
Action 3.5.1.C Accumulators Do not include.
Action 3.5.2.B ECCS - Operating Do not include.
Action 3.5.3.B ECCS - Shutdown Do not include.
Action 3.5.4.A RWST Do not include.
Action 3.5.4.B RWST Do not include.
Action 3.5.6.A Boron Injection Tank Do not include.
Action 3.6.3.B Containment Isolation Valves Do not include.
Action 3.6.3.C Containment Isolation Valves Do not include.
Action 3.6.3.D Containment Isolation Valves Do not include.
Action 3.6.3.E Containment Isolation Valves Do not include.
Action 3.6.6A.E Containment Spray and Cooling Systems (Atmospheric and Dual)
Do not include.
Action 3.6.6B.G Containment Spray and Cooling Systems (Atmospheric and Dual)
Do not include.
Action 3.6.6C.B Containment Spray System (Ice Condenser)
Do not include.
Action 3.6.6D.B QS System (Subatmospheric)
Do not include.
Action 3.6.6E.F RS System (Subatmospheric)
Do not include.
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1431, Westinghouse STS Page 5 Specification Specification Title Notes Action 3.6.9.B Hydrogen Mixing System Do not include.
Action 3.6.10.C HIS (Ice Condenser)
Do not include.
Action 3.6.14.B ARS (Ice Condenser)
Do not include.
Action 3.6.15.A Ice Bed Do not include.
Action 3.6.17.A Divider Barrier Integrity (Ice Condenser)
Do not include.
Action 3.6.17.B Divider Barrier Integrity (Ice Condenser)
Do not include.
Action 3.6.18.A Containment Recirculation Drains (Ice Condenser)
Do not include.
Action 3.6.18.B Containment Recirculation Drains (Ice Condenser)
Do not include.
Action 3.7.2.C MSIVs Do not include.
Action 3.7.5.C AFW System Do not include.
Action 3.7.6.A Condensate Storage Tank Do not include.
Action 3.7.7.B CCW System Do not include.
Action 3.7.8.B SWS Do not include.
Action 3.7.9.C UHS Do not include.
Action 3.7.11.B CREATCS Do not include.
Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505.
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached Recommended Changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1432, Combustion Engineering STS Page 6 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.3.4.B ESFAS Instrumentation (Analog)
Do not include.
Action 3.3.5.B ESFAS Logic and Manual Trip (Analog)
Do not include.
Action 3.3.5.E ESFAS Logic and Manual Trip (Analog)
Do not include.
Action 3.3.6.A ESFAS Logic and Manual Trip (Digital)
Do not include.
Action 3.3.6.E ESFAS Logic and Manual Trip (Digital)
Do not include.
Action 3.4.9.C Pressurizer Do not include.
Action 3.4.10.A Pressurizer Safety Valves Do not include.
Action 3.4.11.E Pressurizer Power Operated Relief Valves (PORVs)
Do not include.
Action 3.4.11.F Pressurizer Power Operated Relief Valves (PORVs)
Do not include.
Action 3.4.14.C RCS Pressure Isolation Valve (PIV) Leakage Do not include.
Action 3.5.1.A SITs Do not include.
Action 3.5.1.B SITs Do not include.
Action 3.5.1.C SITs Do not include.
Action 3.5.2.C ECCS - Operating Do not include.
Action 3.5.3.A ECCS - Shutdown Do not include.
Action 3.5.4.A RWT Do not include.
Action 3.5.4.B RWT Do not include.
Action 3.6.3.C Containment Isolation Valves Do not include.
Action 3.6.3.E Containment Isolation Valves Do not include.
Action 3.6.3.F Containment Isolation Valves Do not include.
Action 3.6.6A.F Containment Spray and Cooling Systems (Atmospheric and Dual)
Do not include.
Action 3.6.6B.F Containment Spray and Cooling Systems (Atmospheric and Dual)
Do not include.
Action 3.6.9.B Hydrogen Mixing System Do not include.
Action 3.7.2.C MSIVs Do not include.
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1432, Combustion Engineering STS Page 7 Specification Specification Title Notes Action 3.7.4.B Atmospheric Dump Valves Do not include.
Action 3.7.5.C AFW System Do not include.
Action 3.7.6.A Condensate Storage Tank Do not include.
Action 3.7.7.B CCW System Do not include.
Action 3.7.8.B SWS Do not include.
Action 3.7.9.C UHS Do not include.
Action 3.7.10.B ECW Do not include.
Action 3.7.12.B CREATCS Do not include.
Action 3.8.1.E AC Sources - Operating Do not include.
Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505.
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.18 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1433, BWR/4 STS Page 8 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.1.7.A SLC System Do not include.
Action 3.1.7.C SLC System Do not include.
Action 3.3.1.1.C Reactor Protection System (RPS) Instrumentation Do not include.
Action 3.3.4.1.B End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Do not include.
Action 3.3.4.2.B Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT)
Instrumentation Do not include.
Action 3.3.4.2.C Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT)
Do not include.
Action 3.3.5.2.C Reactor Core Isolation Cooling (RCIC) System Instrumentation Do not include.
Action 3.3.6.1.B Primary Containment Isolation Instrumentation Do not include.
Action 3.3.6.3.C LLS Instrumentation Do not include.
Action 3.3.6.3.D LLS Instrumentation Do not include.
Action 3.4.3.B S/RVs Do not include.
Action 3.5.1.G ECCS - Operating Do not include.
Action 3.5.1.I ECCS - Operating Do not include.
Action 3.6.1.3.B PCIVs Do not include. Required Action outside the scope of TSTF-505.
Action 3.6.1.3.C PCIVs Do not include. Required Action outside the scope of TSTF-505.
Action 3.6.2.3.B Residual Heat Removal (RHR) Suppression Pool Cooling Do not include.
Action 3.6.2.4.B Residual Heat Removal (RHR) Suppression Pool Spray Do not include.
Action 3.6.3.3.B Containment Atmosphere Dilution (CAD) System Do not include.
Action 3.7.1.D Residual Heat Removal Service Water (RHRSW)
System Do not include.
Action 3.7.2.F
[PSW] System and [UHS]
Do not include.
Action 3.7.5.B
[Control Room AC] System Do not include.
Action 3.8.1.E AC Sources - Operating Do not include Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1433, BWR/4 STS Page 9 Specification Specification Title Notes Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505.
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.15 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1434, BWR/6 STS Page 10 Specification Specification Title Notes 1.3 Completion Times See attached recommended changes Action 3.1.7.A SLC System Do not include.
Action 3.1.7.C SLC System Do not include.
Action 3.3.1.1.C Reactor Protection System (RPS) Instrumentation Do not include.
Action 3.3.4.1.B End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Do not include.
Action 3.3.4.2.B Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT)
Instrumentation Do not include.
Action 3.3.4.2.C Anticipated Transient Without Scram Recirculation Pump Trip (ATWS-RPT)
Instrumentation Do not include.
Action 3.3.5.2.C Reactor Core Isolation Cooling (RCIC) System Instrumentation Do not include.
Action 3.3.6.1.B Primary Containment Isolation Instrumentation Do not include.
Action 3.3.6.4.B Suppression Pool Makeup (SPMU) System Instrumentation Do not include.
Action 3.3.6.4.C Suppression Pool Makeup (SPMU) System Instrumentation Do not include.
Action 3.3.6.5.B Relief and LLS Instrumentation Do not include.
Action 3.4.4.B S/RVs Do not include.
Action 3.5.1.G ECCS - Operating Do not include.
Action 3.5.1.I ECCS - Operating Do not include.
Action 3.5.1.J ECCS - Operating Do not include.
Action 3.5.1.K ECCS - Operating Do not include.
Action 3.5.1.L ECCS - Operating Do not include.
Action 3.6.1.3.B Primary Containment Isolation Valves (PCIVs)
Do not include.
Action 3.6.1.3.C Primary Containment Isolation Valves (PCIVs)
Do not include.
Action 3.6.1.3.D Primary Containment Isolation Valves (PCIVs)
Do not include.
Action 3.6.1.7.B Residual Heat Removal (RHR) Containment Spray System Do not include.
Action 3.6.2.3.B Residual Heat Removal (RHR) Suppression Pool Cooling Do not include.
Action 3.6.2.4.A SPMU System Do not include.
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests TSTF-505 Markup to NUREG-1434, BWR/6 STS Page 11 Specification Specification Title Notes Action 3.6.2.4.B SPMU System Do not include.
Action 3.6.2.4.D SPMU System Do not include.
Action 3.6.3.1.B Drywell Cooling System Fans Do not include.
Action 3.6.3.2.B Drywell Purge System Do not include.
Action 3.6.5.1.A Drywell Do not include.
Action 3.6.5.3.B Drywell Isolation Valve[s]
Do not include.
Action 3.6.5.6.D Drywell Vacuum Relief System Do not include.
Action 3.6.5.6.E Drywell Vacuum Relief System Do not include.
Action 3.6.5.6.F Drywell Vacuum Relief System Do not include.
Action 3.7.1.D
[SSW] System and [UHS]
Do not include.
Action 3.7.4.B
[Control Room AC] System Do not include.
Action 3.8.1.E AC Sources - Operating Do not include Action 3.8.1.G AC Sources - Operating Do not include Action 3.8.4.A.1 DC Sources - Operating Do not include. Required Action outside the scope of TSTF-505.
Action 3.8.4.D DC Sources - Operating Do not include Action 3.8.7.B Inverters - Operating Do not include Action 3.8.9.D Distribution Systems - Operating Do not include 5.5.15 Risk Informed Completion Time Program See attached recommended changes Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Recommended Changes to the Section 1.3 Example Page 12
Reviewer's Note ------------------------------------------
Example 1.3-8 is only applicable to plants that have adopted the Risk Informed Completion Time Program.
[
EXAMPLE 1.3-8 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One subsystem inoperable.
A.1 Restore subsystem to OPERABLE status.
7 days OR In accordance with the Risk Informed Completion Time Program B. --- NOTE ------
Not applicable when second subsystem intentionally made inoperable.
Two subsystems inoperable.
B.1 Restore subsystems to OPERABLE status.
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> OR In accordance with the Risk Informed Completion Time Program BC.Required Action and associated Completion Time not met.
BC.1 Be in MODE 3.
AND BC.2 Be in MODE 5.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> 36 hours Recommended Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Recommended Changes to the Section 1.3 Example Page 13 When a subsystem is declared inoperable, Condition A is entered. The 7 day Completion Time may be applied as discussed in Example 1.3-2. However, the licensee may elect to apply the Risk Informed Completion Time Program which permits calculation of a Risk Informed Completion Time (RICT) that may be used to complete the Required Action beyond the 7 day Completion Time. The RICT cannot exceed 30 days. After the 7 day Completion Time has expired, the subsystem must be restored to OPERABLE status within the RICT or Condition BC must also be entered.
If a second subsystem is declared inoperable, Condition B may also be entered. The Condition is modified by a Note stating it is not applicable if the second subsystem is intentionally made inoperable. The Required Actions of Condition B are not intended for voluntary removal of redundant subsystems from service. The Required Action is only applicable if one subsystem is inoperable for any reason and the second subsystem is found to be inoperable, or if both subsystems are found to be inoperable at the same time. If Condition B is applicable, at least one subsystem must be restored to OPERABLE status within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or Condition C must also be entered. The licensee may be able to apply a RICT to extend the Completion Time beyond 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the requirements of the Risk Informed Completion Time Program are met. If two subsystems are inoperable and Condition B is not applicable (i.e., the second subsystem was intentionally made inoperable), LCO 3.0.3 is entered as there is no applicable Condition.
The Risk Informed Completion Time Program requires recalculation of the RICT to reflect changing plant conditions. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the plant configuration change, whichever is less.
If the 7 day Completion Time clock of Condition A or the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Completion Time clock of Condition B have has expired and subsequent changes in plant condition result in exiting the applicability of the Risk Informed Completion Time Program without restoring the inoperable subsystem to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start.
If the RICT expires or is recalculated to be less than the elapsed time since the Condition was entered and the inoperable subsystem has not been restored to OPERABLE status, Condition BC is also entered and the Completion Time clocks for Required Actions BC.1 and BC.2 start. If the inoperable subsystems are restored to OPERABLE status after Condition BC is entered, Conditions A, B, and BC are exited, and therefore, the Required Actions of Condition BC may be terminated. ]
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 14
[ 5.5.18 Risk Informed Completion Time Program This program provides controls to calculate a Risk Informed Completion Time (RICT) and must be implemented in accordance with NEI 06-09-A, Revision 0, "Risk-Managed Technical Specifications (RMTS) Guidelines." The program shall include the following:
- a. The RICT may not exceed 30 days;
REVIEWER'S NOTE ----------------------------------
The Risk Informed Completion Time is only applicable in MODES supported by the Licensees PRA. Licensee's applying the RICT Program to MODES other than Modes 1 and 2 must demonstrate that they have the capability to calculate a RICT in those MODES or that the risk indicated by their MODE 1 and 2 PRA model is bounding with respect to the lower MODE conditions.
- b.
A RICT may only be utilized in MODE 1, 2 [, and 3, and MODE 4 while relying on steam generators for heat removal];
- c.
When a RICT is being used, any change to the plant configuration, as defined in NEI 06-09-A, Appendix A, change within the scope of the Risk Informed Completion Time Program must be considered for the effect on the RICT.
- 1. For planned changes, the revised RICT must be determined prior to implementation of the change in configuration.
- 2. For emergent conditions, the revised RICT must be determined within the time limits of the Required Action Completion Time (i.e., not the RICT) or 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after the plant configuration change, whichever is less.
- 3. Revising the RICT is not required If the plant configuration change would lower plant risk and would result in a longer RICT.
- d.
Use of a RICT is not permitted for voluntary entry into a configuration which represents a loss of a specified safety function or inoperability of all required trains of a system required to be OPERABLE.
- e.
Use of a RICT is permitted for emergent conditions which represent a loss of a specified safety function or inoperability of all required trains of a system required to be OPERABLE if one or more of the trains are considered "PRA functional" as defined in Section 2.3.1 of NEI 06-09.]
Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 15
- d.
If the extent of condition evaluation for inoperable structures, systems, or components (SSCs) is not complete prior to exceeding the Completion Time, the RICT shall account for the increased possibility of common cause failure (CCF) by either:
- 2. Risk Management Actions (RMAs) not already credited in the RICT calculation shall be implemented that support redundant or diverse SSCs that perform the function(s) of the inoperable SSCs, and, if practicable, reduce the frequency of initiating events that challenge the function(s) performed by the inoperable SSCs.
- e.
[This paragraph will describe when prior NRC approval is needed for changes to the methodology used to calculate a RICT. The wording for this provision is currently under discussion between the NRC and the industry.]
Discussion of Recommended Changes to the Risk Informed Completion Time Program
- 1.
The reference to NEI 06-09 is revised to refer to the approved version, NEI 06-09-A, Revision
- 0.
- 2.
Paragraphs d. and e. of TSTF-505 are deleted. These paragraphs discuss determining a RICT when all trains of a system are inoperable and are not applicable to the near-term submittals that are the subject of this letter.
- 3.
The NRC questioned the difference between the TSTF-505 Risk Informed Completion Time (RICT) Program in paragraph 5.5.c and the NEI 06-09 Configuration Risk Management Program (CRMP). The traveler justification stated that the TS Section 5.5 RICT Program was the same as the NEI 06-09 CRMP; however, users of the TS may not have TSTF-505 available, which may lead to confusion when applying NEI 06-09 in accordance with the TS 5.5 RICT Program. The program was revised to clarify the application of the requirements.
- 4.
A new paragraph d. is added addressing common cause failure considerations.
- 5.
A new paragraph e. is added. The NRC's Safety Evaluation for NEI 06-09 stated:
As part of its review and approval of a licensees application requesting to implement the RMTS, the NRC staff intends to impose a license condition that will explicitly address the scope of the PRA and non-PRA methods approved by the NRC staff for use in the plant-specific RMTS program. If a licensee wishes to change its methods, and the change is outside the bounds of the license condition, the licensee will need NRC approval, via a license amendment, of the implementation of the new method in its RMTS program. The focus of the NRC staffs review and approval will be on the Recommended Variations from TSTF-505-A in Near-Term Plant-Specific Amendment Requests Recommended Changes to the Risk Informed Completion Time Program Page 16 technical adequacy of the methodology and analyses relied upon for the RMTS application.
There is no legal difference between a license condition and a Technical Specification and it is less error prone to put all requirements related to calculation of a RICT in the same location.
Therefore, in lieu of a license condition, the restriction is added as paragraph e. of the program.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 17 Specification LCO Requirements and Condition Condition on Use 3.3.8.B LCO: Three channels of loss of voltage Function and three channels of degraded voltage Function EDG LOPS instrumentation per EDG shall be OPERABLE.
Condition: One or more Functions with two or more channels per EDG inoperable.
Licensee must justify that two or more channels per EDG inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.3.12.B LCO: Two manual initiation switches per actuation channel for each of the following emergency feedwater initiation and control (EFIC)
Functions shall be OPERABLE:
- a. Steam generator (SG) A Main Feedwater (MFW)
Isolation,
- c. SG A Main Steam Line Isolation,
- d. SG B Main Steam Line Isolation, and
- e. Emergency Feedwater Actuation.
Condition: One or more EFIC Function(s) with one or both manual initiation switches inoperable in both actuation channels.
Licensee must justify that one or both channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 18 Specification LCO Requirements and Condition Condition on Use 3.4.9.C LCO: The pressurizer shall be OPERABLE.
Condition: Capacity of pressurizer heaters
[capable of being powered by emergency power supply] less than limit.
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.5.2.B LCO: Two ECCS trains shall be OPERABLE.
Condition: One or more [ECCS] trains inoperable for reasons other than one LPI subsystem inoperable.
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1430, Babcock and Wilcox STS Page 19 Specification LCO Requirements and Condition Condition on Use 3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism.
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS.
3.6.6 LCO: Containment Spray and Cooling Systems Condition A: One containment spray train inoperable Condition C: One [required] containment cooling train inoperable.
Condition D: One containment spray train and one
[required] containment cooling train inoperable.
Condition E: Two [required] containment cooling trains inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 20 Specification LCO Requirements and Condition Condition on Use 3.3.1.F LCO: The RTS instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE.
Condition: One Power Range Neutron Flux - High channel inoperable.
Licensee must justify that the condition does not represent the inability to perform the safety function assumed in the FSAR given the loss of spacial distribution of the remaining Power Range detectors. The justification can include that the Actions require periodic monitoring of spacial power distribution and imposition of compensatory limits and reduced power.
3.3.1.DD LCO: The RTS instrumentation for each Function in Table 3.3.1-1 shall be OPERABLE.
Condition: One RTB train inoperable.
The licensee must include information regarding how the TSTF-411 conditions and limitations will be implemented (or similar conditions if TSTF-411 has not been adopted), including discussion of ATWS Mitigation System Actuation (AMSAC),
and why those actions are sufficient, including a discussion of defense in depth.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 21 Specification LCO Requirements and Condition Condition on Use 3.3.5.B LCO: [Three] channels per bus of the loss of voltage Function and [three] channels per bus of the degraded voltage Function shall be OPERABLE.
Condition: One or more Functions with two or more channels per bus inoperable.
Licensee must justify that two or more channels per bus inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.3.9.A LCO: Boron Dilution Protection System (BDPS)
Condition: One train inoperable (applicable to MODES [2,] 3, 4, and 5.)
BDPS is typically not modeled in the PRA.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.4.9.B LCO: The pressurizer shall be OPERABLE Condition: One [required] group of pressurizer heaters inoperable.
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 22 Specification LCO Requirements and Condition Condition on Use 3.5.2.A LCO: Two ECCS trains shall be OPERABLE.
Condition: One or more [ECCS] trains inoperable.
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable. Acceptable justification is TS Condition requiring 100% flow equivalent to a single ECCS train.
3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism.
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS.
3.6.6A LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit taken for iodine removal by the Containment Spray System)
Condition A: One containment spray train inoperable.
Condition C: One [required] containment cooling train inoperable.
Condition D: Two [required] containment cooling trains inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 23 Specification LCO Requirements and Condition Condition on Use 3.6.6B LCO: Containment Spray and Cooling Systems (Atmospheric and Dual (Credit not taken for iodine removal by the Containment Spray System)
Condition A: One containment spray train inoperable.
Condition B: One [required] containment cooling train inoperable.
Condition C: Two containment spray trains inoperable.
Condition D: One containment spray train and one
[required] containment cooling train inoperable.
Condition E: Two [required] containment cooling trains inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.6.6C.A LCO: Containment Spray System (Ice Condenser)
Condition: One containment spray train inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.6.6D.A LCO: Quench Spray (QS) System (Subatmospheric)
Condition: One QS train inoperable Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1431, Westinghouse STS Page 24 Specification LCO Requirements and Condition Condition on Use 3.6.6E LCO: Recirculation Spray (RS) System (Subatmospheric)
Condition A: One RS subsystem inoperable.
Condition B: Two RS subsystems inoperable in one train.
Condition C: Two inside RS subsystems inoperable Condition D: Two outside RS subsystems inoperable.
Condition E: Casing cooling tank inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.6.16.A LCO: The ice condenser inlet doors, intermediate deck doors, and top deck [doors] shall be OPERABLE and closed.
Condition: One or more ice condenser doors physically restrained from opening Licensee must justify that one or more inoperable doors is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.7.4.B LOC: [Three] Atmospheric Dump Valves (ADV) lines shall be OPERABLE.
Condition: Two or more required ADV lines inoperable Licensee must justify that two or more inoperable ADVs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 25 Specification LCO Requirements and Condition Condition on Use 3.3.6.C (analog)
LCO: [Four] channels of Loss of Voltage Function and [four] channels of Degraded Voltage Function auto-initiation instrumentation per DG shall be OPERABLE.
Condition: One or more Functions with more than two channels inoperable.
Licensee must justify that more than two channels per bus inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.4.9.B LCO: The pressurizer shall be OPERABLE Condition: One [required] group of pressurizer heaters inoperable.
Pressurizer is typically not modeled in the PRA. Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.5.2.D LCO: Two ECCS trains shall be OPERABLE.
Condition: Less than 100% of the ECCS flow equivalent to a single OPERABLE train available.
Licensee must justify that one or more ECCS trains inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable. Acceptable justification is TS Condition requiring 100% flow equivalent to a single ECCS train.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 26 Specification LCO Requirements and Condition Condition on Use 3.6.2.C LCO: [Two] containment air lock[s] shall be OPERABLE. Condition: One or more containment air locks inoperable for reasons other than an inoperable door or inoperable interlock mechanism.
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.2 requires the condition to be assessed in accordance with TS 3.6.1, Containment Integrity, and any loss of function would require an immediate plant shutdown under that TS.
3.6.6A LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit taken for iodine removal by the Containment Spray System)
Condition A: One containment spray train inoperable.
Condition C: One containment cooling train inoperable.
Condition D: One containment spray and one containment cooling train inoperable.
Condition E: Two containment cooling trains inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1432, Combustion Engineering STS Page 27 Specification LCO Requirements and Condition Condition on Use 3.6.6B LCO: Containment Spray and Cooling Systems (Atmospheric and Dual) (Credit not taken for iodine removal by the Containment Spray System)
Condition A: One containment spray train inoperable.
Condition B: One containment cooling train inoperable.
Condition C: Two containment spray trains inoperable.
Condition D: One containment spray train and one containment cooling train inoperable.
Condition E: Two containment cooling trains inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 28 Specification LCO Requirements and Condition Condition on Use 3.3.1.2.A LCO: The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE.
Condition: One or more required SRMs inoperable in MODE 2 with intermediate range monitors (IRMs) on Range 2 or below Licensee must justify that one or more inoperable SRMs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.3.2.2.B LCO: [Three] channels of feedwater and main turbine high water level trip instrumentation shall be OPERABLE.
Condition: Two or more feedwater and main turbine high water level trip channels inoperable.
Licensee must justify that two or more inoperable trip channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 29 Specification LCO Requirements and Condition Condition on Use 3.3.4.1.A LCO: End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Condition: One or more required channels inoperable.
Licensee must justify that one or more inoperable EOC-RPT channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Licensee must justify the ability to calculate a RICT given that EOC-RPT channels are not typically modeled in the PRA.
3.3.6.3.A LCO: Low-Low Set (LLS) Instrumentation Condition: One LLS valve inoperable due to inoperable channel(s).
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 30 Specification LCO Requirements and Condition Condition on Use 3.3.8.1.A LCO: The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.
Condition: One or more channels inoperable.
Licensee must justify that one or more channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.6.1.2.C LCO: The primary containment air lock shall be OPERABLE. Condition: Primary containment air lock inoperable for reasons other than Condition A or B.
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.1.2 requires the condition to be assessed in accordance with TS 3.6.1.1, Primary Containment, and any loss of function would require an immediate plant shutdown under that TS.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1433, BWR/4 STS Page 31 Specification LCO Requirements and Condition Condition on Use 3.6.1.3.E LCO: Each PCIV, except reactor building-to-suppression chamber vacuum breakers, shall be OPERABLE.
Condition: One or more penetration flow paths with one or more containment purge valves not within purge valve leakage limits.
Licensee must justify that PCIV leakage in excess of the limits is not a condition in which all required trains or subsystems of a TS required system are inoperable.
Licensee must justify the ability to calculate a RICT for this inoperability.
3.6.1.7.D LCO: Each reactor building-to-suppression chamber vacuum breaker shall be OPERABLE.
Condition: Two or more lines with one or more reactor building -to-suppression chamber vacuum breakers inoperable for opening.
Licensee must justify that one or more inoperable vacuum breakers on two or more lines is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.7.7.A LCO: The Main Turbine Bypass System shall be OPERABLE.
OR The following limits are made applicable:
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," limits for an inoperable Main Turbine Bypass System, as specified in the [COLR]; and ]
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the
[COLR]. ]
Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable].
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 32 Specification LCO Requirements and Condition Condition on Use 3.3.1.2.A LCO: The SRM instrumentation in Table 3.3.1.2-1 shall be OPERABLE.
Condition: One or more required SRMs inoperable in MODE 2 with intermediate range monitors (IRMs) on Range 2 or below.
Licensee must justify that one or more inoperable SRMs is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Licensee must justify the ability to calculate a RICT given that SRMs are not typically modeled in the PRA.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 33 Specification LCO Requirements and Condition Condition on Use 3.3.4.1.A LCO: End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation Condition: One or more required channels inoperable.
Licensee must justify that one or more inoperable channels is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.3.6.5.A LCO: Relief and Low-Low Set (LLS)
Instrumentation Condition: One trip system inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 34 Specification LCO Requirements and Condition Condition on Use 3.3.8.1.A LCO: The LOP instrumentation for each Function in Table 3.3.8.1-1 shall be OPERABLE.
Condition: One or more channels inoperable.
Licensee must justify that one or more channels inoperable is not a condition in which all required trains or subsystems of a TS required system are inoperable or modify the Action to not apply a RICT when all required trains or subsystems are inoperable. See Note 1 at the end of.
3.6.1.2.C LCO: The primary containment air lock shall be OPERABLE. Condition: Primary containment air lock inoperable for reasons other than Condition A or B.
Licensee must justify that an inoperable containment air lock is not a condition in which all required trains or subsystems of a TS required system are inoperable. An acceptable argument may be that a note in TS 3.6.1.2 requires the condition to be assessed in accordance with TS 3.6.1.1, Primary Containment, and any loss of function would require an immediate plant shutdown under that TS.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 35 Specification LCO Requirements and Condition Condition on Use 3.6.1.3.E LCO: Each PCIV shall be OPERABLE.
Condition: One or more penetration flow paths with one or more containment purge valves not within purge valve leakage limits.
Licensee must justify that PCIV leakage in excess of the limits is not a condition in which all required trains or subsystems of a TS required system are inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.6.1.7.A LCO: Residual Heat Removal (RHR) Containment Spray System Condition: One RHR containment spray subsystem inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
3.7.4.A LCO: Two [control room AC] subsystems shall be OPERABLE.
Condition: One [control room AC] subsystem inoperable.
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests NUREG-1434, BWR/6 STS Page 36 Specification LCO Requirements and Condition Condition on Use 3.7.6.A LCO: The Main Turbine Bypass System shall be OPERABLE.
OR The following limits are made applicable:
[ a. LCO 3.2.1, "AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR)," limits for an inoperable Main Turbine Bypass System, as specified in the [COLR] and ]
[ b. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR)," limits for an inoperable Main Turbine Bypass System, as specified in the
[COLR]. ]
Condition: [Requirements of the LCO not met or Main Turbine Bypass System inoperable].
Licensee must justify the ability to calculate a RICT for the condition, including how the system is modeled in the PRA, whether all functions of the system are modeled, and, if a surrogate is used, why that modeling is conservative.
Conditional Variations from TSTF-505-A in Near-Term Plant-Specific License Amendment Requests Page 37 Note 1 Some Conditions are applicable when an unspecified number of subsystems or instrument channels are inoperable, typically written as "One or more" or "Two or more". These conditions currently apply when all subsystems or channels required to be operable to perform a function are inoperable, and application of a RICT in this situation is prohibited in the near-term TSTF-505 submittals.
To address this, it is recommended that the following modification to TSTF-505 be made to the Required Actions indicated in the Attachment 2 tables for Completion Times potentially applicable when all required subsystems or channels are inoperable.
The typical Completion Time is modified by TSTF-505 to state:
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (i.e., the existing Completion Time)
OR In accordance with the Risk Informed Completion Time Program It is recommended that the second Completion Time be modified with a Note, as shown below:
72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (i.e., the existing Completion Time)
NOTE-------------
Not applicable when
[all/four/both] required channels are inoperable.
In accordance with the Risk Informed Completion Time Program The bracketed number of channels will depend on the specification. This approach retains the existing requirements and limits the use of a RICT to conditions in which the function can still be performed.
The licensee must justify that the required function can still be performed absent an additional failure when a RICT is applied.
Alternatively, the licensee may modify the Condition to only apply when at least one subsystem or channel is operable, but this approach may require creating a new Condition or modifying an existing condition to retain the current requirements, or accepting a more restrictive requirement (such a LCO 3.0.3 entry).
TSTF-505 Model Application
Page PROPOSED MODEL APPLICATION FOR PLANT-SPECIFIC ADOPTION OF TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B" U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
SUBJECT:
[PLANT]
DOCKET NO. 50-[XXX]
LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT RISK INFORMED COMPLETION TIMES TSTF-505, REVISION 1, "PROVIDE RISK-INFORMED EXTENDED COMPLETION TIMES - RITSTF INITIATIVE 4B."
REFERENCE:
Letter from the TSTF to U.S. NRC, "Response to NRC Questions on TSTF-505, 'Provide Risk-Informed Extended Completion Times'," dated DATE In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), [LICENSEE] is submitting a request for an amendment to the Technical Specifications (TS) for [PLANT.]
The proposed amendment would modify TS requirements to permit the use of Risk Informed Completion Times in accordance with TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b," as modified by the [DATE] letter from the TSTF to the NRC (Reference). The availability of this TS improvement was announced in the Federal Register on March 15, 2012 (77 FR 15399).
- Attachment 1 provides a description and assessment of the proposed change, the requested confirmation of applicability, and plant-specific verifications.
- Attachment 2 provides the existing TS pages marked up to show the proposed changes.
- Attachment 3 provides revised (clean) TS pages.
- Attachment 4 provides existing TS Bases pages marked up to show the proposed changes.
[LICENSEE] requests approval of the proposed license amendment by [DATE], with the amendment being implemented [BY DATE OR WITHIN X DAYS].
Page In accordance with 10 CFR 50.91(a)(1), "Notice for Public Comment," the analysis about the issue of no significant hazards consideration using the standards in 10 CFR 50.92 is being provided to the Commission.
In accordance with 10 CFR 50.91(b)(1), "Notice for Public Comment; State Consultation," a copy of this application, with attachments, is being provided to the designated [STATE] Official.
I declare [or certify, verify, state] under penalty of perjury that the foregoing is true and correct.
Executed on [date][Signature]
If you should have any questions regarding this submittal, please contact [NAME, TELEPHONE NUMBER].
Sincerely,
[Name, Title]
Attachments: 1. Description and Assessment
- 2. Proposed Technical Specification Changes (Mark-Up)
- 3. Revised Technical Specification Pages
- 4. Proposed Technical Specification Bases Changes (Mark-Up)
Enclosures:
- 1. List of Revised Required Actions to Corresponding PRA Functions
- 2. Information Supporting Consistency with Regulatory Guide 1.200, Revision 2.
- 3. Information Supporting Technical Adequacy of PRA Models Without PRA Standards Endorsed by Regulatory Guide 1.200, Revision 2.
- 4. Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models.
- 6. Justification of Application Of At-Power PRA Models to Shutdown Modes.
- 7. PRA Model Update Process.
- 8. Attributes of the CRMP Model.
- 9. Key Assumptions and Sources of Uncertainty.
- 10. Program Implementation
- 11. Monitoring Program
- 12. Risk Management Action Examples cc:
NRC Project Manager NRC Regional Office NRC Resident Inspector State Contact
ATTACHMENT 1 DESCRIPTION AND ASSESSMENT OF THE PROPOSED CHANGE License Amendment Request for Adoption of TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b"
1.0 DESCRIPTION
The proposed amendment would modify the Technical Specification (TS) requirements related to Completion Times (CTs) for Required Actions to provide the option to calculate a longer, risk-informed CT (RICT). A new program, the Risk-Informed Completion Time Program, is added to TS Section 5 Administrative Controls.
The methodology for using the RICT Program is described in NEI 06-09-A, "Risk-Informed Technical Specifications Initiative 4b, Risk-Managed Technical Specifications (RMTS)
Guidelines," Revision 0, which was approved by the NRC on May 17, 2007. Adherence to NEI 06-09-A is required by the RICT Program.
The proposed amendment is consistent with TSTF-505, Revision 1, "Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b," as modified by the TSTF's [DATE] letter to the NRC, "Response to NRC Questions on TSTF-505, 'Provide Risk-Informed Extended Completion Times'." However, only those Required Actions described in Enclosure 1 are proposed to be changed, [which does not include all of the modified Required Actions in TSTF-505 and which includes some plant-specific Required Actions not included in TSTF-505].
2.0 ASSESSMENT
2.1 Applicability of Published Safety Evaluation
[LICENSEE] has reviewed the model safety evaluation dated [DATE] as part of the Federal Register Notice for Comment. This review included a review of the NRC staffs evaluation, as well as the supporting information provided to support TSTF-505 and the safety evaluation for NEI 06-09, as well as the TSTF's [DATE] letter on TSTF-505. [As described in the subsequent paragraphs,][LICENSEE] has concluded that the technical basis presented in the TSTF-505 proposal, the associated model safety evaluation prepared by the NRC staff, as modified by the TSTF letter on TSTF-505 are applicable to [PLANT, UNIT NOS.] and support incorporation of this amendment in the [PLANT] TS. ]
2.2 Verifications and Regulatory Commitments In accordance with Section 4.0, Limitations and Conditions, of the safety evaluation for NEI 06-09-A, the following is provided:
Page
- 1. Enclosure 1 identifies each of the TS Required Actions to which the RICT Program will apply, with a comparison of the TS functions to the functions modeled in the probabilistic risk assessment (PRA) of the structures, systems and components (SSCs) subject to those actions.
- 2. Enclosure 2 provides a discussion of the results of peer reviews and self-assessments conducted for the plant-specific PRA models which support the RICT Program, as required by Regulatory Guide (RG) 1.200 Section 4.2.
- 3. [Enclosure 3 provides a description of all PRA models used to support the RICT Program for which Nuclear Regulatory Commission endorsed standards are not available.]
[Enclosure 3 is not applicable since each PRA model used for the RICT Program is addressed using a standard endorsed by the Nuclear Regulatory Commission.]
- 4. Enclosure 4 provides appropriate justification for excluding sources of risk not addressed by the PRA models.
- 5. Enclosure 5 provides the plant-specific baseline CDF and LERF to confirm that the potential risk increases allowed under the RICT Program are acceptable.
- 6. [Enclosure 6 provides appropriate plant-specific justification for using at power PRA models in shutdown modes to which the RICT Program applies (modes 3 [and 4]).]
[Enclosure 6 is not applicable since the RICT Program is not being applied to shutdown modes.]
- 7. Enclosure 7 provides a discussion of the licensees programs and procedures that assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant.
- 8. Enclosure 8 provides a description of how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP
- 9. Enclosure 9 provides a discussion of how the key assumptions and sources of uncertainty in the PRA models were identified, and how their impact on the RICT Program was assessed and dispositioned.
- 10. Enclosure 10 provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation, including risk management action (RMA) implementation.
Page
- 11. Enclosure 11 provides a description of the implementation and monitoring program as described in NEI 06-09, Section 2.3.2, Step 7.
- 12. Enclosure 12 provides a description of the process to identify and provide RMAs.
2.3 Optional Changes and Variations
[LICENSEE is not proposing any changes, variations, or deviations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE], except as described in the TSTF letter dated [DATE].] [LICENSEE is proposing the following changes or variations from the TS changes described in the TSTF-505, Revision 1, or the applicable parts of the NRC staffs model safety evaluation dated [DATE].
These options were recognized as acceptable changes or variations in TSTF-505 and the NRC staff's model safety evaluation.]
{NOTE: If a change or variation is not identified in TSTF-505, the NRC staff's model safety evaluation, or NEI 06-09 then provide the description and justification.}
[The [PLANT] TS utilize different [numbering][and][titles] than the Standard Technical Specifications on which TSTF-505 was based. Specifically, [describe differences between the plant-specific TS numbering and/or titles (including Required Actions and programs) and the TSTF-505 numbering and titles.] These differences are administrative and do not affect the applicability of TSTF-505 to the [PLANT] TS.]
3.0 REGULATORY SAFETY ANALYSIS 3.1 No Significant Hazards Consideration Determination
[LICENSEE] has evaluated the proposed change to the TS using the criteria in 10 CFR 50.92 and has determined that the proposed change does not involve a significant hazards consideration.
[PLANT, UNIT NOS.] requests adoption of an approved change to the standard technical specifications (STS) and plant-specific technical specifications (TS), to modify the TS requirements related to Completion Times for Required Actions to provide the option to calculate a longer, risk-informed Completion Time. The allowance is described in a new program in Chapter 5, "Administrative Controls," entitled the "Risk-Informed Completion Time Program."
As required by 10 CFR 50.91(a), an analysis of the issue of no significant hazards consideration is presented below:
- 1.
Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Page Response: No.
The proposed change permits the extension of Completion Times provided the associated risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change does not involve a significant increase in the probability of an accident previously evaluated because the change involves no change to the plant or its modes of operation. The proposed change does not increase the consequences of an accident because the design-basis mitigation function of the affected systems is not changed and the consequences of an accident during the extended Completion Time are no different from those during the existing Completion Time.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2.
Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
The proposed change does not change the design, configuration, or method of operation of the plant. The proposed change does not involve a physical alteration of the plant (no new or different kind of equipment will be installed).
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3.
Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change permit the extension of Completion Times provided risk is assessed and managed in accordance with the NRC approved Risk-Informed Completion Time Program. The proposed change implements a risk-informed configuration management program to assure that adequate margins of safety are maintained. Application of these new specifications and the configuration management program considers cumulative effects of multiple systems or components being out of service and does so more effectively than the current TS.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Page Based on the above, [LICENSEE] concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
4.0 ENVIRONMENTAL CONSIDERATION
[LICENSEE] has reviewed the environmental evaluation included in the model safety evaluation published on [DATE] ([ ] FR [ ]) as part of the Notice of Availability. [LICENSEE] has concluded that the NRC staff findings presented in that evaluation are applicable to [PLANT, NO.].
The proposed change would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed change does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed change meet the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed change.
ATTACHMENT 2 PROPOSED TECHNICAL SPECIFICATION CHANGES (MARK-UP)
{provided by the licensee}
ATTACHMENT 3 REVISED TECHNICAL SPECIFICATION PAGES
{provided by the licensee}
ATTACHMENT 4 PROPOSED CHANGES TO TECHNICAL SPECIFICATION BASES CHANGES (MARK-UP) PAGES
{provided by the licensee}
ENCLOSURE 1 LIST OF REVISED REQUIRED ACTIONS TO CORRESPONDING PRA FUNCTIONS
{NOTE: This enclosure provides confirmation that the PRA models include the necessary scope of structures, systems, and components (SSCs) and their functions to address each proposed application of the RICT Program to the TS Required Actions.
TS conditions with insufficient TS operable equipment to meet the specified safety function of the system, are not to be included in the application.
List each TS Required Action to which the RICT Program may be applied and, for each Required Action, describe the following:
The TS Required Action; The corresponding SSC; Each design basis function of the SSC; How each design basis function is modeled in the PRA. If one of the design basis functions of an SSC or the SSC is not modeled in the PRA, describe any proposed surrogates and why the proposed surrogate adequately captures the configuration risk; and The success criteria used in the PRA model compared to the licensing basis criteria. The success criteria should include both train-level and component/parameter level.
Note that the above description should be at the level of the TS condition/TS Required Action (not at the LCO level only). If the TS condition/ TS Required action covers multiple SSCs or multiple design basis functions, such as in the case ESFAS Instrumentation or Containment Sprays, describe each one individually.
The enclosure should also include clear definitions of any used terms, such as train, division, loop, "subsystem," etc.
The enclosure should provide a detailed system description of TS 3.8, "Electrical Power Systems," Required Actions if the loading scheme is not uniform (e.g., Train A and B have similar loading, except Train B supplies power to additional SSCs.) Also, provide a description in Enclosure 12 of representative RMAs for non-uniform trains to demonstrate that the systems safety function is maintained with either train or subsystem operable.}
ENCLOSURE 2 INFORMATION SUPPORTING CONSISTENCY WITH REGULATORY GUIDE 1.200, REVISION 2
{NOTE: This enclosure provides information supporting the licensee evaluation of the technical adequacy of the PRA models supporting the RICT Program based on peer reviews and self-assessments against the relevant PRA standards as endorsed in the current applicable revision of RG 1.200, including consideration of staff clarifications of the standards.
Per NEI 06-09 Rev. 0, capability category II of the standards is applicable; therefore, the licensee identifies those parts of the PRAs that conform to capability categories lower than II, and provides a disposition for the RICT Program. Consistent with RG 1.200 Section 4.2, the licensee identifies and provides a discussion of the resolution of any findings and observations from the peer reviews or self-assessments.
The licensee assessment must also address the clarifications and qualifications found in RG 1.200, either by a separate discussion provided by the licensee, or by confirmation that the peer reviews or self-assessments included consideration of the clarifications and qualifications of the current applicable RG 1.200 revision.
Licensees are strongly encouraged to apply the guidance in Appendix X, "Close out of Facts and Observations," of NEI 05-04, "Process for Performing Internal Events PRA Peer Reviews Using the ASME/ANS PRA Standard, Rev 3, November 2009," NEI 07-12, "Fire Probabilistic Risk Assessment Peer Review Process Guidelines, Rev 1, June 2010," and NEI 12-13, "External Hazards PRA Peer Review Process Guidelines, Rev 0, August 2012," to close PRA peer review findings, as this will make more efficient use of the NRC and industry resources needed to develop and review of the application. }
ENCLOSURE 3 INFORMATION SUPPORTING TECHNICAL ADEQUACY OF PRA MODELS WITHOUT PRA STANDARDS ENDORSED BY REGULATORY GUIDE 1.200, REVISION 2
{NOTE: This enclosure provides information supporting the licensee evaluation of the PRA models supporting the RICT Program for which the relevant PRA standards are not yet endorsed in the current applicable revision of RG 1.200.
RG 1.200 Rev. 2 endorses standards for internal and external events including internal floods and fires, seismic events, and other external hazards for full power conditions.
This scope includes the relevant hazard groups applicable to a RICT Program unless the program is to apply to lower modes of operation. In this case, shutdown and transition risk PRA models may apply but are not be covered by an endorsed standard.
If applicable, the licensee should provide a detailed description of these PRA models and the basis for its determination of their technical adequacy to support the RICT Program.}
ENCLOSURE 4 INFORMATION SUPPORTING JUSTIFICATION OF EXCLUDING SOURCES OF RISK NOT ADDRESSED BY THE PRA MODELS
{NOTE: This enclosure identifies and provides a justification for excluding sources of risk which are not in the scope of the PRA models applied to the RICT Program.
Exclusion of risk sources determined to be insignificant to the calculation of configuration specific risk, or the use of conservative or bounding analyses for the calculation of RICTs in lieu of realistic PRA models, are described. A qualitative treatment may be sufficient if the licensee demonstrates that those risk contributions would not affect decisions in a RICT Program. The use of conservative bounding calculations in a RICT Program may also be acceptable. However, when the risk associated with a particular hazard group would affect decisions, it is the Commissions policy that risk be assessed using a PRA that meets the staff-endorsed PRA standard.
External hazards screened out from inclusion in RICT calculations should be clearly identified as such, and should be done in a manner consistent with Part 6 of the ASME ANS PRA Standard. The justification should address baseline and configuration-specific considerations.
For external hazards that are not screened out from inclusion in RICT calculations, the licensee may propose a bounding approach to address the hazard. If the bounding approach involves assuming a uniform increase in baseline risk to address the hazard, the licensee will need to address potential RICT-specific impacts by doing one of the following:
- Establish a procedure to evaluate the validity of the bounding approach when calculating an RICT that is not demonstrated to be bounded in the LAR, or For RICTs not demonstrated to be bounded in the LAR, establish a procedure to qualitatively evaluate the impact of the specific external hazard for each RICT when calculated and apply risk management actions as appropriate. }
ENCLOSURE 5 BASELINE CDF AND LERF
{NOTE: This enclosure provides the plant-specific total CDF and total LERF to confirm that these are less than 10-4/year and 10-5/year, respectively. This assures that the potential risk increases allowed under the RICT Program are consistent with RG 1.174, "An Approach for Using Probabilistic Risk Assessment in Risk-Informed Decisions on Plant-Specific Changes to the Licensing Basis," Revision 2.
The licensee should provide the totals and the contributions from each hazard group (internal events, fires, floods, seismic, other external). }
ENCLOSURE 6 JUSTIFICATION OF APPLICATION OF AT-POWER PRA MODELS TO SHUTDOWN MODES
{NOTE: This enclosure provides a justification for the use of existing PRA models during shutdown conditions if the RICT Program is applicable in these shutdown conditions.
The at-power PRA models may potentially be applied to lower modes of operation (hot standby for PWRs, and hot shutdown for PWRs and BWRs) for some Required Actions.
If the licensee is not proposing to use the RICT Program in these modes, then this information is not required and this Enclosure should be marked "Not applicable."
Otherwise, the licensee provides a detailed justification for those Required Actions proposed to apply the RICT Program in lower modes of operation using the at-power PRA models.}
ENCLOSURE 7 PRA MODEL UPDATE PROCESS
{NOTE: This enclosure describes how the PRA models used in the calculation of completion times is maintained consistent with the as-built, as-operated plant.
The licensee provides a discussion of its programs and procedures to assure the PRA models that support the RICT Program are maintained consistent with the as-built, as-operated plant. This should include a discussion of the timing of significant PRA model changes as described in NEI 06-09, Section 2.3.4, Step 7.}
ENCLOSURE 8 ATTRIBUTES OF THE CRMP MODEL
{NOTE: This enclosure describes how the baseline PRA model, which calculates average annual risk, is evaluated and modified for use in the Configuration Risk Management Program (CRMP) to assess real-time configuration risk, and describes the scope of, and quality controls applied to, the CRMP.
The licensee provides a description of the PRA models and CRMP used to support the RICT Program. The following specific attributes must also be addressed:
- The baseline PRA models assess the average annual risk. However, some risk is not consistent throughout the year or the operating cycle, and the PRA models used for the CRMP need to properly assess the change in risk for the existing plant conditions. For example, success criteria may be different at core beginning of life compared to end of life, or at different times of the year for room cooling systems. The licensee describes these issues and how they are addressed in the CRMP.
- The baseline PRA models may assume some configurations are not allowable, but these assumptions may not be applicable to a CRMP. The licensee describes these issues and how they are addressed in the CRMP.
- The scope of SSCs within the CRMP is provided, along with confirmation that the CRMP tools can be readily applied for each TS Required Action within the scope of the Risk-Informed Completion Time Program. The licensee should also identify and justify SSCs that are not included in the CRMP that could provide accident mitigation functions.
- The licensee describes how consistency of calculated results from the baseline PRA model and the CRMP are verified to assure the CRMP PRA models are consistent with the baseline model and updated when the baseline PRA model is updated.
- The licensee describes the training and qualification programs applicable to personnel responsible for development and use of the CRMP.}
ENCLOSURE 9 KEY ASSUMPTIONS AND SOURCES OF UNCERTAINTY
{NOTE: This enclosure describes the key assumptions and sources of uncertainty in the PRA models, and how their impact on the RICT Program was assessed and dispositioned. Sensitivity analyses for various plant configuration cases under different assumptions should be provided to justify conclusions.}
ENCLOSURE 10 PROGRAM IMPLEMENTATION
{NOTE: This enclosure provides a description of the implementing programs and procedures regarding the plant staff responsibilities for the RICT Program implementation including training of plant personnel, and specifically discusses the decision process for risk management action (RMA) implementation during extended CTs.}
ENCLOSURE 11 MONITORING PROGRAM
{NOTE: This enclosure describes the monitoring program for cumulative risk impacts as described in NEI 06-09, Revision 0, Section 2.3.2, Step 7. This should include a description of how the calculations are made and what actions and thresholds are applied when corrective measures are necessary due to excessive risk increases.}
ENCLOSURE 12 RISK MANAGEMENT ACTION EXAMPLES
{NOTE: This enclosure describes the process for identification of RMAs applicable during extended CTs, and provides examples of RMAs.
Provide example RMAs for TS 3.8 Required Actions. These should be representative examples, such as a long and short RICTs. See the Plant Vogtle April 14, 2017 RAI response (ADAMS Accession No. ML17108A253) for an example.
If the TS-required electrical power loading scheme is not uniform (e.g., Train A and B have similar loading, except Train B supplies power to additional SSCs,) provide a description of representative RMAs for non-uniform trains to ensure that the systems safety function is maintained with either train or subsystem inoperable.}