ML18009A838: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML18009A838
| number = ML18009A838
| issue date = 02/28/1991
| issue date = 02/28/1991
| title = Monthly Operating Rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 Ltr
| title = Monthly Operating Rept for Feb 1991 for Harris Nuclear Power Plant Unit 1
| author name = Hale M, Richey R
| author name = Hale M, Richey R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS                                                       TION SYSTEM
{{#Wiki_filter:ACCELERATED D TRIBUTION DEMONS TION SYSTEM
                                                                                                        'a...r
'a...r
        'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9103180102               DOC.DATE:   91/02/28   NOTARIZED: NO                     DOCKET'g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                                 05000400 AUTH. NAME           , AUTHOR AFFXLXATION HALE,M.                 Carolina Power     6   Light Co.
ACCESSION NBR:9103180102 DOC.DATE: 91/02/28 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME
RICHEY,R.B.         . Carolina Power     6   Light Co.
, AUTHOR AFFXLXATION HALE,M.
RECIP.NAME               RECIPIENT AFFILIATION                                                                 R
Carolina Power 6 Light Co.
RICHEY,R.B.
. Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET'g 05000400 R


==SUBJECT:==
==SUBJECT:==
Monthly operating rept           for Feb   1991   for Harris Nuclear               Power Plant Unit 1.W/910312           ltr.                                                             '
Monthly operating rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 ltr.
DXSTRIBUTION CODE         IE24D     COPIES RECEIVED:LTR         ENCL                   SIZE:
DXSTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.                                                       o5ooo4oo     /
TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.
RECIPXENT               COPIES            RECIPIENT                      COPIES ID  CODE/NAME            LTTR ENCL        ID CODE/NAME                   LTTR ENCL              D PD2-1 LA                     3      3      PD2-1 PD                            1    1 BECKER,D                      1      1                                                                D INTERNAL: ACRS                           10    10      AEOD/DOA                            1    1 AEOD/DSP/TPAB                 1     1     NRR/DLPQ/~LPEB10                   1    1, NRR/DOEA/OEAB                1      1      R G &I-LE                     1   1     1 RGN2                          1     1 EXTERNAL: EG&G BRYCE,J.H                  1     1     NRC PDR                            1     1 NSIC                          1     1 D
o5ooo4oo /
RECIPXENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DLPQ/~LPEB10 R
G &I-LE 1
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1, 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
A D
A D
D NOTE TO ALL "RIDS" RECIPIENTS:
D PLEASE HELP US TO REDUCE WASIE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
PLEASE HELP US TO REDUCE WASI E! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM   DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR                 24   ENCL     24
LTTR 24 ENCL 24


Carolina Power & Light Company P. O. Box 165 ~ New Hill N. C. 27562
Carolina Power & Light Company P. O. Box 165 ~ New Hill~ N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project MAR.
                                                                ~
1 2 1991 File Number'SHF/10-15505 Letter Number:
R. B. RICHEY Vice President Harris Nuclear Project MAR. 1 2 1991 File Number'SHF/10-15505 Letter Number: HO-913008 (0)
HO-913008 (0)
Document       Control Desk United States Nuclear Regulatory Commission Washington,         DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.                           1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT


==Dear       Sirs:==
==Dear Sirs:==
 
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.
1, Carolina Power
Yours very           truly, 1 R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc. 'Mr.       S. D. Ebneter (NRC-RII)
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.
Mr. R. G. Oehl (DOE)
Yours very truly, 1
Mr. J. E. Tedrow (NRC-SHNPP)
R.
MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR       ADOCK       05000400 PDR
B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc.'Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR ADOCK 05000400 PDR


1 p
1 p
IL
IL


DOCKET NO.:       050-400 UNIT:       Harris Unit 1 DATE:       February 1991 COMPLETED BY:   Mark Hale OPERATIONS  
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
February 1991 COMPLETED BY:
Mark Hale OPERATIONS


==SUMMARY==
==SUMMARY==
 
Harris Unit 1
Harris Unit     1 operated at a 100.00 percent Availability Factor for the referenced month and a 97.44 percent Capacity Factor.           There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheets.
operated at a 100.00 percent Availability Factor for the referenced month and a
There are   157 fuel assemblies   in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.
97.44 percent Capacity Factor.
In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse.
There were two events.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools.
306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.
In addition to the spent
: fuel, 60 new fuel assemblies were received from Westinghouse.
MEM/DATAREPa/1/OS4
MEM/DATAREPa/1/OS4


CnL                           PLANT PERFORMAHCE DATA SYSTEM                      PAGE RPD36-000 CO'UH DATE     03/07/91             OPERATING DATA REPORT RUH TIME 14: 28: 00                   HARRIS UNIT   1 DOCI(ET HO. 650"408 COMPLETED BY MARK W. HALE OPERATIHG STATUS                                          TELEPHONE     <919)362-2944 UHIT HANE:       HARRIS UHIT                       I NOTES                             I
CnL CO'UH DATE 03/07/91 RUH TIME 14: 28: 00 PLANT PERFORMAHCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
: 2. REPORTING PERIOD: FEBRUARY 91                       I See operations summary.           I
PAGE RPD36-000 OPERATIHG STATUS DOCI(ET HO. 650"408 COMPLETED BY MARK W.
: 3. LICEHBED THERMAL POWER (MWT): 2775                 I                                    I NAMEPLATE RATING (GROSS MWF): 958.9                 I                                    I
HALE TELEPHONE
: 5. DESIGN ELECTRICAL RATING <HET MWE): 980.0                                               I
<919)362-2944 UHIT HANE:
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8                                               I
HARRIS UHIT I
: 7. NAX DEPENDABLE CAPAclTY (HET MWE): 860.8
NOTES 2.
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7) SINCE LAST REPORT, GIVE REASONS: N/A
REPORTING PERIOD:
: 9. POWER LEVEL TO WHICH RESTRICTED       IF ANY (NET NWE):   None.
FEBRUARY 91 I
: 10. REASONS FOR RESTRICTION IF ANY:       N/A THIS           YR TO         CUNUL MONTH            DATE          ATIVE
See operations 3.
<<. HOURS IN REPORTING PERIOD                     672.00          1416.00        33577.08
LICEHBED THERMAL POWER (MWT): 2775 I
: 12. NUMBER OF HOURS REACTOR CRITICAL               672.80          1416.00        27262.09
NAMEPLATE RATING (GROSS MWF): 958.9 I
: 13. REACTOR RESERVE SHUTDOWN HRS                       .08              .00            .66
5.
: 14. HOURS GENERATOR OH LINE                       672.80          1416.00        26888.35
DESIGN ELECTRICAL RATING <HET MWE): 980.0 6.
: 15. UHIT RESERVE SHUTDOWN HOURS                       .08              .00            .08
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8 7.
: 16. GROSS THERMAL ENERGY GEH. (MWH)           1782562.32      3832583.58    78887827.88
NAX DEPENDABLE CAPAclTY (HET MWE): 860.8
: 17. GROSS ELEC. ENERGY GEN. (MWH)               600933.80        1292501.00    23544435.00
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7)
: 18. NET ELEC. ENERGY GEHERATED (MWH)           563<<6.68        12<<696.86    21888866.80
SINCE GIVE REASONS: N/A I
: 19. UNlT SERVICE FACTOR                           180.88            108.06            88.08
summary.
: 20. UNIT AVAILABIIITY FACTOR                       100.08            160.66          '80. 68
I I
: 21. UNIT CAP. FACTOR <USING NDC NET)               97.44            99.50            75.80
I I
: 22. UNIT CAP. FACTOR (USING DER NET)               93.11            95.88            72.43
I LAST REPORT, 9.
: 23. UNIT FORCED OUTAGE RATE                           .88              .00           4.43
POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE): None.
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS        (TYPE, DATE,   AHD DURATION OF   EACH):
10.
Refueling Outage,  March 16th,  1991      9  weeks.
REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUNUL ATIVE HOURS IN REPORTING PERIOD 12.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
NUMBER OF HOURS REACTOR CRITICAL 13.
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITlAL CRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH 1.16  9 MEM/DATREPa/2/OS4
REACTOR RESERVE SHUTDOWN HRS 14.
HOURS GENERATOR OH LINE 15.
UHIT RESERVE SHUTDOWN HOURS 16.
GROSS THERMAL ENERGY GEH.
(MWH) 17.
GROSS ELEC.
ENERGY GEN.
(MWH) 18.
NET ELEC.
ENERGY GEHERATED (MWH) 19.
UNlT SERVICE FACTOR 20.
UNIT AVAILABIIITY FACTOR 21.
UNIT CAP.
FACTOR
<USING NDC NET) 22.
UNIT CAP.
FACTOR (USING DER NET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONT Refueling Outage, March 16th, 672.00 1416.00 672.80 1416.00
.08
.00 672.80 1416.00
.08
.00 1782562.32 3832583.58 600933.80 1292501.00 563<<6.68 12<<696.86 180.88 108.06 100.08 160.66 97.44 99.50 93.11 95.88
.88
.00 HS (TYPE,
: DATE, AHD DURATION 1991 9 weeks.
33577.08 27262.09
.66 26888.35
.08 78887827.88 23544435.00 21888866.80 88.08
'80. 68 75.80 72.43 4.43 OF EACH):
: 25. IF SHUTDOWN AT END OF REPORT
: PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITlALCRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH MEM/DATREPa/2/OS4 1.16 9


I I
I I


CPhL CO                     PLANT PERFORMANCE DATA SYSTEH                PAGE RUN DATE 03/07/93     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TINE  34:27:58                HARRIS UNIT 3 DOCKET NO. 050-400 CONPLETED BY HARK W. HALE TELEPHONE (919)362-2944 FEBRUARY        199'3 DAY   AVG. DAILY POWER  I EVEL      DAY  AVG. DAILY POWER LEVEL (MWE-NET)                            (HWE-NET) 882                   17             874 SSO                                  872 823 29 873 873
CPhL CO RUN DATE RUN TINE 03/07/93 34:27:58 PLANT PERFORMANCE DATA SYSTEH APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 3
$ 0                                                   859 875 851                                  875 804 877 877 MEM/DATREPa/3/OS4
PAGE RPD39-000 FEBRUARY 199'3 DAY AVG. DAILY POWER I EVEL (MWE-NET)
DOCKET NO. 050-400 CONPLETED BY HARK W.
HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 882 SSO 823 17 29 874 872 873 873
$ 0 851 804 859 875 875 877 877 MEM/DATREPa/3/OS4
 
a


a '
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:           3/7/91 COMPLETED BY:   M. W. Hale TELEPHONE:       (919) 362"2944 REPORT MONTH:  February 1991 TI                      R      Method No.         Date       y       Duration                 of        Licensee      System Component          Cause  8, Corrective P        (Hours)             Shutting     Event       Code 4 Code 5                   Action to e                                Down      Report  f                                Prevent Recurrence Reactor Reduced  unit  power  to 70$  to 91-002         910203                 0.0                                             HA     VALVE   perform turbine valve testing. Unit was returned to 100$ power on 2-3-91.
February 1991 UNIT NAME:
I                       2                                                3                            4 F: Forced               Reason:                                          Method:                      Exhibit G-Instructions S: Scheduled             A-Equipment Failure (Explain)                     I-Manual                      for Preparation of Data B-Maintenance or Test                             2-Manual Scram                Entry Sheets for Licensee C-Refueling                                       3-Automatic Scram            Event Report (LER) File D-Regulatory Restriction                         4-Continued                    (NUREG-0161)
Harris DATE:
E-Operator Training 8, License Examination       5-Reduced Load F-Administrative                                  6-Other                       5 G-Operational Error (Explain)                                                   Exhibit I - Same Source MEM/DATAREPa/4/OS4
3/7/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362"2944 No.
Date TI y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause 8, Corrective Action to Prevent Recurrence 91-002 910203 0.0 HA VALVE Reduced unit power to 70$ to perform turbine valve testing.
Unit was returned to 100$ power on 2-3-91.
I F: Forced S: Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4


UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:       Harris DATE:             3/7/91 COMPLETED BY:     M. W. Hale TELEPHONE:       (919) 362-2944 REPORT MONTH:  February  1991 Tl                            Method No.         Date       y       Duration                 of      Licensee      System  Component            Cause 4  Corrective p        (Hours)             Shutting     Event         Code 4   Code 5                   Action to e                              Down      Report  f                                  Prevent Recurrence Reactor Reduced  unit  power  to "305 power due to 91-003       910224                 0.0                               N/A           HC     PIPE   a tube leak in the west side of the condenser. One leaking tube was plugged. Eight additional tubes in adjacent areas were plugged to prevent future problems. Unit was returned to full load on 2-26-91.
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
1                     2                                                    3                          4 F:   Forced             Reason:                                            Method:                      Exhibit G-Instructions S:   Scheduled         A-Equipment Failure (Explain)                       I-Manual                    for Preparation of Data B-Maintenance or Test                               2-Manual Scram              Entry Sheets for Licensee C-Refueling                                         3-Automatic Scram          Event Report (LER) File D-Regulatory Restriction                             4-Continued                  (NUREG-0161)
February 1991 UNIT NAME:
E-Operator Training 8, License Examination           5-Reduced Load F-Administrative                                     6-Other                      5 G-Operational Error (Explain)                                                     Exhibit  I -  Same  Source H-Other (Explain)
Harris DATE:
MEM/DATAREPa/5/OS4}}
3/7/91 COMPLETED BY:
M. W. Hale TELEPHONE:
(919) 362-2944 No.
Date Tl y
p e
Duration (Hours)
Method of Shutting Down Reactor Licensee Event Report f System Code 4
Component Code 5
Cause 4 Corrective Action to Prevent Recurrence 91-003 910224 0.0 N/A HC PIPE Reduced unit power to "305 power due to a tube leak in the west side of the condenser.
One leaking tube was plugged.
Eight additional tubes in adjacent areas were plugged to prevent future problems.
Unit was returned to full load on 2-26-91.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/5/OS4}}

Latest revision as of 06:51, 7 January 2025

Monthly Operating Rept for Feb 1991 for Harris Nuclear Power Plant Unit 1
ML18009A838
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/28/1991
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913008-(), HO-913008-(0), NUDOCS 9103180102
Download: ML18009A838 (10)


Text

ACCELERATED D TRIBUTION DEMONS TION SYSTEM

'a...r

'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103180102 DOC.DATE: 91/02/28 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME

, AUTHOR AFFXLXATION HALE,M.

Carolina Power 6 Light Co.

RICHEY,R.B.

. Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET'g 05000400 R

SUBJECT:

Monthly operating rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 ltr.

DXSTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.

o5ooo4oo /

RECIPXENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DLPQ/~LPEB10 R

G &I-LE 1

NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1, 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASIE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

Carolina Power & Light Company P. O. Box 165 ~ New Hill~ N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project MAR.

1 2 1991 File Number'SHF/10-15505 Letter Number:

HO-913008 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.

Yours very truly, 1

R.

B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc.'Mr. S.

D. Ebneter (NRC-RII)

Mr. R.

G. Oehl (DOE)

Mr. J.

E. Tedrow (NRC-SHNPP)

MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR ADOCK 05000400 PDR

1 p

IL

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

February 1991 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1

operated at a 100.00 percent Availability Factor for the referenced month and a

97.44 percent Capacity Factor.

There were two events.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools.

306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.

In addition to the spent

fuel, 60 new fuel assemblies were received from Westinghouse.

MEM/DATAREPa/1/OS4

CnL CO'UH DATE 03/07/91 RUH TIME 14: 28: 00 PLANT PERFORMAHCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-000 OPERATIHG STATUS DOCI(ET HO. 650"408 COMPLETED BY MARK W.

HALE TELEPHONE

<919)362-2944 UHIT HANE:

HARRIS UHIT I

NOTES 2.

REPORTING PERIOD:

FEBRUARY 91 I

See operations 3.

LICEHBED THERMAL POWER (MWT): 2775 I

NAMEPLATE RATING (GROSS MWF): 958.9 I

5.

DESIGN ELECTRICAL RATING <HET MWE): 980.0 6.

MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8 7.

NAX DEPENDABLE CAPAclTY (HET MWE): 860.8

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7)

SINCE GIVE REASONS: N/A I

summary.

I I

I I

I LAST REPORT, 9.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE): None.

10.

REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUNUL ATIVE HOURS IN REPORTING PERIOD 12.

NUMBER OF HOURS REACTOR CRITICAL 13.

REACTOR RESERVE SHUTDOWN HRS 14.

HOURS GENERATOR OH LINE 15.

UHIT RESERVE SHUTDOWN HOURS 16.

GROSS THERMAL ENERGY GEH.

(MWH) 17.

GROSS ELEC.

ENERGY GEN.

(MWH) 18.

NET ELEC.

ENERGY GEHERATED (MWH) 19.

UNlT SERVICE FACTOR 20.

UNIT AVAILABIIITY FACTOR 21.

UNIT CAP.

FACTOR

<USING NDC NET) 22.

UNIT CAP.

FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE 24.

SHUTDOWNS SCHED.

OVER NEXT 6 MONT Refueling Outage, March 16th, 672.00 1416.00 672.80 1416.00

.08

.00 672.80 1416.00

.08

.00 1782562.32 3832583.58 600933.80 1292501.00 563<<6.68 12<<696.86 180.88 108.06 100.08 160.66 97.44 99.50 93.11 95.88

.88

.00 HS (TYPE,

DATE, AHD DURATION 1991 9 weeks.

33577.08 27262.09

.66 26888.35

.08 78887827.88 23544435.00 21888866.80 88.08

'80. 68 75.80 72.43 4.43 OF EACH):

25. IF SHUTDOWN AT END OF REPORT
PERIOD, ESTIMATED DATE OF START UP:

26.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITlALCRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH MEM/DATREPa/2/OS4 1.16 9

I I

CPhL CO RUN DATE RUN TINE 03/07/93 34:27:58 PLANT PERFORMANCE DATA SYSTEH APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 3

PAGE RPD39-000 FEBRUARY 199'3 DAY AVG. DAILY POWER I EVEL (MWE-NET)

DOCKET NO. 050-400 CONPLETED BY HARK W.

HALE TELEPHONE (919)362-2944 DAY AVG. DAILY POWER LEVEL (HWE-NET) 882 SSO 823 17 29 874 872 873 873

$ 0 851 804 859 875 875 877 877 MEM/DATREPa/3/OS4

a

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

February 1991 UNIT NAME:

Harris DATE:

3/7/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362"2944 No.

Date TI y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report f System Code 4

Component Code 5

Cause 8, Corrective Action to Prevent Recurrence 91-002 910203 0.0 HA VALVE Reduced unit power to 70$ to perform turbine valve testing.

Unit was returned to 100$ power on 2-3-91.

I F: Forced S: Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

February 1991 UNIT NAME:

Harris DATE:

3/7/91 COMPLETED BY:

M. W. Hale TELEPHONE:

(919) 362-2944 No.

Date Tl y

p e

Duration (Hours)

Method of Shutting Down Reactor Licensee Event Report f System Code 4

Component Code 5

Cause 4 Corrective Action to Prevent Recurrence 91-003 910224 0.0 N/A HC PIPE Reduced unit power to "305 power due to a tube leak in the west side of the condenser.

One leaking tube was plugged.

Eight additional tubes in adjacent areas were plugged to prevent future problems.

Unit was returned to full load on 2-26-91.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161) 5 Exhibit I - Same Source MEM/DATAREPa/5/OS4