Monthly Operating Rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 Ltr
ML18009A838
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 02/28/1991
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-913008-(), HO-913008-(0), NUDOCS 9103180102
Download: ML18009A838 (10)


Text

ACCELERATED D TRIBUTION DEMONS TION SYSTEM

'a...r

'r REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9103180102 DOC.DATE: 91/02/28 NOTARIZED: NO DOCKET'g FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME , AUTHOR AFFXLXATION HALE,M. Carolina Power 6 Light Co.

RICHEY,R.B. . Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept for Feb 1991 for Harris Nuclear Power Plant Unit 1.W/910312 ltr. '

DXSTRIBUTION CODE IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed. o5ooo4oo /

RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-1 LA 3 3 PD2-1 PD 1 1 BECKER,D 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/~LPEB10 1 1, NRR/DOEA/OEAB 1 1 R G &I-LE 1 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASI E! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION'IPID FOR DOCUMENTS YOU DON T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Carolina Power & Light Company P. O. Box 165 ~ New Hill N. C. 27562

~

R. B. RICHEY Vice President Harris Nuclear Project MAR. 1 2 1991 File Number'SHF/10-15505 Letter Number: HO-913008 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of February 1991.

Yours very truly, 1 R. B. Richey Vice President Harris Nuclear Project MWH:svm Enclosure cc. 'Mr. S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP)

MEM/DATAREPa/1/OS4 9i03130l02 910228 PDR ADOCK 05000400 PDR

1 p

IL

DOCKET NO.: 050-400 UNIT: Harris Unit 1 DATE: February 1991 COMPLETED BY: Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100.00 percent Availability Factor for the referenced month and a 97.44 percent Capacity Factor. There were two events. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 438 spent fuel assemblies in the Spent Fuel Pools. 306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant. Twenty eight of the spent fuel assemblies in the Spent Fuel Pools are from CPSL's Robinson Plant.

In addition to the spent fuel, 60 new fuel assemblies were received from Westinghouse.

MEM/DATAREPa/1/OS4

CnL PLANT PERFORMAHCE DATA SYSTEM PAGE RPD36-000 CO'UH DATE 03/07/91 OPERATING DATA REPORT RUH TIME 14: 28: 00 HARRIS UNIT 1 DOCI(ET HO. 650"408 COMPLETED BY MARK W. HALE OPERATIHG STATUS TELEPHONE <919)362-2944 UHIT HANE: HARRIS UHIT I NOTES I

2. REPORTING PERIOD: FEBRUARY 91 I See operations summary. I
3. LICEHBED THERMAL POWER (MWT): 2775 I I NAMEPLATE RATING (GROSS MWF): 958.9 I I
5. DESIGN ELECTRICAL RATING <HET MWE): 980.0 I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.8 I
7. NAX DEPENDABLE CAPAclTY (HET MWE): 860.8
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 TI.IRU 7) SINCE LAST REPORT, GIVE REASONS: N/A
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET NWE): None.
10. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUNUL MONTH DATE ATIVE

<<. HOURS IN REPORTING PERIOD 672.00 1416.00 33577.08

12. NUMBER OF HOURS REACTOR CRITICAL 672.80 1416.00 27262.09
13. REACTOR RESERVE SHUTDOWN HRS .08 .00 .66
14. HOURS GENERATOR OH LINE 672.80 1416.00 26888.35
15. UHIT RESERVE SHUTDOWN HOURS .08 .00 .08
16. GROSS THERMAL ENERGY GEH. (MWH) 1782562.32 3832583.58 78887827.88
17. GROSS ELEC. ENERGY GEN. (MWH) 600933.80 1292501.00 23544435.00
18. NET ELEC. ENERGY GEHERATED (MWH) 563<<6.68 12<<696.86 21888866.80
19. UNlT SERVICE FACTOR 180.88 108.06 88.08
20. UNIT AVAILABIIITY FACTOR 100.08 160.66 '80. 68
21. UNIT CAP. FACTOR <USING NDC NET) 97.44 99.50 75.80
22. UNIT CAP. FACTOR (USING DER NET) 93.11 95.88 72.43
23. UNIT FORCED OUTAGE RATE .88 .00 4.43
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AHD DURATION OF EACH):

Refueling Outage, March 16th, 1991 9 weeks.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITlAL CRITICALITY INITIAL ELEC TRICITY COMMERCIAL OPERATIOH 1.16 9 MEM/DATREPa/2/OS4

I I

CPhL CO PLANT PERFORMANCE DATA SYSTEH PAGE RUN DATE 03/07/93 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TINE 34:27:58 HARRIS UNIT 3 DOCKET NO. 050-400 CONPLETED BY HARK W. HALE TELEPHONE (919)362-2944 FEBRUARY 199'3 DAY AVG. DAILY POWER I EVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (HWE-NET) 882 17 874 SSO 872 823 29 873 873

$ 0 859 875 851 875 804 877 877 MEM/DATREPa/3/OS4

a '

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362"2944 REPORT MONTH: February 1991 TI R Method No. Date y Duration of Licensee System Component Cause 8, Corrective P (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor Reduced unit power to 70$ to 91-002 910203 0.0 HA VALVE perform turbine valve testing. Unit was returned to 100$ power on 2-3-91.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source MEM/DATAREPa/4/OS4

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris DATE: 3/7/91 COMPLETED BY: M. W. Hale TELEPHONE: (919) 362-2944 REPORT MONTH: February 1991 Tl Method No. Date y Duration of Licensee System Component Cause 4 Corrective p (Hours) Shutting Event Code 4 Code 5 Action to e Down Report f Prevent Recurrence Reactor Reduced unit power to "305 power due to 91-003 910224 0.0 N/A HC PIPE a tube leak in the west side of the condenser. One leaking tube was plugged. Eight additional tubes in adjacent areas were plugged to prevent future problems. Unit was returned to full load on 2-26-91.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training 8, License Examination 5-Reduced Load F-Administrative 6-Other 5 G-Operational Error (Explain) Exhibit I - Same Source H-Other (Explain)

MEM/DATAREPa/5/OS4