ML18022A558: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML18022A558
| number = ML18022A558
| issue date = 07/31/1987
| issue date = 07/31/1987
| title = Monthly Operating Rept for Jul 1987.W/870813 Ltr
| title = Monthly Operating Rept for Jul 1987
| author name = Hale M, Watson R
| author name = Hale M, Watson R
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:~                                       ~ ~
{{#Wiki_filter:~
CPKK Carolinapower S Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New Hill, North     Carolina   27562 AUG   33 1987 File Number: SHF/10-15505 Letter Number'HO-875011 (0)
~ ~
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555 HARRIS''NUCLEAR PROJECT DEPARTMENT UNIT NO.       1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
CPKK Carolinapower S Light Company HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 AUG 33 1987 File Number:
SHF/10-15505 Letter Number'HO-875011 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.
20555 HARRIS''NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT


==Dear Sirs:==
==Dear Sirs:==
 
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1987.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1987.
Yours very   truly, R. A. Watson Vice President Harris Nuclear Project MWH:gmw Enclosure cc:   Dr. J. Nelson Grace (NRC)
Yours very truly, MWH:gmw Enclosure R. A. Watson Vice President Harris Nuclear Project cc:
Messrs. J. M. Taylor (NRC)
Dr. J. Nelson Grace (NRC)
Messrs.
J.
M. Taylor (NRC)
G. F. Maxwell (NRC-SHNPP)
G. F. Maxwell (NRC-SHNPP)
R. G. Oehl (DOE) 8708170392 87073i PDR ADOCK 05000400 PDR MEM/HO-875011/Page   1/OS3
R. G. Oehl (DOE) 8708170392 87073i PDR ADOCK 05000400 PDR
                                                                  /p
/p MEM/HO-875011/Page 1/OS3


              ~ ~
~ ~
OPERATING DATA REPORT DOCKET NO. 050"400 DATE 8/6/87 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 OPERATING STATUS Notes.'.
OPERATING DATA REPORT OPERATING STATUS DOCKET NO. 050"400 DATE 8/6/87 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 Notes.'.
Unit Name'. Shearon Harris Unit   1 2 1  Reporting Period: July 1987 3 ~ ,Licensed Thermal Power (MWt): 2775 4 ~  Nameplate Rating (Gross MWe):     950 5 ~  Design Electrical Rating (Net-MWe):   900 6;   Maximum Dependable   Capacity (Gross-MWe): 920 7.'aximum     Dependable Capacity (Net-MWe): 860
2 1 3 ~
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:     N/A
4 ~
: 9. Power Level to Which Restricted,     if any (Net-MWe): None
5 ~
: 10. Reasons for Restrictions,   if any: N/A This Month           Yr.-to-Date     Cumulative
Unit Name'.
: 11. Hours in Report Period                           744.00               2184.00      2184.00
Shearon Harris Unit 1
: 12. Number of Hours Reactor   Was Critical           597 F 10             1813.22      1813.22
Reporting Period:
: 13. Reactor Reserve Shutdown Hours                               0.00         0.00          0.00
July 1987
: 14. Hours Generator On-Line                           586.95               1770.80      1770.80
,Licensed Thermal Power (MWt):
: 15. Unit Reserve Shutdown Hours                                 0.00         0.00            .00
2775 Nameplate Rating (Gross MWe):
: 16. Gross Thermal Energy Generated (MWH)         1453711.50             4455500.04    4455500.04
950 Design Electrical Rating (Net-MWe):
: 17. Gross Electrical Energy Generated (MWH)       471233.00             1450568.00    1450568.00
900 6;
: 18. Net Electrical Energy Generated (MWH)         431956.00             1334785 00    1334785 F 00
Maximum Dependable Capacity (Gross-MWe):
: 19. Unit Service Factor                                         78. 89       81.08          81.08
920 7.'aximum Dependable Capacity (Net-MWe):
: 20. Unit Availability Factor                                   78.89         81.08          81 F 08
860 8.
: 21. Unit Capacity Factor (Using   MDC Net)                   67.51           71.07          71.07
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 22. Unit Capacity Factor (Using   DER Net)                     64.51         67.91          67.91
N/A 9.
: 23. Unit Forced Outage Rate                                     1.89         5.16          5.16
Power Level to Which Restricted, if any (Net-MWe):
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration              of Each):
None 10.
Surveillance Test Outage / October 10, 1987 / Two Weeks
Reasons for Restrictions, if any:
: 25. If Shut Down at end of Report Period, Estimated Date of           Startup'N/A
N/A This Month Yr.-to-Date Cumulative 11.
: 26. Units in Test   Status (Prior to Commercial Operation):
Hours in Report Period 744.00 12.
Forecast             Achieved INITIAL CRITICALITY      12/30/86               1/3/87 INITIAL ELECTRICITY      1/11/87               1/19/87 COMMERCIAL OPERATION    4/25/87               5/2/87 MEM/DATAREPa/Page 1/OS3
Number of Hours Reactor Was Critical 597 F 10 13.
Reactor Reserve Shutdown Hours 0.00 14.
Hours Generator On-Line 586.95 15.
Unit Reserve Shutdown Hours 0.00 16.
Gross Thermal Energy Generated (MWH) 1453711.50 17.
Gross Electrical Energy Generated (MWH) 471233.00 18.
Net Electrical Energy Generated (MWH) 431956.00 19.
Unit Service Factor
: 78. 89 20.
Unit Availability Factor 78.89 21.
Unit Capacity Factor (Using MDC Net) 67.51 22.
Unit Capacity Factor (Using DER Net) 64.51 23.
Unit Forced Outage Rate 1.89 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Surveillance Test Outage / October 10, 1987 /
2184.00 1813.22 0.00 1770.80 0.00 4455500.04 1450568.00 1334785 00 81.08 81.08 71.07 67.91 5.16 Duration of Two Weeks 2184.00 1813.22 0.00 1770.80
.00 4455500.04 1450568.00 1334785 F 00 81.08 81 F 08 71.07 67.91 5.16 Each):
: 25. If Shut Down at end of Report Period, Estimated Date of Startup'N/A 26.
Units in Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY 12/30/86 INITIALELECTRICITY 1/11/87 COMMERCIAL OPERATION 4/25/87 Achieved 1/3/87 1/19/87 5/2/87 MEM/DATAREPa/Page 1/OS3


            ~ ~
~ ~
PLANT PERFORMANCE DATA SYSTEM, APPENDIX B -'VERAGE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 July  1987 DAY         AVG. DAILY POWER LEVEL           DAY     AVG. DAILY POWER LEVEL (MWE-NET)                                (MWE-NET) 810                     17               -32 839                     18               -32 432                     19               -35 404                     20               -39 5                     732                     21               -39 846                     22               248 846                     23               815 848                     24                 835 352                     25                 823 10                   647                     26                 833 840                     27                 836 12                   844                     28                 837 13                   840                     29                 847 14                    798                    30                846 15                    306                    31                841 16                     30 MEM/DATAREPa/Page 2/OS3
PLANT PERFORMANCE DATA SYSTEM, APPENDIX B -'VERAGE DAILY POWER LEVEL HARRIS UNIT 1 July 1987 DOCKET NO. 050-400 COMPLETED BY M.
W.
HALE TELEPHONE (919) 362-2944 DAY AVG. DAILY POWER LEVEL (MWE-NET)
DAY AVG. DAILY POWER LEVEL (MWE-NET) 810 17
-32 839 18
-32 432 19
-35 404 20
-39 5
732 21
-39 846 22 248 846 23 815 848 24 835 352 25 823 10 647 26 833 840 27 836 12 844 28 837 13 14 15 840 798 306 29 30 31 847 846 841 16 30 MEM/DATAREPa/Page 2/OS3


UNIT SHUTDOWNS AND POWER REDUCTION                             DOCKET   NO,:     050-400 UNIT NAME:   - Harris DATE:     8/6/87 COMPLETED BY:       M, W. Hale TELEPHONE:     (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                     R      Method Date      y       Duration               of        Licensee        System    Component          Cause 6  Corrective P        (Hours)             Shutting       Event         Code 4     Code 5                   Action to e                              Down      Report If                                    Prevent Recurrence Reactor 87-028         870703                                                   N/A           HH       PUMPXX   Load reduction to repair the Main Feedpump IA outboard pump seal.       The pump was removed from service and the seal was replaced'n       addition, the motor bearings were replaced, a new lube oil pump and lube o(l hose was Installed. Unit was returned to full service after the repairs-.
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
Reason:                                              Method:                        Exhibit G-Instructions F:   Forced Scheduled       A-Equipment Failure (Explain)                         1-Manual                        for Preparation of Data S:
JULY 1987 DOCKET NO,:
B&alntenance or Test                                 2-Manual Scram                  Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram.              Event Report (LER)    File 4-Continued                    (NUREGW161 )
050-400 UNIT NAME: -
regulatory Restriction E-Operator Training d License Examination             5-Reduced  Load F-Administrative                                     60thef G-Operational Error (Explain)                                                         Exhibit  I - Same  Source H-Other (Explain)
Harris DATE:
MEM/DATAREPa/Page 3/OS3
8/6/87 COMPLETED BY:
M, W. Hale TELEPHONE:
(919) 362-2944 Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report If System Code 4
Component Code 5
Cause 6 Corrective Action to Prevent Recurrence 87-028 870703 N/A HH PUMPXX Load reduction to repair the Main Feedpump IA outboard pump seal.
The pump was removed from service and the seal was replaced'n addition, the motor bearings were replaced, a new lube oil pump and lube o(l hose was Installed.
Unit was returned to full service after the repairs-.
F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B&alntenance or Test C-Refueling regulatory Restriction E-Operator Training d License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram.
4-Continued 5-Reduced Load 60thef Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREGW161 )
Exhibit I - Same Source MEM/DATAREPa/Page 3/OS3


UNIT SHUTDOWNS AND POWER REDUCTION                               DOCKET NO,:   050-400 UNIT NAME:     Harris DATE:   8/6/87 COMPLETED BY:     M. W Hale TELEPHONE:     (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                         R      Method Date      y       Duration                   of        Licensee        System    Component            Cause 4  Corrective (Hours)               Shutting,     Event         Code 4     Code 5                   Action to P
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
e                                  Down      Report  l                                    Prevent Recurrence Reactor 87&29         870709               I I ~ 30                             87-042         SD       VALVEX   Reactor/Turbine Trip from     full power due to Low-Low Level on 1C steam generator. This occurred when a clearance tag was hung on an. ammonia chemical addition valve for feedwater and the control fuse for the IC feed-water isolation valve was mistakenly removed. This caused isolation valve to close and lead to the Low-Low Level trip. Operations personnel will be retralned on interpretting control wiring diagrams, Unit was returned to service.
JULY 1987 DOCKET NO,:
Reason:                                                  Method:                          Exhibit G-Instructions F:   Forced Scheduled         A-Equipment Failure (Explain)                           1-Manual                        for Preparation of Data S:
050-400 UNIT NAME:
B-Maintenance or Test                                     2-Manual Scram                   Entry Sheets for Licensee C-Refueling                                              3-Automatic Scram,               Event Report (LER)    File 4-Continued                       (NUREG-0161)
Harris DATE:
D-Regulatory Restriction EWperator Training II License Examination                5-Reduced   Load F-Administrative                                          6-Other G-Operational Error    (Explain )
8/6/87 COMPLETED BY:
Exhibit I - Same Source H-Other (Explain)
M.
                                                                                " Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 4/OS3
W Hale TELEPHONE:
(919) 362-2944 Date Tl y
P e
Duration (Hours)
R Method of
: Shutting, Down Reactor Licensee Event Report l System Code 4
Component Code 5
Cause 4 Corrective Action to Prevent Recurrence 87&29 870709 I I ~ 30 87-042 SD VALVEX Reactor/Turbine Trip from full power due to Low-Low Level on 1C steam generator.
This occurred when a
clearance tag was hung on an. ammonia chemical addition valve for feedwater and the control fuse for the IC feed-water isolation valve was mistakenly removed.
This caused isolation valve to close and lead to the Low-Low Level trip.
Operations personnel will be retralned on interpretting control wiring diagrams, Unit was returned to service.
F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction EWperator Training II License Examination F-Administrative G-Operational Error (Explain
)
H-Other (Explain)
Method:
1-Manual 2-Manual Scram 3-Automatic Scram, 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I - Same Source
" Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 4/OS3


UNIT SHUTDOWNS AND POWER REDUCTION                                 DOCKET   NO,:   050-400 UNIT NAME:       Harris DATE:     8/6/87 COMPLETED    8Y:    M. W Hale TELEPHONE:        (919) 362-2944 REPORT MONTH:  JULY 1987 Tl                       R      Method Date      y         Duration                 of        Licensee      System    Component              Cause  II  Col recilve P          (Hours)             Shutting       Event       Code 4     Code 5                     Action to e                                Down      Report S                                        Prevent Recurrence Reactor 87-030         870714                                                     N/A                   PIPEXX       Load reduction to repair 18 main feedpump hot bleed off and seal water injection lines and to clean and inspect the condenser <<ater.boxes.
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
JULY 1987 DOCKET NO,:
UNIT NAME:
DATE:
COMPLETED 8Y:
TELEPHONE:
050-400 Harris 8/6/87 M.
W Hale (919) 362-2944 Date Tl y
P e
Duration (Hours)
R Method of Shutting Down Reactor Licensee Event Report S
System Code 4
Component Code 5
Cause II Col recilve Action to Prevent Recurrence 87-030 870714 N/A PIPEXX Load reduction to repair 18 main feedpump hot bleed off and seal water injection lines and to clean and inspect the condenser
<<ater.boxes.
Repairs and inspections were implemented, Unit was returned to service.
Repairs and inspections were implemented, Unit was returned to service.
F:   Forced             Reason:                                                Method:                          Exhibit G-Instructions S:   Scheduled         A-Equipment Failure (Explain)                         I-Manual                          for Preparation of Data 8-Maintenance or Test                                 2-Manual Scram                    Entry Sheets for Licensee C-Refueling                                           3-Automatic Scram,                Event Report (LER)      File C Regulatory Restriction                               4Contlnued                        (NUREG&161 )
F:
E-Operator Training 8, License Examination             5-Reduced Load F-Administrative                                      6-Other                     . 5 G-Operational Error (Explain)                                                           Exhibit I - Same   Source H-Other (Explain)
Forced S:
                                                                              "Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 5/OS3
Scheduled Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling C Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
I-Manual 2-Manual Scram 3-Automatic Scram, 4Contlnued 5-Reduced Load 6-Other
. 5 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG&161 )
Exhibit I - Same Source "Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 5/OS3


UNIT SHUTDOWNS AND POWER REDUCTION                                 DOCKET NO,:   050-400 UNIT NAME:     Harris DATE:   8/6/87 COMPLETED BY:    M. W   Hale TELEPHONE:    (9I9) 362-2944 REPORT MONTH:  JULY 1987 Tl                      R2    Method No,           Date       y       Duration               of        Licensee        System    Component            Cause II Corrective P        (Hours)             Shutting     Event           Code 4     Code 5                     Action to e                                Down      Report    I                                      Prevent Recurrence Reactor 8731           870716               145,75                             N/A             Hl       VALVE     Unit removed from service to repair leaking steam generator blowdown valves and to perform inspections of production equipment, Repairs were implemented to the condenser and 5AKB.
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
feedwater heaters, Temporary repairs Implemented on the steam generator blowdown valves with permanent repairs scheduled for the fall outage       Unit was returned to service, 4
JULY 1987 DOCKET NO,:
F:   Forced             Reason:                                                Method:                          Exhibit G-Instructions S:   Scheduled         A-Equipment Failure (Explain[                     ~  I-Manual                          for Preparation of Data 8-Maintenance or Test                                   2-Manual Scram                    Entry Sheets for Licensee C-Refueling                                             3-Automatic Scram,                Event Report (LER)  File D-Regulatory Restriction                               4-Continued                      (NUREG-0161)
UNIT NAME:
E-Operator Training II License Examination             5-Reduced  Load F-Administrative                                     . 6&ther G-Operational Error (Explain)                                                             Exhibit  I  Same Source H-Other (Explain)
DATE:
MEM/DATAREPa/Page 6/OS3
COMPLETED BY:
TELEPHONE:
050-400 Harris 8/6/87 M.
W Hale (9I9) 362-2944 No, Date Tl y
P e
Duration (Hours)
R2 Method of Shutting Down Reactor Licensee Event Report I System Code 4
Component Code 5
Cause II Corrective Action to Prevent Recurrence 8731 870716 145,75 N/A Hl VALVE Unit removed from service to repair leaking steam generator blowdown valves and to perform inspections of production equipment, Repairs were implemented to the condenser and 5AKB.
feedwater heaters, Temporary repairs Implemented on the steam generator blowdown valves with permanent repairs scheduled for the fall outage Unit was returned to service, F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain[
8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
~ I-Manual 2-Manual Scram 3-Automatic Scram, 4-Continued 5-Reduced Load
. 6&ther 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit I Same Source MEM/DATAREPa/Page 6/OS3


September   3, 1987       DISTR ENCLOSURES I BUT ION         '/0 PDII-1 R/F id                                                    PAnderson lD.o,c.k:e't-N         o. 5'0=40.0M DOCKET- NO(S) .        50-400
DOCKET-NO(S).
50-400 id September 3,
1987 DISTR I BUT ION'/0 ENCLOSURES PDII-1 R/F PAnderson lD.o,c.k:e't-N o.
5'0=40.0M


==SUBJECT:==
==SUBJECT:==
BI-WEEKLY NOTICE APPLICATIONS AND AMENDMENTS TO OPERATING LICENSE INVOLVING NO SIGNIFICANT. HAZARDS CONSIDERATIONS-SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT 1 The   following documents concerning our review of the subject                               facility are             transmitted for your information.
BI-WEEKLY NOTICE APPLICATIONS AND AMENDMENTS TO OPERATING LICENSE INVOLVING NO SIGNIFICANT. HAZARDS CONSIDERATIONS-SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT 1 The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q     Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                       dated
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
                                                                                      ~
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated
Environmental Assessment and Finding of No Significant Impact, dated Q     Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated
[jg Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No d
[jg Hi-Weekly Notice; Applications and Amendments to Operating Licenses                                         Involving No d d id           li
d id li
* d d                   id                 , d d           d         d i]
* d d
Exemption, dated Construction Permit No. CPPR-                                         , Amendment No.                         dated Facility Operating License No.                                         , Amendment No.                         dated Order Extending Construction Completion Date, dated Monthly Operating Report for                                                 transmitted by letter dated dd Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
id d
d~
d d i]
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated dd Annual/Semi-Annual Report-transmitted by letter dated


==Enclosures:==
==Enclosures:==
As stated Office of Nuclear Reactor Regulation cc: See Next Page i
OFFICE/
~
J P, o P D $
SURN*MEP P P nd p DATE)I 9/3 7
~jSA o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~
~ ~
~
d ~ ~
~
~
~ ~ ~ ~ ~ ~
~ ~ ~
'RC FORM 3 I8 IIOIBOINRCM 0240 OFFICIAL RECORD COPY


As  stated cc: See Next Page i
~
OFFICE/ ~
P, o
P D$
J SURN*MEP DATE)I PP  nd p 9/3    7
                            ~ j SA o~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~  ~ ~ ~ ~ ~ ~ ~ ~ ~
                                                                                                                ~ ~ ~ ~ ~ ~ ~  ~ ~ ~ d ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
'RC FORM 3 I 8 IIOIBOI NRCM 0240                              OFFICIAL RECORD COPY


~
Mr. D. A. Nauman South Carolina Electric 5 Gas Company Virgil C.
Mr. D. A. Nauman South Carolina Electric 5 Gas Company   Virgil C. Summer Nuclear Station CC:
Summer Nuclear Station CC:
Mr. William A. Williams,   Jr.
Mr. William A. Williams, Jr.
Technical Assistant - Nuclear Operations Santee Cooper P.O. Box 764 (Mail Code 167)
Technical Assistant - Nuclear Operations Santee Cooper P.O.
Columbia, South Carolina 29218 J. B. Knotts, Jr., Esq.
Box 764 (Mail Code 167)
Columbia, South Carolina 29218 J.
B. Knotts, Jr.,
Esq.
Bishop, Liberman, Cook, Purcell and Reynolds 1200 17th Street, N.W.
Bishop, Liberman, Cook, Purcell and Reynolds 1200 17th Street, N.W.
Washington, D. C. 20036 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Chairman, Fairfield County Council P.O. Box 293 Winnsboro, South Carolina 29180 Attorney General Box 11549 Columbia, South Carolina   29211 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental   Control 2600 Bull Street Columbia, South Carolina   29201
Washington, D. C.
20036 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Chairman, Fairfield County Council P.O.
Box 293 Winnsboro, South Carolina 29180 Attorney General Box 11549
: Columbia, South Carolina 29211 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street
: Columbia, South Carolina 29201


~   o y   ~ l
~
          ~ ~
o y
~
l
~ ~


August 19, 1987             DISTR I BUTI'ON:   M/0 ENCLOSURES
DOCKET NO(S).
                                                                                                    ~Docke.t No.. 5.0   4003 PDI I-I r/f DOCKET        NO(S).            50 400                                                  PAnderson Corrected. Monthly operating Report for June 1987 Shearon Harris Nuclear Power Plant, Unit 1 The   following               documents       concerning our review of the subject   facility are   transmitted for your information.
50 400 August 19, 1987 DISTR I BUTI'ON:
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q     Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                               dated Environmental Assessment and Finding of No Significant Impact, dated Q     Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q     Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                     [see page(s) 3 Exemption, dated Construction Permit No. CPPR-                                   , Amendment No.                 da'ted
M/0 ENCLOSURES
          +     Facility Operating License No.                                   , Amendment No.               dated Order Extending Construction Completion Date, dated CorrGkMonthly Operating Report for Shearon Harris transmitted by letter dated Jul 8                                   ~98        9
~Docke.t No..
-'c ted
5.0 4003 PDI I-I r/f PAnderson Corrected. Monthly operating Report for June 1987 Shearon Harris Nuclear Power Plant, Unit 1
          +     Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation Encl osures:
The following documents concerning our review of the subject facility are transmitted for your information.
As   stated See         Next Blge OFFICE)
dated
              .'J.A.'P. RI 5,;.
~98 9 transmitted by letter dated Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
SURNAME) 3!Andarsan.                       ~~~~ ~ ~ ~ ~ ~ ~ ~
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated
OAVES P      8/19/87
[see page(s) 3 Exemption, dated Construction Permit No.
              ~ ~~ ~~~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~
CPPR-
NRC FORM 3IB ROIBOI NRCM 0240                                     OFFICIAL RECORD COPY
, Amendment No.
da'ted
+ Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated CorrGkMonthly Operating Report for Shearon Harris transmitted by letter dated Jul 8
-'cted + Annual/Semi-Annual Report-Encl osures:
As stated Office of Nuclear Reactor Regulation See Next Blge OFFICE)
SURNAME)
OAVES P
.'J.A.'P. RI5,;.
3!Andarsan.
8/19/87
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~
~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~
NRC FORM 3IB ROIBOI NRCM 0240 OFFICIAL RECORD COPY


~ 0     ~
~ 0
~
A 1
A 1
I 7,
7, I
I
I


Shearon Harris CC: Chief Division of Ecological'ervices Bureau of Sport Fisheries 5. Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
Shearon Harris CC:
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave., NW Washington, DC 20230 Dr. William B. Stroube, Jr.
Chief Division of Ecological'ervices Bureau of Sport Fisheries
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD   20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street,   NE Atlanta, GA 30365
: 5. Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365


t August 17, 1987                           DISTRIBUTION:               W/0 ENCLOSURES PDI         I-I R/F PAnderson DOCKET    NO(S).      50 400                                                                              ~Docket No. 50-4003 SUBJECT-       Bi-Weekly Notice Appl ications and Amendments to Operating Licensee. Involving No Significant Hazards Considerations Shear on Harr                   is Nuclear         Power   Plant, Unit             1 The   following documents concerning our review of the subject                                         facility are               transmitted for your information.
t
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                                           dated
 
                                                                                  ~
DOCKET NO(S).
Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 i ty Operating License, dated
50 400 August 17, 1987 DISTRIBUTION:
      +XBi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No dig id'                     d         C           dd   d   . d   d                     g               d d]
W/0 ENCLOSURES PDI I-I R/F PAnderson
Exemption, dated Construction Permit No. CPPR-Facility Operating License Order Extending Construction Completion Date, dated No.,         , Amendment No.
~Docket No. 50-4003 SUBJECT-Bi-Weekly Notice Appl ications and Amendments to Operating Licensee. Involving No Significant Hazards Considerations Shear on Harr is Nuclear Power Plant, Unit 1
The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 ity Operating License, dated
+XBi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No dig id' d
C dd d
d d~
g d d]
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.,
Amendment No.
Amendment No.
dated dated Monthly Operating Report for                                                     transmitted by letter dated
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated
      +   Annual/Semi-Annual Report-transmitted by     letter     dated..
+ Annual/Semi-Annual Report-transmitted by letter dated..
Office of Nuclear Reactor Regulation Encl osures:
Encl osures:
As   stated See     Next Page OFFICE)   :LA:PDII-I SURNAME)
As stated Office of Nuclear Reactor Regulation See Next Page OFFICE)
          .P.hndar.san.       J) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
SURNAME)
DATE)    8/17/87 ",                                                        ~~ ~~   ~~~~~~~~~~~~~ ~~~~~~~~~~~~~ I~ ~ ~ ~ ~ ~ ~
DATE)
NRC FORM 3I8 IIO/80I NRCM 0240                                   OFFICIAL RECORD 'COPY
:LA:PDII-I
.P.hndar.san.
8/17/87 ",
J) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~I~ ~ ~ ~ ~ ~ ~
NRC FORM 3I8 IIO/80I NRCM 0240 OFFICIAL RECORD 'COPY


        ~ ~     ~ ~
~ ~
J a I J   il           ~ t r
~ ~
7 ~
J a
I J
il
~ t r
7
~


Mr. E. E. Utley Carolina Power   8 Light Company     Shearon Harris CC:
Mr. E.
Thomas A. Baxter, Esq.                 Ms. Carol Love Shaw, Pittman, Potts 8   Trowbridge   100 Park Drive 2300 N Street,   NW                   P.O. Box 12276 Washington, DC   20037               Research  Triangle Park,  NC  27709 Mr. D. E. Hollar                       Regional Administrator, Region II Associate General Council             U.S. Nuclear Regulatory Commission Carolina Power   8 Light Company     101 Marietta Street P.O. Box 1551                         Suite 2900 Raleigh, North Carolina     27602     Atlanta, Georgia  30303 Resident Inspector/Harris NPS         Mr. J. L. Willis c/o U.S. Nuclear Regulatory Commission Plant General Manager Route 1, Box 315B                     Harris Nuclear Plant New Hill, North   Carolina 27562     P.O. Box 165 New Hill North Carolina   27562 Mr. R. A. Watson                      Mr. Dayne H. Brown, Chief Vice President                        Radiation Protection Section Harris Nuclear Plant                  Division of Facility Services P.O. Box 165                          N.C. Department of Human Resources New  Hill, North  Carolina  27562    701 Barbour Drive Raleigh, North Carolina 27603-2008
E. Utley Carolina Power 8 Light Company CC:
Thomas A. Baxter, Esq.
Shaw, Pittman, Potts 8 Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. D. E. Hollar Associate General Council Carolina Power 8 Light Company P.O.
Box 1551
: Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.
Box 165 New Hill, North Carolina 27562 Shearon Harris Ms. Carol Love 100 Park Drive P.O.
Box 12276 Research Triangle Park, NC 27709 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. J. L. Willis Plant General Manager Harris Nuclear Plant P.O.
Box 165 New Hill North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008


r, 4
4 r,
I 1
I 1
0 d
0 d


July 31,                 1987                                 DISTRIBUTION: W/0 ENCLOSURES P D I I - I R/F PAnderson (2)
DOCKET NO(S).
DOCKET      NO(S).        5O qOO                                                                                              ~Docket No. 50=4003
5O qOO July 31, 1987 DISTRIBUTION: W/0 ENCLOSURES P D I I - I R/F PAnderson (2)
~Docket No. 50=4003


==SUBJECT:==
==SUBJECT:==
Monthly Report                     for   June 1987, Shearon           Harris Nuclear               Power           Plant, Unit                       1 The following documents concerning our review of the subject                                                            facility are        transmitted for your information.
Monthly Report for June
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                                                   dated Environmental. Assessment and Finding of No Significant Impact, dated f;
: 1987, Shearon Harris Nuclear Power Plant, Unit 1
Q     Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating Li cense, dated Q~ Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                                                   teee page(e) ]
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
Exemption, dated Construction Permit No. CPPR-                                         , Amendment No.                                             da'ted d~
dated Environmental. Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating
Facility Operating License No.                                               , Amendment No.                                         dated Order Extending Construction Completion Date, dated ejM llyap Annual/Semi-Annual Report-i      Rp Un 'i t 1
: License, dated Q~ Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated teee page(e) ]
                                                                                                        <<i                  dtyl              d transmitted by letter dated Office of Nuclear Reactor Regulation
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
da'ted Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated ejM llyap i
Rpf;<<i dtyl d d~
Annual/Semi-Annual Report-Un 'i t 1
transmitted by letter dated dated The following documents concerning our review of the subject facility are transmitted for your information.


==Enclosures:==
==Enclosures:==
As stated Office of Nuclear Reactor Regulation Service List OFFICEP SURNAME/
~ DATEP
. r'.L.A.'.P.P.l,t.-..
PAnderson 7/3l/87.
sh
~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~
~ ~ ~ ~
I I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~ ~
~ ~ \\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 NRC FORM 3181'ID/80) NRCM 0240 OFFICIAL RECORD COPY


As  stated Service List OFFICEP
~ 0
          . r'.L.A.'.P.P.l,t.-..                                              ~~    ~~  \~~~~~~~~~~~~~~~                                                                    ~  ~
~
SURNAME/    PAnderson            sh
                                  ~~~~~~    ~~~ ~~ ~ ~ ~ ~ ~        ~~          ~ ~ ~ ~ ~ ~~~~ ~~~~~                      ~ ~~ ~~~~~~~~~ ~~~~~~~~~~~
I
  ~ DATE P  7/3l/87.            I~~~~~~~~~ ~~~~ ~~~~~~~                    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                                  ~ ~~~~~~~~~~~~~ ~~~~~ 0 NRC FORM 3181'ID/80) NRCM 0240                                OFFICIAL RECORD COPY
 
  ~ 0        ~
II
II
                ~,
~
          ~ ~
~
~,
E, k
E, k


Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the   Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
Shearon Harris cc:
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,   NW Washington, DC 20230 Dr. William B. Stroube, Jr.
Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD   20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation Representative 345 Courtland Street, NE Atlanta, GA 30365
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365


Ju1y 8,, 1987       DISTRIBUTION: w/0 ENCLOSURES IDocket No. 50=400+I:
DOCKET NO(S)
PDII-I       R/F PAnderson           (2)
~ 50-400 Ju1y 8,,
DOCKET NO(S)              ~  50-400
1987 DISTRIBUTION: w/0 ENCLOSURES IDocket No.
50=400+I:
PDII-I R/F PAnderson (2)


==SUBJECT:==
==SUBJECT:==
Monthly Operating Report for Nay 1987 Shearon                 Harris Nuclear Po'wer Plant, Unit                     1 e
Monthly Operating Report for Nay 1987 Shearon Harris Nuclear Po'wer Plant, Unit 1
The following documents concerning our review of the subject                                           facility are         transmitted for your information.
e The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability, of Draft/Final Environmental Statement, dated Safety Evaluation Repo'rt, or Supplement No.                                                                 dated Environmental Assessment and Finding of No Significant Impact, dated Q     Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                               Lsee page(s) j Exemption, dated Construction Permit No. CPPR-                                             , Amendment No.                         dated Facility Operating License No.                                               , Amendment No.                       dated Order Extending Construction Completion Date, dated Q] monthly Operating Report fors                                                         transmitted by letter dated
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability,of Draft/Final Environmental Statement, dated Safety Evaluation Repo'rt, or Supplement No.
        +     Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated Lsee page(s) j Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated Q] monthly Operating Report fors transmitted by letter dated
+ Annual/Semi-Annual Report-transmitted by letter dated


==Enclosures:==
==Enclosures:==
As stated Office of Nuclear Reactor Regulation Serv ce List OsslCEIk SURNAME/
DATEP
:.P.A: P D I I-I
.An,der.s.an/.
7/8/87
~ ~ < ~ ~
e
~ ~ ~ ~ ~ ~ ~
~ ~
h ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~
~
~
~ ~ ~ ~
~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~
~ ~ ~ ~
~
~
~ ~
~ ~ ~ ~
NRC FORM 3l8 IIOI80) NRCM 0240 OFF IC IAL R ECOR D COPY


As    stated Serv ce            List OsslCEIk :.P.A:    P D  I I- I SURNAME/
~ ~
            .An,der.s.an/. h              ~ ~ ~ ~ ~ ~ ~  ~ ~~ ~ ~ ~ ~    ~~~~ ~  ~ ~~ ~~                  ~ ~  ~ ~ ~ ~ ~ ~
DATE P 7/8/87
            ~ ~<~ ~ e  ~~~~ ~~ ~ ~ ~ ~ ~ ~  ~~~~~ ~~~~  ~ ~ ~~~ ~  ~~~ ~
NRC FORM  3l8 IIOI80) NRCM 0240                                        OFF I C IAL R ECOR D COPY


~ ~
Shearon Harris cc:
Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,   DC   20240 Chief (NOAA/BF/ECD/H6814)
Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S.
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,     NW Washington, DC 20230 Dr. William B. Stroube,     Jr.
Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,   MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional- Radiation Representative 345 Courtland Street,   NE Atlanta, GA   30365
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional-Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365


tune 9, 1987 DOCKET NO(S)     gO'OO                                                 DISTRIBUTION:
tune 9, 1987 DOCKET NO(S) gO'OO DISTRIBUTION:
( Docket No. 50-400 -,
( Docket No. 50-400 -,
PD21 r/f PAnderson
PD21 r/f PAnderson


==SUBJECT:==
==SUBJECT:==
Technical Specification Change to Table 3.3-11 and
Technical Specification Change to Table 3.3-11 and
                    .Table 4.3-8, Shearon Harris Nuclear Power Plant The following documents concerning our review of the subject         facility are transmitted for your in formati on.
.Table 4.3-8, Shearon Harris Nuclear Power Plant The following documents concerning our review of the subject facility are transmitted for your informati on.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                               dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to li    if'*
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
Facil i ty Operating Li cense, dated Exemption, dated d  C    id      i,d      d~f
dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facil ity Operating
[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Sl]
: License, dated
Construction Permit No. CPPR-                   , Amendment No.               dated Facility Operating License No.                   , Amendment No.               dated Order Extending Construction Completion Date, dated monthly Operating Report for                           transmitted by letter dated
[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No li if'*d C
      + Annual/Semi-Annual       Repor t-transmitted by letter dated Office of Nuclear Reactor Regulation
id i,d d~f Sl]
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.
, Amendment No.
dated Order Extending Construction Completion Date, dated monthly Operating Report for transmitted by letter dated
+ Annual/Semi-Annual Repor t-transmitted by letter dated


==Enclosures:==
==Enclosures:==
 
As stated Office of Nuclear Reactor Regulation OFFICE/
As stated Service    List N
SURNAME/
OFFICE/
OATEP Service List LA:.PD PAnder o
LA:.PD SURNAME/  PAnder o OATE P NRC FORM 3IB IIOl Ol N CM 0240             OFFICIAL RECORD COPY
N NRC FORM 3IB IIOl Ol N CM 0240 OFFICIAL RECORD COPY


~0 5
~0 5
1
1


                          ~
~
Mr. E. E. Utley Carolina Power   & Light Company     Shearon Harris CC:
Mr. E.
Thomas A. Baxter, Esq.              Mr. Travis Payne, Esq.
E. Utley Carolina Power
Shaw,   Pittman, Potts & Trowbridge     723 W. Johnson Street 2300 N Street, NW                   Post Office Box 12643 Washington,   DC 20037               Raleigh, North Carolina    27605 Mr. D. E. Hollar                     Mr. Daniel F. Read Associate General Counsel               CHANGE Carolina Power and Light     Company   Post Office Box 2151 P.O. Box 1551                           Raleigh, North Carolina    27602 Raleigh, North Carolina     27602 Bradley W. Jones, Esq.
& Light Company Shearon Harris CC:
Mr. H. A. Cole                         U.S. Nuclear Regulatory  Comm.
Thomas A. Baxter, Esq.
Special Deputy Attorney General         Region II State of North Carolina                 101 Marietta Street Post Office Box 629                     Atlanta, Georgia 30303 Raleigh, North Carolina     27602 Richard D. Wilson', M.D.
Shaw, Pittman, Potts
Resident Inspector/Harris NPS           725 Hunter  Street c/o U.S. Nuclear Regulatory Commission Apex, North Carolina    27502 Route 1, Box 315B New Hill, North Carolina     27562     Regional Administrator, Region II U.S. Nuclear Regulatory Commission Mr. R. A. Watson                       101 Marietta Street Vice President                         Suite 2900 Harris Nuclear Plant                   Atlanta, Georgia  30303 P.O. Box 165 New Hill, North   Carolina   27562     Mr. Robert P. Gruber Executive Director Mr. John Runkle, Executive Coordinator  Public Staff - NCUC Conservation Council of North Carolina  Post Office Box 29520 307 Granville Road                      Raleigh, North Carolina   27626-0520 Chapel  Hill,  North Carolina    27514 Mr. J. L. Willis Mr. Wells Eddleman                      Plant General Manager 812 Yancey Street                      Harris Nuclear Plant Durham, North Carolina      27701      P.O. Box 165 New Hill, North Carolina   27562 Dr. Linda Little Governor's Waste Management Board      Mr. Dayne H. Brown, Chief 513 Albemarle Building                  Radiation Protection Section 325 North Salisbury Street              Division of Facility Services Raleigh, North Carolina 27611          N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina   27603-2008
& Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O.
Box 1551
: Raleigh, North Carolina 27602 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.
Box 165 New Hill, North Carolina 27562 Mr. John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Road Chapel Hill, North Carolina 27514 Mr. Wells Eddleman 812 Yancey Street Durham, North Carolina 27701 Dr. Linda Little Governor's Waste Management Board 513 Albemarle Building 325 North Salisbury Street
: Raleigh, North Carolina 27611 Mr. Travis Payne, Esq.
723 W. Johnson Street Post Office Box 12643
: Raleigh, North Carolina 27605 Mr. Daniel F.
Read CHANGE Post Office Box 2151
: Raleigh, North Carolina 27602 Bradley W. Jones, Esq.
U.S. Nuclear Regulatory Comm.
Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Wilson', M.D.
725 Hunter Street Apex, North Carolina 27502 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. Robert P. Gruber Executive Director Public Staff - NCUC Post Office Box 29520
: Raleigh, North Carolina 27626-0520 Mr. J. L. Willis Plant General Manager Harris Nuclear Plant P.O.
Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008


DISTRIBUTION:
MAY 29 lS8l DISTRIBUTION:I~400 PD21 r/f PAnderson DOCKET NO(S). 50-400 SUBJECT-Monthly Operating Report for April 1987 Shearon Harris Nuclear Power
MAY     29 lS8l                                                                   I ~400 PD21   r/f PAnderson DOCKET NO(S) . 50-400 SUBJECT-Monthly       Operating Report for April 1987 Shearon   Harris Nuclear Power Plant, Unit                             1 The following documents concerning our review of the subject                                   facility are           transmitted for your information.
: Plant, Unit 1
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                           dated Environmental Assessment and Finding of No Significant Impact, dated f
The following documents concerning our review of the subject facility are transmitted for your information.
Notice of Consideration of Issuance of Facility Operating License or Amendmen't Operating License, dated                                                                                                     to'acility Q     Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                   [see page(s) j Exemption, dated Construction Permit No. CPPR-               , Amendment No.                                                   dated
dated transmitted by letter dated Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
      +     Faci1 i ty Operating License No.                   , Amendment No.                                               dated Order Extending Construction Completion Date, dated Q   Monthly Operating Report for Shearon Harr is transmitted by letter dated 5 14/87                                                                           .
dated Environmental Assessment and Finding of No Significant Impact, dated f
Annual/Semi-Annual Report-transmitted by letter dated Office of Nuclear Reactor Regulation
Notice of Consideration of Issuance of Facility Operating License or Amendmen't to'acility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated
[see page(s) j Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated
+ Faci1 ity Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated Q Monthly Operating Report for Shearon Harr is transmitted by letter dated 5 14/87 Annual/Semi-Annual Report-


==Enclosures:==
==Enclosures:==
 
As stated Office of Nuclear Reactor Regulation CC:
As stated CC:
OFFICE Q SURNAME/
OFFICE Q SURNAME/
LA'A'n-
DATEP LA'A'n- 'on
                    'on
'&#xc3;'/ '8'7"'R
                  '8'7"'R
~ ~ ~
          '&#xc3;'/                                      ~ ~ ~ ~ ~~~~ ~ ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~ ~~ ~ ~ ~ ~~ ~ ~ ~ ~ ~ ~~~ ~~~ ~     ~~~ ~~ ~~ ~~~~~~~~ 1~~~~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
DATE P NRC FORM 3LS ROI80) NRCM 0240           OFFIClAL RECORD COPY
~
~ ~
~ ~ ~ ~ ~ ~
~ ~ ~
~
~ ~
~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~ ~ ~
NRC FORM 3LS ROI80) NRCM 0240 OFFIClAL RECORD COPY


OO           ~ g x     't
OO
              ; I C                   a
~g x
                          ~ ~
't
4 l ~
; I C
g,     'L
a 4
                                  > ~
~
                                      ~ ~
~
l
~
g,
> ~
~ ~
'L


c Shearon Harris Nuclear Power Plant, Unit 1
c Shearon Harris Nuclear Power Plant, Unit 1
CC: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,   DC   20240 Chief (NOAA/BF/ECD/H6814)
CC:
Ecol ogy and Con servati on Di v i s i on National Oceanic   8 Atmospheric Administration 14th and Constitution Ave.,     NW Washington,   DC   20230 Dr. William B. Stroube, Jr.
Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
FDA Research Chemist National Bureau of Standards Reactor Building 235,     Room B-108-Gaithersburg,   MD   20899 U.S. Environmental Protection Agency Region IV Office ATTN:   Regional Radiation Representative 345 Courtland   Street,   NE Atlanta, GA   30365
Ecol ogy and Con servati on Divis ion National Oceanic 8 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108-Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365


A May   ll, 1987 DISTRIBUTION:
A May ll, 1987 DOCKET NO(S).
                                                                                                          ~Docket-No. 50-400 PD II r/f PAnderson DOCKET        NO(S).       50-400
50-400 DISTRIBUTION:
~Docket-No.50-400 PD II r/f PAnderson
+Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated
[see page(s) j Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
dated Facility Operating License No.,
Amendment No.
dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated x Annual/Semi-Annual Report-861024-1231 J2!3llW-.
transmitted by letter dated


==SUBJECT:==
==SUBJECT:==
Shearon             Harris Nuclear Power Plant, Unit 1, Annua1..Environmenta1 (Nonradiologica1)
Shearon Harris Nuclear Power Plant, Unit 1, Annua1..Environmenta1 (Nonradiologica1)
Operating Report The
Operating Report
                                          \ g following documents concerning our review of the subject
\\ g
                                                                          ~                                  .. are facility      transmitted for
~
                                                                                                                              ~
~
your information.
The following documents concerning our review of the subject facility are transmitted for your information.
      +Notice of                Receipt of Application, dated Draft/Final Environmental Statement, dated Q      Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                                        dated Environmental Assessment and Finding of No Significant Impact, dated Q      Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q      Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                                              [see page(s) j Exemption, dated Construction Permit No. CPPR-Facility Operating License          No.,
Order Extending Construction Completion Date, dated
                                                                            , Amendment No.
Amendment No.
dated dated Monthly Operating Report for                                                    transmitted by letter dated x Annual/Semi-Annual Report-861024-1231                        transmitted by letter dated J2!3llW-.
Office of Nuclear Reactor Regulation


==Enclosures:==
==Enclosures:==
As stated Office of Nuclear Reactor Regulation CC-0FF<cEI1 SURNAME/
DATEP
.LA:PD P
~ ~ ~ ~ ~ ~
~
~ ~
~
~ ~
PAnde 05/I ( /87
~ ~ ~ ~i ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ ~
~
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
NRC FORM 318110/80) NRCM 0240 OFFICIAL RECORD COPY


As    stated CC-0FF<cEI1 .LA: PD              P
~
            ~ ~~~~~      ~ ~~ ~ ~~                                        ~~ ~~ ~ ~~ ~ ~ ~ ~~~~ ~~ ~                              ~~~~~ ~ ~ ~~ ~~~ ~ ~~ ~~~
~
SURNAME/    PAnde                              ~  ~~ ~~~ ~~ ~~~ 0 ~~~~~
DATE P    05/Ii ( /87
            ~ ~~~ ~1 ~~~~~~~~~~~
NRC FORM 318110/80) NRCM 0240                      OFFICIAL RECORD COPY
 
  ~ ~
yt g
yt g


Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,   DC   20240 Chief (NOAA/BF/ECD/H6814)
Shearon Harris cc:
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,   NW Washington, DC 20230 Dr. William B. Stroube,   Jr.
Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,   HD   20899 U.S. Environmental Protection Agency Region IV Office ATTN: Regional Radiation     Representative 345 Courtland Street, NE Atlanta, GA   30365
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, HD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365


April 28, 1987 DISTRIBUTION: W/0 Enclosures
DOCKET NO(S).
                                                                              ~Docket-- No.-50:400:~
50-400 April 28, 1987 DISTRIBUTION: W/0 Enclosures
PDI  I-I R/F DOCKET        NO(S). 50-400                                              PAnderson (2)
~Docket-- No.-50:400:~
PDII-I R/F PAnderson (2)


==SUBJECT:==
==SUBJECT:==
Shearon Harris Nuclear Pouter Plant, Unit No. 1 Monthly Operating Report for March 1987 The      following documents concerning our review of the subject      facility are    transmitted for your information.
Shearon Harris Nuclear Pouter Plant, Unit No.
Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.                                 dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 i ty Operating Li cense, dated Q Bi-Weekly         Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated                     [see page(s) ]
1 Monthly Operating Report for March 1987 Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.
Exemption, dated Construction Permit No. CPPR-                 , Amendment No.                   da'ted Facility Operating License No.                 , Amendment No.                   dated Order Extending Construction Completion Date, dated KM t1 Op i                     p Annual/Semi-Annual Report-I     M   hlg7             *'b           1       d transmitted by letter dated Office of Nuclear Reactor Regulation
dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 ity Operating
: License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated
[see page(s) ]
Exemption, dated Construction Permit No.
CPPR-
, Amendment No.
da'ted Facility Operating License No.
, Amendment No.
Order Extending Construction Completion Date, dated KM t1 Op i
p I
M hlg7
*'b 1
d Annual/Semi-Annual Report-dated transmitted by letter dated The following documents concerning our review of the subject facility are transmitted for your information.


==Enclosures:==
==Enclosures:==
 
As stated Office of Nuclear Reactor Regulation CC:
As   stated CC:
OFFICE/
OFFICE/ LA:P
          ~ ~ ~  0 ~
SURNAME/
SURNAME/
PAn 0ATEt) 94/g .K?......
0ATEt)
NRC FORM 318 (10/801 NRCM   0240           OFFICIAL RECORD COPY
LA:P
~ ~ ~
0 ~
PAn 94/g.K?......
NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY


II
II
      ,a P
,a P
            ~ '-
~ '-
0 g$
g$
h
0 h
                        ~
~ \\'
                          \'
g l
g l


Shearon Harris cc: Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington,   DC   20240 Chief (NOAA/BF/ECD/H6814)
Shearon Harris cc:
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,     NW Washington, DC 20230 Dr. William B. Stroube,     Jr.
Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg,   MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:   Regional Radiation Representative 345 Courtland Street,   NE Atlanta, GA   30365}}
Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,
NW Washington, DC 20230 Dr. William B. Stroube, Jr.
FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:
Regional Radiation Representative 345 Courtland Street, NE
: Atlanta, GA 30365}}

Latest revision as of 04:51, 7 January 2025

Monthly Operating Rept for Jul 1987
ML18022A558
Person / Time
Site: Harris 
Issue date: 07/31/1987
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-875011-(), HO-875011-(0), NUDOCS 8708170392
Download: ML18022A558 (38)


Text

~

~ ~

CPKK Carolinapower S Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 AUG 33 1987 File Number:

SHF/10-15505 Letter Number'HO-875011 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRISNUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of July 1987.

Yours very truly, MWH:gmw Enclosure R. A. Watson Vice President Harris Nuclear Project cc:

Dr. J. Nelson Grace (NRC)

Messrs.

J.

M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R. G. Oehl (DOE) 8708170392 87073i PDR ADOCK 05000400 PDR

/p MEM/HO-875011/Page 1/OS3

~ ~

OPERATING DATA REPORT OPERATING STATUS DOCKET NO. 050"400 DATE 8/6/87 COMPLETED BY M. W. HALE TELEPHONE (919) 362-2944 Notes.'.

2 1 3 ~

4 ~

5 ~

Unit Name'.

Shearon Harris Unit 1

Reporting Period:

July 1987

,Licensed Thermal Power (MWt):

2775 Nameplate Rating (Gross MWe):

950 Design Electrical Rating (Net-MWe):

900 6;

Maximum Dependable Capacity (Gross-MWe):

920 7.'aximum Dependable Capacity (Net-MWe):

860 8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.

Power Level to Which Restricted, if any (Net-MWe):

None 10.

Reasons for Restrictions, if any:

N/A This Month Yr.-to-Date Cumulative 11.

Hours in Report Period 744.00 12.

Number of Hours Reactor Was Critical 597 F 10 13.

Reactor Reserve Shutdown Hours 0.00 14.

Hours Generator On-Line 586.95 15.

Unit Reserve Shutdown Hours 0.00 16.

Gross Thermal Energy Generated (MWH) 1453711.50 17.

Gross Electrical Energy Generated (MWH) 471233.00 18.

Net Electrical Energy Generated (MWH) 431956.00 19.

Unit Service Factor

78. 89 20.

Unit Availability Factor 78.89 21.

Unit Capacity Factor (Using MDC Net) 67.51 22.

Unit Capacity Factor (Using DER Net) 64.51 23.

Unit Forced Outage Rate 1.89 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Surveillance Test Outage / October 10, 1987 /

2184.00 1813.22 0.00 1770.80 0.00 4455500.04 1450568.00 1334785 00 81.08 81.08 71.07 67.91 5.16 Duration of Two Weeks 2184.00 1813.22 0.00 1770.80

.00 4455500.04 1450568.00 1334785 F 00 81.08 81 F 08 71.07 67.91 5.16 Each):

25. If Shut Down at end of Report Period, Estimated Date of Startup'N/A 26.

Units in Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY 12/30/86 INITIALELECTRICITY 1/11/87 COMMERCIAL OPERATION 4/25/87 Achieved 1/3/87 1/19/87 5/2/87 MEM/DATAREPa/Page 1/OS3

~ ~

PLANT PERFORMANCE DATA SYSTEM, APPENDIX B -'VERAGE DAILY POWER LEVEL HARRIS UNIT 1 July 1987 DOCKET NO. 050-400 COMPLETED BY M.

W.

HALE TELEPHONE (919) 362-2944 DAY AVG. DAILY POWER LEVEL (MWE-NET)

DAY AVG. DAILY POWER LEVEL (MWE-NET) 810 17

-32 839 18

-32 432 19

-35 404 20

-39 5

732 21

-39 846 22 248 846 23 815 848 24 835 352 25 823 10 647 26 833 840 27 836 12 844 28 837 13 14 15 840 798 306 29 30 31 847 846 841 16 30 MEM/DATAREPa/Page 2/OS3

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1987 DOCKET NO,:

050-400 UNIT NAME: -

Harris DATE:

8/6/87 COMPLETED BY:

M, W. Hale TELEPHONE:

(919) 362-2944 Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report If System Code 4

Component Code 5

Cause 6 Corrective Action to Prevent Recurrence 87-028 870703 N/A HH PUMPXX Load reduction to repair the Main Feedpump IA outboard pump seal.

The pump was removed from service and the seal was replaced'n addition, the motor bearings were replaced, a new lube oil pump and lube o(l hose was Installed.

Unit was returned to full service after the repairs-.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B&alntenance or Test C-Refueling regulatory Restriction E-Operator Training d License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram.

4-Continued 5-Reduced Load 60thef Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREGW161 )

Exhibit I - Same Source MEM/DATAREPa/Page 3/OS3

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1987 DOCKET NO,:

050-400 UNIT NAME:

Harris DATE:

8/6/87 COMPLETED BY:

M.

W Hale TELEPHONE:

(919) 362-2944 Date Tl y

P e

Duration (Hours)

R Method of

Shutting, Down Reactor Licensee Event Report l System Code 4

Component Code 5

Cause 4 Corrective Action to Prevent Recurrence 87&29 870709 I I ~ 30 87-042 SD VALVEX Reactor/Turbine Trip from full power due to Low-Low Level on 1C steam generator.

This occurred when a

clearance tag was hung on an. ammonia chemical addition valve for feedwater and the control fuse for the IC feed-water isolation valve was mistakenly removed.

This caused isolation valve to close and lead to the Low-Low Level trip.

Operations personnel will be retralned on interpretting control wiring diagrams, Unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction EWperator Training II License Examination F-Administrative G-Operational Error (Explain

)

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram, 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

" Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 4/OS3

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1987 DOCKET NO,:

UNIT NAME:

DATE:

COMPLETED 8Y:

TELEPHONE:

050-400 Harris 8/6/87 M.

W Hale (919) 362-2944 Date Tl y

P e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report S

System Code 4

Component Code 5

Cause II Col recilve Action to Prevent Recurrence 87-030 870714 N/A PIPEXX Load reduction to repair 18 main feedpump hot bleed off and seal water injection lines and to clean and inspect the condenser

<<ater.boxes.

Repairs and inspections were implemented, Unit was returned to service.

F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling C Regulatory Restriction E-Operator Training 8, License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

I-Manual 2-Manual Scram 3-Automatic Scram, 4Contlnued 5-Reduced Load 6-Other

. 5 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG&161 )

Exhibit I - Same Source "Corrective action to prevent recurrence per the Licensee Event Report, MEM/DATAREPa/Page 5/OS3

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

JULY 1987 DOCKET NO,:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

050-400 Harris 8/6/87 M.

W Hale (9I9) 362-2944 No, Date Tl y

P e

Duration (Hours)

R2 Method of Shutting Down Reactor Licensee Event Report I System Code 4

Component Code 5

Cause II Corrective Action to Prevent Recurrence 8731 870716 145,75 N/A Hl VALVE Unit removed from service to repair leaking steam generator blowdown valves and to perform inspections of production equipment, Repairs were implemented to the condenser and 5AKB.

feedwater heaters, Temporary repairs Implemented on the steam generator blowdown valves with permanent repairs scheduled for the fall outage Unit was returned to service, F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain[

8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training II License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

Method:

~ I-Manual 2-Manual Scram 3-Automatic Scram, 4-Continued 5-Reduced Load

. 6&ther 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I Same Source MEM/DATAREPa/Page 6/OS3

DOCKET-NO(S).

50-400 id September 3,

1987 DISTR I BUT ION'/0 ENCLOSURES PDII-1 R/F PAnderson lD.o,c.k:e't-N o.

5'0=40.0M

SUBJECT:

BI-WEEKLY NOTICE APPLICATIONS AND AMENDMENTS TO OPERATING LICENSE INVOLVING NO SIGNIFICANT. HAZARDS CONSIDERATIONS-SHEARON HARRIS NUCLEAR POWER PLANT ~ UNIT 1 The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated

[jg Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No d

d id li

  • d d

id d

d~

d d i]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.

, Amendment No.

dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated dd Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Office of Nuclear Reactor Regulation cc: See Next Page i

OFFICE/

~

J P, o P D $

SURN*MEP P P nd p DATE)I 9/3 7

~jSA o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~

~ ~

~

d ~ ~

~

~

~ ~ ~ ~ ~ ~

~ ~ ~

'RC FORM 3 I8 IIOIBOINRCM 0240 OFFICIAL RECORD COPY

~

Mr. D. A. Nauman South Carolina Electric 5 Gas Company Virgil C.

Summer Nuclear Station CC:

Mr. William A. Williams, Jr.

Technical Assistant - Nuclear Operations Santee Cooper P.O.

Box 764 (Mail Code 167)

Columbia, South Carolina 29218 J.

B. Knotts, Jr.,

Esq.

Bishop, Liberman, Cook, Purcell and Reynolds 1200 17th Street, N.W.

Washington, D. C.

20036 Resident Inspector/Summer NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 64 Jenkinsville, South Carolina 29065 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Chairman, Fairfield County Council P.O.

Box 293 Winnsboro, South Carolina 29180 Attorney General Box 11549

Columbia, South Carolina 29211 Mr. Heyward G. Shealy, Chief Bureau of Radiological Health South Carolina Department of Health and Environmental Control 2600 Bull Street
Columbia, South Carolina 29201

~

o y

~

l

~ ~

DOCKET NO(S).

50 400 August 19, 1987 DISTR I BUTI'ON:

M/0 ENCLOSURES

~Docke.t No..

5.0 4003 PDI I-I r/f PAnderson Corrected. Monthly operating Report for June 1987 Shearon Harris Nuclear Power Plant, Unit 1

The following documents concerning our review of the subject facility are transmitted for your information.

dated

~98 9 transmitted by letter dated Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated

[see page(s) 3 Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

da'ted

+ Facility Operating License No.

, Amendment No.

Order Extending Construction Completion Date, dated CorrGkMonthly Operating Report for Shearon Harris transmitted by letter dated Jul 8

-'cted + Annual/Semi-Annual Report-Encl osures:

As stated Office of Nuclear Reactor Regulation See Next Blge OFFICE)

SURNAME)

OAVES P

.'J.A.'P. RI5,;.

3!Andarsan.

8/19/87

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~

~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~

NRC FORM 3IB ROIBOI NRCM 0240 OFFICIAL RECORD COPY

~ 0

~

A 1

7, I

I

Shearon Harris CC:

Chief Division of Ecological'ervices Bureau of Sport Fisheries

5. Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

t

DOCKET NO(S).

50 400 August 17, 1987 DISTRIBUTION:

W/0 ENCLOSURES PDI I-I R/F PAnderson

~Docket No. 50-4003 SUBJECT-Bi-Weekly Notice Appl ications and Amendments to Operating Licensee. Involving No Significant Hazards Considerations Shear on Harr is Nuclear Power Plant, Unit 1

The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci 1 ity Operating License, dated

+XBi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No dig id' d

C dd d

d d~

g d d]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated..

Encl osures:

As stated Office of Nuclear Reactor Regulation See Next Page OFFICE)

SURNAME)

DATE)

LA:PDII-I

.P.hndar.san.

8/17/87 ",

J) ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~I~ ~ ~ ~ ~ ~ ~

NRC FORM 3I8 IIO/80I NRCM 0240 OFFICIAL RECORD 'COPY

~ ~

~ ~

J a

I J

il

~ t r

7

~

Mr. E.

E. Utley Carolina Power 8 Light Company CC:

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts 8 Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. D. E. Hollar Associate General Council Carolina Power 8 Light Company P.O.

Box 1551

Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.

Box 165 New Hill, North Carolina 27562 Shearon Harris Ms. Carol Love 100 Park Drive P.O.

Box 12276 Research Triangle Park, NC 27709 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. J. L. Willis Plant General Manager Harris Nuclear Plant P.O.

Box 165 New Hill North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008

4 r,

I 1

0 d

DOCKET NO(S).

5O qOO July 31, 1987 DISTRIBUTION: W/0 ENCLOSURES P D I I - I R/F PAnderson (2)

~Docket No. 50=4003

SUBJECT:

Monthly Report for June

1987, Shearon Harris Nuclear Power Plant, Unit 1

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental. Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating

License, dated Q~ Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated teee page(e) ]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

da'ted Facility Operating License No.

, Amendment No.

Order Extending Construction Completion Date, dated ejM llyap i

Rpf;<<i dtyl d d~

Annual/Semi-Annual Report-Un 'i t 1

transmitted by letter dated dated The following documents concerning our review of the subject facility are transmitted for your information.

Enclosures:

As stated Office of Nuclear Reactor Regulation Service List OFFICEP SURNAME/

~ DATEP

. r'.L.A.'.P.P.l,t.-..

PAnderson 7/3l/87.

sh

~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

~ ~ ~ ~

I I ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~ ~

~ ~ \\ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 NRC FORM 3181'ID/80) NRCM 0240 OFFICIAL RECORD COPY

~ 0

~

II

~

~

~,

E, k

Shearon Harris cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

DOCKET NO(S)

~ 50-400 Ju1y 8,,

1987 DISTRIBUTION: w/0 ENCLOSURES IDocket No.

50=400+I:

PDII-I R/F PAnderson (2)

SUBJECT:

Monthly Operating Report for Nay 1987 Shearon Harris Nuclear Po'wer Plant, Unit 1

e The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability,of Draft/Final Environmental Statement, dated Safety Evaluation Repo'rt, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated Lsee page(s) j Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.

, Amendment No.

dated Order Extending Construction Completion Date, dated Q] monthly Operating Report fors transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Office of Nuclear Reactor Regulation Serv ce List OsslCEIk SURNAME/

DATEP

.P.A: P D I I-I

.An,der.s.an/.

7/8/87

~ ~ < ~ ~

e

~ ~ ~ ~ ~ ~ ~

~ ~

h ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~

~

~

~ ~ ~ ~

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

~ ~ ~ ~

~

~

~ ~

~ ~ ~ ~

NRC FORM 3l8 IIOI80) NRCM 0240 OFF IC IAL R ECOR D COPY

~ ~

Shearon Harris cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S.

Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional-Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

tune 9, 1987 DOCKET NO(S) gO'OO DISTRIBUTION:

( Docket No. 50-400 -,

PD21 r/f PAnderson

SUBJECT:

Technical Specification Change to Table 3.3-11 and

.Table 4.3-8, Shearon Harris Nuclear Power Plant The following documents concerning our review of the subject facility are transmitted for your informati on.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facil ity Operating

License, dated

[jQ Hi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No li if'*d C

id i,d d~f Sl]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.

, Amendment No.

dated Order Extending Construction Completion Date, dated monthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Repor t-transmitted by letter dated

Enclosures:

As stated Office of Nuclear Reactor Regulation OFFICE/

SURNAME/

OATEP Service List LA:.PD PAnder o

N NRC FORM 3IB IIOl Ol N CM 0240 OFFICIAL RECORD COPY

~0 5

1

~

Mr. E.

E. Utley Carolina Power

& Light Company Shearon Harris CC:

Thomas A. Baxter, Esq.

Shaw, Pittman, Potts

& Trowbridge 2300 N Street, NW Washington, DC 20037 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O.

Box 1551

Raleigh, North Carolina 27602 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina Post Office Box 629 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R. A. Watson Vice President Harris Nuclear Plant P.O.

Box 165 New Hill, North Carolina 27562 Mr. John Runkle, Executive Coordinator Conservation Council of North Carolina 307 Granville Road Chapel Hill, North Carolina 27514 Mr. Wells Eddleman 812 Yancey Street Durham, North Carolina 27701 Dr. Linda Little Governor's Waste Management Board 513 Albemarle Building 325 North Salisbury Street

Raleigh, North Carolina 27611 Mr. Travis Payne, Esq.

723 W. Johnson Street Post Office Box 12643

Raleigh, North Carolina 27605 Mr. Daniel F.

Read CHANGE Post Office Box 2151

Raleigh, North Carolina 27602 Bradley W. Jones, Esq.

U.S. Nuclear Regulatory Comm.

Region II 101 Marietta Street Atlanta, Georgia 30303 Richard D. Wilson', M.D.

725 Hunter Street Apex, North Carolina 27502 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30303 Mr. Robert P. Gruber Executive Director Public Staff - NCUC Post Office Box 29520

Raleigh, North Carolina 27626-0520 Mr. J. L. Willis Plant General Manager Harris Nuclear Plant P.O.

Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.C. Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008

MAY 29 lS8l DISTRIBUTION:I~400 PD21 r/f PAnderson DOCKET NO(S). 50-400 SUBJECT-Monthly Operating Report for April 1987 Shearon Harris Nuclear Power

Plant, Unit 1

The following documents concerning our review of the subject facility are transmitted for your information.

dated transmitted by letter dated Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated f

Notice of Consideration of Issuance of Facility Operating License or Amendmen't to'acility Operating License, dated Q Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated

[see page(s) j Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated

+ Faci1 ity Operating License No.

, Amendment No.

Order Extending Construction Completion Date, dated Q Monthly Operating Report for Shearon Harr is transmitted by letter dated 5 14/87 Annual/Semi-Annual Report-

Enclosures:

As stated Office of Nuclear Reactor Regulation CC:

OFFICE Q SURNAME/

DATEP LA'A'n- 'on

'Ã'/ '8'7"'R

~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~

~ ~ ~ ~ ~ ~

~ ~ ~

~

~ ~

~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1 ~ ~ ~ ~

NRC FORM 3LS ROI80) NRCM 0240 OFFIClAL RECORD COPY

OO

~g x

't

I C

a 4

~

~

l

~

g,

> ~

~ ~

'L

c Shearon Harris Nuclear Power Plant, Unit 1

CC:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecol ogy and Con servati on Divis ion National Oceanic 8 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108-Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

A May ll, 1987 DOCKET NO(S).

50-400 DISTRIBUTION:

~Docket-No.50-400 PD II r/f PAnderson

+Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Q Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated

[see page(s) j Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated x Annual/Semi-Annual Report-861024-1231 J2!3llW-.

transmitted by letter dated

SUBJECT:

Shearon Harris Nuclear Power Plant, Unit 1, Annua1..Environmenta1 (Nonradiologica1)

Operating Report

\\ g

~

~

The following documents concerning our review of the subject facility are transmitted for your information.

Enclosures:

As stated Office of Nuclear Reactor Regulation CC-0FF<cEI1 SURNAME/

DATEP

.LA:PD P

~ ~ ~ ~ ~ ~

~

~ ~

~

~ ~

PAnde 05/I ( /87

~ ~ ~ ~i ~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 318110/80) NRCM 0240 OFFICIAL RECORD COPY

~

~

yt g

Shearon Harris cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, HD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365

DOCKET NO(S).

50-400 April 28, 1987 DISTRIBUTION: W/0 Enclosures

~Docket-- No.-50:400:~

PDII-I R/F PAnderson (2)

SUBJECT:

Shearon Harris Nuclear Pouter Plant, Unit No.

1 Monthly Operating Report for March 1987 Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 ity Operating

License, dated Q Bi-Weekly Notice; Applications and Amendments to Operating Licenses Involving No Significant Hazards Considerations, dated

[see page(s) ]

Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

da'ted Facility Operating License No.

, Amendment No.

Order Extending Construction Completion Date, dated KM t1 Op i

p I

M hlg7

  • 'b 1

d Annual/Semi-Annual Report-dated transmitted by letter dated The following documents concerning our review of the subject facility are transmitted for your information.

Enclosures:

As stated Office of Nuclear Reactor Regulation CC:

OFFICE/

SURNAME/

0ATEt)

LA:P

~ ~ ~

0 ~

PAn 94/g.K?......

NRC FORM 318 (10/801 NRCM 0240 OFFICIAL RECORD COPY

II

,a P

~ '-

g$

0 h

~ \\'

g l

Shearon Harris cc:

Chief Division of Ecological Services Bureau of Sport Fisheries 5 Wildlife U.S. Department of the Interior Washington, DC 20240 Chief (NOAA/BF/ECD/H6814)

Ecology and Conservation Division National Oceanic 5 Atmospheric Administration 14th and Constitution Ave.,

NW Washington, DC 20230 Dr. William B. Stroube, Jr.

FDA Research Chemist National Bureau of Standards Reactor Building 235, Room B-108 Gaithersburg, MD 20899 U.S. Environmental Protection Agency Region IV Office ATTN:

Regional Radiation Representative 345 Courtland Street, NE

Atlanta, GA 30365