ML18173A098: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18173A098
| number = ML18173A098
| issue date = 06/06/2018
| issue date = 06/06/2018
| title = Transcript of Advisory Committee on Reactor Safeguards Nuscale Subcommittee Meeting - June 6, 2018 - Open Session
| title = Transcript of Advisory Committee on Reactor Safeguards NuScale Subcommittee Meeting - June 6, 2018 - Open Session
| author name = Snodderly M
| author name = Snodderly M
| author affiliation = NRC/ACRS
| author affiliation = NRC/ACRS
Line 19: Line 19:


==Title:==
==Title:==
Advisory Committee on Reactor Safeguards NuScale Subcommittee: Open Session Docket Number:   (n/a)
Advisory Committee on Reactor Safeguards NuScale Subcommittee: Open Session Docket Number:
Location:         Rockville, Maryland Date:             Wednesday, June 6, 2018 Work Order No.:   NRC-3761                         Pages 1-190 NEAL R. GROSS AND CO., INC.
(n/a)
Location:
Rockville, Maryland Date:
Wednesday, June 6, 2018 Work Order No.:
NRC-3761 Pages 1-190 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005 (202) 234-4433
Washington, D.C. 20005 (202) 234-4433


1 1
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
2 3
(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 1
4                              DISCLAIMER 5
1 2
6 7  UNITED STATES NUCLEAR REGULATORY COMMISSIONS 8        ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 9
3 DISCLAIMER 4
10 11          The contents of this transcript of the 12 proceeding of the United States Nuclear Regulatory 13 Commission Advisory Committee on Reactor Safeguards, 14 as reported herein, is a record of the discussions 15 recorded at the meeting.
5 6
16 17          This transcript has not been reviewed, 18 corrected, and edited, and it may contain 19 inaccuracies.
UNITED STATES NUCLEAR REGULATORY COMMISSIONS 7
20 21 22 23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 8
(202) 234-4433          WASHINGTON, D.C. 20005-3701  www.nealrgross.com
9 10 The contents of this transcript of the 11 proceeding of the United States Nuclear Regulatory 12 Commission Advisory Committee on Reactor Safeguards, 13 as reported herein, is a record of the discussions 14 recorded at the meeting.
15 16 This transcript has not been reviewed, 17 corrected, and edited, and it may contain 18 inaccuracies.
19 20 21 22 23  


1 1                    UNITED STATES OF AMERICA 2                  NUCLEAR REGULATORY COMMISSION 3                                + + + + +
1 UNITED STATES OF AMERICA 1
4            ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 5                                  (ACRS) 6                                + + + + +
NUCLEAR REGULATORY COMMISSION 2
7                        NUSCALE SUBCOMMITTEE 8                                + + + + +
+ + + + +
9                              OPEN SESSION 10                                + + + + +
3 ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 4
11                                 WEDNESDAY 12                              JUNE 6, 2018 13                                + + + + +
(ACRS) 5
14                        ROCKVILLE, MARYLAND 15                                + + + + +
+ + + + +
16                  The   Subcommittee         met     at the Nuclear 17 Regulatory Commission, Two White Flint North, Room 18 T2B1, 11545 Rockville Pike, at 8:30 a.m., Dennis Bley, 19 Chairman, presiding.
6 NUSCALE SUBCOMMITTEE 7
20 COMMITTEE MEMBERS:
+ + + + +
21            DENNIS C. BLEY, Chairman 22            CHARLES H. BROWN, JR. Member 23            MICHAEL L. CORRADINI, Member 24            WALTER L. KIRCHNER, Member 25            JOSE MARCH-LEUBA, Member NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 OPEN SESSION 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
+ + + + +
10 WEDNESDAY 11 JUNE 6, 2018 12
+ + + + +
13 ROCKVILLE, MARYLAND 14
+ + + + +
15 The Subcommittee met at the Nuclear 16 Regulatory Commission, Two White Flint North, Room 17 T2B1, 11545 Rockville Pike, at 8:30 a.m., Dennis Bley, 18 Chairman, presiding.
19 COMMITTEE MEMBERS:
20 DENNIS C. BLEY, Chairman 21 CHARLES H. BROWN, JR. Member 22 MICHAEL L. CORRADINI, Member 23 WALTER L. KIRCHNER, Member 24 JOSE MARCH-LEUBA, Member 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


2 1            HAROLD B. RAY, Member 2            PETER RICCARDELLA, Member 3            GORDON R. SKILLMAN, Member 4            MATTHEW SUNSERI, Member 5
2 HAROLD B. RAY, Member 1
6 ACRS CONSULTANT:
PETER RICCARDELLA, Member 2
7            STEPHEN SCHULTZ 8 DESIGNATED FEDERAL OFFICIAL:
GORDON R. SKILLMAN, Member 3
9            MICHAEL SNODDERLY 10 ALSO PRESENT:
MATTHEW SUNSERI, Member 4
11            TOM BERGMAN, NuScale 12            LUIS BETANCOURT, NRO 13            TIM DRZEWIECKI, NRO 14            JEFF EHLERS, NuScale 15            ROBERT FITZPATRICK, NRR 16            TED HOUGH, NuScale 17            NADIM KHAN, NRR 18            SHEILA RAY, NRR 19            OMID TABATABAI, NRO 20            DINESH TINEJA, NRO 21            ANDREA D. VEIL, Executive Director, ACRS 22            KENT WELTER, NuScale 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
5 ACRS CONSULTANT:
(202) 234-4433         WASHINGTON, D.C. 20005-3701 (202) 234-4433
6 STEPHEN SCHULTZ 7
DESIGNATED FEDERAL OFFICIAL:
8 MICHAEL SNODDERLY 9
ALSO PRESENT:
10 TOM BERGMAN, NuScale 11 LUIS BETANCOURT, NRO 12 TIM DRZEWIECKI, NRO 13 JEFF EHLERS, NuScale 14 ROBERT FITZPATRICK, NRR 15 TED HOUGH, NuScale 16 NADIM KHAN, NRR 17 SHEILA RAY, NRR 18 OMID TABATABAI, NRO 19 DINESH TINEJA, NRO 20 ANDREA D. VEIL, Executive Director, ACRS 21 KENT WELTER, NuScale 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


3 1                          C-O-N-T-E-N-T-S 2 Opening Remarks 3            By Dennis Bley     . . . . . . . . . . . . . .          4 4 Introductory Remarks 5            By Omid Tabtabai       . . . . . . . . . . . . .        7 6 OPEN SESSION 7 Overview of Chapter 8, "Electric Power,"
3 C-O-N-T-E-N-T-S 1
8            NuScale Design Certification 9            Application . . . . . . . . . . . . . . . .             8 10 Break . . . . . . . . . . . . . . . . . . . . . . 99 11 Evaluation with Open Items             . . . . . . . . . . . 99 12 Adjourn . . . . . . . . . . . . . . . . . . . .                 152 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Opening Remarks 2
(202) 234-4433         WASHINGTON, D.C. 20005-3701     (202) 234-4433
By Dennis Bley 4
3 Introductory Remarks 4
By Omid Tabtabai 7
5 OPEN SESSION 6
Overview of Chapter 8, "Electric Power,"
7 NuScale Design Certification 8
Application................
8 9
Break...................... 99 10 Evaluation with Open Items
........... 99 11 Adjourn....................
152 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


4 1                    P R O C E E D I N G S 2                                                          8:30 a.m.
4 P R O C E E D I N G S 1
3                CHAIR BLEY:         Good morning.       The meeting 4 will now come to order.             This is a meeting of the 5 Advisory Committee on Reactor Safeguards, a NuScale 6 Subcommittee. I'm Dennis Bley, chairman for today's 7 meeting.
8:30 a.m.
8                Members in attendance today are Charlie 9 Brown, Mike Corradini -- I don't know if Walt's here 10 or not, maybe not, we expect Walt Kirchner to come in 11 --- Jose March-Leuba, Harold Ray, Joy --- we expect 12 Dr. Joy Rempe, Pete Riccardella, Matt Sunseri, Dick 13 Skillman, and our consultant, Steven Schultz, is with 14 us.
2 CHAIR BLEY: Good morning. The meeting 3
15                Mike Snodderly is the Designated Federal 16 Official for this meeting.               The Subcommittee will 17 review the staff's safety evaluation report with open 18 items of Chapter 8: Electric Power to the NuScale 19 Design Cert Application. Today we have members of the 20 NRC staff and NuScale to brief the Committee.
will now come to order. This is a meeting of the 4
21                Before     we   start     and     I go into     the 22 boilerplate stuff, I'll just comment to the staff.
Advisory Committee on Reactor Safeguards, a NuScale 5
23 From reading the SER, it really feels like we're 24 premature in this meeting.               It is a SER with open 25 items, but all of the most significant open items are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Subcommittee. I'm Dennis Bley, chairman for today's 6
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
meeting.
7 Members in attendance today are Charlie 8
Brown, Mike Corradini -- I don't know if Walt's here 9
or not, maybe not, we expect Walt Kirchner to come in 10
--- Jose March-Leuba, Harold Ray, Joy --- we expect 11 Dr. Joy Rempe, Pete Riccardella, Matt Sunseri, Dick 12 Skillman, and our consultant, Steven Schultz, is with 13 us.
14 Mike Snodderly is the Designated Federal 15 Official for this meeting. The Subcommittee will 16 review the staff's safety evaluation report with open 17 items of Chapter 8: Electric Power to the NuScale 18 Design Cert Application. Today we have members of the 19 NRC staff and NuScale to brief the Committee.
20 Before we start and I go into the 21 boilerplate stuff, I'll just comment to the staff.
22 From reading the SER, it really feels like we're 23 premature in this meeting. It is a SER with open 24 items, but all of the most significant open items are 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


5 1 still open. And despite the submittal of responses to 2 the RAIs, there isn't much for us to review and 3 comment on.
5 still open. And despite the submittal of responses to 1
4                  I'm hoping that the staff will be able to 5 at least give us a little more background on where 6 they stand and what they expect to come out of their 7 review of the main open item on this issue today.
the RAIs, there isn't much for us to review and 2
8 Otherwise, in the future. maybe we ought to think 9 about how our schedule is progressing.                   It does seem 10 a little premature.
comment on.
11                  The ACRS was established by statute and is 12 governed by the Federal Advisory Committee Act, FACA.
3 I'm hoping that the staff will be able to 4
13 That means the Committee can only speak through its 14 published letter reports.
at least give us a little more background on where 5
15                  We hold meetings to gather information to 16 support our deliberations.                 Interested parties who 17 wish       to provide   comments       can     contact our   office 18 requesting time after the meeting announcement is 19 published in the Federal Register.
they stand and what they expect to come out of their 6
20                  That said, we set aside ten minutes for 21 comments from members of the public attending or 22 listening to our meetings.             Written comments are also 23 welcome.         The ACRS section of the US NRC public 24 website provides our charter, by-laws, letter reports, 25 and transcripts of all Committee meetings including NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
review of the main open item on this issue today.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 Otherwise, in the future. maybe we ought to think 8
about how our schedule is progressing. It does seem 9
a little premature.
10 The ACRS was established by statute and is 11 governed by the Federal Advisory Committee Act, FACA.
12 That means the Committee can only speak through its 13 published letter reports.
14 We hold meetings to gather information to 15 support our deliberations. Interested parties who 16 wish to provide comments can contact our office 17 requesting time after the meeting announcement is 18 published in the Federal Register.
19 That said, we set aside ten minutes for 20 comments from members of the public attending or 21 listening to our meetings. Written comments are also 22 welcome. The ACRS section of the US NRC public 23 website provides our charter, by-laws, letter reports, 24 and transcripts of all Committee meetings including 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


6 1 the slides presented there.
6 the slides presented there.
2                  The rules for participation in today's 3 meeting were announced in the Federal Register on June 4 5th, and I apologize for that.                   I'm not sure why it 5 was so late.
1 The rules for participation in today's 2
6                  The   meeting         was       announced   as       an 7 open/closed meeting which means we may close the 8 meeting after the open portion to discuss proprietary 9 material.         And presenters can defer questions that 10 should not be answered in the public session to that 11 time.       So we have to leave that up to you if we start 12 straying into proprietary information.
meeting were announced in the Federal Register on June 3
13                  No written statement or request for making 14 an     oral   statement     to   the     Subcommittee     has     been 15 received from the public concerning this meeting.                         A 16 transcript of the meeting is being kept, will be made 17 available as stated in the Federal Register notice.
5th, and I apologize for that. I'm not sure why it 4
18                  Therefore, we request the participants in 19 this meeting use the microphones located throughout 20 the       room   when     addressing           the   Subcommittee.
was so late.
21 Participants should first identify themselves and 22 state with sufficient clarity and volume so they can 23 be readily heard.
5 The meeting was announced as an 6
24                  We have a bridge line established for the 25 public to listen in to the meeting.                       To minimize NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
open/closed meeting which means we may close the 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
meeting after the open portion to discuss proprietary 8
material. And presenters can defer questions that 9
should not be answered in the public session to that 10 time. So we have to leave that up to you if we start 11 straying into proprietary information.
12 No written statement or request for making 13 an oral statement to the Subcommittee has been 14 received from the public concerning this meeting. A 15 transcript of the meeting is being kept, will be made 16 available as stated in the Federal Register notice.
17 Therefore, we request the participants in 18 this meeting use the microphones located throughout 19 the room when addressing the Subcommittee.
20 Participants should first identify themselves and 21 state with sufficient clarity and volume so they can 22 be readily heard.
23 We have a bridge line established for the 24 public to listen in to the meeting. To minimize 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


7 1 disturbance, the public line will be kept in the 2 listen in only mode.             I also request that attendees 3 put their electronic devices on silence.                       We don't 4 want them going off during the meeting.
7 disturbance, the public line will be kept in the 1
5                  We'll now proceed with the meeting.                   And 6 I'm going to call upon Omid Tabatabai from the NRC 7 staff to make introductory remarks, and then we'll 8 turn it over to the NuScale folks.                     Omid?
listen in only mode. I also request that attendees 2
9                  MR. TABATABAI:         Good morning.       Thank you 10 so much, Dr. Bley, and thank you, the members of the 11 ACRS.         As you mentioned, this is a Subcommittee 12 presentation of Chapter 8: Electric Power for NuScale 13 Design Certification Application.
put their electronic devices on silence. We don't 3
14                  We're     excited       to       present   to       the 15 Subcommittee members.             And the interesting part is 16 that this is the beginning of Phase 3 of the review of 17 NuScale Design Certification Application. And this is 18 the first chapter that comes before the ACRS.
want them going off during the meeting.
19                  The team from NuScale is going to start 20 the presentation first.             And then after that, the NRC 21 staff will make their presentation with respect to the 22 evaluation of information.
4 We'll now proceed with the meeting. And 5
23                  Dr. Bley mentioned --- made a comment 24 about this review being premature.                     And I think, to 25 some degree, we agree with that.                     And we're hoping NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
I'm going to call upon Omid Tabatabai from the NRC 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
staff to make introductory remarks, and then we'll 7
turn it over to the NuScale folks. Omid?
8 MR. TABATABAI: Good morning. Thank you 9
so much, Dr. Bley, and thank you, the members of the 10 ACRS. As you mentioned, this is a Subcommittee 11 presentation of Chapter 8: Electric Power for NuScale 12 Design Certification Application.
13 We're excited to present to the 14 Subcommittee members. And the interesting part is 15 that this is the beginning of Phase 3 of the review of 16 NuScale Design Certification Application. And this is 17 the first chapter that comes before the ACRS.
18 The team from NuScale is going to start 19 the presentation first. And then after that, the NRC 20 staff will make their presentation with respect to the 21 evaluation of information.
22 Dr. Bley mentioned --- made a comment 23 about this review being premature. And I think, to 24 some degree, we agree with that. And we're hoping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


8 1 that during our presentation we can provide additional 2 information to the members.               With that, I'll turn the 3 microphone back to you.
8 that during our presentation we can provide additional 1
4                    CHAIR BLEY: Thank you. And I guess I can 5 turn it over to Paul Infanger from NuScale.                     Paul, go 6 ahead.
information to the members. With that, I'll turn the 2
7                    MR. INFANGER:         Good morning, my name is 8 Paul Infanger and I'm the licensing project manager 9 for Chapter 8.         And my background, education, I went 10 to Ohio State University, a bachelor's in physics, 11 master's in nuclear engineering.
microphone back to you.
12                    And   I've     been     in     the nuclear     power 13 industry         for about     35   years,       about   25 years       at 14 operating plants and about the last ten years working 15 on new reactors.           I was at UniStar for about seven 16 years, and now I've been at NuScale for about three.
3 CHAIR BLEY: Thank you. And I guess I can 4
17                    So we'll start with the introductions, and 18 then I have a couple of opening remarks about the 19 chapter presentation.             Kent?
turn it over to Paul Infanger from NuScale. Paul, go 5
20                    MR. WELTER:       My name is Kent Welter.             I'm 21 a chief engineer at NuScale Power.                     I graduated from 22 Oregon         State   University       with       a PhD in   nuclear 23 engineering, about ten years at NuScale and about five 24 years at the NRC in New and Advanced Reactors before 25 joining NuScale.
ahead.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
6 MR. INFANGER: Good morning, my name is 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
Paul Infanger and I'm the licensing project manager 8
for Chapter 8. And my background, education, I went 9
to Ohio State University, a bachelor's in physics, 10 master's in nuclear engineering.
11 And I've been in the nuclear power 12 industry for about 35 years, about 25 years at 13 operating plants and about the last ten years working 14 on new reactors. I was at UniStar for about seven 15 years, and now I've been at NuScale for about three.
16 So we'll start with the introductions, and 17 then I have a couple of opening remarks about the 18 chapter presentation. Kent?
19 MR. WELTER: My name is Kent Welter. I'm 20 a chief engineer at NuScale Power. I graduated from 21 Oregon State University with a PhD in nuclear 22 engineering, about ten years at NuScale and about five 23 years at the NRC in New and Advanced Reactors before 24 joining NuScale.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


9 1                MR. EHLERS:       Yes, my name is Jeff Ehlers.
9 MR. EHLERS: Yes, my name is Jeff Ehlers.
2 I've been at NuScale since January.                 I've been in the 3 nuclear industry for probably 15 years, mostly spent 4 at Cooper Nuclear Station.             I received my degree in 5 electrical     engineering         from       the   University         of 6 Nebraska.     And now I am serving in the role of the 7 electrical engineering supervisor at NuScale.
1 I've been at NuScale since January. I've been in the 2
8                MR. HOUGH:       Good morning, I'm Ted Hough.
nuclear industry for probably 15 years, mostly spent 3
9 Good to be here again, see all these faces again from 10 last year.     I started my nuclear career back in 1968 11 when I read a book called Accelerators: Machines of 12 Nuclear Physics.         And about a year later the Navy 13 recruiter thought that was pretty nice, so I got in 14 the Nuclear Navy that way.
at Cooper Nuclear Station. I received my degree in 4
15                And   over     the     years,     I   worked     nine 16 different commercial units, and then ended up at 17 Cooper for about 20 years there.                 That's how I got to 18 know Jeff.       And over the years, I got the lead 19 auditor, Level 3 inspector for electrical cert, and a 20 EE degree from the University of Nebraska. And that's 21 my background there.
electrical engineering from the University of 5
22                And I think we can just roll right into 23 the presentation if everybody ---
Nebraska. And now I am serving in the role of the 6
24                MR. INFANGER:         Yes.     I just wanted to say 25 a couple of things about Chapter 8.                   I think Omid NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
electrical engineering supervisor at NuScale.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 MR. HOUGH: Good morning, I'm Ted Hough.
8 Good to be here again, see all these faces again from 9
last year. I started my nuclear career back in 1968 10 when I read a book called Accelerators: Machines of 11 Nuclear Physics. And about a year later the Navy 12 recruiter thought that was pretty nice, so I got in 13 the Nuclear Navy that way.
14 And over the years, I worked nine 15 different commercial units, and then ended up at 16 Cooper for about 20 years there. That's how I got to 17 know Jeff. And over the years, I got the lead 18 auditor, Level 3 inspector for electrical cert, and a 19 EE degree from the University of Nebraska. And that's 20 my background there.
21 And I think we can just roll right into 22 the presentation if everybody ---
23 MR. INFANGER: Yes. I just wanted to say 24 a couple of things about Chapter 8. I think Omid 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


10 1 mentioned, this is the first of the chapters.                       We've 2 brought a number of topical reports to the ACRS. This 3 is the first of our chapters.
10 mentioned, this is the first of the chapters. We've 1
4                  And although there's quite a number of 5 items that are in the open items in the SER, one thing 6 that       we'd   like   to   point     out     is that   for       the 7 confirmatory items that are mentioned in the SER, 8 those were in Revision I, which was issued after                           --
brought a number of topical reports to the ACRS. This 2
9 was submitted to the NRC after the SER was already in 10 the review cycle.             And that's why there's quite a 11 number of confirmatory items. But those have all been 12 --- the responses to all those have been submitted and 13 are on the docket.
is the first of our chapters.
14                  And also, for the open items, the largest 15 open item is meeting the topical report for the 16 electrical distribution system for non-safety related 17 power.         We have submitted an RAI response on that 18 which       has provided     how     we   meet     all   of the     SER 19 conditions.
3 And although there's quite a number of 4
20                  So that has been submitted.                 That was 21 submitted in late March which, again, was after the 22 SER was already in the review cycle.                     So that's why 23 those things are not in the SER.                   But we are willing 24 to and able to answer questions about those items. We 25 have the appropriate people here.
items that are in the open items in the SER, one thing 5
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
that we'd like to point out is that for the 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
confirmatory items that are mentioned in the SER, 7
those were in Revision I, which was issued after --
8 was submitted to the NRC after the SER was already in 9
the review cycle. And that's why there's quite a 10 number of confirmatory items. But those have all been 11
--- the responses to all those have been submitted and 12 are on the docket.
13 And also, for the open items, the largest 14 open item is meeting the topical report for the 15 electrical distribution system for non-safety related 16 power. We have submitted an RAI response on that 17 which has provided how we meet all of the SER 18 conditions.
19 So that has been submitted. That was 20 submitted in late March which, again, was after the 21 SER was already in the review cycle. So that's why 22 those things are not in the SER. But we are willing 23 to and able to answer questions about those items. We 24 have the appropriate people here.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


11 1                    CHAIR   BLEY:       Okay,       good.     Well,     two 2 questions, well, two comments.                   One is thank you for 3 the list of acronyms.               I wish I had it when I was 4 reading this stuff, ha, ha.
11 CHAIR BLEY: Okay, good. Well, two 1
5                    Number two, have you responded to all the 6 RAIs       on   this   chapter?         Or   are       there   still     some 7 outstanding that you have not responded to?                         I know 8 the staff hasn't reviewed them all yet but ---
questions, well, two comments. One is thank you for 2
9                    MR. INFANGER:         Yes.       We responded to all 10 the Chapter 8 RAIs.
the list of acronyms. I wish I had it when I was 3
11                    CHAIR BLEY:       Okay, thank you.
reading this stuff, ha, ha.
12                    MR. INFANGER:         And with that, Ted, why 13 don't you start the presentation?
4 Number two, have you responded to all the 5
14                    MR. HOUGH:       All right.           We'll just jump 15 right in there. Of course, the abbreviations that the 16 member mentioned there, probably most important is all 17 the system names.           After that it's pretty much run of 18 the mill acronyms in the industry.                     I'll just kind of 19 click through those for you.
RAIs on this chapter? Or are there still some 6
20                    And   then     again,       the       purpose   of     the 21 meeting, to provide an overview of our electrical 22 systems       and   then   present     some       highlights     of     the 23 systems.         And you can see the presentation's kind of 24 organized just like Chapter 8, 8.1 through 8.4 down 25 there, design basis, offsite power, onsite AC and DC, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
outstanding that you have not responded to? I know 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
the staff hasn't reviewed them all yet but ---
8 MR. INFANGER: Yes. We responded to all 9
the Chapter 8 RAIs.
10 CHAIR BLEY: Okay, thank you.
11 MR. INFANGER: And with that, Ted, why 12 don't you start the presentation?
13 MR. HOUGH: All right. We'll just jump 14 right in there. Of course, the abbreviations that the 15 member mentioned there, probably most important is all 16 the system names. After that it's pretty much run of 17 the mill acronyms in the industry. I'll just kind of 18 click through those for you.
19 And then again, the purpose of the 20 meeting, to provide an overview of our electrical 21 systems and then present some highlights of the 22 systems. And you can see the presentation's kind of 23 organized just like Chapter 8, 8.1 through 8.4 down 24 there, design basis, offsite power, onsite AC and DC, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


12 1 and then the station blackout.
12 and then the station blackout.
2                  And then as indicated there, we'll talk 3 about the topical and the road map that'll be provided 4 for that toward the end of the presentation.                             So 5 there'll be a general flow here.
1 And then as indicated there, we'll talk 2
6                  I just want to give you a little bit of 7 background.       The starting point that we had when I 8 first got to NuScale in late 2010, October of 2010, of 9 course, you know, your key basis is nuclear safety and 10 regulatory       requirements         that       everybody   has       to 11 implement.
about the topical and the road map that'll be provided 3
12                  And then in March of 2011, the Fukushima 13 event happened. That weighed heavy on our mind, me in 14 particular.       That was a significant emotional event 15 for me, I guess you might say.                   And then what we had 16 to work with was the robust, inherently safe module 17 design that Dr. Reyes put together.
for that toward the end of the presentation. So 4
18                  You   know,     our     plant     is very   simple 19 mechanically.         And that was an emphasis that we had 20 all along, make it as simple as possible, don't 21 complicate things.             And so my challenge was to put 22 together electrical design that complemented that 23 simplicity.
there'll be a general flow here.
24                  But at the same time, what I had to look 25 for,       I   can't   just     put     together       12 independent NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
5 I just want to give you a little bit of 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
background. The starting point that we had when I 7
first got to NuScale in late 2010, October of 2010, of 8
course, you know, your key basis is nuclear safety and 9
regulatory requirements that everybody has to 10 implement.
11 And then in March of 2011, the Fukushima 12 event happened. That weighed heavy on our mind, me in 13 particular. That was a significant emotional event 14 for me, I guess you might say. And then what we had 15 to work with was the robust, inherently safe module 16 design that Dr. Reyes put together.
17 You know, our plant is very simple 18 mechanically. And that was an emphasis that we had 19 all along, make it as simple as possible, don't 20 complicate things. And so my challenge was to put 21 together electrical design that complemented that 22 simplicity.
23 But at the same time, what I had to look 24 for, I can't just put together 12 independent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


13 1 distribution systems.             That's not economical.               But, 2 you know, at the same time, look out for GDC 5, things 3 like that, when we shared electrical systems, you 4 know, so they don't impact economics and viability of 5 the plant.
13 distribution systems. That's not economical. But, 1
6                    So that's where we started. And so moving 7 along       here,   what   we   have     is     design   basis.         We 8 maintained         everything,     the     fail-safe     and   loss       of 9 power,         everything,       any     active       components       like 10 solenoids.         They would de-energize and move to their 11 safety position, depending on what their function is.
you know, at the same time, look out for GDC 5, things 2
12 Breakers would open, for example, reactor trip and 13 pressurizer, heater.
like that, when we shared electrical systems, you 3
14                    And then once those active components 15 moved       to   their   safety       position,       via   no   power, 16 everything from that point on is natural, you know, 17 passive cooling, thermodynamic principles, et cetera.
know, so they don't impact economics and viability of 4
18 So it's pretty straight forward.
the plant.
19                    MEMBER SKILLMAN:           Ted, let me ask you a 20 question here.
5 So that's where we started. And so moving 6
21                    MR. HOUGH:       Yes, sir.
along here, what we have is design basis. We 7
22                    MEMBER SKILLMAN:         Go back a slide please.
maintained everything, the fail-safe and loss of 8
23 On your next to the last bullet, design electrical 24 systems that complement the simplicity, I hear from 25 your background you've obviously dealt with small NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
: power, everything, any active components like 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
solenoids. They would de-energize and move to their 10 safety position, depending on what their function is.
11 Breakers would open, for example, reactor trip and 12 pressurizer, heater.
13 And then once those active components 14 moved to their safety position, via no power, 15 everything from that point on is natural, you know, 16 passive cooling, thermodynamic principles, et cetera.
17 So it's pretty straight forward.
18 MEMBER SKILLMAN: Ted, let me ask you a 19 question here.
20 MR. HOUGH: Yes, sir.
21 MEMBER SKILLMAN: Go back a slide please.
22 On your next to the last bullet, design electrical 23 systems that complement the simplicity, I hear from 24 your background you've obviously dealt with small 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


14 1 plants         and   likely     paralleling           diesel engines, 2 paralleling other power supplies.
14 plants and likely paralleling diesel
3                    In   this     design,         you   can have       12 4 independent machines, each of which is parallel to the 5 other --
: engines, 1
6                    MR. HOUGH:       Yes.
paralleling other power supplies.
7                    MEMBER SKILLMAN:             -- under at least a 8 defined set of conditions, the 11 collapse to an 9 island mode of a selected machine.
2 In this
10                    I was considering, as I did this review, 11 whether I thought that was simple or not simple, 12 drawing       on my   background       of   paralleling   multiple 13 diesel engines, finding the oscilloscope, making sure 14 I knew, if I was on lead, when I was going to close 15 the breakers manually.               All of that I did manually, 16 you probably did too.
: design, you can have 12 3
17                    MR. HOUGH:       Yes.
independent machines, each of which is parallel to the 4
18                    MEMBER SKILLMAN: Maybe that's going to be 19 same situation for your operators that might have 12 20 of these modules coming on one at time on a particular 21 time period, or at least three or four coming on 22 during a particular time period.                         Speak to that 23 relative the work simplicity.
other --
24                    MR. HOUGH:       I think, you know, that's a 25 good point, you know, bringing the units online.                         Of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
5 MR. HOUGH: Yes.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
6 MEMBER SKILLMAN: -- under at least a 7
defined set of conditions, the 11 collapse to an 8
island mode of a selected machine.
9 I was considering, as I did this review, 10 whether I thought that was simple or not simple, 11 drawing on my background of paralleling multiple 12 diesel engines, finding the oscilloscope, making sure 13 I knew, if I was on lead, when I was going to close 14 the breakers manually. All of that I did manually, 15 you probably did too.
16 MR. HOUGH: Yes.
17 MEMBER SKILLMAN: Maybe that's going to be 18 same situation for your operators that might have 12 19 of these modules coming on one at time on a particular 20 time period, or at least three or four coming on 21 during a particular time period. Speak to that 22 relative the work simplicity.
23 MR. HOUGH: I think, you know, that's a 24 good point, you know, bringing the units online. Of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


15 1 course, they'll have to be, you know, brought in 2 parallel online as they come up.                   Within the island 3 mode factor that you talk about, that is the part of 4 the design that is yet to go in terms of, you know, 5 controls to do that, if it's in the final design 6 phase.
15 course, they'll have to be, you know, brought in 1
7                But it's fairly simple in the aspect of 8 when the grid gets --- either it goes away or it gets 9 unstable, disconnect from it.             Get away from it.           And 10 then we move one unit into isochronous.                 And the rest 11 of them have full bypass capability, the breakers just 12 open. So the operators have very little to do in that 13 event.
parallel online as they come up. Within the island 2
14                I know     you   mentioned         the island     mode 15 there, but that's probably, I would say, I guess in my 16 opinion, the most complicated thing is getting the 17 controls lined up, all the relaying and stuff to make 18 that happen. But that's still yet to go in the design 19 phase.
mode factor that you talk about, that is the part of 3
20                MEMBER SKILLMAN:             Let me just add one 21 more.
the design that is yet to go in terms of, you know, 4
22                MR. HOUGH:       Sure.
controls to do that, if it's in the final design 5
23                MEMBER SKILLMAN:           So let's say we're on 24 watch, and we've got --- we're a fully mature 12 25 module plant. And we've got four operating, and we're NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
phase.
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433
6 But it's fairly simple in the aspect of 7
when the grid gets --- either it goes away or it gets 8
unstable, disconnect from it. Get away from it. And 9
then we move one unit into isochronous. And the rest 10 of them have full bypass capability, the breakers just 11 open. So the operators have very little to do in that 12 event.
13 I know you mentioned the island mode 14 there, but that's probably, I would say, I guess in my 15 opinion, the most complicated thing is getting the 16 controls lined up, all the relaying and stuff to make 17 that happen. But that's still yet to go in the design 18 phase.
19 MEMBER SKILLMAN: Let me just add one 20 more.
21 MR. HOUGH: Sure.
22 MEMBER SKILLMAN: So let's say we're on 23 watch, and we've got --- we're a fully mature 12 24 module plant. And we've got four operating, and we're 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


16 1 bringing two online.           What's different here is, when 2 you're paralleling the next two modules, you're not 3 just adding an alternator to pick up load.                             The 4 instant you connect, you're pumping reactivity to 5 increase power to allow that machine to come out and 6 not     only stay   synchronized         but       add to the     load 7 capacity.
16 bringing two online. What's different here is, when 1
8                  MR. HOUGH:       Yes.
you're paralleling the next two modules, you're not 2
9                  MEMBER SKILLMAN:           And so what's really 10 different in this setup is what it takes to, if you 11 will, parallel, assume load, and had enough reactivity 12 that you are actually taking part of the load.
just adding an alternator to pick up load. The 3
13                  So it's a two-step process, whereas in a 14 diesel or gas turbine, you almost automatically come 15 on up and take load.         Here is an action that requires 16 addition of reactivity in addition to paralleling the 17 electrical machine.           So how has that been considered 18 in terms of simplicity?
instant you connect, you're pumping reactivity to 4
19                  MR. HOUGH:           I would say not from an 20 electrical standpoint but, you know, each module is 21 connected to its own turbine, right --
increase power to allow that machine to come out and 5
22                  MEMBER SKILLMAN:         Yes.
not only stay synchronized but add to the load 6
23                  MR. HOUGH:         -- independently.           So the 24 reactivity controls are ---
capacity.
25                  MEMBER     SKILLMAN:           So   does it     load NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MR. HOUGH: Yes.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 MEMBER SKILLMAN: And so what's really 9
different in this setup is what it takes to, if you 10 will, parallel, assume load, and had enough reactivity 11 that you are actually taking part of the load.
12 So it's a two-step process, whereas in a 13 diesel or gas turbine, you almost automatically come 14 on up and take load. Here is an action that requires 15 addition of reactivity in addition to paralleling the 16 electrical machine. So how has that been considered 17 in terms of simplicity?
18 MR. HOUGH: I would say not from an 19 electrical standpoint but, you know, each module is 20 connected to its own turbine, right --
21 MEMBER SKILLMAN: Yes.
22 MR. HOUGH: -- independently. So the 23 reactivity controls are ---
24 MEMBER SKILLMAN: So does it load 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


17 1 automatically and increase reactivity automatically?
17 automatically and increase reactivity automatically?
2                MR. HOUGH: Yes. Dr. Welter might be able 3 to follow on there for me ---
1 MR. HOUGH: Yes. Dr. Welter might be able 2
4                MEMBER SKILLMAN:         What I'm getting at is 5 the term simplicity.         And I'm not challenging that 6 that is accurate.         It may be.           But I'm imagining a 7 scenario that, at least, I lived through.                   And it 8 wasn't quite as simple as one might have thought it 9 is.
to follow on there for me ---
10                MR. WELTER:         Yes. I don't disagree.         I 11 guess what Ted is speaking to a little bit is we're 12 going through a lot of that right now.                 So we have a 13 crew of about 20 folks going through ISV right now, 14 you know, potential operators of the plant going 15 through all these various scenarios on how to start it 16 up.
3 MEMBER SKILLMAN: What I'm getting at is 4
17                CHAIR   BLEY:         Would       you define     your 18 acronyms as you use them, please?
the term simplicity. And I'm not challenging that 5
19                MR. WELTER:       ISV ---
that is accurate. It may be. But I'm imagining a 6
20                CHAIR BLEY:         You've forgotten what the 21 words mean, ha, ha, ha.
scenario that, at least, I lived through. And it 7
22                MR. WELTER:         Yes,     sorry, independent 23 system verification.         It's part of our human factors 24 engineering program. So not all of the details on how 25 to do what you're asking have been worked out. But we NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
wasn't quite as simple as one might have thought it 8
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
is.
9 MR. WELTER: Yes. I don't disagree. I 10 guess what Ted is speaking to a little bit is we're 11 going through a lot of that right now. So we have a 12 crew of about 20 folks going through ISV right now, 13 you know, potential operators of the plant going 14 through all these various scenarios on how to start it 15 up.
16 CHAIR BLEY: Would you define your 17 acronyms as you use them, please?
18 MR. WELTER: ISV ---
19 CHAIR BLEY: You've forgotten what the 20 words mean, ha, ha, ha.
21 MR. WELTER: Yes, sorry, independent 22 system verification. It's part of our human factors 23 engineering program. So not all of the details on how 24 to do what you're asking have been worked out. But we 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


18 1 have a human factors engineering program, we have 2 people on the simulator right going through a lot of 3 these various scenarios.
18 have a human factors engineering program, we have 1
4                    MEMBER     SKILLMAN:             But we're   in     the 5 conceptual stage, a lot of lessons ahead. You kind of 6 understand exactly where you want to go.                     There's a 7 lot of work to get there from here.
people on the simulator right going through a lot of 2
8                    MR. WELTER:         Well, I would say from a 9 design         certification       perspective,         we   have       the 10 electrical         and   the     systems         designed,   and       the 11 capability of the plant is well understood.                     And now 12 exactly how you want to operate that is still being 13 worked out, yes, so conceptual, if you will.                           And 14 that's part of the human ---
these various scenarios.
15                    MEMBER SKILLMAN: Yes, fair enough. Thank 16 you.       Okay.
3 MEMBER SKILLMAN: But we're in the 4
17                    MR. HOUGH:       Okay.       So then final bullet 18 there, based on the application of topical, highlights 19 our overall design of AC and DC systems are non-1E.
conceptual stage, a lot of lessons ahead. You kind of 5
20 We have the highly reliable DC system we talked about 21 last year with augmented design qualifications and QA 22 provisions.
understand exactly where you want to go. There's a 6
23                    And that system itself powers up the main 24 control room emergency lighting, your post-accident 25 monitoring type Bravo and Charlie variables. And then NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
lot of work to get there from here.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
7 MR. WELTER: Well, I would say from a 8
design certification perspective, we have the 9
electrical and the systems
: designed, and the 10 capability of the plant is well understood. And now 11 exactly how you want to operate that is still being 12 worked out, yes, so conceptual, if you will. And 13 that's part of the human ---
14 MEMBER SKILLMAN: Yes, fair enough. Thank 15 you. Okay.
16 MR. HOUGH: Okay. So then final bullet 17 there, based on the application of topical, highlights 18 our overall design of AC and DC systems are non-1E.
19 We have the highly reliable DC system we talked about 20 last year with augmented design qualifications and QA 21 provisions.
22 And that system itself powers up the main 23 control room emergency lighting, your post-accident 24 monitoring type Bravo and Charlie variables. And then 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


19 1 there are no power sources required to perform any 2 safety related functions.             And so consequently, the 3 design supports exemption of GDC 17 and 18.
19 there are no power sources required to perform any 1
4                Here's a picture we put together just to 5 give you kind of a big picture overview of how the 6 systems interrelate to one another.                     At the top, 7 you'll see the grid or what we call the load, fed by 8 the high voltage system, 13.8, electronically designed 9 as a 345 out to the grid.           And then EHV supports the 10 medium voltage system at 4160 through unit auxiliary 11 transformers.
safety related functions. And so consequently, the 2
12                And we'll go into a little bit more detail 13 in the next slide here.         Then that drops down to a 480 14 system with low voltage. And the ELV 480 system feeds 15 our DC, both DC systems, the normal DC, the highly 16 reliable DC, and over to the right there in the yellow 17 is the plant lighting system.             It also feeds security 18 power down there in the blue box.
design supports exemption of GDC 17 and 18.
19                And   then     the     backup       power system       is 20 actually divided into two pieces, one at a 13.8 source 21 that's called the auxiliary AC power supply, and then 22 the backup diesel generators there, at the 480 level, 23 is also part of the backup power supply system.                       So 24 that's how they all interrelate to one another in a 25 big picture fashion.
3 Here's a picture we put together just to 4
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
give you kind of a big picture overview of how the 5
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433
systems interrelate to one another. At the top, 6
you'll see the grid or what we call the load, fed by 7
the high voltage system, 13.8, electronically designed 8
as a 345 out to the grid. And then EHV supports the 9
medium voltage system at 4160 through unit auxiliary 10 transformers.
11 And we'll go into a little bit more detail 12 in the next slide here. Then that drops down to a 480 13 system with low voltage. And the ELV 480 system feeds 14 our DC, both DC systems, the normal DC, the highly 15 reliable DC, and over to the right there in the yellow 16 is the plant lighting system. It also feeds security 17 power down there in the blue box.
18 And then the backup power system is 19 actually divided into two pieces, one at a 13.8 source 20 that's called the auxiliary AC power supply, and then 21 the backup diesel generators there, at the 480 level, 22 is also part of the backup power supply system. So 23 that's how they all interrelate to one another in a 24 big picture fashion.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


20 1                And here's where --- I know this is very 2 hard to see.         You know, the pictures are in the 3 application and stuff. At the top there, I would like 4 to point out it's a standard breaker and a half 5 scheme. That's what most places use. It doesn't have 6 to be, but that's we put in there.
20 And here's where --- I know this is very 1
7                In the 13.8, there're some interesting 8 aspects of that. Over here at the far left you'll see 9 --     that's the   auxiliary       power       supply unit,       an 10 auxiliary     AC power     supply     unit,       APS. And     it's 11 connected to what appears to be kind of like a swing 12 bus to some of the folks.             It might be.
hard to see. You know, the pictures are in the 2
13                But what that allows us to do, in part of 14 this design, part of my background was maintenance 15 rule coordinator at Cooper for five years.                 And I was 16 on the Advisory Board.           And I've seen a lot of folks 17 struggling with unavailability of maintenance. That's 18 why we end up with A4, five, you know, people trying 19 to do too much online.
application and stuff. At the top there, I would like 3
20                We designed this so that you could take 21 out any component of the AC distribution system and 22 stick device protection in there.                 They disconnect to 23 the breaker safely.           And you can see, I could take 24 this generator here, and move it over to this bus.
to point out it's a standard breaker and a half 4
25                That main part transformer there was a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
scheme. That's what most places use. It doesn't have 5
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
to be, but that's we put in there.
6 In the 13.8, there're some interesting 7
aspects of that. Over here at the far left you'll see 8
-- that's the auxiliary power supply unit, an 9
auxiliary AC power supply unit, APS. And it's 10 connected to what appears to be kind of like a swing 11 bus to some of the folks. It might be.
12 But what that allows us to do, in part of 13 this design, part of my background was maintenance 14 rule coordinator at Cooper for five years. And I was 15 on the Advisory Board. And I've seen a lot of folks 16 struggling with unavailability of maintenance. That's 17 why we end up with A4, five, you know, people trying 18 to do too much online.
19 We designed this so that you could take 20 out any component of the AC distribution system and 21 stick device protection in there. They disconnect to 22 the breaker safely. And you can see, I could take 23 this generator here, and move it over to this bus.
24 That main part transformer there was a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


21 1 component of the AC distribution system.                 And they 2 still provide 100 percent power.                   And we put two 3 device protection in there.                 They disconnect the 4 breaker so it allows safety for the maintenance shops.
21 component of the AC distribution system. And they 1
5                And you can see, I can take this generator 6 here, and I can move it over to this bus.               That main 7 power transformer there will still put out --- each 8 one is built to handle output of two generators.
still provide 100 percent power. And we put two 2
9                And I can move that other generator.                 You 10 know, I can take this one, put it over here where it 11 normally would be and put two over here.               Now I have 12 this bus and this MPT available.                   These are three 13 phase main power transformers, about 115 MVA each.
device protection in there. They disconnect the 3
14                So the bus, unless it's the generator 15 itself that goes down on you, I could still put out 16 100 percent power.         And that was also a factor in 17 designing this, because you had to have --- it's not 18 like a normal plant where we're going to take the unit 19 down and, you know, have bus outages and bipower.
breaker so it allows safety for the maintenance shops.
20                What you have here is a plant that's going 21 to operate 24/7 from all the other units that are 22 still online, so even if I take one generator ---
4 And you can see, I can take this generator 5
23 reactor off for refuel.             So those are kind of the 24 highlights of the 13.8 system.
here, and I can move it over to this bus. That main 6
25                Now to 4160, you can see it is arranged, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
power transformer there will still put out --- each 7
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
one is built to handle output of two generators.
8 And I can move that other generator. You 9
know, I can take this one, put it over here where it 10 normally would be and put two over here. Now I have 11 this bus and this MPT available. These are three 12 phase main power transformers, about 115 MVA each.
13 So the bus, unless it's the generator 14 itself that goes down on you, I could still put out 15 100 percent power. And that was also a factor in 16 designing this, because you had to have --- it's not 17 like a normal plant where we're going to take the unit 18 down and, you know, have bus outages and bipower.
19 What you have here is a plant that's going 20 to operate 24/7 from all the other units that are 21 still online, so even if I take one generator ---
22 reactor off for refuel. So those are kind of the 23 highlights of the 13.8 system.
24 Now to 4160, you can see it is arranged, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


22 1 and if you follow it through, you can see there's a 2 ring bus concept built here.                 And if I have a lockout 3 or anything happened on the UAT, the unit auxiliary 4 transformers there, it'll automatically transfer to an 5 adjacent bus and Ops is selected.
22 and if you follow it through, you can see there's a 1
6                    And then moving down to the 480 section 7 down here, you can see --- it's real hard to see 8 there, but each one is a main-tie-main configuration.
ring bus concept built here. And if I have a lockout 2
9 So I have reliability built in there, that if one of 10 those         SSTs,   you   know,     trips,       or overloads,       or 11 whatever, it can go the other side, to the main-tie-12 main       configuration.           So   we've       built a lot       of 13 reliability in there.
or anything happened on the UAT, the unit auxiliary 3
14                    And the other factor was, from the control 15 mass type of simplicity, how do I make this system 16 very simple for the operators?                   Don't add operations 17 for this, you know, because we knew we had this 18 combined control room to deal with. We knew it had to 19 be simple in the first place.                     So that was another 20 factor we had to consider.
transformers there, it'll automatically transfer to an 4
21                    CHAIR BLEY:       Ted?
adjacent bus and Ops is selected.
22                    MR. HOUGH:       Sir?
5 And then moving down to the 480 section 6
23                    CHAIR BLEY:         I don't remember if you've 24 done this yet.           How are you responding to the open 25 phase situation?
down here, you can see --- it's real hard to see 7
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
there, but each one is a main-tie-main configuration.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 So I have reliability built in there, that if one of 9
those SSTs, you know, trips, or overloads, or 10 whatever, it can go the other side, to the main-tie-11 main configuration. So we've built a lot of 12 reliability in there.
13 And the other factor was, from the control 14 mass type of simplicity, how do I make this system 15 very simple for the operators? Don't add operations 16 for this, you know, because we knew we had this 17 combined control room to deal with. We knew it had to 18 be simple in the first place. So that was another 19 factor we had to consider.
20 CHAIR BLEY: Ted?
21 MR. HOUGH: Sir?
22 CHAIR BLEY: I don't remember if you've 23 done this yet. How are you responding to the open 24 phase situation?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


23 1                MR. HOUGH:       Actually, BTP 8-9, we don't 2 have any motors, anything like that that would be 3 harmed by an open phase condition.                   And all of our, 4 again, with a zero power need, 8-9 really is a never 5 mind.
23 MR. HOUGH: Actually, BTP 8-9, we don't 1
6                CHAIR   BLEY:       You     don't   need electric 7 power, but it's darn nice to have.                     So you're not 8 adding any open phase protection, because you don't 9 need it?
have any motors, anything like that that would be 2
10                MR. HOUGH:       No, that's correct.
harmed by an open phase condition. And all of our, 3
11                CHAIR BLEY:       Okay.       Your choice, but ---
again, with a zero power need, 8-9 really is a never 4
12                (Off the record comments) 13                CHAIR BLEY:         Oh, I'm sorry.         Go ahead, 14 Jeff.
mind.
15                MR. EHLERS:         Yes.       This design doesn't 16 have any stand-by AC units.             So the open phase issue 17 is     where you have     a   standby         transformer     that's 18 energized but not loaded. We do not have one of those 19 in our design.       So all of our transformers will be 20 loaded and not ready to be transferred to at some type 21 of emergency or a trip condition.
5 CHAIR BLEY: You don't need electric 6
22                So that's where the open phase causes you 23 a problem.       Because once you load that transformer, 24 then that open phase becomes apparent and then causes 25 all your motors, three-phase motors, to be down to two NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
power, but it's darn nice to have. So you're not 7
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
adding any open phase protection, because you don't 8
need it?
9 MR. HOUGH: No, that's correct.
10 CHAIR BLEY: Okay. Your choice, but ---
11 (Off the record comments) 12 CHAIR BLEY: Oh, I'm sorry. Go ahead, 13 Jeff.
14 MR. EHLERS: Yes. This design doesn't 15 have any stand-by AC units. So the open phase issue 16 is where you have a standby transformer that's 17 energized but not loaded. We do not have one of those 18 in our design. So all of our transformers will be 19 loaded and not ready to be transferred to at some type 20 of emergency or a trip condition.
21 So that's where the open phase causes you 22 a problem. Because once you load that transformer, 23 then that open phase becomes apparent and then causes 24 all your motors, three-phase motors, to be down to two 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


24 1 phases and causes problems.
24 phases and causes problems.
2                    So the times when we don't have that 3 detection, it's because as soon as we lose a phase due 4 to     our     design,   we're     going     to     know   immediately, 5 because we're using those transformers.                     So in the OE 6 that       you're   --   the   operating         experience     you're 7 speaking of, that was the problem, was that they had 8 a standby transformer that lost a phase.
1 So the times when we don't have that 2
9                    And   due     to     the       design     of     those 10 transformers, they have a delta winding on the center 11 of them that allows the voltage to be placed on the 12 third       phase,   even     though     it's     not   connected         to 13 anything.         It's a phantom voltage.               As soon as you 14 load it, it goes away.             But again, we don't have that 15 in our design.           So therefore, if we lose a phase, 16 we'll know so immediately.
detection, it's because as soon as we lose a phase due 3
17                    MEMBER BROWN:           You said it's a delta 18 output, right?
to our design, we're going to know immediately, 4
19                    MR. EHLERS:         No, no, no.         I'm talking 20 about in the middle of the transformer.
because we're using those transformers. So in the OE 5
21                    MEMBER BROWN:         No, the three phase ---
that you're -- the operating experience you're 6
22                    MR. EHLERS:       Yes.
speaking of, that was the problem, was that they had 7
23                    MEMBER BROWN:         It's a delta ---
a standby transformer that lost a phase.
24                    MR. EHLERS:       Right.
8 And due to the design of those 9
25                    MEMBER BROWN:         -- connected system.             And NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
transformers, they have a delta winding on the center 10 of them that allows the voltage to be placed on the 11 third phase, even though it's not connected to 12 anything. It's a phantom voltage. As soon as you 13 load it, it goes away. But again, we don't have that 14 in our design. So therefore, if we lose a phase, 15 we'll know so immediately.
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
16 MEMBER BROWN: You said it's a delta 17 output, right?
18 MR. EHLERS: No, no, no. I'm talking 19 about in the middle of the transformer.
20 MEMBER BROWN: No, the three phase ---
21 MR. EHLERS: Yes.
22 MEMBER BROWN: It's a delta ---
23 MR. EHLERS: Right.
24 MEMBER BROWN: -- connected system. And 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


25 1 you can't operate, saying it goes away, that's not the 2 ---
25 you can't operate, saying it goes away, that's not the 1
3                (Simultaneous speaking) 4                MEMBER BROWN:         When it goes down to two 5 phases, you have an open delta, but it can still 6 supply about 60 percent of the load.
2 (Simultaneous speaking) 3 MEMBER BROWN: When it goes down to two 4
7                MR. EHLERS:       Right.
phases, you have an open delta, but it can still 5
8                MEMBER BROWN:         Roughly.
supply about 60 percent of the load.
9                MR. EHLERS:       With some pretty high phase 10 currents.
6 MR. EHLERS: Right.
11                MEMBER BROWN:         Well, there's imbalances.
7 MEMBER BROWN: Roughly.
12 But, I mean, it can ---
8 MR. EHLERS: With some pretty high phase 9
13                MR. EHLERS:       Right.
currents.
14                MEMBER BROWN:         -- you can supply about 60 15 percent of the load.         So I've got a little bit of a 16 disconnect when you say it goes away.
10 MEMBER BROWN: Well, there's imbalances.
17                MR. EHLERS:       Well, I mean, the voltage on 18 that third phase is --- the problem with the open 19 phase issue is that, in the sense of transformers not 20 loaded, your voltage indications are going to show 21 there's a voltage on that phase.                 It's going to show 22 that -- your indication's going to say that phase is 23 energized.
11 But, I mean, it can ---
24                But as soon as you load it, then this 25 voltage on the open phase goes away.                 And therefore, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 MR. EHLERS: Right.
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
13 MEMBER BROWN: -- you can supply about 60 14 percent of the load. So I've got a little bit of a 15 disconnect when you say it goes away.
16 MR. EHLERS: Well, I mean, the voltage on 17 that third phase is --- the problem with the open 18 phase issue is that, in the sense of transformers not 19 loaded, your voltage indications are going to show 20 there's a voltage on that phase. It's going to show 21 that -- your indication's going to say that phase is 22 energized.
23 But as soon as you load it, then this 24 voltage on the open phase goes away. And therefore, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


26 1 you're down to two phases. So that's the problem with 2 the       open phase   issue,       is   that       on   an unloaded 3 transformer there's no way to detect it, or there 4 wasn't any way to detect that open phase until the 5 transformer was actually loaded.
26 you're down to two phases. So that's the problem with 1
6                Now, then once you transport --- then once 7 you transfer to that transformer, put load on it, then 8 it became readily apparent that that was already too 9 late. Because you were needing it, and you just cause 10 all your motors, your loads to be operating on two 11 phases instead of three, what they were designed for.
the open phase issue, is that on an unloaded 2
12 Does that make it clear?           Did I answer your question?
transformer there's no way to detect it, or there 3
13                MEMBER BROWN: A little bit. I just never 14 --- I did an open phase delta connected analysis at 15 one time back in one of my old jobs.                   I never really 16 thought about it under the zero load condition.                         So 17 trying to connect that back to saying that all of a 18 sudden the voltage can't be sensed, I mean, I'd have 19 to go back and look at that.           It's just been awhile --
wasn't any way to detect that open phase until the 4
20                MR. EHLERS:       Well, it ---
transformer was actually loaded.
21                MEMBER BROWN:         About 20 years.
5 Now, then once you transport --- then once 6
22                MR. EHLERS:         Yes.         In the operating 23 experience, that was the problem for the two cases 24 this occurred, that have been publicized, is where the 25 phase ---
you transfer to that transformer, put load on it, then 7
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
it became readily apparent that that was already too 8
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
late. Because you were needing it, and you just cause 9
all your motors, your loads to be operating on two 10 phases instead of three, what they were designed for.
11 Does that make it clear? Did I answer your question?
12 MEMBER BROWN: A little bit. I just never 13
--- I did an open phase delta connected analysis at 14 one time back in one of my old jobs. I never really 15 thought about it under the zero load condition. So 16 trying to connect that back to saying that all of a 17 sudden the voltage can't be sensed, I mean, I'd have 18 to go back and look at that. It's just been awhile --
19 MR. EHLERS: Well, it ---
20 MEMBER BROWN: About 20 years.
21 MR. EHLERS: Yes. In the operating 22 experience, that was the problem for the two cases 23 this occurred, that have been publicized, is where the 24 phase ---
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


27 1                  CHAIR BLEY:           Well, that's why it was 2 allowed to exist for the length ---
27 CHAIR BLEY: Well, that's why it was 1
3                  MR. EHLERS:       Yes, because if it --
allowed to exist for the length ---
4                  CHAIR BLEY: -- of time it existed.               And I 5 agree with you that it's obvious if you have the 6 transformer loaded.           However, you can still get some 7 pretty big phase currents temporarily.                   And the idea 8 that that can't do any damage, I'm not convinced of 9 that.
2 MR. EHLERS: Yes, because if it --
10                  MR. EHLERS:       Well, I mean ---
3 CHAIR BLEY: -- of time it existed. And I 4
11                  CHAIR BLEY:       Then again, you know, Ted's 12 right for the details of your response to accident 13 conditions. You don't need it. On the other hand, if 14 it were my plant, I'd think about it long and hard 15 before I didn't worry about that.
agree with you that it's obvious if you have the 5
16                  MR. EHLERS:       I'm     just saying, due to all 17 the transformers being loaded, and power flow going 18 through       them,   an     open     phase       condition     would 19 immediately recognized.
transformer loaded. However, you can still get some 6
20                  CHAIR BLEY:       Yes, it would.         I agree with 21 you on that.
pretty big phase currents temporarily. And the idea 7
22                  MR. EHLERS:         Yes.     Where the open phase 23 detection system is for unloaded transformers.
that that can't do any damage, I'm not convinced of 8
24                  CHAIR BLEY:       I'm not completely sure that 25 under all conditions none of that operating equipment NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
that.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
9 MR. EHLERS: Well, I mean ---
10 CHAIR BLEY: Then again, you know, Ted's 11 right for the details of your response to accident 12 conditions. You don't need it. On the other hand, if 13 it were my plant, I'd think about it long and hard 14 before I didn't worry about that.
15 MR. EHLERS: I'm just saying, due to all 16 the transformers being loaded, and power flow going 17 through
: them, an open phase condition would 18 immediately recognized.
19 CHAIR BLEY: Yes, it would. I agree with 20 you on that.
21 MR. EHLERS: Yes. Where the open phase 22 detection system is for unloaded transformers.
23 CHAIR BLEY: I'm not completely sure that 24 under all conditions none of that operating equipment 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


28 1 could be damaged though. That's the other side of it.
28 could be damaged though. That's the other side of it.
2                  MR. EHLERS: Well, yes, I agree with that.
1 MR. EHLERS: Well, yes, I agree with that.
3                  CHAIR BLEY: And I would worry about that.
2 CHAIR BLEY: And I would worry about that.
4                  MR. EHLERS:       Yes, I agree with that.
3 MR. EHLERS: Yes, I agree with that.
5                  CHAIR BLEY:       If it were my own plant.
4 CHAIR BLEY: If it were my own plant.
6                  MR. EHLERS:       Yes.
5 MR. EHLERS: Yes.
7                  (Simultaneous speaking) 8                  MEMBER SKILLMAN: Where in this diagram is 9 the voltage stepped up to the grid, if this is used, 10 for       instance,   in     grid     supply       versus a     local 11 application where you're not really feeding the grid?
6 (Simultaneous speaking) 7 MEMBER SKILLMAN: Where in this diagram is 8
12                  MR. HOUGH:     Okay.     Right here is the 13.8 13 bus. That's the main power transformer, 13.8, the 345 14 going out. And you have a double bus configuration to 15 offsite breakers.         Does that answer your question?
the voltage stepped up to the grid, if this is used, 9
16                  MEMBER SKILLMAN:             So could you go to 17 island mode?       And back into island mode where you're 18 just       feeding   in-house,       could       you   then   have       a 19 transformer fault where you did have an open phase 20 that you did not detect?
for instance, in grid supply versus a local 10 application where you're not really feeding the grid?
21                  In other words, could you find yourself in 22 a transient condition going to island mode, separating 23 from the grid, and in that separation end up with the 24 transformer fault that ---
11 MR. HOUGH: Okay. Right here is the 13.8 12 bus. That's the main power transformer, 13.8, the 345 13 going out. And you have a double bus configuration to 14 offsite breakers. Does that answer your question?
25                  MR. HOUGH: As Jeff indicated, I think ---
15 MEMBER SKILLMAN: So could you go to 16 island mode? And back into island mode where you're 17 just feeding in-house, could you then have a 18 transformer fault where you did have an open phase 19 that you did not detect?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
20 In other words, could you find yourself in 21 a transient condition going to island mode, separating 22 from the grid, and in that separation end up with the 23 transformer fault that ---
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
24 MR. HOUGH: As Jeff indicated, I think ---
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


29 1                  MEMBER SKILLMAN:           That would disable a 2 phase?
29 MEMBER SKILLMAN: That would disable a 1
3                  MR. HOUGH:         I think I understand the 4 question.         The island mode functionality basically 5 disconnects at this point here.                 And so again, all of 6 these transformers here, all four of the --- or all 7 eight of the main power transformers are normally 8 energized.       And you would know whether they were, you 9 know, had a problem or not right away.
phase?
10                  And so whatever service unit is designated 11 as the island mode module, you know, it'll pick up the 12 load and just feed it right back through once you're 13 disconnected here from the grid itself.                     Again, you 14 would know ---
2 MR. HOUGH: I think I understand the 3
15                  MEMBER SKILLMAN:         Okay, thank you.
question. The island mode functionality basically 4
16                  MR. HOUGH:     Okay.     Any other questions on 17 this?       Hard to read --
disconnects at this point here. And so again, all of 5
18                  MEMBER BROWN:         Yes.       You mentioned the 19 4160 was a ring bus, and I --
these transformers here, all four of the --- or all 6
20                  MR. HOUGH:       yes, sir.
eight of the main power transformers are normally 7
21                  MEMBER BROWN:         -- I didn't pick that up 22 when I looked at this before.
energized. And you would know whether they were, you 8
23                  MR. HOUGH:       Okay.       You have to kind of 24 trace it through, ha, ha.
know, had a problem or not right away.
25                  MEMBER BROWN:         I'm trying to see where it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 And so whatever service unit is designated 10 as the island mode module, you know, it'll pick up the 11 load and just feed it right back through once you're 12 disconnected here from the grid itself. Again, you 13 would know ---
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
14 MEMBER SKILLMAN: Okay, thank you.
15 MR. HOUGH: Okay. Any other questions on 16 this? Hard to read --
17 MEMBER BROWN: Yes. You mentioned the 18 4160 was a ring bus, and I --
19 MR. HOUGH: yes, sir.
20 MEMBER BROWN: -- I didn't pick that up 21 when I looked at this before.
22 MR. HOUGH: Okay. You have to kind of 23 trace it through, ha, ha.
24 MEMBER BROWN: I'm trying to see where it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


30 1 circles.       It's no connection.
30 circles. It's no connection.
2                  MR. HOUGH:       There's these ---
1 MR. HOUGH: There's these ---
3                  MEMBER BROWN:           Oh, it's that side as 4 opposed to left or right.
2 MEMBER BROWN: Oh, it's that side as 3
5                  MR. HOUGH:     Yes, yes.         And then over here 6 too on the outside.
opposed to left or right.
7                  MEMBER BROWN:           No, hold it.       It still 8 doesn't go back to 4160.               So as you come to a 4160 9 bus, off of the 13.8 kV, just pick one of those.
4 MR. HOUGH: Yes, yes. And then over here 5
10                  MR. HOUGH:       Yes, go here.
too on the outside.
11                  MEMBER BROWN:         And then I can go ring bus 12 to the other -- to the left.
6 MEMBER BROWN: No, hold it. It still 7
13                  MR. HOUGH:       Yes.
doesn't go back to 4160. So as you come to a 4160 8
14                  MEMBER BROWN:         Come down, and there's no 15 connection.
bus, off of the 13.8 kV, just pick one of those.
16                  MR. HOUGH: Or you can go here.
9 MR. HOUGH: Yes, go here.
17                  MEMBER BROWN:         I don't see any ring bus 18 connection on 4160.           I don't really care ---
10 MEMBER BROWN: And then I can go ring bus 11 to the other -- to the left.
19                  MR. HOUGH:       Because it's supposed to --
12 MR. HOUGH: Yes.
20                  (Simultaneous speaking) 21                  MEMBER BROWN:       You just made the comment, 22 and I can't find the line.
13 MEMBER BROWN: Come down, and there's no 14 connection.
23                  MR. HOUGH:     Yes.     It is there. And these 24 connection points here get you to the other side.
15 MR. HOUGH: Or you can go here.
25                  MEMBER BROWN:         I'll work on that.
16 MEMBER BROWN: I don't see any ring bus 17 connection on 4160. I don't really care ---
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MR. HOUGH: Because it's supposed to --
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
19 (Simultaneous speaking) 20 MEMBER BROWN: You just made the comment, 21 and I can't find the line.
22 MR. HOUGH: Yes. It is there. And these 23 connection points here get you to the other side.
24 MEMBER BROWN: I'll work on that.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


31 1                MR. HOUGH:       Okay.
31 MR. HOUGH: Okay.
2                MEMBER BROWN:         I do not see it.
1 MEMBER BROWN: I do not see it.
3                MR. HOUGH:     Okay.     It is there. Again, I 4 apologize for the --- it's kind of hard to, on this 5 large picture, or large schematic, the small picture.
2 MR. HOUGH: Okay. It is there. Again, I 3
6                All right, the offsite system, again, this 7 would be like 8.2 in the SRP or DSRS, offsite power 8 system is our switchyard and one or more connections 9 to the transmission grid, as you see in there, or a 10 microgrid, or a dedicated service line.
apologize for the --- it's kind of hard to, on this 4
11                We do have a COLA item included in the DCA 12 for the Applicant to describe their own specific 13 switchyard configuration.             And here again, we don't 14 rely on any AC power, either onsite or offsite, to 15 mitigate a design basis event.             And a loss of offsite 16 power, as Mr. Skillman refers to, we transition to 17 island mode, and the house load is powered from any 18 one of the designated TGs.
large picture, or large schematic, the small picture.
19                MEMBER SKILLMAN:         What is the house load?
5 All right, the offsite system, again, this 6
20                MR. HOUGH:         It's somewhere right at 30 21 megawatts, so it's about 50 percent power.
would be like 8.2 in the SRP or DSRS, offsite power 7
22                MEMBER BROWN:         Is that per module?
system is our switchyard and one or more connections 8
23                MR. HOUGH:       No, that's the entire house.
to the transmission grid, as you see in there, or a 9
24                MEMBER BROWN:         That's the entire --- if 25 you had 12 modules connected to the house load, is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
microgrid, or a dedicated service line.
(202) 234-4433       WASHINGTON, D.C. 20005-3701       (202) 234-4433
10 We do have a COLA item included in the DCA 11 for the Applicant to describe their own specific 12 switchyard configuration. And here again, we don't 13 rely on any AC power, either onsite or offsite, to 14 mitigate a design basis event. And a loss of offsite 15 power, as Mr. Skillman refers to, we transition to 16 island mode, and the house load is powered from any 17 one of the designated TGs.
18 MEMBER SKILLMAN: What is the house load?
19 MR. HOUGH: It's somewhere right at 30 20 megawatts, so it's about 50 percent power.
21 MEMBER BROWN: Is that per module?
22 MR. HOUGH: No, that's the entire house.
23 MEMBER BROWN: That's the entire --- if 24 you had 12 modules connected to the house load, is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


32 1 that a 30 megawatt?
32 that a 30 megawatt?
2                    MR. HOUGH: That's correct. But we put it 3 together that way so that, you know, if something 4 happens in the grid, it'd be nice to be the first one 5 back on.         So it's an obstacle once the other 11, if 6 they're all aligned, they'll go into a one percent 7 bypass.       So the capability is there.               And we maintain 8 a whole house load with one unit.
1 MR. HOUGH: That's correct. But we put it 2
9                    MEMBER SKILLMAN: And that one unit's good 10 for 50 or 60 megawatts electrical?                     Okay, thank you.
together that way so that, you know, if something 3
11                    MR. HOUGH:     And these are smaller, unlike 12 today's units, you know, they run back to, say, like 13 the Cooper 800-plus. And, you know, when you run back 14 to house load, it's somewhere around 20, 22.                       That's 15 a long ways for that big turbine to drop.                     Or, well, 16 ours are small, nimble turbines that very easily 17 accommodate that.
happens in the grid, it'd be nice to be the first one 4
18                    Okay, onsite AC, we kind of went through 19 some of this, but we'll breeze through it here.                             We 20 specified all standard AC componentry, you know, look 21 out     for   short   circuit       readings       that didn't       buy 22 anything special as far as off the shelf kind of 23 stuff.
back on. So it's an obstacle once the other 11, if 5
24                    And   as     I   noted,       we   support   online 25 maintenance. Any major component, again, can be taken NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
they're all aligned, they'll go into a one percent 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
bypass. So the capability is there. And we maintain 7
a whole house load with one unit.
8 MEMBER SKILLMAN: And that one unit's good 9
for 50 or 60 megawatts electrical? Okay, thank you.
10 MR. HOUGH: And these are smaller, unlike 11 today's units, you know, they run back to, say, like 12 the Cooper 800-plus. And, you know, when you run back 13 to house load, it's somewhere around 20, 22. That's 14 a long ways for that big turbine to drop. Or, well, 15 ours are small, nimble turbines that very easily 16 accommodate that.
17 Okay, onsite AC, we kind of went through 18 some of this, but we'll breeze through it here. We 19 specified all standard AC componentry, you know, look 20 out for short circuit readings that didn't buy 21 anything special as far as off the shelf kind of 22 stuff.
23 And as I noted, we support online 24 maintenance. Any major component, again, can be taken 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


33 1 out without affecting power output unless it's the TG 2 itself.
33 out without affecting power output unless it's the TG 1
3                Those main power transformers take the 4 load of two turbine generators, UATs.                 Any two of the 5 UATs can power an entire site.                   As you see in the 6 diagram they do not --- it's real small. There's a 6A 7 slide, 6B slide, so a six-pack.                 And any two of the 8 UATs can supply that entire load.
itself.
9                Let's see, as we stated there, the 12-10 module house load, and again, it is our normal source 11 of power, the term preferred power supply really isn't 12 applicable to NuScale design.                   That's an existing 13 fleet, that's an offsite power source.                 Not for us.
2 Those main power transformers take the 3
14 Our 13.8 buses are our supply, our normal load.
load of two turbine generators, UATs. Any two of the 4
15                And the EMVS is where we have shared 16 loads, shared large loads, that 4160 circ water, site 17 cooling water, chilled water system, any of those big 18 loads that are shared amongst all the units.                   That's 19 where EMV, that's its role and then, of course, to 20 feed the 480.       And the 480, that's where we start 21 breaking it up into module-specific loads.                 It'll be 22 the main-tie-main configurations, the lower horsepower 23 loads.
UATs can power an entire site. As you see in the 5
24                The plant lighting system here, PLS, is 25 actually listed as a power source.                 It is the power NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
diagram they do not --- it's real small. There's a 6A 6
(202) 234-4433       WASHINGTON, D.C. 20005-3701           (202) 234-4433
slide, 6B slide, so a six-pack. And any two of the 7
UATs can supply that entire load.
8 Let's see, as we stated there, the 12-9 module house load, and again, it is our normal source 10 of power, the term preferred power supply really isn't 11 applicable to NuScale design. That's an existing 12 fleet, that's an offsite power source. Not for us.
13 Our 13.8 buses are our supply, our normal load.
14 And the EMVS is where we have shared 15 loads, shared large loads, that 4160 circ water, site 16 cooling water, chilled water system, any of those big 17 loads that are shared amongst all the units. That's 18 where EMV, that's its role and then, of course, to 19 feed the 480. And the 480, that's where we start 20 breaking it up into module-specific loads. It'll be 21 the main-tie-main configurations, the lower horsepower 22 loads.
23 The plant lighting system here, PLS, is 24 actually listed as a power source. It is the power 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


34 1 source for us, as well as a main load too.                   And it 2 provided 480, 277, 208, and 120.
34 source for us, as well as a main load too. And it 1
3                The next onsite AC system is the backup 4 power supply system.         And if all eight of the 13.8 5 buses go dead or, you know, lost for some reason, 6 after a 30-second time delay those units, both the 7 BDGs and the AAPS, will start.                   And then Ops will 8 manually load them.
provided 480, 277, 208, and 120.
9                CHAIR BLEY:         I'm sorry, say that again.
2 The next onsite AC system is the backup 3
10 I didn't quite follow.
power supply system. And if all eight of the 13.8 4
11                MR. HOUGH: If all eight of the 13.8 buses 12 go away, that's when we will start the BDGs, backup 13 diesel generators, and the auxiliary AC power source.
buses go dead or, you know, lost for some reason, 5
14 So after a 30-second time delay, Ops can load them as 15 they see fit.
after a 30-second time delay those units, both the 6
16                CHAIR       BLEY:             They   don't     start 17 automatically?
BDGs and the AAPS, will start. And then Ops will 7
18                MR. HOUGH:       It starts automatically.
manually load them.
19                CHAIR   BLEY:       Yes,     that's what   I     had 20 thought.
8 CHAIR BLEY: I'm sorry, say that again.
21                MR. HOUGH:       Yes.
9 I didn't quite follow.
22                CHAIR BLEY:       Okay.
10 MR. HOUGH: If all eight of the 13.8 buses 11 go away, that's when we will start the BDGs, backup 12 diesel generators, and the auxiliary AC power source.
23                MR. HOUGH:     After a 30-second time delay.
13 So after a 30-second time delay, Ops can load them as 14 they see fit.
24 And the BDGs, we put them at 480, specifically to 25 power up charger loads.           We had a big sit-down with NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 CHAIR BLEY:
(202) 234-4433       WASHINGTON, D.C. 20005-3701         (202) 234-4433
They don't start 16 automatically?
17 MR. HOUGH: It starts automatically.
18 CHAIR BLEY: Yes, that's what I had 19 thought.
20 MR. HOUGH: Yes.
21 CHAIR BLEY: Okay.
22 MR. HOUGH: After a 30-second time delay.
23 And the BDGs, we put them at 480, specifically to 24 power up charger loads. We had a big sit-down with 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


35 1 Operations.         And they said, okay, since we don't have 2 any RTNSS loads, let's put our power where we want it.
35 Operations. And they said, okay, since we don't have 1
3                And we said, okay, where do you want it.
any RTNSS loads, let's put our power where we want it.
4 And       so   that's     where,       you     know,   control     room 5 ventilation, and CVCS pumps, a lot of those loads that 6 Ops wanted for, you know, recovery of the plant, 7 things like that, they said, okay, good.                   Well, we'll 8 do that.         And so the BDGs are, I think the way this 9 calc shows, about 2.4 MVA each. And the AAPS is about 10 14 MVA units.
2 And we said, okay, where do you want it.
11                MEMBER BROWN: If you lose the power, if you 12 lose whatever you're losing and the backups come on --
3 And so that's where, you know, control room 4
13 -
ventilation, and CVCS pumps, a lot of those loads that 5
14                MR. HOUGH:       Yes.
Ops wanted for, you know, recovery of the plant, 6
15                MEMBER BROWN: -- multiple backup fuses come 16 on,       do   they   operate       independently,         or do     they 17 automatically synchronize, or anything?                     I forgot to 18 ask that question.
things like that, they said, okay, good. Well, we'll 7
19                MR. HOUGH:       Yes, that's a good question.
do that. And so the BDGs are, I think the way this 8
20 But     they're     manually     loaded,         so they've   got     to 21 manually synced to get ---
calc shows, about 2.4 MVA each. And the AAPS is about 9
22                MEMBER BROWN:         Manually synced, okay.             So 23 each individual module, BDGs come up and they stick 24 with the ---
14 MVA units.
25                MR. HOUGH:       Well, there's only two for the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER BROWN: If you lose the power, if you 11 lose whatever you're losing and the backups come on --
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
12 13 MR. HOUGH: Yes.
14 MEMBER BROWN: -- multiple backup fuses come 15 on, do they operate independently, or do they 16 automatically synchronize, or anything? I forgot to 17 ask that question.
18 MR. HOUGH: Yes, that's a good question.
19 But they're manually loaded, so they've got to 20 manually synced to get ---
21 MEMBER BROWN: Manually synced, okay. So 22 each individual module, BDGs come up and they stick 23 with the ---
24 MR. HOUGH: Well, there's only two for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


36 1 whole site.
36 whole site.
2                MEMBER BROWN: Oh, that's right. Okay, yes.
1 MEMBER BROWN: Oh, that's right. Okay, yes.
3                MEMBER SKILLMAN:         Ted ---
2 MEMBER SKILLMAN: Ted ---
4                MEMBER BROWN:       I got it.
3 MEMBER BROWN: I got it.
5                MEMBER SKILLMAN: Oh, excuse me. Excuse me.
4 MEMBER SKILLMAN: Oh, excuse me. Excuse me.
6                MEMBER BROWN:         No, I'm finished, Dick.         I 7 was just re-calibrating.
5 MEMBER BROWN: No, I'm finished, Dick. I 6
8                MEMBER SKILLMAN:         I appreciate that you got 9 input from Ops, where do they want power, good place 10 to start.
was just re-calibrating.
11                MR. HOUGH:     Yes.
7 MEMBER SKILLMAN: I appreciate that you got 8
12                MEMBER SKILLMAN:         Was the selection of the 13 loads solely based on Ops preference, or did you 14 inform, did NuScale inform that decision either by 15 items that are deemed critical out of your PRA or out 16 of operating experience?
input from Ops, where do they want power, good place 9
17                MR. HOUGH:       That's a real good question.
to start.
18 And I'd answer it, all of the above.                 You know, of 19 course Ops has had a main influence for us.                 But we 20 had, I'd say, 80, 90 percent design. And then we went 21 to Ops and said, okay, look, here's where we stand 22 when I had RTNSS loads. And they never independently, 23 they were going, okay, we got these BDGs, what do we 24 do with them?       How do we want to do this?
10 MR. HOUGH: Yes.
25                And so they came to us, and we sort of met NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 MEMBER SKILLMAN: Was the selection of the 12 loads solely based on Ops preference, or did you 13 inform, did NuScale inform that decision either by 14 items that are deemed critical out of your PRA or out 15 of operating experience?
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
16 MR. HOUGH: That's a real good question.
17 And I'd answer it, all of the above. You know, of 18 course Ops has had a main influence for us. But we 19 had, I'd say, 80, 90 percent design. And then we went 20 to Ops and said, okay, look, here's where we stand 21 when I had RTNSS loads. And they never independently, 22 they were going, okay, we got these BDGs, what do we 23 do with them? How do we want to do this?
24 And so they came to us, and we sort of met 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


37 1 in the middle kind of thing. But, let's see, you have 2 a third element that just slipped my mind here.                       The 3 use of those were kind of a joint agreement.
37 in the middle kind of thing. But, let's see, you have 1
4                MR. WELTER:       Yes, so ---
a third element that just slipped my mind here. The 2
5                (Off the record comments) 6                MR. WELTER:       Yes, my mic's on.         So if PRA 7 was used throughout the conceptual design process for 8 various systems, so the PRA did influence a little 9 back and forth, iterative, on selection of some of 10 these loads.
use of those were kind of a joint agreement.
11                What you'll find is, in the PRAs, some of 12 the     important   things     from,     like,     prevention       and 13 mitigation of the accident perspective, are the CVCS 14 pumps and the CFDS pumps, and the ability to put water 15 back into the containment or the core.
3 MR. WELTER: Yes, so ---
16                So you'll see that that's consistent with 17 the PRA, and they did have a number of back and forth 18 during the conceptual design phase on, you know, what 19 do the risk results on the inside look like?
4 (Off the record comments) 5 MR. WELTER: Yes, my mic's on. So if PRA 6
20                MR. HOUGH:       I will add to that, but thank 21 you for the reminder. That was the third item, and it 22 slipped my mind there.
was used throughout the conceptual design process for 7
23                The   BDGs,       because         they're   non-safety 24 related, and they don't have to be divisional, we made 25 it so that either one can power up the whole line.                       So NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
various systems, so the PRA did influence a little 8
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
back and forth, iterative, on selection of some of 9
these loads.
10 What you'll find is, in the PRAs, some of 11 the important things from, like, prevention and 12 mitigation of the accident perspective, are the CVCS 13 pumps and the CFDS pumps, and the ability to put water 14 back into the containment or the core.
15 So you'll see that that's consistent with 16 the PRA, and they did have a number of back and forth 17 during the conceptual design phase on, you know, what 18 do the risk results on the inside look like?
19 MR. HOUGH: I will add to that, but thank 20 you for the reminder. That was the third item, and it 21 slipped my mind there.
22 The
: BDGs, because they're non-safety 23 related, and they don't have to be divisional, we made 24 it so that either one can power up the whole line. So 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


38 1 we increased the size of it.
38 we increased the size of it.
2                Because the way it was before, we initially 3 started with a divisional.             And then if you lost the 4 division, you're going to lose two. That's two out of 5 four, our MPS -- oh, no, we can't go there.                     So we 6 said, all right, we'll make it so either one can power 7 the whole plant.         And so ---
1 Because the way it was before, we initially 2
8                MR. WELTER:       Yes.
started with a divisional. And then if you lost the 3
9                MR. HOUGH:       -- you played a big role in 10 that.
division, you're going to lose two. That's two out of 4
11                MR. WELTER:     Yes, and I was responsible for 12 the PRA group at that time and, I mean, the PRA 13 practitioners       also     were     nice       enough to present 14 alternative designs for your consideration, I think.
four, our MPS -- oh, no, we can't go there. So we 5
15                MR. HOUGH:     Yes.
said, all right, we'll make it so either one can power 6
16                MR. WELTER:         So the PRA would actually 17 suggest you could do away with some of the redundancy 18 and diversity that's in the existing system. But that 19 was provided as input.
the whole plant. And so ---
20                MEMBER SKILLMAN: Let me ask this. And this 21 might be the wrong time to ask --- the wrong time for 22 me to ask this.         But if you're going to answer it 23 later, that'd be fine.
7 MR. WELTER: Yes.
24                I read that you're using ELMS, electric load 25 management system, to design this. And if you've been NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 MR. HOUGH: -- you played a big role in 9
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
that.
10 MR. WELTER: Yes, and I was responsible for 11 the PRA group at that time and, I mean, the PRA 12 practitioners also were nice enough to present 13 alternative designs for your consideration, I think.
14 MR. HOUGH: Yes.
15 MR. WELTER: So the PRA would actually 16 suggest you could do away with some of the redundancy 17 and diversity that's in the existing system. But that 18 was provided as input.
19 MEMBER SKILLMAN: Let me ask this. And this 20 might be the wrong time to ask --- the wrong time for 21 me to ask this. But if you're going to answer it 22 later, that'd be fine.
23 I read that you're using ELMS, electric load 24 management system, to design this. And if you've been 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


39 1 in a live plant, and you want them to transition from 2 OLMs to ELMS, you recognize that using ELMS is a 3 special database, and it takes specially qualified 4 people to do it.       Can you speak to that at this point?
39 in a live plant, and you want them to transition from 1
5 ELMS is your electric load management system and most 6 importantly --- excuse me, I mean ETAP.
OLMs to ELMS, you recognize that using ELMS is a 2
7                MR. WELTER:     ETAP.
special database, and it takes specially qualified 3
8                MEMBER SKILLMAN:         I'm sorry.       There was a 9 transition from ELMS to ETAP.
people to do it. Can you speak to that at this point?
10                MR. WELTER:     Okay.
4 ELMS is your electric load management system and most 5
11                MEMBER SKILLMAN:         And the ETAP people are 12 like PRA people. It's a different group of electrical 13 people who know how to run that software.                       And if 14 ETAP's         used   properly,         it     will   manage       your 15 configuration and ensure that the flow and the breaker 16 coordination is what it's supposed to be, if it's done 17 properly.
importantly --- excuse me, I mean ETAP.
18                Is ETAP what you have been using from the 19 outset?       Or let me say it differently.           Was this a mom 20 and pop design that you kind of forced into ETAP?
6 MR. WELTER: ETAP.
21                MR. HOUGH:     We used ETAP from the onset.               I 22 went down to --- in California and got trained myself.
7 MEMBER SKILLMAN: I'm sorry. There was a 8
23 And the guys, the entire group were all ETAP.
transition from ELMS to ETAP.
24                MEMBER     SKILLMAN:             They're   all     ETAP 25 qualified, and they've got punch cards, and they're NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MR. WELTER: Okay.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
10 MEMBER SKILLMAN: And the ETAP people are 11 like PRA people. It's a different group of electrical 12 people who know how to run that software. And if 13 ETAP's used
: properly, it will manage your 14 configuration and ensure that the flow and the breaker 15 coordination is what it's supposed to be, if it's done 16 properly.
17 Is ETAP what you have been using from the 18 outset? Or let me say it differently. Was this a mom 19 and pop design that you kind of forced into ETAP?
20 MR. HOUGH: We used ETAP from the onset. I 21 went down to --- in California and got trained myself.
22 And the guys, the entire group were all ETAP.
23 MEMBER SKILLMAN:
They're all ETAP 24 qualified, and they've got punch cards, and they're 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


40 1 qualified users?
40 qualified users?
2                MR. HOUGH:     Yes, sir.
1 MR. HOUGH: Yes, sir.
3                MEMBER SKILLMAN: I'm serious. I mean, it's 4 a ---
2 MEMBER SKILLMAN: I'm serious. I mean, it's 3
5                MR. HOUGH:     Yes it is.         It is a complicated 6 program.       In fact I made the comment at the ETAP 7 training that, hey, you're doing away with electrical 8 engineers' jobs.
a ---
9                And they said oh, no, no, no.             ETAP is just 10 a tool for you. You still have to recognize when this 11 thing's giving you an erroneous answer, obviously.
4 MR. HOUGH: Yes it is. It is a complicated 5
12                MEMBER SKILLMAN:           So I heard you say you 13 used ETAP right from the beginning.
program. In fact I made the comment at the ETAP 6
14                MR. HOUGH:     Yes, sir.
training that, hey, you're doing away with electrical 7
15                MEMBER SKILLMAN:         And the individuals that 16 are using it are qualified individuals?
engineers' jobs.
17                MR. HOUGH:     All have been trained, right.
8 And they said oh, no, no, no. ETAP is just 9
18                MEMBER SKILLMAN:         Okay, thank you.
a tool for you. You still have to recognize when this 10 thing's giving you an erroneous answer, obviously.
19                MR. HOUGH:     Yes.
11 MEMBER SKILLMAN: So I heard you say you 12 used ETAP right from the beginning.
20                CHAIR BLEY:     Ted --- oh, I'm sorry.
13 MR. HOUGH: Yes, sir.
21                MR. SCHULTZ:       Ted, with your response with 22 regard to what the PRA team had offered as options, 23 what was the basis for that, for their discussion 24 associated with other design options?
14 MEMBER SKILLMAN: And the individuals that 15 are using it are qualified individuals?
25                Were they suggesting that a target value, a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. HOUGH: All have been trained, right.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
17 MEMBER SKILLMAN: Okay, thank you.
18 MR. HOUGH: Yes.
19 CHAIR BLEY: Ted --- oh, I'm sorry.
20 MR. SCHULTZ: Ted, with your response with 21 regard to what the PRA team had offered as options, 22 what was the basis for that, for their discussion 23 associated with other design options?
24 Were they suggesting that a target value, a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


41 1 target         risk   profile     could     be     met   with different 2 alternatives?           It sounds as if ---
41 target risk profile could be met with different 1
3                  MR. WELTER:       Yes.     What they were ---
alternatives? It sounds as if ---
4                  MR. SCHULTZ:         --   a     more   conservative 5 approach was determined by the designers than what the 6 PRA team might have thought was acceptable?
2 MR. WELTER: Yes. What they were ---
7                  MR. WELTER:       Yes.     And in summary from a, 8 you know, plant risk perspective, the design is very 9 robust.         And you could do away with some of the 10 redundancy         that's     built     in   with     minimal impact, 11 negligible impact to core damage frequency or large 12 release frequency as an example.
3 MR. SCHULTZ: -- a more conservative 4
13                  So that was more of an economic suggestion 14 and reliability suggestion.                   It was just his input.
approach was determined by the designers than what the 5
15 And so, yes, I mean, overall, the PRA team said you 16 can       make   it   less     complicated         and   cheaper,     not 17 complicated but just less robust.                       And the PRA would 18 support that.             But the decision was made by the 19 designers to go with this existing design. And it had 20 to do with, well, I'll speak to ---
PRA team might have thought was acceptable?
21                  MR. HOUGH:       Yes. And again, the way it was 22 set up before, we really thought everything had to be 23 divisional.           But that was, you know, when it was 24 potentially a RTNSS diesel. And it turns out on those 25 loads, there's nothing on there.                     So they said, geez, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
6 MR. WELTER: Yes. And in summary from a, 7
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
you know, plant risk perspective, the design is very 8
robust. And you could do away with some of the 9
redundancy that's built in with minimal impact, 10 negligible impact to core damage frequency or large 11 release frequency as an example.
12 So that was more of an economic suggestion 13 and reliability suggestion. It was just his input.
14 And so, yes, I mean, overall, the PRA team said you 15 can make it less complicated and cheaper, not 16 complicated but just less robust. And the PRA would 17 support that. But the decision was made by the 18 designers to go with this existing design. And it had 19 to do with, well, I'll speak to ---
20 MR. HOUGH: Yes. And again, the way it was 21 set up before, we really thought everything had to be 22 divisional. But that was, you know, when it was 23 potentially a RTNSS diesel. And it turns out on those 24 loads, there's nothing on there. So they said, geez, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


42 1 it doesn't have to be divisional.
42 it doesn't have to be divisional.
2                And we can eliminate a potential two out of 3 four scenarios if we were on the diesels and, you 4 know, we lost one.             So you get a two out of four 5 signal, and the MPS would, you know, actuate.               But we 6 could eliminate that challenge to the safety systems 7 by making either one of them supply both. So we said, 8 okay, we'll do it.             It was a good decision, with 9 observation from PRA.
1 And we can eliminate a potential two out of 2
10                CHAIR BLEY:       Ted?
four scenarios if we were on the diesels and, you 3
11                MR. HOUGH:     Yes, sir?
know, we lost one. So you get a two out of four 4
12                CHAIR BLEY:         You talked some about the 13 backup diesel generators.
signal, and the MPS would, you know, actuate. But we 5
14                MR. HOUGH:     Yes.
could eliminate that challenge to the safety systems 6
15                CHAIR BLEY:       You also have, I think, just 16 one alternate AC power supply?
by making either one of them supply both. So we said, 7
17                MR. HOUGH:       Yes, sir, good segue into the 18 next slide, ha, ha, ha.
okay, we'll do it. It was a good decision, with 8
19                CHAIR BLEY:       You're welcome. Go ahead.
observation from PRA.
20                (Laughter) 21                MR. HOUGH:     The AAPS is just a single unit.
9 CHAIR BLEY: Ted?
22 And it's there to supply permanent non-safety loads, 23 things like your fire protection.
10 MR. HOUGH: Yes, sir?
24                MEMBER CORRADINI:         What is it if it's not a 25 diesel generator?
11 CHAIR BLEY: You talked some about the 12 backup diesel generators.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MR. HOUGH: Yes.
(202) 234-4433         WASHINGTON, D.C. 20005-3701     (202) 234-4433
14 CHAIR BLEY: You also have, I think, just 15 one alternate AC power supply?
16 MR. HOUGH: Yes, sir, good segue into the 17 next slide, ha, ha, ha.
18 CHAIR BLEY: You're welcome. Go ahead.
19 (Laughter) 20 MR. HOUGH: The AAPS is just a single unit.
21 And it's there to supply permanent non-safety loads, 22 things like your fire protection.
23 MEMBER CORRADINI: What is it if it's not a 24 diesel generator?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


43 1                MR. HOUGH:         Okay,     we     had tentatively, 2 because most facilities around the country will use a 3 combustion turbine generator.
43 MR. HOUGH: Okay, we had tentatively, 1
4                MEMBER CORRADINI:         Oh.
because most facilities around the country will use a 2
5                MR. HOUGH: And we said, okay, you know, but 6 it doesn't have to be.           It's just ---
combustion turbine generator.
7                MEMBER   CORRADINI:           So   it's yet   to     be 8 specified.
3 MEMBER CORRADINI: Oh.
9                MR. HOUGH:     We ---
4 MR. HOUGH: And we said, okay, you know, but 5
10                MEMBER CORRADINI:         Okay.
it doesn't have to be. It's just ---
11                MR. HOUGH:     -- put it in that way, and have 12 designed around that.             But it's conceptual design 13 information where a ---
6 MEMBER CORRADINI: So it's yet to be 7
14                CHAIR BLEY:     But you're thinking it'd be a 15 gas turbine.
specified.
16                MR. HOUGH: Yes. There's some places, like, 17 it was in -- wherever, got a hydro unit or whatever.
8 MR. HOUGH: We ---
18                MEMBER CORRADINI:           The same size as the 19 backup diesel generator?
9 MEMBER CORRADINI: Okay.
20                MR. HOUGH: No. This will be a 14 MVA unit.
10 MR. HOUGH: -- put it in that way, and have 11 designed around that. But it's conceptual design 12 information where a ---
21                MEMBER RICCARDELLA:           I'm sorry, would you 22 repeat that please?
13 CHAIR BLEY: But you're thinking it'd be a 14 gas turbine.
23                MR. HOUGH:     The size?
15 MR. HOUGH: Yes. There's some places, like, 16 it was in -- wherever, got a hydro unit or whatever.
24                MEMBER RICCARDELLA:           Yes.
17 MEMBER CORRADINI: The same size as the 18 backup diesel generator?
25                MR. HOUGH:     Fourteen MPA.
19 MR. HOUGH: No. This will be a 14 MVA unit.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
20 MEMBER RICCARDELLA: I'm sorry, would you 21 repeat that please?
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
22 MR. HOUGH: The size?
23 MEMBER RICCARDELLA: Yes.
24 MR. HOUGH: Fourteen MPA.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


44 1                MEMBER MARCH-LEUBA:             These generators are 2 what size?
44 MEMBER MARCH-LEUBA: These generators are 1
3                MR. HOUGH:     2.4. These are --
what size?
4                (Simultaneous speaking) 5                MR. HOUGH:     -- numbers, what they actually 6 buy could be a 2.5.         Well, it's a minimum of that, and 7 needs a calc.       And then, again, we put that unit, the 8 13.8 bus, up there so that Ops could put the power 9 anywhere they wanted it.
2 MR. HOUGH: 2.4. These are --
10                And then     we   have     a     portable generator 11 connection. Originally, we were going to use it maybe 12 for a flex connection.               But they don't need it for 13 that.       So it's still there.
3 (Simultaneous speaking) 4 MR. HOUGH: -- numbers, what they actually 5
14                CHAIR BLEY:     Did you --- when you did that, 15 are you using that standard flex connection terminal 16 set so you can hook up a flex generator if you get one 17 from somebody?
buy could be a 2.5. Well, it's a minimum of that, and 6
18                MR. HOUGH: I'm sure I would be, ha, ha, ha.
needs a calc. And then, again, we put that unit, the 7
19                CHAIR BLEY:     You haven't specified though.
13.8 bus, up there so that Ops could put the power 8
20                MR. HOUGH: No, not yet. Okay, moving on to 21 onsite DC, the most ---
anywhere they wanted it.
22                CHAIR BLEY:       Does that show up on the one 23 line, the AAP --
9 And then we have a portable generator 10 connection. Originally, we were going to use it maybe 11 for a flex connection. But they don't need it for 12 that. So it's still there.
24                MR. HOUGH:     I guess.
13 CHAIR BLEY: Did you --- when you did that, 14 are you using that standard flex connection terminal 15 set so you can hook up a flex generator if you get one 16 from somebody?
25                CHAIR BLEY:       No. Your portable generator NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
17 MR. HOUGH: I'm sure I would be, ha, ha, ha.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
18 CHAIR BLEY: You haven't specified though.
19 MR. HOUGH: No, not yet. Okay, moving on to 20 onsite DC, the most ---
21 CHAIR BLEY: Does that show up on the one 22 line, the AAP --
23 MR. HOUGH: I guess.
24 CHAIR BLEY: No. Your portable generator 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


45 1 connection.
45 connection.
2                  MR. HOUGH:     In this diagram here, yes.
1 MR. HOUGH: In this diagram here, yes.
3                  CHAIR BLEY:     But not on the big one line?
2 CHAIR BLEY: But not on the big one line?
4                  MR. HOUGH:       Right there, yes.             Not the 5 overall one line, no.
3 MR. HOUGH: Right there, yes. Not the 4
6                  CHAIR BLEY:       Okay.     That's what I've been 7 looking at.         Okay, go ahead.
overall one line, no.
8                  MR. HOUGH:     Yes, this shows a BDG and then 9 a flex connection to that 480 bus that you have there, 10 BDG bus.
5 CHAIR BLEY: Okay. That's what I've been 6
11                  Okay, the highly reliable DC system, EDSS, 12 again,         that's   the     one     that       has   the augmented 13 provisions applied to it.               The Class 1E isolation, if 14 you think about Reg Guide 175 and 3D-4, you're looking 15 in a reverse manner to what we have.                     It's usually a 16 1E power supply being isolated from                     non-1E loads, et 17 cetera.
looking at. Okay, go ahead.
18                  In our case, it's a non-1E power supply 19 being isolated from a 1E load down there.                       And that 20 would be done --- the DC-DC converters, and that'll 21 be, you know, discussed in Chapter 7.                       That is the 22 power supply from module protection, 23  and neutron monitoring, et cetera.
7 MR. HOUGH: Yes, this shows a BDG and then 8
24                  The key here is to recognize, you know, they 25 said, oh look, this is a 1E load.                     It's got to be 1E NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
a flex connection to that 480 bus that you have there, 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
BDG bus.
10 Okay, the highly reliable DC system, EDSS, 11 again, that's the one that has the augmented 12 provisions applied to it. The Class 1E isolation, if 13 you think about Reg Guide 175 and 3D-4, you're looking 14 in a reverse manner to what we have. It's usually a 15 1E power supply being isolated from non-1E loads, et 16 cetera.
17 In our case, it's a non-1E power supply 18 being isolated from a 1E load down there. And that 19 would be done --- the DC-DC converters, and that'll 20 be, you know, discussed in Chapter 7. That is the 21 power supply from module protection, 22 and neutron monitoring, et cetera.
23 The key here is to recognize, you know, they 24 said, oh look, this is a 1E load. It's got to be 1E 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


46 1 power supply. No, it doesn't, because of the stuff we 2 discussed last year at the topical here.                     It's not 3 essential to achieve the safety-related function.
46 power supply. No, it doesn't, because of the stuff we 1
4 Therefore it can be a non-1E power supply. And that's 5 specifically really the SER that was issued last 6 December.
discussed last year at the topical here. It's not 2
7                The system utilizes VRLA batteries, valve-8 regulated lead acid.           The duty cycles in the module-9 specific subsystem of EDSS, there's two different duty 10 cycles. Again, Alpha, Charlie is Div 1. Bravo, Delta 11 is Div 2.         And the Alpha and Delta channel of those 12 are 24 hours.         And that's to achieve our ECCS hold 13 mode to hold out ECCS if, you know, if a loss of AC 14 happens, so we can automatically launch ECCS.                           VHR 15 will go first.
essential to achieve the safety-related function.
16                MEMBER MARCH-LEUBA:           Hey, Ted?
3 Therefore it can be a non-1E power supply. And that's 4
17                MR. HOUGH:     Sir?
specifically really the SER that was issued last 5
18                MEMBER   MARCH-LEUBA:             We have not     seen 19 Chapter       15 yet,   but   that     24     hours would   become 20 important,         because       it     goes       into   ECCS       mode 21 automatically.         So the question is -- and I assume 22 it's not critical if it's 22 or 26, but about how 23 accurate are we going to be on the timing?                   It's not 24 going to be 150 hours.
December.
25                MR. HOUGH:     No, no, that's ---
6 The system utilizes VRLA batteries, valve-7 regulated lead acid. The duty cycles in the module-8 specific subsystem of EDSS, there's two different duty 9
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
cycles. Again, Alpha, Charlie is Div 1. Bravo, Delta 10 is Div 2. And the Alpha and Delta channel of those 11 are 24 hours. And that's to achieve our ECCS hold 12 mode to hold out ECCS if, you know, if a loss of AC 13 happens, so we can automatically launch ECCS. VHR 14 will go first.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
15 MEMBER MARCH-LEUBA: Hey, Ted?
16 MR. HOUGH: Sir?
17 MEMBER MARCH-LEUBA: We have not seen 18 Chapter 15 yet, but that 24 hours would become 19 important, because it goes into ECCS mode 20 automatically. So the question is -- and I assume 21 it's not critical if it's 22 or 26, but about how 22 accurate are we going to be on the timing? It's not 23 going to be 150 hours.
24 MR. HOUGH: No, no, that's ---
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


47 1                MEMBER MARCH-LEUBA:               How do you achieve 2 that?
47 MEMBER MARCH-LEUBA: How do you achieve 1
3                MR. HOUGH:     We've sized the batteries that 4 way.       And then there's also a ---
that?
5                MEMBER MARCH-LEUBA:           But aren't the loads 6 going to be variable or not?
2 MR. HOUGH: We've sized the batteries that 3
7                MR. HOUGH:     I'm sorry?
way. And then there's also a ---
8                MEMBER   MARCH-LEUBA:             You   can size       the 9 battery, but the load might be case-dependent or won't 10 be?
4 MEMBER MARCH-LEUBA: But aren't the loads 5
11                MR. HOUGH:       It will be depending on what 12 vendor we use for the solenoids and things like that.
going to be variable or not?
13 You're right.
6 MR. HOUGH: I'm sorry?
14                MEMBER MARCH-LEUBA:         So maybe we'll revisit 15 this on the Chapter 15 uncertainties.                   We will assume 16 this is covered in 24 hours, but it could be 26.
7 MEMBER MARCH-LEUBA: You can size the 8
17                MR. WELTER:     I'm actually going to --- in a 18 station blackout transient ---
battery, but the load might be case-dependent or won't 9
19                MEMBER CORRADINI:         You've got a curve.
be?
20                MR. WELTER:         Yes.           I'll   talk     to     a 21 sensitivity we did where we looked at with DC power 22 and without, where the ECCS actuated to two hours 23 versus 24 in a few more slides and kind of get a feel 24 for the ---
10 MR. HOUGH: It will be depending on what 11 vendor we use for the solenoids and things like that.
25                MEMBER MARCH-LEUBA:           Okay.     Thank you.
12 You're right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MEMBER MARCH-LEUBA: So maybe we'll revisit 14 this on the Chapter 15 uncertainties. We will assume 15 this is covered in 24 hours, but it could be 26.
(202) 234-4433         WASHINGTON, D.C. 20005-3701             (202) 234-4433
16 MR. WELTER: I'm actually going to --- in a 17 station blackout transient ---
18 MEMBER CORRADINI: You've got a curve.
19 MR. WELTER: Yes. I'll talk to a 20 sensitivity we did where we looked at with DC power 21 and without, where the ECCS actuated to two hours 22 versus 24 in a few more slides and kind of get a feel 23 for the ---
24 MEMBER MARCH-LEUBA: Okay. Thank you.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


48 1                MR. WELTER:     -- plant response.
48 MR. WELTER: -- plant response.
2                MEMBER CORRADINI:           So maybe I'll ask my 3 questions there. But so this is coupled to the timing 4 of this 24-hour changeover?               This is coupled to the 5 timing.
1 MEMBER CORRADINI: So maybe I'll ask my 2
6                MR. WELTER:       I mean, the station blackout 7 analysis was run with a 24-hour ECCS --
questions there. But so this is coupled to the timing 3
8                MEMBER CORRADINI:         Clock.
of this 24-hour changeover? This is coupled to the 4
9                MR. WELTER: -- clock, correct. But we did 10 a sensitivity to that as well.
timing.
11                MEMBER CORRADINI:         Thank you.
5 MR. WELTER: I mean, the station blackout 6
12                MR. WELTER:     Yes.
analysis was run with a 24-hour ECCS --
13                CHAIR BLEY:     Ted?
7 MEMBER CORRADINI: Clock.
14                MR. HOUGH:     Sir?
8 MR. WELTER: -- clock, correct. But we did 9
15                CHAIR   BLEY:         You   know,   a lot   of     the 16 machinations we've gone through on the topical report 17 and now here are essentially, I think, because there 18 are no VRLA Class 1A batteries around.
a sensitivity to that as well.
19                Is there any movement in the industry you 20 guys have tracked that were -- I mean, these things 21 are used everywhere.           The more you look, the more you 22 find people are using them.               Is there any motion to 23 try to get these things classified 1E?
10 MEMBER CORRADINI: Thank you.
24                MR. HOUGH:     The last input that I had was, 25 you know, from the EPRI folks. And they were actually NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 MR. WELTER: Yes.
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
12 CHAIR BLEY: Ted?
13 MR. HOUGH: Sir?
14 CHAIR BLEY: You know, a lot of the 15 machinations we've gone through on the topical report 16 and now here are essentially, I think, because there 17 are no VRLA Class 1A batteries around.
18 Is there any movement in the industry you 19 guys have tracked that were -- I mean, these things 20 are used everywhere. The more you look, the more you 21 find people are using them. Is there any motion to 22 try to get these things classified 1E?
23 MR. HOUGH: The last input that I had was, 24 you know, from the EPRI folks. And they were actually 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


49 1 looking at more advanced batteries, you know, looking 2 at Type A and things like that, to actually have it 3 ready as a 1E qual, for example, for the AP 1000 when 4 their existing VRLAs become, you know, obsolete or 5 whatever.       They're actually kind of leapfrogging over 6 VRLA.       And that was the last information I had.
49 looking at more advanced batteries, you know, looking 1
7                CHAIR BLEY:       Of course, going to lithium 8 would raise other issues, but go ahead.
at Type A and things like that, to actually have it 2
9                (Laughter) 10                MR. SCHULTZ:       Has EPRI discussed a schedule 11 associated with that?
ready as a 1E qual, for example, for the AP 1000 when 3
12                MR. HOUGH:       I'm not aware of it.     But it 13 wouldn't be in our timeframe for sure.
their existing VRLAs become, you know, obsolete or 4
14                (Off the record comments) 15                MR. HOUGH: So the second to the last bullet 16 ---
whatever. They're actually kind of leapfrogging over 5
17                CHAIR BLEY:       So the answer is kind of no.
VRLA. And that was the last information I had.
18 Nobody's really trying to --
6 CHAIR BLEY: Of course, going to lithium 7
19                MR. HOUGH:     I'm sorry, I didn't --
would raise other issues, but go ahead.
20                CHAIR BLEY:       -- see VRLAs as 1E batteries.
8 (Laughter) 9 MR. SCHULTZ: Has EPRI discussed a schedule 10 associated with that?
21 The effort is more looking at something beyond that.
11 MR. HOUGH: I'm not aware of it. But it 12 wouldn't be in our timeframe for sure.
22                MR. HOUGH:       Not that I'm aware of, right.
13 (Off the record comments) 14 MR. HOUGH: So the second to the last bullet 15 16 CHAIR BLEY: So the answer is kind of no.
23 Fortunately, we don't need it.
17 Nobody's really trying to --
24                The Bravo and Charlie channels, those are 25 there to support the PAM functionality from a module-NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MR. HOUGH: I'm sorry, I didn't --
(202) 234-4433           WASHINGTON, D.C. 20005-3701   (202) 234-4433
19 CHAIR BLEY: -- see VRLAs as 1E batteries.
20 The effort is more looking at something beyond that.
21 MR. HOUGH: Not that I'm aware of, right.
22 Fortunately, we don't need it.
23 The Bravo and Charlie channels, those are 24 there to support the PAM functionality from a module-25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


50 1 specific --- get the information from each module. It 2 goes to the control room, and then your EDSS common, 3 they have I and II, feed the displays in the control 4 room for post-accident monitoring.                         Let's see, so 5 here's ---
50 specific --- get the information from each module. It 1
6                  MEMBER CORRADINI:         So ---
goes to the control room, and then your EDSS common, 2
7                  MR. HOUGH:     Sure?
they have I and II, feed the displays in the control 3
8                  MEMBER CORRADINI: No, no. You're on the --
room for post-accident monitoring. Let's see, so 4
9 I want you to explain the orange.                     I'm very confused 10 about how the orange is safety related and what that 11 is, unless that's simply valve actuation at time zero.
here's ---
12 Is that what the Class 1E box --
5 MEMBER CORRADINI: So ---
13                  MR. HOUGH:         The   Class       1E   box,     that 14 represents         the   1E     load     which       is   MPS,   neutron 15 monitoring, et cetera, all right.                       You know, that's 16 your sense and command.               And then the execute device 17 would be your field solenoid or whatever.
6 MR. HOUGH: Sure?
18                  MEMBER CORRADINI:         Okay.       But if I get into 19 an accident in a situation where I demand scram, 20 that's not needed once I scram. But does that also --
7 MEMBER CORRADINI: No, no. You're on the --
21 - that does not power any valve actuation. The valves 22 fail to a safe position?
8 I want you to explain the orange. I'm very confused 9
23                  MR. HOUGH:     That's correct.           Every execute 24 device we have fails to a safety position without 25 power.         And I ---
about how the orange is safety related and what that 10 is, unless that's simply valve actuation at time zero.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 Is that what the Class 1E box --
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
12 MR. HOUGH: The Class 1E box, that 13 represents the 1E load which is MPS, neutron 14 monitoring, et cetera, all right. You know, that's 15 your sense and command. And then the execute device 16 would be your field solenoid or whatever.
17 MEMBER CORRADINI: Okay. But if I get into 18 an accident in a situation where I demand scram, 19 that's not needed once I scram. But does that also --
20
- that does not power any valve actuation. The valves 21 fail to a safe position?
22 MR. HOUGH: That's correct. Every execute 23 device we have fails to a safety position without 24 power. And I ---
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


51 1                MEMBER CORRADINI: This is strictly the MPS?
51 MEMBER CORRADINI: This is strictly the MPS?
2                MR. HOUGH:     Yes.
1 MR. HOUGH: Yes.
3                MEMBER CORRADINI:         Okay.
2 MEMBER CORRADINI: Okay.
4                CHAIR BLEY:       But on loss of AC power, you 5 also scram.
3 CHAIR BLEY: But on loss of AC power, you 4
6                MR. HOUGH:     Yes.
also scram.
7                CHAIR BLEY: Without a signal. I mean, it's 8 just ---
5 MR. HOUGH: Yes.
9                MEMBER   CORRADINI:           So     let me ask     the 10 question now, and then Kent will answer in his exam.
6 CHAIR BLEY: Without a signal. I mean, it's 7
11 So if I have a loss of AC power and DC power and all 12 is not what it's supposed to be, and I mistimed the 13 24-hour changeover --- I can't come up with a better 14 word --- transition, it doesn't matter whether it's a 15 time zero or 24 hours, it's just the most convenient 16 24 hours?
just ---
17                MR. WELTER:     Yes. When we initially, well, 18 from a safety perspective it does not matter.                         Now 19 there's --- and I can show that with a transient ---
8 MEMBER CORRADINI: So let me ask the 9
20                MEMBER CORRADINI:         Okay.
question now, and then Kent will answer in his exam.
21                MR. WELTER:     But the 24-hour time period we 22 established sort of early in the design process with 23 discussion with Ops, and looking at OE, and just ---
10 So if I have a loss of AC power and DC power and all 11 is not what it's supposed to be, and I mistimed the 12 24-hour changeover --- I can't come up with a better 13 word --- transition, it doesn't matter whether it's a 14 time zero or 24 hours, it's just the most convenient 15 24 hours?
24 it's more providing time to recover power before you 25 actually       actuate   the     ECCS     and       blowing down       to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. WELTER: Yes. When we initially, well, 17 from a safety perspective it does not matter. Now 18 there's --- and I can show that with a transient ---
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
19 MEMBER CORRADINI: Okay.
20 MR. WELTER: But the 24-hour time period we 21 established sort of early in the design process with 22 discussion with Ops, and looking at OE, and just ---
23 it's more providing time to recover power before you 24 actually actuate the ECCS and blowing down to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


52 1 containment.       So that's more of an operational coping 2 time period that we want to provide.
52 containment. So that's more of an operational coping 1
3                MEMBER CORRADINI:           So to put it in brutal 4 terms, you induce a LOCA with a 24-hour clock.
time period that we want to provide.
5                MR. WELTER: Well, LOCA is a pipe break. We 6 control, by definition ---
2 MEMBER CORRADINI: So to put it in brutal 3
7                MEMBER CORRADINI:         So it's a POCA.       It's a 8 planned loss of coolant, POCA.
terms, you induce a LOCA with a 24-hour clock.
9                (Off the record comments) 10                MR. WELTER:               It's     a   controlled 11 depressurization of the reactor coolant system.
4 MR. WELTER: Well, LOCA is a pipe break. We 5
12                MEMBER CORRADINI:           Okay. All right.       But 13 whether it's 24, it's a matter of Ops deciding what 14 they thought they needed to try to recover from ---
control, by definition ---
15                MR. WELTER:     Correct.
6 MEMBER CORRADINI: So it's a POCA. It's a 7
16                MEMBER CORRADINI:         Okay.
planned loss of coolant, POCA.
17                MR. HOUGH:     Questions here then?
8 (Off the record comments) 9 MR.
18                MEMBER BROWN:       Yes, do you need AC power to 19 do that?       I've forgotten some of the stuff.
WELTER:
20                MR. WELTER:     I'm sorry, to do what?
It's a
21                MEMBER BROWN:       To execute your ECCS.
controlled 10 depressurization of the reactor coolant system.
22                MR. WELTER:         No. In the beginning of a 23 station blackout, we assume that ---
11 MEMBER CORRADINI: Okay. All right. But 12 whether it's 24, it's a matter of Ops deciding what 13 they thought they needed to try to recover from ---
24                MEMBER BROWN:       You need DC power?
14 MR. WELTER: Correct.
25                MR. WELTER:     The DC power keeps it closed.
15 MEMBER CORRADINI: Okay.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. HOUGH: Questions here then?
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
17 MEMBER BROWN: Yes, do you need AC power to 18 do that? I've forgotten some of the stuff.
19 MR. WELTER: I'm sorry, to do what?
20 MEMBER BROWN: To execute your ECCS.
21 MR. WELTER: No. In the beginning of a 22 station blackout, we assume that ---
23 MEMBER BROWN: You need DC power?
24 MR. WELTER: The DC power keeps it closed.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


53 1 And when you lose the DC power at 24 hours, the 2 batteries run out, you remove power from the soleoids, 3 and the ECCS valves open, actuate.
53 And when you lose the DC power at 24 hours, the 1
4                MR. HOUGH: So the answer to the question is 5 either.
batteries run out, you remove power from the soleoids, 2
6                MEMBER BROWN:         Yes.       I'm just trying to, 7 again, I'm trying to calibrate myself, if I lost 8 everything, all the power.
and the ECCS valves open, actuate.
9                CHAIR BLEY:     It's probably more a question 10 --
3 MR. HOUGH: So the answer to the question is 4
11                MEMBER BROWN:       AC, DC, and everything else.
either.
12                MR. WELTER:     I'll talk about that a little 13 bit more almost on two more slides.
5 MEMBER BROWN: Yes. I'm just trying to, 6
14                MEMBER BROWN: Okay. But when you get there 15 ---
again, I'm trying to calibrate myself, if I lost 7
16                (Simultaneous speaking) 17                CHAIR BLEY:     -- station blackout.       I'm just 18 thinking if there's no power, that's obviously a super 19 station blackout.
everything, all the power.
20                MR. WELTER:     Yes.     I'll talk just a little 21 bit to that in a couple of slides.
8 CHAIR BLEY: It's probably more a question 9
22                CHAIR BLEY: When you get there, or maybe in 23 Chapter 15, when we lose the batteries, we don't go 24 from full voltage to zero voltage. It degrades, which 25 to me says there's going to be some random sequencing NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER BROWN: AC, DC, and everything else.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
11 MR. WELTER: I'll talk about that a little 12 bit more almost on two more slides.
13 MEMBER BROWN: Okay. But when you get there 14 15 (Simultaneous speaking) 16 CHAIR BLEY: -- station blackout. I'm just 17 thinking if there's no power, that's obviously a super 18 station blackout.
19 MR. WELTER: Yes. I'll talk just a little 20 bit to that in a couple of slides.
21 CHAIR BLEY: When you get there, or maybe in 22 Chapter 15, when we lose the batteries, we don't go 23 from full voltage to zero voltage. It degrades, which 24 to me says there's going to be some random sequencing 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


54 1 of how these valves drift from close to open.
54 of how these valves drift from close to open.
2                Have you thought about that?               You know, if 3 you turn off all the DC power, boom, everything works 4 the way you've designed it to work.
1 Have you thought about that? You know, if 2
5                MR. INFANGER:       The 24 hours is on a timer.
you turn off all the DC power, boom, everything works 3
6 It's not just a decay away and then they lose DC 7 power.
the way you've designed it to work.
8                CHAIR BLEY:     Okay, so the timer ---
4 MR. INFANGER: The 24 hours is on a timer.
9                MR. INFANGER:       The actual timer ---
5 It's not just a decay away and then they lose DC 6
10                (Simultaneous speaking) 11                CHAIR BLEY:       -- the timer, these into the 12 batteries.
power.
13                MR. INFANGER: The batteries are sized to be 14 at least 24 hours.         In that 24 hours, you will get a 15 signal that opens all of them and potentially actuates 16 the ECCS.
7 CHAIR BLEY: Okay, so the timer ---
17                MR. WELTER:       Yes, sorry.           I should have 18 clarified that.
8 MR. INFANGER: The actual timer ---
19                MEMBER CORRADINI:         So wait a minute.
9 (Simultaneous speaking) 10 CHAIR BLEY: -- the timer, these into the 11 batteries.
20                MEMBER MARCH-LEUBA:           This will be an issue 21 with what you were talking about.                   If your batteries 22 are not large enough, and they only last 23 hours ---
12 MR. INFANGER: The batteries are sized to be 13 at least 24 hours. In that 24 hours, you will get a 14 signal that opens all of them and potentially actuates 15 the ECCS.
23                CHAIR BLEY:         Yes.       Then this becomes a 24 question.
16 MR. WELTER: Yes, sorry. I should have 17 clarified that.
25                MEMBER MARCH-LEUBA:         I would like to have a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MEMBER CORRADINI: So wait a minute.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
19 MEMBER MARCH-LEUBA: This will be an issue 20 with what you were talking about. If your batteries 21 are not large enough, and they only last 23 hours ---
22 CHAIR BLEY: Yes. Then this becomes a 23 question.
24 MEMBER MARCH-LEUBA: I would like to have a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


55 1 voltage monitor isotopes on the batteries.
55 voltage monitor isotopes on the batteries.
2                MEMBER   CORRADINI:           But   get to Dennis' 3 question of the essence.               So let's say your design 4 works as planned.         But at 22 hours it starts becoming 5 --- it doesn't hit your timer, but it's kind of 6 degrading.       What do the valves do?                 That's what 7 Dennis' question ---
1 MEMBER CORRADINI: But get to Dennis' 2
8                MEMBER BROWN:       Do some of them close?
question of the essence. So let's say your design 3
9                (Simultaneous speaking) 10                CHAIR BLEY:       if, in fact, your batteries, 11 when you get the actual load in the accident and it's 12 ten years into operation, here they're kind of running 13 out of power before you expect it in your design. And 14 now things don't happen all at once like they will in 15 the timer.       But you start getting, first one drops 16 out, then another one.
works as planned. But at 22 hours it starts becoming 4
17                MR. WELTER:         I'll have to defer to the 18 electrical systems ---
--- it doesn't hit your timer, but it's kind of 5
19                CHAIR   BLEY:       You   don't     see that     as   a 20 feasible situation?
degrading. What do the valves do? That's what 6
21                MR. WELTER: I guess I haven't thought about 22 that at the moment.
Dennis' question ---
23                CHAIR BLEY:       I think it's a good thing to 24 think about.
7 MEMBER BROWN: Do some of them close?
25                MR. WELTER:     I'd have to talk with the I&C NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 (Simultaneous speaking) 9 CHAIR BLEY: if, in fact, your batteries, 10 when you get the actual load in the accident and it's 11 ten years into operation, here they're kind of running 12 out of power before you expect it in your design. And 13 now things don't happen all at once like they will in 14 the timer. But you start getting, first one drops 15 out, then another one.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
16 MR. WELTER: I'll have to defer to the 17 electrical systems ---
18 CHAIR BLEY: You don't see that as a 19 feasible situation?
20 MR. WELTER: I guess I haven't thought about 21 that at the moment.
22 CHAIR BLEY: I think it's a good thing to 23 think about.
24 MR. WELTER: I'd have to talk with the I&C 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


56 1 folks exactly how the system is designed and how 2 losing         a   little     bit     of   power     ---  it's       my 3 understanding, you know, you're not going to lose a 4 little bit of power and have, like, one ---
56 folks exactly how the system is designed and how 1
5                  CHAIR BLEY:     Well, by design you're not.
losing a
6                  MR. WELTER: Even by that consideration, but 7 ---
little bit of power it's my 2
8                  MR. EHLERS: Well, they'll still be doing it 9 just to --- I know you're talking about a theoretical 10 situation, I mean, they're going to still be doing 11 testing of the batteries to make sure their capacity 12 is there to make the 24 hours on a routine basis.
understanding, you know, you're not going to lose a 3
13                  But in this scenario where if, for somewhat 14 of a reason, it didn't make the 24 hours, again, 15 you're only causing an operational issue, not so much 16 a safety one.
little bit of power and have, like, one ---
17                  MR. WELTER: Yes. I mean, you're generating 18 a signal, right.           It's not like they're --- I mean, 19 you're generating a signal to actuate.                     And so when 20 that signal --- we're not generating partial signals 21 to actuate the ECCS system.                 They're ---
4 CHAIR BLEY: Well, by design you're not.
22                  CHAIR BLEY:     Well, you generate a signal to 23 remove all of the power.               And the valves pop open.
5 MR. WELTER: Even by that consideration, but 6
24                  MR. WELTER:     Correct.         And if you don't get 25 that signal ---
7 MR. EHLERS: Well, they'll still be doing it 8
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
just to --- I know you're talking about a theoretical 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
situation, I mean, they're going to still be doing 10 testing of the batteries to make sure their capacity 11 is there to make the 24 hours on a routine basis.
12 But in this scenario where if, for somewhat 13 of a reason, it didn't make the 24 hours, again, 14 you're only causing an operational issue, not so much 15 a safety one.
16 MR. WELTER: Yes. I mean, you're generating 17 a signal, right. It's not like they're --- I mean, 18 you're generating a signal to actuate. And so when 19 that signal --- we're not generating partial signals 20 to actuate the ECCS system. They're ---
21 CHAIR BLEY: Well, you generate a signal to 22 remove all of the power. And the valves pop open.
23 MR. WELTER: Correct. And if you don't get 24 that signal ---
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


57 1                CHAIR BLEY:     If the power degrades ---
57 CHAIR BLEY: If the power degrades ---
2                MR. WELTER:         Then you don't generate a 3 signal.
1 MR. WELTER: Then you don't generate a 2
4                CHAIR BLEY: -- before you generate a signal 5 ---
signal.
6                MR. WELTER:     Then they don't pop up.
3 CHAIR BLEY: -- before you generate a signal 4
7                CHAIR BLEY: -- at some point, they're going 8 to drift open when they don't have enough power to 9 hold them shut.
5 MR. WELTER: Then they don't pop up.
10                MR. HOUGH: I think there's a -- the missing 11 piece here is the instrumentation and control.                   And 12 correct me if I'm wrong here, but we have something 13 called the equipment interface module. And it doesn't 14 matter whether you remove power, whether you get a 15 logic signal from one state to a zero state, or an 16 operator reaction as a result of the same.                       The 17 execute device goes to a safety position, okay.
6 CHAIR BLEY: -- at some point, they're going 7
18                MEMBER BROWN:         Say that first part again, 19 something goes to the safe position.
to drift open when they don't have enough power to 8
20                MR. HOUGH:         They     execute device,     the 21 solenoid, or whatever, the breaker will go to a safety 22 position.
hold them shut.
23                CHAIR BLEY:       I'll probably save this for 24 when the PRA guys get here eventually, but we've seen 25 real plants where the easy one isn't electrical, it's NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MR. HOUGH: I think there's a -- the missing 10 piece here is the instrumentation and control. And 11 correct me if I'm wrong here, but we have something 12 called the equipment interface module. And it doesn't 13 matter whether you remove power, whether you get a 14 logic signal from one state to a zero state, or an 15 operator reaction as a result of the same. The 16 execute device goes to a safety position, okay.
(202) 234-4433         WASHINGTON, D.C. 20005-3701     (202) 234-4433
17 MEMBER BROWN: Say that first part again, 18 something goes to the safe position.
19 MR. HOUGH: They execute device, the 20 solenoid, or whatever, the breaker will go to a safety 21 position.
22 CHAIR BLEY: I'll probably save this for 23 when the PRA guys get here eventually, but we've seen 24 real plants where the easy one isn't electrical, it's 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


58 1 air,       air   pressure     doing     the     same   thing   as     the 2 electrical is doing here.
58 air, air pressure doing the same thing as the 1
3                  And if it goes away at once, of course, 4 everything goes to the right position.                       If it goes 5 away gradually, weird stuff starts happening. A valve 6 over here drifts shut, something over here speeds up, 7 something here happens, and it's not, you know, moving 8 the way you expect.
electrical is doing here.
9                  So I hope the PRA guys have thought about 10 that.       You're looking at design.             And in design, this 11 can't happen.         In the real world, sometimes things 12 happen that are outside of your design basis.
2 And if it goes away at once, of course, 3
13                  MEMBER MARCH-LEUBA:         Let me postulate that.
everything goes to the right position. If it goes 4
14                  CHAIR BLEY:     But I'll postpone that.
away gradually, weird stuff starts happening. A valve 5
15                  MEMBER MARCH-LEUBA: There was an earthquake 16 that partially grounds to one of your cables.
over here drifts shut, something over here speeds up, 6
17                  CHAIR BLEY:       There you go.           And there's a 18 ---
something here happens, and it's not, you know, moving 7
19                  MEMBER MARCH-LEUBA: So then you have bigger 20 load,         and   suddenly     you     only       last   six   hours.
the way you expect.
21 Definitely, I would prefer if you have a monitor of 22 the voltage.         And do it before the voltage stops, you 23 know, 11 -- yeah.
8 So I hope the PRA guys have thought about 9
24                  CHAIR BLEY:     It's up to you, Matt.
that. You're looking at design. And in design, this 10 can't happen. In the real world, sometimes things 11 happen that are outside of your design basis.
25                  MEMBER SUNSERI:           So I've got a slightly NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 MEMBER MARCH-LEUBA: Let me postulate that.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
13 CHAIR BLEY: But I'll postpone that.
14 MEMBER MARCH-LEUBA: There was an earthquake 15 that partially grounds to one of your cables.
16 CHAIR BLEY: There you go. And there's a 17 18 MEMBER MARCH-LEUBA: So then you have bigger 19 load, and suddenly you only last six hours.
20 Definitely, I would prefer if you have a monitor of 21 the voltage. And do it before the voltage stops, you 22 know, 11 -- yeah.
23 CHAIR BLEY: It's up to you, Matt.
24 MEMBER SUNSERI: So I've got a slightly 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


59 1 different question on this topic.                       In some of the 2 plants         that   I've     been     in,     from     a reliability 3 perspective, we worked hard to eliminate energized --
59 different question on this topic. In some of the 1
4 continuously         energized       relays       and   coils from       a 5 reliability perspective, especially if they were a 6 single point of vulnerability.
plants that I've been in, from a reliability 2
7                  So can   you   comment       on   the reliability 8 aspects of having your ECCS valve energized to stay 9 closed for the whole operating cycle?
perspective, we worked hard to eliminate energized --
10                  MR. HOUGH:     That is a good point, something 11 we thought about early on.                 If you wanted to have a 12 zero power plant, that's what you end up with. And an 13 EQ qual for that has to account for that.                     So it is a 14 consideration here.             You're exactly right.
3 continuously energized relays and coils from a 4
15                    MEMBER KIRCHNER:         I'm trying to remember.
reliability perspective, especially if they were a 5
16 You presented previously.                 I think we saw how the 17 valves were, the ECCS valves were --- what's their 18 normal environment?             Are they in water or air?                 I 19 guess they're in air, the actuators?
single point of vulnerability.
20                  MR. WELTER:         Yes,     they're   inside     the 21 containment, yes.
6 So can you comment on the reliability 7
22                  MEMBER   KIRCHNER:           So     they're   in     the 23 containment, they're in air.
aspects of having your ECCS valve energized to stay 8
24                  MR. WELTER:     Vacuated containment, minimal 25 air.
closed for the whole operating cycle?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MR. HOUGH: That is a good point, something 10 we thought about early on. If you wanted to have a 11 zero power plant, that's what you end up with. And an 12 EQ qual for that has to account for that. So it is a 13 consideration here. You're exactly right.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
14 MEMBER KIRCHNER: I'm trying to remember.
15 You presented previously. I think we saw how the 16 valves were, the ECCS valves were --- what's their 17 normal environment? Are they in water or air? I 18 guess they're in air, the actuators?
19 MR. WELTER: Yes, they're inside the 20 containment, yes.
21 MEMBER KIRCHNER: So they're in the 22 containment, they're in air.
23 MR. WELTER: Vacuated containment, minimal 24 air.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


60 1                MEMBER KIRCHNER:         But not accessible?
60 MEMBER KIRCHNER: But not accessible?
2                MR. WELTER:       Not during normal operation, 3 correct.
1 MR. WELTER: Not during normal operation, 2
4                MEMBER KIRCHNER: So I think Matt's point is 5 a good one.
correct.
6                MR. HOUGH:       Well, that's the mechanical 7 valve itself.
3 MEMBER KIRCHNER: So I think Matt's point is 4
8                MR. WELTER:     That's the mechanical part.
a good one.
9                MR. HOUGH: Tripped solenoids and stuff like 10 that are outside.
5 MR. HOUGH: Well, that's the mechanical 6
11                MR. WELTER:     Yes, that's correct.
valve itself.
12                MEMBER SUNSERI:         So I guess the follow-up 13 question is what's the consequence of a spurious 14 opening of the valve?
7 MR. WELTER: That's the mechanical part.
15                CHAIR BLEY:     One valve.
8 MR. HOUGH: Tripped solenoids and stuff like 9
16                MR. INFANGER: Yes. The spurious opening of 17 a single valve is evaluated in 15.6. And essentially, 18 what happens is water starts going into containment.
that are outside.
19 The water level in containment rises.                 And when you 20 reach the level set point in containment, the rest of 21 the valves open.
10 MR. WELTER: Yes, that's correct.
22                MEMBER SUNSERI:           So I guess the reactor 23 shuts down and ---
11 MEMBER SUNSERI: So I guess the follow-up 12 question is what's the consequence of a spurious 13 opening of the valve?
24                MR. INFANGER:         Yes.     Containment isolates 25 the reactor, and it trips, and the DHRS actuates.
14 CHAIR BLEY: One valve.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 MR. INFANGER: Yes. The spurious opening of 16 a single valve is evaluated in 15.6. And essentially, 17 what happens is water starts going into containment.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
18 The water level in containment rises. And when you 19 reach the level set point in containment, the rest of 20 the valves open.
21 MEMBER SUNSERI: So I guess the reactor 22 shuts down and ---
23 MR. INFANGER: Yes. Containment isolates 24 the reactor, and it trips, and the DHRS actuates.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


61 1                MEMBER BROWN:       How often are the batteries 2 tested? You made the comment about --- I've forgotten 3 who made the comment about they're periodically tested 4 to ensure that their capacity is satisfactory ---
61 MEMBER BROWN: How often are the batteries 1
5                MR. EHLERS:     Right.
tested? You made the comment about --- I've forgotten 2
6                MEMBER BROWN:       -- to handle.       And so what's 7 the timeframe between capacity tests?
who made the comment about they're periodically tested 3
8                MR. EHLERS:     That's still to be determined.
to ensure that their capacity is satisfactory ---
9 I mean, that's going to follow the vendor guidance 10 when we get the batteries.
4 MR. EHLERS: Right.
11                MEMBER BROWN:           Okay, implementing 1188, 12 1187?
5 MEMBER BROWN: -- to handle. And so what's 6
13                MR. EHLERS: Typically, it's going to be 14 --
the timeframe between capacity tests?
15                MEMBER BROWN:         Are we talking a year, two 16 year --
7 MR. EHLERS: That's still to be determined.
17                MR. EHLERS:     -- two years, four years.
8 I mean, that's going to follow the vendor guidance 9
18                MEMBER BROWN:       -- refueling cycle?
when we get the batteries.
19                MR. EHLERS:     It depends also, typically, on 20 the trend of the capacity, you know, starting ---
10 MEMBER BROWN: Okay, implementing 1188, 11 1187?
21                MEMBER BROWN: The reason I ask is, relative 22 to     Dennis'   question     about     the     sequential   or     the 23 degrading part, is batteries are very unpredictable in 24 terms       of their   post-tested         performance.       They're 25 innately good.
12 MR. EHLERS: Typically, it's going to be 13 14 MEMBER BROWN: Are we talking a year, two 15 year --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. EHLERS: -- two years, four years.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
17 MEMBER BROWN: -- refueling cycle?
18 MR. EHLERS: It depends also, typically, on 19 the trend of the capacity, you know, starting ---
20 MEMBER BROWN: The reason I ask is, relative 21 to Dennis' question about the sequential or the 22 degrading part, is batteries are very unpredictable in 23 terms of their post-tested performance. They're 24 innately good.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


62 1
62 1
2                I mean, a typical example, I know a buddy of 3 mine came up to visit with me for a week and turned 4 off his car.       And half an hour later he went back out 5 to start the car, and it didn't start.               The battery 6 was dead.       And it did that in a half an hour even 7 though he'd been driving for four hours to get to my 8 house.
I mean, a typical example, I know a buddy of 2
9                So I think it's a good question to ask about 10 the ability to predict the performance of all the 11 batteries, of the number of batteries you've got, and 12 not have some of them do something slightly different 13 than what you --- I'm not saying you're doing it the 14 right way, all I'm bringing out is to amplify Dennis' 15 point.
mine came up to visit with me for a week and turned 3
16                MR. HOUGH:     Those are good points.     Let me 17 bring up that we are implementing IEEE 1187, 1188 for 18 the batteries, the monitoring and maintenance of them.
off his car. And half an hour later he went back out 4
19 And we also have continuous battery monitors installed 20 on the PRA also.
to start the car, and it didn't start. The battery 5
21                MR. WELTER: I don't know if you can see ---
was dead. And it did that in a half an hour even 6
22                MEMBER BROWN:         Yes, but those --- that's 23 another capacity, that just says that ---
though he'd been driving for four hours to get to my 7
24                MR. HOUGH:     No, that's correct.
house.
25                MEMBER BROWN: -- you're just putting, well, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 So I think it's a good question to ask about 9
(202) 234-4433         WASHINGTON, D.C. 20005-3701     (202) 234-4433
the ability to predict the performance of all the 10 batteries, of the number of batteries you've got, and 11 not have some of them do something slightly different 12 than what you --- I'm not saying you're doing it the 13 right way, all I'm bringing out is to amplify Dennis' 14 point.
15 MR. HOUGH: Those are good points. Let me 16 bring up that we are implementing IEEE 1187, 1188 for 17 the batteries, the monitoring and maintenance of them.
18 And we also have continuous battery monitors installed 19 on the PRA also.
20 MR. WELTER: I don't know if you can see ---
21 MEMBER BROWN: Yes, but those --- that's 22 another capacity, that just says that ---
23 MR. HOUGH: No, that's correct.
24 MEMBER BROWN: -- you're just putting, well, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


63 1 you're generating some current at some voltage.
63 you're generating some current at some voltage.
2                  CHAIR BLEY: I think it was Paul earlier who 3 said you are going do deep discharge testing on these 4 routinely.         No?   I misunderstood what you said.
1 CHAIR BLEY: I think it was Paul earlier who 2
5                  (Off the record comments) 6                  MEMBER BROWN:         There was a periodic test 7 every refueling cycle or something like that, they 8 haven't determined yet.               It's a capacity test.
said you are going do deep discharge testing on these 3
9                  CHAIR BLEY:       Well, to me a capacity test 10 sounds like a deep discharge test.                     You're running it 11 way down.         If you're not doing that, then the battery 12 performance gets fuzzier.
routinely. No? I misunderstood what you said.
13                  MR. INFANGER:         Yes.       There's actually a 14 standard for the VRLA batteries.                     And they don't do a 15 deep discharge for them.                     You do a more shallow 16 discharge, and you trend it on graphs.                       So it's just 17 a different process.             Because you don't want to ---
4 (Off the record comments) 5 MEMBER BROWN: There was a periodic test 6
18                  CHAIR BLEY:     No, it's more than a different 19 process, it's not testing what you're worrying about.
every refueling cycle or something like that, they 7
20                  MR. INFANGER:           If you're at 25 percent 21 discharge, and then you trend that, that has been 22 proven         to   be accurate       for   determining     that     the 23 batteries maintain their capacity.
haven't determined yet. It's a capacity test.
24                  MR. EHLERS:       The key to both technologies 25 that apply to VLAs and to VRLAs is the trending NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 CHAIR BLEY: Well, to me a capacity test 9
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
sounds like a deep discharge test. You're running it 10 way down. If you're not doing that, then the battery 11 performance gets fuzzier.
12 MR. INFANGER: Yes. There's actually a 13 standard for the VRLA batteries. And they don't do a 14 deep discharge for them. You do a more shallow 15 discharge, and you trend it on graphs. So it's just 16 a different process. Because you don't want to ---
17 CHAIR BLEY: No, it's more than a different 18 process, it's not testing what you're worrying about.
19 MR. INFANGER: If you're at 25 percent 20 discharge, and then you trend that, that has been 21 proven to be accurate for determining that the 22 batteries maintain their capacity.
23 MR. EHLERS: The key to both technologies 24 that apply to VLAs and to VRLAs is the trending 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


64 1 portion       of it.     So   whatever       test   you   do   is     to 2 determine the capacity of your current battery and to 3 ascertain the data to do the trend to see how the 4 capacity is degrading over time, so you can make an 5 informed decision of what point you replace that 6 battery.
64 portion of it. So whatever test you do is to 1
7                So that's what he's speaking about, is the 8 actual trend.       Whether you do a 25 percent discharge 9 test or you're doing a full deep discharge, which is 10 more common amongst the traditional fleet right now, 11 the purpose of both of those is to get that data for 12 the capacity.
determine the capacity of your current battery and to 2
13                CHAIR BLEY:       Yes.     And what I'm not fully 14 familiar with is substantial data that confirms that 15 a partial discharge gives you the right trend.
ascertain the data to do the trend to see how the 3
16                You know, my experience when these started 17 40, 45 years ago with the phone company who used to do 18 very light testing, and then every time they needed 19 the batteries they didn't work.                   And they eventually 20 went to deep discharge testing.
capacity is degrading over time, so you can make an 4
21                But if there's plenty of information to 22 prove that a 25 percent gives you the real trend, and 23 not a pseudo trend, that would help me.                     And I guess 24 usually the standard doesn't point me to all of that 25 research that proves it's good enough.                     If you guys NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
informed decision of what point you replace that 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
battery.
6 So that's what he's speaking about, is the 7
actual trend. Whether you do a 25 percent discharge 8
test or you're doing a full deep discharge, which is 9
more common amongst the traditional fleet right now, 10 the purpose of both of those is to get that data for 11 the capacity.
12 CHAIR BLEY: Yes. And what I'm not fully 13 familiar with is substantial data that confirms that 14 a partial discharge gives you the right trend.
15 You know, my experience when these started 16 40, 45 years ago with the phone company who used to do 17 very light testing, and then every time they needed 18 the batteries they didn't work. And they eventually 19 went to deep discharge testing.
20 But if there's plenty of information to 21 prove that a 25 percent gives you the real trend, and 22 not a pseudo trend, that would help me. And I guess 23 usually the standard doesn't point me to all of that 24 research that proves it's good enough. If you guys 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


65 1 can, that would be interesting certainly.
65 can, that would be interesting certainly.
2                  MR. HOUGH:     The Navy uses these, so ---
1 MR. HOUGH: The Navy uses these, so ---
3                  CHAIR BLEY:       Yes, the Navy doesn't share 4 very much.
2 CHAIR BLEY: Yes, the Navy doesn't share 3
5                  MR. HOUGH:     That's correct.
very much.
6                  MEMBER SKILLMAN:         The question I would ask 7 is is this system included in your Maintenance Rule, 8 50.65?         I presume that it is.         And if it is, then your 9 electrical system is going to be subject to a host of 10 confirmatory tests that it's capable of performing the 11 functional performance requirements for which it is 12 designed.
4 MR. HOUGH: That's correct.
13                  And it would seem to me that, in that 14 context, you're going to have some form of a discharge 15 test, whether it's via a RLA or a different type 16 battery, to confirm the capacitance is what it is 17 required to be.         And you're going to pull batteries, 18 replace         cells   as   needed       when     those cells   don't 19 perform.         Is that accurate?
5 MEMBER SKILLMAN: The question I would ask 6
20                  MR. EHLERS:     I believe it is.
is is this system included in your Maintenance Rule, 7
21                  MEMBER SKILLMAN:         I believe it is too.           So 22 if that's the case, then whatever that test might be 23 will be the test that is appropriate for that specific 24 battery design.             Otherwise, your Maintenance Rule 25 program         is not   applicable       or     is not capable       of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
50.65? I presume that it is. And if it is, then your 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
electrical system is going to be subject to a host of 9
confirmatory tests that it's capable of performing the 10 functional performance requirements for which it is 11 designed.
12 And it would seem to me that, in that 13 context, you're going to have some form of a discharge 14 test, whether it's via a RLA or a different type 15 battery, to confirm the capacitance is what it is 16 required to be. And you're going to pull batteries, 17 replace cells as needed when those cells don't 18 perform. Is that accurate?
19 MR. EHLERS: I believe it is.
20 MEMBER SKILLMAN: I believe it is too. So 21 if that's the case, then whatever that test might be 22 will be the test that is appropriate for that specific 23 battery design. Otherwise, your Maintenance Rule 24 program is not applicable or is not capable of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


66 1 performing its function.             So I think this is going to 2 come out in 50.65 in your Maintenance Rule program.
66 performing its function. So I think this is going to 1
3                MR. HOUGH: Yes, it's definitely going to --
come out in 50.65 in your Maintenance Rule program.
4 -
2 MR. HOUGH: Yes, it's definitely going to --
5                CHAIR BLEY:       I'm partially responsible for 6 us being a little behind.             But we're down to the last 7 20 minutes for you guys.             So I'm going to let you run 8 a little freer here toward the end.
3 4
9                MR. HOUGH:     All right.
CHAIR BLEY: I'm partially responsible for 5
10                CHAIR BLEY:       If we can all do that.
us being a little behind. But we're down to the last 6
11                MEMBER BROWN:       I'll save my other question 12 until the end then. It's not on this, it's a slightly 13 different question.         And they won't be able to answer 14 it.       But I just wanted to get it on the ---
20 minutes for you guys. So I'm going to let you run 7
15                CHAIR BLEY:       Thanks, Charlie.         Get on the 16 record.
a little freer here toward the end.
17                MEMBER BROWN:       -- I wanted to get it on the 18 table before the meeting was over.
8 MR. HOUGH: All right.
19                MR. HOUGH:       All right, moving on to EES's 20 little brother here, EDNS.                   These are also VRLA 21 batteries with a 40-minute duty cycle.                 It originally 22 specifies a 30-minute duty cycle in the URD, the 23 utility requirements document.                 And we certainly put 24 some margin on there.           It's been made in 40 minutes.
9 CHAIR BLEY: If we can all do that.
25                And that way, loads as you see here like, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER BROWN: I'll save my other question 11 until the end then. It's not on this, it's a slightly 12 different question. And they won't be able to answer 13 it. But I just wanted to get it on the ---
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 CHAIR BLEY: Thanks, Charlie. Get on the 15 record.
16 MEMBER BROWN: -- I wanted to get it on the 17 table before the meeting was over.
18 MR. HOUGH: All right, moving on to EES's 19 little brother here, EDNS. These are also VRLA 20 batteries with a 40-minute duty cycle. It originally 21 specifies a 30-minute duty cycle in the URD, the 22 utility requirements document. And we certainly put 23 some margin on there. It's been made in 40 minutes.
24 And that way, loads as you see here like, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


67 1 you know, breaker control power, things like that, if 2 we needed it, you know, the AAPS would be up and ready 3 to load within that 30-minute time period.                     And so it 4 was a ten-minute margin.               So again, this is all non-5 safety         loads   for     investment         protection,     power 6 generation, TG emergency lube oil pumps, controller 7 drive supply, et cetera.
67 you know, breaker control power, things like that, if 1
8                  Moving along here. At this point, I'll turn 9 to my colleague here, Dr. Welter.
we needed it, you know, the AAPS would be up and ready 2
10                  MR. WELTER:     Thank you, Ted.           So I'll give 11 that punch line first here, and then we'll look at the 12 three plots.
to load within that 30-minute time period. And so it 3
13                  So we're     looking       at       station blackout 14 scenario, a 72-hour coping period.                     And so I'm going 15 to show a single module analysis. But from an initial 16 conditions perspective, it assumes all 12 modules were 17 operating at 100 percent power prior to the event.
was a ten-minute margin. So again, this is all non-4 safety loads for investment protection, power 5
18                  Again, the punch line first, all safety 19 functions achieved and maintained for that 72 hours 20 without reliance on AC power or operator action.                         And 21 those are the safety functions there, the reactor 22 trip, go to passive decay heat removal system, the 23 DHRS, and then eventually the ECCS after the 24-hour 24 time period you talked about.
generation, TG emergency lube oil pumps, controller 6
25                  So the criteria for station blackout coping NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
drive supply, et cetera.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 Moving along here. At this point, I'll turn 8
to my colleague here, Dr. Welter.
9 MR. WELTER: Thank you, Ted. So I'll give 10 that punch line first here, and then we'll look at the 11 three plots.
12 So we're looking at station blackout 13 scenario, a 72-hour coping period. And so I'm going 14 to show a single module analysis. But from an initial 15 conditions perspective, it assumes all 12 modules were 16 operating at 100 percent power prior to the event.
17 Again, the punch line first, all safety 18 functions achieved and maintained for that 72 hours 19 without reliance on AC power or operator action. And 20 those are the safety functions there, the reactor 21 trip, go to passive decay heat removal system, the 22 DHRS, and then eventually the ECCS after the 24-hour 23 time period you talked about.
24 So the criteria for station blackout coping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


68 1 period,       the   core       remains         cooled,   maintained 2 containment integrity without AC power.                 I don't have 3 the plots, but I'll speak to it.                   We did do a ---
68
4                CHAIR BLEY:       Well, before you do that ---
: period, the core remains
5                MR. WELTER:       Yes.
: cooled, maintained 1
6                CHAIR BLEY: -- just a quick question. Your 7 Table A.4-1 on station blackout begins at time zero 8 then gets a high pressure signal at nine seconds and 9 a reactor trip on high pressure.                 Why don't we have a 10 reactor trip at time zero on loss of power? I thought 11 losing power releases the rod.
containment integrity without AC power. I don't have 2
12                MR. WELTER:       AC power?
the plots, but I'll speak to it. We did do a ---
13                CHAIR BLEY:       What kind of power holds the 14 rods up?
3 CHAIR BLEY: Well, before you do that ---
15                MEMBER BROWN:       That's your EDN system?
4 MR. WELTER: Yes.
16                MR. WELTER:       Yes.     The EDNS is powered by 17 the DC system, so we go back a few slides ---
5 CHAIR BLEY: -- just a quick question. Your 6
18                CHAIR BLEY:       We've got 40 minutes there.
Table A.4-1 on station blackout begins at time zero 7
19                MR. WELTER:       Yes, you've got 40 minutes on 20 that from --- the batteries provide that.
then gets a high pressure signal at nine seconds and 8
21                CHAIR BLEY:     So it comes off the batteries.
a reactor trip on high pressure. Why don't we have a 9
22                MR. WELTER:       Yes, for 40 minutes.
reactor trip at time zero on loss of power? I thought 10 losing power releases the rod.
23                CHAIR BLEY:         I didn't realize that.               I 24 thought it came off of AC.
11 MR. WELTER: AC power?
25                MEMBER MARCH-LEUBA:             But your protection NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 CHAIR BLEY: What kind of power holds the 13 rods up?
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MEMBER BROWN: That's your EDN system?
15 MR. WELTER: Yes. The EDNS is powered by 16 the DC system, so we go back a few slides ---
17 CHAIR BLEY: We've got 40 minutes there.
18 MR. WELTER: Yes, you've got 40 minutes on 19 that from --- the batteries provide that.
20 CHAIR BLEY: So it comes off the batteries.
21 MR. WELTER: Yes, for 40 minutes.
22 CHAIR BLEY: I didn't realize that. I 23 thought it came off of AC.
24 MEMBER MARCH-LEUBA: But your protection 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


69 1 system must still work for 40 minutes?
69 system must still work for 40 minutes?
2                MR. HOUGH:     Module protection?
1 MR. HOUGH: Module protection?
3                MEMBER MARCH-LEUBA: The planned protection 4 system.
2 MEMBER MARCH-LEUBA: The planned protection 3
5                MR. HOUGH:       It's actually 24 hours and 72 6 hours --
system.
7                MEMBER MARCH-LEUBA:           Class 1E?
4 MR. HOUGH: It's actually 24 hours and 72 5
8                MR. HOUGH:     -- on protection.
hours --
9                MR. WELTER:       On the slide that ---
6 MEMBER MARCH-LEUBA: Class 1E?
10                MEMBER MARCH-LEUBA:           Class 1E?
7 MR. HOUGH: -- on protection.
11                MR. WELTER:       Yes.     The slide that Ted had 12 shows the EDNS with a different ---
8 MR. WELTER: On the slide that ---
13                (Off the record comments) 14                MR. HOUGH:       There's EDN, and you can see 15 control rod drives there.
9 MEMBER MARCH-LEUBA: Class 1E?
16                MR. WELTER:     You had onsite DC power on the 17 battery duty cycle ---
10 MR. WELTER: Yes. The slide that Ted had 11 shows the EDNS with a different ---
18                MR. HOUGH:     There's the other one for EDS, 19 for MTS that you're talking about.
12 (Off the record comments) 13 MR. HOUGH: There's EDN, and you can see 14 control rod drives there.
20                MR. WELTER:       Oh, sorry, 15.
15 MR. WELTER: You had onsite DC power on the 16 battery duty cycle ---
21                MEMBER MARCH-LEUBA:         Okay. If you lost all 22 of AC power ---
17 MR. HOUGH: There's the other one for EDS, 18 for MTS that you're talking about.
23                MR. WELTER:       Sure.
19 MR. WELTER: Oh, sorry, 15.
24                MEMBER MARCH-LEUBA:           -- and now you don't 25 scram, your protection system must work.
20 MEMBER MARCH-LEUBA: Okay. If you lost all 21 of AC power ---
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
22 MR. WELTER: Sure.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
23 MEMBER MARCH-LEUBA: -- and now you don't 24 scram, your protection system must work.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


70 1                MR. WELTER:     Correct.
70 MR. WELTER: Correct.
2                MEMBER MARCH-LEUBA:           What powers it?
1 MEMBER MARCH-LEUBA: What powers it?
3                MR. HOUGH: EDSS is the power supply for the 4 module protection system.
2 MR. HOUGH: EDSS is the power supply for the 3
5                MEMBER MARCH-LEUBA:           And that's Class 1E.
module protection system.
6                CHAIR BLEY:     That's the highly reliable ---
4 MEMBER MARCH-LEUBA: And that's Class 1E.
7                MEMBER BROWN:       Highly reliable DC power --
5 CHAIR BLEY: That's the highly reliable ---
8                CHAIR BLEY:     -- DC power system.
6 MEMBER BROWN: Highly reliable DC power --
9                (Off the record comments) 10                MEMBER MARCH-LEUBA:             I'm surprised.         But 11 it's now creating the plant power?
7 CHAIR BLEY: -- DC power system.
12                MR. HOUGH:       That's correct.           It is the 13 normal supply.
8 (Off the record comments) 9 MEMBER MARCH-LEUBA: I'm surprised. But 10 it's now creating the plant power?
14                MEMBER MARCH-LEUBA:             My understanding was 15 you lose power, your rods drop.                   And you ---
11 MR. HOUGH: That's correct. It is the 12 normal supply.
16                CHAIR BLEY: That's what I thought I read in 17 this document.       But I didn't mark it, so I have to 18 find it.
13 MEMBER MARCH-LEUBA: My understanding was 14 you lose power, your rods drop. And you ---
19                MEMBER BROWN: The EDNS system is the normal 20 DC power system.         And I just went back to Chapter 7, 21 okay.
15 CHAIR BLEY: That's what I thought I read in 16 this document. But I didn't mark it, so I have to 17 find it.
22                CHAIR BLEY:     That's EDNS.         EDSS is the one 23 ---
18 MEMBER BROWN: The EDNS system is the normal 19 DC power system. And I just went back to Chapter 7, 20 okay.
24                MEMBER BROWN:         EDNS is what supplies the 25 circuit breakers, the reactor trip breakers. It's the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
21 CHAIR BLEY: That's EDNS. EDSS is the one 22 23 MEMBER BROWN: EDNS is what supplies the 24 circuit breakers, the reactor trip breakers. It's the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


71 1 power       through   the     breakers,       not     the actual     trip 2 actuation devices.           But that's the power through the 3 breakers.
71 power through the breakers, not the actual trip 1
4                  CHAIR BLEY:     Through the breakers.
actuation devices. But that's the power through the 2
5                  MEMBER BROWN:         Through those control rod 6 mechanisms.         I think that's correct.                 I haven't 7 reviewed all of Chapter 7.
breakers.
8                  MR. HOUGH:     That is correct.
3 CHAIR BLEY: Through the breakers.
9                  MEMBER   BROWN:           So     according   to     the 10 schematic, you open these DC breakers via the module 11 --- the plant protection system, or whatever the 12 acronym is.           But the actual DC power is supplied 13 through the DC breakers.               And if the ---
4 MEMBER BROWN: Through those control rod 5
14                  CHAIR BLEY:       And that's off of the normal 15 DC?
mechanisms. I think that's correct. I haven't 6
16                  MEMBER BROWN: Yes. If, theoretically, your 17 plant protection system would still be energized at 18 this point, although I haven't checked the power 19 sources to that in all cases.
reviewed all of Chapter 7.
20                  CHAIR BLEY:       I misread something on that.
7 MR. HOUGH: That is correct.
21 It's not real clear.
8 MEMBER BROWN:
22                  MEMBER MARCH-LEUBA:             The same power that 23 keeps       the   rods   up     is   the   one     that powers     the 24 protection system?
So according to the 9
25                  MR. HOUGH:     No.
schematic, you open these DC breakers via the module 10
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
--- the plant protection system, or whatever the 11 acronym is. But the actual DC power is supplied 12 through the DC breakers. And if the ---
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
13 CHAIR BLEY: And that's off of the normal 14 DC?
15 MEMBER BROWN: Yes. If, theoretically, your 16 plant protection system would still be energized at 17 this point, although I haven't checked the power 18 sources to that in all cases.
19 CHAIR BLEY: I misread something on that.
20 It's not real clear.
21 MEMBER MARCH-LEUBA: The same power that 22 keeps the rods up is the one that powers the 23 protection system?
24 MR. HOUGH: No.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


72 1                MEMBER BROWN: No, it's not. That's -- I've 2 told you.       I have --
72 MEMBER BROWN: No, it's not. That's -- I've 1
3                CHAIR BLEY:     The normal ones light the rods 4 up.
told you. I have --
5                (Simultaneous speaking) 6                CHAIR BLEY:         The highly reliable system 7 powers the ---
2 CHAIR BLEY: The normal ones light the rods 3
8                MEMBER MARCH-LEUBA:           But none of them are 9 Class 1E?
up.
10                CHAIR BLEY:     No.
4 (Simultaneous speaking) 5 CHAIR BLEY: The highly reliable system 6
11                MEMBER MARCH-LEUBA:         So for 40 minutes, you 12 may or may not have protection if you have a transit?
powers the ---
13                MR. HOUGH:     Oh, no.       You have protection.
7 MEMBER MARCH-LEUBA: But none of them are 8
14                MEMBER MARCH-LEUBA:         Well, you may not have 15 power to the protection system.
Class 1E?
16                MR. HOUGH:     That's the EDS highly reliable 17 DC     system   that provides       power     to   the protection 18 system.       And I don't need that system to achieve 19 safety functions.
9 CHAIR BLEY: No.
20                MEMBER MARCH-LEUBA: Even with the rods out?
10 MEMBER MARCH-LEUBA: So for 40 minutes, you 11 may or may not have protection if you have a transit?
21 Your rods are being held by the other batteries.
12 MR. HOUGH: Oh, no. You have protection.
22                MR. HOUGH:     That's correct.
13 MEMBER MARCH-LEUBA: Well, you may not have 14 power to the protection system.
23                MEMBER MARCH-LEUBA:           You are going to have 24 to run this by me eventually.                       Because there is 25 something, I mean, what I understood is we don't need NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 MR. HOUGH: That's the EDS highly reliable 16 DC system that provides power to the protection 17 system. And I don't need that system to achieve 18 safety functions.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
19 MEMBER MARCH-LEUBA: Even with the rods out?
20 Your rods are being held by the other batteries.
21 MR. HOUGH: That's correct.
22 MEMBER MARCH-LEUBA: You are going to have 23 to run this by me eventually. Because there is 24 something, I mean, what I understood is we don't need 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


73 1 Class 1E power, because if I lose power I scram.
73 Class 1E power, because if I lose power I scram.
2                MR. HOUGH:     Yes.
1 MR. HOUGH: Yes.
3                MEMBER MARCH-LEUBA:         Apparently now, a non-4 safety grade, highly reliable but not safety grade 5 power holds the rods up.
2 MEMBER MARCH-LEUBA: Apparently now, a non-3 safety grade, highly reliable but not safety grade 4
6                CHAIR BLEY:     Keeps me from shutting down.
power holds the rods up.
7                MEMBER MARCH-LEUBA: Keeps you from shutting 8 down automatically.             And another non-safety grade, 9 highly reliable power is supposed to contain the 10 protection system going.
5 CHAIR BLEY: Keeps me from shutting down.
11                MEMBER BROWN: The EDSS systems supplies the 12 module systems and the plant protection system.                         I 13 counted       another   figure       while     we're sitting     here 14 talking about it.         And I'm just looking at Chapter 7 15 again, Figure 7.0-2 shows the ---
6 MEMBER MARCH-LEUBA: Keeps you from shutting 7
16                (Simultaneous speaking) 17                MEMBER BROWN:           They call it the highly 18 reliable DC.
down automatically. And another non-safety grade, 8
19                CHAIR BLEY: So we're kind of in an odd spot 20 we didn't know we were in here.
highly reliable power is supposed to contain the 9
21                MEMBER BROWN:       Yes.
protection system going.
22                CHAIR BLEY:     If you lose that, you're going 23 to scram, but if you don't lose that ---
10 MEMBER BROWN: The EDSS systems supplies the 11 module systems and the plant protection system. I 12 counted another figure while we're sitting here 13 talking about it. And I'm just looking at Chapter 7 14 again, Figure 7.0-2 shows the ---
24                MEMBER BROWN:       You don't scram?     You don't 25 ---
15 (Simultaneous speaking) 16 MEMBER BROWN: They call it the highly 17 reliable DC.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 CHAIR BLEY: So we're kind of in an odd spot 19 we didn't know we were in here.
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
20 MEMBER BROWN: Yes.
21 CHAIR BLEY: If you lose that, you're going 22 to scram, but if you don't lose that ---
23 MEMBER BROWN: You don't scram? You don't 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


74 1                  CHAIR BLEY:     You don't scram until you get 2 some signal to scram.
74 CHAIR BLEY: You don't scram until you get 1
3                  MEMBER KIRCHNER:           So I think to maintain 4 religious purity here, they have to scram on loss of 5 power.         But they don't.
some signal to scram.
6                  CHAIR BLEY:     Well, if they lose full power, 7 they do.
2 MEMBER KIRCHNER: So I think to maintain 3
8                  MR. BERGMAN:         If I could interject, Tom 9 Bergman.
religious purity here, they have to scram on loss of 4
10                  CHAIR BLEY:     Yes, Tom.
power. But they don't.
11                  MR. BERGMAN:       That is you lose the --- if 12 you maintain the EDSS you could keep the rods out, but 13 you've lost the EDSS which would cause loss of the 14 module protection system and you will trip the plant.
5 CHAIR BLEY: Well, if they lose full power, 6
15                  MR. HOUGH: That's correct. That's correct.
they do.
16                  CHAIR BLEY:     You just used the same acronym 17 twice.         You didn't mean to.
7 MR. BERGMAN: If I could interject, Tom 8
18                  MR. BERGMAN: Oh, I'm sorry, they sound very 19 similar.
Bergman.
20                  CHAIR BLEY:     If you lose EVMS the rods will 21 fall.
9 CHAIR BLEY: Yes, Tom.
22                  MR. BERGMAN: The common system, which is on 23 the current slide ---
10 MR. BERGMAN: That is you lose the --- if 11 you maintain the EDSS you could keep the rods out, but 12 you've lost the EDSS which would cause loss of the 13 module protection system and you will trip the plant.
24                  CHAIR BLEY:     Yes.
14 MR. HOUGH: That's correct. That's correct.
25                  MR. BERGMAN:       -- that's the one that keeps NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 CHAIR BLEY: You just used the same acronym 16 twice. You didn't mean to.
(202) 234-4433           WASHINGTON, D.C. 20005-3701     (202) 234-4433
17 MR. BERGMAN: Oh, I'm sorry, they sound very 18 similar.
19 CHAIR BLEY: If you lose EVMS the rods will 20 fall.
21 MR. BERGMAN: The common system, which is on 22 the current slide ---
23 CHAIR BLEY: Yes.
24 MR. BERGMAN: -- that's the one that keeps 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


75 1 the rods out.
75 the rods out.
2                  CHAIR BLEY:     And if you lose that, the rods 3 will drop.
1 CHAIR BLEY: And if you lose that, the rods 2
4                  MR. BERGMAN:       Yes.
will drop.
5                  CHAIR BLEY:     Yes.
3 MR. BERGMAN: Yes.
6                  MR. BERGMAN:       If you maintain this one but 7 you lose the EDNS -- no sorry, you had it right -- the 8 EDNS powers the control rods.                   That would keep them 9 out.       But if you lost the power supply to the module 10 protection system, you will trip the plant.
4 CHAIR BLEY: Yes.
11                  CHAIR BLEY: You'll get a signal to trip the 12 plant.
5 MR. BERGMAN: If you maintain this one but 6
13                  MR. BERGMAN:       Yes.     The module protection 14 system controls the Class 1E devices.                     If you lose 15 that,       all   the safety       systems       go to their     safe 16 position, regardless of the other power supplies in 17 the plant.
you lose the EDNS -- no sorry, you had it right -- the 7
18                  MR. WELTER: Yes, and in Chapter --- not all 19 of the -- at the start of a transient, when you look 20 at it in Chapter 15, you look at loss of power as an 21 initiating event, as an example --- or as a coincident 22 event.
EDNS powers the control rods. That would keep them 8
23                  But the   module     ---     not   all the   safety 24 functions, you know, happen within time zero, right.
out. But if you lost the power supply to the module 9
25 So we have power to the module protection system to, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
protection system, you will trip the plant.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
10 CHAIR BLEY: You'll get a signal to trip the 11 plant.
12 MR. BERGMAN: Yes. The module protection 13 system controls the Class 1E devices. If you lose 14 that, all the safety systems go to their safe 15 position, regardless of the other power supplies in 16 the plant.
17 MR. WELTER: Yes, and in Chapter --- not all 18 of the -- at the start of a transient, when you look 19 at it in Chapter 15, you look at loss of power as an 20 initiating event, as an example --- or as a coincident 21 event.
22 But the module --- not all the safety 23 functions, you know, happen within time zero, right.
24 So we have power to the module protection system to, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


76 1 you know, monitor the plant.                 And we have a number of 2 trips       that   are   going     to   hit     depending     on     the 3 transient.
76 you know, monitor the plant. And we have a number of 1
4                And so we want power to the MPS for a 5 transient         so   that     MPS     can     perform     its   safety 6 functions.         Reactor trip is just one of those.                       We 7 have       containment     isolation,         you     know, DHRS,     DCCS 8 actuation, so we want highly reliable power to the MPS 9 to protect the plant through the various transients.
trips that are going to hit depending on the 2
10                But to Tom's point, if you lose that, then 11 it goes to the fail safe position.                         It's a whole 12 different paradigm.
transient.
13                MR. EHLERS:       Yes.     Just to be clear ---
3 And so we want power to the MPS for a 4
14                MEMBER CORRADINI:             Yes, let's be clear, 15 because I thought I understood it now.
transient so that MPS can perform its safety 5
16                MR. EHLERS:         The initiator for the plant 17 trip is loss of power to the battery chargers.                               So 18 once you lose that power, you get a sixty second time 19 delay just to alleviate any momentary lapses, you 20 know, drops or spikes.
functions. Reactor trip is just one of those. We 6
21                MEMBER BROWN:           So that's loss of all AC 22 power then.
have containment isolation, you know, DHRS, DCCS 7
23                MR. EHLERS:       Right.       And so as soon as we 24 lose power to our chargers, to charge the batteries, 25 for better than 60 seconds, we will trip the plant.
actuation, so we want highly reliable power to the MPS 8
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
to protect the plant through the various transients.
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
9 But to Tom's point, if you lose that, then 10 it goes to the fail safe position. It's a whole 11 different paradigm.
12 MR. EHLERS: Yes. Just to be clear ---
13 MEMBER CORRADINI: Yes, let's be clear, 14 because I thought I understood it now.
15 MR. EHLERS: The initiator for the plant 16 trip is loss of power to the battery chargers. So 17 once you lose that power, you get a sixty second time 18 delay just to alleviate any momentary lapses, you 19 know, drops or spikes.
20 MEMBER BROWN: So that's loss of all AC 21 power then.
22 MR. EHLERS: Right. And so as soon as we 23 lose power to our chargers, to charge the batteries, 24 for better than 60 seconds, we will trip the plant.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


77 1                CHAIR   BLEY:         And   that's   a timer     that 2 generates the trip signal?
77 CHAIR BLEY: And that's a timer that 1
3                MR. EHLERS: Yes. Well, it's a --- yes, the 4 voltage signal goes to the MPS.
generates the trip signal?
5                (Off the record comments) 6                MEMBER BROWN:         So independent of the EDSS 7 and independent of the EDNS, if you lose AC power --
2 MR. EHLERS: Yes. Well, it's a --- yes, the 3
8                CHAIR BLEY:     To the chargers.
voltage signal goes to the MPS.
9                MEMBER BROWN:         -- the chargers --- yes, 10 thank you --- chargers, there's an independent timer 11 that then says, Kings X, scram the plant. And I don't 12 know where that comes from or how it gets processed.
4 (Off the record comments) 5 MEMBER BROWN: So independent of the EDSS 6
13 But if you go back and look in Chapter 7, we should be 14 able to see that.
and independent of the EDNS, if you lose AC power --
15                MR. EHLERS:     That's in Chapter 7.
7 CHAIR BLEY: To the chargers.
16                MR. WELTER:       And as a point, since we do 17 have DC power, we hit that trip point sooner on high 18 pressure before that ---
8 MEMBER BROWN: -- the chargers --- yes, 9
19                MEMBER BROWN:       You lost me.
thank you --- chargers, there's an independent timer 10 that then says, Kings X, scram the plant. And I don't 11 know where that comes from or how it gets processed.
20                (Laughter) 21                CHAIR BLEY: In the current analysis that he 22 wanted to talk about --
12 But if you go back and look in Chapter 7, we should be 13 able to see that.
23                (Simultaneous speaking) 24                CHAIR BLEY:       -- they're going to trip in 25 nine seconds because of --
14 MR. EHLERS: That's in Chapter 7.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 MR. WELTER: And as a point, since we do 16 have DC power, we hit that trip point sooner on high 17 pressure before that ---
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
18 MEMBER BROWN: You lost me.
19 (Laughter) 20 CHAIR BLEY: In the current analysis that he 21 wanted to talk about --
22 (Simultaneous speaking) 23 CHAIR BLEY: -- they're going to trip in 24 nine seconds because of --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


78 1                MR. WELTER:       -- in nine seconds, which is 2 within that 60 second window.
78 MR. WELTER: -- in nine seconds, which is 1
3                MR. BERGMAN:       It's hard to envision making 4 it 60 seconds with no AC power and not getting a 5 reactor trip somewhere first.
within that 60 second window.
6                MEMBER   BROWN:         Even     though there's       no 7 "accident" scenario involved.
2 MR. BERGMAN: It's hard to envision making 3
8                MR. BERGMAN:       Right.
it 60 seconds with no AC power and not getting a 4
9                MR. WELTER:       If I could go back to the 10 earlier line of questioning ---
reactor trip somewhere first.
11                MEMBER SUNSERI:         Can you get closer to the 12 mic?
5 MEMBER BROWN: Even though there's no 6
13                MR. BERGMAN:       Oh, sorry.         The questioning 14 about degraded voltage, that will come up in Chapter 15 7 which is in August.                 But it does isolate our 16 degraded voltage.
"accident" scenario involved.
17                MEMBER BROWN:         I tried to find that, Tom, 18 and was unable to.
7 MR. BERGMAN: Right.
19                (Off mic comments) 20                (Laughter) 21                MEMBER BROWN: Is Rev 0 the current revision 22 for Chapter 7?       That's all I've got.             So we're due to 23 do that in a couple of months.
8 MR. WELTER: If I could go back to the 9
24                MR. BERGMAN:       I'm assuming we have Rev. 1, 25 Chapter 7.
earlier line of questioning ---
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER SUNSERI: Can you get closer to the 11 mic?
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
12 MR. BERGMAN: Oh, sorry. The questioning 13 about degraded voltage, that will come up in Chapter 14 7 which is in August. But it does isolate our 15 degraded voltage.
16 MEMBER BROWN: I tried to find that, Tom, 17 and was unable to.
18 (Off mic comments) 19 (Laughter) 20 MEMBER BROWN: Is Rev 0 the current revision 21 for Chapter 7? That's all I've got. So we're due to 22 do that in a couple of months.
23 MR. BERGMAN: I'm assuming we have Rev. 1, 24 Chapter 7.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


79 1                MR. SNODDERLY:         Yes.
79 MR. SNODDERLY: Yes.
2                MR. BERGMAN:       I don't know how many ---
1 MR. BERGMAN: I don't know how many ---
3                MEMBER BROWN:       Mine's 2016.       So that's Rev.
2 MEMBER BROWN: Mine's 2016. So that's Rev.
4 0.     So I have not seen a Rev. 1 yet.
3
5                MR. BERGMAN:           We   reissued     the     DCA     as 6 Revision 1 in March, mid-March, all the chapters.
: 0. So I have not seen a Rev. 1 yet.
7                MR. SNODDERLY:         Yes, this is --- yes.
4 MR. BERGMAN: We reissued the DCA as 5
8                MR. BERGMAN:       I'll certainly be in touch.
Revision 1 in March, mid-March, all the chapters.
9                MEMBER BROWN:           I was unable to find it 10 anywhere.
6 MR. SNODDERLY: Yes, this is --- yes.
11                MR. SNODDERLY:       This is Mike Snodderly from 12 the ACRS staff.       So as Tom said, Revision 1 came in on 13 March 15th, 2018.         And I was going to make a request 14 to the staff.         Because also on the public website 15 right now it's still Rev. 0.               But, yes, Rev. 1's in, 16 hopefully we can get ---
7 MR. BERGMAN: I'll certainly be in touch.
17                MEMBER BROWN:       That's where I got it.
8 MEMBER BROWN: I was unable to find it 9
18                MR. SNODDERLY:       Yes. Hopefully, we can get 19 that up to date.       But otherwise, we'll get access for 20 you guys.
anywhere.
21                MEMBER   BROWN:         And     just to   get       the 22 proprietary version, not the non-proprietary version 23 that's on the public website.               I think it's --- or is 24 it totally non-proprietary?
10 MR. SNODDERLY: This is Mike Snodderly from 11 the ACRS staff. So as Tom said, Revision 1 came in on 12 March 15th, 2018. And I was going to make a request 13 to the staff. Because also on the public website 14 right now it's still Rev. 0. But, yes, Rev. 1's in, 15 hopefully we can get ---
25                MR. BERGMAN:           Oh,       no. The     design NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MEMBER BROWN: That's where I got it.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
17 MR. SNODDERLY: Yes. Hopefully, we can get 18 that up to date. But otherwise, we'll get access for 19 you guys.
20 MEMBER BROWN: And just to get the 21 proprietary version, not the non-proprietary version 22 that's on the public website. I think it's --- or is 23 it totally non-proprietary?
24 MR. BERGMAN: Oh, no. The design 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


80 1 certification application is non-proprietary.
80 certification application is non-proprietary.
2                MEMBER BROWN:       Is totally proprietary?
1 MEMBER BROWN: Is totally proprietary?
3                CHAIR BLEY:     Non-proprietary.
2 CHAIR BLEY: Non-proprietary.
4                MEMBER BROWN:         Non-proprietary, okay.             Is 5 there any proprietary version of Chapter 7?
3 MEMBER BROWN: Non-proprietary, okay. Is 4
6                MR. BERGMAN:       There should not be, no.
there any proprietary version of Chapter 7?
7                MEMBER BROWN:         Okay.       I'm just trying to 8 clarify.
5 MR. BERGMAN: There should not be, no.
9                MR. BERGMAN:       Some chapters have security-10 related information which is redacted but --
6 MEMBER BROWN: Okay. I'm just trying to 7
11                MEMBER BROWN:       Okay.
clarify.
12                MR. BERGMAN:       -- will lead us into Chapter 13 7.
8 MR. BERGMAN: Some chapters have security-9 related information which is redacted but --
14                CHAIR BLEY:       I want to come back to Jeff 15 just so I understand this.             And maybe we'll get to it 16 again in Chapter 7.           But this timer that starts when 17 you lose AC power to the battery chargers, I've got 18 two or three things about it.                     Is it a mechanical 19 timer or a digital timer?
10 MEMBER BROWN: Okay.
20                MR. EHLERS:     I can't speak to that.
11 MR. BERGMAN: -- will lead us into Chapter 12 7.
21                CHAIR BLEY:     Is it in the protection system 22 or is it, you know, kind of a separate thing?
13 CHAIR BLEY: I want to come back to Jeff 14 just so I understand this. And maybe we'll get to it 15 again in Chapter 7. But this timer that starts when 16 you lose AC power to the battery chargers, I've got 17 two or three things about it. Is it a mechanical 18 timer or a digital timer?
23                MR. EHLERS:     It's part of the MPS system.
19 MR. EHLERS: I can't speak to that.
24                CHAIR BLEY:     It's part of the MPS.
20 CHAIR BLEY: Is it in the protection system 21 or is it, you know, kind of a separate thing?
25                MR. EHLERS:     Yes.
22 MR. EHLERS: It's part of the MPS system.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
23 CHAIR BLEY: It's part of the MPS.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
24 MR. EHLERS: Yes.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


81 1                CHAIR BLEY:       And does it do anything else 2 other than generate a reactor trip signal? We'll want 3 to know all about that come --
81 CHAIR BLEY: And does it do anything else 1
4                MR. EHLERS:     Okay.
other than generate a reactor trip signal? We'll want 2
5                CHAIR BLEY:     -- Chapter 7 time.
to know all about that come --
6                MR. WELTER: The next slide. This is a plot 7 of a reactor pressure vessel water level above the top 8 of the active fuel.           This is collapsed liquid level.
3 MR. EHLERS: Okay.
9 This is a plot generated from NRELAP 5, a NuScale 10 proprietary version of RELAP.
4 CHAIR BLEY: -- Chapter 7 time.
11                It's a 72-hour time period, so it's a fairly 12 long plot.         We kind of already talked about it a 13 little bit, where you lose AC power to the battery 14 chargers.       There is a timer.           But, you know, you're 15 going       to lose   your     secondary         site heat removal, 16 because you're not, you know, providing any power to 17 your feedwater pumps.
5 MR. WELTER: The next slide. This is a plot 6
18                And since they are fairly smaller reactors, 19 when you lose that secondary site heat removal, it'll 20 be fairly quick increase in primary system pressure.
of a reactor pressure vessel water level above the top 7
21 And     you're   going   to   trip     the     reactor on   a   high 22 pressure signal within about ten seconds, so fairly 23 quickly.
of the active fuel. This is collapsed liquid level.
24                And then you're also going, on the reactor 25 trip, you're going to get a containment isolation NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 This is a plot generated from NRELAP 5, a NuScale 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
proprietary version of RELAP.
10 It's a 72-hour time period, so it's a fairly 11 long plot. We kind of already talked about it a 12 little bit, where you lose AC power to the battery 13 chargers. There is a timer. But, you know, you're 14 going to lose your secondary site heat removal, 15 because you're not, you know, providing any power to 16 your feedwater pumps.
17 And since they are fairly smaller reactors, 18 when you lose that secondary site heat removal, it'll 19 be fairly quick increase in primary system pressure.
20 And you're going to trip the reactor on a high 21 pressure signal within about ten seconds, so fairly 22 quickly.
23 And then you're also going, on the reactor 24 trip, you're going to get a containment isolation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


82 1 signal which then you also get a DHRS actuation 2 signal.         So within ten seconds of this transient, 3 you've         tripped     the     reactor,           you've   isolated 4 containment, and then you've transitioned to your 5 passive DHRS system.
82 signal which then you also get a DHRS actuation 1
6                  CHAIR BLEY:     And the containment isolation 7 and DHRS comes off of the reactor trip signal?
signal. So within ten seconds of this transient, 2
8                  MR. WELTER:     It's a separate ---
you've tripped the
9                  CHAIR BLEY:     It's separate.
: reactor, you've isolated 3
10                  MR. WELTER: Separate, but the logic is when 11 you get a reactor trip, well, the DHRS is actuated on 12 CNV isolation.         So the containment needs to isolate 13 before the DHRS can function.
containment, and then you've transitioned to your 4
14                  MEMBER MARCH-LEUBA:               I thought DHRS was 15 counting on high pressure or it needs --
passive DHRS system.
16                  (Simultaneous speaking) 17                  MR. WELTER:       Yes.       Well, the trip signal 18 comes       on   the high     pressure.           And   then the       CNV 19 isolation comes on the reactor trip, and a DHRS 20 actuation comes on the CNV isolation.                     We don't want 21 to ---
5 CHAIR BLEY: And the containment isolation 6
22                  MEMBER MARCH-LEUBA:         But I thought the DHRS 23 valves needed high pressure to open.                         What am I 24 missing?
and DHRS comes off of the reactor trip signal?
25                  MR. WELTER:         No,   I'm     just giving       the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MR. WELTER: It's a separate ---
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 CHAIR BLEY: It's separate.
9 MR. WELTER: Separate, but the logic is when 10 you get a reactor trip, well, the DHRS is actuated on 11 CNV isolation. So the containment needs to isolate 12 before the DHRS can function.
13 MEMBER MARCH-LEUBA: I thought DHRS was 14 counting on high pressure or it needs --
15 (Simultaneous speaking) 16 MR. WELTER: Yes. Well, the trip signal 17 comes on the high pressure. And then the CNV 18 isolation comes on the reactor trip, and a DHRS 19 actuation comes on the CNV isolation. We don't want 20 to ---
21 MEMBER MARCH-LEUBA: But I thought the DHRS 22 valves needed high pressure to open. What am I 23 missing?
24 MR. WELTER: No, I'm just giving the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


83 1 sequence of the trips.                 Because we don't want to 2 actuate the DHRS before the reactor's tripped or the 3 containment's isolated.               So there's a logic to the 4 trip       sequence.     They're       right     after   each   other.
83 sequence of the trips. Because we don't want to 1
5 There's not a delay in between them.                     So we have to 6 make sure there's a logic that happens.
actuate the DHRS before the reactor's tripped or the 2
7                MEMBER BROWN:       You said CNV or CNB?
containment's isolated. So there's a logic to the 3
8                MR. WELTER:       CNV containment, I'm sorry.
trip sequence. They're right after each other.
9                CHAIR BLEY:     That's the vessel containment.
4 There's not a delay in between them. So we have to 5
10                MR. WELTER:       Containment vessel, CNV.                 So 11 reactor trip, CNV isolation, DHRS actuation.
make sure there's a logic that happens.
12                MEMBER KIRCHNER:         So this is the result of 13 the decayed ---
6 MEMBER BROWN: You said CNV or CNB?
14                MR. WELTER:     Yes. Can you go back a slide, 15 please?
7 MR. WELTER: CNV containment, I'm sorry.
16                MEMBER KIRCHNER: -- system pulling down the 17 pressure.
8 CHAIR BLEY: That's the vessel containment.
18                MR. WELTER:       Yes, and slowly over time, 19 right.         You're   going     to   be   reducing,     well,       the 20 pressure is ---         yes, the pressure goes down pretty 21 quickly on the second slide.               I wasn't ready to go to 22 the second slide yet.
9 MR. WELTER: Containment vessel, CNV. So 10 reactor trip, CNV isolation, DHRS actuation.
23                So this is just the water level.                   So it 24 stays pretty high in the reactor coolant system. It's 25 an     elevated   water     level,       so     you have   natural NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 MEMBER KIRCHNER: So this is the result of 12 the decayed ---
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
13 MR. WELTER: Yes. Can you go back a slide, 14 please?
15 MEMBER KIRCHNER: -- system pulling down the 16 pressure.
17 MR. WELTER: Yes, and slowly over time, 18 right. You're going to be reducing, well, the 19 pressure is --- yes, the pressure goes down pretty 20 quickly on the second slide. I wasn't ready to go to 21 the second slide yet.
22 So this is just the water level. So it 23 stays pretty high in the reactor coolant system. It's 24 an elevated water level, so you have natural 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


84 1 circulation cooling.             And then in 24 hours, you have 2 that ECCS timer.           Because we still have DC power in 3 this scenario.
84 circulation cooling. And then in 24 hours, you have 1
4                  This is a loss of AC with DC power.                       And 5 then when you get the 24-hour signal, then you have a 6 rapid depressurization at that --- well, actually the 7 depressurization isn't that rapid at that time.                           You 8 have a rapid loss of inventory as the re-circulation 9 valves         and   the     RVV     valves       at     the   top     open 10 simultaneously, and the ECCS system actuates.
that ECCS timer. Because we still have DC power in 2
11                  MEMBER KIRCHNER:         So why even actuate the 12 ECCS?
this scenario.
13                  MR. WELTER:       It's on a 24-hour timer.                 So 14 the plant is designed to do that.
3 This is a loss of AC with DC power. And 4
15                  MEMBER KIRCHNER:         But why actuate it if you 16 don't need it?
then when you get the 24-hour signal, then you have a 5
17                  MR. WELTER:     You would have --- h'mm ---
rapid depressurization at that --- well, actually the 6
18                  MEMBER   KIRCHNER:         You       would reduce       the 19 pressure.         You've got natural circulation cooling.
depressurization isn't that rapid at that time. You 7
20 Why breach containment?
have a rapid loss of inventory as the re-circulation 8
21                  (Off the record comments) 22                  MR. WELTER:               It's       a   controlled 23 depressurization.           It's --- yes.
valves and the RVV valves at the top open 9
24                  CHAIR BLEY:     No, I understand that.
simultaneously, and the ECCS system actuates.
25                  MR. WELTER:       Yes.       No, I understand the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER KIRCHNER: So why even actuate the 11 ECCS?
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
12 MR. WELTER: It's on a 24-hour timer. So 13 the plant is designed to do that.
14 MEMBER KIRCHNER: But why actuate it if you 15 don't need it?
16 MR. WELTER: You would have --- h'mm ---
17 MEMBER KIRCHNER: You would reduce the 18 pressure. You've got natural circulation cooling.
19 Why breach containment?
20 (Off the record comments) 21 MR.
WELTER:
It's a
controlled 22 depressurization. It's --- yes.
23 CHAIR BLEY: No, I understand that.
24 MR. WELTER: Yes. No, I understand the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


85 1 question.
85 question.
2                  CHAIR BLEY:       But it's the ECCS actuation 3 where you've breached containment.
1 CHAIR BLEY: But it's the ECCS actuation 2
4                  MR. WELTER:     Yes.     And so this whole timer 5 thing is interesting in terms of how we had it in the 6 design and all and had others add in.                       It's not a 7 safety feature.         And so if we wanted to keep it ---
where you've breached containment.
8                  (Simultaneous speaking) 9                  MR. WELTER:     What's that?
3 MR. WELTER: Yes. And so this whole timer 4
10                  MEMBER   MARCH-LEUBA:             If you lost     your 11 feedwater, you don't have any way for heat to go 12 outside.         And if your vessel is intact, your thermos 13 bottle prevents you from losing heat. So you need it.
thing is interesting in terms of how we had it in the 5
14                  MR. WELTER:     We don't need the --- we have 15 the DHRS ---
design and all and had others add in. It's not a 6
16                  MEMBER   MARCH-LEUBA:             The DHRS   is   still 17 working?
safety feature. And so if we wanted to keep it ---
18                  MR. WELTER: -- that will work, yes. Right, 19 that's         the first   passive       safety       system.       We've 20 designed a system to fail safe on loss of power.                         And 21 we've designed an ECCS system to fail safe in its fail 22 safe position as it is depressurizing, right?                           It's 23 opening valves and depressurizing.
7 (Simultaneous speaking) 8 MR. WELTER: What's that?
24                  And from an operations perspective, you 25 don't want to depressurize that, even though it's fine NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MEMBER MARCH-LEUBA: If you lost your 10 feedwater, you don't have any way for heat to go 11 outside. And if your vessel is intact, your thermos 12 bottle prevents you from losing heat. So you need it.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
13 MR. WELTER: We don't need the --- we have 14 the DHRS ---
15 MEMBER MARCH-LEUBA: The DHRS is still 16 working?
17 MR. WELTER: -- that will work, yes. Right, 18 that's the first passive safety system. We've 19 designed a system to fail safe on loss of power. And 20 we've designed an ECCS system to fail safe in its fail 21 safe position as it is depressurizing, right? It's 22 opening valves and depressurizing.
23 And from an operations perspective, you 24 don't want to depressurize that, even though it's fine 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


86 1 from       a   safety   perspective,         we     want   to give     the 2 operators time to recover the power so you don't 3 actuate ECCS.
86 from a safety perspective, we want to give the 1
4                  So it's not --- you know, the thing is you 5 could say why not 36 hours, right?                     Well, the way our 6 system is designed, we'd have to add more batteries, 7 right, because of the way that the system is designed 8 to     keep     the valves     closed       from     an operational 9 perspective, to give them --- it's an investment 10 protection thing.
operators time to recover the power so you don't 2
11                  So when you're looking at how long to do 12 this, it is -- this timer, it's an economic question.
actuate ECCS.
13 So you can keep it longer, and add more batteries, or 14 this is kind of the spot we pick.
3 So it's not --- you know, the thing is you 4
15                  CHAIR BLEY:       I'm still --- I'm learning a 16 lot this morning.
could say why not 36 hours, right? Well, the way our 5
17                  MR. WELTER:     Yes.
system is designed, we'd have to add more batteries, 6
18                  CHAIR BLEY:     The 24-hour timer does exactly 19 what?
right, because of the way that the system is designed 7
20                  MR. WELTER:       For this, it sends an ECCS 21 actuation signal.
to keep the valves closed from an operational 8
22                  CHAIR BLEY:     ECCS actuation.
perspective, to give them --- it's an investment 9
23                  MR. WELTER:       Correct.         To de-energize the 24 solenoids to open the five ECCS valves.
protection thing.
25                  MEMBER CORRADINI:         So can we just back up?
10 So when you're looking at how long to do 11 this, it is -- this timer, it's an economic question.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
12 So you can keep it longer, and add more batteries, or 13 this is kind of the spot we pick.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
14 CHAIR BLEY: I'm still --- I'm learning a 15 lot this morning.
16 MR. WELTER: Yes.
17 CHAIR BLEY: The 24-hour timer does exactly 18 what?
19 MR. WELTER: For this, it sends an ECCS 20 actuation signal.
21 CHAIR BLEY: ECCS actuation.
22 MR. WELTER: Correct. To de-energize the 23 solenoids to open the five ECCS valves.
24 MEMBER CORRADINI: So can we just back up?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


87 1 So this stylized station blackout is a scenario that 2 you have to look at relative to station blackout 3 assumptions.       But a more severe one will be that I 4 lost DC at time zero.
87 So this stylized station blackout is a scenario that 1
5                MR. WELTER:         So   we     did   look   at     that 6 sensitivity.         Well, severe, it's not really more 7 severe from a safety perspective.                   You'll have a ---
you have to look at relative to station blackout 2
8 if you go to the next slide as an example.
assumptions. But a more severe one will be that I 3
9                So, you know, DHRS is cooling the system for 10 the first 24 hours, and you see you get almost below 11 100 PSI in the reactor coolant system before ECCS 12 actuates.       So once it actuates, if you go to the next 13 slide, the bump in containment pressure is very small 14 at about 35 PSI.
lost DC at time zero.
15                And if I didn't have DC power, we did a 16 sensitivity case, and we --- now, here's where it gets 17 just a little bit more subtle, is that we have an 18 inadvertent actuation block mechanism on our ECCS 19 valves.       So we   have     another       ---   and this     is   a 20 mechanical system that prevents the ECCS valves from 21 opening above a certain pressure or differential.
4 MR. WELTER: So we did look at that 5
22                So if we didn't have DC power, if we didn't 23 have power to the solenoids, and that got removed, and 24 you're at high pressure, at 18.50, you have an IAB 25 mechanism that will block the valves from opening, and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
sensitivity. Well, severe, it's not really more 6
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
severe from a safety perspective. You'll have a ---
7 if you go to the next slide as an example.
8 So, you know, DHRS is cooling the system for 9
the first 24 hours, and you see you get almost below 10 100 PSI in the reactor coolant system before ECCS 11 actuates. So once it actuates, if you go to the next 12 slide, the bump in containment pressure is very small 13 at about 35 PSI.
14 And if I didn't have DC power, we did a 15 sensitivity case, and we --- now, here's where it gets 16 just a little bit more subtle, is that we have an 17 inadvertent actuation block mechanism on our ECCS 18 valves. So we have another --- and this is a 19 mechanical system that prevents the ECCS valves from 20 opening above a certain pressure or differential.
21 So if we didn't have DC power, if we didn't 22 have power to the solenoids, and that got removed, and 23 you're at high pressure, at 18.50, you have an IAB 24 mechanism that will block the valves from opening, and 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


88 1 you wouldn't -- until you got down to a range of 800 2 to 1,000 PSI with those valves actually open.
88 you wouldn't -- until you got down to a range of 800 1
3                So if you go back to the previous slide, we 4 did a sensitivity where we opened at the lower range 5 of 800 PSI, and it would open in about two hours.                       So 6 you would have the start of the transient, loss of all 7 power, everything, super station blackout, and you 8 would come down --- you'd go to DHRS cooling, you 9 would come down and we, for the transient, you would 10 open around 1,000 to 800 PSI.
to 1,000 PSI with those valves actually open.
11                And then you'd get a little bit more rapid 12 depressurization.         The containment pressure would go 13 up to about 200 instead of 35.                   So you can open it 14 earlier, way earlier, at two hours. You still get the 15 same top of active fuel level, and you have a slightly 16 higher containment pressure.
2 So if you go back to the previous slide, we 3
17                MEMBER   CORRADINI:               So what was       the 18 containment pressure at two hours?
did a sensitivity where we opened at the lower range 4
19                MR. WELTER:     What's that?
of 800 PSI, and it would open in about two hours. So 5
20                MEMBER CORRADINI:         What was the containment 21 pressure at two hours?
you would have the start of the transient, loss of all 6
22                MR. WELTER:       At spike, it gets about 200 23 PSI.
power, everything, super station blackout, and you 7
24                MEMBER CORRADINI:           so the 35 pound spike 25 goes to 200?
would come down --- you'd go to DHRS cooling, you 8
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
would come down and we, for the transient, you would 9
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
open around 1,000 to 800 PSI.
10 And then you'd get a little bit more rapid 11 depressurization. The containment pressure would go 12 up to about 200 instead of 35. So you can open it 13 earlier, way earlier, at two hours. You still get the 14 same top of active fuel level, and you have a slightly 15 higher containment pressure.
16 MEMBER CORRADINI:
So what was the 17 containment pressure at two hours?
18 MR. WELTER: What's that?
19 MEMBER CORRADINI: What was the containment 20 pressure at two hours?
21 MR. WELTER: At spike, it gets about 200 22 PSI.
23 MEMBER CORRADINI: so the 35 pound spike 24 goes to 200?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


89 1                  MR. WELTER:     Yes, yes, yes.         Because you're 2 depressurizing at a higher pressure, about 800 versus 3 100.
89 MR. WELTER: Yes, yes, yes. Because you're 1
4                  So that's the sensitivity.               So, you know, 5 and in Chapter 15, we do sensitivities of power/not 6 power.         And you'll see similar phenomenon in Chapter 7 15 analysis when we don't have DC power.                         So we do 8 that sensitivity to evaluate.
depressurizing at a higher pressure, about 800 versus 2
9                  And again, that 24-hour timer is not a 10 safety         feature.         It's     purely       for   investment 11 protection.           But we do evaluate it as, you know, 12 extreme examples of it not working.
100.
13                  And actually,       in   the     PRA   there   was     a 14 question on, you know, the degraded power.                         And I'm 15 not going to attempt to answer the details on the I&C 16 system. But in the PRA we do look at partial failures 17 of the ECCS system.             And you will see that when that 18 chapter comes.           So irrespective of it's a mechanical 19 or electrical, we do look at that failure in the PRA.
3 So that's the sensitivity. So, you know, 4
20                  MEMBER KIRCHNER:           What's the containment 21 vessel design pressure?
and in Chapter 15, we do sensitivities of power/not 5
22                  MR. WELTER:         One thousand PSI.             It's a 23 stainless steel, well, it's a carbon steel, dual clad, 24 and stainless steel containment vessel.
power. And you'll see similar phenomenon in Chapter 6
25                  MR. SCHULTZ:         Kent, the partial failure NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
15 analysis when we don't have DC power. So we do 7
(202) 234-4433             WASHINGTON, D.C. 20005-3701             (202) 234-4433
that sensitivity to evaluate.
8 And again, that 24-hour timer is not a 9
safety feature.
It's purely for investment 10 protection. But we do evaluate it as, you know, 11 extreme examples of it not working.
12 And actually, in the PRA there was a 13 question on, you know, the degraded power. And I'm 14 not going to attempt to answer the details on the I&C 15 system. But in the PRA we do look at partial failures 16 of the ECCS system. And you will see that when that 17 chapter comes. So irrespective of it's a mechanical 18 or electrical, we do look at that failure in the PRA.
19 MEMBER KIRCHNER: What's the containment 20 vessel design pressure?
21 MR. WELTER: One thousand PSI. It's a 22 stainless steel, well, it's a carbon steel, dual clad, 23 and stainless steel containment vessel.
24 MR. SCHULTZ: Kent, the partial failure 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


90 1 you're talking about is valves not actuating, or the 2 timing of the event, valve performance ---
90 you're talking about is valves not actuating, or the 1
3                MR. WELTER:     Right.     So when you're looking 4 at ---
timing of the event, valve performance ---
5                MR. SCHULTZ:       -- or both of those?
2 MR. WELTER: Right. So when you're looking 3
6                MR. WELTER:       Well, yes.         The PRA, from a 7 Level 1 perspective, when you're looking at the ECCS 8 system, it's the five valves, right.                   And we look at 9 combinations of if one of them opens and four of them 10 don't, and two open, and three don't, the top or the 11 bottom.       They look at all those various combinations.
at ---
12 And there's definitely cases where at least the core 13 damage, you have some open and some don't.                   So that's 14 on the PRA.
4 MR. SCHULTZ: -- or both of those?
15                MR. SCHULTZ:       Thank you.
5 MR. WELTER: Well, yes. The PRA, from a 6
16                MEMBER SUNSERI:         If you go back just one 17 slide, so what's the slight decreasing trend? Is that 18 just cooling from the DHS system, or you're not losing 19 any inventory, it's just ---
Level 1 perspective, when you're looking at the ECCS 7
20                MR. WELTER: No. It's all bottled up. Yes, 21 you don't start depressurizing and losing inventory 22 until 24 hours.         Okay.
system, it's the five valves, right. And we look at 8
23                MEMBER SKILLMAN:         Kent, where else --- you 24 say that the 24-hours is really driven by investment 25 protection         and   the     recognition         that   you     will NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
combinations of if one of them opens and four of them 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
don't, and two open, and three don't, the top or the 10 bottom. They look at all those various combinations.
11 And there's definitely cases where at least the core 12 damage, you have some open and some don't. So that's 13 on the PRA.
14 MR. SCHULTZ: Thank you.
15 MEMBER SUNSERI: If you go back just one 16 slide, so what's the slight decreasing trend? Is that 17 just cooling from the DHS system, or you're not losing 18 any inventory, it's just ---
19 MR. WELTER: No. It's all bottled up. Yes, 20 you don't start depressurizing and losing inventory 21 until 24 hours. Okay.
22 MEMBER SKILLMAN: Kent, where else --- you 23 say that the 24-hours is really driven by investment 24 protection and the recognition that you will 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


91 1 conceivably be good 48 or 96 hours, except that does 2 the battery hold, and hence you're increasing the 3 battery capacity that would be required to extend 4 beyond 24?
91 conceivably be good 48 or 96 hours, except that does 1
5                MR. WELTER:     You need more batteries to go 6 beyond 24, yes.
the battery hold, and hence you're increasing the 2
7                MEMBER   SKILLMAN:           Is     there any     other 8 function that shares that same facet in your thinking?
battery capacity that would be required to extend 3
9 In other words, we really could have more margin or 10 have more time.         But because of our economic model, 11 this is as far as we're willing to go relative to our 12 battery capacity.
beyond 24?
13                MR. WELTER:         That's         interesting.         I 14 actually, from a safety perspective, want to push it 15 to eight hours.         Because when you look at the data, 16 you've got plenty of time within eight hours.                       So if 17 I was going to start back ten years ago, I would have 18 proposed eight hours instead of 24.
4 MR. WELTER: You need more batteries to go 5
19                MEMBER SKILLMAN:         Except that what you're 20 doing then is you're pitting yourself against your 21 heat generation rate and your decay heat removal 22 capability, right?
beyond 24, yes.
23                MR. WELTER:     It doesn't change after eight 24 hours.         So if you look there after --- if you see 25 where that dip is, that's way back in the five-hour NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
6 MEMBER SKILLMAN: Is there any other 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
function that shares that same facet in your thinking?
8 In other words, we really could have more margin or 9
have more time. But because of our economic model, 10 this is as far as we're willing to go relative to our 11 battery capacity.
12 MR. WELTER: That's interesting. I 13 actually, from a safety perspective, want to push it 14 to eight hours. Because when you look at the data, 15 you've got plenty of time within eight hours. So if 16 I was going to start back ten years ago, I would have 17 proposed eight hours instead of 24.
18 MEMBER SKILLMAN: Except that what you're 19 doing then is you're pitting yourself against your 20 heat generation rate and your decay heat removal 21 capability, right?
22 MR. WELTER: It doesn't change after eight 23 hours. So if you look there after --- if you see 24 where that dip is, that's way back in the five-hour 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


92 1 period. It's at very low pressure, very low already.
92 period. It's at very low pressure, very low already.
2 I think that 24 hours is quite high, actually, on the 3 high end.       And ---
1 I think that 24 hours is quite high, actually, on the 2
4                MEMBER SKILLMAN:         Okay, so --
high end. And ---
5                (Simultaneous speaking) 6                MEMBER SKILLMAN: -- so your answer, I would 7 have preferred to have less than 24.                 But my question 8 is ---
3 MEMBER SKILLMAN: Okay, so --
9                (Simultaneous speaking) 10                MEMBER SKILLMAN:         -- is 24, is that marker 11 24 spinning up other decisions that we should know 12 about?
4 (Simultaneous speaking) 5 MEMBER SKILLMAN: -- so your answer, I would 6
13                MR. WELTER:     Well, it sizes the batteries.
have preferred to have less than 24. But my question 7
14                MR. HOUGH:     Yes, but it was done early on.
is ---
15                MR. WELTER: It was done early on, yes. And 16 it's ---
8 (Simultaneous speaking) 9 MEMBER SKILLMAN: -- is 24, is that marker 10 24 spinning up other decisions that we should know 11 about?
17                MR. HOUGH:     As Kent says, you know, can see 18 here. You know, less than eight hours, it's almost an 19 equilibrium. And we know where we're at. And then we 20 said, okay, we'll give you a factor of three, give Ops 21 time to do something if they wanted to.                 So that was 22 ---
12 MR. WELTER: Well, it sizes the batteries.
23                MEMBER SKILLMAN:         So if you went to 12 you 24 --
13 MR. HOUGH: Yes, but it was done early on.
25                (Simultaneous speaking)
14 MR. WELTER: It was done early on, yes. And 15 it's ---
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MR. HOUGH: As Kent says, you know, can see 17 here. You know, less than eight hours, it's almost an 18 equilibrium. And we know where we're at. And then we 19 said, okay, we'll give you a factor of three, give Ops 20 time to do something if they wanted to. So that was 21 22 MEMBER SKILLMAN: So if you went to 12 you 23 24 (Simultaneous speaking) 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


93 1                MEMBER SKILLMAN:           If you went to 12, you 2 conceivably have your battery capacity?
93 MEMBER SKILLMAN: If you went to 12, you 1
3                MR. HOUGH:     I think you could drop it, yes.
conceivably have your battery capacity?
4                MEMBER SKILLMAN:         Just, I mean, that's what 5 we're here to talk about.
2 MR. HOUGH: I think you could drop it, yes.
6                MR. WELTER:     Yes.
3 MEMBER SKILLMAN: Just, I mean, that's what 4
7                MEMBER SKILLMAN:           So the answer could be 8 yes.
we're here to talk about.
9                MR. HOUGH:     Yes.
5 MR. WELTER: Yes.
10                CHAIR BLEY:     Well, for this one particular 11 case.
6 MEMBER SKILLMAN: So the answer could be 7
12                MEMBER SKILLMAN: For this scenario.               Okay, 13 thank you.
yes.
14                MR. HOUGH: I think we're back to almost the 15 last of the slides here.             As I noted early on, we're 16 going to talk about the road map.
8 MR. HOUGH: Yes.
17                Late last year, there was discussion on a 18 phone call to staff in looking for, you know, some way 19 to     validate   incorporation         of     the   topical report, 20 conditions of applicability, and the five conditions 21 of the SER.
9 CHAIR BLEY: Well, for this one particular 10 case.
22                And so we received that RAI on January 29th 23 and responded on, as Paul indicated, in late March.
11 MEMBER SKILLMAN: For this scenario. Okay, 12 thank you.
24 And that's Table 839 in the latest revision there.
13 MR. HOUGH: I think we're back to almost the 14 last of the slides here. As I noted early on, we're 15 going to talk about the road map.
25 And it provides --- here's an example of that table NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 Late last year, there was discussion on a 17 phone call to staff in looking for, you know, some way 18 to validate incorporation of the topical report, 19 conditions of applicability, and the five conditions 20 of the SER.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
21 And so we received that RAI on January 29th 22 and responded on, as Paul indicated, in late March.
23 And that's Table 839 in the latest revision there.
24 And it provides --- here's an example of that table 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


94 1 right here.
94 right here.
2                I can't fill out that left-hand column, 3 because that's proprietary information.             We'd have to 4 go to a closed session and show you how to put that 5 in.       But you can see on the right, it directs the 6 reader to appropriate sections within the DCA to 7 perform the validation of the ---
1 I can't fill out that left-hand column, 2
8                CHAIR BLEY:     And by the way, we have all of 9 those things on the left from the topical report.
because that's proprietary information. We'd have to 3
10                MR. HOUGH:     That's correct, that's correct.
go to a closed session and show you how to put that 4
11 Let's see, and we did make some, you know, conforming 12 changes as a result of doing the road map.             You know, 13 for example, Reg. Guide 141 for testing, we added that 14 in so that we could include that in Chapter 14.
in. But you can see on the right, it directs the 5
15                And then places where it didn't explicitly 16 say without power, we added that verbiage in there.
reader to appropriate sections within the DCA to 6
17 So it's fairly easy to validate now.
perform the validation of the ---
18                And then, so in conclusion, the distribution 19 system is in support of the use of the topical.
7 CHAIR BLEY: And by the way, we have all of 8
20 There's no power required for any safety related 21 function, or Type A variable, or manual operator 22 action.       So everything's non-1E, our backup power 23 sources, the result is that their asset protection and 24 black start, if you want it.
those things on the left from the topical report.
25                And as I noted earlier, it's designed to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MR. HOUGH: That's correct, that's correct.
(202) 234-4433         WASHINGTON, D.C. 20005-3701     (202) 234-4433
10 Let's see, and we did make some, you know, conforming 11 changes as a result of doing the road map. You know, 12 for example, Reg. Guide 141 for testing, we added that 13 in so that we could include that in Chapter 14.
14 And then places where it didn't explicitly 15 say without power, we added that verbiage in there.
16 So it's fairly easy to validate now.
17 And then, so in conclusion, the distribution 18 system is in support of the use of the topical.
19 There's no power required for any safety related 20 function, or Type A variable, or manual operator 21 action. So everything's non-1E, our backup power 22 sources, the result is that their asset protection and 23 black start, if you want it.
24 And as I noted earlier, it's designed to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


95 1 support online maintenance and be a very flexible 2 system.       And as a consequence, it supports exemption 3 to GDC 17 and 18.
95 support online maintenance and be a very flexible 1
4                CHAIR BLEY:     I have a separate question on 5 Section 832.1.1, highly reliable, direct, current 6 power system.       Your first sentence says, "The EDSS is 7 composed of two DC distribution systems that provide 8 a continuous fault tolerant source."                     And you don't 9 define fault tolerant there.               It means lots of things 10 to lots of people in other applications.                   What do you 11 mean by fault tolerant?
system. And as a consequence, it supports exemption 2
12                MR. HOUGH:     We just mean we do the FMEA.
to GDC 17 and 18.
13                CHAIR BLEY:     Okay, ha, ha, ha, ha.
3 CHAIR BLEY: I have a separate question on 4
14                MR. HOUGH:     We're not adversely affected.
Section 832.1.1, highly reliable, direct, current 5
15                CHAIR BLEY: You think it's pretty reliable, 16 that's what you think, okay.
power system. Your first sentence says, "The EDSS is 6
17                MR. HOUGH:     Yes, sir.         Right.
composed of two DC distribution systems that provide 7
18                CHAIR BLEY:     I want to thank you for a real 19 good discussion.           And we'll get on to more of this 20 later perhaps.         Before we get there, Charlie, I had 21 one thing.
a continuous fault tolerant source." And you don't 8
22                I want to point out, you know, this is one 23 of the glitches in these design reviews when we go 24 chapter by chapter.           There's an awful lot of Chapter 25 7     that's     having     us   confused         because   of       the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
define fault tolerant there. It means lots of things 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
to lots of people in other applications. What do you 10 mean by fault tolerant?
11 MR. HOUGH: We just mean we do the FMEA.
12 CHAIR BLEY: Okay, ha, ha, ha, ha.
13 MR. HOUGH: We're not adversely affected.
14 CHAIR BLEY: You think it's pretty reliable, 15 that's what you think, okay.
16 MR. HOUGH: Yes, sir. Right.
17 CHAIR BLEY: I want to thank you for a real 18 good discussion. And we'll get on to more of this 19 later perhaps. Before we get there, Charlie, I had 20 one thing.
21 I want to point out, you know, this is one 22 of the glitches in these design reviews when we go 23 chapter by chapter. There's an awful lot of Chapter 24 7
that's having us confused because of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


96 1 interactions among these things.                     And we'll hit that 2 more and more.         So we'll try to keep track of that and 3 look for things.           Charlie?
96 interactions among these things. And we'll hit that 1
4                MEMBER BROWN:         My question relates to that 5 little bit of what Dennis said before earlier that we 6 haven't done Chapter 7, and there is some flow back 7 and forth. But with all the energized type stuff, you 8 know, go to the fail safe position, as well as other 9 systems that are not necessarily safety related, has 10 there       been   a   consideration           of     evaluating     "I'm 11 operating normally?"
more and more. So we'll try to keep track of that and 2
12                And you had inadvertent actuation of various 13 parts of the plant.             And where is the description of 14 that?       I pawed through this thing, the Chapter 8, and 15 tried to go through Chapter 7.                   I don't know whether 16 --- I haven't done a complete thing on Chapter 7.
look for things. Charlie?
17 That was just what I call skating.                     I mean, there's a 18 number of other components that get power.
3 MEMBER BROWN: My question relates to that 4
19                The other question was the energizing of 20 electric plant components.               I was trying to find out 21 how that gets executed.                   I couldn't find direct 22 reference in Chapter 7 to control systems that actuate 23 breakers, et cetera, other stuff that may have some 24 impact.
little bit of what Dennis said before earlier that we 5
25                As I go through the plant networks, does it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
haven't done Chapter 7, and there is some flow back 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
and forth. But with all the energized type stuff, you 7
know, go to the fail safe position, as well as other 8
systems that are not necessarily safety related, has 9
there been a consideration of evaluating "I'm 10 operating normally?"
11 And you had inadvertent actuation of various 12 parts of the plant. And where is the description of 13 that? I pawed through this thing, the Chapter 8, and 14 tried to go through Chapter 7. I don't know whether 15
--- I haven't done a complete thing on Chapter 7.
16 That was just what I call skating. I mean, there's a 17 number of other components that get power.
18 The other question was the energizing of 19 electric plant components. I was trying to find out 20 how that gets executed. I couldn't find direct 21 reference in Chapter 7 to control systems that actuate 22 breakers, et cetera, other stuff that may have some 23 impact.
24 As I go through the plant networks, does it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


97 1 have a separate --- are they analoged, the old style 2 where you just turn a switch, and a relay opens 3 someplace, or a contacter, or what?                 There was no 4 description of how, at least that I found in that 5 cursory look.
97 have a separate --- are they analoged, the old style 1
6                So that's the question I'll probably be 7 addressing.       I don't expect an answer now.         It's just 8 something that's going to be on the table when we get 9 to Chapter 7.
where you just turn a switch, and a relay opens 2
10                CHAIR BLEY:     I had the same thing.
someplace, or a contacter, or what? There was no 3
11                MEMBER BROWN:       Okay.
description of how, at least that I found in that 4
12                CHAIR BLEY:         Well, I don't know if it 13 belongs there or here on some of this, but ---
cursory look.
14                MEMBER BROWN: It's too late here right now.
5 So that's the question I'll probably be 6
15                (Simultaneous speaking) 16                MEMBER BROWN: Yes. Because they're kind of 17 unrelated since they're not I&C type systems.               But do 18 you use main control room stuff through a computing 19 system, the teachable, or whatever you want to call 20 it, if somebody grabbed control of it, could you 21 initiate selected component actuations that would ---
addressing. I don't expect an answer now. It's just 7
22                MR. WELTER:     Yes.
something that's going to be on the table when we get 8
23                CHAIR BLEY:         I don't think you need to 24 answer this --
to Chapter 7.
25                MEMBER BROWN: I don't want him to answer it NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 CHAIR BLEY: I had the same thing.
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
10 MEMBER BROWN: Okay.
11 CHAIR BLEY: Well, I don't know if it 12 belongs there or here on some of this, but ---
13 MEMBER BROWN: It's too late here right now.
14 (Simultaneous speaking) 15 MEMBER BROWN: Yes. Because they're kind of 16 unrelated since they're not I&C type systems. But do 17 you use main control room stuff through a computing 18 system, the teachable, or whatever you want to call 19 it, if somebody grabbed control of it, could you 20 initiate selected component actuations that would ---
21 MR. WELTER: Yes.
22 CHAIR BLEY: I don't think you need to 23 answer this --
24 MEMBER BROWN: I don't want him to answer it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


98 1 right now.       It's just on the table.             That's all.
98 right now. It's just on the table. That's all.
2                MR. WELTER:     I think you'll see it later.
1 MR. WELTER: I think you'll see it later.
3                CHAIR BLEY:     Tom, you had something?
2 CHAIR BLEY: Tom, you had something?
4                MR. BERGMAN:         Just to clarify, so yes.
3 MR. BERGMAN: Just to clarify, so yes.
5 Chapter 7, Revision 1 does have changes in response to 6 RAIs in it.       That would be the appropriate version to 7 read.
4 Chapter 7, Revision 1 does have changes in response to 5
8                And then Rev. 0 of Chapter 8 has been 9 corrected. Rev. I, there is no flex connection. That 10 was part of our ELAP analysis.                   So there is no flex 11 connection in Rev. 1.
RAIs in it. That would be the appropriate version to 6
12                CHAIR BLEY:       Is that the only substantive 13 change?
read.
14                MR. BERGMAN: Well, no. Rev. 1 captured all 15 the staffs' RAIs that we had ready up to that point.
7 And then Rev. 0 of Chapter 8 has been 8
16                CHAIR BLEY: Oh, okay. So we got that stuff 17 as responses to the RAIs.             It's now in my ---
corrected. Rev. I, there is no flex connection. That 9
18                MR. BERGMAN:         But the large open item in 19 Chapter 8, there's an RAI subsequent to the staffs' 20 issuance of that.         It was kind of in parallel, but it 21 was already damaged in review that closes most of 22 that.
was part of our ELAP analysis. So there is no flex 10 connection in Rev. 1.
23                CHAIR BLEY:       Okay.     On the large RAI that 24 we're going to hear more from the staff about, are 25 discussions continuing on that?                   Are you comfortable NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 CHAIR BLEY: Is that the only substantive 12 change?
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
13 MR. BERGMAN: Well, no. Rev. 1 captured all 14 the staffs' RAIs that we had ready up to that point.
15 CHAIR BLEY: Oh, okay. So we got that stuff 16 as responses to the RAIs. It's now in my ---
17 MR. BERGMAN: But the large open item in 18 Chapter 8, there's an RAI subsequent to the staffs' 19 issuance of that. It was kind of in parallel, but it 20 was already damaged in review that closes most of 21 that.
22 CHAIR BLEY: Okay. On the large RAI that 23 we're going to hear more from the staff about, are 24 discussions continuing on that? Are you comfortable 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


99 1 with where that's headed, or do you have anything you 2 want to say about that before we hear from the staff?
99 with where that's headed, or do you have anything you 1
3                MR. HOUGH:     I just read a lot in developing 4 that table in here --
want to say about that before we hear from the staff?
5                CHAIR BLEY:       Okay.     Fair enough.     At this 6 time, we're going to recess for a break.                   We'll come 7 back at 25 minutes until 11:00.                   We're going to lose 8 three people at noon for an internal meeting. It'd be 9 nice to finish by noon, but if we don't, we can go 10 over a little bit.           We'll recess right now until 25 11 until.
2 MR. HOUGH: I just read a lot in developing 3
12                (Whereupon, the above-entitled matter 13 went off the record at 10:16 a.m. and resumed at 14 10:34 a.m.)
that table in here --
15                CHAIR BLEY: We are back in session. We look 16 forward to hearing from the staff.                   And I sincerely 17 hope you're able to go beyond what you gave us in 18 slides today.       Omid, I'll turn it over to you.
4 CHAIR BLEY: Okay. Fair enough. At this 5
19                MR. TABATABAI: Okay.               Yes, good morning, 20 everyone. Thank you very much for the opportunity for 21 the staff to present their Safety Evaluation Report 22 with open items with respect to Chapter 8, Electric 23 Power of the NuScale Design Certification Application.
time, we're going to recess for a break. We'll come 6
24                Today, I just want to make sure that we 25 understand, the Chapter 8 that NuScale has presented NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
back at 25 minutes until 11:00. We're going to lose 7
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
three people at noon for an internal meeting. It'd be 8
nice to finish by noon, but if we don't, we can go 9
over a little bit. We'll recess right now until 25 10 until.
11 (Whereupon, the above-entitled matter 12 went off the record at 10:16 a.m. and resumed at 13 10:34 a.m.)
14 CHAIR BLEY: We are back in session. We look 15 forward to hearing from the staff. And I sincerely 16 hope you're able to go beyond what you gave us in 17 slides today. Omid, I'll turn it over to you.
18 MR. TABATABAI: Okay. Yes, good morning, 19 everyone. Thank you very much for the opportunity for 20 the staff to present their Safety Evaluation Report 21 with open items with respect to Chapter 8, Electric 22 Power of the NuScale Design Certification Application.
23 Today, I just want to make sure that we 24 understand, the Chapter 8 that NuScale has presented 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


100 1 to us is not the ordinary ones that we have seen in 2 the past.         That's why we have involvement from many 3 other branches, expertise to a new Chapter 8.
100 to us is not the ordinary ones that we have seen in 1
4                It's   not     quite     standalone.           We     have 5 reviewers, support from Instrumentation and Control, 6 Containment,         Ventilation,         Mechanical         Engineering, 7 Reactor       Systems,     and   Plan     Systems,       and   PRA,       who 8 contributed to this review.
the past. That's why we have involvement from many 2
9                I'm Omid Tabatabai, I'm the Chapter PM for 10 Chapter 8.         Lead Project Manager for NuScale Design 11 Certification is Greg Cranston.                       I just wanted to 12 recognize         these     colleagues         of     mine   who       have 13 significantly contributed to this review.                     And by the 14 way, they are available, they are in the audience, in 15 case there are questions in those areas, they should 16 be able to support us.
other branches, expertise to a new Chapter 8.
17                Just   want     to,   before       we get   into       the 18 technical presentation of Chapter 8, just as a matter 19 of background, NuScale Power submitted its Rev. 0 of 20 Design Certification Application back in December of 21 2016.
3 It's not quite standalone. We have 4
22                And then, they submitted a Revision 1 in 23 mid-March 2018.           And they're currently working on 24 preparing Revision 2, which includes all of the back 25 and forth RAIs, followup RAIs, and other requests from NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
reviewers, support from Instrumentation and Control, 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
Containment, Ventilation, Mechanical Engineering, 6
Reactor Systems, and Plan Systems, and PRA, who 7
contributed to this review.
8 I'm Omid Tabatabai, I'm the Chapter PM for 9
Chapter 8. Lead Project Manager for NuScale Design 10 Certification is Greg Cranston. I just wanted to 11 recognize these colleagues of mine who have 12 significantly contributed to this review. And by the 13 way, they are available, they are in the audience, in 14 case there are questions in those areas, they should 15 be able to support us.
16 Just want to, before we get into the 17 technical presentation of Chapter 8, just as a matter 18 of background, NuScale Power submitted its Rev. 0 of 19 Design Certification Application back in December of 20 2016.
21 And then, they submitted a Revision 1 in 22 mid-March 2018. And they're currently working on 23 preparing Revision 2, which includes all of the back 24 and forth RAIs, followup RAIs, and other requests from 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


101 1 the staff to incorporate into the Design Certification 2 Application.
101 the staff to incorporate into the Design Certification 1
3                This SER that the staff has prepared is 4 based on Revision 0.           I just want to make sure that, 5 although we have more up-to-date information, but the 6 SER does not reflect that, because of the timing, as 7 was mentioned earlier.
Application.
8                Again --
2 This SER that the staff has prepared is 3
9                MEMBER CORRADINI: So, just to be clear, so 10 this is Revision 0 that we're going to see the review 11 of.
based on Revision 0. I just want to make sure that, 4
12                MR. TABATABAI: Yes.
although we have more up-to-date information, but the 5
13                MEMBER   CORRADINI:         And     Revision 1   is     in 14 preparation?
SER does not reflect that, because of the timing, as 6
15                MR. TABATABAI: Revision 2.             Revision 1 has 16 --
was mentioned earlier.
17                MEMBER CORRADINI: Revision 2?
7 Again --
18                MR. TABATABAI: Yes.
8 MEMBER CORRADINI: So, just to be clear, so 9
19                MEMBER CORRADINI: But if I go to the NRC 20 website for it, all that's there is Revision 0.
this is Revision 0 that we're going to see the review 10 of.
21                MR. TABATABAI: The whole application?
11 MR. TABATABAI: Yes.
22                MEMBER CORRADINI: Yes.
12 MEMBER CORRADINI: And Revision 1 is in 13 preparation?
23                CHAIR BLEY: The public website.
14 MR. TABATABAI: Revision 2. Revision 1 has 15 16 MEMBER CORRADINI: Revision 2?
24                MEMBER CORRADINI: The public website.
17 MR. TABATABAI: Yes.
25                MR. TABATABAI:         It     should   be actually NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MEMBER CORRADINI: But if I go to the NRC 19 website for it, all that's there is Revision 0.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
20 MR. TABATABAI: The whole application?
21 MEMBER CORRADINI: Yes.
22 CHAIR BLEY: The public website.
23 MEMBER CORRADINI: The public website.
24 MR. TABATABAI: It should be actually 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


102 1 Revision 1, we have --
102 Revision 1, we have --
2                MEMBER CORRADINI: Really?             Okay.
1 MEMBER CORRADINI: Really? Okay.
3                MR. TABATABAI: We have --
2 MR. TABATABAI: We have --
4                MR. SNODDERLY: As of yesterday, it still 5 wasn't up yet.
3 MR. SNODDERLY: As of yesterday, it still 4
6                MR. TABATABAI: Okay.
wasn't up yet.
7                MR. SNODDERLY: We can make that -- hopefully 8 you guys will get to it.
5 MR. TABATABAI: Okay.
9                MR. TABATABAI: I know my project management 10 colleagues, they were working on clearing it for 11 posting it on the website --
6 MR. SNODDERLY: We can make that -- hopefully 7
12                MR. SNODDERLY: All right, great.
you guys will get to it.
13                MEMBER CORRADINI: That's the reason I asked, 14 is that's --
8 MR. TABATABAI: I know my project management 9
15                MR. TABATABAI: Right.
colleagues, they were working on clearing it for 10 posting it on the website --
16                MEMBER CORRADINI: -- where I go to check 17 what's publicly available.               But that's fine, thank 18 you.
11 MR. SNODDERLY: All right, great.
19                CHAIR BLEY: So, since we've interrupted you 20 here for a second, I'm going to state something I 21 think I noticed here.           And whoever is doing Chapter 22 8.1 can address this, or you might want to, Omid.
12 MEMBER CORRADINI: That's the reason I asked, 13 is that's --
23                When I read Section 8.1 and go through all 24 of the comments through the GDCs and through the other 25 NRC documents and SECYs, it seems there's an awful lot NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
14 MR. TABATABAI: Right.
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
15 MEMBER CORRADINI: -- where I go to check 16 what's publicly available. But that's fine, thank 17 you.
18 CHAIR BLEY: So, since we've interrupted you 19 here for a second, I'm going to state something I 20 think I noticed here. And whoever is doing Chapter 21 8.1 can address this, or you might want to, Omid.
22 When I read Section 8.1 and go through all 23 of the comments through the GDCs and through the other 24 NRC documents and SECYs, it seems there's an awful lot 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


103 1 of things that remain -- I don't think they have an 2 open item number attached to them, but you say you're 3 still evaluating exemptions to GDCs 17, 18, 33, 34, 4 35, 38, 41, and 44.
103 of things that remain -- I don't think they have an 1
5                Those don't -- well, two of them are part of 6 the giant open item. The rest don't seem to have open 7 items, but it's still ongoing work --
open item number attached to them, but you say you're 2
8                MR. TABATABAI: Right.
still evaluating exemptions to GDCs 17, 18, 33, 34, 3
9                CHAIR BLEY: -- that you're --
35, 38, 41, and 44.
10                MR. TABATABAI: That's correct.
4 Those don't -- well, two of them are part of 5
11                CHAIR BLEY: -- involved in.             Okay.
the giant open item. The rest don't seem to have open 6
12                MR. TABATABAI: That's correct.
items, but it's still ongoing work --
13                CHAIR BLEY: So, those are not finished yet?
7 MR. TABATABAI: Right.
14 There's an awful lot in 8.1 that's --
8 CHAIR BLEY: -- that you're --
15                MR. TABATABAI: That's correct.
9 MR. TABATABAI: That's correct.
16                CHAIR BLEY: -- still in process?
10 CHAIR BLEY: -- involved in. Okay.
17                MR. TABATABAI: Right.             I think during the 18 presentation, it was mentioned that the RAI question 19 that we sent for the Topical Report that how NuScale 20 is basically incorporating information in the ECA, 21 that RAI, evaluation of that RAI response is still 22 ongoing, which feeds into those GDCs.
11 MR. TABATABAI: That's correct.
23                CHAIR BLEY: Okay.
12 CHAIR BLEY: So, those are not finished yet?
24                MS. RAY: This is Sheila Ray.             If I may add 25 to Omid's response, 8.1 is really meant to be an NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 There's an awful lot in 8.1 that's --
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MR. TABATABAI: That's correct.
15 CHAIR BLEY: -- still in process?
16 MR. TABATABAI: Right. I think during the 17 presentation, it was mentioned that the RAI question 18 that we sent for the Topical Report that how NuScale 19 is basically incorporating information in the ECA, 20 that RAI, evaluation of that RAI response is still 21 ongoing, which feeds into those GDCs.
22 CHAIR BLEY: Okay.
23 MS. RAY: This is Sheila Ray. If I may add 24 to Omid's response, 8.1 is really meant to be an 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


104 1 introduction       and   an   overview,         and   it should       be 2 pointing to other sections in Chapter 8 where we do 3 make technical evaluations.               But, yes, those GDCs are 4 still open and still under review.
104 introduction and an overview, and it should be 1
5                CHAIR BLEY: Okay. And they could have RAIs, 6 but they don't as yet?             Separate ones?
pointing to other sections in Chapter 8 where we do 2
7                MS. RAY: Correct.
make technical evaluations. But, yes, those GDCs are 3
8                CHAIR BLEY: Okay.
still open and still under review.
9                MR. TABATABAI:         For       the   Chapter         8, 10 specifically, we have issued ten RAIs, which contain 11 about 25 questions.           And NuScale has responded to all 12 of the questions.
4 CHAIR BLEY: Okay. And they could have RAIs, 5
13                This SER has two open items and one big, as 14 you mentioned, and the other one relates to the 15 electrical       penetration       assemblies.           And we     will 16 address all of the confirmatory items and open items 17 during the Phase 4 of our review.
but they don't as yet? Separate ones?
18                So, this was my introduction to this, before 19 we     get   into   the     technical         substance     of     this 20 presentation.         With that, I would like to ask my 21 colleague, Sheila Ray, to continue.
6 MS. RAY: Correct.
22                MS. RAY: Thank you.           As Omid mentioned, my 23 name is Sheila Ray. I am the Reviewer for 8.1, 8.3-2, 24 and I will be presenting for 8.4, my colleague Fanta 25 Sacko is on business travel, so I will be presenting NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 CHAIR BLEY: Okay.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 MR.
TABATABAI:
For the Chapter 8,
9 specifically, we have issued ten RAIs, which contain 10 about 25 questions. And NuScale has responded to all 11 of the questions.
12 This SER has two open items and one big, as 13 you mentioned, and the other one relates to the 14 electrical penetration assemblies. And we will 15 address all of the confirmatory items and open items 16 during the Phase 4 of our review.
17 So, this was my introduction to this, before 18 we get into the technical substance of this 19 presentation. With that, I would like to ask my 20 colleague, Sheila Ray, to continue.
21 MS. RAY: Thank you. As Omid mentioned, my 22 name is Sheila Ray. I am the Reviewer for 8.1, 8.3-2, 23 and I will be presenting for 8.4, my colleague Fanta 24 Sacko is on business travel, so I will be presenting 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


105 1 on her behalf.         So, thank you.
105 on her behalf. So, thank you.
2                Section   8.1   is     the     introduction.           The 3 electric       power   system     for     the     NuScale   design       is 4 comprised       of nonsafety-related             AC   and nonsafety-5 related DC power systems.             The design does not depend 6 on onsite or offsite AC or DC electrical power system, 7 including that from the transmission grid for safe 8 operation.
1 Section 8.1 is the introduction. The 2
9                The NuScale design with non-reliance on 10 electrical power accommodates a site location where 11 offsite       transmission       grid       is     not   necessarily 12 available. As NuScale mentioned, the normal source of 13 power is one or more of the 12 operating power module 14 main generators.
electric power system for the NuScale design is 3
15                The staff     reviewed         the   design   of     the 16 electric power systems necessary for the safe design 17 and operation of the plant or whose failure might 18 adversely       affect     their     safety-related         or     risk-19 significant safety functions.
comprised of nonsafety-related AC and nonsafety-4 related DC power systems. The design does not depend 5
20                The staff used the DSRS and SRP, as well as 21 the graded review approach for its review.
on onsite or offsite AC or DC electrical power system, 6
22                MEMBER   MARCH-LEUBA:         Go     back to   --     stay 23 there.         That's   an     interesting         concept   that     they 24 wouldn't be -- that the plant would be sited in a 25 place where there would be a permanent loss of offsite NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
including that from the transmission grid for safe 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
operation.
8 The NuScale design with non-reliance on 9
electrical power accommodates a site location where 10 offsite transmission grid is not necessarily 11 available. As NuScale mentioned, the normal source of 12 power is one or more of the 12 operating power module 13 main generators.
14 The staff reviewed the design of the 15 electric power systems necessary for the safe design 16 and operation of the plant or whose failure might 17 adversely affect their safety-related or risk-18 significant safety functions.
19 The staff used the DSRS and SRP, as well as 20 the graded review approach for its review.
21 MEMBER MARCH-LEUBA: Go back to -- stay 22 there. That's an interesting concept that they 23 wouldn't be -- that the plant would be sited in a 24 place where there would be a permanent loss of offsite 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


106 1 power.         Is that what we're considering?
106 power. Is that what we're considering?
2                  MS. RAY: I would not say it's a permanent 3 loss of offsite power, they may not be connected to 4 the bulk power system.
1 MS. RAY: I would not say it's a permanent 2
5                  MEMBER MARCH-LEUBA: So, there will be a 6 complete loss of offsite power and they will have 7 their own --
loss of offsite power, they may not be connected to 3
8                  CHAIR BLEY: They won't have any offsite 9 power.
the bulk power system.
10                  MEMBER   MARCH-LEUBA:         It's   an interesting 11 concept.         We need to consider the implications of 12 that, because you can make into an extended period of 13 problems, if you have a common cause failure between 14 the modules.
4 MEMBER MARCH-LEUBA: So, there will be a 5
15                  MS. RAY: I understand your point.
complete loss of offsite power and they will have 6
16                  MEMBER MARCH-LEUBA: Yes.               So, we need to 17 consider that for the review.
their own --
18                  MS. RAY: At this time, since it's nonsafety-19 related power, and that is really where --
7 CHAIR BLEY: They won't have any offsite 8
20                  MEMBER MARCH-LEUBA: Okay.
power.
21                  MS. RAY: -- we'll transition perfectly to my 22 next slide.         This is where the open item comes in.
9 MEMBER MARCH-LEUBA: It's an interesting 10 concept. We need to consider the implications of 11 that, because you can make into an extended period of 12 problems, if you have a common cause failure between 13 the modules.
23 The major open item, Open Item 8.3-1, is recurring 24 throughout         Chapter     8   in   that     this open item       is 25 referenced in all of the sections: Section 8.2 for NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
14 MS. RAY: I understand your point.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
15 MEMBER MARCH-LEUBA: Yes. So, we need to 16 consider that for the review.
17 MS. RAY: At this time, since it's nonsafety-18 related power, and that is really where --
19 MEMBER MARCH-LEUBA: Okay.
20 MS. RAY: -- we'll transition perfectly to my 21 next slide. This is where the open item comes in.
22 The major open item, Open Item 8.3-1, is recurring 23 throughout Chapter 8 in that this open item is 24 referenced in all of the sections: Section 8.2 for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


107 1 offsite power systems, 8.3.1 for onsite AC systems, 2 8.3-2 for onsite DC systems, as well as 8.4 for 3 station blackout.
107 offsite power systems, 8.3.1 for onsite AC systems, 1
4                MEMBER SKILLMAN: Sheila, as you begin, is 5 this the totality, the exact wording of Open Item 8.3-6 1 or is this a Cliffs notes version of 8.3-1?
8.3-2 for onsite DC systems, as well as 8.4 for 2
7                MS. RAY: It would be essentially the Cliffs 8 notes version.
station blackout.
9                MEMBER SKILLMAN: Okay.
3 MEMBER SKILLMAN: Sheila, as you begin, is 4
10                MS. RAY: However, in the SER, we do refer to 11 a specific RAI, and that is RAI 9359.
this the totality, the exact wording of Open Item 8.3-5 1 or is this a Cliffs notes version of 8.3-1?
12                MEMBER SKILLMAN: No, I go it.             Okay, thank 13 you, Sheila.       Thank you.
6 MS. RAY: It would be essentially the Cliffs 7
14                MS. RAY:     You're     welcome.       So,     this 15 particular open item is repeated in each section of 16 Chapter 8.       And I will discuss the details of this 17 open item up-front, so many of the details will not be 18 repeated later on in the continuous sections.
notes version.
19                As previously stated, the NuScale design 20 does       not rely   on   safety-related           AC or DC   power 21 systems. A Topical Report was submitted on the safety 22 classification of passive nuclear power plant electric 23 systems and the staff approved the Topical Report with 24 five additional conditions.
8 MEMBER SKILLMAN: Okay.
25                The open item relates to the exemptions to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 MS. RAY: However, in the SER, we do refer to 10 a specific RAI, and that is RAI 9359.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
11 MEMBER SKILLMAN: No, I go it. Okay, thank 12 you, Sheila. Thank you.
13 MS.
RAY:
You're welcome.
So, this 14 particular open item is repeated in each section of 15 Chapter 8. And I will discuss the details of this 16 open item up-front, so many of the details will not be 17 repeated later on in the continuous sections.
18 As previously stated, the NuScale design 19 does not rely on safety-related AC or DC power 20 systems. A Topical Report was submitted on the safety 21 classification of passive nuclear power plant electric 22 systems and the staff approved the Topical Report with 23 five additional conditions.
24 The open item relates to the exemptions to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


108 1 GDC 17 and 18, as described in DCA Part 7, regarding 2 the staff verifying that the design does not require 3 safety-related power.           In addition, the Chapter 15 4 review on accident analyses is still ongoing.
108 GDC 17 and 18, as described in DCA Part 7, regarding 1
5                Staff   issued     an   RAI     regarding   how     the 6 NuScale       design       meets       these       conditions         of 7 applicability.
the staff verifying that the design does not require 2
8                CHAIR BLEY: There are parts of your review 9 of Chapter 8 that cannot complete until the Chapter 15 10 is done, because it's essentially referred to here in 11 Chapter 8?
safety-related power. In addition, the Chapter 15 3
12                MS. RAY: Correct. And it's not just Chapter 13 15, we have been talking to our friends in Chapter 7 14 review, PRA, Chapter 6.             So, there's a lot of review 15 that will feed into the conclusion of our chapter.
review on accident analyses is still ongoing.
16                MEMBER   MARCH-LEUBA:           Going   back   to     my 17 previous       comment,     if   you     don't     have any     grid 18 whatsoever, how do you start the first modules?
4 Staff issued an RAI regarding how the 5
19                MS. RAY: If you remember, NuScale mentioned 20 the backup diesel generators and the AAPS are black-21 start capabilities.
NuScale design meets these conditions of 6
22                MEMBER     MARCH-LEUBA:           Okay.     You       are 23 considering that, right?
applicability.
24                MS. RAY: So, what I -- I think you will get 25 a flavor from our review that many of these things are NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 CHAIR BLEY: There are parts of your review 8
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
of Chapter 8 that cannot complete until the Chapter 15 9
is done, because it's essentially referred to here in 10 Chapter 8?
11 MS. RAY: Correct. And it's not just Chapter 12 15, we have been talking to our friends in Chapter 7 13 review, PRA, Chapter 6. So, there's a lot of review 14 that will feed into the conclusion of our chapter.
15 MEMBER MARCH-LEUBA: Going back to my 16 previous comment, if you don't have any grid 17 whatsoever, how do you start the first modules?
18 MS. RAY: If you remember, NuScale mentioned 19 the backup diesel generators and the AAPS are black-20 start capabilities.
21 MEMBER MARCH-LEUBA:
Okay.
You are 22 considering that, right?
23 MS. RAY: So, what I -- I think you will get 24 a flavor from our review that many of these things are 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


109 1 still non-safety.           As of right now, we still have the 2 open items, so we're not concluding that they should 3 be non-safety or safety-related.                       So, our review is 4 essentially not fully complete yet, because of this 5 major open item.
109 still non-safety. As of right now, we still have the 1
6                MEMBER CORRADINI: What -- then let me ask 7 the question.       I guess I took the open item to be that 8 NuScale       has   yet   to   document         how   it   meets     the 9 limitations and conditions from the Topical Report --
open items, so we're not concluding that they should 2
10                MS. RAY: They have --
be non-safety or safety-related. So, our review is 3
11                MEMBER CORRADINI: -- but it's more than 12 that?
essentially not fully complete yet, because of this 4
13                MS. RAY: So, they have provided a response.
major open item.
14 The staff is still evaluating that response.
5 MEMBER CORRADINI: What -- then let me ask 6
15                MEMBER CORRADINI: Do -- probably, we have it 16 and I don't remember seeing it.
the question. I guess I took the open item to be that 7
17                CHAIR BLEY: We got the response.
NuScale has yet to document how it meets the 8
18                MEMBER   CORRADINI:         We     got   the response?
limitations and conditions from the Topical Report --
19 Okay.       So, go ahead, I didn't mean to interrupt.
9 MS. RAY: They have --
20                MS. RAY: No problem.             So, the responses to 21 RAI     9359,   staff   is   still     evaluating.         And     that 22 includes not just Chapter 8 reviewers, that includes 23 Chapter 15, 6, a lot of the other reviewers.                             And 24 we'll be evaluating it in Phase 4 of our review.                         So, 25 staff has issued the RAI and now, we are currently NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER CORRADINI: -- but it's more than 11 that?
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
12 MS. RAY: So, they have provided a response.
13 The staff is still evaluating that response.
14 MEMBER CORRADINI: Do -- probably, we have it 15 and I don't remember seeing it.
16 CHAIR BLEY: We got the response.
17 MEMBER CORRADINI: We got the response?
18 Okay. So, go ahead, I didn't mean to interrupt.
19 MS. RAY: No problem. So, the responses to 20 RAI 9359, staff is still evaluating. And that 21 includes not just Chapter 8 reviewers, that includes 22 Chapter 15, 6, a lot of the other reviewers. And 23 we'll be evaluating it in Phase 4 of our review. So, 24 staff has issued the RAI and now, we are currently 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


110 1 evaluating the response.
110 evaluating the response.
2                  And now, I will --
1 And now, I will --
3                  MEMBER CORRADINI: Well, I don't even --
2 MEMBER CORRADINI: Well, I don't even --
4                  MS. RAY: Yes?
3 MS. RAY: Yes?
5                  MEMBER CORRADINI: -- know how to ask my next 6 question, but I'm --
4 MEMBER CORRADINI: -- know how to ask my next 5
7                  MS. RAY: Sure.
question, but I'm --
8                  MEMBER     CORRADINI:           --    struggling         to 9 understand this interconnection, because is it the 10 passive         nature   of     the     plant       that   makes     this 11 interconnection more complex than a typical active 12 plant?         I would think there still -- or is it the fact 13 that they're claiming that there's no need for Class 14 1E power?
6 MS. RAY: Sure.
15                  MS. RAY: It is -- correct. It's the second.
7 MEMBER CORRADINI:
16 It's, do they need safety-related power?                       In order to 17 determine if they need safety-related power, we need 18 to look at how they're safely shutting down and doing 19 accident mitigation.               Do they need power for those 20 functions and does it have to be safety-related power?
struggling to 8
21                  MEMBER CORRADINI: So, then, let me ask --
understand this interconnection, because is it the 9
22 oh, okay. All right. I guess my obvious question is, 23 why     are     we   looking     at   this     at   all right     now, 24 considering that everything else has to be considered 25 before we look at this?
passive nature of the plant that makes this 10 interconnection more complex than a typical active 11 plant? I would think there still -- or is it the fact 12 that they're claiming that there's no need for Class 13 1E power?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
14 MS. RAY: It is -- correct. It's the second.
(202) 234-4433             WASHINGTON, D.C. 20005-3701           (202) 234-4433
15 It's, do they need safety-related power? In order to 16 determine if they need safety-related power, we need 17 to look at how they're safely shutting down and doing 18 accident mitigation. Do they need power for those 19 functions and does it have to be safety-related power?
20 MEMBER CORRADINI: So, then, let me ask --
21 oh, okay. All right. I guess my obvious question is, 22 why are we looking at this at all right now, 23 considering that everything else has to be considered 24 before we look at this?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


111 1                MS. RAY: Does that --
111 MS. RAY: Does that --
2                MEMBER CORRADINI: Sorry to ask the question 3 --
1 MEMBER CORRADINI: Sorry to ask the question 2
4                MS. RAY: No, it's a great --
3 MS. RAY: No, it's a great --
5                MEMBER CORRADINI: -- but I'm struggling.
4 MEMBER CORRADINI: -- but I'm struggling.
6                MS. RAY: -- question.             Honestly, the staff 7 asked the same question.             It's a scheduling issue.
5 MS. RAY: -- question. Honestly, the staff 6
8                MEMBER CORRADINI: Okay.               So, then, in my 9 role as Chairman, I will say, don't be surprised when 10 we upset your apple cart schedule, because although 11 this is first, somehow in my mind, it's at the end, 12 because everything feeds into it 13                MS. RAY: I would agree with your assessment.
asked the same question. It's a scheduling issue.
14                MEMBER CORRADINI: Okay, fine.
7 MEMBER CORRADINI: Okay. So, then, in my 8
15                CHAIR BLEY: So, along that line, do we have 16 a -- do you have a likely point in the overall 17 schedule when Chapter 8 will be complete?
role as Chairman, I will say, don't be surprised when 9
18                MS. RAY: So, we're currently working on our 19 Phase 4 review, and I will leave it to Omid to discuss 20 the schedule date of our Phase 4 review.
we upset your apple cart schedule, because although 10 this is first, somehow in my mind, it's at the end, 11 because everything feeds into it 12 MS. RAY: I would agree with your assessment.
21                CHAIR BLEY: In your talk, are you going to 22 address at all any of the responses from NuScale with 23 regard to the big open item, 3-1?
13 MEMBER CORRADINI: Okay, fine.
24                MS. RAY: I cannot.               The staff is still 25 evaluating the response.
14 CHAIR BLEY: So, along that line, do we have 15 a -- do you have a likely point in the overall 16 schedule when Chapter 8 will be complete?
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
17 MS. RAY: So, we're currently working on our 18 Phase 4 review, and I will leave it to Omid to discuss 19 the schedule date of our Phase 4 review.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
20 CHAIR BLEY: In your talk, are you going to 21 address at all any of the responses from NuScale with 22 regard to the big open item, 3-1?
23 MS. RAY: I cannot. The staff is still 24 evaluating the response.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


112 1                CHAIR BLEY: Okay.         So, it's wide open?
112 CHAIR BLEY: Okay. So, it's wide open?
2                MS. RAY: It is.
1 MS. RAY: It is.
3                MEMBER BROWN: On other, just to make sure, 4 the Topical Report is still Rev. 1 of 16497?
2 MEMBER BROWN: On other, just to make sure, 3
5                MS. RAY: I believe so. Yes, that's correct.
the Topical Report is still Rev. 1 of 16497?
6                MEMBER BROWN: Okay.           And that's in the RAI 7 that       you,   I think     you   referenced,       if I   did     it 8 correctly, if I can find the right place here, I lost 9 it.       There was a RAI, something -- what was --
4 MS. RAY: I believe so. Yes, that's correct.
10                MS. RAY: 9359?
5 MEMBER BROWN: Okay. And that's in the RAI 6
11                MEMBER BROWN: 9359, yes, I think -- is that 12 the one we got part of the package, Mike?
that you, I think you referenced, if I did it 7
13                MR. SNODDERLY: Yes.             But let's make sure 14 we're all on the same page right now. So, the Topical 15 Report, I believe was issued as Rev. 1.                   And an SE has 16 been issued by you guys approving that Topical, with 17 a set of limitations and conditions.
correctly, if I can find the right place here, I lost 8
18                MS. RAY: Correct.
it. There was a RAI, something -- what was --
19                MR. SNODDERLY:         Those       limitations       and 20 conditions are scheduled to be addressed within the 21 Safety Evaluation for Chapter 8. Which, right now, is 22 -- the Safety Evaluation is on Rev. 0, but you're 23 aware of Rev. 1 and they are working on Rev. 2, which 24 -- I'm sorry, yes, okay.
9 MS. RAY: 9359?
25                MS. RAY:     Let's     --   you're     right   on     the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER BROWN: 9359, yes, I think -- is that 11 the one we got part of the package, Mike?
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
12 MR. SNODDERLY: Yes. But let's make sure 13 we're all on the same page right now. So, the Topical 14 Report, I believe was issued as Rev. 1. And an SE has 15 been issued by you guys approving that Topical, with 16 a set of limitations and conditions.
17 MS. RAY: Correct.
18 MR.
SNODDERLY:
Those limitations and 19 conditions are scheduled to be addressed within the 20 Safety Evaluation for Chapter 8. Which, right now, is 21
-- the Safety Evaluation is on Rev. 0, but you're 22 aware of Rev. 1 and they are working on Rev. 2, which 23
-- I'm sorry, yes, okay.
24 MS. RAY: Let's -- you're right on the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


113 1 Topical Report is Rev. 1.               We evaluated DCA Rev. 0.
113 Topical Report is Rev. 1. We evaluated DCA Rev. 0.
2 In Phase 4, we'll evaluate DCA Rev. 1, as well as the 3 RAI response to the Topical.
1 In Phase 4, we'll evaluate DCA Rev. 1, as well as the 2
4                MR. SNODDERLY: Okay.
RAI response to the Topical.
5                CHAIR BLEY: Okay.           And let me ask you one 6 more question about these Revs.                     When we got the 7 NuScale response to the big RAI, all of the pages are 8 labeled Rev. 2, which is okay, I managed to put them 9 where they belong within the Rev. 0 version of Chapter 10 8.
3 MR. SNODDERLY: Okay.
11                My question is, and maybe you don't know the 12 answer to this, were there any substantive changes in 13 whatever was Rev. 1, because the page numbers are 14 certainly very different in the Rev. 2 response to 15 your RAI than they are in Rev. 0?
4 CHAIR BLEY: Okay. And let me ask you one 5
16                MS. RAY: I can't answer that --
more question about these Revs. When we got the 6
17                CHAIR BLEY: Because you haven't --
NuScale response to the big RAI, all of the pages are 7
18                MS. RAY: -- because we haven't --
labeled Rev. 2, which is okay, I managed to put them 8
19                CHAIR BLEY: -- looked at Rev. 1?
where they belong within the Rev. 0 version of Chapter 9
20                MS. RAY: Correct.
8.
21                CHAIR BLEY: But -- I'm a little confused 22 now.       You said your next task will be to review Rev.
10 My question is, and maybe you don't know the 11 answer to this, were there any substantive changes in 12 whatever was Rev. 1, because the page numbers are 13 certainly very different in the Rev. 2 response to 14 your RAI than they are in Rev. 0?
23 1 with a response to the RAIs, but I thought it was 24 said       earlier that     you've     received       Rev. 2,   which 25 includes all of that folded into one.
15 MS. RAY: I can't answer that --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 CHAIR BLEY: Because you haven't --
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
17 MS. RAY: -- because we haven't --
18 CHAIR BLEY: -- looked at Rev. 1?
19 MS. RAY: Correct.
20 CHAIR BLEY: But -- I'm a little confused 21 now. You said your next task will be to review Rev.
22 1 with a response to the RAIs, but I thought it was 23 said earlier that you've received Rev. 2, which 24 includes all of that folded into one.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


114 1                MS. RAY: No, we've only received DCA Rev. 1.
114 MS. RAY: No, we've only received DCA Rev. 1.
2                CHAIR BLEY: And the RAI responses that --
1 CHAIR BLEY: And the RAI responses that --
3                MS. RAY: Correct.
2 MS. RAY: Correct.
4                CHAIR BLEY: -- fit into that one?
3 CHAIR BLEY: -- fit into that one?
5                MS. RAY: Correct.
4 MS. RAY: Correct.
6                CHAIR BLEY: Okay.         Go ahead.
5 CHAIR BLEY: Okay. Go ahead.
7                MEMBER RAY: Well, before she goes ahead, I 8 just want to make a comment, for what it's worth, that 9 in my experience, we as a Committee would not want to 10 finish our review until the staff had finished their 11 review.
6 MEMBER RAY: Well, before she goes ahead, I 7
12                MS. RAY: We understand.
just want to make a comment, for what it's worth, that 8
13                MEMBER RAY: Okay.
in my experience, we as a Committee would not want to 9
14                MS. RAY: We absolutely understand.
finish our review until the staff had finished their 10 review.
15                MEMBER RAY: And that would include Chapter 16 8.     Okay, thank you.
11 MS. RAY: We understand.
17                MEMBER SKILLMAN: Let me add one more, if I 18 may, please.       If I read the Safety Evaluation for the 19 Topical Report, that is 0815-16497 Rev. 0, and I 20 compare it with Rev. 1 of that same Topical, Rev. 0 21 had six conditions, Rev. 1 has five.                 And the last 22 three are different in Rev. 1.
12 MEMBER RAY: Okay.
23                And it appears as though, some of the word 24 changes are substantive, leading me to believe there 25 was a great deal of deliberation in your Safety NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MS. RAY: We absolutely understand.
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
14 MEMBER RAY: And that would include Chapter 15
: 8. Okay, thank you.
16 MEMBER SKILLMAN: Let me add one more, if I 17 may, please. If I read the Safety Evaluation for the 18 Topical Report, that is 0815-16497 Rev. 0, and I 19 compare it with Rev. 1 of that same Topical, Rev. 0 20 had six conditions, Rev. 1 has five. And the last 21 three are different in Rev. 1.
22 And it appears as though, some of the word 23 changes are substantive, leading me to believe there 24 was a great deal of deliberation in your Safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


115 1 Evaluation of that Topical Report to Rev. 1 that may 2 be influencing what we're talking about here.
115 Evaluation of that Topical Report to Rev. 1 that may 1
3                  What drove the change in the conditions from 4 six to five, because those five conditions plus the 5 other three are really the NRC's backstop for the 6 super wanadine DC system, at least that's the way I 7 interpret the collage of information.
be influencing what we're talking about here.
8                  MS. RAY: I understand your question, I may 9 want to defer that to the closed session.
2 What drove the change in the conditions from 3
10                  MEMBER SKILLMAN: Yes, ma'am, that would be 11 fine.       Thank you.
six to five, because those five conditions plus the 4
12                  MR. TABATABAI: And if I may add something?
other three are really the NRC's backstop for the 5
13 You're right, we had some interactions with NuScale 14 with respect to our conditions of the SER for the 15 Topical Report.
super wanadine DC system, at least that's the way I 6
16                  And those     issues     were     discussed   among 17 various branches, electrical engineering staff were 18 not involved in that.             And that discussions were led 19 by the Reactor Systems Branch and Dr. Drzewiecki here 20 is our expert for that topic.                 Tim, if you would like 21 to say something now?
interpret the collage of information.
22                  DR. DRZEWIECKI: Yes. I can say, in terms of 23 some       of   the changes     in     language,       there was     one 24 condition that was kind of focused on a sequence that 25 had to do with, if you have any kind of AOO, that if NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 MS. RAY: I understand your question, I may 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
want to defer that to the closed session.
9 MEMBER SKILLMAN: Yes, ma'am, that would be 10 fine. Thank you.
11 MR. TABATABAI: And if I may add something?
12 You're right, we had some interactions with NuScale 13 with respect to our conditions of the SER for the 14 Topical Report.
15 And those issues were discussed among 16 various branches, electrical engineering staff were 17 not involved in that. And that discussions were led 18 by the Reactor Systems Branch and Dr. Drzewiecki here 19 is our expert for that topic. Tim, if you would like 20 to say something now?
21 DR. DRZEWIECKI: Yes. I can say, in terms of 22 some of the changes in language, there was one 23 condition that was kind of focused on a sequence that 24 had to do with, if you have any kind of AOO, that if 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


116 1 you don't take credit for your DC power system, at 2 some point in time, a few hours into that event, 3 you're going to have a pressure inside of your RCS 4 that is low enough such that you will actuate the ECCS 5 system.       Which is not a LOCA, but it's a LOCA-like 6 type of event.
116 you don't take credit for your DC power system, at 1
7                So, one of our conditions was that you would 8 go through and do a PRA-type of an analysis, such that 9 you can show that that is not expected to occur on the 10 frequency of an AOO or during other life of the plant.
some point in time, a few hours into that event, 2
11                Our first version of that language needed to 12 be sharpened a little bit.             In fact, if you go back to 13 the record, I believe it was Mr. Skillman -- I'm 14 sorry, not Mr. Skillman, Mr. Stetgar that gave us 15 feedback on that as well.               So, we had to sharpen up 16 some of that language.             That was a change, that was 17 probably one of the largest changes in the conditions.
you're going to have a pressure inside of your RCS 3
18                Also, our first Rev., the first time we did 19 a review of that SER, we were trying to write it for 20 a general plant.           It was not NuScale-specific, it 21 could have been applied to any type of advanced 22 reactor.       Coming out of that meeting, it was decided 23 that it should be focused and applied only to the 24 NuScale design.         So, that also had an effect.
that is low enough such that you will actuate the ECCS 4
25                So, in terms of the precise changes in the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
system. Which is not a LOCA, but it's a LOCA-like 5
(202) 234-4433           WASHINGTON, D.C. 20005-3701     (202) 234-4433
type of event.
6 So, one of our conditions was that you would 7
go through and do a PRA-type of an analysis, such that 8
you can show that that is not expected to occur on the 9
frequency of an AOO or during other life of the plant.
10 Our first version of that language needed to 11 be sharpened a little bit. In fact, if you go back to 12 the record, I believe it was Mr. Skillman -- I'm 13 sorry, not Mr. Skillman, Mr. Stetgar that gave us 14 feedback on that as well. So, we had to sharpen up 15 some of that language. That was a change, that was 16 probably one of the largest changes in the conditions.
17 Also, our first Rev., the first time we did 18 a review of that SER, we were trying to write it for 19 a general plant. It was not NuScale-specific, it 20 could have been applied to any type of advanced 21 reactor. Coming out of that meeting, it was decided 22 that it should be focused and applied only to the 23 NuScale design. So, that also had an effect.
24 So, in terms of the precise changes in the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


117 1 language, I have to go back and see what changed 2 exactly, but that's the context in which those changes 3 were made.
117 language, I have to go back and see what changed 1
4                CHAIR BLEY: So, just to get this clear, when 5 we reviewed the Topical with you folks, you had an SER 6 at that time, we made suggestions, other people made 7 comments.       You issued a revised SER that had somewhat 8 different language on the conditions?
exactly, but that's the context in which those changes 2
9                DR. DRZEWIECKI: Yes.
were made.
10                CHAIR BLEY: Okay.         And I guess I never went 11 back and looked at the revised SER, but we had it.                     We 12 have it, yes.
3 CHAIR BLEY: So, just to get this clear, when 4
13                MEMBER SKILLMAN: And that was very helpful.
we reviewed the Topical with you folks, you had an SER 5
14 Thank you.
at that time, we made suggestions, other people made 6
15                MEMBER CORRADINI: But just to close the 16 loop, and there were some things we suggested, they 17 politely told us, no.
comments. You issued a revised SER that had somewhat 7
18                MR. TABATABAI:       Right.         As part   of     the 19 Topical Report, there were some examples to help the 20 staff with their review.                 And I think Committee 21 recommended to take them out of the SER, any reference 22 to those examples.         That was the other changes.
different language on the conditions?
23                MS. RAY: I'll turn it over to Nadim now.
8 DR. DRZEWIECKI: Yes.
24                MR. KHAN: Thank you, Sheila.               I am Nadim 25 Khan and I will be discussing Section 8.2, offsite NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
9 CHAIR BLEY: Okay. And I guess I never went 10 back and looked at the revised SER, but we had it. We 11 have it, yes.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
12 MEMBER SKILLMAN: And that was very helpful.
13 Thank you.
14 MEMBER CORRADINI: But just to close the 15 loop, and there were some things we suggested, they 16 politely told us, no.
17 MR. TABATABAI: Right. As part of the 18 Topical Report, there were some examples to help the 19 staff with their review. And I think Committee 20 recommended to take them out of the SER, any reference 21 to those examples. That was the other changes.
22 MS. RAY: I'll turn it over to Nadim now.
23 MR. KHAN: Thank you, Sheila. I am Nadim 24 Khan and I will be discussing Section 8.2, offsite 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


118 1 power system.
118 power system.
2                The offsite power system for the NuScale 3 Power Plant includes a switchyard and one or more 4 connections to a transmission grid, micro-grid, or 5 dedicated service load.             However, the offsite power 6 system is not needed for safe operation, such as the 7 ability to achieve and maintain safe shutdown.
1 The offsite power system for the NuScale 2
8                The Applicant has stated that the passive 9 design of NuScale Power Plant does not depend on 10 offsite AC power for safe operation and does not rely 11 on     offsite   AC   power     to     support     safety-related 12 functions.
Power Plant includes a switchyard and one or more 3
13                The Applicant has stated in DCA Part 7 that 14 offsite power is not required. The staff reviewed the 15 offsite power system to ensure that it will perform 16 its design function during all operating and accident 17 conditions.
connections to a transmission grid, micro-grid, or 4
18                The review of the offsite power system is 19 awaiting for the completion of Open Item 8.3-1, to 20 address the offsite power system's ability to achieve 21 and       maintain   safety-related           function   and     safe 22 shutdown.
dedicated service load. However, the offsite power 5
23                With that, I will turn it over to Bob.
system is not needed for safe operation, such as the 6
24                MR. FITZPATRICK:         Thank     you. I'm       Bob 25 Fitzpatrick and I'm going to discuss Section 8.3.1 of NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
ability to achieve and maintain safe shutdown.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 The Applicant has stated that the passive 8
design of NuScale Power Plant does not depend on 9
offsite AC power for safe operation and does not rely 10 on offsite AC power to support safety-related 11 functions.
12 The Applicant has stated in DCA Part 7 that 13 offsite power is not required. The staff reviewed the 14 offsite power system to ensure that it will perform 15 its design function during all operating and accident 16 conditions.
17 The review of the offsite power system is 18 awaiting for the completion of Open Item 8.3-1, to 19 address the offsite power system's ability to achieve 20 and maintain safety-related function and safe 21 shutdown.
22 With that, I will turn it over to Bob.
23 MR. FITZPATRICK: Thank you. I'm Bob 24 Fitzpatrick and I'm going to discuss Section 8.3.1 of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


119 1 the SER on onsite AC power systems.
119 the SER on onsite AC power systems.
2                The following nonsafety-related systems are 3 the major constituents of the onsite AC power system:
1 The following nonsafety-related systems are 2
4 the high voltage system at 13.8 kV, the medium voltage 5 at 4.16 kV, and the low voltage at 480 and below.
the major constituents of the onsite AC power system:
6 There are two backup diesel generators at the 480 volt 7 level and one auxiliary AC power source at the 13.8 kV 8 level.
3 the high voltage system at 13.8 kV, the medium voltage 4
9                The overall system operation, there are 12 10 sets of module support systems separated into two six-11 module sections, north and south, which each section's 12 buses powering multiple module loads.                     However, no 13 individual loads are shared between the modules.
at 4.16 kV, and the low voltage at 480 and below.
14                We had one open item, and that was on 15 electrical penetration assemblies.                   In Rev. 0 of the 16 FSAR, it's stated that there are no AC circuits that 17 penetrate containment.           However, that statement left 18 out, for example, pressurizer heaters.
5 There are two backup diesel generators at the 480 volt 6
19                So, as we looked into this, we issued a 20 couple of RAIs on this issue, and the response to the 21 last RAI did not meet our deadline for Phase 2 SER, 22 but we feel we have a path for resolution that will be 23 addressed in our Phase 4 SER.
level and one auxiliary AC power source at the 13.8 kV 7
24                There were also a few areas where the staff 25 sought clarity in the FSAR.             And for these areas that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
level.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
8 The overall system operation, there are 12 9
sets of module support systems separated into two six-10 module sections, north and south, which each section's 11 buses powering multiple module loads. However, no 12 individual loads are shared between the modules.
13 We had one open item, and that was on 14 electrical penetration assemblies. In Rev. 0 of the 15 FSAR, it's stated that there are no AC circuits that 16 penetrate containment. However, that statement left 17 out, for example, pressurizer heaters.
18 So, as we looked into this, we issued a 19 couple of RAIs on this issue, and the response to the 20 last RAI did not meet our deadline for Phase 2 SER, 21 but we feel we have a path for resolution that will be 22 addressed in our Phase 4 SER.
23 There were also a few areas where the staff 24 sought clarity in the FSAR. And for these areas that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


120 1 needed         clarity,   the     Applicant           has   successfully 2 responded         to   our   RAIs     and   these     items   are     now 3 confirmatory, and, again, to be addressed in Phase 4.
120 needed clarity, the Applicant has successfully 1
4                  An example of the confirmatory items was, we 5 had     a   question   about     how     many     modules   could       be 6 connected to any of the 13.8 buses.                     And it sounded, 7 from what we were reading in the FSAR that maybe up to 8 three could be connected to any given bus and we 9 wanted to know if everything was sized accordingly.
responded to our RAIs and these items are now 2
10                  And NuScale, in their response to our RAI, 11 they said, no, only two will be on any given bus, and 12 they explained that to us.               So, that's an example of 13 just trying to straighten things out and we have an 14 acceptable answer on that.
confirmatory, and, again, to be addressed in Phase 4.
15                  So, in summary, for the Chapter 8, we had 16 two open items and four clarification items. The open 17 item       with   respect     to   GDC     17,     the   Applicant     has 18 documented         the   disposition       for     the   conditions       of 19 applicability, with an answer to our question.
3 An example of the confirmatory items was, we 4
20                  And they've supplied us with two additional 21 tables for Chapter 8 that presents a roadmap as to how 22 to go through that.               We have not reviewed that, 23 finished reviewing that yet, so that's still seeing as 24 open, and it will be addressed in Phase 4.
had a question about how many modules could be 5
25                  The other open on electrical penetration NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
connected to any of the 13.8 buses. And it sounded, 6
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
from what we were reading in the FSAR that maybe up to 7
three could be connected to any given bus and we 8
wanted to know if everything was sized accordingly.
9 And NuScale, in their response to our RAI, 10 they said, no, only two will be on any given bus, and 11 they explained that to us. So, that's an example of 12 just trying to straighten things out and we have an 13 acceptable answer on that.
14 So, in summary, for the Chapter 8, we had 15 two open items and four clarification items. The open 16 item with respect to GDC 17, the Applicant has 17 documented the disposition for the conditions of 18 applicability, with an answer to our question.
19 And they've supplied us with two additional 20 tables for Chapter 8 that presents a roadmap as to how 21 to go through that. We have not reviewed that, 22 finished reviewing that yet, so that's still seeing as 23 open, and it will be addressed in Phase 4.
24 The other open on electrical penetration 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


121 1 assemblies, as discussed on the other slide, the staff 2 feels we have a path to resolution on this.                   And as 3 stated also before, the confirmatory items will be 4 addressed in our Phase 4 SER.
121 assemblies, as discussed on the other slide, the staff 1
5                CHAIR BLEY: Bob, a path to resolution means, 6 you've agreed with them to do something a little 7 different than their response said?                 Or you think --
feels we have a path to resolution on this. And as 2
8                MR. FITZPATRICK: No.
stated also before, the confirmatory items will be 3
9                CHAIR BLEY: -- their response is resolution?
addressed in our Phase 4 SER.
10                MR. FITZPATRICK: It's just open, but we feel 11 -- the status of that is actually -- Swagata Som, who 12 retired end of May, was our lead on this item.                       And 13 so, she briefed me before leaving that it looks good, 14 but --
4 CHAIR BLEY: Bob, a path to resolution means, 5
15                CHAIR BLEY: Okay.
you've agreed with them to do something a little 6
16                MR. FITZPATRICK: -- I haven't had time to 17 get to it yet.
different than their response said? Or you think --
18                CHAIR BLEY: Okay, fair enough.
7 MR. FITZPATRICK: No.
19                MR. FITZPATRICK: So, I don't think I'm going 20 to have a problem with it, but that's where it is.
8 CHAIR BLEY: -- their response is resolution?
21                MS. RAY: Bob, if I may add, this is Sheila, 22 we     received   the   last   response         on the electrical 23 penetrations after we had submitted our SE.                 So, it's 24 a timing issue as well.
9 MR. FITZPATRICK: It's just open, but we feel 10
25                MEMBER KIRCHNER: Bob?
-- the status of that is actually -- Swagata Som, who 11 retired end of May, was our lead on this item. And 12 so, she briefed me before leaving that it looks good, 13 but --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
14 CHAIR BLEY: Okay.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
15 MR. FITZPATRICK: -- I haven't had time to 16 get to it yet.
17 CHAIR BLEY: Okay, fair enough.
18 MR. FITZPATRICK: So, I don't think I'm going 19 to have a problem with it, but that's where it is.
20 MS. RAY: Bob, if I may add, this is Sheila, 21 we received the last response on the electrical 22 penetrations after we had submitted our SE. So, it's 23 a timing issue as well.
24 MEMBER KIRCHNER: Bob?
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


122 1                MR. FITZPATRICK: Yes, sir?
122 MR. FITZPATRICK: Yes, sir?
2                MEMBER KIRCHNER: May I ask, GDC 18, this is 3 at risk, I'm doing it from memory, this talks about 4 tests and inspection and includes batteries.                     Given 5 the role their battery DC system, one would expect 6 that 18 would apply to that, because it's risk-7 significant, would it not?
1 MEMBER KIRCHNER: May I ask, GDC 18, this is 2
8                MR. FITZPATRICK: No.
at risk, I'm doing it from memory, this talks about 3
9                MEMBER KIRCHNER: No?
tests and inspection and includes batteries. Given 4
10                MR. FITZPATRICK: No.
the role their battery DC system, one would expect 5
11                MEMBER KIRCHNER: So, you're just going to go 12 -- your position now is just to do a blanket waiver on 13 17 and 18?
that 18 would apply to that, because it's risk-6 significant, would it not?
14                MR. FITZPATRICK: No, we're evaluating that.
7 MR. FITZPATRICK: No.
15 Part of -- I think, some clarification, this might 16 help.       We reviewed Chapter 8 as if they're going to 17 meet all the requirements.
8 MEMBER KIRCHNER: No?
18                MEMBER KIRCHNER: Okay.
9 MR. FITZPATRICK: No.
19                MR. FITZPATRICK: When we wrote up the SER, 20 we were told we couldn't say it in that -- that's just 21 not the right way to say it.                   So, we're -- it's an 22 open item.       Now, Open Item 8.3.1 --
10 MEMBER KIRCHNER: So, you're just going to go 11
23                MEMBER KIRCHNER: Yes.
-- your position now is just to do a blanket waiver on 12 17 and 18?
24                MR. FITZPATRICK:         --     8.3-1, in terms       of 25 Section 8.3.1, there are 15 items in here that would NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MR. FITZPATRICK: No, we're evaluating that.
(202) 234-4433           WASHINGTON, D.C. 20005-3701       (202) 234-4433
14 Part of -- I think, some clarification, this might 15 help. We reviewed Chapter 8 as if they're going to 16 meet all the requirements.
17 MEMBER KIRCHNER: Okay.
18 MR. FITZPATRICK: When we wrote up the SER, 19 we were told we couldn't say it in that -- that's just 20 not the right way to say it. So, we're -- it's an 21 open item. Now, Open Item 8.3.1 --
22 MEMBER KIRCHNER: Yes.
23 MR. FITZPATRICK: -- 8.3-1, in terms of 24 Section 8.3.1, there are 15 items in here that would 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


123 1 feed-up to that one open item.
123 feed-up to that one open item.
2                MEMBER KIRCHNER: Right.
1 MEMBER KIRCHNER: Right.
3                MR. FITZPATRICK: And GDC 18, 17, and then, 4 all these other things that you find in the DSRS as --
2 MR. FITZPATRICK: And GDC 18, 17, and then, 3
5                MEMBER KIRCHNER: Yes.
all these other things that you find in the DSRS as --
6                MR. FITZPATRICK: -- supplemental guidance --
4 MEMBER KIRCHNER: Yes.
7                MEMBER KIRCHNER: Right.
5 MR. FITZPATRICK: -- supplemental guidance --
8                MR. FITZPATRICK: -- that they need to meet 9 if they have to meet 17 and they don't have to meet if 10 they don't have to meet 17.             So, it looks like a great 11 big, big open item, but in terms of work to solve it, 12 we need the answers from everybody else and we need to 13 wait until the end, everyone else is done with their 14 review.
6 MEMBER KIRCHNER: Right.
15                But   the     actual     solution     of that,       if 16 everything turns out right, is just some wording 17 changes in the SER.             So, it looks like we're very 18 preliminary in coming here, but if things work out, 19 we're not.
7 MR. FITZPATRICK: -- that they need to meet 8
20                MEMBER   KIRCHNER:       So,     just rhetorically, 21 since there are a number of exemption requests to the 22 GDCs, whose principles I would think still apply in 23 some reasonable manner, even if you do come down and 24 say, it's not safety-related, how are you going to 25 approach these?       Are you going to put conditions then NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
if they have to meet 17 and they don't have to meet if 9
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
they don't have to meet 17. So, it looks like a great 10 big, big open item, but in terms of work to solve it, 11 we need the answers from everybody else and we need to 12 wait until the end, everyone else is done with their 13 review.
14 But the actual solution of that, if 15 everything turns out right, is just some wording 16 changes in the SER. So, it looks like we're very 17 preliminary in coming here, but if things work out, 18 we're not.
19 MEMBER KIRCHNER: So, just rhetorically, 20 since there are a number of exemption requests to the 21 GDCs, whose principles I would think still apply in 22 some reasonable manner, even if you do come down and 23 say, it's not safety-related, how are you going to 24 approach these? Are you going to put conditions then 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


124 1 on the exemption?         Or look for some further PRA-based 2 --
124 on the exemption? Or look for some further PRA-based 1
3                MR. FITZPATRICK: No, actually, we're going 4 to look to, like Reactor Systems, when they finish 5 their review of Chapter 15 and they say, okay, the 6 Chapter 15 analyses work and the analyses didn't 7 require any electrical power, AC or DC, to get there, 8 then we're done.
2 MR. FITZPATRICK: No, actually, we're going 3
9                We don't need to apply any exemptions, they 10 don't need this, it's done another way.               So, that --
to look to, like Reactor Systems, when they finish 4
11                MEMBER KIRCHNER: So, then, you'll document 12 that --
their review of Chapter 15 and they say, okay, the 5
13                MR. FITZPATRICK: Right.
Chapter 15 analyses work and the analyses didn't 6
14                MEMBER KIRCHNER: -- accordingly in the SE?
require any electrical power, AC or DC, to get there, 7
15                MR. FITZPATRICK: And what we're talking 16 about is any electrical input from GDCs, the 33 and 4 17 and all that.       It's just, if it's not needed, then we 18 just write it off that way.               But we don't know that 19 until others finish some really detailed work.
then we're done.
20                DR. SCHULTZ: So, Bob, originally, you were 21 thinking of saying something like, it meets the intent 22 of the GDC, or something like that, and rather what 23 you want to do is to indicate that the GDC just does 24 not need to apply --
8 We don't need to apply any exemptions, they 9
25                MR. FITZPATRICK: Well, yes --
don't need this, it's done another way. So, that --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER KIRCHNER: So, then, you'll document 11 that --
(202) 234-4433         WASHINGTON, D.C. 20005-3701       (202) 234-4433
12 MR. FITZPATRICK: Right.
13 MEMBER KIRCHNER: -- accordingly in the SE?
14 MR. FITZPATRICK: And what we're talking 15 about is any electrical input from GDCs, the 33 and 4 16 and all that. It's just, if it's not needed, then we 17 just write it off that way. But we don't know that 18 until others finish some really detailed work.
19 DR. SCHULTZ: So, Bob, originally, you were 20 thinking of saying something like, it meets the intent 21 of the GDC, or something like that, and rather what 22 you want to do is to indicate that the GDC just does 23 not need to apply --
24 MR. FITZPATRICK: Well, yes --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


125 1                  DR. SCHULTZ: -- to this design?
125 DR. SCHULTZ: -- to this design?
2                  MR. FITZPATRICK: My draft said, pending 3 resolution of this big issue, that it looks --
1 MR. FITZPATRICK: My draft said, pending 2
4                  DR. SCHULTZ: Of course.
resolution of this big issue, that it looks --
5                  MR. FITZPATRICK: -- acceptable.
3 DR. SCHULTZ: Of course.
6                  DR. SCHULTZ: Yes, right.
4 MR. FITZPATRICK: -- acceptable.
7                  MR. FITZPATRICK: And I was told that, that's 8 really not the way we write things, because it's --
5 DR. SCHULTZ: Yes, right.
9                  DR. SCHULTZ: I understand now.
6 MR. FITZPATRICK: And I was told that, that's 7
10                  MR. FITZPATRICK: -- it could be misleading.
really not the way we write things, because it's --
11                  DR. SCHULTZ: Yes.
8 DR. SCHULTZ: I understand now.
12                  MR. FITZPATRICK: So, apparently, the other 13 way is misleading too, in a way.
9 MR. FITZPATRICK: -- it could be misleading.
14                  DR. SCHULTZ: It has to be turned around.
10 DR. SCHULTZ: Yes.
15                  MR. FITZPATRICK: Right.               That's where we 16 are.
11 MR. FITZPATRICK: So, apparently, the other 12 way is misleading too, in a way.
17                  CHAIR   BLEY:     Bob,     you     reminded   me     of 18 something I meant to ask right in the beginning.
13 DR. SCHULTZ: It has to be turned around.
19 Everybody's -- I'd be interested in anything anyone 20 has to say.         This is the first time we've used the 21 DSRS.         How is it working?           Have you found it needs 22 revision too or is it working out pretty well?
14 MR. FITZPATRICK: Right. That's where we 15 are.
23                  MR. FITZPATRICK: Well, actually, it worked 24 out fairly well.           The thing is, when we brought this 25 to ACRS, the DSRS --
16 CHAIR BLEY: Bob, you reminded me of 17 something I meant to ask right in the beginning.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 Everybody's -- I'd be interested in anything anyone 19 has to say. This is the first time we've used the 20 DSRS. How is it working? Have you found it needs 21 revision too or is it working out pretty well?
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
22 MR. FITZPATRICK: Well, actually, it worked 23 out fairly well. The thing is, when we brought this 24 to ACRS, the DSRS --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


126 1                CHAIR BLEY: Yes.
126 CHAIR BLEY: Yes.
2                MR. FITZPATRICK: -- we said we would leave 3 some of the things about Class 1E in, because we 4 wouldn't know --
1 MR. FITZPATRICK: -- we said we would leave 2
5                CHAIR BLEY: Exactly.
some of the things about Class 1E in, because we 3
6                MR. FITZPATRICK: -- so, we did.               So, if we 7 had known -- I'll make the same comment I made when we 8 talked about that. If we had known ahead of time that 9 we really wouldn't have a need for Class 1E power, it 10 would have been a more condensed version and less work 11 to go through.         But it's just what we came up with.
wouldn't know --
12                CHAIR BLEY: Okay.           Other than that, though 13 --
4 CHAIR BLEY: Exactly.
14                MR. FITZPATRICK: Yes.
5 MR. FITZPATRICK: -- so, we did. So, if we 6
15                CHAIR BLEY: -- it's been okay?
had known -- I'll make the same comment I made when we 7
16                MR. FITZPATRICK: It's worked out well.
talked about that. If we had known ahead of time that 8
17                MS. RAY: This is Sheila Ray.               I would add, 18 also at the time of writing of the DSRS, we were not 19 aware of an exemption to GDC 17 and 18.                   So, when we 20 used       DSRS, in   my   opinion,       that     was one   of     the 21 challenges.       It does not address review capability 22 with the addition of an exemption, or exemptions.
we really wouldn't have a need for Class 1E power, it 9
23                MEMBER BROWN: I would make one observation.
would have been a more condensed version and less work 10 to go through. But it's just what we came up with.
24 The DSRS -- and I'm segueing back to when we did this 25 review and wrote a letter on it, whatever we did back NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 CHAIR BLEY: Okay. Other than that, though 12 13 MR. FITZPATRICK: Yes.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 CHAIR BLEY: -- it's been okay?
15 MR. FITZPATRICK: It's worked out well.
16 MS. RAY: This is Sheila Ray. I would add, 17 also at the time of writing of the DSRS, we were not 18 aware of an exemption to GDC 17 and 18. So, when we 19 used DSRS, in my opinion, that was one of the 20 challenges. It does not address review capability 21 with the addition of an exemption, or exemptions.
22 MEMBER BROWN: I would make one observation.
23 The DSRS -- and I'm segueing back to when we did this 24 review and wrote a letter on it, whatever we did back 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


127 1 two years ago, three years ago, whatever it was.
127 two years ago, three years ago, whatever it was.
2                  The fact that you are addressing exemptions 3 or not should not be a reason for not having a general 4 DSRS that applies to SMRs, where you don't delete 5 stuff,         you just   say,     hey,     it's     now no   longer 6 applicable. You do what you're doing now, you address 7 exemptions.
1 The fact that you are addressing exemptions 2
8                  So, you don't want to write a specific that 9 says, oh, you've got these exemptions to all these 10 things, before you know what's going on.                       You would 11 still have a general DSRS.                 So, I think you really 12 want to maintain it in a generalized basis, so that 13 you can then adapt it to other SMRs that come on, will 14 have different exemptions potentially.
or not should not be a reason for not having a general 3
15                  So, I'm just providing a counterpoint to, we 16 could have had a simpler DSRS.                         I just think the 17 purpose is to make it so that the Applicant knows what 18 he's supposed to be thinking about, and if there are 19 things that you can exempt or take out, then you do 20 that at the time.           That's just an observation.
DSRS that applies to SMRs, where you don't delete 4
21                  MR. FITZPATRICK: And with that, I will turn 22 it back to Sheila, for Section 8.3.2.
stuff, you just say, hey, it's now no longer 5
23                  MEMBER MARCH-LEUBA: I still have a comment.
applicable. You do what you're doing now, you address 6
24 This morning, we were -- I was very confused with the 25 use of timers all over the place, which are used to NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
exemptions.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 So, you don't want to write a specific that 8
says, oh, you've got these exemptions to all these 9
things, before you know what's going on. You would 10 still have a general DSRS. So, I think you really 11 want to maintain it in a generalized basis, so that 12 you can then adapt it to other SMRs that come on, will 13 have different exemptions potentially.
14 So, I'm just providing a counterpoint to, we 15 could have had a simpler DSRS. I just think the 16 purpose is to make it so that the Applicant knows what 17 he's supposed to be thinking about, and if there are 18 things that you can exempt or take out, then you do 19 that at the time. That's just an observation.
20 MR. FITZPATRICK: And with that, I will turn 21 it back to Sheila, for Section 8.3.2.
22 MEMBER MARCH-LEUBA: I still have a comment.
23 This morning, we were -- I was very confused with the 24 use of timers all over the place, which are used to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


128 1 turn on and off the electrical systems.                 I assume you 2 guys didn't review that part.                 Are we passing it to 3 Reactor Systems for them to consider or how is that 4 handled?
128 turn on and off the electrical systems. I assume you 1
5                MR. TABATABAI: I think, if I'm not mistaken, 6 we have I&C staff here, if you want to chime in on 7 this timer issue --
guys didn't review that part. Are we passing it to 2
8                MEMBER MARCH-LEUBA: So, somebody --
Reactor Systems for them to consider or how is that 3
9                MR. TABATABAI: -- otherwise, we can get the 10 response --
handled?
11                MEMBER MARCH-LEUBA: My point is --
4 MR. TABATABAI: I think, if I'm not mistaken, 5
12                MR. TABATABAI: -- on that.
we have I&C staff here, if you want to chime in on 6
13                MEMBER MARCH-LEUBA: -- somebody needs, from 14 the staff, needs to understand how all those things 15 flow together.         Because even the NuScale staff was 16 confused when they were trying to explain it to us.
this timer issue --
17 So --
7 MEMBER MARCH-LEUBA: So, somebody --
18                MS. RAY: I think we understand your point, 19 I can definitely say, Chapter 8 did not look at it.
8 MR. TABATABAI: -- otherwise, we can get the 9
20 However, our friends --
response --
21                MEMBER MARCH-LEUBA: So, we --
10 MEMBER MARCH-LEUBA: My point is --
22                MS. RAY: -- from other chapters might have.
11 MR. TABATABAI: -- on that.
23                MEMBER MARCH-LEUBA: We should remember, when 24 we look at Chapter 7 and/or 15.
12 MEMBER MARCH-LEUBA: -- somebody needs, from 13 the staff, needs to understand how all those things 14 flow together. Because even the NuScale staff was 15 confused when they were trying to explain it to us.
25                MR. TABATABAI:       We     took   notes   of     the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 So --
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
17 MS. RAY: I think we understand your point, 18 I can definitely say, Chapter 8 did not look at it.
19 However, our friends --
20 MEMBER MARCH-LEUBA: So, we --
21 MS. RAY: -- from other chapters might have.
22 MEMBER MARCH-LEUBA: We should remember, when 23 we look at Chapter 7 and/or 15.
24 MR. TABATABAI: We took notes of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


129 1 discussion on that topic, so we will be --
129 discussion on that topic, so we will be --
2                  MR. BETANCOURT: So, this is Luis Betancourt 3 from I&C.         We have reviewed that aspect and we're 4 going to be seeing you guys in August, but we took 5 note of that comment and we're going to put that 6 discussion in the presentation.
1 MR. BETANCOURT: So, this is Luis Betancourt 2
7                  MEMBER MARCH-LEUBA: Make sure you have a 8 nice flow diagram of how they work.
from I&C. We have reviewed that aspect and we're 3
9                  (Laughter.)
going to be seeing you guys in August, but we took 4
10                  MR. BETANCOURT: Yes, thank you.
note of that comment and we're going to put that 5
11                  MEMBER MARCH-LEUBA: Because I definitely --
discussion in the presentation.
12 and second, maybe while you're there, I don't know if 13 it's still I&C or who, but we talked about if, in case 14 those       timers   fail     or   the   batteries     don't     have 15 sufficient         power,     you're     going     to have degraded 16 voltage and have actuation of equipment out of order.
6 MEMBER MARCH-LEUBA: Make sure you have a 7
17 Whose going to handle that?
nice flow diagram of how they work.
18                  MR. BETANCOURT: So, this is Luis Betancourt 19 again.         We're going to be talking about that as well.
8 (Laughter.)
20                  MEMBER MARCH-LEUBA: Okay.
9 MR. BETANCOURT: Yes, thank you.
21                  MR. BETANCOURT: And possibly NPS due to 22 degraded voltage, as well as the 24-hour timers.                       So, 23 that was part of the Chapter 7 review.
10 MEMBER MARCH-LEUBA: Because I definitely --
24                  MEMBER MARCH-LEUBA: Somehow, you need to get 25 this report of Reactor Systems to say, what happens if NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 and second, maybe while you're there, I don't know if 12 it's still I&C or who, but we talked about if, in case 13 those timers fail or the batteries don't have 14 sufficient power, you're going to have degraded 15 voltage and have actuation of equipment out of order.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
16 Whose going to handle that?
17 MR. BETANCOURT: So, this is Luis Betancourt 18 again. We're going to be talking about that as well.
19 MEMBER MARCH-LEUBA: Okay.
20 MR. BETANCOURT: And possibly NPS due to 21 degraded voltage, as well as the 24-hour timers. So, 22 that was part of the Chapter 7 review.
23 MEMBER MARCH-LEUBA: Somehow, you need to get 24 this report of Reactor Systems to say, what happens if 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


130 1 this valve opens before that valve?
130 this valve opens before that valve?
2                MR. BETANCOURT: Yes.
1 MR. BETANCOURT: Yes.
3                MEMBER MARCH-LEUBA: You have to have some 4 analysis of some kind.
2 MEMBER MARCH-LEUBA: You have to have some 3
5                MR. BETANCOURT: I will leave that to team, 6 but, yes.
analysis of some kind.
7                MEMBER MARCH-LEUBA: Yes, but make sure you 8 guys interface --
4 MR. BETANCOURT: I will leave that to team, 5
9                MR. BETANCOURT: Okay.               So, then, in that 10 Chapter 7 ACRS presentation, we will discuss that.
but, yes.
11                MEMBER MARCH-LEUBA: Excellent, thank you.
6 MEMBER MARCH-LEUBA: Yes, but make sure you 7
12                MS. RAY: Thank you, Luis.             I think you can 13 get a flavor of all of the interactions we had in 14 reviewing our chapter.           So, Section 8.3.2 is on DC --
guys interface --
15                MEMBER CORRADINI: Hold on --
8 MR. BETANCOURT: Okay. So, then, in that 9
16                MS. RAY: Yes?
Chapter 7 ACRS presentation, we will discuss that.
17                MEMBER CORRADINI: Hold on a sec. So, let me 18 observe something, and I could be wrong, but I'm 19 guessing, NuScale is pioneering a path on passive 20 safety systems, with interesting inherent attributes.
10 MEMBER MARCH-LEUBA: Excellent, thank you.
21                I would venture to say, if we ever get past 22 this, to other unusual systems, that the staff is now 23 writing design criteria or alternatives, et cetera, 24 they're going to see the same thing.
11 MS. RAY: Thank you, Luis. I think you can 12 get a flavor of all of the interactions we had in 13 reviewing our chapter. So, Section 8.3.2 is on DC --
25                Is this method of review logical for these NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
14 MEMBER CORRADINI: Hold on --
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
15 MS. RAY: Yes?
16 MEMBER CORRADINI: Hold on a sec. So, let me 17 observe something, and I could be wrong, but I'm 18 guessing, NuScale is pioneering a path on passive 19 safety systems, with interesting inherent attributes.
20 I would venture to say, if we ever get past 21 this, to other unusual systems, that the staff is now 22 writing design criteria or alternatives, et cetera, 23 they're going to see the same thing.
24 Is this method of review logical for these 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


131 1 sorts of systems?           Where this sits here and you're 2 doing it by chapter, and yet, this chapter is totally 3 or highly interactive with another one.
131 sorts of systems? Where this sits here and you're 1
4                You might want to think about this from a 5 process standpoint, because all the advanced systems 6 with all the various funny looking coolants and funny 7 looking designs, all basically have passive system 8 approaches,       attributes     that     are       quite similar       to 9 NuScale in this regard.               So, I'm wondering if this 10 whole process makes sense, from a scheduling and 11 efficiency and effectiveness standpoint.
doing it by chapter, and yet, this chapter is totally 2
12                You might want to look at this now, since it 13 may affect -- it may help you here and it may help you 14 downstream, since I know staff has three or four 15 others that are already starting to interact, but 16 don't have water as the fluid of interest, but has 17 very similar decay heat removal systems, things that 18 don't want to have Class 1E power, that same sort of 19 general attributes.           Just a thought.
or highly interactive with another one.
20                MS. RAY: Thank you for your comment, we do 21 understand.
3 You might want to think about this from a 4
22                MEMBER CORRADINI: I won't forget it, because 23 I'll bring it up again once we see, June 19.
process standpoint, because all the advanced systems 5
24                CHAIR BLEY: For people who are wondering, 25 that's the licensing modernization meeting.
with all the various funny looking coolants and funny 6
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
looking designs, all basically have passive system 7
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
approaches, attributes that are quite similar to 8
NuScale in this regard. So, I'm wondering if this 9
whole process makes sense, from a scheduling and 10 efficiency and effectiveness standpoint.
11 You might want to look at this now, since it 12 may affect -- it may help you here and it may help you 13 downstream, since I know staff has three or four 14 others that are already starting to interact, but 15 don't have water as the fluid of interest, but has 16 very similar decay heat removal systems, things that 17 don't want to have Class 1E power, that same sort of 18 general attributes. Just a thought.
19 MS. RAY: Thank you for your comment, we do 20 understand.
21 MEMBER CORRADINI: I won't forget it, because 22 I'll bring it up again once we see, June 19.
23 CHAIR BLEY: For people who are wondering, 24 that's the licensing modernization meeting.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


132 1                  MR. TANEJA: I may be speaking -- this is 2 Dinesh Taneja from the I&C Branch.                     I may be speaking 3 out of line right now, but we already started looking 4 at the usefulness of using the DSRS and the lessons 5 learned from DSRS review and looking at the potential 6 advance reactor designs coming in.
132 MR. TANEJA: I may be speaking -- this is 1
7                  And we have already started working on a 8 strawman of the review standard that should address 9 most of your concerns that you've raised today.                           So, 10 let's hope that we can come to you in a few months 11 with our idea of what we are thinking and get your 12 feedback at that time.
Dinesh Taneja from the I&C Branch. I may be speaking 2
13                  MS. RAY: Thank you, Dinesh.               So, back to 14 onsite DC power systems, Section 8.3.2.                       As NuScale 15 mentioned, there are several DC systems.                     The highly 16 reliable DC system is the EDSS.
out of line right now, but we already started looking 3
17                  There's the EDSS-common, that serves common 18 loads,         such as   the     Main     Control       Room emergency 19 lighting and Post-Accident monitoring.                       The EDSS-MS 20 serves each module.             In addition, the EDNS is also 21 non-Class         1E and   serves       loads     related   to     power 22 generation.
at the usefulness of using the DSRS and the lessons 4
23                  The NuScale design uses Valve-Regulated Lead 24 Acid batteries.
learned from DSRS review and looking at the potential 5
25                  The staff performed an audit of a NuScale NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
advance reactor designs coming in.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
6 And we have already started working on a 7
strawman of the review standard that should address 8
most of your concerns that you've raised today. So, 9
let's hope that we can come to you in a few months 10 with our idea of what we are thinking and get your 11 feedback at that time.
12 MS. RAY: Thank you, Dinesh. So, back to 13 onsite DC power systems, Section 8.3.2. As NuScale 14 mentioned, there are several DC systems. The highly 15 reliable DC system is the EDSS.
16 There's the EDSS-common, that serves common 17 loads, such as the Main Control Room emergency 18 lighting and Post-Accident monitoring. The EDSS-MS 19 serves each module. In addition, the EDNS is also 20 non-Class 1E and serves loads related to power 21 generation.
22 The NuScale design uses Valve-Regulated Lead 23 Acid batteries.
24 The staff performed an audit of a NuScale 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


133 1 document, which describes how the NuScale Plant meets 2 the conditions of applicability described in the TR.
133 document, which describes how the NuScale Plant meets 1
3 But     specifically,     the   staff     evaluated       the   design 4 qualification and quality assurance provisions that 5 are applied to the EDSS system.
the conditions of applicability described in the TR.
6                MEMBER   BROWN:       Just     a   little   technical 7 question, I guess, but I just thought of it.
2 But specifically, the staff evaluated the design 3
8                MS. RAY: Yes?
qualification and quality assurance provisions that 4
9                MEMBER   BROWN:     The   EDSS,     in   your     first 10 bullet, says you apply this to Main Control emergency 11 lighting, PAM, et cetera, et cetera. So, that is a DC 12 system.       Is there -- so, that's battery-powered?
are applied to the EDSS system.
13                MS. RAY: Correct, that is a DC --
5 MEMBER BROWN: Just a little technical 6
14                MEMBER BROWN: And I presume, since most of 15 your emergency lighting and other things are AC, that 16 you go from the battery to invertors, you've still got 17 that same routine --
question, I guess, but I just thought of it.
18                MS. RAY: Right.
7 MS. RAY: Yes?
19                MEMBER BROWN: -- there's not some magic --
8 MEMBER BROWN: The EDSS, in your first 9
20                MS. RAY: Correct.
bullet, says you apply this to Main Control emergency 10 lighting, PAM, et cetera, et cetera. So, that is a DC 11 system. Is there -- so, that's battery-powered?
21                MEMBER BROWN: -- DC stuff you're going to 22 stick in there?
12 MS. RAY: Correct, that is a DC --
23                MS. RAY: Right.
13 MEMBER BROWN: And I presume, since most of 14 your emergency lighting and other things are AC, that 15 you go from the battery to invertors, you've still got 16 that same routine --
24                MEMBER BROWN: That's all I wanted to know, 25 I mean, that's --
17 MS. RAY: Right.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 MEMBER BROWN: -- there's not some magic --
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
19 MS. RAY: Correct.
20 MEMBER BROWN: -- DC stuff you're going to 21 stick in there?
22 MS. RAY: Right.
23 MEMBER BROWN: That's all I wanted to know, 24 I mean, that's --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


134 1                MS. RAY: And I will just add, we do evaluate 2 lighting in Chapter 9.           So, we'll come back to you on 3 lighting.
134 MS. RAY: And I will just add, we do evaluate 1
4                MEMBER BROWN: Yes, I'm just -- my mind will 5 be basically waiting for the elucidation of these 6 details.
lighting in Chapter 9. So, we'll come back to you on 2
7                MS. RAY: Excellent.
lighting.
8                MEMBER KIRCHNER: I have a related question, 9 if I may?
3 MEMBER BROWN: Yes, I'm just -- my mind will 4
10                MEMBER BROWN: Have at it.
be basically waiting for the elucidation of these 5
11                MEMBER KIRCHNER: Yes.           The plant protection 12 system, I assume is the source of the Post-Accident 13 Monitoring information?               Or the module protection 14 system, I think NuScale calls it.
details.
15                MS. RAY: I'm going to turn to my friend, 16 Luis.
6 MS. RAY: Excellent.
17                MR. BETANCOURT: This is Luis Betancourt, 18 I&C, again.       So, the plant protection system, all it 19 does       is basically     for     common       components   and     it 20 basically       does   two     things:         the Control     Room 21 habitability and the Control Room integrity.
7 MEMBER KIRCHNER: I have a related question, 8
22                The module protection system, that's where 23 it's contained --         the wording that, because they use 24 protection system in the plant protection system, many 25 people think that's the actual protection system, as NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
if I may?
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
9 MEMBER BROWN: Have at it.
10 MEMBER KIRCHNER: Yes. The plant protection 11 system, I assume is the source of the Post-Accident 12 Monitoring information? Or the module protection 13 system, I think NuScale calls it.
14 MS. RAY: I'm going to turn to my friend, 15 Luis.
16 MR. BETANCOURT: This is Luis Betancourt, 17 I&C, again. So, the plant protection system, all it 18 does is basically for common components and it 19 basically does two things:
the Control Room 20 habitability and the Control Room integrity.
21 The module protection system, that's where 22 it's contained -- the wording that, because they use 23 protection system in the plant protection system, many 24 people think that's the actual protection system, as 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


135 1 defined by the GDCs. It's a terminology issue, that's 2 the way the NuScale used that.
135 defined by the GDCs. It's a terminology issue, that's 1
3                MEMBER KIRCHNER: Well, I'm just thinking of 4 things like the neutron detectors for power and such, 5 so you know that you scrammed.                   Those probably are 6 feeding in through the protection system?
the way the NuScale used that.
7                MR. BETANCOURT: Right.
2 MEMBER KIRCHNER: Well, I'm just thinking of 3
8                MEMBER KIRCHNER: And then, I would assume, 9 then, they're tapped and used for the -- get my 10 terminology       right     --   the     PAM,     the Post-Accident 11 Monitoring --
things like the neutron detectors for power and such, 4
12                MR. BETANCOURT: That's correct.
so you know that you scrammed. Those probably are 5
13                MEMBER KIRCHNER: -- system, right?
feeding in through the protection system?
14                MR. BETANCOURT: Yes.
6 MR. BETANCOURT: Right.
15                MEMBER     KIRCHNER:         So,     when you     have 16 interrelated systems like that, which for its primary 17 function, is a 1E-type system, doesn't the power have 18 to be therefore 1E?
7 MEMBER KIRCHNER: And then, I would assume, 8
19                MR. BETANCOURT: No, we were able to discuss 20 that in the last Topical review.
then, they're tapped and used for the -- get my 9
21                MEMBER KIRCHNER: Yes.
terminology right -- the PAM, the Post-Accident 10 Monitoring --
22                MR. BETANCOURT: So, the conclusion that we 23 made was, if that variable has to be credited for 24 manual action, then that power has to be safety-25 related.       In the case of NuScale, that's still under NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
11 MR. BETANCOURT: That's correct.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
12 MEMBER KIRCHNER: -- system, right?
13 MR. BETANCOURT: Yes.
14 MEMBER KIRCHNER:
So, when you have 15 interrelated systems like that, which for its primary 16 function, is a 1E-type system, doesn't the power have 17 to be therefore 1E?
18 MR. BETANCOURT: No, we were able to discuss 19 that in the last Topical review.
20 MEMBER KIRCHNER: Yes.
21 MR. BETANCOURT: So, the conclusion that we 22 made was, if that variable has to be credited for 23 manual action, then that power has to be safety-24 related. In the case of NuScale, that's still under 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


136 1 review.
136 review.
2                  Assuming that in the case that there's no 3 amount         of   credited       operator         action,     per       the 4 regulations,         that     power     doesn't       have   to   safety-5 related.       It has to be some of it safety-related and 6 nonsafety-related --
1 Assuming that in the case that there's no 2
7                  MEMBER KIRCHNER: Yes.
amount of credited operator
8                  MR. BETANCOURT: -- and that's why we have 9 this highly reliable.
: action, per the 3
10                  MEMBER KIRCHNER: Well, I guess we'll have to 11 hear more from you in August about these things like 12 these timers that --
regulations, that power doesn't have to safety-4 related. It has to be some of it safety-related and 5
13                  MR. BETANCOURT: Yes.
nonsafety-related --
14                  MEMBER   KIRCHNER:         --      are   supposed         to 15 function, and if they don't, whose scramming the 16 reactor?
6 MEMBER KIRCHNER: Yes.
17                  MR. BETANCOURT: Yes.             We will discuss that 18 in August.
7 MR. BETANCOURT: -- and that's why we have 8
19                  MEMBER KIRCHNER: Okay, thank you.
this highly reliable.
20                  CHAIR BLEY: A nice figure to lock all that 21 stuff together would be helpful.                       I don't know if 22 there is one or not.
9 MEMBER KIRCHNER: Well, I guess we'll have to 10 hear more from you in August about these things like 11 these timers that --
23                  MR. BETANCOURT: Say that again?
12 MR. BETANCOURT: Yes.
24                  CHAIR   BLEY:       A   nice       figure     for     your 25 presentation --
13 MEMBER KIRCHNER:
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
are supposed to 14 function, and if they don't, whose scramming the 15 reactor?
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
16 MR. BETANCOURT: Yes. We will discuss that 17 in August.
18 MEMBER KIRCHNER: Okay, thank you.
19 CHAIR BLEY: A nice figure to lock all that 20 stuff together would be helpful. I don't know if 21 there is one or not.
22 MR. BETANCOURT: Say that again?
23 CHAIR BLEY:
A nice figure for your 24 presentation --
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


137 1                MEMBER KIRCHNER: Older people need figures.
137 MEMBER KIRCHNER: Older people need figures.
2                (Laughter.)
1 (Laughter.)
3                CHAIR BLEY: I think it would be helpful.
2 CHAIR BLEY: I think it would be helpful.
4 There might be one in Chapter 7 already, but --
3 There might be one in Chapter 7 already, but --
5                MR. BETANCOURT: Yes.
4 MR. BETANCOURT: Yes.
6                CHAIR BLEY: -- I don't know.
5 CHAIR BLEY: -- I don't know.
7                MR. BETANCOURT: There are and I have --
6 MR. BETANCOURT: There are and I have --
8                CHAIR BLEY: Okay.
7 CHAIR BLEY: Okay.
9                MR. BETANCOURT: -- I have to provide that to 10 you.
8 MR. BETANCOURT: -- I have to provide that to 9
11                CHAIR BLEY: All right. I have not looked at 12 7.     Thank you.
you.
13                MS. RAY: Thank you.             Next slide. So, in 14 Section 8.3.2, the open items are related to the 15 classification of the highly reliable DC system and 16 the GDC 17 and 18 exemptions.
10 CHAIR BLEY: All right. I have not looked at 11
17                The completion of the staff's review of 18 onsite DC power systems is awaiting the completion of 19 the major open item.           Next slide.
: 7. Thank you.
20                MEMBER SKILLMAN: Sheila, let me ask this --
12 MS. RAY: Thank you. Next slide. So, in 13 Section 8.3.2, the open items are related to the 14 classification of the highly reliable DC system and 15 the GDC 17 and 18 exemptions.
21                MS. RAY: Sure.
16 The completion of the staff's review of 17 onsite DC power systems is awaiting the completion of 18 the major open item. Next slide.
22                MEMBER SKILLMAN: -- I'm in the SER --
19 MEMBER SKILLMAN: Sheila, let me ask this --
23                MS. RAY: Yes.
20 MS. RAY: Sure.
24                MEMBER SKILLMAN: -- for Chapter 8, and I'm 25 on 8-48 to the top of the page.
21 MEMBER SKILLMAN: -- I'm in the SER --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
22 MS. RAY: Yes.
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
23 MEMBER SKILLMAN: -- for Chapter 8, and I'm 24 on 8-48 to the top of the page.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


138 1                MS. RAY: Forty?
138 MS. RAY: Forty?
2                MEMBER SKILLMAN: 8-48 at the top of the 3 page.
1 MEMBER SKILLMAN: 8-48 at the top of the 2
4                MS. RAY: Yes.
page.
5                MEMBER SKILLMAN: And the italicized text 6 reads as follows.         The EDSS structures, systems, and 7 components are further augmented by applying design 8 qualification and QA provisions typically applied to 9 Class 1E DC power systems, using a graded approach.
3 MS. RAY: Yes.
10                So, the short version is, EDSS, it's not 1E, 11 but we're going to apply QA to it so it's somewhat 12 like a 1E system?
4 MEMBER SKILLMAN: And the italicized text 5
13                MS. RAY: Correct.         And --
reads as follows. The EDSS structures, systems, and 6
14                MEMBER SKILLMAN: Okay.
components are further augmented by applying design 7
15                MS. RAY: -- that's covered in the Topical 16 Report.
qualification and QA provisions typically applied to 8
17                MEMBER SKILLMAN: Question is, how do you 18 know       where to   stop,       in   terms       of applying       18 19 characteristics of Appendix B? Where do you stop? Do 20 you stop at records retention?
Class 1E DC power systems, using a graded approach.
21                Do you stop at Criterion 3, design control?
9 So, the short version is, EDSS, it's not 1E, 10 but we're going to apply QA to it so it's somewhat 11 like a 1E system?
22 Do you stop at testing, NTS?               How do you choose where 23 to go no further? In other words, what's the boundary 24 for saying, this is enough for this system?
12 MS. RAY: Correct. And --
25                MS. RAY: So, what we evaluated in the DCA NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MEMBER SKILLMAN: Okay.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MS. RAY: -- that's covered in the Topical 15 Report.
16 MEMBER SKILLMAN: Question is, how do you 17 know where to stop, in terms of applying 18 18 characteristics of Appendix B? Where do you stop? Do 19 you stop at records retention?
20 Do you stop at Criterion 3, design control?
21 Do you stop at testing, NTS? How do you choose where 22 to go no further? In other words, what's the boundary 23 for saying, this is enough for this system?
24 MS. RAY: So, what we evaluated in the DCA 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


139 1 was how they are meeting the TR.                     And so, we did an 2 audit       to look   at,     how     are     they   meeting     those 3 requirements, as stated in the TR?
139 was how they are meeting the TR. And so, we did an 1
4                So, in our review, since the TR is approved 5 by the staff, our review on the NuScale DCA review 6 was, are they meeting the TR?                 And the audit showed, 7 yes, they are.         And we evaluated some documents from 8 NuScale where they're referencing the appropriate 9 standards and what they have stated in the TR.
audit to look at, how are they meeting those 2
10                MEMBER CORRADINI: But I -- that kind of 11 answer tells me that you kind of did it on a case-by-12 case basis.
requirements, as stated in the TR?
13                MS. RAY:     We     did     it     for   the     EDSS 14 specifically.
3 So, in our review, since the TR is approved 4
15                MEMBER KIRCHNER: So, if you give them a 16 waiver on 18, on test and inspection, you've got this 17 statement here about this further augmenting the EDSS, 18 why would that not fall into tech specs?
by the staff, our review on the NuScale DCA review 5
19                This morning, earlier, surely you heard us 20 talking about battery testing and such, wouldn't that 21 be critical to the reliability of this system for its 22 application?
was, are they meeting the TR? And the audit showed, 6
23                I'm just     trying     to     followup   on   Dick's 24 question and push you a little.                     So, if there's an 25 exemption and then, there's no limits or conditions or NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
yes, they are. And we evaluated some documents from 7
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
NuScale where they're referencing the appropriate 8
standards and what they have stated in the TR.
9 MEMBER CORRADINI: But I -- that kind of 10 answer tells me that you kind of did it on a case-by-11 case basis.
12 MS.
RAY:
We did it for the EDSS 13 specifically.
14 MEMBER KIRCHNER: So, if you give them a 15 waiver on 18, on test and inspection, you've got this 16 statement here about this further augmenting the EDSS, 17 why would that not fall into tech specs?
18 This morning, earlier, surely you heard us 19 talking about battery testing and such, wouldn't that 20 be critical to the reliability of this system for its 21 application?
22 I'm just trying to followup on Dick's 23 question and push you a little. So, if there's an 24 exemption and then, there's no limits or conditions or 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


140 1 it doesn't have to be covered in tech specs or -- but 2 we're talking about how highly reliable this system 3 is.       So, how do you know it's highly reliable?
140 it doesn't have to be covered in tech specs or -- but 1
4                MS. RAY: And that's where the TR comes in.
we're talking about how highly reliable this system 2
5 Based on the provisions in the TR.                     And those are 6 proprietary in the TR, it is meeting certain standards 7 or meeting certain criteria, in order to establish 8 augmented quality as well as testing requirements.
is. So, how do you know it's highly reliable?
9                MEMBER KIRCHNER: Okay.             Well, maybe I have 10 to wait for --
3 MS. RAY: And that's where the TR comes in.
11                MEMBER BROWN: Well, but there's also an RAI 12 still to that TR.
4 Based on the provisions in the TR. And those are 5
13                MEMBER KIRCHNER Yes.
proprietary in the TR, it is meeting certain standards 6
14                MEMBER BROWN: Is that --
or meeting certain criteria, in order to establish 7
15                MS. RAY: Correct, but --
augmented quality as well as testing requirements.
16                MEMBER BROWN: -- have you completed that and 17 --
8 MEMBER KIRCHNER: Okay. Well, maybe I have 9
18                MS. RAY: No.
to wait for --
19                MEMBER BROWN: So, you're relying on the TR, 20 but you haven't got the TR upgraded or agreed based on 21 the RAI responses?
10 MEMBER BROWN: Well, but there's also an RAI 11 still to that TR.
22                MS. RAY: We haven't finished the evaluation 23 of the RAI.       However, we did perform an audit to look 24 at how specifically the EDSS meets the conditions 25 related to the EDSS.
12 MEMBER KIRCHNER Yes.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
13 MEMBER BROWN: Is that --
(202) 234-4433         WASHINGTON, D.C. 20005-3701         (202) 234-4433
14 MS. RAY: Correct, but --
15 MEMBER BROWN: -- have you completed that and 16 17 MS. RAY: No.
18 MEMBER BROWN: So, you're relying on the TR, 19 but you haven't got the TR upgraded or agreed based on 20 the RAI responses?
21 MS. RAY: We haven't finished the evaluation 22 of the RAI. However, we did perform an audit to look 23 at how specifically the EDSS meets the conditions 24 related to the EDSS.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


141 1                  MEMBER BROWN: In the TR, as initially --
141 MEMBER BROWN: In the TR, as initially --
2                  MS. RAY: In the TR.
1 MS. RAY: In the TR.
3                  MEMBER BROWN: -- without the RAI --
2 MEMBER BROWN: -- without the RAI --
4                  MS. RAY: Correct.
3 MS. RAY: Correct.
5                  MEMBER     BROWN:       --        clarifications         or 6 improvements or revisions?
4 MEMBER BROWN:
7                  MS. RAY: Correct.         When we --
clarifications or 5
8                  MEMBER   BROWN:       And     those   were   deemed 9 sufficient for the EDSS, but not sufficient for other 10 things, because they may not have been resolved yet 11 with the RAI?
improvements or revisions?
12                  MS. RAY: So, the other items are essentially 13 outside the scope of the electrical.                   They are -- our 14 colleagues in other chapters, on the other conditions.
6 MS. RAY: Correct. When we --
15                  MEMBER BROWN: Okay.
7 MEMBER BROWN:
16                  MS. RAY: So, we have --
And those were deemed 8
17                  MEMBER BROWN: I guess okay.
sufficient for the EDSS, but not sufficient for other 9
18                  MS. RAY: You'll hear more about it later, is 19 really -- in other chapters is what I can --
things, because they may not have been resolved yet 10 with the RAI?
20                  MR. TABATABAI: If I can --
11 MS. RAY: So, the other items are essentially 12 outside the scope of the electrical. They are -- our 13 colleagues in other chapters, on the other conditions.
21                  MEMBER BROWN: You're assuming I'll remember 22 it that long.
14 MEMBER BROWN: Okay.
23                  MS. RAY: I'll make sure you remember.
15 MS. RAY: So, we have --
24                  MR. TABATABAI: If I may add something, Mr.
16 MEMBER BROWN: I guess okay.
25 Brown?         The RAI is not written for the Topical Report NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
17 MS. RAY: You'll hear more about it later, is 18 really -- in other chapters is what I can --
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
19 MR. TABATABAI: If I can --
20 MEMBER BROWN: You're assuming I'll remember 21 it that long.
22 MS. RAY: I'll make sure you remember.
23 MR. TABATABAI: If I may add something, Mr.
24 Brown? The RAI is not written for the Topical Report 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


142 1 itself.         The Topical Report is done.             Topical Report 2 is supposed to be a standalone document.
142 itself. The Topical Report is done. Topical Report 1
3                  However, because the Topical Report was 4 referenced or incorporated by reference in Chapter 8, 5 the staff wrote the RAI that how basically the DCA 6 meets the Topical Report.               So, just want to make sure 7 we are clear.
is supposed to be a standalone document.
8                  MEMBER BROWN: Okay, thank you. I understand 9 now, sort of.
2 However, because the Topical Report was 3
10                  (Laughter.)
referenced or incorporated by reference in Chapter 8, 4
11                  MEMBER MARCH-LEUBA: Okay.               Changing the 12 topic again, all these highly reliable DC systems, 13 have you considered external hazards, like seismic or 14 more important, flooding?               Because this is not light 15 water.         All these batteries, if I remember correctly, 16 they're located underground in a basement?
the staff wrote the RAI that how basically the DCA 5
17                  MS. RAY:     They're     in     a seismic   Cat     I 18 structure.
meets the Topical Report. So, just want to make sure 6
19                  MEMBER MARCH-LEUBA: Yes, but they're like a 20 wall away from a seven million gallon pool of water 21 and     they're     in the     basement?           I mean, are     they 22 floodable?         Is that part of your consideration?
we are clear.
23                  MEMBER CORRADINI: First of all, if we're 24 getting to things that we've got to go to closed 25 session, you stop us.
7 MEMBER BROWN: Okay, thank you. I understand 8
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
now, sort of.
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
9 (Laughter.)
10 MEMBER MARCH-LEUBA: Okay. Changing the 11 topic again, all these highly reliable DC systems, 12 have you considered external hazards, like seismic or 13 more important, flooding? Because this is not light 14 water. All these batteries, if I remember correctly, 15 they're located underground in a basement?
16 MS. RAY: They're in a seismic Cat I 17 structure.
18 MEMBER MARCH-LEUBA: Yes, but they're like a 19 wall away from a seven million gallon pool of water 20 and they're in the basement? I mean, are they 21 floodable? Is that part of your consideration?
22 MEMBER CORRADINI: First of all, if we're 23 getting to things that we've got to go to closed 24 session, you stop us.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


143 1                  MS. RAY: Yes, sir.
143 MS. RAY: Yes, sir.
2                  MEMBER CORRADINI: Okay.
1 MEMBER CORRADINI: Okay.
3                  MS. RAY: We may take that one into closed 4 session.
2 MS. RAY: We may take that one into closed 3
5                  MEMBER MARCH-LEUBA: Okay, I'll remember.
session.
6                  MS. RAY: Okay.       I may not be able to answer 7 it, since that may not have been completely part of 8 the     electrical     review,     we   may     have   to have     our 9 colleagues in Structures, I'm not sure if they're 10 here, but --
4 MEMBER MARCH-LEUBA: Okay, I'll remember.
11                  MEMBER MARCH-LEUBA: Okay.
5 MS. RAY: Okay. I may not be able to answer 6
12                  MS. RAY: -- we will do our best.               The last 13 topic to cover, quickly, is station blackout.                           As I 14 mentioned, the Lead Reviewer is on business travel, so 15 I'll be presenting for her.
it, since that may not have been completely part of 7
16                  The NuScale design does not rely on the use 17 of onsite or offsite AC power for the performance of 18 safety-related functions for any design basis event.
the electrical review, we may have to have our 8
19 And     a   safe   and   stable     shutdown       is automatically 20 achieved and maintained for 72 hours without operator 21 actions.
colleagues in Structures, I'm not sure if they're 9
22                  The   staff       reviewed           the   SBO-related 23 information provided in the FSAR and the RAI responses 24 against the guidelines of Reg Guide 1.155 and the 25 DSRS.
here, but --
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
10 MEMBER MARCH-LEUBA: Okay.
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
11 MS. RAY: -- we will do our best. The last 12 topic to cover, quickly, is station blackout. As I 13 mentioned, the Lead Reviewer is on business travel, so 14 I'll be presenting for her.
15 The NuScale design does not rely on the use 16 of onsite or offsite AC power for the performance of 17 safety-related functions for any design basis event.
18 And a safe and stable shutdown is automatically 19 achieved and maintained for 72 hours without operator 20 actions.
21 The staff reviewed the SBO-related 22 information provided in the FSAR and the RAI responses 23 against the guidelines of Reg Guide 1.155 and the 24 DSRS.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


144 1                The staff requested a regulatory audit to 2 seek       clarification     on   NuScale's       assumptions       and 3 methodology on the SBO Transient Analysis and the SBO 4 sensitivity       case.         The     SBO       sensitivity     case 5 demonstrates the NuScale design does not rely on DC 6 power from the EDSS to meet the requirements of 10 CFR 7 50.63.
144 The staff requested a regulatory audit to 1
8                The   staff     verified         and   accepted       the 9 methodology       assumptions         and   results     of   the     SBO 10 Transient and sensitivity case, with respect to the 11 electrical.
seek clarification on NuScale's assumptions and 2
12                And in   conclusion,         there     are two   items 13 awaiting the completion of Open Item 8.3-1.                   And the 14 last slide is a summary.
methodology on the SBO Transient Analysis and the SBO 3
15                We have two open items, one on the EPAs, 16 electrical penetration assemblies, and the second one 17 related to the exemptions of GDC 17 and 18.                   And the 18 staff is currently working on the Phase 4 review.
sensitivity case.
19                MEMBER CORRADINI: So, can we just go back?
The SBO sensitivity case 4
20 I don't understand --
demonstrates the NuScale design does not rely on DC 5
21                CHAIR BLEY: How far back?
power from the EDSS to meet the requirements of 10 CFR 6
22                MEMBER CORRADINI: I'm back to Slide 11, that 23 she just -- not that far.               So, what is it about 8.4 24 that is pending?       It's really dependent on everything 25 else, assuming everything else -- I'm going to use NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
50.63.
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
7 The staff verified and accepted the 8
methodology assumptions and results of the SBO 9
Transient and sensitivity case, with respect to the 10 electrical.
11 And in conclusion, there are two items 12 awaiting the completion of Open Item 8.3-1. And the 13 last slide is a summary.
14 We have two open items, one on the EPAs, 15 electrical penetration assemblies, and the second one 16 related to the exemptions of GDC 17 and 18. And the 17 staff is currently working on the Phase 4 review.
18 MEMBER CORRADINI: So, can we just go back?
19 I don't understand --
20 CHAIR BLEY: How far back?
21 MEMBER CORRADINI: I'm back to Slide 11, that 22 she just -- not that far. So, what is it about 8.4 23 that is pending? It's really dependent on everything 24 else, assuming everything else -- I'm going to use 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


145 1 Bob's approach.
145 Bob's approach.
2                Assuming everything goes as planned, then 3 the analysis is appropriately using systems to address 4 this sort of station blackout.                   Is there something 5 particular about station blackout that is an open item 6 or is this just appended onto everything else, because 7 it's using a nonsafety system?
1 Assuming everything goes as planned, then 2
8                MS. RAY: It is --
the analysis is appropriately using systems to address 3
9                MEMBER CORRADINI: It's the latter?
this sort of station blackout. Is there something 4
10                MS. RAY: It's depending on GDC 17 and 18.
particular about station blackout that is an open item 5
11 So, in order to conclude everything is okay with 12 station blackout, if you -- in our DSRS, we do use GDC 13 17 and 18, in 8.4. So, we cannot make that conclusion 14 --
or is this just appended onto everything else, because 6
15                MEMBER CORRADINI: Oh, okay.               I see.
it's using a nonsafety system?
16                MS. RAY: -- until we complete the open item.
7 MS. RAY: It is --
17                MEMBER   CORRADINI:         All     right. So,     it's 18 connected in that regard?
8 MEMBER CORRADINI: It's the latter?
19                MS. RAY: Correct.
9 MS. RAY: It's depending on GDC 17 and 18.
20                MEMBER CORRADINI: Okay.               Thank you.
10 So, in order to conclude everything is okay with 11 station blackout, if you -- in our DSRS, we do use GDC 12 17 and 18, in 8.4. So, we cannot make that conclusion 13 14 MEMBER CORRADINI: Oh, okay. I see.
21                MS. RAY: And that concludes the staff's 22 presentation.
15 MS. RAY: -- until we complete the open item.
23                CHAIR BLEY: Thank you very much.               Anything 24 more from the Committee?             I'm going to take us, after 25 we collect comments, into the closed session, just in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
16 MEMBER CORRADINI: All right. So, it's 17 connected in that regard?
(202) 234-4433         WASHINGTON, D.C. 20005-3701           (202) 234-4433
18 MS. RAY: Correct.
19 MEMBER CORRADINI: Okay. Thank you.
20 MS. RAY: And that concludes the staff's 21 presentation.
22 CHAIR BLEY: Thank you very much. Anything 23 more from the Committee? I'm going to take us, after 24 we collect comments, into the closed session, just in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


146 1 case.       There were a few things that came up and we'll 2 just do that to see.
146 case. There were a few things that came up and we'll 1
3                  But before that, I want to make sure the 4 phone line is open and we'll look for comments there.
just do that to see.
5 Is there anybody in the room who would like to make a 6 comment?         If so, please come to the microphone.
2 But before that, I want to make sure the 3
7                  If there's anybody on the phone line who 8 would like to make a comment, please identify yourself 9 and do so.         I'm not sure if the phone line is open or 10 not, but we'll keep trying.                 Anybody there?       I don't 11 hear anybody, so I guess we have no comments from 12 there.
phone line is open and we'll look for comments there.
13                  At this time, I'd like to go around the 14 table and I'm going to start with Charlie.                     Any final 15 comments?
4 Is there anybody in the room who would like to make a 5
16                  MEMBER BROWN: Only to reiterate downstream, 17 evaluating         the   inadvertent         actuation       via   either 18 internal, because somebody makes a mistake, and/or 19 whether         the   plant     design       and     architecture         is 20 susceptible to external influences?
comment? If so, please come to the microphone.
21                  My quick review was unable to clear that up 22 relative to the electric plant controls, where there 23 seems to be some definition relative to the protection 24 systems and safeguard systems.
6 If there's anybody on the phone line who 7
25                  CHAIR   BLEY:     We'll     raise     that again       in NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
would like to make a comment, please identify yourself 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
and do so. I'm not sure if the phone line is open or 9
not, but we'll keep trying. Anybody there? I don't 10 hear anybody, so I guess we have no comments from 11 there.
12 At this time, I'd like to go around the 13 table and I'm going to start with Charlie. Any final 14 comments?
15 MEMBER BROWN: Only to reiterate downstream, 16 evaluating the inadvertent actuation via either 17 internal, because somebody makes a mistake, and/or 18 whether the plant design and architecture is 19 susceptible to external influences?
20 My quick review was unable to clear that up 21 relative to the electric plant controls, where there 22 seems to be some definition relative to the protection 23 systems and safeguard systems.
24 CHAIR BLEY: We'll raise that again in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


147 1 Chapter 7.
147 Chapter 7.
2                  MEMBER BROWN: Yes, it's all Chapter 7 stuff.
1 MEMBER BROWN: Yes, it's all Chapter 7 stuff.
3 So, then, I couldn't find the connection to the 4 electric plant controls, how they are managed within 5 the overall architecture. So, that's the only comment 6 I would reiterate, to make sure it doesn't get lost.
2 So, then, I couldn't find the connection to the 3
7                  I'm sorry, I did not have my microphone, did 8 you hear me, young lady?             Thank you.       Did you all hear 9 me?       I figure my voice carries well enough.
electric plant controls, how they are managed within 4
10                  CHAIR BLEY: Walt?
the overall architecture. So, that's the only comment 5
11                  MEMBER KIRCHNER: No further comments at this 12 point.         Thank you.
I would reiterate, to make sure it doesn't get lost.
13                  CHAIR BLEY: Thank you.             Jose?
6 I'm sorry, I did not have my microphone, did 7
14                  MEMBER MARCH-LEUBA: No comments.
you hear me, young lady? Thank you. Did you all hear 8
15                  CHAIR BLEY: Michael?
me? I figure my voice carries well enough.
16                  MEMBER CORRADINI: No further comments.
9 CHAIR BLEY: Walt?
17                  CHAIR BLEY: Pete?
10 MEMBER KIRCHNER: No further comments at this 11 point. Thank you.
18                  MEMBER RICCARDELLA: No comments.
12 CHAIR BLEY: Thank you. Jose?
19                  CHAIR BLEY: Matt?
13 MEMBER MARCH-LEUBA: No comments.
20                  MEMBER SUNSERI: No additional comments.
14 CHAIR BLEY: Michael?
21                  CHAIR BLEY: Dick?
15 MEMBER CORRADINI: No further comments.
22                  MEMBER SKILLMAN: Yes, sir, one comment.                   My 23 comment is aimed on the Safety Evaluation, Page 8-9.
16 CHAIR BLEY: Pete?
24 This is the SER, Chapter 8.                   At Paragraph 8.1.4.8.
17 MEMBER RICCARDELLA: No comments.
25 Before I make my comment, I would like to make a NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
18 CHAIR BLEY: Matt?
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
19 MEMBER SUNSERI: No additional comments.
20 CHAIR BLEY: Dick?
21 MEMBER SKILLMAN: Yes, sir, one comment. My 22 comment is aimed on the Safety Evaluation, Page 8-9.
23 This is the SER, Chapter 8. At Paragraph 8.1.4.8.
24 Before I make my comment, I would like to make a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


148 1 statement.
148 statement.
2                I have a vivid memory of what we went 3 through       at TMI   when     we   transitioned       to natural 4 circulation.         The reason that we maintained pressure 5 up until that time was because we were maintaining 6 NPSH for one reactor coolant pump, and we knew that 7 one pump was a run-out and we needed that NPSH.
1 I have a vivid memory of what we went 2
8                Once we stopped that pump, we lost the 9 pressurizer       level,     stopped     the     pump, and   we     had 10 instrumentation that showed us that we went into 11 natural circulation.             But we maintained subcooling, 12 because we did not know the condition of the core.
through at TMI when we transitioned to natural 3
13 Emphasis, did not know the condition of the core.
circulation. The reason that we maintained pressure 4
14                In another event, Walt and I lived this, we 15 both operated a power reactor in downtown Manhattan.
up until that time was because we were maintaining 5
16 That power reactor was named Savannah.                         We had a 17 couple of events where we lost pressurizer level.
NPSH for one reactor coolant pump, and we knew that 6
18                But   our     gold     standard       was to maintain 19 pressurizer pressure, no matter how many pumps we had 20 operating, because we wanted to maintain subcooling on 21 that fuel.
one pump was a run-out and we needed that NPSH.
22                So, to my point, in the Safety Evaluation, 23 the     NuScale   design     does     not   rely     on pressurizer 24 heaters to establish and maintain natural circulation 25 and shutdown conditions.                 I get it, for what we've NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 Once we stopped that pump, we lost the 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
pressurizer level, stopped the pump, and we had 9
instrumentation that showed us that we went into 10 natural circulation. But we maintained subcooling, 11 because we did not know the condition of the core.
12 Emphasis, did not know the condition of the core.
13 In another event, Walt and I lived this, we 14 both operated a power reactor in downtown Manhattan.
15 That power reactor was named Savannah. We had a 16 couple of events where we lost pressurizer level.
17 But our gold standard was to maintain 18 pressurizer pressure, no matter how many pumps we had 19 operating, because we wanted to maintain subcooling on 20 that fuel.
21 So, to my point, in the Safety Evaluation, 22 the NuScale design does not rely on pressurizer 23 heaters to establish and maintain natural circulation 24 and shutdown conditions. I get it, for what we've 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


149 1 been presented regarding this reactor design.
149 been presented regarding this reactor design.
2                  But from a systems perspective, it seems 3 that this reactor, if you will, is a hybrid.                     Most of 4 the time, it's a P, pressurized water reactor, but it 5 can go to conditions that are very similar to a B.
1 But from a systems perspective, it seems 2
6 And when it goes to those conditions, it may have 7 reactivity requirements that depend on subcooling.
that this reactor, if you will, is a hybrid. Most of 3
8                  And so, I'm going to be very skeptical as we 9 go ahead about the technical accuracy of whether or 10 not pressurizer heaters, and I translate that to be 11 subcooling, is really not needed.                     Whether it's a 1E 12 power system, whether it's an Evinrude with some kind 13 of     an     alternator     that     will   make     sure subcooling 14 exists.
the time, it's a P, pressurized water reactor, but it 4
15                  I've seen the analysis, I understand the 16 explanations we've been given today, but I'm skeptical 17 on the this one point.               And to me, this will be the 18 turning point for whether you need a 1E system or not.
can go to conditions that are very similar to a B.
19 Do     you     really     not     need     subcooling       driven       by 20 pressurizer heaters when this plant has gone into a 21 quasi-PWR/BWR mode?             Thank you.
5 And when it goes to those conditions, it may have 6
22                  CHAIR BLEY: Thanks, Dick.               Harold?
reactivity requirements that depend on subcooling.
23                  MEMBER RAY: Just to say again, although our 24 review is independent of the staff, it does include 25 review of the staff's conclusions and I look forward NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
7 And so, I'm going to be very skeptical as we 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701           (202) 234-4433
go ahead about the technical accuracy of whether or 9
not pressurizer heaters, and I translate that to be 10 subcooling, is really not needed. Whether it's a 1E 11 power system, whether it's an Evinrude with some kind 12 of an alternator that will make sure subcooling 13 exists.
14 I've seen the analysis, I understand the 15 explanations we've been given today, but I'm skeptical 16 on the this one point. And to me, this will be the 17 turning point for whether you need a 1E system or not.
18 Do you really not need subcooling driven by 19 pressurizer heaters when this plant has gone into a 20 quasi-PWR/BWR mode? Thank you.
21 CHAIR BLEY: Thanks, Dick. Harold?
22 MEMBER RAY: Just to say again, although our 23 review is independent of the staff, it does include 24 review of the staff's conclusions and I look forward 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


150 1 to being able to do that when the time is appropriate.
150 to being able to do that when the time is appropriate.
2                  CHAIR BLEY: And our consultant, Dr. Schultz?
1 CHAIR BLEY: And our consultant, Dr. Schultz?
3                  DR. SCHULTZ: My comments are two, and one is 4 just       a   recognition,     both     in     the     presentation       by 5 NuScale and then, by the staff, it's very clear that 6 what -- one of the things that's ongoing here is that 7 the reviews, although they're presented sequentially, 8 we are beginning with Chapter 8, you've got, as you 9 said at the beginning of your presentation, a dozen 10 staff       members   from     different         areas     within       the 11 organization working together to perform the review.
2 DR. SCHULTZ: My comments are two, and one is 3
12                  And the   material       that       the Committee       is 13 wrestling with today is a lot, to a great extent, 14 associated with trying to knit those pieces together.
just a recognition, both in the presentation by 4
15 As is the staff.         So, that's one side of the comment.
NuScale and then, by the staff, it's very clear that 5
16                  The other     is,   looking         at this   from     a 17 different angle, as the material is presented, one of 18 the things that is difficult in the situation where 19 we've got a major, a major open item, as we go through 20 it section by section, piece by piece, the conclusion 21 by the staff is all affected by that.
what -- one of the things that's ongoing here is that 6
22                  But I think, in fact, there is a gradation 23 of to what extent that review is in fact completed.
the reviews, although they're presented sequentially, 7
24 But they all seem to be tied together by one final 25 comment saying, well, we'll just have to wait and see NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
we are beginning with Chapter 8, you've got, as you 8
(202) 234-4433           WASHINGTON, D.C. 20005-3701             (202) 234-4433
said at the beginning of your presentation, a dozen 9
staff members from different areas within the 10 organization working together to perform the review.
11 And the material that the Committee is 12 wrestling with today is a lot, to a great extent, 13 associated with trying to knit those pieces together.
14 As is the staff. So, that's one side of the comment.
15 The other is, looking at this from a 16 different angle, as the material is presented, one of 17 the things that is difficult in the situation where 18 we've got a major, a major open item, as we go through 19 it section by section, piece by piece, the conclusion 20 by the staff is all affected by that.
21 But I think, in fact, there is a gradation 22 of to what extent that review is in fact completed.
23 But they all seem to be tied together by one final 24 comment saying, well, we'll just have to wait and see 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


151 1 if that is resolved.
151 if that is resolved.
2                  More   information         about     the level       of 3 conclusion that in fact has been reached to this point 4 in the review would be helpful, because we are going 5 through an iterative process here.
1 More information about the level of 2
6                  CHAIR BLEY: Thanks, Steve.             I want to thank 7 NuScale and the Staff for very good discussions today, 8 that's added some clarity.
conclusion that in fact has been reached to this point 3
9                  We're on the schedule to write an interim 10 letter.         If we   write     an     interim     letter on     this 11 chapter, it won't say more than, we look forward to 12 seeing your SER when it has content.
in the review would be helpful, because we are going 4
13                  MEMBER CORRADINI: There is, in past letters 14 such as this, a conclusion that there's a myriad of 15 system interactions that may alter our conclusions.
through an iterative process here.
16                  CHAIR BLEY: And that's reasonable too.                 For 17 me, I --
5 CHAIR BLEY: Thanks, Steve. I want to thank 6
18                  MEMBER CORRADINI: That's the only that I --
NuScale and the Staff for very good discussions today, 7
19                  CHAIR BLEY: -- we have no conclusion thus 20 far, other than we don't see any showstoppers, I 21 think.         And I guess, you do want a letter?                 Yay or 22 nay?
that's added some clarity.
23                  MR. TABATABAI: Yes. Actually, I just wanted 24 to mention that we are scheduled to present to the 25 full Committee on July 11.               So, we took notes of some NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 We're on the schedule to write an interim 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
letter. If we write an interim letter on this 10 chapter, it won't say more than, we look forward to 11 seeing your SER when it has content.
12 MEMBER CORRADINI: There is, in past letters 13 such as this, a conclusion that there's a myriad of 14 system interactions that may alter our conclusions.
15 CHAIR BLEY: And that's reasonable too. For 16 me, I --
17 MEMBER CORRADINI: That's the only that I --
18 CHAIR BLEY: -- we have no conclusion thus 19 far, other than we don't see any showstoppers, I 20 think. And I guess, you do want a letter? Yay or 21 nay?
22 MR. TABATABAI: Yes. Actually, I just wanted 23 to mention that we are scheduled to present to the 24 full Committee on July 11. So, we took notes of some 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


152 1 comments and questions that you had and hopefully, by 2 then, at least if we are not giving you the full 3 conclusion, because the reviews are still ongoing, as 4 you've heard, so to whatever extent we can, we can 5 come back to the Committee and --
152 comments and questions that you had and hopefully, by 1
6                CHAIR BLEY: Yes, for us to write a letter, 7 you're going to have to come back.
then, at least if we are not giving you the full 2
8                MR. TABATABAI: Yes.
conclusion, because the reviews are still ongoing, as 3
9                CHAIR BLEY: If you can emphasize anything 10 that answers any of the questions, that will be very 11 good.       I suspect the letter won't say much more than 12 I just said, although we might add something.                     And I 13 understand you want it, so we will help you out and do 14 one, if it helps.
you've heard, so to whatever extent we can, we can 4
15                But I guess that's it.             Anything else from 16 any of the members?
come back to the Committee and --
17                MEMBER CORRADINI: You want to go to the 18 closed session?
5 CHAIR BLEY: Yes, for us to write a letter, 6
19                CHAIR BLEY: I do.         At this time, we need to 20 clear the room, turn off the phone lines, and we're 21 going off the public record and onto a closed record.
you're going to have to come back.
22                (Whereupon, the above-entitled matter went 23 into closed session at 11:37 a.m.)
7 MR. TABATABAI: Yes.
24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
8 CHAIR BLEY: If you can emphasize anything 9
(202) 234-4433           WASHINGTON, D.C. 20005-3701         (202) 234-4433
that answers any of the questions, that will be very 10 good. I suspect the letter won't say much more than 11 I just said, although we might add something. And I 12 understand you want it, so we will help you out and do 13 one, if it helps.
14 But I guess that's it. Anything else from 15 any of the members?
16 MEMBER CORRADINI: You want to go to the 17 closed session?
18 CHAIR BLEY: I do. At this time, we need to 19 clear the room, turn off the phone lines, and we're 20 going off the public record and onto a closed record.
21 (Whereupon, the above-entitled matter went 22 into closed session at 11:37 a.m.)
23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433


NuScale Nonproprietary ACRS Presentation Chapter 8 Overview Ted Hough Electrical Design Kent Welter Nuclear Safety Jeff Ehlers Electrical Design Paul Infanger Licensing June 6, 2018 1
PM-0618-60190-NP 1
PM-0618-60190-NP Revision: 0          Copyright 2018 by NuScale Power, LLC.
Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 NuScale Nonproprietary ACRS Presentation Chapter 8 Overview Ted Hough Electrical Design Kent Welter Nuclear Safety Jeff Ehlers Electrical Design Paul Infanger Licensing June 6, 2018


Abbreviations
PM-0618-60190-NP 2
* AAPS - alternate AC power supply
Copyright 2018 by NuScale Power, LLC.
* AC - alternating current
Revision: 0 Template #: 0000-21727-F01 R3 T
* BDG - backup diesel generator
Abbreviations AAPS - alternate AC power supply AC - alternating current BDG - backup diesel generator BPSS - backup power supply system CFDS - containment flooding and drain system COA - condition of applicability CHWS - chilled water system CNV - containment vessel CVCS - chemical and volume control system CW - circulating water DC - direct current DCA - design certification application ECCS - emergency core cooling system EDNS - normal DC power system EDSS - highly reliable DC power system EHVS - electrical high voltage system
* BPSS - backup power supply system
* CFDS - containment flooding and drain system
* COA - condition of applicability
* CHWS - chilled water system
* CNV - containment vessel
* CVCS - chemical and volume control system
* CW - circulating water
* DC - direct current
* DCA - design certification application
* ECCS - emergency core cooling system
* EDNS - normal DC power system
* EDSS - highly reliable DC power system
* EHVS - electrical high voltage system 2
PM-0618-60190-NP                                                                                          T Revision: 0                                      Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


Abbreviations
PM-0618-60190-NP 3
* ELVS - electrical low voltage system
Copyright 2018 by NuScale Power, LLC.
* EMVS - electrical medium voltage system
Revision: 0 Template #: 0000-21727-F01 R3 T
* FSAR - final safety analysis report
Abbreviations ELVS - electrical low voltage system EMVS - electrical medium voltage system FSAR - final safety analysis report HP - horsepower LTR - licensing topical report MCR - main control room MCS - module control system MPS - module protection system MPT - main power transformer MS - module specific NMS - neutron monitoring system OPS - operations PAM - post accident monitoring PCS - plant control system PLS - plant lighting system PPS - plant protection system PZR - pressurizer
* HP - horsepower
* LTR - licensing topical report
* MCR - main control room
* MCS - module control system
* MPS - module protection system
* MPT - main power transformer
* MS - module specific
* NMS - neutron monitoring system
* OPS - operations
* PAM - post accident monitoring
* PCS - plant control system
* PLS - plant lighting system
* PPS - plant protection system
* PZR - pressurizer 3
PM-0618-60190-NP                                                                                        T Revision: 0                                    Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


Abbreviations
PM-0618-60190-NP 4
* RAI - request for additional information
Copyright 2018 by NuScale Power, LLC.
* RG - regulatory guide
Revision: 0 Template #: 0000-21727-F01 R3 T
* RT - reactor trip
Abbreviations RAI - request for additional information RG - regulatory guide RT - reactor trip SBO - station blackout SDIS safety display and indication system SER - safety evaluation report SPS - security power system SST - station service transformers TG - turbine generator UAT - unit auxiliary transformer VRLA - valve regulated lead acid
* SBO - station blackout
* SDIS safety display and indication system
* SER - safety evaluation report
* SPS - security power system
* SST - station service transformers
* TG - turbine generator
* UAT - unit auxiliary transformer
* VRLA - valve regulated lead acid 4
PM-0618-60190-NP                                                                                          T Revision: 0                                        Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 5
Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Purpose
Purpose
* Provide an overview and highlights of the electrical systems pertinent to Chapter 8 of the NuScale DCA
* Provide an overview and highlights of the electrical systems pertinent to Chapter 8 of the NuScale DCA
            - design basis
- design basis
            - off-site power
- off-site power
            - on-site power (AC)
- on-site power (AC)
            - on-site power (DC)
- on-site power (DC)
            - station blackout
- station blackout
            - FSAR Table 8.3-9
- FSAR Table 8.3-9
* TR-0815-16497 Conditions of Applicability
* TR-0815-16497 Conditions of Applicability
* TR-0815-16497 NRC additional conditions 5
* TR-0815-16497 NRC additional conditions
PM-0618-60190-NP                                                                          T Revision: 0                      Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 6
Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Starting Point
Starting Point
* Key influences in the overall electrical design
* Key influences in the overall electrical design
            - nuclear safety and regulatory requirements
- nuclear safety and regulatory requirements
            - Fukushima electrical insights/dependence on power
- Fukushima electrical insights/dependence on power
            - the robust, inherently safe module concept
- the robust, inherently safe module concept
            - our plant mechanical design emphasizes simplicity
- our plant mechanical design emphasizes simplicity
            - design electrical systems that compliment the simplicity
- design electrical systems that compliment the simplicity
            - 12X factor, electrical impact regarding viability and economics 6
- 12X factor, electrical impact regarding viability and economics
PM-0618-60190-NP                                                                                T Revision: 0                              Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 7
Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Design Basis
Design Basis
* Safety-related components fail-safe on a loss of electrical power
* Safety-related components fail-safe on a loss of electrical power
            - solenoids (de-energized) - valves close/open depending on function
- solenoids (de-energized) - valves close/open depending on function
            - breakers (RT + PZR) - open
- breakers (RT + PZR) - open
* Safety-related systems rely on natural passive mechanisms based on fundamental physical and thermodynamic principles
* Safety-related systems rely on natural passive mechanisms based on fundamental physical and thermodynamic principles
* Based upon the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems, TR-0815-16497, the following are key electrical design features:
* Based upon the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems, TR-0815-16497, the following are key electrical design features:
            - AC and DC electrical distribution systems are classified as non-Class 1E
- AC and DC electrical distribution systems are classified as non-Class 1E
            - highly reliable DC power system (EDSS) has augmented design, qualification, and QA provisions
- highly reliable DC power system (EDSS) has augmented design, qualification, and QA provisions
            - MCR emergency lighting and PAM B&C variables powered by EDSS
- MCR emergency lighting and PAM B&C variables powered by EDSS
            - power sources are not required to support safety-related functions
- power sources are not required to support safety-related functions
            - design supports exemption to GDC 17 and 18 7
- design supports exemption to GDC 17 and 18
PM-0618-60190-NP                                                                              T Revision: 0                          Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 8
Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Overall Electrical Design The Grid / Load EHVS (13.8kV)
Overall Electrical Design The Grid / Load EHVS (13.8kV)
EMVS (4160V)
EMVS (4160V)
ELVS (480V)
ELVS (480V)
EDNS                         EDSS                 PLS BPSS         BPSS SPS (AAPS 13.8kV) (BDGs 480V) 8 PM-0618-60190-NP                                                                            T Revision: 0                      Copyright 2018 by NuScale Power, LLC.
EDNS EDSS BPSS (AAPS 13.8kV)
Template #: 0000-21727-F01 R3
PLS SPS BPSS (BDGs 480V)


Overall Single-Line Drawing Switchyard 13.8kV 4160V 9
PM-0618-60190-NP 9
PM-0618-60190-NP                                                               T Revision: 0            Copyright 2018 by NuScale Power, LLC.
Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 T
Overall Single-Line Drawing Switchyard 13.8kV 4160V


PM-0618-60190-NP 10 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Off-Site Power System
Off-Site Power System
* The off-site power system includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.
* The off-site power system includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.
            - COLA Item (8.2-1) to describe the site-specific switchyard layout and design including off-site power connections
- COLA Item (8.2-1) to describe the site-specific switchyard layout and design including off-site power connections
* The passive design of the NuScale power plant does not rely on AC power and does not require an off-site power system to mitigate design-basis events.
* The passive design of the NuScale power plant does not rely on AC power and does not require an off-site power system to mitigate design-basis events.
* On a loss of off-site power the plant is designed to transition to island mode with house load powered from the designated TG unit.
* On a loss of off-site power the plant is designed to transition to island mode with house load powered from the designated TG unit.
10 PM-0618-60190-NP                                                                          T Revision: 0                        Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 11 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site AC Power
On-Site AC Power
* Use of standardized industrial AC electrical distribution equipment
* Use of standardized industrial AC electrical distribution equipment
* Support online electrical bus outages with multiple modules in service (e.g., transformer capacities, short circuit ratings, etc.)
* Support online electrical bus outages with multiple modules in service (e.g., transformer capacities, short circuit ratings, etc.)
* Electrical distribution levels
* Electrical distribution levels
            - EHVS - 13.8kV (main generators, MPTs, buses) one generator can power entire 12-module house load normal AC power source to on-site loads
- EHVS - 13.8kV (main generators, MPTs, buses) one generator can power entire 12-module house load normal AC power source to on-site loads
            - EMVS - 4160V (UATs, buses) supports large shared plant loads (CW, SCW, CHWS) 11 PM-0618-60190-NP                                                                              T Revision: 0                          Copyright 2018 by NuScale Power, LLC.
- EMVS - 4160V (UATs, buses) supports large shared plant loads (CW, SCW, CHWS)
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 12 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site AC Power
On-Site AC Power
* ELVS - 480V (SSTs, buses)
* ELVS - 480V (SSTs, buses)
            - station service transformers (main-tie-main configuration)
- station service transformers (main-tie-main configuration)
* module-specific and lower HP shared loads
* module-specific and lower HP shared loads
* PLS - 480V, 277V, 208V, and 120V
* PLS - 480V, 277V, 208V, and 120V
            - plant lighting loads and misc. power panel loads
- plant lighting loads and misc. power panel loads
* BPSS
* BPSS
            - auto start on loss of all AC to 13.8kV buses (30-second time delay), manually loaded
- auto start on loss of all AC to 13.8kV buses (30-second time delay), manually loaded
* backup diesel generators (BDGs 480V) support selected plant loads (battery chargers, control room ventilation, CVCS pumps, CFDS pumps) 12 PM-0618-60190-NP                                                                                      T Revision: 0                            Copyright 2018 by NuScale Power, LLC.
* backup diesel generators (BDGs 480V) support selected plant loads (battery chargers, control room ventilation, CVCS pumps, CFDS pumps)
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 13 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site AC Power
On-Site AC Power
* BPSS
* BPSS
            - auxiliary AC power source (AAPS 13.8kV)
- auxiliary AC power source (AAPS 13.8kV)
* support permanent nonsafety loads when normal AC not available
* support permanent nonsafety loads when normal AC not available
* 13.8kV so OPS can distribute power as needed
* 13.8kV so OPS can distribute power as needed
            - portable generator connection (480V) 13 PM-0618-60190-NP                                                                          T Revision: 0                        Copyright 2018 by NuScale Power, LLC.
- portable generator connection (480V)
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 14 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site DC Power
On-Site DC Power
* EDSS (highly reliable DC power system)
* EDSS (highly reliable DC power system)
            - augmented design requirements
- augmented design requirements
            - augmented QA requirements
- augmented QA requirements
            - Class 1E isolation - performed by the MPS and NMS power supply components (i.e., DC-DC converters)
- Class 1E isolation - performed by the MPS and NMS power supply components (i.e., DC-DC converters)
            - VRLA batteries
- VRLA batteries
            - battery duty cycle
- battery duty cycle
* EDSS MS Channel A & D - 24 hours (ECCS Hold Mode)
* EDSS MS Channel A & D - 24 hours (ECCS Hold Mode)
* EDSS MS Channel B & C - 72 hours (PAM Support)
* EDSS MS Channel B & C - 72 hours (PAM Support)
* EDSS-C Division I & II - 72 hours (PAM Support) 14 PM-0618-60190-NP                                                                            T Revision: 0                        Copyright 2018 by NuScale Power, LLC.
* EDSS-C Division I & II - 72 hours (PAM Support)
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 15 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site DC Power
On-Site DC Power
* EDSS - 125V                                                       EDSS-MS Channel A
* EDSS - 125V
            - EDSS-MS (module specific)
- EDSS-MS (module specific)
* not shared per RG 1.81
* not shared per RG 1.81
* power to MPS and NMS
* power to MPS and NMS
* 4-channel system to support 4-channel MPS and NMS
* 4-channel system to support 4-channel MPS and NMS
            - EDSS-C (common)
- EDSS-C (common)
Non-Class 1E
* shared common loads (PPS, MCR emergency lights, SDIS)
* shared common loads (PPS, MCR emergency lights, SDIS)
* two divisions Class 1E 15 PM-0618-60190-NP                                                                                          T Revision: 0                          Copyright 2018 by NuScale Power, LLC.
* two divisions Non-Class 1E EDSS-MS Channel A Class 1E
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 16 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
On-Site DC Power
On-Site DC Power
* EDNS - 250 VDC,125 VDC, and 208 VAC
* EDNS - 250 VDC,125 VDC, and 208 VAC
            - VRLA batteries and 40-minute battery duty cycle
- VRLA batteries and 40-minute battery duty cycle
            - supports nonsafety loads/functions related to investment protection and power generation, for example:
- supports nonsafety loads/functions related to investment protection and power generation, for example:
* nonsafety I&C (PCS and MCS)
* nonsafety I&C (PCS and MCS)
* control rod drive power supply
* control rod drive power supply
* electrical distribution control power
* electrical distribution control power
* TG emergency lube oil pumps 16 PM-0618-60190-NP                                                                                T Revision: 0                            Copyright 2018 by NuScale Power, LLC.
* TG emergency lube oil pumps
Template #: 0000-21727-F01 R3


PM-0618-60190-NP 17 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Station Blackout
Station Blackout
* Passive plant design coping duration (SECY-94-084 and SECY-95-132)
* Passive plant design coping duration (SECY-94-084 and SECY-95-132)
            - station blackout (72 hour coping duration)
- station blackout (72 hour coping duration)
            - SBO analysis includes all 12 modules operating at 100% prior to the event
- SBO analysis includes all 12 modules operating at 100% prior to the event
            - all safety functions achieved and maintained for 72 hours without reliance on AC power or operator action (reactor trip, decay heat removal system, emergency core cooling system)
- all safety functions achieved and maintained for 72 hours without reliance on AC power or operator action (reactor trip, decay heat removal system, emergency core cooling system)
            - core cooling and containment integrity maintained without AC power
- core cooling and containment integrity maintained without AC power
            - sensitivity case demonstrates core cooling and containment integrity maintained without DC power as well
- sensitivity case demonstrates core cooling and containment integrity maintained without DC power as well
            - EDSS available to support PAM 17 PM-0618-60190-NP                                                                            T Revision: 0                        Copyright 2018 by NuScale Power, LLC.
- EDSS available to support PAM
Template #: 0000-21727-F01 R3


Station Blackout (RPV Level) 24 hour ECCS actuation 18 PM-0618-60190-NP                                                         T Revision: 0      Copyright 2018 by NuScale Power, LLC.
PM-0618-60190-NP 18 Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 T
Station Blackout (RPV Level) 24 hour ECCS actuation


Station Blackout (RPV Pressure) 19 PM-0618-60190-NP                                                         T Revision: 0      Copyright 2018 by NuScale Power, LLC.
PM-0618-60190-NP 19 Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 T
Station Blackout (RPV Pressure)


Station Blackout (CNV Pressure) 20 PM-0618-60190-NP                                                         T Revision: 0      Copyright 2018 by NuScale Power, LLC.
PM-0618-60190-NP 20 Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 T
Station Blackout (CNV Pressure)


PM-0618-60190-NP 21 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Electrical Topical Report Evaluation
Electrical Topical Report Evaluation
* NuScale received NRC eRAI No. 9359 on 1/29/18 requesting the addition of a table to the FSAR providing a cross reference for the conditions of applicability provided in the LTR and the five conditions identified in the associated SER
* NuScale received NRC eRAI No. 9359 on 1/29/18 requesting the addition of a table to the FSAR providing a cross reference for the conditions of applicability provided in the LTR and the five conditions identified in the associated SER
* NuScale responded to the RAI on 3/27/18 with the addition of Table 8.3-9 (addresses COAs and SER conditions) and Table 8.3-10 (addresses augmented design provisions), which provide the required FSAR cross references for the LTR and associated SER
* NuScale responded to the RAI on 3/27/18 with the addition of Table 8.3-9 (addresses COAs and SER conditions) and Table 8.3-10 (addresses augmented design provisions), which provide the required FSAR cross references for the LTR and associated SER
            - as a result of the FSAR cross reference evaluation, numerous conforming changes were made to the Tier 2 FSAR to enhance validation 21 PM-0618-60190-NP                                                                          T Revision: 0                        Copyright 2018 by NuScale Power, LLC.
- as a result of the FSAR cross reference evaluation, numerous conforming changes were made to the Tier 2 FSAR to enhance validation
Template #: 0000-21727-F01 R3


Table 8.3-9 FSAR Cross Reference 22 PM-0618-60190-NP                                                         T Revision: 0      Copyright 2018 by NuScale Power, LLC.
PM-0618-60190-NP 22 Copyright 2018 by NuScale Power, LLC.
Template #: 0000-21727-F01 R3
Revision: 0 Template #: 0000-21727-F01 R3 T
Table 8.3-9 FSAR Cross Reference


PM-0618-60190-NP 23 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 T
Conclusion
Conclusion
* The electrical distribution system supports the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems,TR-0815-16497
* The electrical distribution system supports the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems,TR-0815-16497
Line 2,060: Line 2,932:
* Backup power sources (BDGs, AAPS) are available for asset protection, designated plant loads, and black start
* Backup power sources (BDGs, AAPS) are available for asset protection, designated plant loads, and black start
* The electrical distribution system has flexibility to support bus outages with multiple modules in service
* The electrical distribution system has flexibility to support bus outages with multiple modules in service
* The design supports exemption to GDC 17 and 18 23 PM-0618-60190-NP                                                                       T Revision: 0                    Copyright 2018 by NuScale Power, LLC.
* The design supports exemption to GDC 17 and 18
Template #: 0000-21727-F01 R3
 
PM-0618-60190-NP 24 Copyright 2018 by NuScale Power, LLC.
Revision: 0 Template #: 0000-21727-F01 R3 Portland Office 6650 SW Redwood Lane, Suite 210 Portland, OR 97224 971.371.1592 Corvallis Office 1100 NE Circle Blvd., Suite 200 Corvallis, OR 97330 541.360.0500 Rockville Office 11333 Woodglen Ave., Suite 205 Rockville, MD 20852 301.770.0472 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 Richland Office 1933 Jadwin Ave., Suite 130 Richland, WA 99354 541.360.0500 Arlington Office 2300 Clarendon Blvd., Suite 1110 Arlington, VA 22201 London Office 1st Floor Portland House Bressenden Place London SW1E 5BH United Kingdom
+44 (0) 2079 321700 http://www.nuscalepower.com Twitter: @NuScale_Power
 
Presentation to the ACRS Subcommittee NuScale Power, LLC NuScale Design Certification Application Review Safety Evaluation with Open Items: Chapter 8 ELECTRIC POWER June 06, 2018
 
June 06, 2018 Chapter 8, Electric Power 2
* Technical Staff Reviewers
* Project Managers


Portland Office                    Richland Office 6650 SW Redwood Lane,              1933 Jadwin Ave., Suite 130 Suite 210                          Richland, WA 99354 Portland, OR 97224                541.360.0500 971.371.1592 Arlington Office Corvallis Office                  2300 Clarendon Blvd., Suite 1110 1100 NE Circle Blvd., Suite 200    Arlington, VA 22201 Corvallis, OR 97330 541.360.0500                      London Office 1st Floor Portland House Rockville Office                  Bressenden Place 11333 Woodglen Ave., Suite 205    London SW1E 5BH Rockville, MD 20852                United Kingdom 301.770.0472                      +44 (0) 2079 321700 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 http://www.nuscalepower.com Twitter: @NuScale_Power 24 PM-0618-60190-NP Revision: 0                                    Copyright 2018 by NuScale Power, LLC.
Lead Project Manager - Gregory Cranston
Template #: 0000-21727-F01 R3


Presentation to the ACRS Subcommittee NuScale Power, LLC NuScale Design Certification Application Review Safety Evaluation with Open Items: Chapter 8 ELECTRIC POWER June 06, 2018
Chapter 8 Project Manager - Omid Tabatabai Sheila Ray. P.E.
* Technical Staff Reviewers Sheila Ray. P.E. Swagata Som                 James Strnisha Nadim Khan         Luis Betancourt             Timothy Drzewiecki Robert Fitzpatrick Clinton Ashley               Jeffrey Schmidt Fanta Sacko       Thomas Scarbrough           Raul Hernandez
Swagata Som James Strnisha Nadim Khan Luis Betancourt Timothy Drzewiecki Robert Fitzpatrick Clinton Ashley Jeffrey Schmidt Fanta Sacko Thomas Scarbrough Raul Hernandez
* Project Managers Lead Project Manager - Gregory Cranston Chapter 8 Project Manager - Omid Tabatabai June 06, 2018              Chapter 8, Electric Power                    2


June 06, 2018 Chapter 8, Electric Power 3
Overview of Chapter 8 Review NuScale submitted its DCA, Rev 0, in December 2016, and a Rev 1, on March 15, 2018. The staffs SER is based on the review of Rev 0 of the DCA.
Overview of Chapter 8 Review NuScale submitted its DCA, Rev 0, in December 2016, and a Rev 1, on March 15, 2018. The staffs SER is based on the review of Rev 0 of the DCA.
Todays presentation is the first ACRS briefing by the NRC Staff in support of the NuScale DCA review.
Todays presentation is the first ACRS briefing by the NRC Staff in support of the NuScale DCA review.
Line 2,075: Line 2,955:
The staffs SER with Open Items contains two open items and will be discussed in the subsequent slides.
The staffs SER with Open Items contains two open items and will be discussed in the subsequent slides.
Open and Confirmatory Items will be closed in Phase 4 of the Review.
Open and Confirmatory Items will be closed in Phase 4 of the Review.
June 06, 2018                    Chapter 8, Electric Power            3


Technical Topics Section 8.1 - Introduction Technical Topics
June 06, 2018 Chapter 8, Electric Power 4
* NuScale Design:
Technical Topics Section 8.1 - Introduction Technical Topics NuScale Design:  
The electric power system for NuScale design is comprised of non-safety related AC (or ac)(alternating current) and non-safety related DC (or dc) (direct current) power system.
 
This design does not depend on onsite or offsite AC or DC electrical power system, including that from the transmission grid for safe operation.
The electric power system for NuScale design is comprised of non-safety related AC (or ac)(alternating current) and non-safety related DC (or dc) (direct current) power system.  
The NuScale Power Plant design with non-reliance on electrical power accommodates a site location where an offsite transmission grid is not available.
 
This design does not depend on onsite or offsite AC or DC electrical power system, including that from the transmission grid for safe operation.  
 
The NuScale Power Plant design with non-reliance on electrical power accommodates a site location where an offsite transmission grid is not available.  
 
The normal source of power is one or more of the twelve (12) operating power module main generators.
The normal source of power is one or more of the twelve (12) operating power module main generators.
* Staffs review:
Staffs review:  
The staff reviewed the design of the electric power systems necessary for safe design and operation of the plant, or whose failure might adversely affect their safety-related or risk-significant safety functions.
 
The staff reviewed the design of the electric power systems necessary for safe design and operation of the plant, or whose failure might adversely affect their safety-related or risk-significant safety functions.  
 
The staff reviewed the design of the electric power systems in accordance with the applicable DSRS or SRP and consistent with the graded review approach.
The staff reviewed the design of the electric power systems in accordance with the applicable DSRS or SRP and consistent with the graded review approach.
June 06, 2018                              Chapter 8, Electric Power                                  4


Technical Topics Section 8.1 - Introduction Open Item 8.3-1
June 06, 2018 Chapter 8, Electric Power 5
* FSAR, Tier 2, Section 8.3 and DCA Part 7 state that the design does not rely on safety-related AC or DC power systems This position is supported by the application of the evaluation methodology described in NuScale topical report (TR)-0815-16497, Safety Classification of Passive Nuclear Power Plant Electrical Systems.
Technical Topics Section 8.1 - Introduction Open Item 8.3-1 FSAR, Tier 2, Section 8.3 and DCA Part 7 state that the design does not rely on safety-related AC or DC power systems
* The open item relates to the exemptions to GDC 17 and 18 regarding the staff verifying that the design does not require safety-related power.
 
* Furthermore, the staffs evaluation of accident analyses are in Chapter 15 which has not been completed to demonstrate that
This position is supported by the application of the evaluation methodology described in NuScale topical report (TR)-0815-16497, Safety Classification of Passive Nuclear Power Plant Electrical Systems.
: 1) fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and
The open item relates to the exemptions to GDC 17 and 18 regarding the staff verifying that the design does not require safety-related power.
: 2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
Furthermore, the staffs evaluation of accident analyses are in Chapter 15 which has not been completed to demonstrate that 1) fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and 2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.
* Staff issued a safety evaluation approving TR-0815-16497 with five additional conditions.
Staff issued a safety evaluation approving TR-0815-16497 with five additional conditions.
* The NuScale DCA did not directly address the conditions of applicability and the five additional conditions.
The NuScale DCA did not directly address the conditions of applicability and the five additional conditions.
* NRC staff issued RAI 9359, Question 1-1, to address the conditions of applicability and the additional conditions associated with TR-0815-16497.
NRC staff issued RAI 9359, Question 1-1, to address the conditions of applicability and the additional conditions associated with TR-0815-16497.
* Staff is evaluating the RAI response.
Staff is evaluating the RAI response.  
June 06, 2018                                   Chapter 8, Electric Power                                         5
 
June 06, 2018 Chapter 8, Electric Power 6
Technical Topics Section 8.2 - Offsite Power System Technical Topics NuScale Design:
 
The Offsite Power System includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.


Technical Topics Section 8.2 - Offsite Power System Technical Topics
* NuScale Design:
The Offsite Power System includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.
The passive design of NuScale Power Plant does not depend on offsite AC power for safe operation and does not rely on offsite AC power to support safety-related function.
The passive design of NuScale Power Plant does not depend on offsite AC power for safe operation and does not rely on offsite AC power to support safety-related function.
The applicant stated in DCA Part 7 that offsite power is not required.
The applicant stated in DCA Part 7 that offsite power is not required.
* Staffs review:
Staffs review:  
 
The staff reviewed the offsite power system to ensure that it will perform its design function during all operating and accident conditions.
The staff reviewed the offsite power system to ensure that it will perform its design function during all operating and accident conditions.
Open Items
Open Items The completion of the review for the offsite power system is awaiting for the completion of OPEN ITEM 8.3-1
* The completion of the review for the offsite power system is awaiting for the completion of OPEN ITEM 8.3-1 June 06, 2018                              Chapter 8, Electric Power                                  6


June 06, 2018 Chapter 8, Electric Power 7
Technical Topics Section 8.3.1 - Onsite AC Power Systems Technical Topics The following nonsafety-related systems are the major constituents of the onsite AC power system:
Technical Topics Section 8.3.1 - Onsite AC Power Systems Technical Topics The following nonsafety-related systems are the major constituents of the onsite AC power system:
Electrical High Voltage System (EHVS) (13.8 kV)
 
Electrical High Voltage System (EHVS) (13.8 kV)  
 
Electrical Medium Voltage System (EMVS) (4.16 kV)
Electrical Medium Voltage System (EMVS) (4.16 kV)
Electrical Low Voltage System (ELVS) (480 Volts and 120 Volts)
Electrical Low Voltage System (ELVS) (480 Volts and 120 Volts)
Backup diesel generators (BDGs) (480 volts)
 
Backup diesel generators (BDGs) (480 volts)  
 
Auxiliary ac power source (AAPS) (13.8 kV)
Auxiliary ac power source (AAPS) (13.8 kV)
The review focused on the following:
The review focused on the following:
* Overall system operation
Overall system operation Electrical penetration assemblies (EPAs)
* Electrical penetration assemblies (EPAs)
A few areas where the staff sought clarity in the FSAR
* A few areas where the staff sought clarity in the FSAR June 06, 2018                            Chapter 8, Electric Power                                7


June 06, 2018 Chapter 8, Electric Power 8
Technical Topics Section 8.3.1 - Onsite AC Power Systems Open Items There are two open items associated with onsite AC power systems:
Technical Topics Section 8.3.1 - Onsite AC Power Systems Open Items There are two open items associated with onsite AC power systems:
* Open Item with respect to GDC 17 and 18 (Open Item 8.3-1)
Open Item with respect to GDC 17 and 18 (Open Item 8.3-1)
The applicant is to document in the DCA the disposition of the conditions of applicability and the additional conditions imposed by the staff review associated with TR-0815-16497 This relates not only to the Applicants request for exemptions to GDC 17 and 18 but also their associated guidance documents from the DSRS
The applicant is to document in the DCA the disposition of the conditions of applicability and the additional conditions imposed by the staff review associated with TR-0815-16497 This relates not only to the Applicants request for exemptions to GDC 17 and 18 but also their associated guidance documents from the DSRS Open item with respect to EPAs The staff has a path to resolution for this item The confirmatory items will be addressed in our phase 4 SER
* Open item with respect to EPAs The staff has a path to resolution for this item
 
* The confirmatory items will be addressed in our phase 4 SER June 06, 2018                             Chapter 8, Electric Power                                 8
June 06, 2018 Chapter 8, Electric Power 9
Technical Topics Section 8.3.2 - Onsite DC Power Systems Technical Topics The onsite DC power systems include the non-Class 1E EDSS and the non-Class 1E EDNS.
The EDSS-common (EDSS-C) plant subsystem serves plant common loads that have functions that are not specific to any single NuScale Power Module (NPM). These plant common loads include Main Control Room (MCR) emergency lighting and Post-Accident Monitoring (PAM) information displayed in the MCR.
The EDSS-module-specific (EDSS-MS) plant subsystem consists of up to 12 separate and independent DC electrical power supply systems, one for each NPM.
The EDNS is shared between the NPMs and provides both DC power and AC power (through inverters) to non-safety related loads that support functions related to investment protection and power generation.
The NuScale design utilizes Valve-Regulated Lead Acid batteries in the DC systems.
The objective of the staff review is to determine that the onsite direct current (DC) power system satisfies the requirements of 10 CFR 50, Appendix A, General Design Criteria (GDC) 2, 4, 5, 17, and 18 and will perform its design function during all plant operating and accident conditions.


Technical Topics Section 8.3.2 - Onsite DC Power Systems Technical Topics
June 06, 2018 Chapter 8, Electric Power 10 Technical Topics Section 8.3.2 - Onsite DC Power Systems Open Item The open items in this section are related to the classification of the highly reliable dc system (EDSS), and GDC 17 and 18 exemptions.
* The onsite DC power systems include the non-Class 1E EDSS and the non-Class 1E EDNS.
The applicant stated in DCA Part 7 that onsite power is not required for the mitigation of design basis events.
* The EDSS-common (EDSS-C) plant subsystem serves plant common loads that have functions that are not specific to any single NuScale Power Module (NPM). These plant common loads include Main Control Room (MCR) emergency lighting and Post-Accident Monitoring (PAM) information displayed in the MCR.
The completion of the staffs review of onsite dc power systems is awaiting the completion of OPEN ITEM 8.3-1
* The EDSS-module-specific (EDSS-MS) plant subsystem consists of up to 12 separate and independent DC electrical power supply systems, one for each NPM.
* The EDNS is shared between the NPMs and provides both DC power and AC power (through inverters) to non-safety related loads that support functions related to investment protection and power generation.
* The NuScale design utilizes Valve-Regulated Lead Acid batteries in the DC systems.
* The objective of the staff review is to determine that the onsite direct current (DC) power system satisfies the requirements of 10 CFR 50, Appendix A, General Design Criteria (GDC) 2, 4, 5, 17, and 18 and will perform its design function during all plant operating and accident conditions.
June 06, 2018                                Chapter 8, Electric Power                                9


Technical Topics Section 8.3.2 - Onsite DC Power Systems Open Item
June 06, 2018 Chapter 8, Electric Power 11 Technical Topics Section 8.4 - Station Blackout Technical Topics NuScale Design:
* The open items in this section are related to the classification of the highly reliable dc system (EDSS), and GDC 17 and 18 exemptions.
* The applicant stated in DCA Part 7 that onsite power is not required for the mitigation of design basis events.
* The completion of the staffs review of onsite dc power systems is awaiting the completion of OPEN ITEM 8.3-1 June 06, 2018                             Chapter 8, Electric Power                                   10


Technical Topics Section 8.4 - Station Blackout Technical Topics
* NuScale Design:
The NuScale Power Module (NPM) design does not rely on the use of onsite or offsite AC power for the performance of safety-related functions for any design basis event.
The NuScale Power Module (NPM) design does not rely on the use of onsite or offsite AC power for the performance of safety-related functions for any design basis event.
A safe and stable shutdown is automatically achieved and maintained for 72 hours without operator actions.
A safe and stable shutdown is automatically achieved and maintained for 72 hours without operator actions.
* Staffs review:
Staffs review:  
 
The staff reviewed the information pertaining to SBO in the FSAR to determine whether the design is capable of withstanding and recovering from a complete loss of ac electric power for a minimum of 72 hours.
The staff reviewed the information pertaining to SBO in the FSAR to determine whether the design is capable of withstanding and recovering from a complete loss of ac electric power for a minimum of 72 hours.
Staff performed an audit of the methodology and assumptions of the SBO Transient Analysis and SBO sensitivity case.
Staff performed an audit of the methodology and assumptions of the SBO Transient Analysis and SBO sensitivity case.
* The completion of the staffs review of station blackout is awaiting the completion of OPEN ITEM 8.3-1 June 06, 2018                            Chapter 8, Electric Power                                  11
The completion of the staffs review of station blackout is awaiting the completion of OPEN ITEM 8.3-1


Summary
June 06, 2018 Chapter 8, Electric Power 12 Summary Two Open Items:
* Two Open Items:
Electrical Penetration Assemblies Relating to the exemptions to GDC 17 and 18, regarding the staff verifying that the design does not require safety-related power.
Electrical Penetration Assemblies Relating to the exemptions to GDC 17 and 18, regarding the staff verifying that the design does not require safety-related power.
* Staffs review:
Staffs review:
Currently working on Phase 4 review.
Currently working on Phase 4 review.}}
June 06, 2018                    Chapter 8, Electric Power                12}}

Latest revision as of 18:11, 5 January 2025

Transcript of Advisory Committee on Reactor Safeguards NuScale Subcommittee Meeting - June 6, 2018 - Open Session
ML18173A098
Person / Time
Issue date: 06/06/2018
From: Michael Snodderly
Advisory Committee on Reactor Safeguards
To:
Snodderly M
References
NRC-3761
Download: ML18173A098 (190)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Advisory Committee on Reactor Safeguards NuScale Subcommittee: Open Session Docket Number:

(n/a)

Location:

Rockville, Maryland Date:

Wednesday, June 6, 2018 Work Order No.:

NRC-3761 Pages 1-190 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005 (202) 234-4433

NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 www.nealrgross.com 1

1 2

3 DISCLAIMER 4

5 6

UNITED STATES NUCLEAR REGULATORY COMMISSIONS 7

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 8

9 10 The contents of this transcript of the 11 proceeding of the United States Nuclear Regulatory 12 Commission Advisory Committee on Reactor Safeguards, 13 as reported herein, is a record of the discussions 14 recorded at the meeting.

15 16 This transcript has not been reviewed, 17 corrected, and edited, and it may contain 18 inaccuracies.

19 20 21 22 23

1 UNITED STATES OF AMERICA 1

NUCLEAR REGULATORY COMMISSION 2

+ + + + +

3 ADVISORY COMMITTEE ON REACTOR SAFEGUARDS 4

(ACRS) 5

+ + + + +

6 NUSCALE SUBCOMMITTEE 7

+ + + + +

8 OPEN SESSION 9

+ + + + +

10 WEDNESDAY 11 JUNE 6, 2018 12

+ + + + +

13 ROCKVILLE, MARYLAND 14

+ + + + +

15 The Subcommittee met at the Nuclear 16 Regulatory Commission, Two White Flint North, Room 17 T2B1, 11545 Rockville Pike, at 8:30 a.m., Dennis Bley, 18 Chairman, presiding.

19 COMMITTEE MEMBERS:

20 DENNIS C. BLEY, Chairman 21 CHARLES H. BROWN, JR. Member 22 MICHAEL L. CORRADINI, Member 23 WALTER L. KIRCHNER, Member 24 JOSE MARCH-LEUBA, Member 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

2 HAROLD B. RAY, Member 1

PETER RICCARDELLA, Member 2

GORDON R. SKILLMAN, Member 3

MATTHEW SUNSERI, Member 4

5 ACRS CONSULTANT:

6 STEPHEN SCHULTZ 7

DESIGNATED FEDERAL OFFICIAL:

8 MICHAEL SNODDERLY 9

ALSO PRESENT:

10 TOM BERGMAN, NuScale 11 LUIS BETANCOURT, NRO 12 TIM DRZEWIECKI, NRO 13 JEFF EHLERS, NuScale 14 ROBERT FITZPATRICK, NRR 15 TED HOUGH, NuScale 16 NADIM KHAN, NRR 17 SHEILA RAY, NRR 18 OMID TABATABAI, NRO 19 DINESH TINEJA, NRO 20 ANDREA D. VEIL, Executive Director, ACRS 21 KENT WELTER, NuScale 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

3 C-O-N-T-E-N-T-S 1

Opening Remarks 2

By Dennis Bley 4

3 Introductory Remarks 4

By Omid Tabtabai 7

5 OPEN SESSION 6

Overview of Chapter 8, "Electric Power,"

7 NuScale Design Certification 8

Application................

8 9

Break...................... 99 10 Evaluation with Open Items

........... 99 11 Adjourn....................

152 12 13 14 15 16 17 18 19 20 21 22 23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

4 P R O C E E D I N G S 1

8:30 a.m.

2 CHAIR BLEY: Good morning. The meeting 3

will now come to order. This is a meeting of the 4

Advisory Committee on Reactor Safeguards, a NuScale 5

Subcommittee. I'm Dennis Bley, chairman for today's 6

meeting.

7 Members in attendance today are Charlie 8

Brown, Mike Corradini -- I don't know if Walt's here 9

or not, maybe not, we expect Walt Kirchner to come in 10

--- Jose March-Leuba, Harold Ray, Joy --- we expect 11 Dr. Joy Rempe, Pete Riccardella, Matt Sunseri, Dick 12 Skillman, and our consultant, Steven Schultz, is with 13 us.

14 Mike Snodderly is the Designated Federal 15 Official for this meeting. The Subcommittee will 16 review the staff's safety evaluation report with open 17 items of Chapter 8: Electric Power to the NuScale 18 Design Cert Application. Today we have members of the 19 NRC staff and NuScale to brief the Committee.

20 Before we start and I go into the 21 boilerplate stuff, I'll just comment to the staff.

22 From reading the SER, it really feels like we're 23 premature in this meeting. It is a SER with open 24 items, but all of the most significant open items are 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

5 still open. And despite the submittal of responses to 1

the RAIs, there isn't much for us to review and 2

comment on.

3 I'm hoping that the staff will be able to 4

at least give us a little more background on where 5

they stand and what they expect to come out of their 6

review of the main open item on this issue today.

7 Otherwise, in the future. maybe we ought to think 8

about how our schedule is progressing. It does seem 9

a little premature.

10 The ACRS was established by statute and is 11 governed by the Federal Advisory Committee Act, FACA.

12 That means the Committee can only speak through its 13 published letter reports.

14 We hold meetings to gather information to 15 support our deliberations. Interested parties who 16 wish to provide comments can contact our office 17 requesting time after the meeting announcement is 18 published in the Federal Register.

19 That said, we set aside ten minutes for 20 comments from members of the public attending or 21 listening to our meetings. Written comments are also 22 welcome. The ACRS section of the US NRC public 23 website provides our charter, by-laws, letter reports, 24 and transcripts of all Committee meetings including 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

6 the slides presented there.

1 The rules for participation in today's 2

meeting were announced in the Federal Register on June 3

5th, and I apologize for that. I'm not sure why it 4

was so late.

5 The meeting was announced as an 6

open/closed meeting which means we may close the 7

meeting after the open portion to discuss proprietary 8

material. And presenters can defer questions that 9

should not be answered in the public session to that 10 time. So we have to leave that up to you if we start 11 straying into proprietary information.

12 No written statement or request for making 13 an oral statement to the Subcommittee has been 14 received from the public concerning this meeting. A 15 transcript of the meeting is being kept, will be made 16 available as stated in the Federal Register notice.

17 Therefore, we request the participants in 18 this meeting use the microphones located throughout 19 the room when addressing the Subcommittee.

20 Participants should first identify themselves and 21 state with sufficient clarity and volume so they can 22 be readily heard.

23 We have a bridge line established for the 24 public to listen in to the meeting. To minimize 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

7 disturbance, the public line will be kept in the 1

listen in only mode. I also request that attendees 2

put their electronic devices on silence. We don't 3

want them going off during the meeting.

4 We'll now proceed with the meeting. And 5

I'm going to call upon Omid Tabatabai from the NRC 6

staff to make introductory remarks, and then we'll 7

turn it over to the NuScale folks. Omid?

8 MR. TABATABAI: Good morning. Thank you 9

so much, Dr. Bley, and thank you, the members of the 10 ACRS. As you mentioned, this is a Subcommittee 11 presentation of Chapter 8: Electric Power for NuScale 12 Design Certification Application.

13 We're excited to present to the 14 Subcommittee members. And the interesting part is 15 that this is the beginning of Phase 3 of the review of 16 NuScale Design Certification Application. And this is 17 the first chapter that comes before the ACRS.

18 The team from NuScale is going to start 19 the presentation first. And then after that, the NRC 20 staff will make their presentation with respect to the 21 evaluation of information.

22 Dr. Bley mentioned --- made a comment 23 about this review being premature. And I think, to 24 some degree, we agree with that. And we're hoping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

8 that during our presentation we can provide additional 1

information to the members. With that, I'll turn the 2

microphone back to you.

3 CHAIR BLEY: Thank you. And I guess I can 4

turn it over to Paul Infanger from NuScale. Paul, go 5

ahead.

6 MR. INFANGER: Good morning, my name is 7

Paul Infanger and I'm the licensing project manager 8

for Chapter 8. And my background, education, I went 9

to Ohio State University, a bachelor's in physics, 10 master's in nuclear engineering.

11 And I've been in the nuclear power 12 industry for about 35 years, about 25 years at 13 operating plants and about the last ten years working 14 on new reactors. I was at UniStar for about seven 15 years, and now I've been at NuScale for about three.

16 So we'll start with the introductions, and 17 then I have a couple of opening remarks about the 18 chapter presentation. Kent?

19 MR. WELTER: My name is Kent Welter. I'm 20 a chief engineer at NuScale Power. I graduated from 21 Oregon State University with a PhD in nuclear 22 engineering, about ten years at NuScale and about five 23 years at the NRC in New and Advanced Reactors before 24 joining NuScale.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

9 MR. EHLERS: Yes, my name is Jeff Ehlers.

1 I've been at NuScale since January. I've been in the 2

nuclear industry for probably 15 years, mostly spent 3

at Cooper Nuclear Station. I received my degree in 4

electrical engineering from the University of 5

Nebraska. And now I am serving in the role of the 6

electrical engineering supervisor at NuScale.

7 MR. HOUGH: Good morning, I'm Ted Hough.

8 Good to be here again, see all these faces again from 9

last year. I started my nuclear career back in 1968 10 when I read a book called Accelerators: Machines of 11 Nuclear Physics. And about a year later the Navy 12 recruiter thought that was pretty nice, so I got in 13 the Nuclear Navy that way.

14 And over the years, I worked nine 15 different commercial units, and then ended up at 16 Cooper for about 20 years there. That's how I got to 17 know Jeff. And over the years, I got the lead 18 auditor, Level 3 inspector for electrical cert, and a 19 EE degree from the University of Nebraska. And that's 20 my background there.

21 And I think we can just roll right into 22 the presentation if everybody ---

23 MR. INFANGER: Yes. I just wanted to say 24 a couple of things about Chapter 8. I think Omid 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

10 mentioned, this is the first of the chapters. We've 1

brought a number of topical reports to the ACRS. This 2

is the first of our chapters.

3 And although there's quite a number of 4

items that are in the open items in the SER, one thing 5

that we'd like to point out is that for the 6

confirmatory items that are mentioned in the SER, 7

those were in Revision I, which was issued after --

8 was submitted to the NRC after the SER was already in 9

the review cycle. And that's why there's quite a 10 number of confirmatory items. But those have all been 11

--- the responses to all those have been submitted and 12 are on the docket.

13 And also, for the open items, the largest 14 open item is meeting the topical report for the 15 electrical distribution system for non-safety related 16 power. We have submitted an RAI response on that 17 which has provided how we meet all of the SER 18 conditions.

19 So that has been submitted. That was 20 submitted in late March which, again, was after the 21 SER was already in the review cycle. So that's why 22 those things are not in the SER. But we are willing 23 to and able to answer questions about those items. We 24 have the appropriate people here.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

11 CHAIR BLEY: Okay, good. Well, two 1

questions, well, two comments. One is thank you for 2

the list of acronyms. I wish I had it when I was 3

reading this stuff, ha, ha.

4 Number two, have you responded to all the 5

RAIs on this chapter? Or are there still some 6

outstanding that you have not responded to? I know 7

the staff hasn't reviewed them all yet but ---

8 MR. INFANGER: Yes. We responded to all 9

the Chapter 8 RAIs.

10 CHAIR BLEY: Okay, thank you.

11 MR. INFANGER: And with that, Ted, why 12 don't you start the presentation?

13 MR. HOUGH: All right. We'll just jump 14 right in there. Of course, the abbreviations that the 15 member mentioned there, probably most important is all 16 the system names. After that it's pretty much run of 17 the mill acronyms in the industry. I'll just kind of 18 click through those for you.

19 And then again, the purpose of the 20 meeting, to provide an overview of our electrical 21 systems and then present some highlights of the 22 systems. And you can see the presentation's kind of 23 organized just like Chapter 8, 8.1 through 8.4 down 24 there, design basis, offsite power, onsite AC and DC, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

12 and then the station blackout.

1 And then as indicated there, we'll talk 2

about the topical and the road map that'll be provided 3

for that toward the end of the presentation. So 4

there'll be a general flow here.

5 I just want to give you a little bit of 6

background. The starting point that we had when I 7

first got to NuScale in late 2010, October of 2010, of 8

course, you know, your key basis is nuclear safety and 9

regulatory requirements that everybody has to 10 implement.

11 And then in March of 2011, the Fukushima 12 event happened. That weighed heavy on our mind, me in 13 particular. That was a significant emotional event 14 for me, I guess you might say. And then what we had 15 to work with was the robust, inherently safe module 16 design that Dr. Reyes put together.

17 You know, our plant is very simple 18 mechanically. And that was an emphasis that we had 19 all along, make it as simple as possible, don't 20 complicate things. And so my challenge was to put 21 together electrical design that complemented that 22 simplicity.

23 But at the same time, what I had to look 24 for, I can't just put together 12 independent 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

13 distribution systems. That's not economical. But, 1

you know, at the same time, look out for GDC 5, things 2

like that, when we shared electrical systems, you 3

know, so they don't impact economics and viability of 4

the plant.

5 So that's where we started. And so moving 6

along here, what we have is design basis. We 7

maintained everything, the fail-safe and loss of 8

power, everything, any active components like 9

solenoids. They would de-energize and move to their 10 safety position, depending on what their function is.

11 Breakers would open, for example, reactor trip and 12 pressurizer, heater.

13 And then once those active components 14 moved to their safety position, via no power, 15 everything from that point on is natural, you know, 16 passive cooling, thermodynamic principles, et cetera.

17 So it's pretty straight forward.

18 MEMBER SKILLMAN: Ted, let me ask you a 19 question here.

20 MR. HOUGH: Yes, sir.

21 MEMBER SKILLMAN: Go back a slide please.

22 On your next to the last bullet, design electrical 23 systems that complement the simplicity, I hear from 24 your background you've obviously dealt with small 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

14 plants and likely paralleling diesel

engines, 1

paralleling other power supplies.

2 In this

design, you can have 12 3

independent machines, each of which is parallel to the 4

other --

5 MR. HOUGH: Yes.

6 MEMBER SKILLMAN: -- under at least a 7

defined set of conditions, the 11 collapse to an 8

island mode of a selected machine.

9 I was considering, as I did this review, 10 whether I thought that was simple or not simple, 11 drawing on my background of paralleling multiple 12 diesel engines, finding the oscilloscope, making sure 13 I knew, if I was on lead, when I was going to close 14 the breakers manually. All of that I did manually, 15 you probably did too.

16 MR. HOUGH: Yes.

17 MEMBER SKILLMAN: Maybe that's going to be 18 same situation for your operators that might have 12 19 of these modules coming on one at time on a particular 20 time period, or at least three or four coming on 21 during a particular time period. Speak to that 22 relative the work simplicity.

23 MR. HOUGH: I think, you know, that's a 24 good point, you know, bringing the units online. Of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

15 course, they'll have to be, you know, brought in 1

parallel online as they come up. Within the island 2

mode factor that you talk about, that is the part of 3

the design that is yet to go in terms of, you know, 4

controls to do that, if it's in the final design 5

phase.

6 But it's fairly simple in the aspect of 7

when the grid gets --- either it goes away or it gets 8

unstable, disconnect from it. Get away from it. And 9

then we move one unit into isochronous. And the rest 10 of them have full bypass capability, the breakers just 11 open. So the operators have very little to do in that 12 event.

13 I know you mentioned the island mode 14 there, but that's probably, I would say, I guess in my 15 opinion, the most complicated thing is getting the 16 controls lined up, all the relaying and stuff to make 17 that happen. But that's still yet to go in the design 18 phase.

19 MEMBER SKILLMAN: Let me just add one 20 more.

21 MR. HOUGH: Sure.

22 MEMBER SKILLMAN: So let's say we're on 23 watch, and we've got --- we're a fully mature 12 24 module plant. And we've got four operating, and we're 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

16 bringing two online. What's different here is, when 1

you're paralleling the next two modules, you're not 2

just adding an alternator to pick up load. The 3

instant you connect, you're pumping reactivity to 4

increase power to allow that machine to come out and 5

not only stay synchronized but add to the load 6

capacity.

7 MR. HOUGH: Yes.

8 MEMBER SKILLMAN: And so what's really 9

different in this setup is what it takes to, if you 10 will, parallel, assume load, and had enough reactivity 11 that you are actually taking part of the load.

12 So it's a two-step process, whereas in a 13 diesel or gas turbine, you almost automatically come 14 on up and take load. Here is an action that requires 15 addition of reactivity in addition to paralleling the 16 electrical machine. So how has that been considered 17 in terms of simplicity?

18 MR. HOUGH: I would say not from an 19 electrical standpoint but, you know, each module is 20 connected to its own turbine, right --

21 MEMBER SKILLMAN: Yes.

22 MR. HOUGH: -- independently. So the 23 reactivity controls are ---

24 MEMBER SKILLMAN: So does it load 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

17 automatically and increase reactivity automatically?

1 MR. HOUGH: Yes. Dr. Welter might be able 2

to follow on there for me ---

3 MEMBER SKILLMAN: What I'm getting at is 4

the term simplicity. And I'm not challenging that 5

that is accurate. It may be. But I'm imagining a 6

scenario that, at least, I lived through. And it 7

wasn't quite as simple as one might have thought it 8

is.

9 MR. WELTER: Yes. I don't disagree. I 10 guess what Ted is speaking to a little bit is we're 11 going through a lot of that right now. So we have a 12 crew of about 20 folks going through ISV right now, 13 you know, potential operators of the plant going 14 through all these various scenarios on how to start it 15 up.

16 CHAIR BLEY: Would you define your 17 acronyms as you use them, please?

18 MR. WELTER: ISV ---

19 CHAIR BLEY: You've forgotten what the 20 words mean, ha, ha, ha.

21 MR. WELTER: Yes, sorry, independent 22 system verification. It's part of our human factors 23 engineering program. So not all of the details on how 24 to do what you're asking have been worked out. But we 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

18 have a human factors engineering program, we have 1

people on the simulator right going through a lot of 2

these various scenarios.

3 MEMBER SKILLMAN: But we're in the 4

conceptual stage, a lot of lessons ahead. You kind of 5

understand exactly where you want to go. There's a 6

lot of work to get there from here.

7 MR. WELTER: Well, I would say from a 8

design certification perspective, we have the 9

electrical and the systems

designed, and the 10 capability of the plant is well understood. And now 11 exactly how you want to operate that is still being 12 worked out, yes, so conceptual, if you will. And 13 that's part of the human ---

14 MEMBER SKILLMAN: Yes, fair enough. Thank 15 you. Okay.

16 MR. HOUGH: Okay. So then final bullet 17 there, based on the application of topical, highlights 18 our overall design of AC and DC systems are non-1E.

19 We have the highly reliable DC system we talked about 20 last year with augmented design qualifications and QA 21 provisions.

22 And that system itself powers up the main 23 control room emergency lighting, your post-accident 24 monitoring type Bravo and Charlie variables. And then 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

19 there are no power sources required to perform any 1

safety related functions. And so consequently, the 2

design supports exemption of GDC 17 and 18.

3 Here's a picture we put together just to 4

give you kind of a big picture overview of how the 5

systems interrelate to one another. At the top, 6

you'll see the grid or what we call the load, fed by 7

the high voltage system, 13.8, electronically designed 8

as a 345 out to the grid. And then EHV supports the 9

medium voltage system at 4160 through unit auxiliary 10 transformers.

11 And we'll go into a little bit more detail 12 in the next slide here. Then that drops down to a 480 13 system with low voltage. And the ELV 480 system feeds 14 our DC, both DC systems, the normal DC, the highly 15 reliable DC, and over to the right there in the yellow 16 is the plant lighting system. It also feeds security 17 power down there in the blue box.

18 And then the backup power system is 19 actually divided into two pieces, one at a 13.8 source 20 that's called the auxiliary AC power supply, and then 21 the backup diesel generators there, at the 480 level, 22 is also part of the backup power supply system. So 23 that's how they all interrelate to one another in a 24 big picture fashion.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

20 And here's where --- I know this is very 1

hard to see. You know, the pictures are in the 2

application and stuff. At the top there, I would like 3

to point out it's a standard breaker and a half 4

scheme. That's what most places use. It doesn't have 5

to be, but that's we put in there.

6 In the 13.8, there're some interesting 7

aspects of that. Over here at the far left you'll see 8

-- that's the auxiliary power supply unit, an 9

auxiliary AC power supply unit, APS. And it's 10 connected to what appears to be kind of like a swing 11 bus to some of the folks. It might be.

12 But what that allows us to do, in part of 13 this design, part of my background was maintenance 14 rule coordinator at Cooper for five years. And I was 15 on the Advisory Board. And I've seen a lot of folks 16 struggling with unavailability of maintenance. That's 17 why we end up with A4, five, you know, people trying 18 to do too much online.

19 We designed this so that you could take 20 out any component of the AC distribution system and 21 stick device protection in there. They disconnect to 22 the breaker safely. And you can see, I could take 23 this generator here, and move it over to this bus.

24 That main part transformer there was a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

21 component of the AC distribution system. And they 1

still provide 100 percent power. And we put two 2

device protection in there. They disconnect the 3

breaker so it allows safety for the maintenance shops.

4 And you can see, I can take this generator 5

here, and I can move it over to this bus. That main 6

power transformer there will still put out --- each 7

one is built to handle output of two generators.

8 And I can move that other generator. You 9

know, I can take this one, put it over here where it 10 normally would be and put two over here. Now I have 11 this bus and this MPT available. These are three 12 phase main power transformers, about 115 MVA each.

13 So the bus, unless it's the generator 14 itself that goes down on you, I could still put out 15 100 percent power. And that was also a factor in 16 designing this, because you had to have --- it's not 17 like a normal plant where we're going to take the unit 18 down and, you know, have bus outages and bipower.

19 What you have here is a plant that's going 20 to operate 24/7 from all the other units that are 21 still online, so even if I take one generator ---

22 reactor off for refuel. So those are kind of the 23 highlights of the 13.8 system.

24 Now to 4160, you can see it is arranged, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

22 and if you follow it through, you can see there's a 1

ring bus concept built here. And if I have a lockout 2

or anything happened on the UAT, the unit auxiliary 3

transformers there, it'll automatically transfer to an 4

adjacent bus and Ops is selected.

5 And then moving down to the 480 section 6

down here, you can see --- it's real hard to see 7

there, but each one is a main-tie-main configuration.

8 So I have reliability built in there, that if one of 9

those SSTs, you know, trips, or overloads, or 10 whatever, it can go the other side, to the main-tie-11 main configuration. So we've built a lot of 12 reliability in there.

13 And the other factor was, from the control 14 mass type of simplicity, how do I make this system 15 very simple for the operators? Don't add operations 16 for this, you know, because we knew we had this 17 combined control room to deal with. We knew it had to 18 be simple in the first place. So that was another 19 factor we had to consider.

20 CHAIR BLEY: Ted?

21 MR. HOUGH: Sir?

22 CHAIR BLEY: I don't remember if you've 23 done this yet. How are you responding to the open 24 phase situation?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

23 MR. HOUGH: Actually, BTP 8-9, we don't 1

have any motors, anything like that that would be 2

harmed by an open phase condition. And all of our, 3

again, with a zero power need, 8-9 really is a never 4

mind.

5 CHAIR BLEY: You don't need electric 6

power, but it's darn nice to have. So you're not 7

adding any open phase protection, because you don't 8

need it?

9 MR. HOUGH: No, that's correct.

10 CHAIR BLEY: Okay. Your choice, but ---

11 (Off the record comments) 12 CHAIR BLEY: Oh, I'm sorry. Go ahead, 13 Jeff.

14 MR. EHLERS: Yes. This design doesn't 15 have any stand-by AC units. So the open phase issue 16 is where you have a standby transformer that's 17 energized but not loaded. We do not have one of those 18 in our design. So all of our transformers will be 19 loaded and not ready to be transferred to at some type 20 of emergency or a trip condition.

21 So that's where the open phase causes you 22 a problem. Because once you load that transformer, 23 then that open phase becomes apparent and then causes 24 all your motors, three-phase motors, to be down to two 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

24 phases and causes problems.

1 So the times when we don't have that 2

detection, it's because as soon as we lose a phase due 3

to our design, we're going to know immediately, 4

because we're using those transformers. So in the OE 5

that you're -- the operating experience you're 6

speaking of, that was the problem, was that they had 7

a standby transformer that lost a phase.

8 And due to the design of those 9

transformers, they have a delta winding on the center 10 of them that allows the voltage to be placed on the 11 third phase, even though it's not connected to 12 anything. It's a phantom voltage. As soon as you 13 load it, it goes away. But again, we don't have that 14 in our design. So therefore, if we lose a phase, 15 we'll know so immediately.

16 MEMBER BROWN: You said it's a delta 17 output, right?

18 MR. EHLERS: No, no, no. I'm talking 19 about in the middle of the transformer.

20 MEMBER BROWN: No, the three phase ---

21 MR. EHLERS: Yes.

22 MEMBER BROWN: It's a delta ---

23 MR. EHLERS: Right.

24 MEMBER BROWN: -- connected system. And 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

25 you can't operate, saying it goes away, that's not the 1

2 (Simultaneous speaking) 3 MEMBER BROWN: When it goes down to two 4

phases, you have an open delta, but it can still 5

supply about 60 percent of the load.

6 MR. EHLERS: Right.

7 MEMBER BROWN: Roughly.

8 MR. EHLERS: With some pretty high phase 9

currents.

10 MEMBER BROWN: Well, there's imbalances.

11 But, I mean, it can ---

12 MR. EHLERS: Right.

13 MEMBER BROWN: -- you can supply about 60 14 percent of the load. So I've got a little bit of a 15 disconnect when you say it goes away.

16 MR. EHLERS: Well, I mean, the voltage on 17 that third phase is --- the problem with the open 18 phase issue is that, in the sense of transformers not 19 loaded, your voltage indications are going to show 20 there's a voltage on that phase. It's going to show 21 that -- your indication's going to say that phase is 22 energized.

23 But as soon as you load it, then this 24 voltage on the open phase goes away. And therefore, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

26 you're down to two phases. So that's the problem with 1

the open phase issue, is that on an unloaded 2

transformer there's no way to detect it, or there 3

wasn't any way to detect that open phase until the 4

transformer was actually loaded.

5 Now, then once you transport --- then once 6

you transfer to that transformer, put load on it, then 7

it became readily apparent that that was already too 8

late. Because you were needing it, and you just cause 9

all your motors, your loads to be operating on two 10 phases instead of three, what they were designed for.

11 Does that make it clear? Did I answer your question?

12 MEMBER BROWN: A little bit. I just never 13

--- I did an open phase delta connected analysis at 14 one time back in one of my old jobs. I never really 15 thought about it under the zero load condition. So 16 trying to connect that back to saying that all of a 17 sudden the voltage can't be sensed, I mean, I'd have 18 to go back and look at that. It's just been awhile --

19 MR. EHLERS: Well, it ---

20 MEMBER BROWN: About 20 years.

21 MR. EHLERS: Yes. In the operating 22 experience, that was the problem for the two cases 23 this occurred, that have been publicized, is where the 24 phase ---

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

27 CHAIR BLEY: Well, that's why it was 1

allowed to exist for the length ---

2 MR. EHLERS: Yes, because if it --

3 CHAIR BLEY: -- of time it existed. And I 4

agree with you that it's obvious if you have the 5

transformer loaded. However, you can still get some 6

pretty big phase currents temporarily. And the idea 7

that that can't do any damage, I'm not convinced of 8

that.

9 MR. EHLERS: Well, I mean ---

10 CHAIR BLEY: Then again, you know, Ted's 11 right for the details of your response to accident 12 conditions. You don't need it. On the other hand, if 13 it were my plant, I'd think about it long and hard 14 before I didn't worry about that.

15 MR. EHLERS: I'm just saying, due to all 16 the transformers being loaded, and power flow going 17 through

them, an open phase condition would 18 immediately recognized.

19 CHAIR BLEY: Yes, it would. I agree with 20 you on that.

21 MR. EHLERS: Yes. Where the open phase 22 detection system is for unloaded transformers.

23 CHAIR BLEY: I'm not completely sure that 24 under all conditions none of that operating equipment 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

28 could be damaged though. That's the other side of it.

1 MR. EHLERS: Well, yes, I agree with that.

2 CHAIR BLEY: And I would worry about that.

3 MR. EHLERS: Yes, I agree with that.

4 CHAIR BLEY: If it were my own plant.

5 MR. EHLERS: Yes.

6 (Simultaneous speaking) 7 MEMBER SKILLMAN: Where in this diagram is 8

the voltage stepped up to the grid, if this is used, 9

for instance, in grid supply versus a local 10 application where you're not really feeding the grid?

11 MR. HOUGH: Okay. Right here is the 13.8 12 bus. That's the main power transformer, 13.8, the 345 13 going out. And you have a double bus configuration to 14 offsite breakers. Does that answer your question?

15 MEMBER SKILLMAN: So could you go to 16 island mode? And back into island mode where you're 17 just feeding in-house, could you then have a 18 transformer fault where you did have an open phase 19 that you did not detect?

20 In other words, could you find yourself in 21 a transient condition going to island mode, separating 22 from the grid, and in that separation end up with the 23 transformer fault that ---

24 MR. HOUGH: As Jeff indicated, I think ---

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

29 MEMBER SKILLMAN: That would disable a 1

phase?

2 MR. HOUGH: I think I understand the 3

question. The island mode functionality basically 4

disconnects at this point here. And so again, all of 5

these transformers here, all four of the --- or all 6

eight of the main power transformers are normally 7

energized. And you would know whether they were, you 8

know, had a problem or not right away.

9 And so whatever service unit is designated 10 as the island mode module, you know, it'll pick up the 11 load and just feed it right back through once you're 12 disconnected here from the grid itself. Again, you 13 would know ---

14 MEMBER SKILLMAN: Okay, thank you.

15 MR. HOUGH: Okay. Any other questions on 16 this? Hard to read --

17 MEMBER BROWN: Yes. You mentioned the 18 4160 was a ring bus, and I --

19 MR. HOUGH: yes, sir.

20 MEMBER BROWN: -- I didn't pick that up 21 when I looked at this before.

22 MR. HOUGH: Okay. You have to kind of 23 trace it through, ha, ha.

24 MEMBER BROWN: I'm trying to see where it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

30 circles. It's no connection.

1 MR. HOUGH: There's these ---

2 MEMBER BROWN: Oh, it's that side as 3

opposed to left or right.

4 MR. HOUGH: Yes, yes. And then over here 5

too on the outside.

6 MEMBER BROWN: No, hold it. It still 7

doesn't go back to 4160. So as you come to a 4160 8

bus, off of the 13.8 kV, just pick one of those.

9 MR. HOUGH: Yes, go here.

10 MEMBER BROWN: And then I can go ring bus 11 to the other -- to the left.

12 MR. HOUGH: Yes.

13 MEMBER BROWN: Come down, and there's no 14 connection.

15 MR. HOUGH: Or you can go here.

16 MEMBER BROWN: I don't see any ring bus 17 connection on 4160. I don't really care ---

18 MR. HOUGH: Because it's supposed to --

19 (Simultaneous speaking) 20 MEMBER BROWN: You just made the comment, 21 and I can't find the line.

22 MR. HOUGH: Yes. It is there. And these 23 connection points here get you to the other side.

24 MEMBER BROWN: I'll work on that.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

31 MR. HOUGH: Okay.

1 MEMBER BROWN: I do not see it.

2 MR. HOUGH: Okay. It is there. Again, I 3

apologize for the --- it's kind of hard to, on this 4

large picture, or large schematic, the small picture.

5 All right, the offsite system, again, this 6

would be like 8.2 in the SRP or DSRS, offsite power 7

system is our switchyard and one or more connections 8

to the transmission grid, as you see in there, or a 9

microgrid, or a dedicated service line.

10 We do have a COLA item included in the DCA 11 for the Applicant to describe their own specific 12 switchyard configuration. And here again, we don't 13 rely on any AC power, either onsite or offsite, to 14 mitigate a design basis event. And a loss of offsite 15 power, as Mr. Skillman refers to, we transition to 16 island mode, and the house load is powered from any 17 one of the designated TGs.

18 MEMBER SKILLMAN: What is the house load?

19 MR. HOUGH: It's somewhere right at 30 20 megawatts, so it's about 50 percent power.

21 MEMBER BROWN: Is that per module?

22 MR. HOUGH: No, that's the entire house.

23 MEMBER BROWN: That's the entire --- if 24 you had 12 modules connected to the house load, is 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

32 that a 30 megawatt?

1 MR. HOUGH: That's correct. But we put it 2

together that way so that, you know, if something 3

happens in the grid, it'd be nice to be the first one 4

back on. So it's an obstacle once the other 11, if 5

they're all aligned, they'll go into a one percent 6

bypass. So the capability is there. And we maintain 7

a whole house load with one unit.

8 MEMBER SKILLMAN: And that one unit's good 9

for 50 or 60 megawatts electrical? Okay, thank you.

10 MR. HOUGH: And these are smaller, unlike 11 today's units, you know, they run back to, say, like 12 the Cooper 800-plus. And, you know, when you run back 13 to house load, it's somewhere around 20, 22. That's 14 a long ways for that big turbine to drop. Or, well, 15 ours are small, nimble turbines that very easily 16 accommodate that.

17 Okay, onsite AC, we kind of went through 18 some of this, but we'll breeze through it here. We 19 specified all standard AC componentry, you know, look 20 out for short circuit readings that didn't buy 21 anything special as far as off the shelf kind of 22 stuff.

23 And as I noted, we support online 24 maintenance. Any major component, again, can be taken 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

33 out without affecting power output unless it's the TG 1

itself.

2 Those main power transformers take the 3

load of two turbine generators, UATs. Any two of the 4

UATs can power an entire site. As you see in the 5

diagram they do not --- it's real small. There's a 6A 6

slide, 6B slide, so a six-pack. And any two of the 7

UATs can supply that entire load.

8 Let's see, as we stated there, the 12-9 module house load, and again, it is our normal source 10 of power, the term preferred power supply really isn't 11 applicable to NuScale design. That's an existing 12 fleet, that's an offsite power source. Not for us.

13 Our 13.8 buses are our supply, our normal load.

14 And the EMVS is where we have shared 15 loads, shared large loads, that 4160 circ water, site 16 cooling water, chilled water system, any of those big 17 loads that are shared amongst all the units. That's 18 where EMV, that's its role and then, of course, to 19 feed the 480. And the 480, that's where we start 20 breaking it up into module-specific loads. It'll be 21 the main-tie-main configurations, the lower horsepower 22 loads.

23 The plant lighting system here, PLS, is 24 actually listed as a power source. It is the power 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

34 source for us, as well as a main load too. And it 1

provided 480, 277, 208, and 120.

2 The next onsite AC system is the backup 3

power supply system. And if all eight of the 13.8 4

buses go dead or, you know, lost for some reason, 5

after a 30-second time delay those units, both the 6

BDGs and the AAPS, will start. And then Ops will 7

manually load them.

8 CHAIR BLEY: I'm sorry, say that again.

9 I didn't quite follow.

10 MR. HOUGH: If all eight of the 13.8 buses 11 go away, that's when we will start the BDGs, backup 12 diesel generators, and the auxiliary AC power source.

13 So after a 30-second time delay, Ops can load them as 14 they see fit.

15 CHAIR BLEY:

They don't start 16 automatically?

17 MR. HOUGH: It starts automatically.

18 CHAIR BLEY: Yes, that's what I had 19 thought.

20 MR. HOUGH: Yes.

21 CHAIR BLEY: Okay.

22 MR. HOUGH: After a 30-second time delay.

23 And the BDGs, we put them at 480, specifically to 24 power up charger loads. We had a big sit-down with 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

35 Operations. And they said, okay, since we don't have 1

any RTNSS loads, let's put our power where we want it.

2 And we said, okay, where do you want it.

3 And so that's where, you know, control room 4

ventilation, and CVCS pumps, a lot of those loads that 5

Ops wanted for, you know, recovery of the plant, 6

things like that, they said, okay, good. Well, we'll 7

do that. And so the BDGs are, I think the way this 8

calc shows, about 2.4 MVA each. And the AAPS is about 9

14 MVA units.

10 MEMBER BROWN: If you lose the power, if you 11 lose whatever you're losing and the backups come on --

12 13 MR. HOUGH: Yes.

14 MEMBER BROWN: -- multiple backup fuses come 15 on, do they operate independently, or do they 16 automatically synchronize, or anything? I forgot to 17 ask that question.

18 MR. HOUGH: Yes, that's a good question.

19 But they're manually loaded, so they've got to 20 manually synced to get ---

21 MEMBER BROWN: Manually synced, okay. So 22 each individual module, BDGs come up and they stick 23 with the ---

24 MR. HOUGH: Well, there's only two for the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

36 whole site.

1 MEMBER BROWN: Oh, that's right. Okay, yes.

2 MEMBER SKILLMAN: Ted ---

3 MEMBER BROWN: I got it.

4 MEMBER SKILLMAN: Oh, excuse me. Excuse me.

5 MEMBER BROWN: No, I'm finished, Dick. I 6

was just re-calibrating.

7 MEMBER SKILLMAN: I appreciate that you got 8

input from Ops, where do they want power, good place 9

to start.

10 MR. HOUGH: Yes.

11 MEMBER SKILLMAN: Was the selection of the 12 loads solely based on Ops preference, or did you 13 inform, did NuScale inform that decision either by 14 items that are deemed critical out of your PRA or out 15 of operating experience?

16 MR. HOUGH: That's a real good question.

17 And I'd answer it, all of the above. You know, of 18 course Ops has had a main influence for us. But we 19 had, I'd say, 80, 90 percent design. And then we went 20 to Ops and said, okay, look, here's where we stand 21 when I had RTNSS loads. And they never independently, 22 they were going, okay, we got these BDGs, what do we 23 do with them? How do we want to do this?

24 And so they came to us, and we sort of met 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

37 in the middle kind of thing. But, let's see, you have 1

a third element that just slipped my mind here. The 2

use of those were kind of a joint agreement.

3 MR. WELTER: Yes, so ---

4 (Off the record comments) 5 MR. WELTER: Yes, my mic's on. So if PRA 6

was used throughout the conceptual design process for 7

various systems, so the PRA did influence a little 8

back and forth, iterative, on selection of some of 9

these loads.

10 What you'll find is, in the PRAs, some of 11 the important things from, like, prevention and 12 mitigation of the accident perspective, are the CVCS 13 pumps and the CFDS pumps, and the ability to put water 14 back into the containment or the core.

15 So you'll see that that's consistent with 16 the PRA, and they did have a number of back and forth 17 during the conceptual design phase on, you know, what 18 do the risk results on the inside look like?

19 MR. HOUGH: I will add to that, but thank 20 you for the reminder. That was the third item, and it 21 slipped my mind there.

22 The

BDGs, because they're non-safety 23 related, and they don't have to be divisional, we made 24 it so that either one can power up the whole line. So 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

38 we increased the size of it.

1 Because the way it was before, we initially 2

started with a divisional. And then if you lost the 3

division, you're going to lose two. That's two out of 4

four, our MPS -- oh, no, we can't go there. So we 5

said, all right, we'll make it so either one can power 6

the whole plant. And so ---

7 MR. WELTER: Yes.

8 MR. HOUGH: -- you played a big role in 9

that.

10 MR. WELTER: Yes, and I was responsible for 11 the PRA group at that time and, I mean, the PRA 12 practitioners also were nice enough to present 13 alternative designs for your consideration, I think.

14 MR. HOUGH: Yes.

15 MR. WELTER: So the PRA would actually 16 suggest you could do away with some of the redundancy 17 and diversity that's in the existing system. But that 18 was provided as input.

19 MEMBER SKILLMAN: Let me ask this. And this 20 might be the wrong time to ask --- the wrong time for 21 me to ask this. But if you're going to answer it 22 later, that'd be fine.

23 I read that you're using ELMS, electric load 24 management system, to design this. And if you've been 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

39 in a live plant, and you want them to transition from 1

OLMs to ELMS, you recognize that using ELMS is a 2

special database, and it takes specially qualified 3

people to do it. Can you speak to that at this point?

4 ELMS is your electric load management system and most 5

importantly --- excuse me, I mean ETAP.

6 MR. WELTER: ETAP.

7 MEMBER SKILLMAN: I'm sorry. There was a 8

transition from ELMS to ETAP.

9 MR. WELTER: Okay.

10 MEMBER SKILLMAN: And the ETAP people are 11 like PRA people. It's a different group of electrical 12 people who know how to run that software. And if 13 ETAP's used

properly, it will manage your 14 configuration and ensure that the flow and the breaker 15 coordination is what it's supposed to be, if it's done 16 properly.

17 Is ETAP what you have been using from the 18 outset? Or let me say it differently. Was this a mom 19 and pop design that you kind of forced into ETAP?

20 MR. HOUGH: We used ETAP from the onset. I 21 went down to --- in California and got trained myself.

22 And the guys, the entire group were all ETAP.

23 MEMBER SKILLMAN:

They're all ETAP 24 qualified, and they've got punch cards, and they're 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

40 qualified users?

1 MR. HOUGH: Yes, sir.

2 MEMBER SKILLMAN: I'm serious. I mean, it's 3

a ---

4 MR. HOUGH: Yes it is. It is a complicated 5

program. In fact I made the comment at the ETAP 6

training that, hey, you're doing away with electrical 7

engineers' jobs.

8 And they said oh, no, no, no. ETAP is just 9

a tool for you. You still have to recognize when this 10 thing's giving you an erroneous answer, obviously.

11 MEMBER SKILLMAN: So I heard you say you 12 used ETAP right from the beginning.

13 MR. HOUGH: Yes, sir.

14 MEMBER SKILLMAN: And the individuals that 15 are using it are qualified individuals?

16 MR. HOUGH: All have been trained, right.

17 MEMBER SKILLMAN: Okay, thank you.

18 MR. HOUGH: Yes.

19 CHAIR BLEY: Ted --- oh, I'm sorry.

20 MR. SCHULTZ: Ted, with your response with 21 regard to what the PRA team had offered as options, 22 what was the basis for that, for their discussion 23 associated with other design options?

24 Were they suggesting that a target value, a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

41 target risk profile could be met with different 1

alternatives? It sounds as if ---

2 MR. WELTER: Yes. What they were ---

3 MR. SCHULTZ: -- a more conservative 4

approach was determined by the designers than what the 5

PRA team might have thought was acceptable?

6 MR. WELTER: Yes. And in summary from a, 7

you know, plant risk perspective, the design is very 8

robust. And you could do away with some of the 9

redundancy that's built in with minimal impact, 10 negligible impact to core damage frequency or large 11 release frequency as an example.

12 So that was more of an economic suggestion 13 and reliability suggestion. It was just his input.

14 And so, yes, I mean, overall, the PRA team said you 15 can make it less complicated and cheaper, not 16 complicated but just less robust. And the PRA would 17 support that. But the decision was made by the 18 designers to go with this existing design. And it had 19 to do with, well, I'll speak to ---

20 MR. HOUGH: Yes. And again, the way it was 21 set up before, we really thought everything had to be 22 divisional. But that was, you know, when it was 23 potentially a RTNSS diesel. And it turns out on those 24 loads, there's nothing on there. So they said, geez, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

42 it doesn't have to be divisional.

1 And we can eliminate a potential two out of 2

four scenarios if we were on the diesels and, you 3

know, we lost one. So you get a two out of four 4

signal, and the MPS would, you know, actuate. But we 5

could eliminate that challenge to the safety systems 6

by making either one of them supply both. So we said, 7

okay, we'll do it. It was a good decision, with 8

observation from PRA.

9 CHAIR BLEY: Ted?

10 MR. HOUGH: Yes, sir?

11 CHAIR BLEY: You talked some about the 12 backup diesel generators.

13 MR. HOUGH: Yes.

14 CHAIR BLEY: You also have, I think, just 15 one alternate AC power supply?

16 MR. HOUGH: Yes, sir, good segue into the 17 next slide, ha, ha, ha.

18 CHAIR BLEY: You're welcome. Go ahead.

19 (Laughter) 20 MR. HOUGH: The AAPS is just a single unit.

21 And it's there to supply permanent non-safety loads, 22 things like your fire protection.

23 MEMBER CORRADINI: What is it if it's not a 24 diesel generator?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

43 MR. HOUGH: Okay, we had tentatively, 1

because most facilities around the country will use a 2

combustion turbine generator.

3 MEMBER CORRADINI: Oh.

4 MR. HOUGH: And we said, okay, you know, but 5

it doesn't have to be. It's just ---

6 MEMBER CORRADINI: So it's yet to be 7

specified.

8 MR. HOUGH: We ---

9 MEMBER CORRADINI: Okay.

10 MR. HOUGH: -- put it in that way, and have 11 designed around that. But it's conceptual design 12 information where a ---

13 CHAIR BLEY: But you're thinking it'd be a 14 gas turbine.

15 MR. HOUGH: Yes. There's some places, like, 16 it was in -- wherever, got a hydro unit or whatever.

17 MEMBER CORRADINI: The same size as the 18 backup diesel generator?

19 MR. HOUGH: No. This will be a 14 MVA unit.

20 MEMBER RICCARDELLA: I'm sorry, would you 21 repeat that please?

22 MR. HOUGH: The size?

23 MEMBER RICCARDELLA: Yes.

24 MR. HOUGH: Fourteen MPA.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

44 MEMBER MARCH-LEUBA: These generators are 1

what size?

2 MR. HOUGH: 2.4. These are --

3 (Simultaneous speaking) 4 MR. HOUGH: -- numbers, what they actually 5

buy could be a 2.5. Well, it's a minimum of that, and 6

needs a calc. And then, again, we put that unit, the 7

13.8 bus, up there so that Ops could put the power 8

anywhere they wanted it.

9 And then we have a portable generator 10 connection. Originally, we were going to use it maybe 11 for a flex connection. But they don't need it for 12 that. So it's still there.

13 CHAIR BLEY: Did you --- when you did that, 14 are you using that standard flex connection terminal 15 set so you can hook up a flex generator if you get one 16 from somebody?

17 MR. HOUGH: I'm sure I would be, ha, ha, ha.

18 CHAIR BLEY: You haven't specified though.

19 MR. HOUGH: No, not yet. Okay, moving on to 20 onsite DC, the most ---

21 CHAIR BLEY: Does that show up on the one 22 line, the AAP --

23 MR. HOUGH: I guess.

24 CHAIR BLEY: No. Your portable generator 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

45 connection.

1 MR. HOUGH: In this diagram here, yes.

2 CHAIR BLEY: But not on the big one line?

3 MR. HOUGH: Right there, yes. Not the 4

overall one line, no.

5 CHAIR BLEY: Okay. That's what I've been 6

looking at. Okay, go ahead.

7 MR. HOUGH: Yes, this shows a BDG and then 8

a flex connection to that 480 bus that you have there, 9

BDG bus.

10 Okay, the highly reliable DC system, EDSS, 11 again, that's the one that has the augmented 12 provisions applied to it. The Class 1E isolation, if 13 you think about Reg Guide 175 and 3D-4, you're looking 14 in a reverse manner to what we have. It's usually a 15 1E power supply being isolated from non-1E loads, et 16 cetera.

17 In our case, it's a non-1E power supply 18 being isolated from a 1E load down there. And that 19 would be done --- the DC-DC converters, and that'll 20 be, you know, discussed in Chapter 7. That is the 21 power supply from module protection, 22 and neutron monitoring, et cetera.

23 The key here is to recognize, you know, they 24 said, oh look, this is a 1E load. It's got to be 1E 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

46 power supply. No, it doesn't, because of the stuff we 1

discussed last year at the topical here. It's not 2

essential to achieve the safety-related function.

3 Therefore it can be a non-1E power supply. And that's 4

specifically really the SER that was issued last 5

December.

6 The system utilizes VRLA batteries, valve-7 regulated lead acid. The duty cycles in the module-8 specific subsystem of EDSS, there's two different duty 9

cycles. Again, Alpha, Charlie is Div 1. Bravo, Delta 10 is Div 2. And the Alpha and Delta channel of those 11 are 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. And that's to achieve our ECCS hold 12 mode to hold out ECCS if, you know, if a loss of AC 13 happens, so we can automatically launch ECCS. VHR 14 will go first.

15 MEMBER MARCH-LEUBA: Hey, Ted?

16 MR. HOUGH: Sir?

17 MEMBER MARCH-LEUBA: We have not seen 18 Chapter 15 yet, but that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> would become 19 important, because it goes into ECCS mode 20 automatically. So the question is -- and I assume 21 it's not critical if it's 22 or 26, but about how 22 accurate are we going to be on the timing? It's not 23 going to be 150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br />.

24 MR. HOUGH: No, no, that's ---

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

47 MEMBER MARCH-LEUBA: How do you achieve 1

that?

2 MR. HOUGH: We've sized the batteries that 3

way. And then there's also a ---

4 MEMBER MARCH-LEUBA: But aren't the loads 5

going to be variable or not?

6 MR. HOUGH: I'm sorry?

7 MEMBER MARCH-LEUBA: You can size the 8

battery, but the load might be case-dependent or won't 9

be?

10 MR. HOUGH: It will be depending on what 11 vendor we use for the solenoids and things like that.

12 You're right.

13 MEMBER MARCH-LEUBA: So maybe we'll revisit 14 this on the Chapter 15 uncertainties. We will assume 15 this is covered in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, but it could be 26.

16 MR. WELTER: I'm actually going to --- in a 17 station blackout transient ---

18 MEMBER CORRADINI: You've got a curve.

19 MR. WELTER: Yes. I'll talk to a 20 sensitivity we did where we looked at with DC power 21 and without, where the ECCS actuated to two hours 22 versus 24 in a few more slides and kind of get a feel 23 for the ---

24 MEMBER MARCH-LEUBA: Okay. Thank you.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

48 MR. WELTER: -- plant response.

1 MEMBER CORRADINI: So maybe I'll ask my 2

questions there. But so this is coupled to the timing 3

of this 24-hour changeover? This is coupled to the 4

timing.

5 MR. WELTER: I mean, the station blackout 6

analysis was run with a 24-hour ECCS --

7 MEMBER CORRADINI: Clock.

8 MR. WELTER: -- clock, correct. But we did 9

a sensitivity to that as well.

10 MEMBER CORRADINI: Thank you.

11 MR. WELTER: Yes.

12 CHAIR BLEY: Ted?

13 MR. HOUGH: Sir?

14 CHAIR BLEY: You know, a lot of the 15 machinations we've gone through on the topical report 16 and now here are essentially, I think, because there 17 are no VRLA Class 1A batteries around.

18 Is there any movement in the industry you 19 guys have tracked that were -- I mean, these things 20 are used everywhere. The more you look, the more you 21 find people are using them. Is there any motion to 22 try to get these things classified 1E?

23 MR. HOUGH: The last input that I had was, 24 you know, from the EPRI folks. And they were actually 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

49 looking at more advanced batteries, you know, looking 1

at Type A and things like that, to actually have it 2

ready as a 1E qual, for example, for the AP 1000 when 3

their existing VRLAs become, you know, obsolete or 4

whatever. They're actually kind of leapfrogging over 5

VRLA. And that was the last information I had.

6 CHAIR BLEY: Of course, going to lithium 7

would raise other issues, but go ahead.

8 (Laughter) 9 MR. SCHULTZ: Has EPRI discussed a schedule 10 associated with that?

11 MR. HOUGH: I'm not aware of it. But it 12 wouldn't be in our timeframe for sure.

13 (Off the record comments) 14 MR. HOUGH: So the second to the last bullet 15 16 CHAIR BLEY: So the answer is kind of no.

17 Nobody's really trying to --

18 MR. HOUGH: I'm sorry, I didn't --

19 CHAIR BLEY: -- see VRLAs as 1E batteries.

20 The effort is more looking at something beyond that.

21 MR. HOUGH: Not that I'm aware of, right.

22 Fortunately, we don't need it.

23 The Bravo and Charlie channels, those are 24 there to support the PAM functionality from a module-25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

50 specific --- get the information from each module. It 1

goes to the control room, and then your EDSS common, 2

they have I and II, feed the displays in the control 3

room for post-accident monitoring. Let's see, so 4

here's ---

5 MEMBER CORRADINI: So ---

6 MR. HOUGH: Sure?

7 MEMBER CORRADINI: No, no. You're on the --

8 I want you to explain the orange. I'm very confused 9

about how the orange is safety related and what that 10 is, unless that's simply valve actuation at time zero.

11 Is that what the Class 1E box --

12 MR. HOUGH: The Class 1E box, that 13 represents the 1E load which is MPS, neutron 14 monitoring, et cetera, all right. You know, that's 15 your sense and command. And then the execute device 16 would be your field solenoid or whatever.

17 MEMBER CORRADINI: Okay. But if I get into 18 an accident in a situation where I demand scram, 19 that's not needed once I scram. But does that also --

20

- that does not power any valve actuation. The valves 21 fail to a safe position?

22 MR. HOUGH: That's correct. Every execute 23 device we have fails to a safety position without 24 power. And I ---

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

51 MEMBER CORRADINI: This is strictly the MPS?

1 MR. HOUGH: Yes.

2 MEMBER CORRADINI: Okay.

3 CHAIR BLEY: But on loss of AC power, you 4

also scram.

5 MR. HOUGH: Yes.

6 CHAIR BLEY: Without a signal. I mean, it's 7

just ---

8 MEMBER CORRADINI: So let me ask the 9

question now, and then Kent will answer in his exam.

10 So if I have a loss of AC power and DC power and all 11 is not what it's supposed to be, and I mistimed the 12 24-hour changeover --- I can't come up with a better 13 word --- transition, it doesn't matter whether it's a 14 time zero or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, it's just the most convenient 15 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />?

16 MR. WELTER: Yes. When we initially, well, 17 from a safety perspective it does not matter. Now 18 there's --- and I can show that with a transient ---

19 MEMBER CORRADINI: Okay.

20 MR. WELTER: But the 24-hour time period we 21 established sort of early in the design process with 22 discussion with Ops, and looking at OE, and just ---

23 it's more providing time to recover power before you 24 actually actuate the ECCS and blowing down to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

52 containment. So that's more of an operational coping 1

time period that we want to provide.

2 MEMBER CORRADINI: So to put it in brutal 3

terms, you induce a LOCA with a 24-hour clock.

4 MR. WELTER: Well, LOCA is a pipe break. We 5

control, by definition ---

6 MEMBER CORRADINI: So it's a POCA. It's a 7

planned loss of coolant, POCA.

8 (Off the record comments) 9 MR.

WELTER:

It's a

controlled 10 depressurization of the reactor coolant system.

11 MEMBER CORRADINI: Okay. All right. But 12 whether it's 24, it's a matter of Ops deciding what 13 they thought they needed to try to recover from ---

14 MR. WELTER: Correct.

15 MEMBER CORRADINI: Okay.

16 MR. HOUGH: Questions here then?

17 MEMBER BROWN: Yes, do you need AC power to 18 do that? I've forgotten some of the stuff.

19 MR. WELTER: I'm sorry, to do what?

20 MEMBER BROWN: To execute your ECCS.

21 MR. WELTER: No. In the beginning of a 22 station blackout, we assume that ---

23 MEMBER BROWN: You need DC power?

24 MR. WELTER: The DC power keeps it closed.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

53 And when you lose the DC power at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the 1

batteries run out, you remove power from the soleoids, 2

and the ECCS valves open, actuate.

3 MR. HOUGH: So the answer to the question is 4

either.

5 MEMBER BROWN: Yes. I'm just trying to, 6

again, I'm trying to calibrate myself, if I lost 7

everything, all the power.

8 CHAIR BLEY: It's probably more a question 9

10 MEMBER BROWN: AC, DC, and everything else.

11 MR. WELTER: I'll talk about that a little 12 bit more almost on two more slides.

13 MEMBER BROWN: Okay. But when you get there 14 15 (Simultaneous speaking) 16 CHAIR BLEY: -- station blackout. I'm just 17 thinking if there's no power, that's obviously a super 18 station blackout.

19 MR. WELTER: Yes. I'll talk just a little 20 bit to that in a couple of slides.

21 CHAIR BLEY: When you get there, or maybe in 22 Chapter 15, when we lose the batteries, we don't go 23 from full voltage to zero voltage. It degrades, which 24 to me says there's going to be some random sequencing 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

54 of how these valves drift from close to open.

1 Have you thought about that? You know, if 2

you turn off all the DC power, boom, everything works 3

the way you've designed it to work.

4 MR. INFANGER: The 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is on a timer.

5 It's not just a decay away and then they lose DC 6

power.

7 CHAIR BLEY: Okay, so the timer ---

8 MR. INFANGER: The actual timer ---

9 (Simultaneous speaking) 10 CHAIR BLEY: -- the timer, these into the 11 batteries.

12 MR. INFANGER: The batteries are sized to be 13 at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. In that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, you will get a 14 signal that opens all of them and potentially actuates 15 the ECCS.

16 MR. WELTER: Yes, sorry. I should have 17 clarified that.

18 MEMBER CORRADINI: So wait a minute.

19 MEMBER MARCH-LEUBA: This will be an issue 20 with what you were talking about. If your batteries 21 are not large enough, and they only last 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> ---

22 CHAIR BLEY: Yes. Then this becomes a 23 question.

24 MEMBER MARCH-LEUBA: I would like to have a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

55 voltage monitor isotopes on the batteries.

1 MEMBER CORRADINI: But get to Dennis' 2

question of the essence. So let's say your design 3

works as planned. But at 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> it starts becoming 4

--- it doesn't hit your timer, but it's kind of 5

degrading. What do the valves do? That's what 6

Dennis' question ---

7 MEMBER BROWN: Do some of them close?

8 (Simultaneous speaking) 9 CHAIR BLEY: if, in fact, your batteries, 10 when you get the actual load in the accident and it's 11 ten years into operation, here they're kind of running 12 out of power before you expect it in your design. And 13 now things don't happen all at once like they will in 14 the timer. But you start getting, first one drops 15 out, then another one.

16 MR. WELTER: I'll have to defer to the 17 electrical systems ---

18 CHAIR BLEY: You don't see that as a 19 feasible situation?

20 MR. WELTER: I guess I haven't thought about 21 that at the moment.

22 CHAIR BLEY: I think it's a good thing to 23 think about.

24 MR. WELTER: I'd have to talk with the I&C 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

56 folks exactly how the system is designed and how 1

losing a

little bit of power it's my 2

understanding, you know, you're not going to lose a 3

little bit of power and have, like, one ---

4 CHAIR BLEY: Well, by design you're not.

5 MR. WELTER: Even by that consideration, but 6

7 MR. EHLERS: Well, they'll still be doing it 8

just to --- I know you're talking about a theoretical 9

situation, I mean, they're going to still be doing 10 testing of the batteries to make sure their capacity 11 is there to make the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on a routine basis.

12 But in this scenario where if, for somewhat 13 of a reason, it didn't make the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, again, 14 you're only causing an operational issue, not so much 15 a safety one.

16 MR. WELTER: Yes. I mean, you're generating 17 a signal, right. It's not like they're --- I mean, 18 you're generating a signal to actuate. And so when 19 that signal --- we're not generating partial signals 20 to actuate the ECCS system. They're ---

21 CHAIR BLEY: Well, you generate a signal to 22 remove all of the power. And the valves pop open.

23 MR. WELTER: Correct. And if you don't get 24 that signal ---

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

57 CHAIR BLEY: If the power degrades ---

1 MR. WELTER: Then you don't generate a 2

signal.

3 CHAIR BLEY: -- before you generate a signal 4

5 MR. WELTER: Then they don't pop up.

6 CHAIR BLEY: -- at some point, they're going 7

to drift open when they don't have enough power to 8

hold them shut.

9 MR. HOUGH: I think there's a -- the missing 10 piece here is the instrumentation and control. And 11 correct me if I'm wrong here, but we have something 12 called the equipment interface module. And it doesn't 13 matter whether you remove power, whether you get a 14 logic signal from one state to a zero state, or an 15 operator reaction as a result of the same. The 16 execute device goes to a safety position, okay.

17 MEMBER BROWN: Say that first part again, 18 something goes to the safe position.

19 MR. HOUGH: They execute device, the 20 solenoid, or whatever, the breaker will go to a safety 21 position.

22 CHAIR BLEY: I'll probably save this for 23 when the PRA guys get here eventually, but we've seen 24 real plants where the easy one isn't electrical, it's 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

58 air, air pressure doing the same thing as the 1

electrical is doing here.

2 And if it goes away at once, of course, 3

everything goes to the right position. If it goes 4

away gradually, weird stuff starts happening. A valve 5

over here drifts shut, something over here speeds up, 6

something here happens, and it's not, you know, moving 7

the way you expect.

8 So I hope the PRA guys have thought about 9

that. You're looking at design. And in design, this 10 can't happen. In the real world, sometimes things 11 happen that are outside of your design basis.

12 MEMBER MARCH-LEUBA: Let me postulate that.

13 CHAIR BLEY: But I'll postpone that.

14 MEMBER MARCH-LEUBA: There was an earthquake 15 that partially grounds to one of your cables.

16 CHAIR BLEY: There you go. And there's a 17 18 MEMBER MARCH-LEUBA: So then you have bigger 19 load, and suddenly you only last six hours.

20 Definitely, I would prefer if you have a monitor of 21 the voltage. And do it before the voltage stops, you 22 know, 11 -- yeah.

23 CHAIR BLEY: It's up to you, Matt.

24 MEMBER SUNSERI: So I've got a slightly 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

59 different question on this topic. In some of the 1

plants that I've been in, from a reliability 2

perspective, we worked hard to eliminate energized --

3 continuously energized relays and coils from a 4

reliability perspective, especially if they were a 5

single point of vulnerability.

6 So can you comment on the reliability 7

aspects of having your ECCS valve energized to stay 8

closed for the whole operating cycle?

9 MR. HOUGH: That is a good point, something 10 we thought about early on. If you wanted to have a 11 zero power plant, that's what you end up with. And an 12 EQ qual for that has to account for that. So it is a 13 consideration here. You're exactly right.

14 MEMBER KIRCHNER: I'm trying to remember.

15 You presented previously. I think we saw how the 16 valves were, the ECCS valves were --- what's their 17 normal environment? Are they in water or air? I 18 guess they're in air, the actuators?

19 MR. WELTER: Yes, they're inside the 20 containment, yes.

21 MEMBER KIRCHNER: So they're in the 22 containment, they're in air.

23 MR. WELTER: Vacuated containment, minimal 24 air.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

60 MEMBER KIRCHNER: But not accessible?

1 MR. WELTER: Not during normal operation, 2

correct.

3 MEMBER KIRCHNER: So I think Matt's point is 4

a good one.

5 MR. HOUGH: Well, that's the mechanical 6

valve itself.

7 MR. WELTER: That's the mechanical part.

8 MR. HOUGH: Tripped solenoids and stuff like 9

that are outside.

10 MR. WELTER: Yes, that's correct.

11 MEMBER SUNSERI: So I guess the follow-up 12 question is what's the consequence of a spurious 13 opening of the valve?

14 CHAIR BLEY: One valve.

15 MR. INFANGER: Yes. The spurious opening of 16 a single valve is evaluated in 15.6. And essentially, 17 what happens is water starts going into containment.

18 The water level in containment rises. And when you 19 reach the level set point in containment, the rest of 20 the valves open.

21 MEMBER SUNSERI: So I guess the reactor 22 shuts down and ---

23 MR. INFANGER: Yes. Containment isolates 24 the reactor, and it trips, and the DHRS actuates.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

61 MEMBER BROWN: How often are the batteries 1

tested? You made the comment about --- I've forgotten 2

who made the comment about they're periodically tested 3

to ensure that their capacity is satisfactory ---

4 MR. EHLERS: Right.

5 MEMBER BROWN: -- to handle. And so what's 6

the timeframe between capacity tests?

7 MR. EHLERS: That's still to be determined.

8 I mean, that's going to follow the vendor guidance 9

when we get the batteries.

10 MEMBER BROWN: Okay, implementing 1188, 11 1187?

12 MR. EHLERS: Typically, it's going to be 13 14 MEMBER BROWN: Are we talking a year, two 15 year --

16 MR. EHLERS: -- two years, four years.

17 MEMBER BROWN: -- refueling cycle?

18 MR. EHLERS: It depends also, typically, on 19 the trend of the capacity, you know, starting ---

20 MEMBER BROWN: The reason I ask is, relative 21 to Dennis' question about the sequential or the 22 degrading part, is batteries are very unpredictable in 23 terms of their post-tested performance. They're 24 innately good.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

62 1

I mean, a typical example, I know a buddy of 2

mine came up to visit with me for a week and turned 3

off his car. And half an hour later he went back out 4

to start the car, and it didn't start. The battery 5

was dead. And it did that in a half an hour even 6

though he'd been driving for four hours to get to my 7

house.

8 So I think it's a good question to ask about 9

the ability to predict the performance of all the 10 batteries, of the number of batteries you've got, and 11 not have some of them do something slightly different 12 than what you --- I'm not saying you're doing it the 13 right way, all I'm bringing out is to amplify Dennis' 14 point.

15 MR. HOUGH: Those are good points. Let me 16 bring up that we are implementing IEEE 1187, 1188 for 17 the batteries, the monitoring and maintenance of them.

18 And we also have continuous battery monitors installed 19 on the PRA also.

20 MR. WELTER: I don't know if you can see ---

21 MEMBER BROWN: Yes, but those --- that's 22 another capacity, that just says that ---

23 MR. HOUGH: No, that's correct.

24 MEMBER BROWN: -- you're just putting, well, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

63 you're generating some current at some voltage.

1 CHAIR BLEY: I think it was Paul earlier who 2

said you are going do deep discharge testing on these 3

routinely. No? I misunderstood what you said.

4 (Off the record comments) 5 MEMBER BROWN: There was a periodic test 6

every refueling cycle or something like that, they 7

haven't determined yet. It's a capacity test.

8 CHAIR BLEY: Well, to me a capacity test 9

sounds like a deep discharge test. You're running it 10 way down. If you're not doing that, then the battery 11 performance gets fuzzier.

12 MR. INFANGER: Yes. There's actually a 13 standard for the VRLA batteries. And they don't do a 14 deep discharge for them. You do a more shallow 15 discharge, and you trend it on graphs. So it's just 16 a different process. Because you don't want to ---

17 CHAIR BLEY: No, it's more than a different 18 process, it's not testing what you're worrying about.

19 MR. INFANGER: If you're at 25 percent 20 discharge, and then you trend that, that has been 21 proven to be accurate for determining that the 22 batteries maintain their capacity.

23 MR. EHLERS: The key to both technologies 24 that apply to VLAs and to VRLAs is the trending 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

64 portion of it. So whatever test you do is to 1

determine the capacity of your current battery and to 2

ascertain the data to do the trend to see how the 3

capacity is degrading over time, so you can make an 4

informed decision of what point you replace that 5

battery.

6 So that's what he's speaking about, is the 7

actual trend. Whether you do a 25 percent discharge 8

test or you're doing a full deep discharge, which is 9

more common amongst the traditional fleet right now, 10 the purpose of both of those is to get that data for 11 the capacity.

12 CHAIR BLEY: Yes. And what I'm not fully 13 familiar with is substantial data that confirms that 14 a partial discharge gives you the right trend.

15 You know, my experience when these started 16 40, 45 years ago with the phone company who used to do 17 very light testing, and then every time they needed 18 the batteries they didn't work. And they eventually 19 went to deep discharge testing.

20 But if there's plenty of information to 21 prove that a 25 percent gives you the real trend, and 22 not a pseudo trend, that would help me. And I guess 23 usually the standard doesn't point me to all of that 24 research that proves it's good enough. If you guys 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

65 can, that would be interesting certainly.

1 MR. HOUGH: The Navy uses these, so ---

2 CHAIR BLEY: Yes, the Navy doesn't share 3

very much.

4 MR. HOUGH: That's correct.

5 MEMBER SKILLMAN: The question I would ask 6

is is this system included in your Maintenance Rule, 7

50.65? I presume that it is. And if it is, then your 8

electrical system is going to be subject to a host of 9

confirmatory tests that it's capable of performing the 10 functional performance requirements for which it is 11 designed.

12 And it would seem to me that, in that 13 context, you're going to have some form of a discharge 14 test, whether it's via a RLA or a different type 15 battery, to confirm the capacitance is what it is 16 required to be. And you're going to pull batteries, 17 replace cells as needed when those cells don't 18 perform. Is that accurate?

19 MR. EHLERS: I believe it is.

20 MEMBER SKILLMAN: I believe it is too. So 21 if that's the case, then whatever that test might be 22 will be the test that is appropriate for that specific 23 battery design. Otherwise, your Maintenance Rule 24 program is not applicable or is not capable of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

66 performing its function. So I think this is going to 1

come out in 50.65 in your Maintenance Rule program.

2 MR. HOUGH: Yes, it's definitely going to --

3 4

CHAIR BLEY: I'm partially responsible for 5

us being a little behind. But we're down to the last 6

20 minutes for you guys. So I'm going to let you run 7

a little freer here toward the end.

8 MR. HOUGH: All right.

9 CHAIR BLEY: If we can all do that.

10 MEMBER BROWN: I'll save my other question 11 until the end then. It's not on this, it's a slightly 12 different question. And they won't be able to answer 13 it. But I just wanted to get it on the ---

14 CHAIR BLEY: Thanks, Charlie. Get on the 15 record.

16 MEMBER BROWN: -- I wanted to get it on the 17 table before the meeting was over.

18 MR. HOUGH: All right, moving on to EES's 19 little brother here, EDNS. These are also VRLA 20 batteries with a 40-minute duty cycle. It originally 21 specifies a 30-minute duty cycle in the URD, the 22 utility requirements document. And we certainly put 23 some margin on there. It's been made in 40 minutes.

24 And that way, loads as you see here like, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

67 you know, breaker control power, things like that, if 1

we needed it, you know, the AAPS would be up and ready 2

to load within that 30-minute time period. And so it 3

was a ten-minute margin. So again, this is all non-4 safety loads for investment protection, power 5

generation, TG emergency lube oil pumps, controller 6

drive supply, et cetera.

7 Moving along here. At this point, I'll turn 8

to my colleague here, Dr. Welter.

9 MR. WELTER: Thank you, Ted. So I'll give 10 that punch line first here, and then we'll look at the 11 three plots.

12 So we're looking at station blackout 13 scenario, a 72-hour coping period. And so I'm going 14 to show a single module analysis. But from an initial 15 conditions perspective, it assumes all 12 modules were 16 operating at 100 percent power prior to the event.

17 Again, the punch line first, all safety 18 functions achieved and maintained for that 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 19 without reliance on AC power or operator action. And 20 those are the safety functions there, the reactor 21 trip, go to passive decay heat removal system, the 22 DHRS, and then eventually the ECCS after the 24-hour 23 time period you talked about.

24 So the criteria for station blackout coping 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

68

period, the core remains
cooled, maintained 1

containment integrity without AC power. I don't have 2

the plots, but I'll speak to it. We did do a ---

3 CHAIR BLEY: Well, before you do that ---

4 MR. WELTER: Yes.

5 CHAIR BLEY: -- just a quick question. Your 6

Table A.4-1 on station blackout begins at time zero 7

then gets a high pressure signal at nine seconds and 8

a reactor trip on high pressure. Why don't we have a 9

reactor trip at time zero on loss of power? I thought 10 losing power releases the rod.

11 MR. WELTER: AC power?

12 CHAIR BLEY: What kind of power holds the 13 rods up?

14 MEMBER BROWN: That's your EDN system?

15 MR. WELTER: Yes. The EDNS is powered by 16 the DC system, so we go back a few slides ---

17 CHAIR BLEY: We've got 40 minutes there.

18 MR. WELTER: Yes, you've got 40 minutes on 19 that from --- the batteries provide that.

20 CHAIR BLEY: So it comes off the batteries.

21 MR. WELTER: Yes, for 40 minutes.

22 CHAIR BLEY: I didn't realize that. I 23 thought it came off of AC.

24 MEMBER MARCH-LEUBA: But your protection 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

69 system must still work for 40 minutes?

1 MR. HOUGH: Module protection?

2 MEMBER MARCH-LEUBA: The planned protection 3

system.

4 MR. HOUGH: It's actually 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and 72 5

hours --

6 MEMBER MARCH-LEUBA: Class 1E?

7 MR. HOUGH: -- on protection.

8 MR. WELTER: On the slide that ---

9 MEMBER MARCH-LEUBA: Class 1E?

10 MR. WELTER: Yes. The slide that Ted had 11 shows the EDNS with a different ---

12 (Off the record comments) 13 MR. HOUGH: There's EDN, and you can see 14 control rod drives there.

15 MR. WELTER: You had onsite DC power on the 16 battery duty cycle ---

17 MR. HOUGH: There's the other one for EDS, 18 for MTS that you're talking about.

19 MR. WELTER: Oh, sorry, 15.

20 MEMBER MARCH-LEUBA: Okay. If you lost all 21 of AC power ---

22 MR. WELTER: Sure.

23 MEMBER MARCH-LEUBA: -- and now you don't 24 scram, your protection system must work.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

70 MR. WELTER: Correct.

1 MEMBER MARCH-LEUBA: What powers it?

2 MR. HOUGH: EDSS is the power supply for the 3

module protection system.

4 MEMBER MARCH-LEUBA: And that's Class 1E.

5 CHAIR BLEY: That's the highly reliable ---

6 MEMBER BROWN: Highly reliable DC power --

7 CHAIR BLEY: -- DC power system.

8 (Off the record comments) 9 MEMBER MARCH-LEUBA: I'm surprised. But 10 it's now creating the plant power?

11 MR. HOUGH: That's correct. It is the 12 normal supply.

13 MEMBER MARCH-LEUBA: My understanding was 14 you lose power, your rods drop. And you ---

15 CHAIR BLEY: That's what I thought I read in 16 this document. But I didn't mark it, so I have to 17 find it.

18 MEMBER BROWN: The EDNS system is the normal 19 DC power system. And I just went back to Chapter 7, 20 okay.

21 CHAIR BLEY: That's EDNS. EDSS is the one 22 23 MEMBER BROWN: EDNS is what supplies the 24 circuit breakers, the reactor trip breakers. It's the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

71 power through the breakers, not the actual trip 1

actuation devices. But that's the power through the 2

breakers.

3 CHAIR BLEY: Through the breakers.

4 MEMBER BROWN: Through those control rod 5

mechanisms. I think that's correct. I haven't 6

reviewed all of Chapter 7.

7 MR. HOUGH: That is correct.

8 MEMBER BROWN:

So according to the 9

schematic, you open these DC breakers via the module 10

--- the plant protection system, or whatever the 11 acronym is. But the actual DC power is supplied 12 through the DC breakers. And if the ---

13 CHAIR BLEY: And that's off of the normal 14 DC?

15 MEMBER BROWN: Yes. If, theoretically, your 16 plant protection system would still be energized at 17 this point, although I haven't checked the power 18 sources to that in all cases.

19 CHAIR BLEY: I misread something on that.

20 It's not real clear.

21 MEMBER MARCH-LEUBA: The same power that 22 keeps the rods up is the one that powers the 23 protection system?

24 MR. HOUGH: No.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

72 MEMBER BROWN: No, it's not. That's -- I've 1

told you. I have --

2 CHAIR BLEY: The normal ones light the rods 3

up.

4 (Simultaneous speaking) 5 CHAIR BLEY: The highly reliable system 6

powers the ---

7 MEMBER MARCH-LEUBA: But none of them are 8

Class 1E?

9 CHAIR BLEY: No.

10 MEMBER MARCH-LEUBA: So for 40 minutes, you 11 may or may not have protection if you have a transit?

12 MR. HOUGH: Oh, no. You have protection.

13 MEMBER MARCH-LEUBA: Well, you may not have 14 power to the protection system.

15 MR. HOUGH: That's the EDS highly reliable 16 DC system that provides power to the protection 17 system. And I don't need that system to achieve 18 safety functions.

19 MEMBER MARCH-LEUBA: Even with the rods out?

20 Your rods are being held by the other batteries.

21 MR. HOUGH: That's correct.

22 MEMBER MARCH-LEUBA: You are going to have 23 to run this by me eventually. Because there is 24 something, I mean, what I understood is we don't need 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

73 Class 1E power, because if I lose power I scram.

1 MR. HOUGH: Yes.

2 MEMBER MARCH-LEUBA: Apparently now, a non-3 safety grade, highly reliable but not safety grade 4

power holds the rods up.

5 CHAIR BLEY: Keeps me from shutting down.

6 MEMBER MARCH-LEUBA: Keeps you from shutting 7

down automatically. And another non-safety grade, 8

highly reliable power is supposed to contain the 9

protection system going.

10 MEMBER BROWN: The EDSS systems supplies the 11 module systems and the plant protection system. I 12 counted another figure while we're sitting here 13 talking about it. And I'm just looking at Chapter 7 14 again, Figure 7.0-2 shows the ---

15 (Simultaneous speaking) 16 MEMBER BROWN: They call it the highly 17 reliable DC.

18 CHAIR BLEY: So we're kind of in an odd spot 19 we didn't know we were in here.

20 MEMBER BROWN: Yes.

21 CHAIR BLEY: If you lose that, you're going 22 to scram, but if you don't lose that ---

23 MEMBER BROWN: You don't scram? You don't 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

74 CHAIR BLEY: You don't scram until you get 1

some signal to scram.

2 MEMBER KIRCHNER: So I think to maintain 3

religious purity here, they have to scram on loss of 4

power. But they don't.

5 CHAIR BLEY: Well, if they lose full power, 6

they do.

7 MR. BERGMAN: If I could interject, Tom 8

Bergman.

9 CHAIR BLEY: Yes, Tom.

10 MR. BERGMAN: That is you lose the --- if 11 you maintain the EDSS you could keep the rods out, but 12 you've lost the EDSS which would cause loss of the 13 module protection system and you will trip the plant.

14 MR. HOUGH: That's correct. That's correct.

15 CHAIR BLEY: You just used the same acronym 16 twice. You didn't mean to.

17 MR. BERGMAN: Oh, I'm sorry, they sound very 18 similar.

19 CHAIR BLEY: If you lose EVMS the rods will 20 fall.

21 MR. BERGMAN: The common system, which is on 22 the current slide ---

23 CHAIR BLEY: Yes.

24 MR. BERGMAN: -- that's the one that keeps 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

75 the rods out.

1 CHAIR BLEY: And if you lose that, the rods 2

will drop.

3 MR. BERGMAN: Yes.

4 CHAIR BLEY: Yes.

5 MR. BERGMAN: If you maintain this one but 6

you lose the EDNS -- no sorry, you had it right -- the 7

EDNS powers the control rods. That would keep them 8

out. But if you lost the power supply to the module 9

protection system, you will trip the plant.

10 CHAIR BLEY: You'll get a signal to trip the 11 plant.

12 MR. BERGMAN: Yes. The module protection 13 system controls the Class 1E devices. If you lose 14 that, all the safety systems go to their safe 15 position, regardless of the other power supplies in 16 the plant.

17 MR. WELTER: Yes, and in Chapter --- not all 18 of the -- at the start of a transient, when you look 19 at it in Chapter 15, you look at loss of power as an 20 initiating event, as an example --- or as a coincident 21 event.

22 But the module --- not all the safety 23 functions, you know, happen within time zero, right.

24 So we have power to the module protection system to, 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

76 you know, monitor the plant. And we have a number of 1

trips that are going to hit depending on the 2

transient.

3 And so we want power to the MPS for a 4

transient so that MPS can perform its safety 5

functions. Reactor trip is just one of those. We 6

have containment isolation, you know, DHRS, DCCS 7

actuation, so we want highly reliable power to the MPS 8

to protect the plant through the various transients.

9 But to Tom's point, if you lose that, then 10 it goes to the fail safe position. It's a whole 11 different paradigm.

12 MR. EHLERS: Yes. Just to be clear ---

13 MEMBER CORRADINI: Yes, let's be clear, 14 because I thought I understood it now.

15 MR. EHLERS: The initiator for the plant 16 trip is loss of power to the battery chargers. So 17 once you lose that power, you get a sixty second time 18 delay just to alleviate any momentary lapses, you 19 know, drops or spikes.

20 MEMBER BROWN: So that's loss of all AC 21 power then.

22 MR. EHLERS: Right. And so as soon as we 23 lose power to our chargers, to charge the batteries, 24 for better than 60 seconds, we will trip the plant.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

77 CHAIR BLEY: And that's a timer that 1

generates the trip signal?

2 MR. EHLERS: Yes. Well, it's a --- yes, the 3

voltage signal goes to the MPS.

4 (Off the record comments) 5 MEMBER BROWN: So independent of the EDSS 6

and independent of the EDNS, if you lose AC power --

7 CHAIR BLEY: To the chargers.

8 MEMBER BROWN: -- the chargers --- yes, 9

thank you --- chargers, there's an independent timer 10 that then says, Kings X, scram the plant. And I don't 11 know where that comes from or how it gets processed.

12 But if you go back and look in Chapter 7, we should be 13 able to see that.

14 MR. EHLERS: That's in Chapter 7.

15 MR. WELTER: And as a point, since we do 16 have DC power, we hit that trip point sooner on high 17 pressure before that ---

18 MEMBER BROWN: You lost me.

19 (Laughter) 20 CHAIR BLEY: In the current analysis that he 21 wanted to talk about --

22 (Simultaneous speaking) 23 CHAIR BLEY: -- they're going to trip in 24 nine seconds because of --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

78 MR. WELTER: -- in nine seconds, which is 1

within that 60 second window.

2 MR. BERGMAN: It's hard to envision making 3

it 60 seconds with no AC power and not getting a 4

reactor trip somewhere first.

5 MEMBER BROWN: Even though there's no 6

"accident" scenario involved.

7 MR. BERGMAN: Right.

8 MR. WELTER: If I could go back to the 9

earlier line of questioning ---

10 MEMBER SUNSERI: Can you get closer to the 11 mic?

12 MR. BERGMAN: Oh, sorry. The questioning 13 about degraded voltage, that will come up in Chapter 14 7 which is in August. But it does isolate our 15 degraded voltage.

16 MEMBER BROWN: I tried to find that, Tom, 17 and was unable to.

18 (Off mic comments) 19 (Laughter) 20 MEMBER BROWN: Is Rev 0 the current revision 21 for Chapter 7? That's all I've got. So we're due to 22 do that in a couple of months.

23 MR. BERGMAN: I'm assuming we have Rev. 1, 24 Chapter 7.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

79 MR. SNODDERLY: Yes.

1 MR. BERGMAN: I don't know how many ---

2 MEMBER BROWN: Mine's 2016. So that's Rev.

3

0. So I have not seen a Rev. 1 yet.

4 MR. BERGMAN: We reissued the DCA as 5

Revision 1 in March, mid-March, all the chapters.

6 MR. SNODDERLY: Yes, this is --- yes.

7 MR. BERGMAN: I'll certainly be in touch.

8 MEMBER BROWN: I was unable to find it 9

anywhere.

10 MR. SNODDERLY: This is Mike Snodderly from 11 the ACRS staff. So as Tom said, Revision 1 came in on 12 March 15th, 2018. And I was going to make a request 13 to the staff. Because also on the public website 14 right now it's still Rev. 0. But, yes, Rev. 1's in, 15 hopefully we can get ---

16 MEMBER BROWN: That's where I got it.

17 MR. SNODDERLY: Yes. Hopefully, we can get 18 that up to date. But otherwise, we'll get access for 19 you guys.

20 MEMBER BROWN: And just to get the 21 proprietary version, not the non-proprietary version 22 that's on the public website. I think it's --- or is 23 it totally non-proprietary?

24 MR. BERGMAN: Oh, no. The design 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

80 certification application is non-proprietary.

1 MEMBER BROWN: Is totally proprietary?

2 CHAIR BLEY: Non-proprietary.

3 MEMBER BROWN: Non-proprietary, okay. Is 4

there any proprietary version of Chapter 7?

5 MR. BERGMAN: There should not be, no.

6 MEMBER BROWN: Okay. I'm just trying to 7

clarify.

8 MR. BERGMAN: Some chapters have security-9 related information which is redacted but --

10 MEMBER BROWN: Okay.

11 MR. BERGMAN: -- will lead us into Chapter 12 7.

13 CHAIR BLEY: I want to come back to Jeff 14 just so I understand this. And maybe we'll get to it 15 again in Chapter 7. But this timer that starts when 16 you lose AC power to the battery chargers, I've got 17 two or three things about it. Is it a mechanical 18 timer or a digital timer?

19 MR. EHLERS: I can't speak to that.

20 CHAIR BLEY: Is it in the protection system 21 or is it, you know, kind of a separate thing?

22 MR. EHLERS: It's part of the MPS system.

23 CHAIR BLEY: It's part of the MPS.

24 MR. EHLERS: Yes.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

81 CHAIR BLEY: And does it do anything else 1

other than generate a reactor trip signal? We'll want 2

to know all about that come --

3 MR. EHLERS: Okay.

4 CHAIR BLEY: -- Chapter 7 time.

5 MR. WELTER: The next slide. This is a plot 6

of a reactor pressure vessel water level above the top 7

of the active fuel. This is collapsed liquid level.

8 This is a plot generated from NRELAP 5, a NuScale 9

proprietary version of RELAP.

10 It's a 72-hour time period, so it's a fairly 11 long plot. We kind of already talked about it a 12 little bit, where you lose AC power to the battery 13 chargers. There is a timer. But, you know, you're 14 going to lose your secondary site heat removal, 15 because you're not, you know, providing any power to 16 your feedwater pumps.

17 And since they are fairly smaller reactors, 18 when you lose that secondary site heat removal, it'll 19 be fairly quick increase in primary system pressure.

20 And you're going to trip the reactor on a high 21 pressure signal within about ten seconds, so fairly 22 quickly.

23 And then you're also going, on the reactor 24 trip, you're going to get a containment isolation 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

82 signal which then you also get a DHRS actuation 1

signal. So within ten seconds of this transient, 2

you've tripped the

reactor, you've isolated 3

containment, and then you've transitioned to your 4

passive DHRS system.

5 CHAIR BLEY: And the containment isolation 6

and DHRS comes off of the reactor trip signal?

7 MR. WELTER: It's a separate ---

8 CHAIR BLEY: It's separate.

9 MR. WELTER: Separate, but the logic is when 10 you get a reactor trip, well, the DHRS is actuated on 11 CNV isolation. So the containment needs to isolate 12 before the DHRS can function.

13 MEMBER MARCH-LEUBA: I thought DHRS was 14 counting on high pressure or it needs --

15 (Simultaneous speaking) 16 MR. WELTER: Yes. Well, the trip signal 17 comes on the high pressure. And then the CNV 18 isolation comes on the reactor trip, and a DHRS 19 actuation comes on the CNV isolation. We don't want 20 to ---

21 MEMBER MARCH-LEUBA: But I thought the DHRS 22 valves needed high pressure to open. What am I 23 missing?

24 MR. WELTER: No, I'm just giving the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

83 sequence of the trips. Because we don't want to 1

actuate the DHRS before the reactor's tripped or the 2

containment's isolated. So there's a logic to the 3

trip sequence. They're right after each other.

4 There's not a delay in between them. So we have to 5

make sure there's a logic that happens.

6 MEMBER BROWN: You said CNV or CNB?

7 MR. WELTER: CNV containment, I'm sorry.

8 CHAIR BLEY: That's the vessel containment.

9 MR. WELTER: Containment vessel, CNV. So 10 reactor trip, CNV isolation, DHRS actuation.

11 MEMBER KIRCHNER: So this is the result of 12 the decayed ---

13 MR. WELTER: Yes. Can you go back a slide, 14 please?

15 MEMBER KIRCHNER: -- system pulling down the 16 pressure.

17 MR. WELTER: Yes, and slowly over time, 18 right. You're going to be reducing, well, the 19 pressure is --- yes, the pressure goes down pretty 20 quickly on the second slide. I wasn't ready to go to 21 the second slide yet.

22 So this is just the water level. So it 23 stays pretty high in the reactor coolant system. It's 24 an elevated water level, so you have natural 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

84 circulation cooling. And then in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, you have 1

that ECCS timer. Because we still have DC power in 2

this scenario.

3 This is a loss of AC with DC power. And 4

then when you get the 24-hour signal, then you have a 5

rapid depressurization at that --- well, actually the 6

depressurization isn't that rapid at that time. You 7

have a rapid loss of inventory as the re-circulation 8

valves and the RVV valves at the top open 9

simultaneously, and the ECCS system actuates.

10 MEMBER KIRCHNER: So why even actuate the 11 ECCS?

12 MR. WELTER: It's on a 24-hour timer. So 13 the plant is designed to do that.

14 MEMBER KIRCHNER: But why actuate it if you 15 don't need it?

16 MR. WELTER: You would have --- h'mm ---

17 MEMBER KIRCHNER: You would reduce the 18 pressure. You've got natural circulation cooling.

19 Why breach containment?

20 (Off the record comments) 21 MR.

WELTER:

It's a

controlled 22 depressurization. It's --- yes.

23 CHAIR BLEY: No, I understand that.

24 MR. WELTER: Yes. No, I understand the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

85 question.

1 CHAIR BLEY: But it's the ECCS actuation 2

where you've breached containment.

3 MR. WELTER: Yes. And so this whole timer 4

thing is interesting in terms of how we had it in the 5

design and all and had others add in. It's not a 6

safety feature. And so if we wanted to keep it ---

7 (Simultaneous speaking) 8 MR. WELTER: What's that?

9 MEMBER MARCH-LEUBA: If you lost your 10 feedwater, you don't have any way for heat to go 11 outside. And if your vessel is intact, your thermos 12 bottle prevents you from losing heat. So you need it.

13 MR. WELTER: We don't need the --- we have 14 the DHRS ---

15 MEMBER MARCH-LEUBA: The DHRS is still 16 working?

17 MR. WELTER: -- that will work, yes. Right, 18 that's the first passive safety system. We've 19 designed a system to fail safe on loss of power. And 20 we've designed an ECCS system to fail safe in its fail 21 safe position as it is depressurizing, right? It's 22 opening valves and depressurizing.

23 And from an operations perspective, you 24 don't want to depressurize that, even though it's fine 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

86 from a safety perspective, we want to give the 1

operators time to recover the power so you don't 2

actuate ECCS.

3 So it's not --- you know, the thing is you 4

could say why not 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />, right? Well, the way our 5

system is designed, we'd have to add more batteries, 6

right, because of the way that the system is designed 7

to keep the valves closed from an operational 8

perspective, to give them --- it's an investment 9

protection thing.

10 So when you're looking at how long to do 11 this, it is -- this timer, it's an economic question.

12 So you can keep it longer, and add more batteries, or 13 this is kind of the spot we pick.

14 CHAIR BLEY: I'm still --- I'm learning a 15 lot this morning.

16 MR. WELTER: Yes.

17 CHAIR BLEY: The 24-hour timer does exactly 18 what?

19 MR. WELTER: For this, it sends an ECCS 20 actuation signal.

21 CHAIR BLEY: ECCS actuation.

22 MR. WELTER: Correct. To de-energize the 23 solenoids to open the five ECCS valves.

24 MEMBER CORRADINI: So can we just back up?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

87 So this stylized station blackout is a scenario that 1

you have to look at relative to station blackout 2

assumptions. But a more severe one will be that I 3

lost DC at time zero.

4 MR. WELTER: So we did look at that 5

sensitivity. Well, severe, it's not really more 6

severe from a safety perspective. You'll have a ---

7 if you go to the next slide as an example.

8 So, you know, DHRS is cooling the system for 9

the first 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and you see you get almost below 10 100 PSI in the reactor coolant system before ECCS 11 actuates. So once it actuates, if you go to the next 12 slide, the bump in containment pressure is very small 13 at about 35 PSI.

14 And if I didn't have DC power, we did a 15 sensitivity case, and we --- now, here's where it gets 16 just a little bit more subtle, is that we have an 17 inadvertent actuation block mechanism on our ECCS 18 valves. So we have another --- and this is a 19 mechanical system that prevents the ECCS valves from 20 opening above a certain pressure or differential.

21 So if we didn't have DC power, if we didn't 22 have power to the solenoids, and that got removed, and 23 you're at high pressure, at 18.50, you have an IAB 24 mechanism that will block the valves from opening, and 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

88 you wouldn't -- until you got down to a range of 800 1

to 1,000 PSI with those valves actually open.

2 So if you go back to the previous slide, we 3

did a sensitivity where we opened at the lower range 4

of 800 PSI, and it would open in about two hours. So 5

you would have the start of the transient, loss of all 6

power, everything, super station blackout, and you 7

would come down --- you'd go to DHRS cooling, you 8

would come down and we, for the transient, you would 9

open around 1,000 to 800 PSI.

10 And then you'd get a little bit more rapid 11 depressurization. The containment pressure would go 12 up to about 200 instead of 35. So you can open it 13 earlier, way earlier, at two hours. You still get the 14 same top of active fuel level, and you have a slightly 15 higher containment pressure.

16 MEMBER CORRADINI:

So what was the 17 containment pressure at two hours?

18 MR. WELTER: What's that?

19 MEMBER CORRADINI: What was the containment 20 pressure at two hours?

21 MR. WELTER: At spike, it gets about 200 22 PSI.

23 MEMBER CORRADINI: so the 35 pound spike 24 goes to 200?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

89 MR. WELTER: Yes, yes, yes. Because you're 1

depressurizing at a higher pressure, about 800 versus 2

100.

3 So that's the sensitivity. So, you know, 4

and in Chapter 15, we do sensitivities of power/not 5

power. And you'll see similar phenomenon in Chapter 6

15 analysis when we don't have DC power. So we do 7

that sensitivity to evaluate.

8 And again, that 24-hour timer is not a 9

safety feature.

It's purely for investment 10 protection. But we do evaluate it as, you know, 11 extreme examples of it not working.

12 And actually, in the PRA there was a 13 question on, you know, the degraded power. And I'm 14 not going to attempt to answer the details on the I&C 15 system. But in the PRA we do look at partial failures 16 of the ECCS system. And you will see that when that 17 chapter comes. So irrespective of it's a mechanical 18 or electrical, we do look at that failure in the PRA.

19 MEMBER KIRCHNER: What's the containment 20 vessel design pressure?

21 MR. WELTER: One thousand PSI. It's a 22 stainless steel, well, it's a carbon steel, dual clad, 23 and stainless steel containment vessel.

24 MR. SCHULTZ: Kent, the partial failure 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

90 you're talking about is valves not actuating, or the 1

timing of the event, valve performance ---

2 MR. WELTER: Right. So when you're looking 3

at ---

4 MR. SCHULTZ: -- or both of those?

5 MR. WELTER: Well, yes. The PRA, from a 6

Level 1 perspective, when you're looking at the ECCS 7

system, it's the five valves, right. And we look at 8

combinations of if one of them opens and four of them 9

don't, and two open, and three don't, the top or the 10 bottom. They look at all those various combinations.

11 And there's definitely cases where at least the core 12 damage, you have some open and some don't. So that's 13 on the PRA.

14 MR. SCHULTZ: Thank you.

15 MEMBER SUNSERI: If you go back just one 16 slide, so what's the slight decreasing trend? Is that 17 just cooling from the DHS system, or you're not losing 18 any inventory, it's just ---

19 MR. WELTER: No. It's all bottled up. Yes, 20 you don't start depressurizing and losing inventory 21 until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Okay.

22 MEMBER SKILLMAN: Kent, where else --- you 23 say that the 24-hours is really driven by investment 24 protection and the recognition that you will 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

91 conceivably be good 48 or 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />, except that does 1

the battery hold, and hence you're increasing the 2

battery capacity that would be required to extend 3

beyond 24?

4 MR. WELTER: You need more batteries to go 5

beyond 24, yes.

6 MEMBER SKILLMAN: Is there any other 7

function that shares that same facet in your thinking?

8 In other words, we really could have more margin or 9

have more time. But because of our economic model, 10 this is as far as we're willing to go relative to our 11 battery capacity.

12 MR. WELTER: That's interesting. I 13 actually, from a safety perspective, want to push it 14 to eight hours. Because when you look at the data, 15 you've got plenty of time within eight hours. So if 16 I was going to start back ten years ago, I would have 17 proposed eight hours instead of 24.

18 MEMBER SKILLMAN: Except that what you're 19 doing then is you're pitting yourself against your 20 heat generation rate and your decay heat removal 21 capability, right?

22 MR. WELTER: It doesn't change after eight 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br />. So if you look there after --- if you see 24 where that dip is, that's way back in the five-hour 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

92 period. It's at very low pressure, very low already.

1 I think that 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is quite high, actually, on the 2

high end. And ---

3 MEMBER SKILLMAN: Okay, so --

4 (Simultaneous speaking) 5 MEMBER SKILLMAN: -- so your answer, I would 6

have preferred to have less than 24. But my question 7

is ---

8 (Simultaneous speaking) 9 MEMBER SKILLMAN: -- is 24, is that marker 10 24 spinning up other decisions that we should know 11 about?

12 MR. WELTER: Well, it sizes the batteries.

13 MR. HOUGH: Yes, but it was done early on.

14 MR. WELTER: It was done early on, yes. And 15 it's ---

16 MR. HOUGH: As Kent says, you know, can see 17 here. You know, less than eight hours, it's almost an 18 equilibrium. And we know where we're at. And then we 19 said, okay, we'll give you a factor of three, give Ops 20 time to do something if they wanted to. So that was 21 22 MEMBER SKILLMAN: So if you went to 12 you 23 24 (Simultaneous speaking) 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

93 MEMBER SKILLMAN: If you went to 12, you 1

conceivably have your battery capacity?

2 MR. HOUGH: I think you could drop it, yes.

3 MEMBER SKILLMAN: Just, I mean, that's what 4

we're here to talk about.

5 MR. WELTER: Yes.

6 MEMBER SKILLMAN: So the answer could be 7

yes.

8 MR. HOUGH: Yes.

9 CHAIR BLEY: Well, for this one particular 10 case.

11 MEMBER SKILLMAN: For this scenario. Okay, 12 thank you.

13 MR. HOUGH: I think we're back to almost the 14 last of the slides here. As I noted early on, we're 15 going to talk about the road map.

16 Late last year, there was discussion on a 17 phone call to staff in looking for, you know, some way 18 to validate incorporation of the topical report, 19 conditions of applicability, and the five conditions 20 of the SER.

21 And so we received that RAI on January 29th 22 and responded on, as Paul indicated, in late March.

23 And that's Table 839 in the latest revision there.

24 And it provides --- here's an example of that table 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

94 right here.

1 I can't fill out that left-hand column, 2

because that's proprietary information. We'd have to 3

go to a closed session and show you how to put that 4

in. But you can see on the right, it directs the 5

reader to appropriate sections within the DCA to 6

perform the validation of the ---

7 CHAIR BLEY: And by the way, we have all of 8

those things on the left from the topical report.

9 MR. HOUGH: That's correct, that's correct.

10 Let's see, and we did make some, you know, conforming 11 changes as a result of doing the road map. You know, 12 for example, Reg. Guide 141 for testing, we added that 13 in so that we could include that in Chapter 14.

14 And then places where it didn't explicitly 15 say without power, we added that verbiage in there.

16 So it's fairly easy to validate now.

17 And then, so in conclusion, the distribution 18 system is in support of the use of the topical.

19 There's no power required for any safety related 20 function, or Type A variable, or manual operator 21 action. So everything's non-1E, our backup power 22 sources, the result is that their asset protection and 23 black start, if you want it.

24 And as I noted earlier, it's designed to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

95 support online maintenance and be a very flexible 1

system. And as a consequence, it supports exemption 2

to GDC 17 and 18.

3 CHAIR BLEY: I have a separate question on 4

Section 832.1.1, highly reliable, direct, current 5

power system. Your first sentence says, "The EDSS is 6

composed of two DC distribution systems that provide 7

a continuous fault tolerant source." And you don't 8

define fault tolerant there. It means lots of things 9

to lots of people in other applications. What do you 10 mean by fault tolerant?

11 MR. HOUGH: We just mean we do the FMEA.

12 CHAIR BLEY: Okay, ha, ha, ha, ha.

13 MR. HOUGH: We're not adversely affected.

14 CHAIR BLEY: You think it's pretty reliable, 15 that's what you think, okay.

16 MR. HOUGH: Yes, sir. Right.

17 CHAIR BLEY: I want to thank you for a real 18 good discussion. And we'll get on to more of this 19 later perhaps. Before we get there, Charlie, I had 20 one thing.

21 I want to point out, you know, this is one 22 of the glitches in these design reviews when we go 23 chapter by chapter. There's an awful lot of Chapter 24 7

that's having us confused because of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

96 interactions among these things. And we'll hit that 1

more and more. So we'll try to keep track of that and 2

look for things. Charlie?

3 MEMBER BROWN: My question relates to that 4

little bit of what Dennis said before earlier that we 5

haven't done Chapter 7, and there is some flow back 6

and forth. But with all the energized type stuff, you 7

know, go to the fail safe position, as well as other 8

systems that are not necessarily safety related, has 9

there been a consideration of evaluating "I'm 10 operating normally?"

11 And you had inadvertent actuation of various 12 parts of the plant. And where is the description of 13 that? I pawed through this thing, the Chapter 8, and 14 tried to go through Chapter 7. I don't know whether 15

--- I haven't done a complete thing on Chapter 7.

16 That was just what I call skating. I mean, there's a 17 number of other components that get power.

18 The other question was the energizing of 19 electric plant components. I was trying to find out 20 how that gets executed. I couldn't find direct 21 reference in Chapter 7 to control systems that actuate 22 breakers, et cetera, other stuff that may have some 23 impact.

24 As I go through the plant networks, does it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

97 have a separate --- are they analoged, the old style 1

where you just turn a switch, and a relay opens 2

someplace, or a contacter, or what? There was no 3

description of how, at least that I found in that 4

cursory look.

5 So that's the question I'll probably be 6

addressing. I don't expect an answer now. It's just 7

something that's going to be on the table when we get 8

to Chapter 7.

9 CHAIR BLEY: I had the same thing.

10 MEMBER BROWN: Okay.

11 CHAIR BLEY: Well, I don't know if it 12 belongs there or here on some of this, but ---

13 MEMBER BROWN: It's too late here right now.

14 (Simultaneous speaking) 15 MEMBER BROWN: Yes. Because they're kind of 16 unrelated since they're not I&C type systems. But do 17 you use main control room stuff through a computing 18 system, the teachable, or whatever you want to call 19 it, if somebody grabbed control of it, could you 20 initiate selected component actuations that would ---

21 MR. WELTER: Yes.

22 CHAIR BLEY: I don't think you need to 23 answer this --

24 MEMBER BROWN: I don't want him to answer it 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

98 right now. It's just on the table. That's all.

1 MR. WELTER: I think you'll see it later.

2 CHAIR BLEY: Tom, you had something?

3 MR. BERGMAN: Just to clarify, so yes.

4 Chapter 7, Revision 1 does have changes in response to 5

RAIs in it. That would be the appropriate version to 6

read.

7 And then Rev. 0 of Chapter 8 has been 8

corrected. Rev. I, there is no flex connection. That 9

was part of our ELAP analysis. So there is no flex 10 connection in Rev. 1.

11 CHAIR BLEY: Is that the only substantive 12 change?

13 MR. BERGMAN: Well, no. Rev. 1 captured all 14 the staffs' RAIs that we had ready up to that point.

15 CHAIR BLEY: Oh, okay. So we got that stuff 16 as responses to the RAIs. It's now in my ---

17 MR. BERGMAN: But the large open item in 18 Chapter 8, there's an RAI subsequent to the staffs' 19 issuance of that. It was kind of in parallel, but it 20 was already damaged in review that closes most of 21 that.

22 CHAIR BLEY: Okay. On the large RAI that 23 we're going to hear more from the staff about, are 24 discussions continuing on that? Are you comfortable 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

99 with where that's headed, or do you have anything you 1

want to say about that before we hear from the staff?

2 MR. HOUGH: I just read a lot in developing 3

that table in here --

4 CHAIR BLEY: Okay. Fair enough. At this 5

time, we're going to recess for a break. We'll come 6

back at 25 minutes until 11:00. We're going to lose 7

three people at noon for an internal meeting. It'd be 8

nice to finish by noon, but if we don't, we can go 9

over a little bit. We'll recess right now until 25 10 until.

11 (Whereupon, the above-entitled matter 12 went off the record at 10:16 a.m. and resumed at 13 10:34 a.m.)

14 CHAIR BLEY: We are back in session. We look 15 forward to hearing from the staff. And I sincerely 16 hope you're able to go beyond what you gave us in 17 slides today. Omid, I'll turn it over to you.

18 MR. TABATABAI: Okay. Yes, good morning, 19 everyone. Thank you very much for the opportunity for 20 the staff to present their Safety Evaluation Report 21 with open items with respect to Chapter 8, Electric 22 Power of the NuScale Design Certification Application.

23 Today, I just want to make sure that we 24 understand, the Chapter 8 that NuScale has presented 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

100 to us is not the ordinary ones that we have seen in 1

the past. That's why we have involvement from many 2

other branches, expertise to a new Chapter 8.

3 It's not quite standalone. We have 4

reviewers, support from Instrumentation and Control, 5

Containment, Ventilation, Mechanical Engineering, 6

Reactor Systems, and Plan Systems, and PRA, who 7

contributed to this review.

8 I'm Omid Tabatabai, I'm the Chapter PM for 9

Chapter 8. Lead Project Manager for NuScale Design 10 Certification is Greg Cranston. I just wanted to 11 recognize these colleagues of mine who have 12 significantly contributed to this review. And by the 13 way, they are available, they are in the audience, in 14 case there are questions in those areas, they should 15 be able to support us.

16 Just want to, before we get into the 17 technical presentation of Chapter 8, just as a matter 18 of background, NuScale Power submitted its Rev. 0 of 19 Design Certification Application back in December of 20 2016.

21 And then, they submitted a Revision 1 in 22 mid-March 2018. And they're currently working on 23 preparing Revision 2, which includes all of the back 24 and forth RAIs, followup RAIs, and other requests from 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

101 the staff to incorporate into the Design Certification 1

Application.

2 This SER that the staff has prepared is 3

based on Revision 0. I just want to make sure that, 4

although we have more up-to-date information, but the 5

SER does not reflect that, because of the timing, as 6

was mentioned earlier.

7 Again --

8 MEMBER CORRADINI: So, just to be clear, so 9

this is Revision 0 that we're going to see the review 10 of.

11 MR. TABATABAI: Yes.

12 MEMBER CORRADINI: And Revision 1 is in 13 preparation?

14 MR. TABATABAI: Revision 2. Revision 1 has 15 16 MEMBER CORRADINI: Revision 2?

17 MR. TABATABAI: Yes.

18 MEMBER CORRADINI: But if I go to the NRC 19 website for it, all that's there is Revision 0.

20 MR. TABATABAI: The whole application?

21 MEMBER CORRADINI: Yes.

22 CHAIR BLEY: The public website.

23 MEMBER CORRADINI: The public website.

24 MR. TABATABAI: It should be actually 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

102 Revision 1, we have --

1 MEMBER CORRADINI: Really? Okay.

2 MR. TABATABAI: We have --

3 MR. SNODDERLY: As of yesterday, it still 4

wasn't up yet.

5 MR. TABATABAI: Okay.

6 MR. SNODDERLY: We can make that -- hopefully 7

you guys will get to it.

8 MR. TABATABAI: I know my project management 9

colleagues, they were working on clearing it for 10 posting it on the website --

11 MR. SNODDERLY: All right, great.

12 MEMBER CORRADINI: That's the reason I asked, 13 is that's --

14 MR. TABATABAI: Right.

15 MEMBER CORRADINI: -- where I go to check 16 what's publicly available. But that's fine, thank 17 you.

18 CHAIR BLEY: So, since we've interrupted you 19 here for a second, I'm going to state something I 20 think I noticed here. And whoever is doing Chapter 21 8.1 can address this, or you might want to, Omid.

22 When I read Section 8.1 and go through all 23 of the comments through the GDCs and through the other 24 NRC documents and SECYs, it seems there's an awful lot 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

103 of things that remain -- I don't think they have an 1

open item number attached to them, but you say you're 2

still evaluating exemptions to GDCs 17, 18, 33, 34, 3

35, 38, 41, and 44.

4 Those don't -- well, two of them are part of 5

the giant open item. The rest don't seem to have open 6

items, but it's still ongoing work --

7 MR. TABATABAI: Right.

8 CHAIR BLEY: -- that you're --

9 MR. TABATABAI: That's correct.

10 CHAIR BLEY: -- involved in. Okay.

11 MR. TABATABAI: That's correct.

12 CHAIR BLEY: So, those are not finished yet?

13 There's an awful lot in 8.1 that's --

14 MR. TABATABAI: That's correct.

15 CHAIR BLEY: -- still in process?

16 MR. TABATABAI: Right. I think during the 17 presentation, it was mentioned that the RAI question 18 that we sent for the Topical Report that how NuScale 19 is basically incorporating information in the ECA, 20 that RAI, evaluation of that RAI response is still 21 ongoing, which feeds into those GDCs.

22 CHAIR BLEY: Okay.

23 MS. RAY: This is Sheila Ray. If I may add 24 to Omid's response, 8.1 is really meant to be an 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

104 introduction and an overview, and it should be 1

pointing to other sections in Chapter 8 where we do 2

make technical evaluations. But, yes, those GDCs are 3

still open and still under review.

4 CHAIR BLEY: Okay. And they could have RAIs, 5

but they don't as yet? Separate ones?

6 MS. RAY: Correct.

7 CHAIR BLEY: Okay.

8 MR.

TABATABAI:

For the Chapter 8,

9 specifically, we have issued ten RAIs, which contain 10 about 25 questions. And NuScale has responded to all 11 of the questions.

12 This SER has two open items and one big, as 13 you mentioned, and the other one relates to the 14 electrical penetration assemblies. And we will 15 address all of the confirmatory items and open items 16 during the Phase 4 of our review.

17 So, this was my introduction to this, before 18 we get into the technical substance of this 19 presentation. With that, I would like to ask my 20 colleague, Sheila Ray, to continue.

21 MS. RAY: Thank you. As Omid mentioned, my 22 name is Sheila Ray. I am the Reviewer for 8.1, 8.3-2, 23 and I will be presenting for 8.4, my colleague Fanta 24 Sacko is on business travel, so I will be presenting 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

105 on her behalf. So, thank you.

1 Section 8.1 is the introduction. The 2

electric power system for the NuScale design is 3

comprised of nonsafety-related AC and nonsafety-4 related DC power systems. The design does not depend 5

on onsite or offsite AC or DC electrical power system, 6

including that from the transmission grid for safe 7

operation.

8 The NuScale design with non-reliance on 9

electrical power accommodates a site location where 10 offsite transmission grid is not necessarily 11 available. As NuScale mentioned, the normal source of 12 power is one or more of the 12 operating power module 13 main generators.

14 The staff reviewed the design of the 15 electric power systems necessary for the safe design 16 and operation of the plant or whose failure might 17 adversely affect their safety-related or risk-18 significant safety functions.

19 The staff used the DSRS and SRP, as well as 20 the graded review approach for its review.

21 MEMBER MARCH-LEUBA: Go back to -- stay 22 there. That's an interesting concept that they 23 wouldn't be -- that the plant would be sited in a 24 place where there would be a permanent loss of offsite 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

106 power. Is that what we're considering?

1 MS. RAY: I would not say it's a permanent 2

loss of offsite power, they may not be connected to 3

the bulk power system.

4 MEMBER MARCH-LEUBA: So, there will be a 5

complete loss of offsite power and they will have 6

their own --

7 CHAIR BLEY: They won't have any offsite 8

power.

9 MEMBER MARCH-LEUBA: It's an interesting 10 concept. We need to consider the implications of 11 that, because you can make into an extended period of 12 problems, if you have a common cause failure between 13 the modules.

14 MS. RAY: I understand your point.

15 MEMBER MARCH-LEUBA: Yes. So, we need to 16 consider that for the review.

17 MS. RAY: At this time, since it's nonsafety-18 related power, and that is really where --

19 MEMBER MARCH-LEUBA: Okay.

20 MS. RAY: -- we'll transition perfectly to my 21 next slide. This is where the open item comes in.

22 The major open item, Open Item 8.3-1, is recurring 23 throughout Chapter 8 in that this open item is 24 referenced in all of the sections: Section 8.2 for 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

107 offsite power systems, 8.3.1 for onsite AC systems, 1

8.3-2 for onsite DC systems, as well as 8.4 for 2

station blackout.

3 MEMBER SKILLMAN: Sheila, as you begin, is 4

this the totality, the exact wording of Open Item 8.3-5 1 or is this a Cliffs notes version of 8.3-1?

6 MS. RAY: It would be essentially the Cliffs 7

notes version.

8 MEMBER SKILLMAN: Okay.

9 MS. RAY: However, in the SER, we do refer to 10 a specific RAI, and that is RAI 9359.

11 MEMBER SKILLMAN: No, I go it. Okay, thank 12 you, Sheila. Thank you.

13 MS.

RAY:

You're welcome.

So, this 14 particular open item is repeated in each section of 15 Chapter 8. And I will discuss the details of this 16 open item up-front, so many of the details will not be 17 repeated later on in the continuous sections.

18 As previously stated, the NuScale design 19 does not rely on safety-related AC or DC power 20 systems. A Topical Report was submitted on the safety 21 classification of passive nuclear power plant electric 22 systems and the staff approved the Topical Report with 23 five additional conditions.

24 The open item relates to the exemptions to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

108 GDC 17 and 18, as described in DCA Part 7, regarding 1

the staff verifying that the design does not require 2

safety-related power. In addition, the Chapter 15 3

review on accident analyses is still ongoing.

4 Staff issued an RAI regarding how the 5

NuScale design meets these conditions of 6

applicability.

7 CHAIR BLEY: There are parts of your review 8

of Chapter 8 that cannot complete until the Chapter 15 9

is done, because it's essentially referred to here in 10 Chapter 8?

11 MS. RAY: Correct. And it's not just Chapter 12 15, we have been talking to our friends in Chapter 7 13 review, PRA, Chapter 6. So, there's a lot of review 14 that will feed into the conclusion of our chapter.

15 MEMBER MARCH-LEUBA: Going back to my 16 previous comment, if you don't have any grid 17 whatsoever, how do you start the first modules?

18 MS. RAY: If you remember, NuScale mentioned 19 the backup diesel generators and the AAPS are black-20 start capabilities.

21 MEMBER MARCH-LEUBA:

Okay.

You are 22 considering that, right?

23 MS. RAY: So, what I -- I think you will get 24 a flavor from our review that many of these things are 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

109 still non-safety. As of right now, we still have the 1

open items, so we're not concluding that they should 2

be non-safety or safety-related. So, our review is 3

essentially not fully complete yet, because of this 4

major open item.

5 MEMBER CORRADINI: What -- then let me ask 6

the question. I guess I took the open item to be that 7

NuScale has yet to document how it meets the 8

limitations and conditions from the Topical Report --

9 MS. RAY: They have --

10 MEMBER CORRADINI: -- but it's more than 11 that?

12 MS. RAY: So, they have provided a response.

13 The staff is still evaluating that response.

14 MEMBER CORRADINI: Do -- probably, we have it 15 and I don't remember seeing it.

16 CHAIR BLEY: We got the response.

17 MEMBER CORRADINI: We got the response?

18 Okay. So, go ahead, I didn't mean to interrupt.

19 MS. RAY: No problem. So, the responses to 20 RAI 9359, staff is still evaluating. And that 21 includes not just Chapter 8 reviewers, that includes 22 Chapter 15, 6, a lot of the other reviewers. And 23 we'll be evaluating it in Phase 4 of our review. So, 24 staff has issued the RAI and now, we are currently 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

110 evaluating the response.

1 And now, I will --

2 MEMBER CORRADINI: Well, I don't even --

3 MS. RAY: Yes?

4 MEMBER CORRADINI: -- know how to ask my next 5

question, but I'm --

6 MS. RAY: Sure.

7 MEMBER CORRADINI:

struggling to 8

understand this interconnection, because is it the 9

passive nature of the plant that makes this 10 interconnection more complex than a typical active 11 plant? I would think there still -- or is it the fact 12 that they're claiming that there's no need for Class 13 1E power?

14 MS. RAY: It is -- correct. It's the second.

15 It's, do they need safety-related power? In order to 16 determine if they need safety-related power, we need 17 to look at how they're safely shutting down and doing 18 accident mitigation. Do they need power for those 19 functions and does it have to be safety-related power?

20 MEMBER CORRADINI: So, then, let me ask --

21 oh, okay. All right. I guess my obvious question is, 22 why are we looking at this at all right now, 23 considering that everything else has to be considered 24 before we look at this?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

111 MS. RAY: Does that --

1 MEMBER CORRADINI: Sorry to ask the question 2

3 MS. RAY: No, it's a great --

4 MEMBER CORRADINI: -- but I'm struggling.

5 MS. RAY: -- question. Honestly, the staff 6

asked the same question. It's a scheduling issue.

7 MEMBER CORRADINI: Okay. So, then, in my 8

role as Chairman, I will say, don't be surprised when 9

we upset your apple cart schedule, because although 10 this is first, somehow in my mind, it's at the end, 11 because everything feeds into it 12 MS. RAY: I would agree with your assessment.

13 MEMBER CORRADINI: Okay, fine.

14 CHAIR BLEY: So, along that line, do we have 15 a -- do you have a likely point in the overall 16 schedule when Chapter 8 will be complete?

17 MS. RAY: So, we're currently working on our 18 Phase 4 review, and I will leave it to Omid to discuss 19 the schedule date of our Phase 4 review.

20 CHAIR BLEY: In your talk, are you going to 21 address at all any of the responses from NuScale with 22 regard to the big open item, 3-1?

23 MS. RAY: I cannot. The staff is still 24 evaluating the response.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

112 CHAIR BLEY: Okay. So, it's wide open?

1 MS. RAY: It is.

2 MEMBER BROWN: On other, just to make sure, 3

the Topical Report is still Rev. 1 of 16497?

4 MS. RAY: I believe so. Yes, that's correct.

5 MEMBER BROWN: Okay. And that's in the RAI 6

that you, I think you referenced, if I did it 7

correctly, if I can find the right place here, I lost 8

it. There was a RAI, something -- what was --

9 MS. RAY: 9359?

10 MEMBER BROWN: 9359, yes, I think -- is that 11 the one we got part of the package, Mike?

12 MR. SNODDERLY: Yes. But let's make sure 13 we're all on the same page right now. So, the Topical 14 Report, I believe was issued as Rev. 1. And an SE has 15 been issued by you guys approving that Topical, with 16 a set of limitations and conditions.

17 MS. RAY: Correct.

18 MR.

SNODDERLY:

Those limitations and 19 conditions are scheduled to be addressed within the 20 Safety Evaluation for Chapter 8. Which, right now, is 21

-- the Safety Evaluation is on Rev. 0, but you're 22 aware of Rev. 1 and they are working on Rev. 2, which 23

-- I'm sorry, yes, okay.

24 MS. RAY: Let's -- you're right on the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

113 Topical Report is Rev. 1. We evaluated DCA Rev. 0.

1 In Phase 4, we'll evaluate DCA Rev. 1, as well as the 2

RAI response to the Topical.

3 MR. SNODDERLY: Okay.

4 CHAIR BLEY: Okay. And let me ask you one 5

more question about these Revs. When we got the 6

NuScale response to the big RAI, all of the pages are 7

labeled Rev. 2, which is okay, I managed to put them 8

where they belong within the Rev. 0 version of Chapter 9

8.

10 My question is, and maybe you don't know the 11 answer to this, were there any substantive changes in 12 whatever was Rev. 1, because the page numbers are 13 certainly very different in the Rev. 2 response to 14 your RAI than they are in Rev. 0?

15 MS. RAY: I can't answer that --

16 CHAIR BLEY: Because you haven't --

17 MS. RAY: -- because we haven't --

18 CHAIR BLEY: -- looked at Rev. 1?

19 MS. RAY: Correct.

20 CHAIR BLEY: But -- I'm a little confused 21 now. You said your next task will be to review Rev.

22 1 with a response to the RAIs, but I thought it was 23 said earlier that you've received Rev. 2, which 24 includes all of that folded into one.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

114 MS. RAY: No, we've only received DCA Rev. 1.

1 CHAIR BLEY: And the RAI responses that --

2 MS. RAY: Correct.

3 CHAIR BLEY: -- fit into that one?

4 MS. RAY: Correct.

5 CHAIR BLEY: Okay. Go ahead.

6 MEMBER RAY: Well, before she goes ahead, I 7

just want to make a comment, for what it's worth, that 8

in my experience, we as a Committee would not want to 9

finish our review until the staff had finished their 10 review.

11 MS. RAY: We understand.

12 MEMBER RAY: Okay.

13 MS. RAY: We absolutely understand.

14 MEMBER RAY: And that would include Chapter 15

8. Okay, thank you.

16 MEMBER SKILLMAN: Let me add one more, if I 17 may, please. If I read the Safety Evaluation for the 18 Topical Report, that is 0815-16497 Rev. 0, and I 19 compare it with Rev. 1 of that same Topical, Rev. 0 20 had six conditions, Rev. 1 has five. And the last 21 three are different in Rev. 1.

22 And it appears as though, some of the word 23 changes are substantive, leading me to believe there 24 was a great deal of deliberation in your Safety 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

115 Evaluation of that Topical Report to Rev. 1 that may 1

be influencing what we're talking about here.

2 What drove the change in the conditions from 3

six to five, because those five conditions plus the 4

other three are really the NRC's backstop for the 5

super wanadine DC system, at least that's the way I 6

interpret the collage of information.

7 MS. RAY: I understand your question, I may 8

want to defer that to the closed session.

9 MEMBER SKILLMAN: Yes, ma'am, that would be 10 fine. Thank you.

11 MR. TABATABAI: And if I may add something?

12 You're right, we had some interactions with NuScale 13 with respect to our conditions of the SER for the 14 Topical Report.

15 And those issues were discussed among 16 various branches, electrical engineering staff were 17 not involved in that. And that discussions were led 18 by the Reactor Systems Branch and Dr. Drzewiecki here 19 is our expert for that topic. Tim, if you would like 20 to say something now?

21 DR. DRZEWIECKI: Yes. I can say, in terms of 22 some of the changes in language, there was one 23 condition that was kind of focused on a sequence that 24 had to do with, if you have any kind of AOO, that if 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

116 you don't take credit for your DC power system, at 1

some point in time, a few hours into that event, 2

you're going to have a pressure inside of your RCS 3

that is low enough such that you will actuate the ECCS 4

system. Which is not a LOCA, but it's a LOCA-like 5

type of event.

6 So, one of our conditions was that you would 7

go through and do a PRA-type of an analysis, such that 8

you can show that that is not expected to occur on the 9

frequency of an AOO or during other life of the plant.

10 Our first version of that language needed to 11 be sharpened a little bit. In fact, if you go back to 12 the record, I believe it was Mr. Skillman -- I'm 13 sorry, not Mr. Skillman, Mr. Stetgar that gave us 14 feedback on that as well. So, we had to sharpen up 15 some of that language. That was a change, that was 16 probably one of the largest changes in the conditions.

17 Also, our first Rev., the first time we did 18 a review of that SER, we were trying to write it for 19 a general plant. It was not NuScale-specific, it 20 could have been applied to any type of advanced 21 reactor. Coming out of that meeting, it was decided 22 that it should be focused and applied only to the 23 NuScale design. So, that also had an effect.

24 So, in terms of the precise changes in the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

117 language, I have to go back and see what changed 1

exactly, but that's the context in which those changes 2

were made.

3 CHAIR BLEY: So, just to get this clear, when 4

we reviewed the Topical with you folks, you had an SER 5

at that time, we made suggestions, other people made 6

comments. You issued a revised SER that had somewhat 7

different language on the conditions?

8 DR. DRZEWIECKI: Yes.

9 CHAIR BLEY: Okay. And I guess I never went 10 back and looked at the revised SER, but we had it. We 11 have it, yes.

12 MEMBER SKILLMAN: And that was very helpful.

13 Thank you.

14 MEMBER CORRADINI: But just to close the 15 loop, and there were some things we suggested, they 16 politely told us, no.

17 MR. TABATABAI: Right. As part of the 18 Topical Report, there were some examples to help the 19 staff with their review. And I think Committee 20 recommended to take them out of the SER, any reference 21 to those examples. That was the other changes.

22 MS. RAY: I'll turn it over to Nadim now.

23 MR. KHAN: Thank you, Sheila. I am Nadim 24 Khan and I will be discussing Section 8.2, offsite 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

118 power system.

1 The offsite power system for the NuScale 2

Power Plant includes a switchyard and one or more 3

connections to a transmission grid, micro-grid, or 4

dedicated service load. However, the offsite power 5

system is not needed for safe operation, such as the 6

ability to achieve and maintain safe shutdown.

7 The Applicant has stated that the passive 8

design of NuScale Power Plant does not depend on 9

offsite AC power for safe operation and does not rely 10 on offsite AC power to support safety-related 11 functions.

12 The Applicant has stated in DCA Part 7 that 13 offsite power is not required. The staff reviewed the 14 offsite power system to ensure that it will perform 15 its design function during all operating and accident 16 conditions.

17 The review of the offsite power system is 18 awaiting for the completion of Open Item 8.3-1, to 19 address the offsite power system's ability to achieve 20 and maintain safety-related function and safe 21 shutdown.

22 With that, I will turn it over to Bob.

23 MR. FITZPATRICK: Thank you. I'm Bob 24 Fitzpatrick and I'm going to discuss Section 8.3.1 of 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

119 the SER on onsite AC power systems.

1 The following nonsafety-related systems are 2

the major constituents of the onsite AC power system:

3 the high voltage system at 13.8 kV, the medium voltage 4

at 4.16 kV, and the low voltage at 480 and below.

5 There are two backup diesel generators at the 480 volt 6

level and one auxiliary AC power source at the 13.8 kV 7

level.

8 The overall system operation, there are 12 9

sets of module support systems separated into two six-10 module sections, north and south, which each section's 11 buses powering multiple module loads. However, no 12 individual loads are shared between the modules.

13 We had one open item, and that was on 14 electrical penetration assemblies. In Rev. 0 of the 15 FSAR, it's stated that there are no AC circuits that 16 penetrate containment. However, that statement left 17 out, for example, pressurizer heaters.

18 So, as we looked into this, we issued a 19 couple of RAIs on this issue, and the response to the 20 last RAI did not meet our deadline for Phase 2 SER, 21 but we feel we have a path for resolution that will be 22 addressed in our Phase 4 SER.

23 There were also a few areas where the staff 24 sought clarity in the FSAR. And for these areas that 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

120 needed clarity, the Applicant has successfully 1

responded to our RAIs and these items are now 2

confirmatory, and, again, to be addressed in Phase 4.

3 An example of the confirmatory items was, we 4

had a question about how many modules could be 5

connected to any of the 13.8 buses. And it sounded, 6

from what we were reading in the FSAR that maybe up to 7

three could be connected to any given bus and we 8

wanted to know if everything was sized accordingly.

9 And NuScale, in their response to our RAI, 10 they said, no, only two will be on any given bus, and 11 they explained that to us. So, that's an example of 12 just trying to straighten things out and we have an 13 acceptable answer on that.

14 So, in summary, for the Chapter 8, we had 15 two open items and four clarification items. The open 16 item with respect to GDC 17, the Applicant has 17 documented the disposition for the conditions of 18 applicability, with an answer to our question.

19 And they've supplied us with two additional 20 tables for Chapter 8 that presents a roadmap as to how 21 to go through that. We have not reviewed that, 22 finished reviewing that yet, so that's still seeing as 23 open, and it will be addressed in Phase 4.

24 The other open on electrical penetration 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

121 assemblies, as discussed on the other slide, the staff 1

feels we have a path to resolution on this. And as 2

stated also before, the confirmatory items will be 3

addressed in our Phase 4 SER.

4 CHAIR BLEY: Bob, a path to resolution means, 5

you've agreed with them to do something a little 6

different than their response said? Or you think --

7 MR. FITZPATRICK: No.

8 CHAIR BLEY: -- their response is resolution?

9 MR. FITZPATRICK: It's just open, but we feel 10

-- the status of that is actually -- Swagata Som, who 11 retired end of May, was our lead on this item. And 12 so, she briefed me before leaving that it looks good, 13 but --

14 CHAIR BLEY: Okay.

15 MR. FITZPATRICK: -- I haven't had time to 16 get to it yet.

17 CHAIR BLEY: Okay, fair enough.

18 MR. FITZPATRICK: So, I don't think I'm going 19 to have a problem with it, but that's where it is.

20 MS. RAY: Bob, if I may add, this is Sheila, 21 we received the last response on the electrical 22 penetrations after we had submitted our SE. So, it's 23 a timing issue as well.

24 MEMBER KIRCHNER: Bob?

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

122 MR. FITZPATRICK: Yes, sir?

1 MEMBER KIRCHNER: May I ask, GDC 18, this is 2

at risk, I'm doing it from memory, this talks about 3

tests and inspection and includes batteries. Given 4

the role their battery DC system, one would expect 5

that 18 would apply to that, because it's risk-6 significant, would it not?

7 MR. FITZPATRICK: No.

8 MEMBER KIRCHNER: No?

9 MR. FITZPATRICK: No.

10 MEMBER KIRCHNER: So, you're just going to go 11

-- your position now is just to do a blanket waiver on 12 17 and 18?

13 MR. FITZPATRICK: No, we're evaluating that.

14 Part of -- I think, some clarification, this might 15 help. We reviewed Chapter 8 as if they're going to 16 meet all the requirements.

17 MEMBER KIRCHNER: Okay.

18 MR. FITZPATRICK: When we wrote up the SER, 19 we were told we couldn't say it in that -- that's just 20 not the right way to say it. So, we're -- it's an 21 open item. Now, Open Item 8.3.1 --

22 MEMBER KIRCHNER: Yes.

23 MR. FITZPATRICK: -- 8.3-1, in terms of 24 Section 8.3.1, there are 15 items in here that would 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

123 feed-up to that one open item.

1 MEMBER KIRCHNER: Right.

2 MR. FITZPATRICK: And GDC 18, 17, and then, 3

all these other things that you find in the DSRS as --

4 MEMBER KIRCHNER: Yes.

5 MR. FITZPATRICK: -- supplemental guidance --

6 MEMBER KIRCHNER: Right.

7 MR. FITZPATRICK: -- that they need to meet 8

if they have to meet 17 and they don't have to meet if 9

they don't have to meet 17. So, it looks like a great 10 big, big open item, but in terms of work to solve it, 11 we need the answers from everybody else and we need to 12 wait until the end, everyone else is done with their 13 review.

14 But the actual solution of that, if 15 everything turns out right, is just some wording 16 changes in the SER. So, it looks like we're very 17 preliminary in coming here, but if things work out, 18 we're not.

19 MEMBER KIRCHNER: So, just rhetorically, 20 since there are a number of exemption requests to the 21 GDCs, whose principles I would think still apply in 22 some reasonable manner, even if you do come down and 23 say, it's not safety-related, how are you going to 24 approach these? Are you going to put conditions then 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

124 on the exemption? Or look for some further PRA-based 1

2 MR. FITZPATRICK: No, actually, we're going 3

to look to, like Reactor Systems, when they finish 4

their review of Chapter 15 and they say, okay, the 5

Chapter 15 analyses work and the analyses didn't 6

require any electrical power, AC or DC, to get there, 7

then we're done.

8 We don't need to apply any exemptions, they 9

don't need this, it's done another way. So, that --

10 MEMBER KIRCHNER: So, then, you'll document 11 that --

12 MR. FITZPATRICK: Right.

13 MEMBER KIRCHNER: -- accordingly in the SE?

14 MR. FITZPATRICK: And what we're talking 15 about is any electrical input from GDCs, the 33 and 4 16 and all that. It's just, if it's not needed, then we 17 just write it off that way. But we don't know that 18 until others finish some really detailed work.

19 DR. SCHULTZ: So, Bob, originally, you were 20 thinking of saying something like, it meets the intent 21 of the GDC, or something like that, and rather what 22 you want to do is to indicate that the GDC just does 23 not need to apply --

24 MR. FITZPATRICK: Well, yes --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

125 DR. SCHULTZ: -- to this design?

1 MR. FITZPATRICK: My draft said, pending 2

resolution of this big issue, that it looks --

3 DR. SCHULTZ: Of course.

4 MR. FITZPATRICK: -- acceptable.

5 DR. SCHULTZ: Yes, right.

6 MR. FITZPATRICK: And I was told that, that's 7

really not the way we write things, because it's --

8 DR. SCHULTZ: I understand now.

9 MR. FITZPATRICK: -- it could be misleading.

10 DR. SCHULTZ: Yes.

11 MR. FITZPATRICK: So, apparently, the other 12 way is misleading too, in a way.

13 DR. SCHULTZ: It has to be turned around.

14 MR. FITZPATRICK: Right. That's where we 15 are.

16 CHAIR BLEY: Bob, you reminded me of 17 something I meant to ask right in the beginning.

18 Everybody's -- I'd be interested in anything anyone 19 has to say. This is the first time we've used the 20 DSRS. How is it working? Have you found it needs 21 revision too or is it working out pretty well?

22 MR. FITZPATRICK: Well, actually, it worked 23 out fairly well. The thing is, when we brought this 24 to ACRS, the DSRS --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

126 CHAIR BLEY: Yes.

1 MR. FITZPATRICK: -- we said we would leave 2

some of the things about Class 1E in, because we 3

wouldn't know --

4 CHAIR BLEY: Exactly.

5 MR. FITZPATRICK: -- so, we did. So, if we 6

had known -- I'll make the same comment I made when we 7

talked about that. If we had known ahead of time that 8

we really wouldn't have a need for Class 1E power, it 9

would have been a more condensed version and less work 10 to go through. But it's just what we came up with.

11 CHAIR BLEY: Okay. Other than that, though 12 13 MR. FITZPATRICK: Yes.

14 CHAIR BLEY: -- it's been okay?

15 MR. FITZPATRICK: It's worked out well.

16 MS. RAY: This is Sheila Ray. I would add, 17 also at the time of writing of the DSRS, we were not 18 aware of an exemption to GDC 17 and 18. So, when we 19 used DSRS, in my opinion, that was one of the 20 challenges. It does not address review capability 21 with the addition of an exemption, or exemptions.

22 MEMBER BROWN: I would make one observation.

23 The DSRS -- and I'm segueing back to when we did this 24 review and wrote a letter on it, whatever we did back 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

127 two years ago, three years ago, whatever it was.

1 The fact that you are addressing exemptions 2

or not should not be a reason for not having a general 3

DSRS that applies to SMRs, where you don't delete 4

stuff, you just say, hey, it's now no longer 5

applicable. You do what you're doing now, you address 6

exemptions.

7 So, you don't want to write a specific that 8

says, oh, you've got these exemptions to all these 9

things, before you know what's going on. You would 10 still have a general DSRS. So, I think you really 11 want to maintain it in a generalized basis, so that 12 you can then adapt it to other SMRs that come on, will 13 have different exemptions potentially.

14 So, I'm just providing a counterpoint to, we 15 could have had a simpler DSRS. I just think the 16 purpose is to make it so that the Applicant knows what 17 he's supposed to be thinking about, and if there are 18 things that you can exempt or take out, then you do 19 that at the time. That's just an observation.

20 MR. FITZPATRICK: And with that, I will turn 21 it back to Sheila, for Section 8.3.2.

22 MEMBER MARCH-LEUBA: I still have a comment.

23 This morning, we were -- I was very confused with the 24 use of timers all over the place, which are used to 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

128 turn on and off the electrical systems. I assume you 1

guys didn't review that part. Are we passing it to 2

Reactor Systems for them to consider or how is that 3

handled?

4 MR. TABATABAI: I think, if I'm not mistaken, 5

we have I&C staff here, if you want to chime in on 6

this timer issue --

7 MEMBER MARCH-LEUBA: So, somebody --

8 MR. TABATABAI: -- otherwise, we can get the 9

response --

10 MEMBER MARCH-LEUBA: My point is --

11 MR. TABATABAI: -- on that.

12 MEMBER MARCH-LEUBA: -- somebody needs, from 13 the staff, needs to understand how all those things 14 flow together. Because even the NuScale staff was 15 confused when they were trying to explain it to us.

16 So --

17 MS. RAY: I think we understand your point, 18 I can definitely say, Chapter 8 did not look at it.

19 However, our friends --

20 MEMBER MARCH-LEUBA: So, we --

21 MS. RAY: -- from other chapters might have.

22 MEMBER MARCH-LEUBA: We should remember, when 23 we look at Chapter 7 and/or 15.

24 MR. TABATABAI: We took notes of the 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

129 discussion on that topic, so we will be --

1 MR. BETANCOURT: So, this is Luis Betancourt 2

from I&C. We have reviewed that aspect and we're 3

going to be seeing you guys in August, but we took 4

note of that comment and we're going to put that 5

discussion in the presentation.

6 MEMBER MARCH-LEUBA: Make sure you have a 7

nice flow diagram of how they work.

8 (Laughter.)

9 MR. BETANCOURT: Yes, thank you.

10 MEMBER MARCH-LEUBA: Because I definitely --

11 and second, maybe while you're there, I don't know if 12 it's still I&C or who, but we talked about if, in case 13 those timers fail or the batteries don't have 14 sufficient power, you're going to have degraded 15 voltage and have actuation of equipment out of order.

16 Whose going to handle that?

17 MR. BETANCOURT: So, this is Luis Betancourt 18 again. We're going to be talking about that as well.

19 MEMBER MARCH-LEUBA: Okay.

20 MR. BETANCOURT: And possibly NPS due to 21 degraded voltage, as well as the 24-hour timers. So, 22 that was part of the Chapter 7 review.

23 MEMBER MARCH-LEUBA: Somehow, you need to get 24 this report of Reactor Systems to say, what happens if 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

130 this valve opens before that valve?

1 MR. BETANCOURT: Yes.

2 MEMBER MARCH-LEUBA: You have to have some 3

analysis of some kind.

4 MR. BETANCOURT: I will leave that to team, 5

but, yes.

6 MEMBER MARCH-LEUBA: Yes, but make sure you 7

guys interface --

8 MR. BETANCOURT: Okay. So, then, in that 9

Chapter 7 ACRS presentation, we will discuss that.

10 MEMBER MARCH-LEUBA: Excellent, thank you.

11 MS. RAY: Thank you, Luis. I think you can 12 get a flavor of all of the interactions we had in 13 reviewing our chapter. So, Section 8.3.2 is on DC --

14 MEMBER CORRADINI: Hold on --

15 MS. RAY: Yes?

16 MEMBER CORRADINI: Hold on a sec. So, let me 17 observe something, and I could be wrong, but I'm 18 guessing, NuScale is pioneering a path on passive 19 safety systems, with interesting inherent attributes.

20 I would venture to say, if we ever get past 21 this, to other unusual systems, that the staff is now 22 writing design criteria or alternatives, et cetera, 23 they're going to see the same thing.

24 Is this method of review logical for these 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

131 sorts of systems? Where this sits here and you're 1

doing it by chapter, and yet, this chapter is totally 2

or highly interactive with another one.

3 You might want to think about this from a 4

process standpoint, because all the advanced systems 5

with all the various funny looking coolants and funny 6

looking designs, all basically have passive system 7

approaches, attributes that are quite similar to 8

NuScale in this regard. So, I'm wondering if this 9

whole process makes sense, from a scheduling and 10 efficiency and effectiveness standpoint.

11 You might want to look at this now, since it 12 may affect -- it may help you here and it may help you 13 downstream, since I know staff has three or four 14 others that are already starting to interact, but 15 don't have water as the fluid of interest, but has 16 very similar decay heat removal systems, things that 17 don't want to have Class 1E power, that same sort of 18 general attributes. Just a thought.

19 MS. RAY: Thank you for your comment, we do 20 understand.

21 MEMBER CORRADINI: I won't forget it, because 22 I'll bring it up again once we see, June 19.

23 CHAIR BLEY: For people who are wondering, 24 that's the licensing modernization meeting.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

132 MR. TANEJA: I may be speaking -- this is 1

Dinesh Taneja from the I&C Branch. I may be speaking 2

out of line right now, but we already started looking 3

at the usefulness of using the DSRS and the lessons 4

learned from DSRS review and looking at the potential 5

advance reactor designs coming in.

6 And we have already started working on a 7

strawman of the review standard that should address 8

most of your concerns that you've raised today. So, 9

let's hope that we can come to you in a few months 10 with our idea of what we are thinking and get your 11 feedback at that time.

12 MS. RAY: Thank you, Dinesh. So, back to 13 onsite DC power systems, Section 8.3.2. As NuScale 14 mentioned, there are several DC systems. The highly 15 reliable DC system is the EDSS.

16 There's the EDSS-common, that serves common 17 loads, such as the Main Control Room emergency 18 lighting and Post-Accident monitoring. The EDSS-MS 19 serves each module. In addition, the EDNS is also 20 non-Class 1E and serves loads related to power 21 generation.

22 The NuScale design uses Valve-Regulated Lead 23 Acid batteries.

24 The staff performed an audit of a NuScale 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

133 document, which describes how the NuScale Plant meets 1

the conditions of applicability described in the TR.

2 But specifically, the staff evaluated the design 3

qualification and quality assurance provisions that 4

are applied to the EDSS system.

5 MEMBER BROWN: Just a little technical 6

question, I guess, but I just thought of it.

7 MS. RAY: Yes?

8 MEMBER BROWN: The EDSS, in your first 9

bullet, says you apply this to Main Control emergency 10 lighting, PAM, et cetera, et cetera. So, that is a DC 11 system. Is there -- so, that's battery-powered?

12 MS. RAY: Correct, that is a DC --

13 MEMBER BROWN: And I presume, since most of 14 your emergency lighting and other things are AC, that 15 you go from the battery to invertors, you've still got 16 that same routine --

17 MS. RAY: Right.

18 MEMBER BROWN: -- there's not some magic --

19 MS. RAY: Correct.

20 MEMBER BROWN: -- DC stuff you're going to 21 stick in there?

22 MS. RAY: Right.

23 MEMBER BROWN: That's all I wanted to know, 24 I mean, that's --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

134 MS. RAY: And I will just add, we do evaluate 1

lighting in Chapter 9. So, we'll come back to you on 2

lighting.

3 MEMBER BROWN: Yes, I'm just -- my mind will 4

be basically waiting for the elucidation of these 5

details.

6 MS. RAY: Excellent.

7 MEMBER KIRCHNER: I have a related question, 8

if I may?

9 MEMBER BROWN: Have at it.

10 MEMBER KIRCHNER: Yes. The plant protection 11 system, I assume is the source of the Post-Accident 12 Monitoring information? Or the module protection 13 system, I think NuScale calls it.

14 MS. RAY: I'm going to turn to my friend, 15 Luis.

16 MR. BETANCOURT: This is Luis Betancourt, 17 I&C, again. So, the plant protection system, all it 18 does is basically for common components and it 19 basically does two things:

the Control Room 20 habitability and the Control Room integrity.

21 The module protection system, that's where 22 it's contained -- the wording that, because they use 23 protection system in the plant protection system, many 24 people think that's the actual protection system, as 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

135 defined by the GDCs. It's a terminology issue, that's 1

the way the NuScale used that.

2 MEMBER KIRCHNER: Well, I'm just thinking of 3

things like the neutron detectors for power and such, 4

so you know that you scrammed. Those probably are 5

feeding in through the protection system?

6 MR. BETANCOURT: Right.

7 MEMBER KIRCHNER: And then, I would assume, 8

then, they're tapped and used for the -- get my 9

terminology right -- the PAM, the Post-Accident 10 Monitoring --

11 MR. BETANCOURT: That's correct.

12 MEMBER KIRCHNER: -- system, right?

13 MR. BETANCOURT: Yes.

14 MEMBER KIRCHNER:

So, when you have 15 interrelated systems like that, which for its primary 16 function, is a 1E-type system, doesn't the power have 17 to be therefore 1E?

18 MR. BETANCOURT: No, we were able to discuss 19 that in the last Topical review.

20 MEMBER KIRCHNER: Yes.

21 MR. BETANCOURT: So, the conclusion that we 22 made was, if that variable has to be credited for 23 manual action, then that power has to be safety-24 related. In the case of NuScale, that's still under 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

136 review.

1 Assuming that in the case that there's no 2

amount of credited operator

action, per the 3

regulations, that power doesn't have to safety-4 related. It has to be some of it safety-related and 5

nonsafety-related --

6 MEMBER KIRCHNER: Yes.

7 MR. BETANCOURT: -- and that's why we have 8

this highly reliable.

9 MEMBER KIRCHNER: Well, I guess we'll have to 10 hear more from you in August about these things like 11 these timers that --

12 MR. BETANCOURT: Yes.

13 MEMBER KIRCHNER:

are supposed to 14 function, and if they don't, whose scramming the 15 reactor?

16 MR. BETANCOURT: Yes. We will discuss that 17 in August.

18 MEMBER KIRCHNER: Okay, thank you.

19 CHAIR BLEY: A nice figure to lock all that 20 stuff together would be helpful. I don't know if 21 there is one or not.

22 MR. BETANCOURT: Say that again?

23 CHAIR BLEY:

A nice figure for your 24 presentation --

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

137 MEMBER KIRCHNER: Older people need figures.

1 (Laughter.)

2 CHAIR BLEY: I think it would be helpful.

3 There might be one in Chapter 7 already, but --

4 MR. BETANCOURT: Yes.

5 CHAIR BLEY: -- I don't know.

6 MR. BETANCOURT: There are and I have --

7 CHAIR BLEY: Okay.

8 MR. BETANCOURT: -- I have to provide that to 9

you.

10 CHAIR BLEY: All right. I have not looked at 11

7. Thank you.

12 MS. RAY: Thank you. Next slide. So, in 13 Section 8.3.2, the open items are related to the 14 classification of the highly reliable DC system and 15 the GDC 17 and 18 exemptions.

16 The completion of the staff's review of 17 onsite DC power systems is awaiting the completion of 18 the major open item. Next slide.

19 MEMBER SKILLMAN: Sheila, let me ask this --

20 MS. RAY: Sure.

21 MEMBER SKILLMAN: -- I'm in the SER --

22 MS. RAY: Yes.

23 MEMBER SKILLMAN: -- for Chapter 8, and I'm 24 on 8-48 to the top of the page.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

138 MS. RAY: Forty?

1 MEMBER SKILLMAN: 8-48 at the top of the 2

page.

3 MS. RAY: Yes.

4 MEMBER SKILLMAN: And the italicized text 5

reads as follows. The EDSS structures, systems, and 6

components are further augmented by applying design 7

qualification and QA provisions typically applied to 8

Class 1E DC power systems, using a graded approach.

9 So, the short version is, EDSS, it's not 1E, 10 but we're going to apply QA to it so it's somewhat 11 like a 1E system?

12 MS. RAY: Correct. And --

13 MEMBER SKILLMAN: Okay.

14 MS. RAY: -- that's covered in the Topical 15 Report.

16 MEMBER SKILLMAN: Question is, how do you 17 know where to stop, in terms of applying 18 18 characteristics of Appendix B? Where do you stop? Do 19 you stop at records retention?

20 Do you stop at Criterion 3, design control?

21 Do you stop at testing, NTS? How do you choose where 22 to go no further? In other words, what's the boundary 23 for saying, this is enough for this system?

24 MS. RAY: So, what we evaluated in the DCA 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

139 was how they are meeting the TR. And so, we did an 1

audit to look at, how are they meeting those 2

requirements, as stated in the TR?

3 So, in our review, since the TR is approved 4

by the staff, our review on the NuScale DCA review 5

was, are they meeting the TR? And the audit showed, 6

yes, they are. And we evaluated some documents from 7

NuScale where they're referencing the appropriate 8

standards and what they have stated in the TR.

9 MEMBER CORRADINI: But I -- that kind of 10 answer tells me that you kind of did it on a case-by-11 case basis.

12 MS.

RAY:

We did it for the EDSS 13 specifically.

14 MEMBER KIRCHNER: So, if you give them a 15 waiver on 18, on test and inspection, you've got this 16 statement here about this further augmenting the EDSS, 17 why would that not fall into tech specs?

18 This morning, earlier, surely you heard us 19 talking about battery testing and such, wouldn't that 20 be critical to the reliability of this system for its 21 application?

22 I'm just trying to followup on Dick's 23 question and push you a little. So, if there's an 24 exemption and then, there's no limits or conditions or 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

140 it doesn't have to be covered in tech specs or -- but 1

we're talking about how highly reliable this system 2

is. So, how do you know it's highly reliable?

3 MS. RAY: And that's where the TR comes in.

4 Based on the provisions in the TR. And those are 5

proprietary in the TR, it is meeting certain standards 6

or meeting certain criteria, in order to establish 7

augmented quality as well as testing requirements.

8 MEMBER KIRCHNER: Okay. Well, maybe I have 9

to wait for --

10 MEMBER BROWN: Well, but there's also an RAI 11 still to that TR.

12 MEMBER KIRCHNER Yes.

13 MEMBER BROWN: Is that --

14 MS. RAY: Correct, but --

15 MEMBER BROWN: -- have you completed that and 16 17 MS. RAY: No.

18 MEMBER BROWN: So, you're relying on the TR, 19 but you haven't got the TR upgraded or agreed based on 20 the RAI responses?

21 MS. RAY: We haven't finished the evaluation 22 of the RAI. However, we did perform an audit to look 23 at how specifically the EDSS meets the conditions 24 related to the EDSS.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

141 MEMBER BROWN: In the TR, as initially --

1 MS. RAY: In the TR.

2 MEMBER BROWN: -- without the RAI --

3 MS. RAY: Correct.

4 MEMBER BROWN:

clarifications or 5

improvements or revisions?

6 MS. RAY: Correct. When we --

7 MEMBER BROWN:

And those were deemed 8

sufficient for the EDSS, but not sufficient for other 9

things, because they may not have been resolved yet 10 with the RAI?

11 MS. RAY: So, the other items are essentially 12 outside the scope of the electrical. They are -- our 13 colleagues in other chapters, on the other conditions.

14 MEMBER BROWN: Okay.

15 MS. RAY: So, we have --

16 MEMBER BROWN: I guess okay.

17 MS. RAY: You'll hear more about it later, is 18 really -- in other chapters is what I can --

19 MR. TABATABAI: If I can --

20 MEMBER BROWN: You're assuming I'll remember 21 it that long.

22 MS. RAY: I'll make sure you remember.

23 MR. TABATABAI: If I may add something, Mr.

24 Brown? The RAI is not written for the Topical Report 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

142 itself. The Topical Report is done. Topical Report 1

is supposed to be a standalone document.

2 However, because the Topical Report was 3

referenced or incorporated by reference in Chapter 8, 4

the staff wrote the RAI that how basically the DCA 5

meets the Topical Report. So, just want to make sure 6

we are clear.

7 MEMBER BROWN: Okay, thank you. I understand 8

now, sort of.

9 (Laughter.)

10 MEMBER MARCH-LEUBA: Okay. Changing the 11 topic again, all these highly reliable DC systems, 12 have you considered external hazards, like seismic or 13 more important, flooding? Because this is not light 14 water. All these batteries, if I remember correctly, 15 they're located underground in a basement?

16 MS. RAY: They're in a seismic Cat I 17 structure.

18 MEMBER MARCH-LEUBA: Yes, but they're like a 19 wall away from a seven million gallon pool of water 20 and they're in the basement? I mean, are they 21 floodable? Is that part of your consideration?

22 MEMBER CORRADINI: First of all, if we're 23 getting to things that we've got to go to closed 24 session, you stop us.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

143 MS. RAY: Yes, sir.

1 MEMBER CORRADINI: Okay.

2 MS. RAY: We may take that one into closed 3

session.

4 MEMBER MARCH-LEUBA: Okay, I'll remember.

5 MS. RAY: Okay. I may not be able to answer 6

it, since that may not have been completely part of 7

the electrical review, we may have to have our 8

colleagues in Structures, I'm not sure if they're 9

here, but --

10 MEMBER MARCH-LEUBA: Okay.

11 MS. RAY: -- we will do our best. The last 12 topic to cover, quickly, is station blackout. As I 13 mentioned, the Lead Reviewer is on business travel, so 14 I'll be presenting for her.

15 The NuScale design does not rely on the use 16 of onsite or offsite AC power for the performance of 17 safety-related functions for any design basis event.

18 And a safe and stable shutdown is automatically 19 achieved and maintained for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without operator 20 actions.

21 The staff reviewed the SBO-related 22 information provided in the FSAR and the RAI responses 23 against the guidelines of Reg Guide 1.155 and the 24 DSRS.

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

144 The staff requested a regulatory audit to 1

seek clarification on NuScale's assumptions and 2

methodology on the SBO Transient Analysis and the SBO 3

sensitivity case.

The SBO sensitivity case 4

demonstrates the NuScale design does not rely on DC 5

power from the EDSS to meet the requirements of 10 CFR 6

50.63.

7 The staff verified and accepted the 8

methodology assumptions and results of the SBO 9

Transient and sensitivity case, with respect to the 10 electrical.

11 And in conclusion, there are two items 12 awaiting the completion of Open Item 8.3-1. And the 13 last slide is a summary.

14 We have two open items, one on the EPAs, 15 electrical penetration assemblies, and the second one 16 related to the exemptions of GDC 17 and 18. And the 17 staff is currently working on the Phase 4 review.

18 MEMBER CORRADINI: So, can we just go back?

19 I don't understand --

20 CHAIR BLEY: How far back?

21 MEMBER CORRADINI: I'm back to Slide 11, that 22 she just -- not that far. So, what is it about 8.4 23 that is pending? It's really dependent on everything 24 else, assuming everything else -- I'm going to use 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

145 Bob's approach.

1 Assuming everything goes as planned, then 2

the analysis is appropriately using systems to address 3

this sort of station blackout. Is there something 4

particular about station blackout that is an open item 5

or is this just appended onto everything else, because 6

it's using a nonsafety system?

7 MS. RAY: It is --

8 MEMBER CORRADINI: It's the latter?

9 MS. RAY: It's depending on GDC 17 and 18.

10 So, in order to conclude everything is okay with 11 station blackout, if you -- in our DSRS, we do use GDC 12 17 and 18, in 8.4. So, we cannot make that conclusion 13 14 MEMBER CORRADINI: Oh, okay. I see.

15 MS. RAY: -- until we complete the open item.

16 MEMBER CORRADINI: All right. So, it's 17 connected in that regard?

18 MS. RAY: Correct.

19 MEMBER CORRADINI: Okay. Thank you.

20 MS. RAY: And that concludes the staff's 21 presentation.

22 CHAIR BLEY: Thank you very much. Anything 23 more from the Committee? I'm going to take us, after 24 we collect comments, into the closed session, just in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

146 case. There were a few things that came up and we'll 1

just do that to see.

2 But before that, I want to make sure the 3

phone line is open and we'll look for comments there.

4 Is there anybody in the room who would like to make a 5

comment? If so, please come to the microphone.

6 If there's anybody on the phone line who 7

would like to make a comment, please identify yourself 8

and do so. I'm not sure if the phone line is open or 9

not, but we'll keep trying. Anybody there? I don't 10 hear anybody, so I guess we have no comments from 11 there.

12 At this time, I'd like to go around the 13 table and I'm going to start with Charlie. Any final 14 comments?

15 MEMBER BROWN: Only to reiterate downstream, 16 evaluating the inadvertent actuation via either 17 internal, because somebody makes a mistake, and/or 18 whether the plant design and architecture is 19 susceptible to external influences?

20 My quick review was unable to clear that up 21 relative to the electric plant controls, where there 22 seems to be some definition relative to the protection 23 systems and safeguard systems.

24 CHAIR BLEY: We'll raise that again in 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

147 Chapter 7.

1 MEMBER BROWN: Yes, it's all Chapter 7 stuff.

2 So, then, I couldn't find the connection to the 3

electric plant controls, how they are managed within 4

the overall architecture. So, that's the only comment 5

I would reiterate, to make sure it doesn't get lost.

6 I'm sorry, I did not have my microphone, did 7

you hear me, young lady? Thank you. Did you all hear 8

me? I figure my voice carries well enough.

9 CHAIR BLEY: Walt?

10 MEMBER KIRCHNER: No further comments at this 11 point. Thank you.

12 CHAIR BLEY: Thank you. Jose?

13 MEMBER MARCH-LEUBA: No comments.

14 CHAIR BLEY: Michael?

15 MEMBER CORRADINI: No further comments.

16 CHAIR BLEY: Pete?

17 MEMBER RICCARDELLA: No comments.

18 CHAIR BLEY: Matt?

19 MEMBER SUNSERI: No additional comments.

20 CHAIR BLEY: Dick?

21 MEMBER SKILLMAN: Yes, sir, one comment. My 22 comment is aimed on the Safety Evaluation, Page 8-9.

23 This is the SER, Chapter 8. At Paragraph 8.1.4.8.

24 Before I make my comment, I would like to make a 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

148 statement.

1 I have a vivid memory of what we went 2

through at TMI when we transitioned to natural 3

circulation. The reason that we maintained pressure 4

up until that time was because we were maintaining 5

NPSH for one reactor coolant pump, and we knew that 6

one pump was a run-out and we needed that NPSH.

7 Once we stopped that pump, we lost the 8

pressurizer level, stopped the pump, and we had 9

instrumentation that showed us that we went into 10 natural circulation. But we maintained subcooling, 11 because we did not know the condition of the core.

12 Emphasis, did not know the condition of the core.

13 In another event, Walt and I lived this, we 14 both operated a power reactor in downtown Manhattan.

15 That power reactor was named Savannah. We had a 16 couple of events where we lost pressurizer level.

17 But our gold standard was to maintain 18 pressurizer pressure, no matter how many pumps we had 19 operating, because we wanted to maintain subcooling on 20 that fuel.

21 So, to my point, in the Safety Evaluation, 22 the NuScale design does not rely on pressurizer 23 heaters to establish and maintain natural circulation 24 and shutdown conditions. I get it, for what we've 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

149 been presented regarding this reactor design.

1 But from a systems perspective, it seems 2

that this reactor, if you will, is a hybrid. Most of 3

the time, it's a P, pressurized water reactor, but it 4

can go to conditions that are very similar to a B.

5 And when it goes to those conditions, it may have 6

reactivity requirements that depend on subcooling.

7 And so, I'm going to be very skeptical as we 8

go ahead about the technical accuracy of whether or 9

not pressurizer heaters, and I translate that to be 10 subcooling, is really not needed. Whether it's a 1E 11 power system, whether it's an Evinrude with some kind 12 of an alternator that will make sure subcooling 13 exists.

14 I've seen the analysis, I understand the 15 explanations we've been given today, but I'm skeptical 16 on the this one point. And to me, this will be the 17 turning point for whether you need a 1E system or not.

18 Do you really not need subcooling driven by 19 pressurizer heaters when this plant has gone into a 20 quasi-PWR/BWR mode? Thank you.

21 CHAIR BLEY: Thanks, Dick. Harold?

22 MEMBER RAY: Just to say again, although our 23 review is independent of the staff, it does include 24 review of the staff's conclusions and I look forward 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

150 to being able to do that when the time is appropriate.

1 CHAIR BLEY: And our consultant, Dr. Schultz?

2 DR. SCHULTZ: My comments are two, and one is 3

just a recognition, both in the presentation by 4

NuScale and then, by the staff, it's very clear that 5

what -- one of the things that's ongoing here is that 6

the reviews, although they're presented sequentially, 7

we are beginning with Chapter 8, you've got, as you 8

said at the beginning of your presentation, a dozen 9

staff members from different areas within the 10 organization working together to perform the review.

11 And the material that the Committee is 12 wrestling with today is a lot, to a great extent, 13 associated with trying to knit those pieces together.

14 As is the staff. So, that's one side of the comment.

15 The other is, looking at this from a 16 different angle, as the material is presented, one of 17 the things that is difficult in the situation where 18 we've got a major, a major open item, as we go through 19 it section by section, piece by piece, the conclusion 20 by the staff is all affected by that.

21 But I think, in fact, there is a gradation 22 of to what extent that review is in fact completed.

23 But they all seem to be tied together by one final 24 comment saying, well, we'll just have to wait and see 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

151 if that is resolved.

1 More information about the level of 2

conclusion that in fact has been reached to this point 3

in the review would be helpful, because we are going 4

through an iterative process here.

5 CHAIR BLEY: Thanks, Steve. I want to thank 6

NuScale and the Staff for very good discussions today, 7

that's added some clarity.

8 We're on the schedule to write an interim 9

letter. If we write an interim letter on this 10 chapter, it won't say more than, we look forward to 11 seeing your SER when it has content.

12 MEMBER CORRADINI: There is, in past letters 13 such as this, a conclusion that there's a myriad of 14 system interactions that may alter our conclusions.

15 CHAIR BLEY: And that's reasonable too. For 16 me, I --

17 MEMBER CORRADINI: That's the only that I --

18 CHAIR BLEY: -- we have no conclusion thus 19 far, other than we don't see any showstoppers, I 20 think. And I guess, you do want a letter? Yay or 21 nay?

22 MR. TABATABAI: Yes. Actually, I just wanted 23 to mention that we are scheduled to present to the 24 full Committee on July 11. So, we took notes of some 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

152 comments and questions that you had and hopefully, by 1

then, at least if we are not giving you the full 2

conclusion, because the reviews are still ongoing, as 3

you've heard, so to whatever extent we can, we can 4

come back to the Committee and --

5 CHAIR BLEY: Yes, for us to write a letter, 6

you're going to have to come back.

7 MR. TABATABAI: Yes.

8 CHAIR BLEY: If you can emphasize anything 9

that answers any of the questions, that will be very 10 good. I suspect the letter won't say much more than 11 I just said, although we might add something. And I 12 understand you want it, so we will help you out and do 13 one, if it helps.

14 But I guess that's it. Anything else from 15 any of the members?

16 MEMBER CORRADINI: You want to go to the 17 closed session?

18 CHAIR BLEY: I do. At this time, we need to 19 clear the room, turn off the phone lines, and we're 20 going off the public record and onto a closed record.

21 (Whereupon, the above-entitled matter went 22 into closed session at 11:37 a.m.)

23 24 25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433

PM-0618-60190-NP 1

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 NuScale Nonproprietary ACRS Presentation Chapter 8 Overview Ted Hough Electrical Design Kent Welter Nuclear Safety Jeff Ehlers Electrical Design Paul Infanger Licensing June 6, 2018

PM-0618-60190-NP 2

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Abbreviations AAPS - alternate AC power supply AC - alternating current BDG - backup diesel generator BPSS - backup power supply system CFDS - containment flooding and drain system COA - condition of applicability CHWS - chilled water system CNV - containment vessel CVCS - chemical and volume control system CW - circulating water DC - direct current DCA - design certification application ECCS - emergency core cooling system EDNS - normal DC power system EDSS - highly reliable DC power system EHVS - electrical high voltage system

PM-0618-60190-NP 3

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Abbreviations ELVS - electrical low voltage system EMVS - electrical medium voltage system FSAR - final safety analysis report HP - horsepower LTR - licensing topical report MCR - main control room MCS - module control system MPS - module protection system MPT - main power transformer MS - module specific NMS - neutron monitoring system OPS - operations PAM - post accident monitoring PCS - plant control system PLS - plant lighting system PPS - plant protection system PZR - pressurizer

PM-0618-60190-NP 4

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Abbreviations RAI - request for additional information RG - regulatory guide RT - reactor trip SBO - station blackout SDIS safety display and indication system SER - safety evaluation report SPS - security power system SST - station service transformers TG - turbine generator UAT - unit auxiliary transformer VRLA - valve regulated lead acid

PM-0618-60190-NP 5

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Purpose

  • Provide an overview and highlights of the electrical systems pertinent to Chapter 8 of the NuScale DCA

- design basis

- off-site power

- on-site power (AC)

- on-site power (DC)

- station blackout

- FSAR Table 8.3-9

  • TR-0815-16497 Conditions of Applicability
  • TR-0815-16497 NRC additional conditions

PM-0618-60190-NP 6

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Starting Point

  • Key influences in the overall electrical design

- nuclear safety and regulatory requirements

- Fukushima electrical insights/dependence on power

- the robust, inherently safe module concept

- our plant mechanical design emphasizes simplicity

- design electrical systems that compliment the simplicity

- 12X factor, electrical impact regarding viability and economics

PM-0618-60190-NP 7

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Design Basis

  • Safety-related components fail-safe on a loss of electrical power

- solenoids (de-energized) - valves close/open depending on function

- breakers (RT + PZR) - open

  • Safety-related systems rely on natural passive mechanisms based on fundamental physical and thermodynamic principles
  • Based upon the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems, TR-0815-16497, the following are key electrical design features:

- AC and DC electrical distribution systems are classified as non-Class 1E

- highly reliable DC power system (EDSS) has augmented design, qualification, and QA provisions

- MCR emergency lighting and PAM B&C variables powered by EDSS

- power sources are not required to support safety-related functions

- design supports exemption to GDC 17 and 18

PM-0618-60190-NP 8

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Overall Electrical Design The Grid / Load EHVS (13.8kV)

EMVS (4160V)

ELVS (480V)

EDNS EDSS BPSS (AAPS 13.8kV)

PLS SPS BPSS (BDGs 480V)

PM-0618-60190-NP 9

Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Overall Single-Line Drawing Switchyard 13.8kV 4160V

PM-0618-60190-NP 10 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Off-Site Power System

  • The off-site power system includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.

- COLA Item (8.2-1) to describe the site-specific switchyard layout and design including off-site power connections

  • The passive design of the NuScale power plant does not rely on AC power and does not require an off-site power system to mitigate design-basis events.
  • On a loss of off-site power the plant is designed to transition to island mode with house load powered from the designated TG unit.

PM-0618-60190-NP 11 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site AC Power

  • Use of standardized industrial AC electrical distribution equipment
  • Support online electrical bus outages with multiple modules in service (e.g., transformer capacities, short circuit ratings, etc.)
  • Electrical distribution levels

- EHVS - 13.8kV (main generators, MPTs, buses) one generator can power entire 12-module house load normal AC power source to on-site loads

- EMVS - 4160V (UATs, buses) supports large shared plant loads (CW, SCW, CHWS)

PM-0618-60190-NP 12 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site AC Power

  • ELVS - 480V (SSTs, buses)

- station service transformers (main-tie-main configuration)

  • module-specific and lower HP shared loads
  • PLS - 480V, 277V, 208V, and 120V

- plant lighting loads and misc. power panel loads

  • BPSS

- auto start on loss of all AC to 13.8kV buses (30-second time delay), manually loaded

  • backup diesel generators (BDGs 480V) support selected plant loads (battery chargers, control room ventilation, CVCS pumps, CFDS pumps)

PM-0618-60190-NP 13 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site AC Power

  • BPSS

- auxiliary AC power source (AAPS 13.8kV)

  • support permanent nonsafety loads when normal AC not available
  • 13.8kV so OPS can distribute power as needed

- portable generator connection (480V)

PM-0618-60190-NP 14 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site DC Power

  • EDSS (highly reliable DC power system)

- augmented design requirements

- augmented QA requirements

- Class 1E isolation - performed by the MPS and NMS power supply components (i.e., DC-DC converters)

- VRLA batteries

- battery duty cycle

  • EDSS MS Channel A & D - 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (ECCS Hold Mode)
  • EDSS MS Channel B & C - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (PAM Support)
  • EDSS-C Division I & II - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> (PAM Support)

PM-0618-60190-NP 15 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site DC Power

  • EDSS - 125V

- EDSS-MS (module specific)

  • power to MPS and NMS
  • 4-channel system to support 4-channel MPS and NMS

- EDSS-C (common)

  • shared common loads (PPS, MCR emergency lights, SDIS)
  • two divisions Non-Class 1E EDSS-MS Channel A Class 1E

PM-0618-60190-NP 16 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

On-Site DC Power

  • EDNS - 250 VDC,125 VDC, and 208 VAC

- VRLA batteries and 40-minute battery duty cycle

- supports nonsafety loads/functions related to investment protection and power generation, for example:

  • electrical distribution control power

PM-0618-60190-NP 17 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Station Blackout

- station blackout (72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> coping duration)

- SBO analysis includes all 12 modules operating at 100% prior to the event

- all safety functions achieved and maintained for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without reliance on AC power or operator action (reactor trip, decay heat removal system, emergency core cooling system)

- core cooling and containment integrity maintained without AC power

- sensitivity case demonstrates core cooling and containment integrity maintained without DC power as well

- EDSS available to support PAM

PM-0618-60190-NP 18 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Station Blackout (RPV Level) 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ECCS actuation

PM-0618-60190-NP 19 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Station Blackout (RPV Pressure)

PM-0618-60190-NP 20 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Station Blackout (CNV Pressure)

PM-0618-60190-NP 21 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Electrical Topical Report Evaluation

  • NuScale received NRC eRAI No. 9359 on 1/29/18 requesting the addition of a table to the FSAR providing a cross reference for the conditions of applicability provided in the LTR and the five conditions identified in the associated SER
  • NuScale responded to the RAI on 3/27/18 with the addition of Table 8.3-9 (addresses COAs and SER conditions) and Table 8.3-10 (addresses augmented design provisions), which provide the required FSAR cross references for the LTR and associated SER

- as a result of the FSAR cross reference evaluation, numerous conforming changes were made to the Tier 2 FSAR to enhance validation

PM-0618-60190-NP 22 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Table 8.3-9 FSAR Cross Reference

PM-0618-60190-NP 23 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 T

Conclusion

  • The electrical distribution system supports the application of Safety Classification of Passive Nuclear Power Plant Electrical Systems,TR-0815-16497
  • The electrical distribution system is not required to support any safety-related function or manual operator action (no RG 1.97 Type A variables), and thus is classified as non-Class 1E
  • Backup power sources (BDGs, AAPS) are available for asset protection, designated plant loads, and black start
  • The electrical distribution system has flexibility to support bus outages with multiple modules in service
  • The design supports exemption to GDC 17 and 18

PM-0618-60190-NP 24 Copyright 2018 by NuScale Power, LLC.

Revision: 0 Template #: 0000-21727-F01 R3 Portland Office 6650 SW Redwood Lane, Suite 210 Portland, OR 97224 971.371.1592 Corvallis Office 1100 NE Circle Blvd., Suite 200 Corvallis, OR 97330 541.360.0500 Rockville Office 11333 Woodglen Ave., Suite 205 Rockville, MD 20852 301.770.0472 Charlotte Office 2815 Coliseum Centre Drive, Suite 230 Charlotte, NC 28217 980.349.4804 Richland Office 1933 Jadwin Ave., Suite 130 Richland, WA 99354 541.360.0500 Arlington Office 2300 Clarendon Blvd., Suite 1110 Arlington, VA 22201 London Office 1st Floor Portland House Bressenden Place London SW1E 5BH United Kingdom

+44 (0) 2079 321700 http://www.nuscalepower.com Twitter: @NuScale_Power

Presentation to the ACRS Subcommittee NuScale Power, LLC NuScale Design Certification Application Review Safety Evaluation with Open Items: Chapter 8 ELECTRIC POWER June 06, 2018

June 06, 2018 Chapter 8, Electric Power 2

  • Technical Staff Reviewers
  • Project Managers

Lead Project Manager - Gregory Cranston

Chapter 8 Project Manager - Omid Tabatabai Sheila Ray. P.E.

Swagata Som James Strnisha Nadim Khan Luis Betancourt Timothy Drzewiecki Robert Fitzpatrick Clinton Ashley Jeffrey Schmidt Fanta Sacko Thomas Scarbrough Raul Hernandez

June 06, 2018 Chapter 8, Electric Power 3

Overview of Chapter 8 Review NuScale submitted its DCA, Rev 0, in December 2016, and a Rev 1, on March 15, 2018. The staffs SER is based on the review of Rev 0 of the DCA.

Todays presentation is the first ACRS briefing by the NRC Staff in support of the NuScale DCA review.

Issued a total of 10 RAIs with 25 Questions. All RAIs have been responded.

The staffs SER with Open Items contains two open items and will be discussed in the subsequent slides.

Open and Confirmatory Items will be closed in Phase 4 of the Review.

June 06, 2018 Chapter 8, Electric Power 4

Technical Topics Section 8.1 - Introduction Technical Topics NuScale Design:

The electric power system for NuScale design is comprised of non-safety related AC (or ac)(alternating current) and non-safety related DC (or dc) (direct current) power system.

This design does not depend on onsite or offsite AC or DC electrical power system, including that from the transmission grid for safe operation.

The NuScale Power Plant design with non-reliance on electrical power accommodates a site location where an offsite transmission grid is not available.

The normal source of power is one or more of the twelve (12) operating power module main generators.

Staffs review:

The staff reviewed the design of the electric power systems necessary for safe design and operation of the plant, or whose failure might adversely affect their safety-related or risk-significant safety functions.

The staff reviewed the design of the electric power systems in accordance with the applicable DSRS or SRP and consistent with the graded review approach.

June 06, 2018 Chapter 8, Electric Power 5

Technical Topics Section 8.1 - Introduction Open Item 8.3-1 FSAR, Tier 2, Section 8.3 and DCA Part 7 state that the design does not rely on safety-related AC or DC power systems

This position is supported by the application of the evaluation methodology described in NuScale topical report (TR)-0815-16497, Safety Classification of Passive Nuclear Power Plant Electrical Systems.

The open item relates to the exemptions to GDC 17 and 18 regarding the staff verifying that the design does not require safety-related power.

Furthermore, the staffs evaluation of accident analyses are in Chapter 15 which has not been completed to demonstrate that 1) fuel design limits and design conditions of the reactor coolant pressure boundary are not exceeded as a result of anticipated operational occurrences and 2) the core is cooled and containment integrity and other vital functions are maintained in the event of postulated accidents.

Staff issued a safety evaluation approving TR-0815-16497 with five additional conditions.

The NuScale DCA did not directly address the conditions of applicability and the five additional conditions.

NRC staff issued RAI 9359, Question 1-1, to address the conditions of applicability and the additional conditions associated with TR-0815-16497.

Staff is evaluating the RAI response.

June 06, 2018 Chapter 8, Electric Power 6

Technical Topics Section 8.2 - Offsite Power System Technical Topics NuScale Design:

The Offsite Power System includes the switchyard and one or more connections to a transmission grid, micro-grid, or dedicated service load.

The passive design of NuScale Power Plant does not depend on offsite AC power for safe operation and does not rely on offsite AC power to support safety-related function.

The applicant stated in DCA Part 7 that offsite power is not required.

Staffs review:

The staff reviewed the offsite power system to ensure that it will perform its design function during all operating and accident conditions.

Open Items The completion of the review for the offsite power system is awaiting for the completion of OPEN ITEM 8.3-1

June 06, 2018 Chapter 8, Electric Power 7

Technical Topics Section 8.3.1 - Onsite AC Power Systems Technical Topics The following nonsafety-related systems are the major constituents of the onsite AC power system:

Electrical High Voltage System (EHVS) (13.8 kV)

Electrical Medium Voltage System (EMVS) (4.16 kV)

Electrical Low Voltage System (ELVS) (480 Volts and 120 Volts)

Backup diesel generators (BDGs) (480 volts)

Auxiliary ac power source (AAPS) (13.8 kV)

The review focused on the following:

Overall system operation Electrical penetration assemblies (EPAs)

A few areas where the staff sought clarity in the FSAR

June 06, 2018 Chapter 8, Electric Power 8

Technical Topics Section 8.3.1 - Onsite AC Power Systems Open Items There are two open items associated with onsite AC power systems:

Open Item with respect to GDC 17 and 18 (Open Item 8.3-1)

The applicant is to document in the DCA the disposition of the conditions of applicability and the additional conditions imposed by the staff review associated with TR-0815-16497 This relates not only to the Applicants request for exemptions to GDC 17 and 18 but also their associated guidance documents from the DSRS Open item with respect to EPAs The staff has a path to resolution for this item The confirmatory items will be addressed in our phase 4 SER

June 06, 2018 Chapter 8, Electric Power 9

Technical Topics Section 8.3.2 - Onsite DC Power Systems Technical Topics The onsite DC power systems include the non-Class 1E EDSS and the non-Class 1E EDNS.

The EDSS-common (EDSS-C) plant subsystem serves plant common loads that have functions that are not specific to any single NuScale Power Module (NPM). These plant common loads include Main Control Room (MCR) emergency lighting and Post-Accident Monitoring (PAM) information displayed in the MCR.

The EDSS-module-specific (EDSS-MS) plant subsystem consists of up to 12 separate and independent DC electrical power supply systems, one for each NPM.

The EDNS is shared between the NPMs and provides both DC power and AC power (through inverters) to non-safety related loads that support functions related to investment protection and power generation.

The NuScale design utilizes Valve-Regulated Lead Acid batteries in the DC systems.

The objective of the staff review is to determine that the onsite direct current (DC) power system satisfies the requirements of 10 CFR 50, Appendix A, General Design Criteria (GDC) 2, 4, 5, 17, and 18 and will perform its design function during all plant operating and accident conditions.

June 06, 2018 Chapter 8, Electric Power 10 Technical Topics Section 8.3.2 - Onsite DC Power Systems Open Item The open items in this section are related to the classification of the highly reliable dc system (EDSS), and GDC 17 and 18 exemptions.

The applicant stated in DCA Part 7 that onsite power is not required for the mitigation of design basis events.

The completion of the staffs review of onsite dc power systems is awaiting the completion of OPEN ITEM 8.3-1

June 06, 2018 Chapter 8, Electric Power 11 Technical Topics Section 8.4 - Station Blackout Technical Topics NuScale Design:

The NuScale Power Module (NPM) design does not rely on the use of onsite or offsite AC power for the performance of safety-related functions for any design basis event.

A safe and stable shutdown is automatically achieved and maintained for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> without operator actions.

Staffs review:

The staff reviewed the information pertaining to SBO in the FSAR to determine whether the design is capable of withstanding and recovering from a complete loss of ac electric power for a minimum of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Staff performed an audit of the methodology and assumptions of the SBO Transient Analysis and SBO sensitivity case.

The completion of the staffs review of station blackout is awaiting the completion of OPEN ITEM 8.3-1

June 06, 2018 Chapter 8, Electric Power 12 Summary Two Open Items:

Electrical Penetration Assemblies Relating to the exemptions to GDC 17 and 18, regarding the staff verifying that the design does not require safety-related power.

Staffs review:

Currently working on Phase 4 review.