ML19329B672: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 19: Line 19:
{{#Wiki_filter:- _____
{{#Wiki_filter:- _____
l
l
                                        '
~
          .
ht/ogagc 3
  .
~
      '
INSTRUMENTATION 3/4.3.2 SAFETY SYSTEM INSTRUMENTATION W
            -
SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION t
            ,
                    '
                          ~
                                ~
ht/ogagc 3                             .
                                                                                                          .
        *
                                                #_                      _ _    _  _
                                            *
  .      -
INSTRUMENTATION               ,
W 3/4.3.2 SAFETY SYSTEM INSTRUMENTATION                                                         .
                                                                                                            '
SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION
                                                                                                              !
LIMITING CONDITION FOR OPERATION t
3.3.2.1 The Safety Features Actuation System (SFAS) functional units shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column,of Table 3.3-4 and with RESPONSE TIMES as shown in Table 3.3-5.
3.3.2.1 The Safety Features Actuation System (SFAS) functional units shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column,of Table 3.3-4 and with RESPONSE TIMES as shown in Table 3.3-5.
APPLICABILITY: As shown in Table 3.3-3.
APPLICABILITY: As shown in Table 3.3-3.
ACTION:
ACTION:
: a. With a SFAS functional unit trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the functional unit inoperable and apply the applicable ACTION requirement of Table 3.3-3, until the func-tional unit is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.
a.
: b. With a SFAS functional unit inoperable, take the action shown in Table 3.3-3.
With a SFAS functional unit trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the functional unit inoperable and apply the applicable ACTION requirement of Table 3.3-3, until the func-tional unit is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.
SURVEILLANCE REQUIREMENTS 4.3.2.1.1     Each SFAS functional unit shall be demonstrated OPERABLE by the perfonnance of the CFANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shewn in Table 4.3-2.
b.
4.3.2.1.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of functional units affected                       1 by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each functional unit affected by bypass operation.
With a SFAS functional unit inoperable, take the action shown in Table 3.3-3.
SURVEILLANCE REQUIREMENTS 4.3.2.1.1 Each SFAS functional unit shall be demonstrated OPERABLE by the perfonnance of the CFANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shewn in Table 4.3-2.
4.3.2.1.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of functional units affected by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each functional unit affected by bypass operation.
4.3.2.1.3 The SAFETY FEATURES RESPONSE TIME of each SFAS function shall be demonstrated to be within the limit at least once per 18 months.
4.3.2.1.3 The SAFETY FEATURES RESPONSE TIME of each SFAS function shall be demonstrated to be within the limit at least once per 18 months.
Each test shall include at least one functional unit per function such       7 that all functional units are tested at least once every N times 18           .
Each test shall include at least one functional unit per function such 7
* months where N is the total number of redundant functional units in a specific SFAS function as shown in the " Total No. of Units" Column of                         1 Table 3.3-3.                                                                                   .
that all functional units are tested at least once every N times 18 months where N is the total number of redundant functional units in a specific SFAS function as shown in the " Total No. of Units" Column of 1
                                                                                                                !
Table 3.3-3.
DAVIS-BESSE, UNIT 1                     3/4 3-9 JAN 121977             !
DAVIS-BESSE, UNIT 1 3/4 3-9 JAN 121977
                                                              ~~
~
l
8005050179
                                                                        -l
~~
    ~
-l
8005050179          -
:


                                                                                                                    -      -
\\
                                                                                                                          '
                                                                                                                              .
TABLE 3.3-3 SAFETY FEATURES ACTUATION SYSTE'ri INSTRUMENTATION
TABLE 3.3-3 SAFETY FEATURES ACTUATION SYSTE'ri INSTRUMENTATION
    $
[
    -
MINIMUM g;
MINIMUM
TOTAL NO.
[                                            TOTAL NO.           UNITS     - UNITS         APPLICABLE g;
UNITS
ACTION g
- UNITS APPLICABLE g
    .
FUNCTIONAL UNIT OF UNIT 5 TO TRIP OPERABLE MODES ACTION g
FUNCTIONAL UNIT                           OF UNIT 5       TO TRIP         OPERABLE         MODES g   1. INSTRUMENT STRINGS U       a. Containment Radiation -
1.
    --            High                             4                   2             3       All MODES           9f
INSTRUMENT STRINGS U
: b. Containment Pressure -
a.
High                             4                   2             3       1,2,3                 9#
Containment Radiation -
: c. Containment Pressure -                                                                       '#
High 4
liigh-High                       4                   2             3       1, 2, 3         ' 91
2 3
: d. RCS Pressure - Low               4                   2             3       1, 2, 3*       d     9#
All MODES 9f b.
: e. RCS Pressure - Low-Low           4                   2             3       1, 2, 3**             9#
Containment Pressure -
4                   2
High 4
                                                                                ~
2 3
3       1,2,3         4      9#
1,2,3 9#
: f.  .BWST Level - Low                                                                                          f M
c.
2. DUTPUT LOGIC                                                                                     g
Containment Pressure -
: a. Incident Level #1:
liigh-High 4
w o
2 3
    '
1, 2, 3
_.
' 91 d.
RCS Pressure - Low 4
2 3
1, 2, 3*
d 9#
9#
e.
RCS Pressure - Low-Low 4
2 3
1, 2, 3**
4 f.
.BWST Level - Low 4
2
~
3 1,2,3 9#
f M
2.
DUTPUT LOGIC g
g a.
Incident Level #1:
2 Containment Isolation NA NAl NA E All MODES 10.
g w
p o
b.
b.
Containment Isolation Incident Level #2:
Incident Level #2:
* NA 2
bh$ N High Pressure Injection p
                                                          *
and Starting Diesel NA 1 NA I NA 2 1, 2, 3 P-(*t10 1#
                                                            .            NAl            NA E-All MODES            10.
Generators
p  g High Pressure Injection and Starting Diesel                                                                     bh$p N Generators              -
#v c.
NA 1               NA I           NA 2     1, 2, 3   1#
Incident Level #3:
: c. Incident Level #3:
Low Pressure Injection NA b NA 8 NA z.
Low Pressure Injection           NA b               NA 8           NA   z. 1, 2, 3 P-(*t10
1, 2, 3 10 by d.
                                                                                                            #v10
Incident Level #4:
: d. Incident Level #4:
Containment Spray NA h NA I NA ?.
1, 2, 3.
1, 2, 3.
by Containment Spray                NA h              NA I          NA ?.                          10
10 e.
: e. Incident Level #5:                                                   '
Incident Level #5:
Containment Sump Recirculation                     NA h               NA 1           NA E     1,2,3                 10
Containment Sump Recirculation NA h NA 1 NA E 1,2,3 10 Q
<_.
s y, s ~ n'l O f g g i
Q       $
dd M A ur g ym y rhyLw,,~~~",
* i                      dd M A ur s y , s g~ ym
                                                          *-
n'l O                   fgg                    %,
                                                                                                                  -
y rhyLw,,~~~",
                                                                                    .                      .
                                                                                                            .


_
i TABLE 3.3-3 SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM g
                                                                                                                                                                                                                                              .
TOTAL NO.
                                          .
UNITS UNITS APPLICABLE ACTION g
                                                                                                                                                                                                                                        .
FUNCTIONAL UNIT OF UNITS TO TRIP OPERABLE MODES g
i
3.
                                                                                                                                                                                              .
MANUAL ACTUATION
                                                                                                                                                                    .                                                                      .
~
TABLE 3.3-3
2 a.
                                                    $                                                                                          SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM
SFAS(exceptContainment Spray and Emergency Sump 2
                                                                                                                                                                                                                                          '
2 8
g                                                                                                        TOTAL NO.         UNITS       UNITS       APPLICABLE g             FUNCTIONAL UNIT                                                                           OF UNITS         TO TRIP     OPERABLE           MODES     -
2 ALL MODES 11.
ACTION
Recirculation) b.
                                                    '
Containment Spray 2
g
2 A 2
                                                    ~
1,2,3,4~'
: 3. MANUAL ACTUATION
11 4.
                                                                                                                                                                          .
SEQUENCE LOGIC CHANNELS 4
                                                                                                                                                                                                                              .'      ,
2***
2                                                                SFAS(exceptContainment
4 1,2,3 97~
                                            '
i O
: a.                                                                                                                                                        .
4
Spray and Emergency Sump                   2               2   8         2     ALL MODES               11.
,Q
                                              ,                                                                        Recirculation)                                                                                                     '
$ 4(/ hN f p cd idMif V^
                                                                                                                                                                                                                                          .
^
: b.                                              Containment Spray                           2               2 A           2       1,2,3,4~'               11
,.. 3 feA n W W j
: 4. SEQUENCE LOGIC CHANNELS                                                                     4               2***           4       1,2,3 -
y a k i.d&
97~
f,hsh /Nb 1
i
=
                                                                                                                                                                                                                              .
g y
                                                      #
g M
4         O
w
                                                                                                                                                                                                            ,      .
                                                                                                                                                                                                                            .,
                                                                                                                                                                                                ,Q        $ 4(/ hN f p cd idMif V^
                                                                                                                                                                                                                                          ^
                                          .                                                                                                                                              ,..
                                            '
                                                                                                                                          .                                                    3 feA an kWi W                     .d&
j                                                                                                                                                      y 1  .
f,hsh /Nb
                                            -
                                                  %
                                                  =
                                                  ..                                                                                                                                                                            g g                                                                                                                                                                               y M
w --          -.
_ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                _ _ _ _ _      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ _ _ . _


i.
i.
,
.
I
I
                                                                                                                                                                      -l
-l TABLE 3.3-4 SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS'
                                                                                                    -
~
TABLE 3.3-4                                                                 ,
enb h
SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS'                           ~
FUNCTIONAL UNIT TRIP SETPOINT ALLOWA'BLE VALUES m
en b
k INSTRUMENT STRINGS 2
TRIP SETPOINT                                 ALLOWA'BLE VALUES h
H a.
m FUNCTIONAL UNIT
Containment Radiation 1 25 mR/hr
                                                                                                                                                ,
< 25 mR/hr b.
:
Containment Pressure - High.
k 2
1.'18.4 psia
INSTRUMENT STRINGS                                           ,
' 1'18.4 psia
                                                                                                                                              -
\\
                                                                                                                                                                  .
c.
H       a.       Containment Radiation                                         1 25 mR/hr                                     < 25 mR/hr
Containment Pressure - High-High 1 38.4 psia s'38.4 psia
                                                                                                                                      -                    _
.i d.
                                                                                                                                                                        .
RCS Pressure - Low
                                                                                                                                                                        .
/ t.1600 psig t 1600 psig e.
                          '
RCS Pressure - Low-Low
: b.      Containment Pressure - High.                                   1.'18.4 psia                             , ' 1'18.4 psia               .
". t 400 psig'
                                                              ,
> 400 psig f.
\                                                 ,
BWST Level 1 36 in. H O
: c.       Containment Pressure - High-High                             1 38.4 psia         -
>i_ 36 in. H O 2
s'38.4 psia                       .,
2 yN SEQUENCE LOGIC CilANNELS 3, *o -
                                                                                                                                    >
0000100 Volts a.
                                                                                                                                                                          .i
Undervoltage Condition 0000100 Volts bS
                                                                                / t.1600 psig                                       t 1600 psig
^
                                                                                                                                                                            '
i 5'o a
: d.        RCS Pressure - Low                                                                                      ,
lo-u de-jv dn~ dL j w/// jj f$ y #'
                                                                                                                                                                        .
3<>. N.,ne.L., h Q4,a, '
: e.        RCS Pressure - Low-Low                                   ". t 400 psig'                                     > 400 psig
OI 1' ~
_
~"
                                                                                                        '
~9 8#
      $      f.       BWST Level                                                   1 36 in. H 2O                                    >i_ 36 in. H 2O
r 52
  .            SEQUENCE LOGIC CilANNELS yN
.}
                                                                                                                                                            .
u,
: a.        Undervoltage Condition                                       0000100 Volts            3, *o -                0000100 Volts bS
\\,.-
                                                                                                                              ^                         '
,.. t.,
                                                                                                                                                                    .        i 5'o                                                         a de- jv dn~ dL j w///
. 7-Fy o
  .
s D;o Q
f$ y~" lo-1' ~
1 2 R
                                              #' u3<>.         N. ,ne.L., h Q4,a, '                         '
:::t:3 2
jj OI                                                          !
                                                                ;                ..        -                    ~9                                                           ,
u,   \,.-
            .    .
                    ,. . t. ,'
                                .
8# . 7-Fys                -.
                                                                                              .
                                                                                                  -
                                                                                                    . r          52o                                            -
                                                                                                                                                                        .}
    *              ''                                                                                            D;o                                 Q                       1 2R                                  :::t:3                 !
2                                                   -! -                      ,
_........a.
_........a.
                                                                          -
9,!R
a
:nu a
                                  -
...~._
                                      .
y i O,i MW WWupesuum se. - ~ +. m o ne-p
                                                        --
                                                            .        .
                                                                  . ..~._                                       9,!R    y
                                                                                                                                        .
:nu
                                                                                                      .
i O,i
                                                                                                                                                                                ,
MW WWupesuum se . - ~ + . m o ne-p


                                                                                          . _ _ _ . .              _ _ - _ - _ _ _ _ _ _ _ -
7 p7k i
  ;
TABLE 3.3-5 (Continued)_
        -                        .-
i SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSETIMEINSECONDS n.
,
Steam and Feedwater Isolation Valves (continued) 8 2.
7 p7k
Main Feedwater Stop NA
                                            '
.3.
i
Main-Steam Warmup NA
                                    .          TABLE 3.3-5   (Continued)_                                       -                          i
[ME 2.
                                                                                                              '                                    '
Contairinent Pressure - High a.
SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION                                 RESPONSETIMEINSECONDS
Fans 1.
                                                                                                                                                    '
Emergency-Vent Fans 1 25*
                                                                                                                        '
2.
: n. Steam and Feedwater Isolation Valves (continued) 8
Containment Cooler Fans 1 45*
: 2.         Main Feedwater Stop               .                  NA
b.
                          .3.         Main-Steam Warmup                                     NA
HV & AC Isolation Valves 1.
[MEContairinent Pressure - High
ECCS Room
: 2.                                                                     ,
< 75*
: a. Fans                                           .
2.
  .                        1.        Emergency-Vent Fans                                   1 25*
Emergency Yent11ation 175*
: 2.         Containment Cooler Fans                               1 45*
3.
: b. HV & AC Isolation Valves
, Containment Air Sample 1 25*
: 1.         ECCS Room                                               < 75*
4.
: 2.         Emergency Yent11ation                               175*
Containment Purge
: 3.         , Containment Air Sample                             1 25*
< NA*
: 4.         Containment Purge                                       < NA*
5.
            ,
Penetration Room Purge 175*
: 5.         Penetration Room Purge                               175*
[c ControlRoomHV&dC' Units 1 10*
                                                                                                                                              -
c.
c.
d.
g{4* <y d.
ControlRoomHV&dC' Units High Pressure Injection 1 10*
High Pressure Injection 1.
[c g{4* <y
High Pressure Injection Pamps
                                                                                                                                                    ,
< 30*
                                                                                                                                                        '
2.
: 1.         High Pressure Injection Pamps                           < 30*                                             ,
High Pressure Injection Valves i30*
1
e.
: 2.         High Pressure Injection Valves                       i30*                                               #
Component Cooling Water g
: e. Component Cooling Water                                                           g                                 , ,
1.
: 1.         Component Cooling Water Pumps                         < 180*
Component Cooling Water Pumps
< 180*
2.
2.
3.
Component Cooling Aux. Equip. Inlet Valves 5180* 4 ff Ag, 3.
Component Cooling Aux. Equip. Inlet Valves Component Cooling to Air Compressor Valves 5180* 4 1 180*
Component Cooling to Air Compressor Valves 1 180*
ff Ag,
f.
    .
Service Water System 1.
: f. Service Water System
Service Water Pumps 45*
: 1.         Service Water Pumps                                   -
2'.
45*
Service Water Fran Component Cooling Heat Exchanger Isolation Valves 1 NA*
2'.         Service Water Fran Component Cooling Heat Exchanger Isolation Valves                     1 NA*
g.
                                                                                                                                                      .
Containment Spray Isolation Valves 1 80*
    .                g. Containment Spray Isolation Valves                               1 80*
h.
: h. Emergency Diesel Generator                                       11 i!
Emergency Diesel Generator 1 1 i!
DAVIS-BESSE UNIT 1                         3/4 3-16
DAVIS-BESSE UNIT 1 3/4 3-16
          .
~
                                                                                      '
                                                            ~
_.      .                ..        ...  . _              . _ . _.
JAN 121977
JAN 121977
_ _
_.                        _
                                                                                              ..


                                                                      *
TABLE 3.3-5 (Continued)
      .
SAFETY FEATURES SYSTEM' RESPONSE TIMES INITIATINGSIGNALANDFUNCTkON RESPONSE TIME IN SECONDS 2.
    ,
Containment Pressure - High (Continued) i I
TABLE 3.3-5 (Continued)
1.
SAFETY FEATURES SYSTEM' RESPONSE TIMES INITIATINGSIGNALANDFUNCTkON                         RESPONSE TIME IN SECONDS
Containment Isolation Valves l
: 2. Containment Pressure - High (Continued)                                                     i
1.
                                                                                              .            I
Vacuum Relief
: 1. Containment Isolation Valves                                                           l
< 25*
: 1. Vacuum Relief                                     < 25*
2.
: 2. Nomal Sump                                         ~ 25*
Nomal Sump
: 3. RCS Letdown Delay Coil Outlet                     7 30*
~ 25*
4   RCS Letdown High Temperature                       130*             ,        ,
3.
: 5. Pressurizer Sample                               '< 48*
RCS Letdown Delay Coil Outlet 7 30*
                  .G. Service Water to Cooling Water                     7                   /
4 RCS Letdown High Temperature 130*
: 7. Vent Header                                           15*
5.
7 15*          k,1         *
Pressurizer Sample
: 8. Drain Tank       i                                       '
'< 48*
                                                                                        .
.G.
  '
Service Water to Cooling Water 7
: 9. Core Flood Tank Vent                               715*         .
/
16
7.
: 10. Core Floed Tank Fill                               7 15*         W
Vent Header 15*
: 11. Steam Generator Sample                             7 15*                    *
k,1 7 15*
        -          12. Atmospheric Vent                                   717*
8.
                                                                            -
Drain Tank i
: 13. Quench 'ank                                                           Ip
16 9.
: 14. Emergency Sump                                     < 90*
Core Flood Tank Vent 715*
: 15. RCP Seal 'ieturn                                   7 30*
10.
: 16. Air Syrkem
Core Floed Tank Fill 7 15*
: 17. N Sptem                                               'ji*s
W 11.
: 18. Q ench Tank Sample
Steam Generator Sample 7 15*
                                                  -
12.
                                                                              < 35*_
Atmospheric Vent 717*
: 19. Main Steam Warmup Drain                           Q,,),5* ) -
13.
: 20. Makeup                                             < 30*
Quench 'ank Ip 14.
: 21. RCP Seal Inlet                                     73*
Emergency Sump
: 2. Core Flood Tank Sample                             <  5*
< 90*
                                                                                    *
15.
: 23. RCP Standpipe Demin Water Supply                   <
RCP Seal 'ieturn 7 30*
: 24. Containment H Dilution Inlet                       < 25*
16.
: 25. Containment 2H Dilution Outlet                     i25*
Air Syrkem 17.
: j. BWST Outlet Valves                                     1 30*
N Sptem
: k. Low Pressure Injection
'ji*s 18.
: 1. Decay Heat Pumps                                   < 30*
Q ench Tank Sample
: 2. Low Pressure Injection Valves                     7 NA*
< 35*_
: 3. Decay Heat Pump Suction Valves                     7 30*
19.
4   Decay Heat Cooler Outlet Valves                   ~
Main Steam Warmup Drain Q,,),5* ) -
1 NA*
20.
: 5. Decay Heat Cooler Bypass Valves         ,
Makeup
S NA*                             ;
< 30*
                                                                                                  .
21.
: 3. Containment Pressure--High-High
RCP Seal Inlet 73*
: a. Containment Spray Pump                                 1 80*                             l
5*
                                                                                                                !
2.
: b. Component Coolfng Isolation Valves             -
Core Flood Tank Sample 23.
l
RCP Standpipe Demin Water Supply 24.
: 1. Inlet to Con +ainment                               < 25 *                         .
Containment H Dilution Inlet
: 2. Outlet froo 2ntainment                             _725*
< 25*
DAVIS-BESSE, UNIT 1                 3/4 3-17 JAN 121977
25.
;                                                              .      __ .                    _ _ _ . _
Containment H Dilution Outlet i25*
_
2 j.
l
BWST Outlet Valves 1 30*
k.
Low Pressure Injection 1.
Decay Heat Pumps
< 30*
2.
Low Pressure Injection Valves 7 NA*
3.
Decay Heat Pump Suction Valves 7 30*
~ NA*
4 Decay Heat Cooler Outlet Valves 1
5.
Decay Heat Cooler Bypass Valves S NA*
3.
Containment Pressure--High-High a.
Containment Spray Pump 1 80*
b.
Component Coolfng Isolation Valves 1.
Inlet to Con +ainment
< 25
* 2.
Outlet froo 2ntainment
_725*
DAVIS-BESSE, UNIT 1 3/4 3-17 JAN 121977


_ - - _ _            _____        _ _ _ _ _ _ _
TABLE 3.3-5 (Continua
  ;  .
~
                                                                                      -
SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS b.
.                                                  TABLE 3.3-5   (Continua
fComponent Cooling Isolation Valves (Continued) 3.
    ~
Inle't to CRDM's
SAFETY FEATURES SYSTEM RESPONSE TIMES
< 35*
  .
4.
INITIATING SIGNAL AND FUNCTION
CROM Booster Pump Suction 7 35*
                                                                      -
-(
RESPONSE TIME IN SECONDS
)*
  ,
5.
: b. fComponent Cooling Isolation Valves (Continued)
Component Cooling from Decay Heat Cooler 1
: 3.         Inle't to CRDM's                                         < 35*
f c.
: 4.         CROM Booster Pump Suction                               7 35*
Steam and Feedwater Isolation Valves 1.
  ,
Main Steam Line
: 5.         Component Cooling from Decay Heat Cooler               -(
< 10*
1       )*
2.
: c. Steam and Feedwater Isolation Valves
Main Feedwater Stop 3.
                                                                                                  < 10*
Main Steam Wannup
f
'1 5*
  .                          1.         Main Steam Line                                               *
4.
: 2.         Main Feedwater Stop                                     <
RCS Pressure-Low THIS PAGE OPEN PENDING RECE:PT O INFORMATION FROM THE APPUCANT I
: 3.         Main Steam Wannup
7,
                                                                ,
1.
                                                                                                '1 5*
Emergency Vent Fans 1 25*
: 4.         RCS Pressure-Low                         THIS PAGE OPEN PENDING RECE:PT O INFORMATION FROM THE APPUCANT                                     I 7 ,
2.
: 1.         Emergency Vent Fans                                     1 25*
Containment Cooler Fans 1 45*
: 2.         Containment Cooler Fans                                 1 45*
Y b.
: b. HV & AC Isolation Valves                                                               Y
HV & AC Isolation Valves LL W
                                        ,
l.
                                                                                                  < 75*
ECCS Room
LL            W
< 75*
: l.         ECCS Room 2.
2.
Emergency Ventilation 7 75*
p 3.
Cont.inment Air Sample 7
4.
Containment Purge 11-5.
Penetration Room Purge
'1 75*
c.
Control Room HV & AC Units 1 0*
d.
High Pressure Injection 1.
High Pressure Injection Pumps
< 30*
2.
High Pressure Injection Valves 1,30*
Component Cooling Water e.
1.
Component Cooling Water Pumps 1 180*
2.
Component Cooling Aux. Equipment Iniet Valves
< 180*
3.
3.
Emergency Ventilation Cont .inment Air Sample 7 75*
Component Cooling to Air Compressor Valves
7 p
_7 180*
: 4.        Containment Purge                                          11-
f.
: 5.        Penetration Room Purge                                  '1 75*
Service Water System 1.
: c. Control Room HV & AC Units                                          1 0*
Service Water Pumps 1 45*
: d. High Pressure Injection
2.
: 1.        High Pressure Injection Pumps                            < 30*
Service Water from Cor.ponent Cooling Heat Exchanger Isolation Valves 1 NA*
: 2.        High Pressure Injection Valves                          1,30*
g.
              .
Containment Spray isolation Valves 1 80*
: e. Component Cooling Water                        -
1 h.
          .                    1.        Component Cooling Water Pumps                          1 180*
Emergency Diesel Generator 4. g#'
: 2.        Component Cooling Aux. Equipment Iniet Valves                                                < 180*
DAVIS-BESSE, UNIT 1 3/4 3-18 t
: 3.        Component Cooling to Air Compressor Valves             _7 180*
\\D JAN 12
: f. Service Water System
: 1.         Service Water Pumps                                     1 45*
: 2.         Service Water from Cor.ponent Cooling Heat Exchanger Isolation Valves                           1 NA*
: g. Containment Spray isolation Valves                                 1 80*         1,
: h. Emergency Diesel Generator                                                             4 . g#'
DAVIS-BESSE, UNIT 1                         3/4 3-18                                                 t         \D
                . . _ .    . . . . . .
JAN 12
        -                                      -
                                                      -
                                                              .    ..      __


___________              __              _      _                                ____      _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
TABLE 3.3-5 (Continuedi SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 4.
              ,.
RCS Pressure-Low (continued) 1.
TABLE 3.3-5 (Continuedi SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION                           RESPONSE TIME IN SECONDS                                           -
Containment Isolation Valves
: 4.     RCS Pressure-Low (continued)
,1.
: 1. Containment Isolation Valves
Vacuum Relief 1 25*
                                  ,1. Vacuum Relief                                       1 25*                                                 ,
2.
: 2. Normal Sump                                         < 25*
Normal Sump
: 3. RCS Letdown Delay Coil Outlet                       7 30*
< 25*
: 4. RCS Letdown High Temperature                         130*                                             Jh._
3.
: 5. Pressurizer Sample                                   < 45*
RCS Letdown Delay Coil Outlet 7 30*
: 6. Service-Water to Cooling Water                     -7 4 *
4.
: 7. Vent Header                                         < 15*                                             f/
RCS Letdown High Temperature 130*
: 8. Drain Tank                                           715*
Jh._
: 5. Core Flood Tank Vent                                 7 15*
5.
: 10. Core Flood Tank Fill                                 5 15*                                     If ky
Pressurizer Sample
: 11. Steam Generator Samole                               < 15*                                       g 17
< 45*
                                                                                                                              *
6.
: 12. Atmospheric Vent
Service-Water to Cooling Water
: 13. Quench Tank                                         7 15*                                   N
-7 4
                                                                                                                              *
* 7.
: 14. Emergency Sump                                     [
Vent Header
: 15. RCP ' Seal Return                                   <
< 15*
: 16. Air Systems                                         < 15*                                       .
f/
: 17. N System                                           71*                                               .
8.
: 18. Q$ench Tank Sample
Drain Tank 715*
: 19. Main Steam Warmup Drain                                           1
5.
: 20. Makeup                                             <                      0*
Core Flood Tank Vent 7 15*
: 21. RCP Seal Inlet                                     7
10.
: 22. Core Flood Tank Sample                             < 15*
Core Flood Tank Fill 5 15*
: 23. RCP Standpipe Demin Water Supply                   7                       5*'
If ky 11.
: 24. Containment H Dilution Inlet                       < 25*'
Steam Generator Samole
: 25. Containment Hf Dilution Outlet                     i25*
< 15*
: j. BWST Outlet Valves                                       1 90*
g 12.
: 5. RCS Pressure--Low-Low           THIS PAGE OPEN NN3iNG REG!PT OF INFOR,*AATM U.A.'s T.,E APPO_NT
Atmospheric Vent 17 13.
: a. Low Pressure Injection
Quench Tank 7 15*
: 1. Decay Heat Pumps                                   < 30*                                             4
N 14.
: 2. Low Pressure Injection Valves                       7 NA* T#                                          PC
Emergency Sump
: 3. D cay Heat Pump Suction Valves
[
: 4. Decay Heat Cooler Outlet Valves                     7 7 NA*        30* M                      i     q
15.
: 5. Decay Heat Cooler Bypass Valves                                                                     ,
RCP ' Seal Return 16.
Air Systems
< 15*
17.
N System 71*
18.
Q$ench Tank Sample 19.
Main Steam Warmup Drain 1
0*
20.
Makeup 21.
RCP Seal Inlet 7
22.
Core Flood Tank Sample
< 15*
23.
RCP Standpipe Demin Water Supply 7
5*'
24.
Containment H Dilution Inlet
< 25*'
Containment Hf Dilution Outlet i25*
25.
j.
BWST Outlet Valves 1 90*
5.
RCS Pressure--Low-Low THIS PAGE OPEN NN3iNG REG!PT OF INFOR,*AATM U.A.'s T.,E APPO_NT a.
Low Pressure Injection 1.
Decay Heat Pumps
< 30*
4 2.
Low Pressure Injection Valves 7 NA* T PC 3.
D cay Heat Pump Suction Valves 7 30* M 7 NA*
q 4.
Decay Heat Cooler Outlet Valves i
5.
Decay Heat Cooler Bypass Valves
[ NA* %
[ NA* %
: b. Component Cooling Isolation Valves
b.
: 1. Auxiliary Equipment Inlet                           1 90*
Component Cooling Isolation Valves 1.
l                                  2. Inlet to Air Compressor                             < 90*
Auxiliary Equipment Inlet 1 90*
l                                   3. Component Cooling from Decay Heat Cooler           5(                                   )*
2.
!
Inlet to Air Compressor
                                                                                                                                                    '
< 90*
l
l l
,
3.
DAVIS-BESSE, UNIT 1                   3/4 3-19 l
Component Cooling from Decay Heat Cooler 5(
l                                                                                                                                 JAN 121977 l                                                                                         -.
)*
\               . . .  ..                                ..          .- _.- __ ,
l DAVIS-BESSE, UNIT 1 3/4 3-19 l
l JAN 121977 l
\\


                                                                                              .
TABLE 3.3-5 (Continued) d SAFETY FEATURES SYSTEM itESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS 6.
-
Containment Radiation - High a.
    .
Emergency Vent Fans 1 25*
      .
b.
  '
HV & AC Isolation Valves 1.
TABLE 3.3-5 (Continued)                       . d
ECCS Room
                                                                                                -
< 75*
SAFETY FEATURES SYSTEM itESPONSE TIMES
2.
                                                                                                !
Emergency Ventilation 375*
RESPONSE TIME IN SECONOS
(
                                                                                                >
3.
INITIATING SIGNAL AND FUNCTION
Containment Air Sample 4.
: 6. Containment Radiation - High
Containment Purge 5.
                                                                                                !
Penetration Room Purge 1
: a. Emergency Vent Fans                               1 25*                     ;
JW.
: b. HV & AC Isolation Valves
c.
: 1. ECCS Room                                     < 75*
Control Room HV & AC Units 1 0*
: 2. Emergency Ventilation                         375*           (
7.
: 3. Containment Air Sample                         <
Borated Water Storage Tank-Low a.
                                                                                  '
Containment Sump Suction Valves 1 S0*
: 4. Containment Purge                                                 .
b.
: 5. Penetration Room Purge                       1
BWST Outlet Valves 1 90*
* JW.
TAB'LE NOTATION Diesel generator starting and sequence loading delays included.
: c. Control Room HV & AC Units                         1 0*
v Response time limit includes movement of valves and attainment of Ip-pump or blower discharge pressure.
: 7. Borated Water Storage Tank-Low
: a. Containment Sump Suction Valves                     1 S0*
: b. BWST Outlet Valves                                 1 90*
TAB'LE NOTATION
* Diesel generator starting and sequence loading delays included.
v Response   time limit includes movement pump or blower discharge pressure.        of valves and attainment   of Ip-
                                                                            ,
f*eg #
f*eg #
                                                                                                .
DAVIS-BESSE, UNIT 1 3/4 3-20' JAN 121977
                                                                                                  '
DAVIS-BESSE, UNIT 1                 3/4 3-20' JAN 121977
          .    .


                                                                                  ,
4, TAR'.E 4.3-2 i
_
g SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS-CilANNEL MODES'IN WHICH
                                                                                                                                  ..--
!n CilANNEL
    ,
. CliANNEL FUNCTIONAL SURVEILLANCE Ci FUNCTIONAL UNIT CilECK CALIBRATION TEST REQUIRED El 1.
                                                                                                                                        '
INSTRUMENT STRINGS se Q
4,
a.
                                                                                                                                              *
Containment Radiation - liigh S
                                                                                                                                            -
R H
                                                                                                                                            .
All M00ES b.
                                                                                                                                                  *
Containment Pressure - liigh S
'
R M(
TAR'.E 4.3-2                                                       ,
1, 2, ; /l c.
i                                                                                                                 .
Containment Pressure - liigh-liigh S
g                       SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS-
R M(
                                                                                                                                                    ,
1, 2, 3 d.
  .
RCS Pressure - Low S
  *
M 1, 2, 3 e.
            $                                                                                                '
RCS Pressure - Low-Low S
CilANNEL                               MODES'IN WHICH
M 1, 2, 3 f.
            !n                                                         CilANNEL                   . CliANNEL                     FUNCTIONAL                             SURVEILLANCE Ci   FUNCTIONAL UNIT                                       CilECK                       CALIBRATION                   TEST                                   REQUIRED El                                                   '
BWST Level - Low S
                                                                                                                -
R H
            *
1, 2, 3
: 1. INSTRUMENT STRINGS                             ,
,gs $wastfm Art chf le- % Wm i
                                                                                                                                          ,
2.
se                                                         .
OUTPUT LOGIC 4
Q        a. Containment Radiation - liigh                   S                           R                             H                               All M00ES
j M *bU M/ # b5 b'* Y d'Wh a.
            -        b. Containment Pressure - liigh
Incident Level #1: Containment y
                                                                                                                                                                                    /l
NA d9fe M alt MODES Isolation b.
        '
Incident Level #2: liigh Pressure I
S                            R                             M(                               1, 2, ;
Injection and Starting Diesel w
: c. Containment Pressure - liigh-liigh               S                           R                             M(                                 1, 2, 3
%5 3
: d. RCS Pressure - Low                               S                                                           M                                 1, 2, 3
Generators NA M
: e. RCS Pressure - Low-Low                           S                     -                                    M                                 1, 2, 3
1, 2, 3 w
  ;                f. BWST Level - Low                               ,
c.
S                            R                             H                                 1, 2, 3 i
Incident i' vel #3: Low Pressure if S
:              2. OUTPUT LOGIC
k Injection NA M
                                                    ,gs $wastfm Art ch f                                  le- % Wmj
1, 2, 3 d.
    '
Incident Level #4: Containment Spray
4
?)A 5 NA M
: a. Incident Level #1: Containment                                                                                                                           y b.
1, 2, 3
Isolation Incident Level #2: liigh Pressure M %*bU M/ # b5                        NA      d9fe b'*M Y d'Wh                                      alt MODES    ,,
)[
I        w                Injection and Starting Diesel 3
e.
  '
Incident Level #5: Containment l
  '
y.5 Sump Recirculation NA N
w        c.
1,2,3 3.
Generators Incident i' vel #3: Low Pressure               %5                            NA                             M                               1, 2, 3 k                                                                      S
MANUAL ACTUATION
            "
: r..
d.
SFAS (6 cent Containment Spray NA NA M(1)
Injection Incident Level #4: Containment                 if                            NA                            M                                1, 2, 3
All MODES andEmergencySumpRecirculation) h b.
  ;                          Spray
Containment Spray NA NA M(1) 1, 2, 3
                                                                          ?)A     5                     NA                           M                                 1, 2, 3
,:e g
                                                                                                                                                                                      )[
4.
: e. Incident Level #5: Containment l
SEQUENCE LOGIC CilANNELS NA NA M
  '
1, 2, 3 m i ljt5-
Sump Recirculation y .5                           NA                           N                                 1,2,3
}( /.'e hf Rd day 4%*% & W h b
: 3. MANUAL ACTUATION                                                                           ,
ef
: r. . SFAS (6 cent Containment Spray                 NA                         -
#fu:-
NA                           M(1)                             All MODES andEmergencySumpRecirculation) h
bue,wu.ty e a,-o aca
      ,:e
/
: b. Containment Spray                             NA                             NA                           M(1)                             1, 2, 3 g
: 4. SEQUENCE LOGIC CilANNELS                             NA                             NA                           M                               1, 2, 3 m i ljt5-     }( /bue,wu.ty.'e ef              #fu:- hfb Rd /day 4%*% & W h e a ,-o aca
              -          -
_ _          _______
wa
wa
______ __ ___                    _ _ _ _ _ _              _    _ ____ _ _ _____ _ ___


    .-  -
INSTRUMENTATION STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2.2' The Steam and Feedwater Rupture Control System (SFRCS) instrumen,
                                                                                        ,
tation channels shown in Table 3.3-11 shall be OPERABLE with their trip a
INSTRUMENTATION
setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-12 and with RESPONSE TIMES as shown in Table 3.3-13.
                                                                                                    . .,
M MM h, S
STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2.2' The Steam and Feedwater Rupture Control System (SFRCS) instrumen ,
APPLICABILITY: MODES 1, 2 and 3.
tation channels shown in Table 3.3-11 shall be OPERABLE with their trip                       a setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-12 and with RESPONSE TIMES as shown in Table 3.3-13.
2b3 ACTION:
APPLICABILITY: MODES 1, 2 and 3.         M MM h,                        S 2b3 ACTION:
a.
: a.     With a SFRCS instrumentation channel trip setpoint less con-servative than the value shown in the Allowable Values column of Table 3.3-12, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-11, until the channel is restored to OPERABLE status wit! t!ie trip setpoint adjusted consistent with the Trip Setpoint value.
With a SFRCS instrumentation channel trip setpoint less con-servative than the value shown in the Allowable Values column of Table 3.3-12, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-11, until the channel is restored to OPERABLE status wit! t!ie trip setpoint adjusted consistent with the Trip Setpoint value.
                                                                                      '
b.
: b. With a SFRCS instrumentation channel inoperable, take the action shown in Table 3.3-11.
With a SFRCS instrumentation channel inoperable, take the action shown in Table 3.3-11.
s SURVEILLANCE REQUIREMENTS 4.3.2.2.1     Each SFRCS instrumentation channel shall be demonstratid OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shown in Table 4.3-11.
s SURVEILLANCE REQUIREMENTS 4.3.2.2.1 Each SFRCS instrumentation channel shall be demonstratid OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shown in Table 4.3-11.
4.3.2.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.2.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.
4.3.2.2.3 The STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM RESPONSE TIME of each SFRCS function shall be demonstrated to be within the limit at               -
4.3.2.2.3 The STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM RESPONSE TIME of each SFRCS function shall be demonstrated to be within the limit at least once per 18 months. Each test shall include at least one channel
>
~2 -
least once per 18 months. Each test shall include at least one channel         ~2 -
per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific SFRCS function as shown in the " Total No. of Channels" Column of Table 3.3-11.
  .
S DAVIS-BESSE, UNIT 1 3/4 3-23 i
per function such that all channels are tested at least once every N
JAN 121977 z.
* times 18 months where N is the total number of redundant channels in a             ,        .
specific SFRCS function as shown in the " Total No. of Channels" Column       '*
of Table 3.3-11.                                                                 S DAVIS-BESSE, UNIT 1                   3/4 3-23               .
i JAN 121977
: z.       .  . - .          _
_
l
l


__ _ _ _ _ _ _ _ _ _ _
f TABLE 3.3-11 (Continued)
_                ,              .
'4STRUMENTATION STEAM AND FEEDWATER RUPTURE CONTROL SP nna h
                                                              .                                                                          .          ,
MINIMUM m
f
TOTAL ?
                                                                                                                                                      .
CilANNELS CHANNELS FUNCTIONAL UNIT OF CilANhELS TO TRIP OPERABLE ACTION s
TABLE 3.3-11 (Continued)
c 2
                                                                                                                                                '
U 2.
STEAM AND FEEDWATER RUPTURE CONTROL SP         '
Feedwater/ Steam Generator Differential Pressure - liigh Instrument Channels a.
                                                                                                      '4STRUMENTATION nn a
PDS 2685A Feedwater/ Steam Generator 2 2
h m                                                                TOTAL ?         CilANNELS MINIMUM CHANNELS     ,
1 2
                          '
13 PDS 26858 Feedwater/ Steam Generator 2 b.
c        FUNCTIONAL UNIT                                 ,
PDS 2685C Feedwater/ Steam Generator 2 2
OF CilANhELS     TO TRIP       OPERABLE ACTION       s 2
1 2
U   2. Feedwater/ Steam Generator
13 i PDS 2685D Feedwater/ Steam Generator 2
                                                                                      '
                                                                                                                      -
                          "        Differential Pressure - liigh Instrument Channels                                                   -
: a. PDS 2685A Feedwater/ Steam Generator 2             2               1             2     13 PDS 26858 Feedwater/ Steam Generator 2                                                         ,
: b. PDS 2685C Feedwater/ Steam Generator 2             2               1             2     13 i PDS 2685D Feedwater/ Steam Generator 2
{
{
                          $        c. PDS 2686A Feedwater/ Steam Generator 1             2               1             2     13 m              PDS 2686B Feedwater/ Steam Generator 1
c.
: d. PDS 2686C Feedwa'ter/ Steam Generator 1             2               1             2     13 PDS 2686D Feedwater/ Steam Generator 1
PDS 2686A Feedwater/ Steam Generator 1 2
: 3. Steam Generator
1 2
* Level - Low Instrument Channels
13 PDS 2686B Feedwater/ Steam Generator 1 m
                                                .
d.
(E, . ..-LSL SP981 Steam Generator 1                         2               1             2     13 LSL SP982 Steam Generator 1
PDS 2686C Feedwa'ter/ Steam Generator 1 2
: b. LSL SP9A3 Steam Generator 1                         2               l'           2     13 LSL SP9A4 Steam Generator 1 N           c. LSLSP9Al/SteamGenerator2                         .2                 1             2     13
1 2
                      ]           l       LSL SP9A21 Steam Generator 2       ,        [
13 PDS 2686D Feedwater/ Steam Generator 1 3.
                                                                                        '
Steam Generator Level - Low Instrument Channels (E,...-
g lpf                             b                                           "M se pp
LSL SP981 Steam Generator 1 2
                                                                                  -
1 2
a                                                                                                                      a
13 LSL SP982 Steam Generator 1 b.
                                                          +
LSL SP9A3 Steam Generator 1 2
_        .                                                                                  __.
l' 2
13 LSL SP9A4 Steam Generator 1 N
LSLSP9Al/SteamGenerator2
[
.2 1
2 13 c.
]
l LSL SP9A21 Steam Generator 2 g
lpf b
"M se pp a
a
+


_ - _ _ _ -          -_.            ..
~ TABLE 3.3-11 (Continued)
                                                                                                                                                  -
STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION ab
                                                                                                      .            ._                            ; .
.U MINIMUM N
                                                                                                                                          .          .
TOTAL N3.
                                                                                                                                                    '
CilANNELS CHANNELS FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE ACTION 3
                                                                                                                                        .
c z
                                                                                                                                              '
M 3.
                                                                                                                                                        ..
Steam Generator Level - Low Instrument Channels (continued) 4 d.
                                                                                                                                                '
LSL SP983 Steam Generator 2 2
                                                                            ~ TABLE 3.3-11 (Continued)
1 2
                    .                                        STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION a
13 LSL SP984 Steam Gener:Lui ?
b
4.
                  .U                                                                                                     MINIMUM N
Loss of RCP Channels a.
* TOTAL N3.     CilANNELS   CHANNELS FUNCTIONAL UNIT                                     OF CHANNELS     TO TRIP     OPERABLE   ACTION       3 c                                                                   ,
SFRCS Channel #1 2
z                                                                   '
1 2
M           3. Steam Generator
13
                        .              Level - Low Instrument                       .
Channels (continued)
                                                                                                                        *
: d. LSL SP983 Steam Generator 2                         2               1         2         13 4
-                                    -_.      LSL SP984 Steam Gener:Lui ?
: 4. Loss of RCP Channels
                                                                                                              '
: a. SFRCS Channel #1                                   2             1         2         13
: b. SFRCS Channel #2                                    2              1          2        13
{
{
                                                                                  '
b.
                      "4         5. Manual Initiation m
SFRCS Channel #2 2
: a.     Steam Pressure - Low                             4             4         4         14
1 2
: b.     Level Steam Generatar - Low                       2               2         2         14
13 "4
  *
5.
: c.     Feedwater A P - liigh                             2               2         2         14
Manual Initiation m
: d.     Loss of RCP's                                     2               2         2         14
a.
* h
Steam Pressure - Low 4
    ==
4 4
    "
14 b.
  ,
Level Steam Generatar - Low 2
a                                                                                                                                      :.x3
2 2
    $"                                                                                                                                        '>
14 c.
M
Feedwater A P - liigh 2
                            '
2 2
i i                                                                                                                      -    -.  -,
14 d.
_}}
Loss of RCP's 2
2 2
14 h
 
==
:.x3 a
M i
i
-}}

Latest revision as of 06:52, 31 December 2024

Tech Specs 3.3 & 4.3 Re Safety Sys Instrumentation
ML19329B672
Person / Time
Site: Davis Besse 
Issue date: 01/12/1977
From:
TOLEDO EDISON CO.
To:
Shared Package
ML19329B671 List:
References
NUDOCS 8002050779
Download: ML19329B672 (13)


Text

- _____

l

~

ht/ogagc 3

~

INSTRUMENTATION 3/4.3.2 SAFETY SYSTEM INSTRUMENTATION W

SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION t

3.3.2.1 The Safety Features Actuation System (SFAS) functional units shown in Table 3.3-3 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column,of Table 3.3-4 and with RESPONSE TIMES as shown in Table 3.3-5.

APPLICABILITY: As shown in Table 3.3-3.

ACTION:

a.

With a SFAS functional unit trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3-4, declare the functional unit inoperable and apply the applicable ACTION requirement of Table 3.3-3, until the func-tional unit is restored to OPERABLE status with the trip setpoint adjusted consistent with the Trip Setpoint value.

b.

With a SFAS functional unit inoperable, take the action shown in Table 3.3-3.

SURVEILLANCE REQUIREMENTS 4.3.2.1.1 Each SFAS functional unit shall be demonstrated OPERABLE by the perfonnance of the CFANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shewn in Table 4.3-2.

4.3.2.1.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of functional units affected by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each functional unit affected by bypass operation.

4.3.2.1.3 The SAFETY FEATURES RESPONSE TIME of each SFAS function shall be demonstrated to be within the limit at least once per 18 months.

Each test shall include at least one functional unit per function such 7

that all functional units are tested at least once every N times 18 months where N is the total number of redundant functional units in a specific SFAS function as shown in the " Total No. of Units" Column of 1

Table 3.3-3.

DAVIS-BESSE, UNIT 1 3/4 3-9 JAN 121977

~

8005050179

~~

-l

\\

TABLE 3.3-3 SAFETY FEATURES ACTUATION SYSTE'ri INSTRUMENTATION

[

MINIMUM g;

TOTAL NO.

UNITS

- UNITS APPLICABLE g

FUNCTIONAL UNIT OF UNIT 5 TO TRIP OPERABLE MODES ACTION g

1.

INSTRUMENT STRINGS U

a.

Containment Radiation -

High 4

2 3

All MODES 9f b.

Containment Pressure -

High 4

2 3

1,2,3 9#

c.

Containment Pressure -

liigh-High 4

2 3

1, 2, 3

' 91 d.

RCS Pressure - Low 4

2 3

1, 2, 3*

d 9#

9#

e.

RCS Pressure - Low-Low 4

2 3

1, 2, 3**

4 f.

.BWST Level - Low 4

2

~

3 1,2,3 9#

f M

2.

DUTPUT LOGIC g

g a.

Incident Level #1:

2 Containment Isolation NA NAl NA E All MODES 10.

g w

p o

b.

Incident Level #2:

bh$ N High Pressure Injection p

and Starting Diesel NA 1 NA I NA 2 1, 2, 3 P-(*t10 1#

Generators

  1. v c.

Incident Level #3:

Low Pressure Injection NA b NA 8 NA z.

1, 2, 3 10 by d.

Incident Level #4:

Containment Spray NA h NA I NA ?.

1, 2, 3.

10 e.

Incident Level #5:

Containment Sump Recirculation NA h NA 1 NA E 1,2,3 10 Q

s y, s ~ n'l O f g g i

dd M A ur g ym y rhyLw,,~~~",

i TABLE 3.3-3 SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM g

TOTAL NO.

UNITS UNITS APPLICABLE ACTION g

FUNCTIONAL UNIT OF UNITS TO TRIP OPERABLE MODES g

3.

MANUAL ACTUATION

~

2 a.

SFAS(exceptContainment Spray and Emergency Sump 2

2 8

2 ALL MODES 11.

Recirculation) b.

Containment Spray 2

2 A 2

1,2,3,4~'

11 4.

SEQUENCE LOGIC CHANNELS 4

2***

4 1,2,3 97~

i O

4

,Q

$ 4(/ hN f p cd idMif V^

^

,.. 3 feA n W W j

y a k i.d&

f,hsh /Nb 1

=

g y

g M

w

i.

I

-l TABLE 3.3-4 SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS'

~

enb h

FUNCTIONAL UNIT TRIP SETPOINT ALLOWA'BLE VALUES m

k INSTRUMENT STRINGS 2

H a.

Containment Radiation 1 25 mR/hr

< 25 mR/hr b.

Containment Pressure - High.

1.'18.4 psia

' 1'18.4 psia

\\

c.

Containment Pressure - High-High 1 38.4 psia s'38.4 psia

.i d.

RCS Pressure - Low

/ t.1600 psig t 1600 psig e.

RCS Pressure - Low-Low

". t 400 psig'

> 400 psig f.

BWST Level 1 36 in. H O

>i_ 36 in. H O 2

2 yN SEQUENCE LOGIC CilANNELS 3, *o -

0000100 Volts a.

Undervoltage Condition 0000100 Volts bS

^

i 5'o a

lo-u de-jv dn~ dL j w/// jj f$ y #'

3<>. N.,ne.L., h Q4,a, '

OI 1' ~

~"

~9 8#

r 52

.}

u,

\\,.-

,.. t.,

. 7-Fy o

s D;o Q

1 2 R

t:3 2

_........a.

9,!R

nu a

...~._

y i O,i MW WWupesuum se. - ~ +. m o ne-p

7 p7k i

TABLE 3.3-5 (Continued)_

i SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSETIMEINSECONDS n.

Steam and Feedwater Isolation Valves (continued) 8 2.

Main Feedwater Stop NA

.3.

Main-Steam Warmup NA

[ME 2.

Contairinent Pressure - High a.

Fans 1.

Emergency-Vent Fans 1 25*

2.

Containment Cooler Fans 1 45*

b.

HV & AC Isolation Valves 1.

ECCS Room

< 75*

2.

Emergency Yent11ation 175*

3.

, Containment Air Sample 1 25*

4.

Containment Purge

< NA*

5.

Penetration Room Purge 175*

[c ControlRoomHV&dC' Units 1 10*

c.

g{4* <y d.

High Pressure Injection 1.

High Pressure Injection Pamps

< 30*

2.

High Pressure Injection Valves i30*

e.

Component Cooling Water g

1.

Component Cooling Water Pumps

< 180*

2.

Component Cooling Aux. Equip. Inlet Valves 5180* 4 ff Ag, 3.

Component Cooling to Air Compressor Valves 1 180*

f.

Service Water System 1.

Service Water Pumps 45*

2'.

Service Water Fran Component Cooling Heat Exchanger Isolation Valves 1 NA*

g.

Containment Spray Isolation Valves 1 80*

h.

Emergency Diesel Generator 1 1 i!

DAVIS-BESSE UNIT 1 3/4 3-16

~

JAN 121977

TABLE 3.3-5 (Continued)

SAFETY FEATURES SYSTEM' RESPONSE TIMES INITIATINGSIGNALANDFUNCTkON RESPONSE TIME IN SECONDS 2.

Containment Pressure - High (Continued) i I

1.

Containment Isolation Valves l

1.

Vacuum Relief

< 25*

2.

Nomal Sump

~ 25*

3.

RCS Letdown Delay Coil Outlet 7 30*

4 RCS Letdown High Temperature 130*

5.

Pressurizer Sample

'< 48*

.G.

Service Water to Cooling Water 7

/

7.

Vent Header 15*

k,1 7 15*

8.

Drain Tank i

16 9.

Core Flood Tank Vent 715*

10.

Core Floed Tank Fill 7 15*

W 11.

Steam Generator Sample 7 15*

12.

Atmospheric Vent 717*

13.

Quench 'ank Ip 14.

Emergency Sump

< 90*

15.

RCP Seal 'ieturn 7 30*

16.

Air Syrkem 17.

N Sptem

'ji*s 18.

Q ench Tank Sample

< 35*_

19.

Main Steam Warmup Drain Q,,),5* ) -

20.

Makeup

< 30*

21.

RCP Seal Inlet 73*

5*

2.

Core Flood Tank Sample 23.

RCP Standpipe Demin Water Supply 24.

Containment H Dilution Inlet

< 25*

25.

Containment H Dilution Outlet i25*

2 j.

BWST Outlet Valves 1 30*

k.

Low Pressure Injection 1.

Decay Heat Pumps

< 30*

2.

Low Pressure Injection Valves 7 NA*

3.

Decay Heat Pump Suction Valves 7 30*

~ NA*

4 Decay Heat Cooler Outlet Valves 1

5.

Decay Heat Cooler Bypass Valves S NA*

3.

Containment Pressure--High-High a.

Containment Spray Pump 1 80*

b.

Component Coolfng Isolation Valves 1.

Inlet to Con +ainment

< 25

  • 2.

Outlet froo 2ntainment

_725*

DAVIS-BESSE, UNIT 1 3/4 3-17 JAN 121977

TABLE 3.3-5 (Continua

~

SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS b.

fComponent Cooling Isolation Valves (Continued) 3.

Inle't to CRDM's

< 35*

4.

CROM Booster Pump Suction 7 35*

-(

)*

5.

Component Cooling from Decay Heat Cooler 1

f c.

Steam and Feedwater Isolation Valves 1.

Main Steam Line

< 10*

2.

Main Feedwater Stop 3.

Main Steam Wannup

'1 5*

4.

RCS Pressure-Low THIS PAGE OPEN PENDING RECE:PT O INFORMATION FROM THE APPUCANT I

7,

1.

Emergency Vent Fans 1 25*

2.

Containment Cooler Fans 1 45*

Y b.

HV & AC Isolation Valves LL W

l.

ECCS Room

< 75*

2.

Emergency Ventilation 7 75*

p 3.

Cont.inment Air Sample 7

4.

Containment Purge 11-5.

Penetration Room Purge

'1 75*

c.

Control Room HV & AC Units 1 0*

d.

High Pressure Injection 1.

High Pressure Injection Pumps

< 30*

2.

High Pressure Injection Valves 1,30*

Component Cooling Water e.

1.

Component Cooling Water Pumps 1 180*

2.

Component Cooling Aux. Equipment Iniet Valves

< 180*

3.

Component Cooling to Air Compressor Valves

_7 180*

f.

Service Water System 1.

Service Water Pumps 1 45*

2.

Service Water from Cor.ponent Cooling Heat Exchanger Isolation Valves 1 NA*

g.

Containment Spray isolation Valves 1 80*

1 h.

Emergency Diesel Generator 4. g#'

DAVIS-BESSE, UNIT 1 3/4 3-18 t

\\D JAN 12

TABLE 3.3-5 (Continuedi SAFETY FEATURES SYSTEM RESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONDS 4.

RCS Pressure-Low (continued) 1.

Containment Isolation Valves

,1.

Vacuum Relief 1 25*

2.

Normal Sump

< 25*

3.

RCS Letdown Delay Coil Outlet 7 30*

4.

RCS Letdown High Temperature 130*

Jh._

5.

Pressurizer Sample

< 45*

6.

Service-Water to Cooling Water

-7 4

  • 7.

Vent Header

< 15*

f/

8.

Drain Tank 715*

5.

Core Flood Tank Vent 7 15*

10.

Core Flood Tank Fill 5 15*

If ky 11.

Steam Generator Samole

< 15*

g 12.

Atmospheric Vent 17 13.

Quench Tank 7 15*

N 14.

Emergency Sump

[

15.

RCP ' Seal Return 16.

Air Systems

< 15*

17.

N System 71*

18.

Q$ench Tank Sample 19.

Main Steam Warmup Drain 1

0*

20.

Makeup 21.

RCP Seal Inlet 7

22.

Core Flood Tank Sample

< 15*

23.

RCP Standpipe Demin Water Supply 7

5*'

24.

Containment H Dilution Inlet

< 25*'

Containment Hf Dilution Outlet i25*

25.

j.

BWST Outlet Valves 1 90*

5.

RCS Pressure--Low-Low THIS PAGE OPEN NN3iNG REG!PT OF INFOR,*AATM U.A.'s T.,E APPO_NT a.

Low Pressure Injection 1.

Decay Heat Pumps

< 30*

4 2.

Low Pressure Injection Valves 7 NA* T PC 3.

D cay Heat Pump Suction Valves 7 30* M 7 NA*

q 4.

Decay Heat Cooler Outlet Valves i

5.

Decay Heat Cooler Bypass Valves

[ NA* %

b.

Component Cooling Isolation Valves 1.

Auxiliary Equipment Inlet 1 90*

2.

Inlet to Air Compressor

< 90*

l l

3.

Component Cooling from Decay Heat Cooler 5(

)*

l DAVIS-BESSE, UNIT 1 3/4 3-19 l

l JAN 121977 l

\\

TABLE 3.3-5 (Continued) d SAFETY FEATURES SYSTEM itESPONSE TIMES INITIATING SIGNAL AND FUNCTION RESPONSE TIME IN SECONOS 6.

Containment Radiation - High a.

Emergency Vent Fans 1 25*

b.

HV & AC Isolation Valves 1.

ECCS Room

< 75*

2.

Emergency Ventilation 375*

(

3.

Containment Air Sample 4.

Containment Purge 5.

Penetration Room Purge 1

JW.

c.

Control Room HV & AC Units 1 0*

7.

Borated Water Storage Tank-Low a.

Containment Sump Suction Valves 1 S0*

b.

BWST Outlet Valves 1 90*

TAB'LE NOTATION Diesel generator starting and sequence loading delays included.

v Response time limit includes movement of valves and attainment of Ip-pump or blower discharge pressure.

f*eg #

DAVIS-BESSE, UNIT 1 3/4 3-20' JAN 121977

4, TAR'.E 4.3-2 i

g SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS-CilANNEL MODES'IN WHICH

!n CilANNEL

. CliANNEL FUNCTIONAL SURVEILLANCE Ci FUNCTIONAL UNIT CilECK CALIBRATION TEST REQUIRED El 1.

INSTRUMENT STRINGS se Q

a.

Containment Radiation - liigh S

R H

All M00ES b.

Containment Pressure - liigh S

R M(

1, 2, ; /l c.

Containment Pressure - liigh-liigh S

R M(

1, 2, 3 d.

RCS Pressure - Low S

M 1, 2, 3 e.

RCS Pressure - Low-Low S

M 1, 2, 3 f.

BWST Level - Low S

R H

1, 2, 3

,gs $wastfm Art chf le- % Wm i

2.

OUTPUT LOGIC 4

j M *bU M/ # b5 b'* Y d'Wh a.

Incident Level #1: Containment y

NA d9fe M alt MODES Isolation b.

Incident Level #2: liigh Pressure I

Injection and Starting Diesel w

%5 3

Generators NA M

1, 2, 3 w

c.

Incident i' vel #3: Low Pressure if S

k Injection NA M

1, 2, 3 d.

Incident Level #4: Containment Spray

?)A 5 NA M

1, 2, 3

)[

e.

Incident Level #5: Containment l

y.5 Sump Recirculation NA N

1,2,3 3.

MANUAL ACTUATION

r..

SFAS (6 cent Containment Spray NA NA M(1)

All MODES andEmergencySumpRecirculation) h b.

Containment Spray NA NA M(1) 1, 2, 3

,:e g

4.

SEQUENCE LOGIC CilANNELS NA NA M

1, 2, 3 m i ljt5-

}( /.'e hf Rd day 4%*% & W h b

ef

  1. fu:-

bue,wu.ty e a,-o aca

/

wa

INSTRUMENTATION STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.2.2' The Steam and Feedwater Rupture Control System (SFRCS) instrumen,

tation channels shown in Table 3.3-11 shall be OPERABLE with their trip a

setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3-12 and with RESPONSE TIMES as shown in Table 3.3-13.

M MM h, S

APPLICABILITY: MODES 1, 2 and 3.

2b3 ACTION:

a.

With a SFRCS instrumentation channel trip setpoint less con-servative than the value shown in the Allowable Values column of Table 3.3-12, declare the channel inoperable and apply the applicable ACTION requirement of Table 3.3-11, until the channel is restored to OPERABLE status wit! t!ie trip setpoint adjusted consistent with the Trip Setpoint value.

b.

With a SFRCS instrumentation channel inoperable, take the action shown in Table 3.3-11.

s SURVEILLANCE REQUIREMENTS 4.3.2.2.1 Each SFRCS instrumentation channel shall be demonstratid OPERABLE by the performance of the CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST during the MODES and at the frequencies shown in Table 4.3-11.

4.3.2.2.2 The logic for the bypasses shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by bypass operation. The total bypass function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by bypass operation.

4.3.2.2.3 The STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM RESPONSE TIME of each SFRCS function shall be demonstrated to be within the limit at least once per 18 months. Each test shall include at least one channel

~2 -

per function such that all channels are tested at least once every N times 18 months where N is the total number of redundant channels in a specific SFRCS function as shown in the " Total No. of Channels" Column of Table 3.3-11.

S DAVIS-BESSE, UNIT 1 3/4 3-23 i

JAN 121977 z.

l

f TABLE 3.3-11 (Continued)

'4STRUMENTATION STEAM AND FEEDWATER RUPTURE CONTROL SP nna h

MINIMUM m

TOTAL ?

CilANNELS CHANNELS FUNCTIONAL UNIT OF CilANhELS TO TRIP OPERABLE ACTION s

c 2

U 2.

Feedwater/ Steam Generator Differential Pressure - liigh Instrument Channels a.

PDS 2685A Feedwater/ Steam Generator 2 2

1 2

13 PDS 26858 Feedwater/ Steam Generator 2 b.

PDS 2685C Feedwater/ Steam Generator 2 2

1 2

13 i PDS 2685D Feedwater/ Steam Generator 2

{

c.

PDS 2686A Feedwater/ Steam Generator 1 2

1 2

13 PDS 2686B Feedwater/ Steam Generator 1 m

d.

PDS 2686C Feedwa'ter/ Steam Generator 1 2

1 2

13 PDS 2686D Feedwater/ Steam Generator 1 3.

Steam Generator Level - Low Instrument Channels (E,...-

LSL SP981 Steam Generator 1 2

1 2

13 LSL SP982 Steam Generator 1 b.

LSL SP9A3 Steam Generator 1 2

l' 2

13 LSL SP9A4 Steam Generator 1 N

LSLSP9Al/SteamGenerator2

[

.2 1

2 13 c.

]

l LSL SP9A21 Steam Generator 2 g

lpf b

"M se pp a

a

+

~ TABLE 3.3-11 (Continued)

STEAM AND FEEDWATER RUPTURE CONTROL SYSTEM INSTRUMENTATION ab

.U MINIMUM N

TOTAL N3.

CilANNELS CHANNELS FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE ACTION 3

c z

M 3.

Steam Generator Level - Low Instrument Channels (continued) 4 d.

LSL SP983 Steam Generator 2 2

1 2

13 LSL SP984 Steam Gener:Lui ?

4.

Loss of RCP Channels a.

SFRCS Channel #1 2

1 2

13

{

b.

SFRCS Channel #2 2

1 2

13 "4

5.

Manual Initiation m

a.

Steam Pressure - Low 4

4 4

14 b.

Level Steam Generatar - Low 2

2 2

14 c.

Feedwater A P - liigh 2

2 2

14 d.

Loss of RCP's 2

2 2

14 h

==

.x3 a

M i

i

-