TAC:42418: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
(One intermediate revision by the same user not shown) | |
(No difference)
|
Latest revision as of 04:04, 31 December 2024
Request for: Closed, Approved | |
Questions Answers Results Other: ML19331C219, ML20052G189, ML20052G192, ML20071K553, ML20078C302, ML20082Q313, ML20090A754, ML20132C457, ML20132H028, ML20137S773, NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage | |
From | |
MONTHYEARML19331C2171980-08-0505 August 1980
[table view]Application for Amend of License DPR-46,requesting Change to App a Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity,To Allow for single-loop Operation.Fee Encl ML19331C2191980-08-0505 August 1980 Proposed Tech Specs 1.1 & 2.1 Re Fuel Cladding Integrity to Allow for single-loop Operation ML20090A7541980-09-30030 September 1980 Forwards Questions Re GE single-loop Operation Rept, NEDO-24258 A810016, Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed1981-04-24024 April 1981 Forwards Response to NRC Request for Addl Info Re Util 800805 Proposed Tech Spec Change to Allow Operation of Facility W/One Recirculation Loop Inoperable.Summarizes Results for Transients Analyzed ML20091K7911981-06-0808 June 1981 Draft Application for Amend to License DPR-46,revising Tech Spec 3.6.F.3 Re Single Loop Operation ML20009A3721981-07-0202 July 1981 Submits 810727-0908 Date Range for Proposed Meeting to Discuss Concerns Re Single Loop Operation for BWRs Above 50% Rated Power,In Response to 810512 Application.Proposed Agenda Encl ML20090B2441981-12-10010 December 1981 Forwards Safety Evaluation Re Plant Operation on Single Loop W/Power Limited to 50%.Evalution Completes One Action Under Multi Plant Item E-04 ML20052G1891982-05-0606 May 1982 Forwards Response to Four NRC Questions Re 800805 Proposed Tech Specs for Single Loop Operation & Updated Tech Spec Pages ML20052G1921982-05-0606 May 1982 Updated Proposed Tech Spec Pages,Incorporating All Recent License Amends & NRC Requests Re Single Loop Operation ML20071K5531982-07-28028 July 1982 Revised Tech Specs Re Single Loop Operation ML20078C3021983-09-0707 September 1983 Notice of Consideration of Issuance of Amend to License DPR-46 & Opportunity for Prior Hearing Revising Tech Spec to Permit Operation Up to 50% Rated Power W/One Recirculation Loop Out of Svc ML20082Q2891983-12-0202 December 1983 Application for Amend to License DPR-46,consisting of Proposed Change 9 to Tech Specs Re Single Loop Operation. Encl Updates 800805 Submittal Which Incorporated All Recent License Amends Through Amend 83 ML20082Q3131983-12-0202 December 1983 Proposed Tech Spec Change 9 Re Single Loop Operation NLS8500061, Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage1985-04-0404 April 1985 Advises That Util Commits to Incorporate GE SIL-380,Rev 1 Into Tech Spec by End of Current Outage Scheduled for End of June 1985.Tech Spec Changes for Dual & Single Loop Will Be Submitted within 2 Months of End of Outage NLS8500260, Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid1985-09-20020 September 1985 Application for Amend to License DPR-46,revising Tech Specs to Allow Operation W/One Recirculation Loop Out of Svc Greater than 24 H.Fee Paid ML20132C4571985-09-20020 September 1985 Proposed Tech Specs Allowing Operation W/One Recirculation Loop Out of Svc Greater than 24 H NLS8500261, Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 8306031985-09-23023 September 1985 Revised Application for Expedited Amend to License DPR-46, Revising 850920 Tech Spec Changes Re Single Loop Operation. Revs Incorporate All Amends to OL Up to & Including Amend 93 Issued on 830603 ML20132H0281985-09-23023 September 1985 Proposed Tech Specs,Revising 850920 Tech Spec Change Request Re Single Loop Operation ML20137S7731985-09-24024 September 1985 Amend 94 to License DPR-46,permitting Reactor Operation W/One Recirculation Loop Out of Svc,Allowing Detection of thermal-hydraulic Instabilities,Updating Refs & Deleting Blank Pages ML20137S7991985-09-24024 September 1985 Safety Evaluation Supporting Amend 94 to License DPR-46 NLS8500266, Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests1985-09-27027 September 1985 Requests Withdrawal of Single Loop Operation Tech Spec Changes Requested in 800805,820506 & 28 & 831202 Submittals. Proposed Changes Superseded by 850923 & 25 Requests 1982-07-28 |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:42418&oldid=4746837"