ML20057B343: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 1
| page count = 1
| project = TAC:M84673
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:_ __          _                    ._m d
{{#Wiki_filter:_
Beaver Vahey Power Station Shippingport, PA 15077-0004 JOHN D. SIEDER                                                                                     (412) 393-5255 j           Senior Vece President and                                                                     Fax (412) 643-8069
._m d
:          CNet Nuclear Officer j           Nuclear Power Division                                                 September 8, 1993
Beaver Vahey Power Station Shippingport, PA 15077-0004 JOHN D. SIEDER (412) 393-5255 j
)       U. S. Nuclear Regulatory Commission i     Attn:     Document Control Desk
Senior Vece President and Fax (412) 643-8069 CNet Nuclear Officer j
]       Washington, DC 20555
Nuclear Power Division September 8, 1993
)
U.
S. Nuclear Regulatory Commission i
Attn:
Document Control Desk
]
Washington, DC 20555


==Subject:==
==Subject:==
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66                                                                 '
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Clarification of Diving Operations Spent Fuel Pool Rerack (TAC No. M84673)
Clarification of Diving Operations Spent Fuel Pool Rerack (TAC No. M84673)
This letter will clarify the. Duquesne Light Company position concerning implementation of Appendix A
This letter will clarify the. Duquesne Light Company position concerning implementation of Appendix A of Regulatory Guide 8.38,                                                       j
of Regulatory Guide 8.38, j
        " Radiological               Precautions       During Diving Operation , ''                 during our               '
" Radiological Precautions During Diving Operation, ''
planned Spent Fuel Pool rerack modification.
during our planned Spent Fuel Pool rerack modification.
The guidance provided in Appendix A of Regulatory Guide 8.38 will be   included               in     our     site specific procedure for controlling radiological diving operations with the exception of Item 6.                                       Item 6 requires the use of a calibrated dosimeter that'provides an alarm to the diver while underwater. The alternate method for satisfying this                                                   ,
The guidance provided in Appendix A of Regulatory Guide 8.38 will be included in our site specific procedure for controlling radiological diving operations with the exception of Item 6.
function includes:                   1) utilization of calibrated remote indicating                                   )
Item 6 requires the use of a calibrated dosimeter that'provides an alarm to the diver while underwater.
instrumentation;                   and   2)   continuous communications between the                                 i individual monitoring the remote indication and the diver in the water.           During a conference call held on September 2, 1993, members of the NRC staff concurred with the Duquesne Light Company alternate position.
The alternate method for satisfying this function includes:
It should be noted that diving operations are not planned to support the rerack effort. Diving operations represent contingency planning only.
1) utilization of calibrated remote indicating
If     you have any questions regarding this response, please contact Mr. Steve Sovick at (412) 393-5211.
)
instrumentation; and 2) continuous communications between the i
individual monitoring the remote indication and the diver in the water.
During a conference call held on September 2, 1993, members of the NRC staff concurred with the Duquesne Light Company alternate position.
It should be noted that diving operations are not planned to support the rerack effort.
Diving operations represent contingency planning only.
If you have any questions regarding this response, please contact Mr. Steve Sovick at (412) 393-5211.
Sincerely,
Sincerely,
                                                                                    ! o. 'SW                   ..        .
! o. 'SW cc: Mr. L.
cc: Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr. G. E. Edison, Project Manager                                                                 ELECTRK UT1UTYof THE YEAR 20016,-
W.
9309210220 930908 PDR        ADOCK 05000334 h
Rossbach, Sr. Resident Inspector Mr.
                                                        %                                                            3    l{D P                         PDR     dii                                                           i i}}
T. T. Martin, NRC Region I Administrator Mr. G.
E.
Edison, Project Manager ELECTRK UT1UTYof THE YEAR 20016,-9309210220 930908 h
l{D PDR ADOCK 05000334 3
P PDR dii i
i}}

Latest revision as of 12:20, 17 December 2024

Clarifies Util Position Re Implementation of App a of Reg Guide 8.38, Radiological Precautions During Diving Operation During Planned Spent Fuel Pool Rerack Mod
ML20057B343
Person / Time
Site: Beaver Valley
Issue date: 09/08/1993
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-REGGD-08.038, RTR-REGGD-8.038 TAC-M84673, NUDOCS 9309210220
Download: ML20057B343 (1)


Text

_

._m d

Beaver Vahey Power Station Shippingport, PA 15077-0004 JOHN D. SIEDER (412) 393-5255 j

Senior Vece President and Fax (412) 643-8069 CNet Nuclear Officer j

Nuclear Power Division September 8, 1993

)

U.

S. Nuclear Regulatory Commission i

Attn:

Document Control Desk

]

Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Clarification of Diving Operations Spent Fuel Pool Rerack (TAC No. M84673)

This letter will clarify the. Duquesne Light Company position concerning implementation of Appendix A

of Regulatory Guide 8.38, j

" Radiological Precautions During Diving Operation,

during our planned Spent Fuel Pool rerack modification.

The guidance provided in Appendix A of Regulatory Guide 8.38 will be included in our site specific procedure for controlling radiological diving operations with the exception of Item 6.

Item 6 requires the use of a calibrated dosimeter that'provides an alarm to the diver while underwater.

The alternate method for satisfying this function includes:

1) utilization of calibrated remote indicating

)

instrumentation; and 2) continuous communications between the i

individual monitoring the remote indication and the diver in the water.

During a conference call held on September 2, 1993, members of the NRC staff concurred with the Duquesne Light Company alternate position.

It should be noted that diving operations are not planned to support the rerack effort.

Diving operations represent contingency planning only.

If you have any questions regarding this response, please contact Mr. Steve Sovick at (412) 393-5211.

Sincerely,

! o. 'SW cc: Mr. L.

W.

Rossbach, Sr. Resident Inspector Mr.

T. T. Martin, NRC Region I Administrator Mr. G.

E.

Edison, Project Manager ELECTRK UT1UTYof THE YEAR 20016,-9309210220 930908 h

l{D PDR ADOCK 05000334 3

P PDR dii i

i